Loading...
HomeMy WebLinkAboutGROWTH LEASING COLORADO - BDR190008 - SUBMITTAL DOCUMENTS - ROUND 3 - CORRESPONDENCEFrom: Cody Snowdon To: matt@r4architects.com Cc: Danny Weber; "Chuck Polson"; torfanos@growthleasing.com; Jennifer Gardner; Brandy Bethurem Harras Subject: RE: Growth Leasing Date: Monday, June 17, 2019 5:07:00 PM Attachments: image011.png image002.png Matt- Thank you for your phone call today regarding the C-1 Form and One-Line Diagram. I was able to talk with a couple people from our group and we are okay with proceeding without a C-1 Form and One-Line Diagram, but wanted to point out some of the risks involved with moving forward. I want everyone to understand that if the C-1 Form and One-Line Diagram results in additional transformers to be placed on the site, it will require additional work and time to revise previously approved plans. Some of the rework that may be required, but not limited to are a revision to the Utility Plans, Landscape Plan and Site Plan requiring a formal Minor Amendment process, additional easement(s) dedicated by separated document, revision to the Right-of-Way Use Permit for WAPA, etc. As long as everyone accepts this risk, Light and Power is fine with resolving that requirement prior to mylars. Let me know if anyone has any questions or concerns. Thanks. Cody Snowdon, P.E. Electric Utility Project Manager Fort Collins Utilities 700 Wood St., PO Box 580 Fort Collins, CO 80522 (970) 416-2306 csnowdon@fcgov.com From: Danny Weber <danny@northernengineering.com> Sent: Monday, June 17, 2019 1:04 PM To: Cody Snowdon <csnowdon@fcgov.com> Subject: FW: Growth Leasing Cody, Matt Rankin should be reaching out to you about the C-1 form. Let me know if he doesn’t. Thanks, Danny Weber, PE Project Engineer NORTHERN ENGINEERING D: (970) 568-5418 | M: (970) 372-7809 From: Jennifer Gardner <JGardner@LOGANSIMPSON.COM> Sent: Monday, June 17, 2019 12:19 PM To: Matt Rankin <matt@r4architects.com>; Danny Weber <danny@northernengineering.com> Cc: Chuck Polson (chuck@apsinc.biz) <chuck@apsinc.biz>; Tom Orfanos (torfanos@growthleasing.com) <torfanos@growthleasing.com> Subject: RE: Growth Leasing Thank you for the explanation Matt. I completely understand. You will want to call Cody Snowdon with Light and Power. His number is 970-416-2306. Thank you! Jennifer From: Matt Rankin [mailto:matt@r4architects.com] Sent: Monday, June 17, 2019 11:57 AM To: Jennifer Gardner <JGardner@LOGANSIMPSON.COM>; Danny Weber <danny@northernengineering.com> Cc: Chuck Polson (chuck@apsinc.biz) <chuck@apsinc.biz>; Tom Orfanos (torfanos@growthleasing.com) <torfanos@growthleasing.com> Subject: RE: Growth Leasing Sorry Jennifer but we are too preliminary to speculate on the building mechanical and refrigeration loads at this point. This should not be atypical with the City. Chuck is our EE. A C-1 form is typically provided during the permit process. . . when design is done or at least further down the road where he can assess true loads and not guesswork. We feel it is irresponsible to guess at this form and find it weird that they are adamant. Tell me who to call if need be. Matt Matt Rankin R4 Architects, Inc 226 Remington, Suite 3 Fort Collins, CO 80524 P 970-224-0630 C 970-556-5874 From: Jennifer Gardner [mailto:JGardner@LOGANSIMPSON.COM] Sent: Monday, June 17, 2019 7:34 AM To: Matt Rankin <matt@r4architects.com>; Danny Weber <danny@northernengineering.com> Subject: RE: Growth Leasing I hear you but the City is insistent that we get them the form prior to signing off on the BDR submittal. Let me know how I can help. Thank you! Jennifer From: Matt Rankin [mailto:matt@r4architects.com] Sent: Saturday, June 15, 2019 9:09 AM To: Danny Weber <danny@northernengineering.com>; Jennifer Gardner <JGardner@LOGANSIMPSON.COM> Subject: RE: Growth Leasing That is one of the last things that the EE does. We have not even commenced design on this. . still waiting on them to provide equipment. Matt Rankin R4 Architects, Inc 226 Remington, Suite 3 Fort Collins, CO 80524 P 970-224-0630 C 970-556-5874 From: Danny Weber [mailto:danny@northernengineering.com] Sent: Friday, June 14, 2019 10:30 AM To: Matt Rankin <matt@r4architects.com>; Jennifer Gardner <JGardner@LOGANSIMPSON.COM> Subject: FW: Growth Leasing The City is bugging us to submit the electrical C-1 form. Any chance we can get this as soon as possible? Danny Weber, PE Project Engineer NORTHERN ENGINEERING D: (970) 568-5418 | M: (970) 372-7809 From: Cody Snowdon <csnowdon@fcgov.com> Sent: Friday, June 14, 2019 10:19 AM To: Danny Weber <danny@northernengineering.com> Cc: Brandy Bethurem Harras <BBethuremHarras@fcgov.com> Subject: RE: Growth Leasing Danny- Any word on the C-1 Form or the One-Line Diagram for this project? Attached is a blank copy of the C-1 form in case the owner didn’t get one online. Let me know if you have any questions or concerns. Thanks. Cody Snowdon, P.E. Electric Utility Project Manager Fort Collins Utilities 700 Wood St., PO Box 580 Fort Collins, CO 80522 (970) 416-2306 csnowdon@fcgov.com From: Danny Weber <danny@northernengineering.com> Sent: Thursday, June 6, 2019 11:25 AM To: Cody Snowdon <csnowdon@fcgov.com> Subject: Growth Leasing Cody, Here is the title commitment and previous plat for the Growth Leasing property. The transmission line easement appears to have been dedicated with the Evergreen Park plat and I don’t see any restrictions for the proposed electrical vault. Also, there are no dedications in the title for the irrigation ditch, none appear on the ALTA, or on the Evergreen Park plat from 1977. Thanks man! Danny Weber, PE Project Engineer 301 N. Howes Street, Suite 100 | Fort Collins, CO 80521 D: (970) 568-5418 | M: (970) 372-7809 www.northernengineering.com