HomeMy WebLinkAboutNORTHFIELD FILING 1 EXPANDED - FDP190012 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSSITE
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
PROPOSED STREET LIGHT
PROPOSED STORM SEWER
EXISTING SANITARY SEWER MAIN
PROPOSED TELEPHONE LINE
EXISTING GAS
EXISTING STORM SEWER
EXISTING WATER MAIN
EXISTING MANHOLE
PROPOSED STORM INLET
LEGEND
PROPOSED CONCRETE
PROPOSED MINOR CONTOUR
EXISTING SPOT ELEVATION PROPOSED SPOT ELEVATION
PROPOSED MAJOR CONTOUR
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
EXISTING UTILITY POLE
EXISTING GUY WIRE
PROPOSED GAS
EXISTING ELECTRIC LINE PROPOSED ELECTRIC LINE
EXISTING TELEPHONE LINE
EXISTING FIRE HYDRANT PROPOSED FIRE HYDRANT
EXISTING WATER VALVE
PROPOSED SANITARY SEWER MAIN
PROPOSED WATER MAIN
EXISTING CONCRETE
EXISTING FLOWLINE, CURB & GUTTER PROPOSED FLOWLINE, CURB & GUTTER
PROPOSED FENCE
LIMITS OF CONSTRUCTION
EXISTING OVERHEAD UTILITY
EXISTING STORM SEWER INLET
PROPOSED WATER VALVE
PROPOSED MANHOLE
PROPOSED UTILITY POLE
EXISTING STREET LIGHT
PROPOSED SWALE
PROPOSED DIRECTION OF OVERLAND FLOW
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
CITY OF FORT COLLINS GENERAL NOTES
1. ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS AND
SPECIFICATIONS SET FORTH IN THE LARIMER COUNTY URBAN AREA STREET STANDARDS AND APPLICABLE STATE AND FEDERAL REGULATIONS.
WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE MOST RESTRICTIVE
STANDARD SHALL APPLY. ALL WORK SHALL BE INSPECTED AND APPROVED BY THE LOCAL ENTITY.
2. ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESS SPECIFICALLY STATED
OTHERWISE.
3. THESE PUBLIC IMPROVEMENT CONSTRUCTION PLANS SHALL BE VALID FOR A PERIOD OF THREE YEARS FROM THE DATE OF APPROVAL BY THE
LOCAL ENTITY ENGINEER. USE OF THESE PLANS AFTER THE EXPIRATION DATE WILL REQUIRE A NEW REVIEW AND APPROVAL PROCESS BY THE
LOCAL ENTITY PRIOR TO COMMENCEMENT OF ANY WORK SHOWN IN THESE PLANS.
4. THE ENGINEER WHO HAS PREPARED THESE PLANS, BY EXECUTION AND/OR SEAL HEREOF, DOES HEREBY AFFIRM RESPONSIBILITY TO THE LOCAL
ENTITY, AS BENEFICIARY OF SAID ENGINEER'S WORK, FOR ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS, AND APPROVAL OF
THESE PLANS BY THE LOCAL ENTITY ENGINEER SHALL NOT RELIEVE THE ENGINEER WHO HAS PREPARED THESE PLANS OF ALL SUCH
RESPONSIBILITY. FURTHER, TO THE EXTENT PERMITTED BY LAW, THE ENGINEER HEREBY AGREES TO HOLD HARMLESS AND INDEMNIFY THE LOCAL
ENTITY, AND ITS OFFICERS AND EMPLOYEES, FROM AND AGAINST ALL LIABILITIES, CLAIMS, AND DEMANDS WHICH MAY ARISE FROM ANY
ERRORS AND OMISSIONS CONTAINED IN THESE PLANS.
5. ALL SANITARY SEWER, STORM SEWER, AND WATER LINE CONSTRUCTION, AS WELL AS POWER AND OTHER "DRY" UTILITY INSTALLATIONS, SHALL
CONFORM TO THE LOCAL ENTITY STANDARDS AND SPECIFICATIONS CURRENT AT THE DATE OF APPROVAL OF THE PLANS BY THE LOCAL
ENTITY ENGINEER.
6. THE TYPE, SIZE, LOCATION AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THE DRAWINGS. IT
SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE
ROUTE OF THE WORK BEFORE COMMENCING NEW CONSTRUCTION. THE DEVELOPER SHALL BE RESPONSIBLE FOR UNKNOWN UNDERGROUND
UTILITIES.
7. THE CONTRACTOR SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) AT 1-800-922-1987, AT LEAST 2 WORKING
DAYS PRIOR TO BEGINNING EXCAVATION OR GRADING, TO HAVE ALL REGISTERED UTILITY LOCATIONS MARKED. OTHER UNREGISTERED UTILITY
ENTITIES (I.E. DITCH / IRRIGATION COMPANY) ARE TO BE LOCATED BY CONTACTING THE RESPECTIVE REPRESENTATIVE. UTILITY SERVICE
LATERALS ARE ALSO TO BE LOCATED PRIOR TO BEGINNING EXCAVATION OR GRADING. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER
TO RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.
8. THE DEVELOPER SHALL BE RESPONSIBLE FOR PROTECTING ALL UTILITIES DURING CONSTRUCTION AND FOR COORDINATING WITH THE
APPROPRIATE UTILITY COMPANY FOR ANY UTILITY CROSSINGS REQUIRED.
9. IF A CONFLICT EXISTS BETWEEN EXISTING AND PROPOSED UTILITIES AND/OR A DESIGN MODIFICATION IS REQUIRED, THE DEVELOPER SHALL
COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN. DESIGN MODIFICATION(S) MUST BE APPROVED BY THE LOCAL ENTITY PRIOR TO
BEGINNING CONSTRUCTION.
10. THE DEVELOPER SHALL COORDINATE AND COOPERATE WITH THE LOCAL ENTITY, AND ALL UTILITY COMPANIES INVOLVED, TO ASSURE THAT
THE WORK IS ACCOMPLISHED IN A TIMELY FASHION AND WITH A MINIMUM DISRUPTION OF SERVICE. THE DEVELOPER SHALL BE RESPONSIBLE
FOR CONTACTING, IN ADVANCE, ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE AS WELL AS THE UTILITY COMPANIES.
11. NO WORK MAY COMMENCE WITHIN ANY PUBLIC STORM WATER, SANITARY SEWER OR POTABLE WATER SYSTEM UNTIL THE DEVELOPER
NOTIFIES THE UTILITY PROVIDER. NOTIFICATION SHALL BE A MINIMUM OF 2 WORKING DAYS PRIOR TO COMMENCEMENT OF ANY WORK. AT
Snyder, Richard F
Rec. No. 94087345
MATCHLINE
SEE SHEET 5
MATCHLINE
SEE SHEET 4
LAKE CANAL
SNYDER, RICHARD F
SCHLAGEL, DONALD E
/CHERYL D
SCHLAGEL, LEONARD L
/JUNE S
UNTERBERGER,
LORIN
Graham, John
C/Ginger L
N. LEMAY AVENUE
KEY MAP
NTS
N
W E
S
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
NOTES:
1. ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN DETERMINED FROM A COMBINATION OF RECORD DRAWINGS,
SURVEYED FIELD MARK-OUTS AND PHYSICAL OBSERVATIONS PROVIDED BY OTHERS. THERE MAY BE OTHER UTILITIES
NOT SHOWN ON THE DRAWINGS WHICH PRESENTLY EXIST IN THE AREA OF CONSTRUCTION. THEREFORE, THE
CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES IN THE PROJECT VICINITY PRIOR TO
BEGINNING WORK. THE CONTRACTOR SHALL COORDINATE AND PROVIDE PROTECTION OF CONFLICTING UTILITIES.
NOTIFY OWNER/ENGINEER IF ANY CONFLICTS ARE ENCOUNTERED. THE OWNER AND/OR ENGINEER ASSUMES NO
RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS SHOWN.
2. COORDINATE DEMOLITION REQUIREMENTS, LIMITS OF DEMOLITION, SALVAGE ITEMS, PROTECTION OF ITEMS TO
REMAIN, TREES, FENCING, ETC. WITH OWNER, ARCHITECT, AND RELEVANT CONSTRUCTION AND/OR PHASING
PLANS. ADDITIONAL DEMOLITION OF PAVING, TREES, UTILITIES, STRUCTURES, ETC. TO BE PERFORMED AS REQUIRED.
3. ALL EXISTING UTILITIES TO REMAIN SHALL BE ADJUSTED TO FINAL GRADE.
Snyder, Richard F
Tract A, Redwood Village
PUD Phase II
Book R-34, Page 1276
Rocky Mountain Raptor Program
Rec. No. 20050047008
REDWOOD STREET
LAKE CANAL
DRY CREEK
MATCHLINE
SEE SHEET 3
MATCHLINE
SEE SHEET 5
SNYDER, RICHARD F
TRACT A, REDWOOD
VILLAGE PUD PHASE II
ROCKY MOUNTAIN
RAPTOR PROGRAM
SNYDER, RICHARD F
KEY MAP
NTS
N
W E
S
NOTES:
1. ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN DETERMINED FROM A COMBINATION OF RECORD DRAWINGS, SURVEYED FIELD
MARK-OUTS AND PHYSICAL OBSERVATIONS PROVIDED BY OTHERS. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THE DRAWINGS WHICH
PRESENTLY EXIST IN THE AREA OF CONSTRUCTION. THEREFORE, THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING
UTILITIES IN THE PROJECT VICINITY PRIOR TO BEGINNING WORK. THE CONTRACTOR SHALL COORDINATE AND PROVIDE PROTECTION OF
CONFLICTING UTILITIES. NOTIFY OWNER/ENGINEER IF ANY CONFLICTS ARE ENCOUNTERED. THE OWNER AND/OR ENGINEER ASSUMES NO
RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS SHOWN.
2. COORDINATE DEMOLITION REQUIREMENTS, LIMITS OF DEMOLITION, SALVAGE ITEMS, PROTECTION OF ITEMS TO REMAIN, TREES, FENCING, ETC.
WITH OWNER, ARCHITECT, AND RELEVANT CONSTRUCTION AND/OR PHASING PLANS. ADDITIONAL DEMOLITION OF PAVING, TREES, UTILITIES,
STRUCTURES, ETC. TO BE PERFORMED AS REQUIRED.
3. ALL EXISTING UTILITIES TO REMAIN SHALL BE ADJUSTED TO FINAL GRADE.
4. CONTRACTOR RESPONSIBLE FOR ALL SURFACE REPAIR/REPLACEMENT TO RESTORE SIDEWALKS, PAVEMENT, CURB/GUTTER AND SOD AREAS
DISTURBED BY NEW WORK. REPAIR/REPLACEMENTS SHALL BE COMPLETED PER CITY OF FORT COLLINS STANDARDS AT CONTRACTOR EXPENSE.
5. EXISTING CONCRETE AND ASPHALT PAVING SHALL BE SAWCUT AND REMOVED PRIOR TO EXCAVATION. REMOVE CONCRETE TO THE NEAREST
JOINT.
6. CONTRACTOR TO PROVIDE ALL NECESSARY EROSION CONTROL MEASURES DURING CONSTRUCTION. PLACE EROSION CONTROL
PROTECTION AT ALL PROPOSED AND EXISTING INLETS DOWNSTREAM FROM CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL
REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED.
7. LIMITS OF STREET CUTS, ASPHALT, AND CONCRETE REMOVALS ARE APPROXIMATE. LIMITS OF REMOVAL TO BE DETERMINED IN THE FIELD TO
ADEQUATELY COMPLETE THE PROPOSED IMPROVEMENTS, WHILE MAINTAINING, IF NOT IMPROVING, EXISTING CONDITIONS. ADDITIONAL
REMOVAL IDENTIFIED IN THE FIELD SHALL BE COMPLETED AT CONTRACTOR EXPENSE. ALL REPAIRS TO BE COMPLETED IN ACCORDANCE WITH
CITY STREET REPAIRS STANDARDS.
8. REFER TO LANDSCAPE TREE MITIGATION PLAN (IF APPLICABLE) FOR TREE REMOVAL, RELOCATION AND PROTECTION. TREE REMOVAL
INFORMATION SHOWN FOR COORDINATION PURPOSES ONLY.
9. REFERENCE LANDSCAPE PLANS FOR ADDITIONAL SITE DEMOLITION.
10. ALL UTILITIES TO BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED.
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
Swartz, David A,
Milcan, Susan Marie
Lot 29
Arreola,
Manuel L
Lot 30 Cusack, Joan E
Lot 37
Emmerich, Karla J
Lot 41
Tallent, Charles G / Tami A
Rec. No. 20160023939
Bazoin-Lappartient, Andrea
Marie, Gregory C
Lot 40
Mondragon, Lucy V /
Christina M, Lot 28
Alta Vista Subdivision
Book A-2, Page 108
N. LEMAY AVENUE
MATCHLINE
SEE SHEET 3
MATCHLINE
SEE SHEET 4
SWARTZ, DAVID A,
MILCAN, SUSAN MARIE
LOT 29
ARREOLA, MANUEL L
LOT 30
CUSACK, JOAN E
LOT 37
EMMERICH, KARLA J
LOT 41
Tallent, Charles G / Tami A
BAZOIN-LAPPARTIENT,
ANDREA MARIE, GREGORY C
LOT 40
MONDRAGON, LUCY
V / CHRISTINA M,
LOT 28
ALTA VISTA
SUBDIVISION
Graham, John
C/Ginger L
Kederike Lemay, LLC
ROCKY MOUNTAIN
RAPTOR PROGRAM
ALTA VISTA STREET
MARTINEZ STREET
MATCHLINE
SEE SHEET 6
KEY MAP
NTS
N
W E
S
NOTES:
1. ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN DETERMINED FROM A COMBINATION OF RECORD
DRAWINGS, SURVEYED FIELD MARK-OUTS AND PHYSICAL OBSERVATIONS PROVIDED BY OTHERS. THERE MAY BE
OTHER UTILITIES NOT SHOWN ON THE DRAWINGS WHICH PRESENTLY EXIST IN THE AREA OF CONSTRUCTION.
THEREFORE, THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES IN THE PROJECT
Tallent, Charles G / Tami A
Rec. No. 20160023939
MAIN
STREET
MATCHLINE
SEE SHEET 5
ROCKY MOUNTAIN
RAPTOR PROGRAM
ALTA VISTA
SUBDIVISION
N. LEMAY AVENUE
E. VINE DRIVE
ALTA VISTA STREET
E. VINE DRIVE
NOTES:
1. ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN DETERMINED FROM A COMBINATION OF RECORD
DRAWINGS, SURVEYED FIELD MARK-OUTS AND PHYSICAL OBSERVATIONS PROVIDED BY OTHERS. THERE MAY BE
OTHER UTILITIES NOT SHOWN ON THE DRAWINGS WHICH PRESENTLY EXIST IN THE AREA OF CONSTRUCTION.
THEREFORE, THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES IN THE PROJECT
VICINITY PRIOR TO BEGINNING WORK. THE CONTRACTOR SHALL COORDINATE AND PROVIDE PROTECTION OF
CONFLICTING UTILITIES. NOTIFY OWNER/ENGINEER IF ANY CONFLICTS ARE ENCOUNTERED. THE OWNER
AND/OR ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS SHOWN.
2. COORDINATE DEMOLITION REQUIREMENTS, LIMITS OF DEMOLITION, SALVAGE ITEMS, PROTECTION OF ITEMS TO
REMAIN, TREES, FENCING, ETC. WITH OWNER, ARCHITECT, AND RELEVANT CONSTRUCTION AND/OR PHASING
PLANS. ADDITIONAL DEMOLITION OF PAVING, TREES, UTILITIES, STRUCTURES, ETC. TO BE PERFORMED AS
REQUIRED.
3. ALL EXISTING UTILITIES TO REMAIN SHALL BE ADJUSTED TO FINAL GRADE.
4. CONTRACTOR RESPONSIBLE FOR ALL SURFACE REPAIR/REPLACEMENT TO RESTORE SIDEWALKS, PAVEMENT,
CURB/GUTTER AND SOD AREAS DISTURBED BY NEW WORK. REPAIR/REPLACEMENTS SHALL BE COMPLETED PER
CITY OF FORT COLLINS STANDARDS AT CONTRACTOR EXPENSE.
5. EXISTING CONCRETE AND ASPHALT PAVING SHALL BE SAWCUT AND REMOVED PRIOR TO EXCAVATION.
REMOVE CONCRETE TO THE NEAREST JOINT.
6. CONTRACTOR TO PROVIDE ALL NECESSARY EROSION CONTROL MEASURES DURING CONSTRUCTION. PLACE
EROSION CONTROL PROTECTION AT ALL PROPOSED AND EXISTING INLETS DOWNSTREAM FROM
CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS
COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED.
7. LIMITS OF STREET CUTS, ASPHALT, AND CONCRETE REMOVALS ARE APPROXIMATE. LIMITS OF REMOVAL TO BE
DETERMINED IN THE FIELD TO ADEQUATELY COMPLETE THE PROPOSED IMPROVEMENTS, WHILE MAINTAINING,
IF NOT IMPROVING, EXISTING CONDITIONS. ADDITIONAL REMOVAL IDENTIFIED IN THE FIELD SHALL BE
COMPLETED AT CONTRACTOR EXPENSE. ALL REPAIRS TO BE COMPLETED IN ACCORDANCE WITH CITY STREET
REPAIRS STANDARDS.
8. REFER TO LANDSCAPE TREE MITIGATION PLAN (IF APPLICABLE) FOR TREE REMOVAL, RELOCATION AND
PROTECTION. TREE REMOVAL INFORMATION SHOWN FOR COORDINATION PURPOSES ONLY.
9. REFERENCE LANDSCAPE PLANS FOR ADDITIONAL SITE DEMOLITION.
10. ALL UTILITIES TO BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED.
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
LAKE CANAL DITCH
MATCHLINE
SEE SHEET 8
N. LEMAY AVENUE
COLLAMER DRIVE
PIONEER TRAIL ROAD
SCHLAGEL STREET
Block 2 Block 1
Block 3
Block 7 Block 6
Block 5
Block 8
Block 14
Block 22
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
ONLY
ONLY
ONLY
LAKE CANAL DITCH
MATCHLINE
SEE SHEET 7
SCHLAGEL STREET
E. SUNIGA ROAD
REDWOOD STREET
MATCHLINE
SEE SHEET 9
Block 21
Lot 1
Tract S
(Drainage, Utility, &
Private Access
Easement)
Tract N
(Drainage, Utility, &
Private Access Easement)
Tract U
(Drainage, Utility, &
Private Access
Easement)
Tract T
(Drainage, Utility, &
Private Access
Easement)
Tract V
(Drainage, Utility,
& Private Access
Easement)
STEELEY DRIVE
Lot 1
Lot 2
Lot 3
Lot 4
Block 20
Bldg 2b
Bldg 1b
Bldg 14a
Bldg 2a Bldg 4a
Bldg 3a
Bldg 5a
Bldg 1a
Bldg 6a
Bldg 7a
Bldg 8a
Bldg 9a
Bldg 1d
Drive 'J' Drive 'J'
Drive 'F'
STEELEY DRIVE
DRY CREEK
SNYDER, RICHARD F
TRACT A, REDWOOD
VILLAGE PUD PHASE II
ROCKY MOUNTAIN
RAPTOR PROGRAM
SNYDER, RICHARD F
ONLY
ONLY
ONLY
MATCHLINE
SEE SHEET 7
N. LEMAY AVENUE
E. SUNIGA ROAD
LANDMARK WAY
MATCHLINE
SEE SHEET 8
RAIN
GARDEN
Tract W
(Drainage, Utility, &
Private Access Easement)
Tract T
(Drainage, Utility, &
Private Access
Easement)
Tract H
(Drainage, Utility, &
Private Access
Easement)
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 20
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Block 16
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 17
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 15
Lot 1
Lot 2
Lot 3
Lot 4
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
LINE AND CURVE TABLES
6/26/19
1" = 50'
N/A
KRB
JTC
18-1000-00
----
10 95
LAKE CANAL
DITCH
DRY CREEK
LAKE CANAL
DITCH
N. LEMAY AVENUE
COLLAMER DRIVE
PIONEER TRAIL ROAD
LANDMARK WAY
N. LEMAY AVENUE
SCHLAGEL STREET
STEELEY DRIVE
Pond B3
Pond A2
Pond B1 Pond A1
Pond D
Pond C
Pond B2
BASIN COEFFICIENT (100-YR)
BASIN DESIGNATION
BASIN AREA
DESIGN POINT
DRAINAGE FLOW ARROW
DRAINAGE BASIN BOUNDARY
DRAINAGE BASIN FLOW PATH
LEGEND
EX MAJOR CONTOUR
EX MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
0
100'
100 50 100 200
SCALE: 1" =
N
W E
S
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
CALL UTILITY NOTIFICATION
AE
AG
AH
AG
AE
AH
AF
LAKE CANAL DITCH
FUTURE LEMAY AVENUE
MATCHLINE
SEE SHEET 14
MATCHLINE
SEE SHEET 13
N. LEMAY AVENUE
COLLAMER DRIVE
PIONEER TRAIL ROAD
LANDMARK
WAY
Tract F
(Drainage,
Utility, & Private
Access
Easement)
Tract A
(Drainage, Utility, &
Private Access
Easement)
SCHLAGEL STREET
4956.38 FEET
4956.38 FEET STA: 139+11
STA: 139+11
4954.08 FEET
STA:
127+80
4954.08 FEET
STA:
127+80
4952.98 FEET
STA:
122+37
4951.84 FEET
STA: 118+01
4951.84 FEET
STA:
118+01
Block 2 Block 1
Block 3
Block 7 Block 6
Block 5
Block 8
Block 14
Block 22
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
AH
AI
AI
AJ
AJ
AK
AI
AH
LAKE CANAL DITCH
DRY CREEK
E. SUNIGA ROAD
MATCHLINE
SEE SHEET 12
MATCHLINE
SEE SHEET 14
STEELEY DRIVE
REDWOOD STREET
Tract S
(Drainage, Utility, &
Private Access
Easement)
Tract N
(Drainage, Utility, &
Private Access
Easement)
Tract U
(Drainage, Utility,
& Private Access
Easement)
4956.38 FEET
STA: 139+11
4960.48 FEET
STA: 144+91
4960.48 FEET
STA: 144+91
4960.77 FEET
STA: 147+32
4961.25 FEET
STA: 149+48
4956.38 FEET
STA: 139+11
A
A
B
B
Block 21
Lot 1
Lot 1
Lot 2
Lot 3
Lot 4
Block 20
STEELEY DRIVE
Pond C
Pond B1
Tract T
(Drainage, Utility,
& Private Access
Easement)
KEY MAP
AE
AF
AG
E. SUNIGA ROAD
MATCHLINE
SEE SHEET 12
MATCHLINE
SEE SHEET 13
LANDMARK WAY
N. LEMAY AVENUE
RAIN
GARDEN
Tract W
(Drainage, Utility, &
Private Access Easement)
Tract T
(Drainage, Utility,
& Private Access
Easement)
Tract H
(Drainage, Utility, &
Private Access
Easement)
Tract V
(Drainage, Utility, &
Private Access Easement)
4954.08 FEET
STA: 127+80
4952.98 FEET
STA:
122+37
4951.84 FEET
STA:
118+01
FUTURE
SUNIGA
ROAD
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 20
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Block 16
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
KEY MAP
NTS
N
W E
S
MATCHLINE - SEE SHEET 18
MATCHLINE - SEE SHEET 16
N. LEMAY AVENUE
(80' ROW)
PIONEER TRAIL ROAD
(57' ROW)
SCHLAGEL STREET
(57' ROW)
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 1
Block 10
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
KEY MAP
NTS
N
W E
S
LAKE CANAL DITCH
MATCHLINE - SEE SHEET 15
Tract A
(Drainage, Utility, &
Private Access
Easement)
SCHLAGEL STREET
(57' ROW)
MATCHLINE - SEE SHEET 17
COLLAMER DRIVE
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 10
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Bldg 12d
Bldg 17a
Bldg 5b
Bldg 4b
Block 6, Bldg 11d
Bldg 2c
Block 7, Bldg 9d
Block 9, Bldg 10d
Bldg 3b
Bldg 16a
Tract E
(D,U,&PAE)
Tract I
(D,U,&PAE)
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
KEY MAP
NTS
N
W E
S
LANDMARK WAY
(86' ROW)
MATCHLINE - SEE SHEET 18
MATCHLINE - SEE SHEET 22
MATCHLINE - SEE SHEET 16
MATCHLINE - SEE SHEET 20
COLLAMER DRIVE
(57' ROW)
SCHLAGEL STREET
(57' ROW)
COLLAMER DRIVE
(57' ROW)
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Bldg 2c Bldg 3c Bldg 4c
Block 8, Bldg 8d
Bldg 15a
Bldg 2b
Block 20, Bldg 1d Block 19, Bldg 2d Block 18, Bldg 2d
Bldg 5c
Bldg 1c
KEY MAP
NTS
N
W E
S
MATCHLINE - SEE SHEET 15
COLLAMER DRIVE
(57' ROW)
Tract F
(Drainage, Utility, &
Private Access Easement)
MATCHLINE - SEE SHEET 17
MATCHLINE - SEE SHEET 19
PIONEER TRAIL ROAD
(57' ROW)
N. LEMAY AVENUE
(80' ROW)
Block 22
Lot 1
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 4
Lot 5
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Bldg 6c
Bldg 7c
Bldg 8c
Bldg 9c
Bldg 12c Bldg 13c
Bldg 10c Bldg 11c
Bldg 2c
Block 17, Bldg 4d Block 16, Bldg 5d
Block 15, Bldg 6d
Bldg 5c
KEY MAP
NTS
N
W E
S
N. LEMAY AVENUE
(80' ROW)
FUTURE SUNIGA ROAD
MATCHLINE - SEE SHEET 20
MATCHLINE - SEE SHEET 18
E. SUNIGA ROAD
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 17, Bldg 4d Block 16, Bldg 5d
Block 15, Bldg 6d
Pond A1
Pond D
Pond D
Tract H
(D,U,&PAE)
Tract W
(D,U,&PAE)
Tract W
(D,U,&PAE)
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
KEY MAP
NTS
N
W E
S
E. SUNIGA ROAD
LANDMARK WAY
RAIN
GARDEN
MATCHLINE - SEE SHEET 19
MATCHLINE - SEE SHEET 21
MATCHLINE - SEE SHEET 17
Bldg 12a
Bldg 11a Bldg 13a
Bldg 10a
Bldg 9a
Bldg 8a
Pond
A1
Tract V
(D,U,&PAE)
Tract W
(D,U,&PAE)
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
KEY MAP
NTS
N
W E
S
E. SUNIGA ROAD
MATCHLINE - SEE SHEET 20
MATCHLINE - SEE SHEET 22
STEELEY DRIVE
(57' ROW)
STEELEY DRIVE
(57' ROW)
Bldg 7a
Bldg 6a
Bldg 5a
Bldg 2a Bldg 4a
Bldg 3a
Bldg 1a
Pond C Pond B1
Tract S
(D,U,&PAE)
Tract T
(D,U,&PAE)
Tract U
(D,U,&PAE)
Tract V
(D,U,&PAE)
Tract U
(D,U,&PAE)
0
30'
30 15 30 60
SCALE: 1" =
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
KEY MAP
NTS
N
W E
S
LAKE CANAL DITCH
STEELEY DRIVE
(57' ROW)
MATCHLINE - SEE SHEET 17
MATCHLINE - SEE SHEET 21
SCHLAGEL STREET
(57' ROW)
Block 21
Lot 1
Bldg 1b
Bldg 14a
Pond C
Tract S Pond B1
(Drainage, Utility, &
Private Access
Easement)
Tract N
(D,U,&PAE)
Tract T
(D,U,&PAE)
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
ONLY
ONLY
ONLY
ONLY
ONLY
ONLY
N. LEMAY AVENUE
E. SUNIGA ROAD
COLLAMER DRIVE
PIONEER TRAIL ROAD
SCHLAGEL STREET
LANDMARK WAY
REDWOOD STREET
STEELEY DRIVE
A
A
B
B
C
C
DRY CREEK
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
100'
100 50 100 200
SCALE: 1" =
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
SECTION A-A
SECTION B-B
SECTION C-C
LAKE CANAL DITCH
MATCHLINE
SEE SHEET 25
N. LEMAY AVENUE
COLLAMER DRIVE
PIONEER TRAIL ROAD
SCHLAGEL STREET
LANDMARK WAY
Block 2 Block 1
Block 3
Block 7 Block 6
Block 5
Block 8
Block 14
Block 9
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
ONLY
ONLY
ONLY
LAKE CANAL DITCH
MATCHLINE
SEE SHEET 24
SCHLAGEL STREET
E. SUNIGA ROAD
REDWOOD STREET
MATCHLINE
SEE SHEET 26
Block 21
Lot 1
STEELEY DRIVE
Lot 1
Lot 2
Lot 3
Lot 4
Block 20
Drive 'J'
Drive 'J'
Bldg 2b
Bldg 1b
Bldg 14a
Bldg 2a Bldg 4a
Bldg 3a
Bldg 5a
Bldg 1a
Bldg 6a
Bldg 7a
Bldg 8a
Bldg 9a
Bldg 1d
DRY CREEK
SNYDER, RICHARD F
TRACT A, REDWOOD
VILLAGE PUD PHASE II
ROCKY MOUNTAIN
RAPTOR PROGRAM
SNYDER, RICHARD F
Tract S
(Drainage, Utility, &
Private Access
Easement)
Tract N
(Drainage, Utility,
& Private
Access Easement)
Tract U
(Drainage, Utility, &
Private Access
Easement)
Tract T
(Drainage, Utility, &
Private Access
Easement)
Tract V
(Drainage, Utility,
& Private Access
Easement)
ONLY
ONLY
ONLY
MATCHLINE
SEE SHEET 24
N. LEMAY AVENUE
E. SUNIGA ROAD
LANDMARK WAY
MATCHLINE
SEE SHEET 25
RAIN
GARDEN
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 20
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Block 16
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 17
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 15
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 18
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Block 19
N. LEMAY AVENUE
E. SUNIGA ROAD
COLLAMER DRIVE
PIONEER TRAIL ROAD
SCHLAGEL STREET
LANDMARK WAY
REDWOOD STREET
STEELEY DRIVE
E. VINE DRIVE
Alta Vista
Subdivision
MAIN STREET
ALTA VISTA STREET
MARTINEZ STREET
N. LEMAY AVENUE
FUTURE LEMAY AVE
0
150'
150 75 150 300
SCALE: 1" =
N
W E
S
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STORM & SANITARY SEWER
OVERALL PLAN
6/26/19
1" = 150'
N/A
KRB
JTC
18-1000-00
----
## 95
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
E. SUNIGA ROAD
MATCHLINE
SEE SHEET
29
Bldg 12a
Bldg 13a
VINE DRIVE
Tract V
(Drainage, Utility, &
Private Access
Easement)
KEY MAP
NTS
N
W E
S
OFFSITE SANITARY SEWER
EX SSWR PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50
MATCHLINE STA 21+50
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
ONLY
ONLY
MATCHLINE
SEE SHEET 28
E. SUNIGA ROAD
MATCHLINE
SEE SHEET 30
E. SUNIGA ROAD
E. SUNIGA ROAD
N. LEMAY AVENUE
Tract W
(Drainage, Utility,
& Private Access
Easement)
Tract W
(Drainage, Utility,
& Private Access
Easement)
EX SSWR PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50 31+00 31+50 32+00 32+50
MATCHLINE STA 21+50
MATCHLINE STA 32+50
KEY MAP
NTS
N
W E
S
OFFSITE SANITARY SEWER
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
MATCHLINE
SEE SHEET
29
MATCHLINE
SEE SHEET
31
E. SUNIGA ROAD
N. LEMAY AVENUE
Drive 'E'
Bldg 9c
Bldg 13c Bldg 15c
Drive 'E'
Tract 3
(D, U, & PAE)
Tract H
(Drainage, Utility, &
Private Access
Easement)
Tract 3
(D, U, & PAE)
Tract W
(Drainage, Utility,
& Private Access
Easement)
EX SSWR PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4940
4945
4950
4955
4960
4965
4970
4940
4945
4950
4955
4960
4965
4970
32+50 33+00 33+50 34+00 34+50 35+00 35+50 36+00 36+50 37+00 37+50 38+00 38+50 39+00 39+50 40+00 40+50 41+00 41+50 42+00 42+50 43+00 43+50
MATCHLINE STA 32+50
MATCHLINE STA 43+50
KEY MAP
NTS
N
W E
S
OFFSITE SANITARY SEWER
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
MATCHLINE
SEE SHEET
30
N. LEMAY AVENUE
SCHLAGEL STREET
Block 1
Block 3
Lot 6
Lot 7
Lot 8
Lot 6
Lot 7
Lot 8
Bldg 20d
Bldg 18d
Lot 3 Lot 4
Lot 4
Drive 'A'
Drive 'B'
Lot 5
Lot 5
FUTURE LEMAY AVENUE
Tract A
(Drainage, Utility, &
Private Access
Easement)
EX SSWR PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
43+50 44+00 44+50 45+00 45+50 46+00 46+50 47+00 47+50
MATCHLINE STA 43+50
KEY MAP
NTS
N
W E
S
OFFSITE SANITARY SEWER
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
STEELEY DRIVE
Drive 'J'
Drive 'J'
Bldg 2a Bldg 4a
Bldg 3a
Bldg 5a
Bldg 1a
Bldg 6a
Bldg 7a
Bldg 10a
Bldg 11a
Bldg 8a
Bldg 9a
Bldg 12a
Bldg 13a
Tract U
(Drainage, Utility,
& Private Access
Easement)
Tract V
(Drainage, Utility,
& Private Access
Easement)
KEY MAP
NTS
N
W E
S
SAN-01
SAN-01 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
24+00 23+50 23+00 22+50 22+00 21+50 21+00 20+50 20+00 19+50 19+00 18+50 18+00 17+50 17+00 16+50 16+00 15+50 15+00 14+50 14+00 13+50 13+00 12+50 12+00 11+50 11+00 10+50 10+00 9+50
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
MATCHLINE
SEE SHEET 34
N. LEMAY AVENUE
LANDMARK WAY
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Block 16
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 17
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 15
Lot 5
Lot 6
Lot 7
Lot 8
Block 18
Drive 'F'
Bldg 3d Bldg 4d
Bldg 5d Bldg 6d
Bldg 4c Bldg 5c Bldg 6c
Bldg 8c
Bldg 9c
Bldg 7c
Block 18
Bldg 3d
Tract H
(Drainage,
Utility, & Private
Access
Easement)
Tract 3
(D, U, & PAE)
KEY MAP
NTS
N
W E
S
SAN-02
SAN-02 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
SCHLAGEL STREET
STEELEY DRIVE
MATCHLINE
SEE SHEET 33
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 20
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 18
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Block 19
Drive 'F'
Bldg 1b
Bldg 14a
Bldg 1d Bldg 2d Bldg 3d
Bldg 2c
Bldg 1c
Bldg 3c Bldg 4c
Tract N
(Drainage, Utility, &
Private Access Easement)
Tract T
(Drainage, Utility, &
Private Access
Easement)
Tract 5
(D, U, & PAE)
KEY MAP
NTS
N
W E
S
SAN-02
SAN-02 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
Drive 'E'
Bldg 8c
Bldg 9c
Drive 'F'
KEY MAP
NTS
N
W E
S
SAN-03
SAN-04
SAN-05
SAN-04 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
11+50 11+00 10+50 10+00 9+50
SAN-03 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
11+50 11+00 10+50 10+00 9+50
Drive 'I'
Bldg 5c
Bldg 6c
Drive 'F'
SAN-05 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Block 19
Drive 'F'
Drive 'G'
Bldg 2d
Bldg 2c
Bldg 1c
Bldg 1c
KEY MAP
NTS
N
W E
S
SAN-06
SAN-07
SAN-07 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4950
4955
4960
4965
4970
4975
4950
4955
4960
4965
4970
4975
12+50 12+00 11+50 11+00 10+50 10+00 9+50
SAN-06 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4950
4955
4960
4965
4970
4975
4950
4955
4960
4965
4970
4975
11+50 11+00 10+50 10+00 9+50
SCHLAGEL STREET
Bldg 1c
Bldg 2b Bldg 1b
Bldg 14a
Drive 'F'
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
SCHLAGEL STREET
N. LEMAY AVENUE
LANDMARK WAY
COLLAMER DRIVE
Block 8
Block 14
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Bldg 15a
Bldg 7d Bldg 12c
Bldg 8d
COLLAMER DRIVE
Bldg 9c
Bldg 13c
Tract F
(Drainage, Utility, &
Private Access
Easement)
Easement)
Tract O
(Drainage, Utility, &
Private Access
Easement)
Tract R
(Drainage, Utility, &
Private Access
Easement)
Tract M (D, U, & PAE)
Tract K
(D, U, & PAE)
Tract L (D, U, & PAE)
KEY MAP
NTS
N
W E
S
SAN-08
SAN-08 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
COLLAMER DRIVE
PIONEER TRAIL ROAD
Block 14
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 13
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Drive D'
Drive 'C'
Bldg 10c
Bldg 11c
Bldg 7d
Bldg 17d
Lot 1
KEY MAP
NTS
N
W E
S
SAN-09
SAN-10
SAN-10 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
11+50 11+00 10+50 10+00 9+50
SAN-09 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
N. LEMAY AVENUE
Drive 'E'
Bldg 12c
Bldg 13c
Bldg 14c
Bldg 15c
KEY MAP
NTS
N
W E
S
SAN-11
SAN-12
SAN-12 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
12+00 11+50 11+00 10+50 10+00 9+50
SAN-11 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00
N. LEMAY AVENUE
Drive 'E'
Bldg 12c
Bldg 13c
Bldg 14c
Bldg 15c
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
N. LEMAY AVENUE
PIONEER TRAIL ROAD
SCHLAGEL STREET
Block 2 Block 1
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Drive 'A' Drive 'A'
Bldg 19d Bldg 20d
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
MATCHLINE
SEE SHEET
41
KEY MAP
NTS
N
W E
S
SAN-13
SAN-13 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
15+50 15+00 14+50 14+00 13+50 13+00 12+50 12+00 11+50 11+00 10+50 10+00 9+50
MATCHLINE STA 15+50
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
MATCHLINE
SEE SHEET
40
SCHLAGEL STREET
Block 2
Drive 'A'
Bldg 3b Bldg 4b Bldg 5b
Bldg 17a
Bldg 19d
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
KEY MAP
NTS
N
W E
S
SAN-13
SAN-13 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
21+50 21+00 20+50 20+00 19+50 19+00 18+50 18+00 17+50 17+00 16+50 16+00 15+50
MATCHLINE STA 15+50
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
MATCHLINE
SEE THIS SHEET
PIONEER TRAIL ROAD
SCHLAGEL STREET
Block 6
Block 5
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 1
Lot 2
Lot 3
Block 4
Block 11
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 1
Block 12
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Drive 'B'
Bldg 17a
Bldg 15d
Bldg 16d
Bldg 11d
Bldg 13d
Bldg 14d
Block 11
Bldg 14d
Block 5
Bldg 13d
Lot 1
Lot 8
KEY MAP
NTS
N
W E
S
SAN-14
SAN-14 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
ONLY
ONLY
ONLY
E. SUNIGA ROAD
E. SUNIGA ROAD
STEELEY DRIVE
Drive 'J' Drive 'J'
Bldg 4a
Bldg 5a
Bldg 6a
Bldg 7a
Bldg 10a
Bldg 11a
Bldg 8a
Bldg 9a
Bldg 12a
Bldg 13a
RAIN
GARDEN
Pond D
Tract W
(Drainage, Utility, &
Private Access
Easement)
Tract U
(Drainage, Utility, &
Private Access
Easement)
Tract V
(Drainage, Utility, & Private Access Easement)
KEY MAP
NTS
N
W E
S
SD-01
SD-01 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
22+00 21+50 21+00 20+50 20+00 19+50 19+00 18+50 18+00 17+50 17+00 16+50 16+00 15+50 15+00 14+50 14+00 13+50 13+00 12+50 12+00 11+50 11+00 10+50 10+00 9+50
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
E. SUNIGA ROAD
STEELEY DRIVE
Drive 'J'
Bldg 6a
Bldg 7a
Tract U
(Drainage, Utility, &
Private Access
Easement)
Tract V
(Drainage, Utility, &
Private Access
Easement)
KEY MAP
NTS
N
W E
S
SD-02
SD-03
SD-03 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
9+50 10+00 10+50 11+00 11+50 12+00
SD-02 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4940
4945
4950
4955
4960
4965
4940
4945
4950
4955
4960
4965
9+50 10+00 10+50 11+00 11+50 12+00
N. LEMAY AVENUE
E. SUNIGA ROAD
Pond A1
Tract H
(Drainage, Utility, &
Private Access Easement)
CHECKED BY:
Date
E. SUNIGA ROAD
N. LEMAY AVENUE
Bldg 9c Bldg 13c Lot 8
FUTURE LEMAY AVENUE
Bldg 15c
N. LEMAY AVENUE
SCHLAGEL STREET
Tract H
(Drainage, Utility, &
Private Access
Easement)
Tract A
(Drainage, Utility, &
Private Access
Easement)
Tract H
(Drainage, Utility,
& Private Access
Easement)
KEY MAP
NTS
N
W E
S
SD-04
SD-04 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4940
4945
4950
4955
4960
4965
4970
4940
4945
4950
4955
4960
4965
4970
9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
PIONEER TRAIL ROAD
E. SUNIGA ROAD
Block 14
Lot 7
Lot 8
Block 13
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Block 16
Lot 7
Lot 8
Block 17
Drive 'F'
Drive D'
Bldg 5d Bldg 4d
Bldg 6c
Bldg 8c
Bldg 7c
Bldg 12c Bldg 14c
Bldg 11c
Bldg 7d Bldg 17d
Pond A2
Pond A1
Tract W
(Drainage,
Utility, &
Private
Access
Easement)
Tract H
(Drainage,
Utility, & Private
Access
Easement)
Tract R
(Drainage, Utility,
& Private Access
Easement) Tract J
(Drainage, Utility,
& Private Access
Easement)
Tract M (D, U, & PAE)
Tract Q
(Drainage,
Utility, & Private
Access
Easement)
Tract 3
(D, U, & PAE)
KEY MAP
NTS
N
W E
S
SD-05
SD-05 PROFILE
HORIZ. SCALE: 1"=50'
Drive 'F'
Bldg 8c
Bldg 7c
COLLAMER DRIVE
Drive 'E'
Pond
A2
Tract R
(Drainage,
Utility, &
Private
Access
Easement)
Tract M
KEY MAP
NTS
N
W E
S
SD-07
SD-06
SD-08
SD-06 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4940
4945
4950
4955
4960
4965
4940
4945
4950
4955
4960
4965
12+00 11+50 11+00 10+50 10+00 9+50
SD-07 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
11+00 10+50 10+00 9+50
SD-08 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
MATCHLINE
SEE SHEET
49
COLLAMER DRIVE
E. SUNIGA ROAD
LANDMARK WAY
Block 9
Lot 1
Block 9
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Block 17
Lot 8
Block 18
Drive 'F'
Bldg 3d
Bldg 4d
Bldg 4c
Bldg 5c
Bldg 10d
Lot 7
Lot 8
Pond B3
Pond A1
Pond B1
Tract H
(Drainage,
Utility, &
Private Access
Easement)
Tract P
(Drainage, Utility, &
Private Access
Easement)
Tract Q
(Drainage, Utility, &
Private Access
Easement)
Tract F
(Drainage,
Utility, & Private
Access
Easement)
KEY MAP
NTS
N
W E
S
SD-09 PROFILE
HORIZ. SCALE: 1"=50'
MATCHLINE
SEE SHEET
48
SCHLAGEL STREET
Block 5
Block 9
Lot 1
Lot 2
Lot 1
Lot 2
Lot 1
Block 4
Block 9
Block 10
Block 11
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Block 12
Block 13
Lot 1
Lot 2
Lot 1
Lot 2
Drive 'B'
Bldg 15d
Bldg 16d
Bldg 17d
Bldg 10d
Bldg 12d
Bldg 13d
Bldg 14d
Pond B3
Pond B3
Block 9
Lot 1
Tract F
(Drainage, Utility, &
Private Access
Easement)
Tract A
(Drainage, Utility,
& Private Access
Easement)
Tract 1
COLLAMER DRIVE
LANDMARK WAY
Block 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Block 9
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Bldg 2c Bldg 3c Bldg 4c
Bldg 8d
Bldg 10d
Pond B2
Pond B3
Tract O
(Drainage, Utility,
& Private Access
Easement)
Tract K
(D, U, & PAE)
KEY MAP
NTS
N
W E
S
SD-12
SD-10
SD-11
SD-10 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
15+50 15+00 14+50 14+00 13+50 13+00 12+50 12+00 11+50 11+00 10+50 10+00 9+50
SD-11 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
E. SUNIGA ROAD
LANDMARK WAY
Lot 5
Lot 6
Lot 7
Block 18
Bldg 3d
Lot 1
Lot 2
Lot 3
Block 17
Bldg 4d
Lot 8
Pond A1
Pond B1
Tract H
(Drainage, Utility, &
Private Access
Easement)
Tract T
(Drainage, Utility, &
Private Access
Easement)
KEY MAP
NTS
N
W E
S
SD-13
SD-14
SD-15
SD-15 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
11+50 11+00 10+50 10+00 9+50
SD-14 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
KEY MAP
NTS
N
W E
S
SD-16
SD-24
SD-23
SD-16 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4975
4945
4950
4955
4960
4965
4970
4975
9+50 10+00 10+50 11+00 11+50 12+00 12+50 12+75
Block 21
Lot 1
STEELEY DRIVE
SCHLAGEL STREET
LAKE CANAL DITCH
Pond C
Tract S
(Drainage, Utility, &
Private Access
Easement)
Tract N
(Drainage, Utility,
& Private Access
Easement)
ONLY
Bldg 1a
LAKE CANAL DITCH
Tract U
(Drainage, Utility, &
Private Access
Easement)
SD-24 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4975
4945
4950
4955
E. SUNIGA ROAD
N. LEMAY AVENUE
KEY MAP
NTS
N
W E
S
SD-19
SD-17
SD-18
SD-17 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4935
4940
4945
4950
4955
4960
4965
4935
4940
4945
4950
4955
4960
4965
13+00 12+50 12+00 11+50 11+00 10+50 10+00 9+50
SD-18 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4940
4945
4950
4955
4960
4965
4970
4940
4945
4950
4955
4960
4965
4970
9+50 10+00 10+50
SD-19 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4940
4945
4950
4955
4960
4965
4970
4940
4945
4950
4955
E. SUNIGA ROAD
Pond D
Tract W
(Drainage, Utility,
& Private Access
Easement)
KEY MAP
NTS
N
W E
S
SD-20
SD-22
SD-21
SD-20 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4940
4945
4950
4955
4960
4965
4970
4975
4940
4945
4950
4955
4960
4965
4970
4975
11+50 11+00 10+50 10+00 9+50
SD-21 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4975
4980
4945
4950
4955
4960
4965
4970
4975
4980
11+50 11+00 10+50 10+00 9+50
SD-22 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4940
4945
4950
KEY MAP
NTS
N
W E
S
SD-25
E. SUNIGA ROAD
LAKE CANAL DITCH
SD-25 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
12+50 12+00 11+50 11+00 10+50 10+00 9+50
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W
E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
KEY MAP
NTS
N
W E
S
E. SUNIGA ROAD
LANDMARK WAY
STEELEY DRIVE
Tract u
(Drainage, Utility, &
Private Access Easement)
Pond B1 West
E. SUNIGA ROAD
LANDMARK WAY
Tract W
(Drainage, Utility,
& Private
Access Easement)
N. LEMAY AVENUE
E. SUNIGA ROAD
Pond A1
Tract F
(Drainage, Utility, &
Private Access Easement)
COLLAMER DRIVE
Pond B3
COLLAMER DRIVE
Tract R
(Drainage, Utility, &
Private Access Easement)
Pond A2
Tract O
(Drainage, Utility, &
Private Access Easement)
SCHLAGEL STREET
COLLAMER DRIVE
Pond B2
0
50'
50 25 50 100
SCALE: 1" =
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
STEELEY DRIVE CL PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
2+25 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50
MATCHLINE STA 12+50
SEE SHEET
58
Tract S
(Drainage,
Utility, & Private
Access
Easement)
Tract U
(Drainage, Utility, &
Private Access
Easement)
Tract T
(Drainage, Utility, &
Private Access
Easement)
Tract V
(Drainage, Utility,
& Private Access
Easement)
Bldg 6a
Bldg 7a
Block 21
Lot 1
STREET 04 FL LT PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
2+25 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50
STEELEY DRIVE FL LT PROFILE
STREET 04 FL RT PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
2+25 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50
STEELEY DRIVE FL RT PROFILE
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
STEELEY DRIVE CL PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50
LAKE CANAL DITCH
MATCHLINE STA 12+50
SEE SHEET
57
Tract N
(Drainage, Utility,
& Private
Access
Easement)
Bldg 14a
Tract S
(Drainage, Utility,
& Private Access
Easement)
Block 21
Lot 1
STREET 04 FL LT PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50
STEELEY DRIVE FL LT PROFILE
STREET 04 FL RT PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50
STEELEY DRIVE FL RT PROFILE
KEY MAP
NTS
N
W E
S
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
SCHLAGEL STREET CL PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00
SCHLAGEL STREET
MATCHLINE STA 13+00
SEE SHEET
60
Tract S
(Drainage, Utility &
Private Access
Easement)
Tract T
(Drainage, Utility &
Private Access
Easement)
Block 21
Lot 1
KEY MAP
NTS
N
W E
S
STREET 01 FL LT PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00
SCHLAGEL STREET FL LT PROFILE
STREET 01 FL RT PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00
SCHLAGEL STREET FL RT PROFILE
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
SCHLAGEL STREET CL PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00
MATCHLINE STA 22+00
SEE SHEET
61
MATCHLINE STA 13+00
SEE SHEET 59
SCHLAGEL STREET SCHLAGEL STREET
Lot 4
Lot 5
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Block 7 Block 6
Block 8
Lot 4
Lot 5
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Tract A
(Drainage, Utility, &
Private Access
Easement)
Tract N
(Drainage, Utility, &
Private Access
SCHLAGEL STREET CL PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50
KEY MAP
NTS
N
W E
S
SCHLAGEL STREET
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Bldg 5b
Bldg 17a
Block 2 Block 1
Block 4 Block 3
Tract A
(Drainage, Utility, & Private
Access Easement)
Bldg 19d Bldg 20d
Bldg 15d Bldg 18d
Tract 1
(D, U, & PAE)
N. LEMAY AVENUE CL PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 35+50 36+00 36+50 37+00 37+50 38+00 38+50 39+00 39+50
MATCHLINE STA 39+50
SEE SHEET
63
N. LEMAY AVENUE
Lot 7
Lot 8 Lot 7
Lot 8
Tract H
(Drainage, Utility, &
Private Access
Easement)
Tract A
(Drainage, Utility, &
Private Access Easement)
Tract H
(Drainage, Utility,
& Private Access
Easement)
Bldg 15c Bldg 13c Bldg 9c
KEY MAP
NTS
N
W E
S
STREET 01 FL LT PROFILE
4950
4955
4960
4965
4950
4955
4960
4965
30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 35+50 36+00 36+50 37+00 37+50 38+00 38+50 39+00 39+50 40+00
N. LEMAY AVENUE FL LT PROFILE
STREET 01 FL RT PROFILE
4950
4955
4960
4965
4950
4955
4960
4965
29+75 30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 35+50 36+00 36+50 37+00 37+50 38+00 38+50 39+00 39+50 40+00 40+50
N. LEMAY AVENUE FL RT PROFILE
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
N. LEMAY AVENUE CL PROFILE
4945
4950
4955
4960
4965
4945
4950
4955
4960
4965
39+25 39+50 40+00 40+50 41+00 41+50 42+00 42+50 43+00 43+50 44+00 44+50 45+00 45+50 46+00 46+50 47+00 47+50
MATCHLINE STA 39+50
SEE SHEET 62
E. SUNIGA ROAD
(SEE SHEET 71)
N. LEMAY AVENUE
Tract H
(Drainage, Utility, &
Private Access
Easement)
Tract W
(Drainage, Utility, &
Private Access
Easement)
KEY MAP
NTS
N
W E
S
STREET 01 FL LT PROFILE
4950
4955
4960
4965
4950
4955
4960
4965
39+50 40+00 40+50 41+00 41+50 42+00 42+50 43+00 43+50 44+00 44+50 45+00 45+50 46+00 46+50 47+00 47+50 48+00
N. LEMAY AVENUE FL LT PROFILE
STREET 01 FL RT PROFILE
4950
4955
4960
4965
4950
4955
4960
4965
39+00 39+50 40+00 40+50 41+00 41+50 42+00 42+50 43+00 43+50 44+00 44+50 45+00 45+50 46+00 46+50 47+00 47+50
N. LEMAY AVENUE FL RT PROFILE
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
HARVEST SUN STREET CL PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00
COLLAMER DRIVE CL PROFILE
COLLAMER DRIVE
LAKE CANAL DITCH
Block 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Tract A
(Drainage, Utility,
& Private Access
Easement)
Tract O
(Drainage, Utility, &
Private Access
Tract N Easement)
(Drainage, Utility,
& Private Access
Easement)
Bldg 15a
Bldg 16a
Bldg 3c
Bldg 8d
Tract K
(D, U, & PAE)
MATCHLINE STA 12+00
SEE SHEET
65
Tract O
(Drainage, Utility, &
Private Access
Easement) KEY MAP
NTS
N
W E
S
STREET 03 FL LT PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00
COLLAMER DRIVE FL LT PROFILE
STREET-03 FL RT PROFILE
HARVEST SUN STREET CL PROFILE
4950
4955
4960
4965
4950
4955
4960
4965
12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50
COLLAMER DRIVE CL PROFILE
COLLAMER DRIVE
Block 22
Lot 1
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
MATCHLINE STA 18+90
SEE SHEET
66
Block 8
Block 14
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Tract F
(Drainage, Utility, &
Private Access
Easement)
Tract R
(Drainage, Utility, &
Private Access
Bldg 3c Bldg 4c Bldg 5c Bldg 6c Easement)
Bldg 7d
Bldg 8d
COMMUNITY
CLUBHOUSE
MATCHLINE STA 12+00
SEE SHEET
64
KEY MAP
NTS
N
W E
S
STREET 03 FL LT PROFILE
4955
4960
4965
4970
4955
4960
4965
MATCHLINE STA 18+90
SEE SHEET
65
PIONEER TRAIL ROAD
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Block 2 Block 1
Block 3
Block 14
Block 4
Tract A
(Drainage, Utility,
& Private Access
Easement)
Block 12
Block 13
Bldg 12c
Bldg 14c
Bldg 11c
Bldg 7d
Bldg 19d Bldg 20d
Bldg 15d Bldg 18d
Bldg 16d
Bldg 17d
Tract 1
(D, U, & PAE)
Tract Y
(D, U, & PAE)
Tract X
(D, U, & PAE)
LANDMARK WAY
Lot 1
Lot 2
Lot 3
Lot 5
Lot 6
Lot 7
Tract W
(Drainage,
Utility, & Private
Access
Easement)
Tract T
(Drainage,
Utility, & Private
Access
Easement)
Tract H
(Drainage,
Utility, & Private
Access
Easement)
Lot 1
Lot 2
Lot 3
Lot 4
Block 17
Lot 5
Lot 6
Lot 7
Lot 8
Block 18
Bldg 3d Bldg 4d
Bldg 4c
Bldg 5c
Drive 'H'
Tract P
(Drainage, Utility, &
Private Access
Easement)
Tract Q
(Drainage, Utility, &
Private Access
Easement)
Tract 5
(D, U, & PAE)
Tract 3
(D, U, & PAE)
Tract F
(Drainage, Utility, &
Private Access
Easement)
KEY MAP
NTS
N
W E
S
STREET 05 FL LT PROFILE
4950
4955
E. SUNIGA ROAD CL PROFILE
4960
4965
4970
4975
4960
4965
4970
4975
27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 35+50 36+00 36+50 37+00 37+50
MATCHLINE STA 37+00
SEE SHEET
69
KEY MAP
NTS
SUNIGA RD FL LT PROFILE
4960
4965
4970
4975
4960
4965
4970
4975
27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 35+50 36+00 36+50 37+00 37+50
E. SUNIGA ROAD FL LT PROFILE
SUNIGA RD FL RT PROFILE
4960
4965
4970
4975
4960
4965
4970
4975
27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 35+50 36+00 36+50 37+00 37+50
E. SUNIGA ROAD FL RT PROFILE
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
E. SUNIGA ROAD CL PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
37+50 38+00 38+50 39+00 39+50 40+00 40+50 41+00 41+50 42+00 42+50 43+00 43+50 44+00 44+50 45+00 45+50 46+00 46+50 47+00
LAKE CANAL DITCH
MATCHLINE STA 47+00
SEE SHEET 70
LAKE CANAL
DITCH
E. SUNIGA ROAD
REDWOOD STREET
Tract D
(Drainage, Utility &
Access Easement)
Tract G
(Drainage,
Utility &
Access
Easement)
STEELEY DRIVE
STEELEY DRIVE
Bldg 4a
Bldg 2a
Bldg 6a
MATCHLINE STA 37+00
SEE SHEET 68
KEY MAP
NTS
N
W E
S
SUNIGA RD FL LT PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
37+50 38+00 38+50 39+00 39+50 40+00 40+50 41+00 41+50 42+00 42+50 43+00 43+50 44+00 44+50 45+00 45+50 46+00 46+50 47+00
E. SUNIGA ROAD FL LT PROFILE
SUNIGA RD FL RT PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
37+50 38+00 38+50 39+00 39+50 40+00 40+50 41+00 41+50 42+00 42+50 43+00 43+50 44+00 44+50 45+00 45+50 46+00 46+50 47+00
E. SUNIGA ROAD FL RT PROFILE
CHECKED BY:
E. SUNIGA ROAD CL PROFILE
4950
4955
4960
4965
4950
4955
4960
4965
47+00 47+50 48+00 48+50 49+00 49+50 50+00 50+50 51+00 51+50 52+00 52+50 53+00 53+50 54+00 54+50 55+00 55+50 56+00 56+50
E. SUNIGA ROAD
MATCHLINE STA 47+00
SEE SHEET 69
Tract E
(Drainage, Utility &
Access Easement)
Tract H
(Drainage,
Utility &
Access
Easement)
MATCHLINE STA 56+50
SEE SHEET 71
Tract I
(Drainage, Utility, &
Access Easement)
LANDMARK WAY
STEELEY DRIVE
STEELEY DRIVE
RAIN
GARDEN
Bldg 6a
Bldg 7a
Bldg 8a Bldg 10a
Bldg 12a
KEY MAP
NTS
N
W E
S
SUNIGA RD FL LT PROFILE
4950
4955
4960
4965
4950
4955
4960
4965
47+00 47+50 48+00 48+50 49+00 49+50 50+00 50+50 51+00 51+50 52+00 52+50 53+00 53+50 54+00 54+50 55+00 55+50 56+00 56+50
E. SUNIGA ROAD FL LT PROFILE
SUNIGA RD FL RT PROFILE
4950
4955
4960
4965
4950
4955
4960
4965
E. SUNIGA ROAD CL PROFILE
4950
4955
4960
4965
4950
4955
4960
4965
56+50 57+00 57+50 58+00 58+50 59+00 59+50 60+00 60+50 61+00 61+50 62+00 62+50 63+00 63+50 64+00 64+50
MATCHLINE STA 56+50
SEE SHEET 70
E. SUNIGA ROAD
N. LEMAY AVENUE
Tract F
(Drainage, Utility &
Access Easement)
Tract I
(Drainage, Utility, &
Access Easement)
LANDMARK WAY
KEY MAP
NTS
N
W E
S
SUNIGA RD FL LT PROFILE
4950
4955
4960
4965
4950
4955
4960
4965
56+50 57+00 57+50 58+00 58+50 59+00 59+50 60+00 60+50 61+00 61+50 62+00 62+50 63+00 63+50 64+00 64+50 65+00
E. SUNIGA ROAD FL LT PROFILE
SUNIGA RD FL RT PROFILE
4950
4955
4960
4965
4950
4955
4960
4965
56+50 57+00 57+50 58+00 58+50 59+00 59+50 60+00 60+50 61+00 61+50 62+00 62+50 63+00 63+50 64+00 64+50 65+00
E. SUNIGA ROAD FL RT PROFILE
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
E. SUNIGA ROAD CL PROFILE
4945
4950
4955
4960
4945
4950
4955
4960
65+00 65+50 66+00 66+50 67+00 67+50 68+00 68+50 69+00 69+50 70+00 70+50 71+00 71+50 72+00 72+50 73+00 73+50 74+00 74+50
ONLY
N. LEMAY AVENUE
KEY MAP
NTS
SUNIGA RD FL LT PROFILE
4945
4950
4955
4960
4945
4950
4955
4960
65+00 65+50 66+00 66+50 67+00 67+50 68+00 68+50 69+00 69+50 70+00 70+50 71+00 71+50 72+00 72+50 73+00 73+50 74+00 74+50 75+00
E. SUNIGA ROAD FL LT PROFILE
SUNIGA RD FL RT PROFILE
4945
4950
4955
4960
4945
4950
4955
4960
65+00 65+50 66+00 66+50 67+00 67+50 68+00 68+50 69+00 69+50 70+00 70+50 71+00 71+50 72+00 72+50 73+00 73+50 74+00 74+50 75+00
E. SUNIGA ROAD FL RT PROFILE
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
E. SUNIGA ROAD
0
REDWOOD STREET
MATCHLINE - SEE BELOW
E. SUNIGA ROAD
E. SUNIGA ROAD
Tract D
(Drainage, Utility, &
Access Easement)
STEELEY DRIVE
MATCHLINE - SEE ABOVE
STEELEY DRIVE
0
30'
30 15 30 60
SCALE: 1" =
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
Tract I
(Drainage, Utility, &
Access Easement)
Tract F
(Drainage, Utility, &
Access Easement)
FUTURE SUNIGA ROAD
N. LEMAY AVENUE
E. SUNIGA ROAD
LANDMARK WAY
E. SUNIGA ROAD
RAIN
GARDEN
LANDMARK WAY
STEELEY DRIVE STEELEY DRIVE
0
30'
30 15 30 60
SCALE: 1" =
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
39+00.00
4957
4958
4960
4962
4964
-60 -40 -20 0 20 40 60
38+00.00
4956
4958
4960
4962
4964
-60 -40 -20 0 20 40 60
38+50.00
4957
4958
4960
4962
4964
-60 -40 -20 0 20 40 60
39+50.00
4958
4960
4962
4964
4966
-60 -40 -20 0 20 40 60
40+00.00
4958
4960
4962
4964
4966
-60 -40 -20 0 20 40 60
40+50.00
4959
4960
4962
4964
4966
-60 -40 -20 0 20 40 60
41+00.00
4959
4960
4962
4964
4966
-60 -40 -20 0 20 40 60
41+50.00
4959
4960
4962
4964
4966
-60 -40 -20 0 20 40 60
42+00.00
4959
4960
4962
45+50.00
4957
4958
4960
4962
4964
-60 -40 -20 0 20 40 60
46+00.00
4956
4958
4960
4962
4964
-60 -40 -20 0 20 40 60
46+50.00
4956
4958
4960
4962
4964
-60 -40 -20 0 20 40 60
47+00.00
4955
4956
4958
4960
4962
-60 -40 -20 0 20 40 60
47+50.00
4954
4956
4958
4960
4962
-60 -40 -20 0 20 40 60
48+00.00
4954
4956
4958
4960
4962
-60 -40 -20 0 20 40 60
48+50.00
4954
4956
4958
4960
4962
-60 -40 -20 0 20 40 60
49+00.00
4954
4956
4958
4960
4962
-60 -40 -20 0 20 40 60
49+50.00
4954
4956
4958
53+00.00
4952
4954
4956
4958
4960
-60 -40 -20 0 20 40 60
53+50.00
4951
4952
4954
4956
4958
-60 -40 -20 0 20 40 60
54+00.00
4951
4952
4954
4956
4958
-60 -40 -20 0 20 40 60
54+50.00
4951
4952
4954
4956
4958
-60 -40 -20 0 20 40 60
55+00.00
4950
4952
4954
4956
4958
-60 -40 -20 0 20 40 60
55+50.00
4950
4952
4954
4956
4958
-60 -40 -20 0 20 40 60
56+00.00
4949
4950
4952
4954
4956
-60 -40 -20 0 20 40 60
56+50.00
4949
4950
4952
4954
4956
-60 -40 -20 0 20 40 60
57+00.00
4949
4950
4952
60+50.00
4949
4950
4952
4954
4956
-60 -40 -20 0 20 40 60
61+00.00
4950
4952
4954
4956
4958
-60 -40 -20 0 20 40 60
61+50.00
4950
4952
4954
4956
4958
-60 -40 -20 0 20 40 60
62+00.00
4950
4952
4954
4956
4958
-60 -40 -20 0 20 40 60
62+50.00
4950
4952
4954
4956
4958
-60 -40 -20 0 20 40 60
63+00.00
4950
4952
4954
4956
4958
-60 -40 -20 0 20 40 60
63+50.00
4950
4952
4954
4956
4958
-60 -40 -20 0 20 40 60
64+00.00
4949
4950
4952
4954
4956
-60 -40 -20 0 20 40 60
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
KEY MAP
NTS
N
W E
S
PIONEER TRAIL ROAD
SCHLAGEL STREET
SCHLAGEL STREET
COLLAMER DRIVE
LANDMARK WAY
COLLAMER DRIVE
COLLAMER DRIVE
PIONEER TRAIL ROAD
0
20'
20 10 20 40
SCALE: 1" =
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
KEY MAP
NTS
N
W E
S
STEELEY DRIVE
SCHLAGEL STREET
E. SUNIGA ROAD
LANDMARK WAY
N. LEMAY AVENUE
SCHLAGEL STREET
0
20'
20 10 20 40
SCALE: 1" =
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
KEY MAP
NTS
N
W E
S
FUTURE SUNIGA ROAD
N. LEMAY AVENUE
E. SUNIGA ROAD
E. SUNIGA ROAD
STEELEY DRIVE STEELEY DRIVE
Bldg 6a
Bldg 7a
0
20'
20 10 20 40
SCALE: 1" =
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
ONLY
ONLY
E. SUNIGA ROAD
REDWOOD STREET
STEELEY DRIVE
E. SUNIGA ROAD
STOP STOP
SPEED
40 LIMIT YIELD TO
TURNING
VEHICLES
ONLY
FUTURE SUNIGA ROAD
N. LEMAY AVENUE
E. SUNIGA ROAD
LANDMARK WAY
STOP
SPEED
40 LIMIT
YIELD TO
TURNING
VEHICLES
STOP
ONLY
ONLY
E. SUNIGA ROAD
STEELEY DRIVE
LANDMARK WAY
YIELD TO
TURNING
VEHICLES
DO NOT
ENTER
0
30'
30 15 30 60
SCALE: 1" =
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
N
ONLY
FUTURE SUNIGA ROAD
N. LEMAY AVENUE
E. SUNIGA ROAD
MATCHLINE - SEE BELOW
MATCHLINE - SEE ABOVE
N. LEMAY AVENUE
0
30'
30 15 30 60
SCALE: 1" =
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
SITE DETAILS
6/26/19
N/A
N/A
KRB
JTC
18-1000-00
----
84 95
ASPHALT PATCH DETAIL
(FOR PRIVATE STREETS ONLY)
NTS
ASPHALT PAVING SECTION DETAIL
HEAVY DUTY
LIGHT DUTY
.
PRELIMINARY SUNIGA ROAD PAVEMENT SECTION
CONCRETE PAVING SECTION DETAIL
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
SITE DETAILS
6/26/19
N/A
N/A
JTC
JTC
18-1000-00
----
85 95
SIGN DETAIL
SIDEWALK CHASE DETAIL CURB CUT W/ RIPRAP PAD DETAIL
SECTION A-A
PLAN
ELEVATION
24" DRAIN CHANNEL
CONCRETE PAN DETAIL
PLAN
SECTION A-A
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
EROSION CONTROL DETAILS
6/26/19
N/A
N/A
JTC
JTC
18-1000-00
----
86 95
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
EROSION CONTROL DETAILS
6/26/19
N/A
N/A
JTC
JTC
18-1000-00
----
87 95
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
DRAINAGE DETAILS
6/26/19
N/A
N/A
JTC
JTC
18-1000-00
----
88 95
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
DRAINAGE DETAILS
6/26/19
N/A
N/A
JTC
JTC
18-1000-00
----
89 95
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
DRAINAGE DETAILS
6/26/19
N/A
N/A
JTC
JTC
18-1000-00
----
MODIFIED TYPE D INLET DETAIL 90 95
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
DRAINAGE DETAILS
6/26/19
N/A
N/A
JTC
JTC
18-1000-00
----
91 95
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
DRAINAGE DETAILS
6/26/19
N/A
N/A
JTC
JTC
18-1000-00
----
92 95
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
C C
A
A
B
B
SECTION C-C
SECTION A-A SECTION B-B
WELL SCREEN FLOW CONTROL PLATE
PLAN
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
UTILITY DETAILS
6/26/19
N/A
N/A
JTC
JTC
18-1000-00
----
93 95
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
UTILITY DETAILS
6/26/19
N/A
N/A
JTC
JTC
18-1000-00
----
94 95
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
UTILITY DETAILS
6/26/19
N/A
N/A
JTC
JTC
18-1000-00
----
95 95
SANITARY CLEANOUT DETAIL
PLAN VIEW
GENERAL NOTES
SECTION D-D
D
D
A A
ABBREVIATIONS
LEGEND
ELEVATION
DRAIN PAN COBBLE RIPRAP RUNDOWN
NTS
CONTRACTION JOINT DETAIL
EXPANSION JOINT DETAIL
6" CURB AND 1' SPILL GUTTER
6" CURB AND 1' CATCH GUTTER
4" MOUNTABLE CURB AND 1' SPILL GUTTER
4" MOUNTABLE CURB AND 1' CATCH GUTTER
CURB AND GUTTER DETAIL (ON-SITE ONLY)
CURB RAMP DETAIL (W/ DETECTABLE WARNING PLATE)
HDS PROJECT #
SCALE (V)
NORTHFIELD
LEMAY AVE SIGNAGE & STRIPING PLAN
6/26/19
1" = 30'
N/A
KRB
JTC
18-1000-00
----
83 95
NOTES:
1. ALL LONGITUDINAL PAVEMENT MARKINGS TO BE DONE IN LATEX PAVEMENT MARKING
PAINT. ALL TRANSVERSE PAVEMENT MARKINGS AND SYMBOLS TO BE DONE IN
PREFORMED THERMOPLASTIC.
2. DIMENSIONS SHOWN FOR STRIPING ARE FROM CENTER OF STRIPE TO CENTER OF STRIPE
OR FROM CENTER OF STRIPE TO FLOWLINE OF CURB.
3. ALL SIGNING AND MARKING TO BE DONE IN ACCORDANCE WITH CITY OF FORT COLLINS
AND/OR MUTCD STANDARDS.
4. THERMOPLASTIC ARROWS SHALL BE 12' ELONGATED FHWA.
5. THERMOPLASTIC BIKE STENCILS SHALL BE 6'-6" W/ 6' ARROW.
6. ALL SIGNS PLACED IN HARDSCAPE SHALL HAVE A SLEEVE INSTALLED.
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
SUNIGA RD SIGNAGE & STRIPING PLAN
6/26/19
1" = 30'
N/A
JTC
JTC
18-1000-00
----
82 95
NOTES:
1. ALL LONGITUDINAL PAVEMENT MARKINGS TO BE DONE IN LATEX PAVEMENT MARKING
PAINT. ALL TRANSVERSE PAVEMENT MARKINGS AND SYMBOLS TO BE DONE IN
PREFORMED THERMOPLASTIC.
2. DIMENSIONS SHOWN FOR STRIPING ARE FROM CENTER OF STRIPE TO CENTER OF STRIPE
OR FROM CENTER OF STRIPE TO FLOWLINE OF CURB.
3. ALL SIGNING AND MARKING TO BE DONE IN ACCORDANCE WITH CITY OF FORT COLLINS
AND/OR MUTCD STANDARDS.
4. THERMOPLASTIC ARROWS SHALL BE 12' ELONGATED FHWA.
5. THERMOPLASTIC BIKE STENCILS SHALL BE 6'-6" W/ 6' ARROW.
6. ALL SIGNS PLACED IN HARDSCAPE SHALL HAVE A SLEEVE INSTALLED.
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
INTERSECTION DETAILS
6/26/19
1" = 20'
N/A
JTC
JTC
18-1000-00
----
81 95
INTERSECTION OF N. LEMAY AVENUE AND E. SUNIGA ROAD INTERSECTION OF STEELEY DRIVE AND E. SUNIGA ROAD
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
INTERSECTION DETAILS
6/26/19
1" = 20'
N/A
JTC
JTC
18-1000-00
----
80 95
INTERSECTION OF SCHLAGEL STREET AND STEELEY DRIVE
INTERSECTION OF LANDMARK WAY AND E. SUNIGA ROAD
INTERSECTION OF SCHLAGEL STREET AND N. LEMAY AVENUE
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
INTERSECTION DETAILS
6/26/19
1" = 20'
N/A
JTC
JTC
18-1000-00
----
79 95
INTERSECTION OF SCHLAGEL STREET AND PIONEER TRAIL ROAD
INTERSECTION OF SCHLAGEL STREET AND COLLAMER DRIVE
INTERSECTION OF COLLAMER DRIVE AND PIONEER TRAIL ROAD
INTERSECTION OF LANDMARK WAY AND COLLAMER DRIVE
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
SUNIGA ROAD CROSS SECTIONS
6/26/19
1" = 20'
1" = 2'
KRB
JTC
18-1000-00
----
78 95
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
4954
4956
-60 -40 -20 0 20 40 60
57+50.00
4949
4950
4952
4954
4956
-60 -40 -20 0 20 40 60
58+00.00
4948
4950
4952
4954
4956
-60 -40 -20 0 20 40 60
58+50.00
4949
4950
4952
4954
4956
-60 -40 -20 0 20 40 60
59+00.00
4949
4950
4952
4954
4956
-60 -40 -20 0 20 40 60
59+50.00
4949
4950
4952
4954
4956
-60 -40 -20 0 20 40 60
60+00.00
4949
4950
4952
4954
4956
-60 -40 -20 0 20 40 60
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
SUNIGA ROAD CROSS SECTIONS
6/26/19
1" = 20'
1" = 2'
KRB
JTC
18-1000-00
----
77 95
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
4960
4962
-60 -40 -20 0 20 40 60
50+00.00
4954
4956
4958
4960
4962
-60 -40 -20 0 20 40 60
50+50.00
4953
4954
4956
4958
4960
-60 -40 -20 0 20 40 60
51+00.00
4953
4954
4956
4958
4960
-60 -40 -20 0 20 40 60
51+50.00
4952
4954
4956
4958
4960
-60 -40 -20 0 20 40 60
52+00.00
4952
4954
4956
4958
4960
-60 -40 -20 0 20 40 60
52+50.00
4952
4954
4956
4958
4960
-60 -40 -20 0 20 40 60
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
SUNIGA ROAD CROSS SECTIONS
6/26/19
1" = 20'
1" = 2'
KRB
JTC
18-1000-00
----
76 95
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
4964
4966
-60 -40 -20 0 20 40 60
42+50.00
4959
4960
4962
4964
4966
-60 -40 -20 0 20 40 60
43+00.00
4959
4960
4962
4964
4966
-60 -40 -20 0 20 40 60
43+50.00
4959
4960
4962
4964
4966
-60 -40 -20 0 20 40 60
44+00.00
4958
4960
4962
4964
4966
-60 -40 -20 0 20 40 60
44+50.00
4958
4960
4962
4964
4966
-60 -40 -20 0 20 40 60
45+00.00
4957
4958
4960
4962
4964
-60 -40 -20 0 20 40 60
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
SUNIGA ROAD CROSS SECTIONS
6/26/19
1" = 20'
1" = 2'
KRB
JTC
18-1000-00
----
75 95
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
SUNIGA ROAD MEDIAN PLAN
6/26/19
1" = 30'
N/A
JTC
JTC
18-1000-00
----
74 95
EASTERN MEDIAN
(LANDMARK WAY TO N. LEMAY AVENUE)
CENTRAL MEDIAN
(STEELEY DRIVE TO LANDMARK WAY)
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
SUNIGA ROAD MEDIAN PLAN
6/26/19
1" = 30'
N/A
JTC
JTC
18-1000-00
----
73 95
WESTERN MEDIAN
(REDWOOD STREET TO STEELEY DRIVE)
WESTERN MEDIAN
(REDWOOD STREET TO STEELEY DRIVE)
LANDSCAPING AND DRAIN DETAILS FOR RAISED MEDIAN
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
E. SUNIGA ROAD STA 65+00 TO 74+50
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
72 95
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
TYPICAL 4-LANE ARTERIAL STREET SECTION
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
E. SUNIGA ROAD
N. LEMAY AVENUE
(SEE SHEET 63)
N. LEMAY AVENUE
(SEE SHEET 63)
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
E. SUNIGA ROAD STA 56+50 TO 65+00
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
71 95
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
TYPICAL 4-LANE ARTERIAL STREET SECTION
LANDMARK WAY
(SEE SHEET 67)
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE "PRELIMINARY
SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL PROPERTY NORTH OF EAST
VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED BY EARTH ENGINEERING
CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY GEOTECHNICAL RECOMMENDATIONS.
3. SEE SHEETS 73 - 74 FOR SUNIGA ROAD MEDIAN DETAILS.
4. SEE SHEET 82 FOR SUNIGA ROAD SIGNAGE & STRIPING PLAN.
47+00 47+50 48+00 48+50 49+00 49+50 50+00 50+50 51+00 51+50 52+00 52+50 53+00 53+50 54+00 54+50 55+00 55+50 56+00 56+50
E. SUNIGA ROAD FL RT PROFILE
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
E. SUNIGA ROAD
LANDMARK WAY
(SEE SHEET 67)
STEELEY DRIVE
(SEE SHEET 57)
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
STEELEY DRIVE
(SEE SHEET 57)
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
E. SUNIGA ROAD STA 47+00 TO 56+50
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
70 95
TYPICAL 4-LANE ARTERIAL STREET SECTION
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE "PRELIMINARY
SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL PROPERTY NORTH OF EAST
VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED BY EARTH ENGINEERING
CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY GEOTECHNICAL RECOMMENDATIONS.
3. SEE SHEETS 73 - 74 FOR SUNIGA ROAD MEDIAN DETAILS.
4. SEE SHEET 82 FOR SUNIGA ROAD SIGNAGE & STRIPING PLAN.
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
E. SUNIGA ROAD
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
E. SUNIGA ROAD STA 37+50 TO 47+00
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
69 95
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE "PRELIMINARY SUBSURFACE
EXPLORATION AND GROUNDWATER REPORT SCHLAGEL PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF
NORTH LEMAY AVENUE", PREPARED BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
3. SEE SHEETS 73 - 74 FOR SUNIGA ROAD MEDIAN DETAILS.
4. SEE SHEET 82 FOR SUNIGA ROAD SIGNAGE & STRIPING PLAN.
TYPICAL 4-LANE ARTERIAL STREET SECTION
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
E. SUNIGA ROAD
N
W
E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
E. SUNIGA ROAD STA 27+00 TO 37+50
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
68 95
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
4960
4965
4950
4955
4960
4965
9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50
LANDMARK WAY FL LT PROFILE
STREET 05 FL RT PROFILE
4950
4955
4960
4965
4950
4955
4960
4965
9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50
LANDMARK WAY FL RT PROFILE
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
LANDMARK WAY
E. SUNIGA ROAD
(SEE SHEET 70)
COLLAMER DRIVE
(SEE SHEET 65)
E. SUNIGA ROAD
(SEE SHEET 71)
COLLAMER DRIVE
(SEE SHEET 65)
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
LANDMARK WAY ROAD STA 9+50 TO 15+50
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
67 95
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
TYPICAL CONNECTOR LOCAL W/ MEDIAN STREET SECTION
TURN LANE MEDIAN DETAIL
Tract C
(D, U, & PAE)
Tract D
(D, U, & PAE)
Tract 4
(D, U, & PAE)
Tract R
(Drainage, Utility, &
Private Access
Easement)
PIONEER TRAIL ROAD CL PROFILE
4950
4955
4960
4965
4950
4955
4960
4965
18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50
PIONEER TRAIL ROAD CL PROFILE
KEY MAP
NTS
N
W E
S
STREET 03 FL LT PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00
PIONEER TRAIL ROAD FL LT PROFILE
STREET-03 FL RT PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00
PIONEER TRAIL ROAD FL RT PROFILE
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
PIONEER TRAIL ROAD
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
SCHLAGEL STREET
(SEE SHEET 61)
SCHLAGEL STREET
(SEE SHEET 61)
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
PIONEER TRAIL ROAD STA 18+90 TO 25+08
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
66 95
CONNECTOR LOCAL STREET DETAIL
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
4970
11+75 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50
COLLAMER DRIVE FL LT PROFILE
STREET-03 FL RT PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50
COLLAMER DRIVE FL RT PROFILE
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
LANDMARK WAY COLLAMER DRIVE
(SEE SHEET 67)
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
PIONEER TRAIL ROAD
(SEE SHEET 66)
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
COLLAMER DRIVE STA 12+00 TO 18+90
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
65 95
CONNECTOR LOCAL STREET DETAIL
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
4955
4960
4965
4970
4955
4960
4965
4970
3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00
COLLAMER DRIVE FL RT PROFILE
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
SCHLAGEL STREET
(SEE SHEET 60)
SCHLAGEL STREET
(SEE SHEET 60)
COLLAMER DRIVE
N
W
E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
COLLAMER DRIVE STA 3+00 TO 12+00
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
64 95
CONNECTOR LOCAL STREET DETAIL
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
N. LEMAY AVENUE
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
N. LEMAY AVE STA 39+50 TO 47+00
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
63 95
CONNECTOR LOCAL STREET DETAIL
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
3. SEE SHEET 83 FOR LEMAY AVENUE SIGNAGE & STRIPING PLAN.
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N. LEMAY AVENUE
MATCHLINE STA 30+05
SEE SHEET
61
SCHLAGEL STREET
(SEE SHEET 61)
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
N. LEMAY AVE STA 30+05 TO 39+50
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
62 95
CONNECTOR LOCAL STREET DETAIL
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
3. SEE SHEET 83 FOR LEMAY AVENUE SIGNAGE & STRIPING PLAN.
Tract Y
(D, U, & PAE)
Tract X
(D, U, & PAE)
Tract C
(D, U, & PAE)
Tract D
(D, U, & PAE)
Tract B
(D, U, & PAE)
STREET 01 FL LT PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50
SCHLAGEL STREET FL LT PROFILE
STREET 01 FL RT PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50
SCHLAGEL STREET FL RT PROFILE
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
SCHLAGEL STREET
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
MATCHLINE STA 22+00
SEE SHEET
60
PIONEER TRAIL ROAD
(SEE SHEET 66)
N. LEMAY AVENUE
(SEE SHEET 62)
MATCHLINE STA 30+05
SEE SHEET
62
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
SCHLAGEL STREET STA 22+00 TO 30+05
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
61 95
CONNECTOR LOCAL STREET DETAIL
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
Easement)
Bldg 4b Bldg 5b
Bldg 3b
Bldg 2b
Bldg 15a Bldg 16a
Bldg 8d
Bldg 9d
Bldg 11d
Tract I
(D, U, & PAE)
Tract O
(Drainage, Utility, &
Private Access
Easement)
Tract K
(D, U, & PAE)
Tract E
(D, U, & PAE)
KEY MAP
NTS
N
W E
S
STREET 01 FL LT PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00
SCHLAGEL STREET FL LT PROFILE
STREET 01 FL RT PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00
SCHLAGEL STREET FL RT PROFILE
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
SCHLAGEL STREET
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
COLLAMER DRIVE
(SEE SHEET 64)
COLLAMER DRIVE
(SEE SHEET 64)
N
W
E
S
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
SCHLAGEL STREET STA 13+00 TO 22+00
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
60 95
CONNECTOR LOCAL STREET DETAIL
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
SCHLAGEL STREET
STEELEY DRIVE
(SEE SHEET
58
)
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
STEELEY DRIVE
(SEE SHEET 58)
N
W
E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
SCHLAGEL STREET STA 10+00 TO 13+00
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
59 95
CONNECTOR LOCAL STREET DETAIL
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
STEELEY DRIVE
E. SUNIGA ROAD
(SEE SHEET
71)
STEELEY DRIVE
N
W
E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
STEELEY DRIVE STA 12+50 TO 16+50
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
58 95
CONNECTOR LOCAL STREET DETAIL
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
STEELEY DRIVE
E. SUNIGA ROAD
(SEE SHEET 69)
E. SUNIGA ROAD
(SEE SHEET 71)
SCHLAGEL STREET
(SEE SHEET 59)
STEELEY DRIVE
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
STEELEY DRIVE STA 2+25 TO 12+50
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
57 95
CONNECTOR LOCAL STREET DETAIL
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
KEY MAP
NTS
S
W E
N
Date
Date
Date
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
PERMANENT DEWATERING PLAN
6/26/19
1" = 50'
N/A
KRB
JTC
18-1000-00
----
56 95
DEWATERING DRAIN AT POND B1
SCALE: 1" = 50'
DEWATERING DRAIN AT POND A1
SCALE: 1" = 50'
DEWATERING DRAIN AT
INFILTRATION GALLERY B3
SCALE: 1" = 30'
DEWATERING DRAIN AT
INFILTRATION GALLERY A2
SCALE: 1" = 30'
DEWATERING DRAIN AT
INFILTRATION GALLERY B2
SCALE: 1" = 30'
GENERAL NOTES:
UNDERDRAIN DETAIL
INFILTRATION GALLERY UNDERDRAIN DETAIL
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STORM PLAN & PROFILE
SD-25 (LAKE CANAL BOX CULVERT)
6/26/19
1" = 50'
1" = 5'
JTC
JTC
18-1000-00
----
55 95
SD-25 (LAKE CANAL BOX CULVERT)
STA 9+50 to 12+00
Lake Canal Company
UTILITY PLAN Approval
District Manager
APPROVED:
Date
4955
4960
4965
4970
4975
4940
4945
4950
4955
4960
4965
4970
4975
9+50 10+00 10+50 11+00
E. SUNIGA ROAD
Bldg 10a
Bldg 12a
Pond B1
Tract T
(Drainage, Utility, &
Private Access
Easement)
Tract V
(Drainage, Utility,
& Private Access
Easement)
E. SUNIGA ROAD
REDWOOD STREET
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STORM PLAN & PROFILE
SD-20, 21 (NECCO A8 & A5 LATERALS ), & 22
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
54 95
SD-22
STA 9+50 to 11+00
NOTES:
1. ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN
ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND
SPECIFICATIONS.
2. STORM PIPES SHALL BE RCP UNLESS OTHERWISE NOTED.
3. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
4. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN
PIPE LENGTHS.
SD-21 (NECCO A5 LATERAL)
STA 9+50 to 11+50
SD-20 (NECCO A8 LATERAL)
STA 9+50 to 11+50
N
W E
S
N
W E
S
4960
4965
4970
12+00 11+50 11+00 10+50 10+00 9+50
E. SUNIGA ROAD
N. LEMAY AVENUE
Pond A1
Tract H
(Drainage,
Utility, & Private
Access
Easement)
Tract W
(Drainage, Utility,
& Private Access
Easement)
E. SUNIGA ROAD
Pond A1
Pond D
Tract W
(Drainage,
Utility, & Private
Access
Easement)
Tract H
(Drainage,
Utility, &
Private Access
Easement)
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STORM PLAN & PROFILE
SD-17, 18, & 19 (NECCO A7 LATERAL)
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
53 95
SD-19 (NECCO A7 LATERAL)
STA 9+50 to 12+00
SD-18
STA 9+50 to 10+50
SD-17
STA 9+50 to 13+00
N
W E
S
N
W E
S
E. SUNIGA ROAD
NOTES:
1. ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN
ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND
SPECIFICATIONS.
2. STORM PIPES SHALL BE RCP UNLESS OTHERWISE NOTED.
3. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
4. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN
PIPE LENGTHS.
Pond D
Pond D
SD-04
(SEE SHEET 45)
SD-02
(SEE SHEET 44)
SD-18
(SEE THIS SHEET)
SD-17
(SEE THIS SHEET)
SD-09
(SEE SHEET 48)
SD-05
(SEE SHEET 46)
4960
4965
4970
4975
12+00 11+50 11+00 10+50 10+00 9+50
E. SUNIGA ROAD
STEELEY DRIVE
Block 21
Lot 1
SCHLAGEL STREET
Pond B1
Pond C
Tract S
(Drainage, Utility, &
Private Access
Easement)
Tract N
(Drainage, Utility,
& Private Access
Easement)
Tract T
(Drainage, Utility, &
Private Access
Easement)
SD-23 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4975
4945
4950
4955
4960
4965
4970
4975
9+50 10+00 10+50 11+00 11+50 12+00 12+50
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W
E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STORM PLAN & PROFILE
SD-16, SD-23, & SD-24 (NECCO A3 LATERAL)
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
52 95
SD-16
STA 9+50 to 12+75
NOTES:
1. ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN
ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND
SPECIFICATIONS.
2. STORM PIPES SHALL BE RCP UNLESS OTHERWISE NOTED.
3. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
4. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN
PIPE LENGTHS.
SD-24 (NECCO A3 LATERAL)
STA 9+50 to 12+00
SD-23
STA 9+50 to 12+50
4965
4970
9+50 10+00 10+50 11+00 11+50
SD-13 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
9+50 10+00 10+50 11+00 11+50
E. SUNIGA ROAD
STEELEY DRIVE
Block 21
Lot 1
Pond C
Pond B1
Tract S
(Drainage, Utility, &
Private Access
Easement)
Tract T
(Drainage, Utility, &
Private Access
Easement)
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Block 19
Drive 'F'
Bldg 2d
Bldg 2c
Bldg 3c
Block 18
Bldg 3d
Pond B1
Tract T
(Drainage,
Utility, &
Private
Access
Easement)
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STORM PLAN & PROFILE
SD-13, 14, & 15
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
51 95
SD-15
STA 9+50 to 11+50
SD-14
STA 9+50 to 11+50
SD-13
STA 9+50 to 11+50
N
W E
S
N
W
E
S
NOTES:
1. ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN
ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND
SPECIFICATIONS.
2. STORM PIPES SHALL BE RCP UNLESS OTHERWISE NOTED.
3. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
4. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN
PIPE LENGTHS.
SD-09
(SEE SHEET 49)
SD-09
(SEE SHEET 49)
4945
4950
4955
4960
4965
4970
9+50 10+00 10+50 11+00 11+50 12+00 12+50
SD-12 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
11+00 10+50 10+00 9+50
Block 14
Block 9
Lot 1
Lot 1
Lot 2
Drive D'
Bldg 10c
Bldg 7d
Pond B3
Tract F
(Drainage,
Utility, & Private
Access
Easement)
COLLAMER DRIVE
Block 8
Lot 3
Lot 4
Lot 5
Lot 6
Block 9
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Bldg 8d
Bldg 10d
Pond B3
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STORM PLAN & PROFILE
SD-10, 11, & 12
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
50 95
SD-12
STA 9+50 to 11+00
SD-11
STA 9+50 to 12+50
SD-10
STA 9+50 to 15+50
N
W
E
S
N
W
E
S
NOTES:
1. ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN
ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND
SPECIFICATIONS.
2. STORM PIPES SHALL BE RCP UNLESS OTHERWISE NOTED.
3. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
4. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN
PIPE LENGTHS.
SD-09
(SEE SHEET 48)
SD-10
(SEE THIS SHEET)
SD-09
(SEE SHEET 49)
SD-09
(SEE SHEET 49)
SD-09
(SEE SHEET 49)
SD-09
(SEE SHEET 49)
SD-12
(SEE THIS SHEET)
(D, U, & PAE)
Tract 2
(D, U, & PAE)
Tract B
(D, U, & PAE)
KEY MAP
NTS
N
W E
S
SD-09 PROFILE
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00
MATCHLINE STA 18+50
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W
E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STORM PLAN & PROFILE
SD-09 STA 18+50 TO 26+00
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
49 95
SD-09
STA 18+50 to 26+00
NOTES:
1. ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN
ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND
SPECIFICATIONS.
2. STORM PIPES SHALL BE RCP UNLESS OTHERWISE NOTED.
3. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
4. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN
PIPE LENGTHS.
SD-11
(SEE SHEET 50)
SD-09
VERT. SCALE: 1"=5'
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50
MATCHLINE STA 18+50
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STORM PLAN & PROFILE
SD-09 STA 9+50 TO 18+50
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
48 95
SD-09
STA 9+50 to 18+50
NOTES:
1. ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN
ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND
SPECIFICATIONS.
2. STORM PIPES SHALL BE RCP UNLESS OTHERWISE NOTED.
3. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
4. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN
PIPE LENGTHS.
SD-05
(SEE SHEET 46)
SD-12
(SEE SHEET 50)
SD-09
SD-13
(SEE SHEET 51)
SD-10
(SEE SHEET 50)
SD-19
(SEE SHEET 53)
4960
4965
4970
4945
4950
4955
4960
4965
4970
9+50 10+00 10+50 11+00 11+50
PIONEER TRAIL ROAD
Block 13
Lot 6
Bldg 14c
Bldg 11c
Bldg 17d
Block 12
Lot 6
Bldg 16d
Tract G
(Drainage, Utility,
& Private Access
Tract J Easement)
(Drainage, Utility,
& Private Access
Easement)
PIONEER TRAIL ROAD
Block 13
Lot 6
Drive D'
Bldg 12c
Bldg 14c
Bldg 11c
Bldg 17d
Bldg 13c
Drive 'E'
Bldg 15c
Tract H
(Drainage, Utility,
& Private Access
Easement)
Tract G
(Drainage, Utility,
& Private Access
Easement)
Tract 3
(D, U, & PAE)
Tract J
(Drainage, Utility,
& Private Access
Easement)
(D, U, & PAE)
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STORM PLAN & PROFILE
SD-06, 07, & 08
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
47 95
SD-08
STA 9+50 to 11+50
SD-07
STA 9+50 to 11+00
SD-06
STA 9+50 to 11+50
N
W E
S
N
W E
S
NOTES:
1. ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN
ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND
SPECIFICATIONS.
2. STORM PIPES SHALL BE RCP UNLESS OTHERWISE NOTED.
3. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
4. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN
PIPE LENGTHS.
SD-05
(SEE SHEET 46)
SD-07
(SEE SHEET 47)
SD-09
(SEE SHEET 49)
SD-08
(SEE SHEET 47)
SD-05
(SEE SHEET 46)
VERT. SCALE: 1"=5'
4940
4945
4950
4955
4960
4965
4970
4940
4945
4950
4955
4960
4965
4970
9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STORM PLAN & PROFILE
SD-05
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
46 95
SD-05
STA 9+50 to 20+50
NOTES:
1. ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN
ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND
SPECIFICATIONS.
2. STORM PIPES SHALL BE RCP UNLESS OTHERWISE NOTED.
3. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
4. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN
PIPE LENGTHS.
SD-08
(SEE SHEET 47)
SD-06
(SEE SHEET
47
)
SD-09
(SEE SHEET 48)
SD-19
(SEE SHEET 53)
SD-07
(SEE SHEET 47)
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STORM PLAN & PROFILE
SD-04 (NECCO A4 LATERAL)
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
45 95
SD-04 (NECCO A4 LATERAL)
STA 9+50 to 24+00
NOTES:
1. ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN
ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND
SPECIFICATIONS.
2. STORM PIPES SHALL BE RCP UNLESS OTHERWISE NOTED.
3. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
4. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN
PIPE LENGTHS.
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STORM PLAN & PROFILE
SD-02 & SD-03
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
44 95
SD-03
STA 9+50 to 12+00
SD-02
STA 9+50 to 12+00
NOTES:
1. ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN
ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND
SPECIFICATIONS.
2. STORM PIPES SHALL BE RCP UNLESS OTHERWISE NOTED.
3. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
4. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN
PIPE LENGTHS.
SD-17
(SEE SHEET 53)
SD-01
(SEE SHEET 43)
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STORM PLAN & PROFILE
SD-01 STA 9+50 TO 22+00
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
43 95
SD-01
STA 9+50 to 22+00 0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
NOTES:
1. ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN
ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND
SPECIFICATIONS.
2. STORM PIPES SHALL BE RCP UNLESS OTHERWISE NOTED.
3. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
4. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN
PIPE LENGTHS.
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
19+00 18+50 18+00 17+50 17+00 16+50 16+00 15+50 15+00 14+50 14+00 13+50 13+00 12+50 12+00 11+50 11+00 10+50 10+00 9+50
MATCHLINE
SEE THIS SHEET
Block 7 Block 6
Block 5
Lot 2
Lot 3
Lot 4
Lot 5
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 9
Block 10 Block 11
Lot 2
Lot 3
Lot 4
Lot 5
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Drive 'B'
Bldg 9d
Bldg 10d
Bldg 12d
Bldg 11d
Bldg 13d
Bldg 14d
Block 11
Bldg 14d
Block 5
Bldg 13d
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
SANITARY SEWER PLAN & PROFILE
SAN-14 STA 9+50 TO 19+00
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
42 95
SAN-14
STA 9+50 to 19+00
SANITARY SERVICE
STATIONING
BLDG
NO. LOT
SRVC
SIZE STATION
12d
1 4" 15+49.00
2 4" 15+90.00
3 4" 15+95.00
4 4" 16+30.00
5 4" 16+35.88
6 4" 16+77.00
13d
1 4" 14+18.00
2 4" 14+42.00
3 4" 14+64.00
4 4" 14+86.00
5 4" 15+10.00
14d
1 4" 14+23.00
2 4" 14+28.00
3 4" 14+67.00
4 4" 14+72.00
5 4" 15+14.00
15d
1 4" 13+11.00
2 4" 13+06.00
3 4" 12+67.00
4 4" 12+62.00
5 4" 12+27.00
6 4" 12+22.00
7 4" 11+83.00
8 4" 11+78.00
16d
1 4" 12+98.00
2 4" 12+56.00
3 4" 12+51.00
4 4" 12+16.00
5 4" 12+11.00
6 4" 11+67.00
N
W
E
S
SANITARY SERVICE STATIONING
BLDG
NO. LOT
SRVC
SIZE STATION
9d
1 4" 17+15.00
2 4" 17+39.00
3 4" 17+61.00
4 4" 17+81.00
5 4" 18+01.00
6 4" 18+21.00
7 4" 18+43.00
8 4" 18+68.00
10d
1 4" 17+09.00
2 4" 17+51.00
3 4" 17+56.00
4 4" 17+91.00
5 4" 17+96.00
6 4" 18+31.00
7 4" 18+36.00
8 4" 18+78.23
11d
1 4" 15+54.00
2 4" 15+78.00
3 4" 16+00.00
4 4" 16+20.00
5 4" 16+42.00
6 4" 16+72.00
NOTES:
1. ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC.
VERIFY BUILDING CONNECTION ELEVATION (RE: MEP).
2. ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE
PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS.
3. INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO
SPRING LINE.
4. SITE CONTRACTOR SHALL COORDINATE UTILITY CONNECTIONS AT THE
BUILDING WITH BUILDING CONTRACTOR.
5. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
6. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE
LENGTHS.
SAN-13
(SEE SHEET 40)
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W
E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
SANITARY SEWER PLAN & PROFILE
SAN-13 STA 15+50 TO 21+50
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
41 95
SAN-13
STA 15+50 to 21+50
SANITARY SERVICE
STATIONING
BLDG
NO.
SRVC
SIZE STATION
3b 4" 21+22.00
4b 4" 19+80.00
5b 4" 18+33.00
17a 4" 17+14.00
NOTES:
1. ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC.
VERIFY BUILDING CONNECTION ELEVATION (RE: MEP).
2. ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE
PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS.
3. INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO
SPRING LINE.
4. SITE CONTRACTOR SHALL COORDINATE UTILITY CONNECTIONS AT THE
BUILDING WITH BUILDING CONTRACTOR.
5. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
6. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE
LENGTHS.
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
SANITARY SEWER PLAN & PROFILE
SAN-13 STA 9+50 TO 15+50
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
40 95
SAN-13
STA 9+50 to 15+50
NOTES:
1. ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC.
VERIFY BUILDING CONNECTION ELEVATION (RE: MEP).
2. ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE
PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS.
3. INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO
SPRING LINE.
4. SITE CONTRACTOR SHALL COORDINATE UTILITY CONNECTIONS AT THE
BUILDING WITH BUILDING CONTRACTOR.
5. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
6. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE
LENGTHS.
SANITARY SERVICE
STATIONING
BLDG
NO. LOT
SRVC
SIZE STATION
20d
1 4" 12+52.00
2 & 3 4" 11+98.00
4 & 5 4" 11+58.00
6 & 7 4" 11+18.00
8 4" 10+64.00
19d
1 4" 14+95.55
2 & 3 4" 14+41.00
4 & 5 4" 14+01.00
6 & 7 4" 13+61.00
8 4" 13+06.00
OFFSITE SANITARY SEWER
(SEE SHEET 31)
SAN-14
(SEE SHEET 42)
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
SANITARY SEWER PLAN & PROFILE
SAN-11 & 12
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
39 95
SAN-11
STA 9+50 to 13+00
SANITARY SERVICE
STATIONING
BLDG
NO.
SRVC
SIZE STATION
12c 6" 12+30.00
13c 6" 12+35.00
14c 6" 11+15.00
15c 6" 11+21.00
SAN-12
STA 9+50 to 11+50
NOTES:
1. ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC.
VERIFY BUILDING CONNECTION ELEVATION (RE: MEP).
2. ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE
PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS.
3. INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO
SPRING LINE.
4. SITE CONTRACTOR SHALL COORDINATE UTILITY CONNECTIONS AT THE
BUILDING WITH BUILDING CONTRACTOR.
5. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
6. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE
LENGTHS.
OFFSITE SANITARY SEWER
(SEE SHEET 30)
OFFSITE SANITARY SEWER
(SEE SHEET 30)
OFFSITE SANITARY SEWER
(SEE SHEET 30)
OFFSITE SANITARY SEWER
(SEE SHEET 30)
4965
4970
14+50 14+00 13+50 13+00 12+50 12+00 11+50 11+00 10+50 10+00 9+50
SCHLAGEL STREET
Bldg 16a
COLLAMER DRIVE
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
SANITARY SEWER PLAN & PROFILE
SAN-09 & 10
6/26/19
1" = 50'
1" = 5'
JTC
JTC
18-1000-00
----
38 95
SAN-09
STA 9+50 to 14+50
SAN-10
STA 9+50 to 11+50
N
W
E
S
SANITARY SERVICE
STATIONING
BLDG
NO.
SRVC
SIZE STATION
10c 6" 13+14.00
11c 6" 13+19.00
17d 4" 14+21.67
16a 4" 10+46.00
NOTES:
1. ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC.
VERIFY BUILDING CONNECTION ELEVATION (RE: MEP).
2. ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE
PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS.
3. INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO
SPRING LINE.
4. SITE CONTRACTOR SHALL COORDINATE UTILITY CONNECTIONS AT THE
BUILDING WITH BUILDING CONTRACTOR.
5. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
6. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE
LENGTHS.
SAN-08
(SEE SHEET 37)
SAN-08
(SEE SHEET 37)
SAN-08
(SEE SHEET 37)
SAN-08
(SEE SHEET 37)
4955
4960
4965
4970
23+50 23+00 22+50 22+00 21+50 21+00 20+50 20+00 19+50 19+00 18+50 18+00 17+50 17+00 16+50 16+00 15+50 15+00 14+50 14+00 13+50 13+00 12+50 12+00 11+50 11+00 10+50 10+00 9+50
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
SANITARY SEWER PLAN & PROFILE
SAN-08 STA 9+50 TO 23+00
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
37 95
SAN-08
STA 9+50 to 23+00
SANITARY SERVICE
STATIONING
BLDG
NO. LOT
SRVC
SIZE STATION
7d
1 4" 15+16.00
2 & 3 4" 14+61.00
4 & 5 4" 14+21.00
6 & 7 4" 13+81.00
8 4" 13+25.59
8d
1 4" 21+41.00
2 & 3 4" 20+87.00
3 4" 20+83.00
4 & 5 4" 20+39.00
5 4" 20+33.00
6 4" 19+75.00
15a n/a 4" 22+76.00
NOTES:
1. ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC.
VERIFY BUILDING CONNECTION ELEVATION (RE: MEP).
2. ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE
PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS.
3. INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO
SPRING LINE.
4. SITE CONTRACTOR SHALL COORDINATE UTILITY CONNECTIONS AT THE
BUILDING WITH BUILDING CONTRACTOR.
5. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
6. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE
LENGTHS.
OFFSITE
SANITARY SEWER
(SEE SHEET 30)
SAN-09
(SEE SHEET 38)
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
SANITARY SEWER PLAN & PROFILE
SAN-06 & 07
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
36 95
SAN-06
STA 9+50 to 11+50
SANITARY SERVICE
STATIONING
BLDG
NO.
SRVC
SIZE STATION
1c 6" 10+93.00
2c 6" 11+09.00
1b 4" 10+51.00
2b 4" 11+97.00
SAN-07
STA 9+50 to 12+50
N
W
E
S
NOTES:
1. ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC.
VERIFY BUILDING CONNECTION ELEVATION (RE: MEP).
2. ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE
PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS.
3. INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO
SPRING LINE.
4. SITE CONTRACTOR SHALL COORDINATE UTILITY CONNECTIONS AT THE
BUILDING WITH BUILDING CONTRACTOR.
5. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
6. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE
LENGTHS.
SAN-02
(SEE SHEET 34)
SAN-02
(SEE SHEET 34)
SAN-02
(SEE SHEET 34)
SAN-02
(SEE SHEET 34)
4960
4965
4970
11+50 11+00 10+50 10+00 9+50
Drive 'F'
Drive 'H'
Bldg 3c
Bldg 4c
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
SANITARY SEWER PLAN & PROFILE
SAN-03, 04, & 05
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
35 95
SAN-03
STA 9+50 to 11+50
SANITARY SERVICE
STATIONING
BLDG
NO.
SRVC
SIZE STATION
3c 6" 11+06.00
4c 6" 11+11.00
5c 6" 11+06.00
6c 6" 11+11.00
8c 6" 10+56.00
9c 6" 11+06.00
SAN-04
STA 9+50 to 11+50
SAN-05
STA 9+50 to 11+50
NOTES:
1. ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC.
VERIFY BUILDING CONNECTION ELEVATION (RE: MEP).
2. ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE
PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS.
3. INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO
SPRING LINE.
4. SITE CONTRACTOR SHALL COORDINATE UTILITY CONNECTIONS AT THE
BUILDING WITH BUILDING CONTRACTOR.
5. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
6. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE
LENGTHS.
SAN-02
(SEE SHEET 33)
SAN-02
(SEE SHEET 33)
SAN-02
(SEE SHEET 33)
SAN-02
(SEE SHEET 33)
SAN-02
(SEE SHEET 34)
SAN-02
(SEE SHEET 34)
4950
4955
4960
4965
4970
28+00 27+50 27+00 26+50 26+00 25+50 25+00 24+50 24+00 23+50 23+00 22+50 22+00 21+50 21+00 20+50 20+00 19+50 19+25
MATCHLINE STA 19+25
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
SANITARY SEWER PLAN & PROFILE
SAN-02 STA 19+25 TO 28+00
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
34 95
SAN-02
STA 19+25 to 28+00
SANITARY SERVICE
STATIONING
BLDG
NO. LOT
SRVC
SIZE STATION
3d
1 4" 20+56.00
2 4" 20+14.00
3 4" 20+09.00
4 4" 19+74.00
5 4" 19+69.00
6 4" 19+34.00
7 4" 19+29.00
2d
1 4" 22+05.00
2 4" 21+63.00
3 4" 21+58.00
4 4" 21+19.00
5 4" 21+14.00
1d
1 4" 23+99.00
2 4" 23+72.00
3 4" 23+67.00
4 4" 23+32.00
5 4" 23+27.00
6 4" 22+92.00
7 4" 22+87.00
8 4" 22+45.00
14a n/a 4" 25+95.00
NOTES:
1. ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC.
VERIFY BUILDING CONNECTION ELEVATION (RE: MEP).
2. ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE
PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS.
3. INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO
SPRING LINE.
4. SITE CONTRACTOR SHALL COORDINATE UTILITY CONNECTIONS AT THE
BUILDING WITH BUILDING CONTRACTOR.
5. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
6. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE
LENGTHS.
SAN-05
(SEE SHEET 35)
SAN-06
(SEE SHEET 36)
SAN-10
(SEE SHEET
38
)
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
19+25 19+00 18+50 18+00 17+50 17+00 16+50 16+00 15+50 15+00 14+50 14+00 13+50 13+00 12+50 12+00 11+50 11+00 10+50 10+00 9+50
MATCHLINE STA 19+25
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
SANITARY SEWER PLAN & PROFILE
SAN-02 STA 9+50 TO 19+25
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
33 95
SAN-02
STA 9+50 to 19+25
SANITARY SERVICE
STATIONING
BLDG
NO. LOT
SRVC
SIZE STATION
7c n/a 6" 14+12.00
6d
1 4" 13+77.00
2 4" 13+35.00
3 4" 13+30.00
4 4" 12+95.00
5 4" 12+90.00
6 4" 12+55.00
7 4" 12+50.00
8 4" 12+09.00
5d
1 4" 15+46.00
2 4" 15+04.00
3 4" 14+99.00
4 4" 14+64.00
5 4" 14+59.00
6 4" 14+17.00
4d
1 4" 17+55.00
2 4" 17+13.00
3 4" 17+08.00
4 4" 16+73.00
5 4" 16+68.00
6 4" 16+33.00
7 4" 16+28.00
8 4" 15+86.00
3d 8 4" 18+85.00
NOTES:
1. ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC.
VERIFY BUILDING CONNECTION ELEVATION (RE: MEP).
2. ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE
PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS.
3. INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO
SPRING LINE.
4. SITE CONTRACTOR SHALL COORDINATE UTILITY CONNECTIONS AT THE
BUILDING WITH BUILDING CONTRACTOR.
5. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
6. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE
LENGTHS.
OFFSITE SANITARY SEWER
(SEE SHEET 30)
OFFSITE SANITARY SEWER
(SEE SHEET 30)
SAN-03
(SEE SHEET 35)
SAN-04
(SEE SHEET 35)
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
SANITARY SEWER PLAN & PROFILE
SAN-01 STA 9+50 TO 24+00
6/26/19
1" = 50'
1" = 5'
JTC
JTC
18-1000-00
----
32 95
SAN-01
STA 9+50 to 24+00
SANITARY SERVICE
STATIONING
BLDG
NO.
SRVC
SIZE STATION
7a 4" 17+34.00
8a 4" 15+15.00
9a 4" 15+05.00
10a 4" 13+44.00
11a 4" 13+34.00
12a 4" 11+40.00
13a 4" 11+84.00
NOTES:
1. ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC.
VERIFY BUILDING CONNECTION ELEVATION (RE: MEP).
2. ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE
PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS.
3. INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO
SPRING LINE.
4. SITE CONTRACTOR SHALL COORDINATE UTILITY CONNECTIONS AT THE
BUILDING WITH BUILDING CONTRACTOR.
5. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
6. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE
LENGTHS.
SANITARY SERVICE
STATIONING
BLDG
NO.
SRVC
SIZE STATION
1a 4" 23+80.92
2a 4" 22+76.00
3a 4" 22+66.00
4a 4" 21+28.00
5a 4" 21+18.00
6a 4" 19+12.00
OFFSITE SANITARY SEWER
(SEE SHEET 29)
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
OFFSITE SANITARY SEWER
STA 43+50 TO 47+50
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
31 95
OFFSITE SANITARY SEWER
STA 43+50 to 47+50
NOTES:
1. ALL SANITARY SEWER MAINS SHALL BE SDR 35 PVC.
2. INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO
SPRING LINE.
3. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
4. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE.
SAN-13
(SEE SHEET 40)
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
OFFSITE SANITARY SEWER
STA 32+50 TO 43+50
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
30 95
OFFSITE SANITARY SEWER
STA 32+50 to 43+50
NOTES:
1. ALL SANITARY SEWER MAINS SHALL BE SDR 35 PVC.
2. INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO
SPRING LINE.
3. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
4. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE.
SAN-02
(SEE SHEET 33)
SAN-08
(SEE SHEET 37)
SAN-11
(SEE SHEET 39)
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
OFFSITE SANITARY SEWER
STA 21+50 TO 32+50
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
29 95
OFFSITE SANITARY SEWER
STA 21+50 to 32+50
NOTES:
1. ALL SANITARY SEWER MAINS SHALL BE SDR 35 PVC.
2. INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO
SPRING LINE.
3. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
4. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE.
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
OFFSITE SANITARY SEWER
STA 9+50 TO 21+50
6/26/19
1" = 50'
1" = 5'
KRB
JTC
18-1000-00
----
28 95
OFFSITE SANITARY SEWER
STA 9+50 to 21+50
NOTES:
1. ALL SANITARY SEWER MAINS SHALL BE SDR 35 PVC.
2. INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO
SPRING LINE.
3. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE
APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
4. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER
OF STRUCTURE.
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
Drive 'F' Drive 'F'
Drive 'E'
Drive 'I'
Drive 'H'
Drive 'G'
Drive 'J'
Bldg 10a
Bldg 11a
Bldg 12a
Bldg 13a
Bldg 1d Bldg 2d Bldg 3d Bldg 4d
Bldg 5d Bldg 6d
Bldg 2c
Bldg 1c
Bldg 3c Bldg 4c Bldg 5c Bldg 6c Bldg 8c
Bldg 9c
Bldg 7c
SWARTZ, DAVID A,
MILCAN, SUSAN MARIE
LOT 29
ARREOLA, MANUEL L
LOT 30
CUSACK, JOAN E
LOT 37
MONDRAGON, LUCY
V / CHRISTINA M,
LOT 28
ALTA VISTA
SUBDIVISION
Graham, John
C/Ginger L
Kederike Lemay, LLC
ROCKY MOUNTAIN
RAPTOR PROGRAM
MAIN STREET
ALTA VISTA STREET
MARTINEZ STREET
EMMERICH, KARLA J
LOT 41
BAZOIN-LAPPARTIENT,
ANDREA MARIE, GREGORY C
LOT 40
Tract W
(Drainage, Utility, &
Private Access
Easement)
Tract T
(Drainage, Utility, &
Private Access
Easement)
Tract H
(Drainage, Utility, &
Private Access
Easement)
Tract V
(Drainage, Utility, & Private Access Easement)
Tract R
(Drainage, Utility,
& Private Access
Easement)
Tract P
(Drainage, Utility, &
Private Access
Easement) Tract Q
(Drainage, Utility, &
Private Access
Easement)
Tract 5
(D, U, & PAE) Tract 3
(D, U, & PAE)
KEY MAP
NTS
N
W E
S
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
NOTES:
1. ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN PROVIDED BY OTHERS AND DETERMINED FROM A COMBINATION OF RECORD DRAWINGS, SURVEYED FIELD MARK-OUTS AND PHYSICAL OBSERVATIONS.
THERE MAY BE UTILITIES NOT SHOWN ON THE DRAWINGS WHICH PRESENTLY EXIST IN THE AREA OF CONSTRUCTION. THEREFORE, THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING
UTILITIES IN THE PROJECT VICINITY PRIOR TO BEGINNING WORK. THE CONTRACTOR SHALL BE FULLY AND SOLELY RESPONSIBLE FOR ANY AND ALL DAMAGES AND COSTS WHICH MIGHT OCCUR BY THE
CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES. THE CONTRACTOR SHALL NOTIFY ALL PUBLIC AND PRIVATE UTILITY COMPANIES AND DETERMINE THE LOCATION OF ALL
EXISTING UTILITIES PRIOR TO PROCEEDING WITH GRADING AND CONSTRUCTION. ALL WORK PERFORMED IN THE AREA OF UTILITIES SHALL BE PERFORMED AND INSPECTED ACCORDING TO THE
REQUIREMENTS OF THE UTILITY OWNER. LIKEWISE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND MAPPING ANY EXISTING UTILITY (INCLUDING DEPTH) WHICH MAY CONFLICT WITH THE
PROPOSED CONSTRUCTION, AND FOR RELOCATING ENCOUNTERED UTILITIES AS DIRECTED BY THE ENGINEER. CONTRACTOR SHALL CONTACT AND RECEIVE APPROVAL FROM OWNER/UTILITY OWNER
BEFORE RELOCATING ANY ENCOUNTERED UTILITIES. CONTRACTOR RESPONSIBLE FOR SERVICE CONNECTIONS, AND RELOCATING AND RECONNECTING AFFECTED UTILITIES AS COORDINATED WITH UTILITY
OWNER AND/OR ENGINEER, INCLUDING NON-MUNICIPAL UTILITIES (TELEPHONE, GAS, CABLE, ETC., WHICH SHALL BE COORDINATED WITH THE UTILITY OWNER). THE CONTRACTOR SHALL IMMEDIATELY
CONTACT ENGINEER UPON DISCOVERY OF A UTILITY DISCREPANCY OR CONFLICT. AT LEAST 48 HOURS PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE UTILITY NOTIFICATION CENTER OF
COLORADO (1-800-922-1987, WWW.UNCC.ORG).
2. IN ADDITION TO MEETING APPLICABLE LCUASS, STATE OR FEDERAL STANDARDS, ALL MATERIALS, WORKMANSHIP AND CONSTRUCTION OF PUBLIC WATER AND WASTEWATER SYSTEM IMPROVEMENTS SHALL
MEET OR EXCEED THE STANDARDS SET FORTH IN THE CITY OF FORT COLLINS WATER AND WASTEWATER DEVELOPMENT STANDARDS.
3. IN CASES OF CONFLICT BETWEEN THESE SIGNED PLANS AND APPLICABLE STANDARDS, THE MOST RESTRICTIVE STANDARD SHALL APPLY.
4. ALL WATER MAINS AND FIRE LINES SHALL BE AWWA C900 PLASTIC PRESSURE PIPE (DR-18, PRESSURE CLASS 305). ALL PLASTIC PRESSURE PIPE SHALL HAVE TRACER WIRE PER STANDARDS. ALL FITTINGS ON
THE
PROPOSED FIRE LINES AND FIRE HYDRANT LATERALS SHALL BE FULLY RESTRAINED JOINTS PER CITY STANDARDS (MEGA-LUG OR APPROVED EQUAL).
5. ALL WATER SERVICES SHALL BE TYPE K SOFT COPPER.
6. ALL WATER MAINS AND SERVICES SHALL HAVE A MINIMUM COVER OF 4.5' AND A MAXIMUM OF 5.5', UNLESS OTHERWISE NOTED.
7. ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC. VERIFY BUILDING CONNECTION ELEVATION (RE: MEP).
8. ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS.
9. INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO SPRING LINE.
10. SITE CONTRACTOR SHALL COORDINATE UTILITY CONNECTIONS AT THE BUILDING WITH BUILDING CONTRACTOR.
11. ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS.
12. STORM PIPES SHALL BE ADS HP STORM PIPE UNLESS OTHERWISE NOTED.
13. COORDINATE SITE LIGHTING AND ELECTRIC SERVICE ROUTING, DEMOLISHING, RELOCATING, AND MODIFICATIONS WITH THE ELECTRICAL ENGINEER, ARCHITECT, AND OWNER.
14. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
15. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE LENGTHS.
16. A FLOODPLAIN USE PERMIT MUST BE APPROVED PRIOR TO BEGINNING ANY WORK WITHIN THE DRY CREEK 100-YEAR FLOOD FRINGE.
17. SEE SHEET 23 FOR FLOODPLAIN/FLOODWAY LIMITS AND REQUIREMENTS.
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
N
W E
S
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
UTILITY PLAN
6/26/19
1" = 50'
N/A
JTC
JTC
18-1000-00
----
26 95
KEY MAP
NTS
N
W E
S
0
50'
50 25 50 100
SCALE: 1" =
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
NOTES:
1. ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN PROVIDED BY OTHERS AND DETERMINED FROM A COMBINATION OF RECORD DRAWINGS,
SURVEYED FIELD MARK-OUTS AND PHYSICAL OBSERVATIONS. THERE MAY BE UTILITIES NOT SHOWN ON THE DRAWINGS WHICH PRESENTLY EXIST IN THE
AREA OF CONSTRUCTION. THEREFORE, THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES IN THE PROJECT VICINITY
PRIOR TO BEGINNING WORK. THE CONTRACTOR SHALL BE FULLY AND SOLELY RESPONSIBLE FOR ANY AND ALL DAMAGES AND COSTS WHICH MIGHT
OCCUR BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES. THE CONTRACTOR SHALL NOTIFY ALL PUBLIC AND
PRIVATE UTILITY COMPANIES AND DETERMINE THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO PROCEEDING WITH GRADING AND CONSTRUCTION.
ALL WORK PERFORMED IN THE AREA OF UTILITIES SHALL BE PERFORMED AND INSPECTED ACCORDING TO THE REQUIREMENTS OF THE UTILITY OWNER.
LIKEWISE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND MAPPING ANY EXISTING UTILITY (INCLUDING DEPTH) WHICH MAY CONFLICT
WITH THE PROPOSED CONSTRUCTION, AND FOR RELOCATING ENCOUNTERED UTILITIES AS DIRECTED BY THE ENGINEER. CONTRACTOR SHALL CONTACT
AND RECEIVE APPROVAL FROM OWNER/UTILITY OWNER BEFORE RELOCATING ANY ENCOUNTERED UTILITIES. CONTRACTOR RESPONSIBLE FOR SERVICE
CONNECTIONS, AND RELOCATING AND RECONNECTING AFFECTED UTILITIES AS COORDINATED WITH UTILITY OWNER AND/OR ENGINEER, INCLUDING
NON-MUNICIPAL UTILITIES (TELEPHONE, GAS, CABLE, ETC., WHICH SHALL BE COORDINATED WITH THE UTILITY OWNER). THE CONTRACTOR SHALL
IMMEDIATELY CONTACT ENGINEER UPON DISCOVERY OF A UTILITY DISCREPANCY OR CONFLICT. AT LEAST 48 HOURS PRIOR TO CONSTRUCTION, THE
CONTRACTOR SHALL NOTIFY THE UTILITY NOTIFICATION CENTER OF COLORADO (1-800-922-1987, WWW.UNCC.ORG).
2. IN ADDITION TO MEETING APPLICABLE LCUASS, STATE OR FEDERAL STANDARDS, ALL MATERIALS, WORKMANSHIP AND CONSTRUCTION OF PUBLIC
WATER AND WASTEWATER SYSTEM IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS SET FORTH IN THE CITY OF FORT COLLINS WATER AND
WASTEWATER DEVELOPMENT STANDARDS.
3. IN CASES OF CONFLICT BETWEEN THESE SIGNED PLANS AND APPLICABLE STANDARDS, THE MOST RESTRICTIVE STANDARD SHALL APPLY.
4. ALL WATER MAINS AND FIRE LINES SHALL BE AWWA C900 PLASTIC PRESSURE PIPE (DR-18, PRESSURE CLASS 305). ALL PLASTIC PRESSURE PIPE SHALL
HAVE TRACER WIRE PER STANDARDS. ALL FITTINGS ON THE PROPOSED FIRE LINES AND FIRE HYDRANT LATERALS SHALL BE FULLY RESTRAINED JOINTS PER
CITY STANDARDS (MEGA-LUG OR APPROVED EQUAL).
5. ALL WATER SERVICES SHALL BE TYPE K SOFT COPPER.
6. ALL WATER MAINS AND SERVICES SHALL HAVE A MINIMUM COVER OF 4.5' AND A MAXIMUM OF 5.5', UNLESS OTHERWISE NOTED.
7. ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC. VERIFY BUILDING CONNECTION ELEVATION (RE: MEP).
8. ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS.
9. INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO SPRING LINE.
10. SITE CONTRACTOR SHALL COORDINATE UTILITY CONNECTIONS AT THE BUILDING WITH BUILDING CONTRACTOR.
11. ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS.
12. STORM PIPES SHALL BE ADS HP STORM PIPE UNLESS OTHERWISE NOTED.
13. COORDINATE SITE LIGHTING AND ELECTRIC SERVICE ROUTING, DEMOLISHING, RELOCATING, AND MODIFICATIONS WITH THE ELECTRICAL ENGINEER,
ARCHITECT, AND OWNER.
14. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
15. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE
LENGTHS.
16. A FLOODPLAIN USE PERMIT MUST BE APPROVED PRIOR TO BEGINNING ANY WORK WITHIN THE DRY CREEK 100-YEAR FLOOD FRINGE.
17. SEE SHEET 23 FOR FLOODPLAIN/FLOODWAY LIMITS AND REQUIREMENTS.
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
N
W E
S
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
UTILITY PLAN
6/26/19
1" = 50'
N/A
JTC
JTC
18-1000-00
----
25 95
DUAL SANITARY SEWER SERVICE LINE DETAIL
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 4
MATCHLINE
SEE SHEET 26
FUTURE LEMAY AVENUE
Block 9
Block 10 Block 11
L
ot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 12
Block 13
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Drive 'B'
Drive 'B'
Drive 'A'
Drive 'B'
Drive D'
Drive 'C'
Drive 'E'
Bldg 5b
Bldg 4b
Bldg 3b
Bldg 2b
Bldg 15a
Bldg 16a
Bldg 17a
Bldg 2c Bldg 3c Bldg 4c Bldg 5c Bldg 6c Bldg 8c
Bldg 9c
Bldg 12c
Bldg 13c
Bldg 14c Bldg 15c
Bldg 10c Bldg 11c
Bldg 7d
Bldg 19d Bldg 20d
Bldg 15d Bldg 18d
Bldg 16d
Bldg 17d
Bldg 8d
Bldg 9d
Bldg 10d Bldg 12d
Bldg 11d
Bldg 13d
Bldg 14d
COMMUNITY
CLUBHOUSE
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
SNYDER, RICHARD F
SCHLAGEL, DONALD E
/CHERYL D
SCHLAGEL, LEONARD L
/JUNE S
UNTERBERGER,
LORIN
Graham, John
C/Ginger L
Tract F
(Drainage, Utility, &
Private Access
Easement)
Tract A
(Drainage, Utility, &
Private Access Easement)
Tract A
(Drainage, Utility, &
Private Access
Easement)
Tract H
(Drainage, Utility,
& Private Access
Easement)
Tract O
(Drainage, Utility, &
Private Access
Easement)
Tract N
(Drainage, Utility, &
Private Access
Easement)
Tract R
(Drainage, Utility, &
Private Access
Easement)
Tract 1
(D, U, & PAE)
Tract Y
(D, U, & PAE)
Tract X
(D, U, & PAE)
Tract C
(D, U, & PAE)
Tract D
(D, U, & PAE)
Tract G
(Drainage, Utility,
& Private Access
Easement)
Tract 3
(D, U, & PAE)
Tract 2
(D, U, & PAE)
Tract 4
(D, U, & PAE)
Tract J
(Drainage, Utility,
& Private Access
Easement)
Tract M (D, U, & PAE)
Tract 2
(D, U, & PAE)
Tract K
(D, U, & PAE)
Tract L (D, U, & PAE)
Tract P
(Drainage, Utility, &
Tract B
(D, U, & PAE)
Tract E
(D, U, & PAE)
Tract I
(D, U, & PAE)
KEY MAP
NTS
N
W E
S
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
NOTES:
1. ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN PROVIDED BY OTHERS AND DETERMINED FROM A COMBINATION OF
RECORD DRAWINGS, SURVEYED FIELD MARK-OUTS AND PHYSICAL OBSERVATIONS. THERE MAY BE UTILITIES NOT SHOWN ON
THE DRAWINGS WHICH PRESENTLY EXIST IN THE AREA OF CONSTRUCTION. THEREFORE, THE CONTRACTOR SHALL VERIFY
LOCATION AND DEPTH OF ALL EXISTING UTILITIES IN THE PROJECT VICINITY PRIOR TO BEGINNING WORK. THE CONTRACTOR
SHALL BE FULLY AND SOLELY RESPONSIBLE FOR ANY AND ALL DAMAGES AND COSTS WHICH MIGHT OCCUR BY THE
CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES. THE CONTRACTOR SHALL NOTIFY ALL
PUBLIC AND PRIVATE UTILITY COMPANIES AND DETERMINE THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO PROCEEDING
WITH GRADING AND CONSTRUCTION. ALL WORK PERFORMED IN THE AREA OF UTILITIES SHALL BE PERFORMED AND
INSPECTED ACCORDING TO THE REQUIREMENTS OF THE UTILITY OWNER. LIKEWISE, THE CONTRACTOR SHALL BE RESPONSIBLE
FOR LOCATING AND MAPPING ANY EXISTING UTILITY (INCLUDING DEPTH) WHICH MAY CONFLICT WITH THE PROPOSED
CONSTRUCTION, AND FOR RELOCATING ENCOUNTERED UTILITIES AS DIRECTED BY THE ENGINEER. CONTRACTOR SHALL
CONTACT AND RECEIVE APPROVAL FROM OWNER/UTILITY OWNER BEFORE RELOCATING ANY ENCOUNTERED UTILITIES.
CONTRACTOR RESPONSIBLE FOR SERVICE CONNECTIONS, AND RELOCATING AND RECONNECTING AFFECTED UTILITIES AS
COORDINATED WITH UTILITY OWNER AND/OR ENGINEER, INCLUDING NON-MUNICIPAL UTILITIES (TELEPHONE, GAS, CABLE,
ETC., WHICH SHALL BE COORDINATED WITH THE UTILITY OWNER). THE CONTRACTOR SHALL IMMEDIATELY CONTACT
ENGINEER UPON DISCOVERY OF A UTILITY DISCREPANCY OR CONFLICT. AT LEAST 48 HOURS PRIOR TO CONSTRUCTION, THE
CONTRACTOR SHALL NOTIFY THE UTILITY NOTIFICATION CENTER OF COLORADO (1-800-922-1987, WWW.UNCC.ORG).
2. IN ADDITION TO MEETING APPLICABLE LCUASS, STATE OR FEDERAL STANDARDS, ALL MATERIALS, WORKMANSHIP AND
CONSTRUCTION OF PUBLIC WATER AND WASTEWATER SYSTEM IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS
SET FORTH IN THE CITY OF FORT COLLINS WATER AND WASTEWATER DEVELOPMENT STANDARDS.
3. IN CASES OF CONFLICT BETWEEN THESE SIGNED PLANS AND APPLICABLE STANDARDS, THE MOST RESTRICTIVE STANDARD
SHALL APPLY.
4. ALL WATER MAINS AND FIRE LINES SHALL BE AWWA C900 PLASTIC PRESSURE PIPE (DR-18, PRESSURE CLASS 305). ALL PLASTIC
PRESSURE PIPE SHALL HAVE TRACER WIRE PER STANDARDS. ALL FITTINGS ON THE PROPOSED FIRE LINES AND FIRE HYDRANT
LATERALS SHALL BE FULLY RESTRAINED JOINTS PER CITY STANDARDS (MEGA-LUG OR APPROVED EQUAL).
5. ALL WATER SERVICES SHALL BE TYPE K SOFT COPPER.
6. ALL WATER MAINS AND SERVICES SHALL HAVE A MINIMUM COVER OF 4.5' AND A MAXIMUM OF 5.5', UNLESS OTHERWISE
NOTED.
7. ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC. VERIFY BUILDING CONNECTION ELEVATION (RE: MEP).
8. ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS.
9. INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO SPRING LINE.
10. SITE CONTRACTOR SHALL COORDINATE UTILITY CONNECTIONS AT THE BUILDING WITH BUILDING CONTRACTOR.
11. ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS
AND SPECIFICATIONS.
12. STORM PIPES SHALL BE ADS HP STORM PIPE UNLESS OTHERWISE NOTED.
13. COORDINATE SITE LIGHTING AND ELECTRIC SERVICE ROUTING, DEMOLISHING, RELOCATING, AND MODIFICATIONS WITH
THE ELECTRICAL ENGINEER, ARCHITECT, AND OWNER.
14. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO
INSTALLATION.
15. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. LENGTH OF FLARED END SECTIONS
ARE INCLUDED IN PIPE LENGTHS.
16. A FLOODPLAIN USE PERMIT MUST BE APPROVED PRIOR TO BEGINNING ANY WORK WITHIN THE DRY CREEK 100-YEAR FLOOD
FRINGE.
17. SEE SHEET 23 FOR FLOODPLAIN/FLOODWAY LIMITS AND REQUIREMENTS.
0
50'
50 25 50 100
SCALE: 1" =
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
UTILITY PLAN
6/26/19
1" = 50'
N/A
JTC
JTC
18-1000-00
----
24 95
PRIVATE DRIVE UTILITY LAYOUTS
(SEE PLAN VIEW FOR SECTION LOCATIONS)
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
OVERALL UTILITY PLAN
6/26/19
1" = 100'
N/A
JTC
JTC
18-1000-00
----
23 95
FLOODPLAIN NOTES
1. THE CURRENT EFFECTIVE (JUNE 17, 2008) FEMA FLOOD INSURANCE RATE MAP (FIRM, MAP NUMBERS 08096C0977G & 08069C0981G) DEPICTS
THE 100-YR FLOODPLAIN IN SOME AREAS OF THE PROPOSED DEVELOPMENT. HOWEVER, IT IS ANTICIPATED THAT, AT THE TIME OF BUILDING
CONSTRUCTION ON THE AFFECTED LOTS, THE NORTHEAST COLLEGE CORRIDOR OUTFALL PROJECT (NECCO) WILL HAVE REMAPPED THE
FLOODPLAIN SUCH THAT THE 100-YR FLOODPLAIN WILL NO LONGER BE PRESENT ON THE PROPOSED DEVELOPMENT. IT IS ANTICIPATED THAT THE
MAP REVISION WILL BE COMPLETED BY THE END OF 2019.
2. IF THE DEVELOPER DECIDES TO CONSTRUCT STRUCTURES OR OTHER CONSTRUCTION ELEMENTS IN THE CURRENT EFFECTIVE 100-YR FLOODPLAIN
BEFORE THE REMAPPING EFFORTS ARE COMPLETE AND DOCUMENTED BY NECCO AND FEMA, IT SHOULD BE NOTED THAT ADDITIONAL ANALYSIS
OF THE BFE IS NECESSARY, AND THE FOLLOWING NOTES WILL ALSO APPLY:
2.1. FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR EACH STRUCTURE AND EACH SITE CONSTRUCTION ELEMENT (DETENTION PONDS, BIKE
PATHS, PARKING LOTS, UTILITIES, ETC.) IN THE FLOODPLAIN
2.2. A FEMA ELEVATION OR FLOODPROOFING CERTIFICATE MUST BE COMPLETED AND APPROVED BEFORE THE CERTIFICATE OF
OCCUPANCY (CO) IS ISSUED FOR ANY STRUCTURES IN THE FLOODPLAIN.
3. THE 500 -YR FLOODPLAIN (SHADED ZONE X - NOT SHOWN HEREON) IS DUE TO THE FLOODING OF THE POUDRE RIVER, CRITICAL FACILITIES ARE
PROHIBITED WITHIN THE 500-YR FLOODPLAIN, FACILITIES FOR AT-RISK POPULATIONS (DAYCARES, SCHOOLS, NURSING HOMES, ETC.) AND
EMERGENCY SERVICES FACILITIES (E.G. URGENT CARE, HOSPITALS, FIRE, POLICE).
4. A FLOODPLAIN USE PERMIT MUST BE APPROVED PRIOR TO BEGINNING ANY WORK WITHIN THE DRY CREEK 100-YEAR FLOOD FRINGE.
100-YR FLOODPLAIN (FEMA)
100-YR FLOODWAY (FEMA)
500-YR FLOODPLAIN (FEMA)
100-YR FLOODPLAIN (NECCO)
100-YR FLOODWAY (NECCO)
LEGEND
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
DETAILED GRADING PLAN
6/26/19
1" = 30'
N/A
JTC
JTC
18-1000-00
----
22 95
0
30'
30 15 30 60
SCALE: 1" =
N
W E
S
1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL
MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION.
2. SPOT ELEVATIONS ARE SHOWN ARE ON FLOWLINE OR BACK OF WALK UNLESS
OTHERWISE LABELED.
3. WALKWAYS SLOPE 2.0% AWAY FROM BUILDINGS AND/OR TOWARD
PARKING/DRIVE AREAS. WALK LABELS ARE SHOWN ON THE HIGH SIDE OF THE
WALK.
4. TW AND BW ELEVATIONS REFER TO TOP OF WALL AND BOTTOM OF WALL AT THE
FINISHED GRADE AND DO NOT NECESSARILY INDICATE OVERALL HEIGHT OF
RETAINING WALLS. REFER TO LANDSCAPING, ARCHITECTURAL, AND
STRUCTURAL PLANS FOR ADDITIONAL WALL INFORMATION. RETAINING WALL
DESIGN TO BE PROVIDED WITH WALL PERMIT.
5. ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER
RECOMMENDATIONS.
6. THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS
REQUIRED FOR PROTECTION FROM THE 100 YEAR STORM. THE LOWEST
OPENING ELEVATIONS SHOWN ARE AT LEAST ONE FOOT ABOVE THE 100 YEAR
STORM ELEVATION OF ADJACENT STREETS, CHANNELS, DITCHES, SWALES, OR
OTHER DRAINAGE FACILITIES. MINIMUM FINISHED FLOOR ELEVATIONS ABOVE
100-YEAR WATER SURFACE IN STREETS, CHANNELS, DITCHES, SWALES, OR OTHER
DRAINAGE FACILITIES, AS ILLUSTRATED BY A MASTER GRADING PLAN ARE TO BE
SHOWN.
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
MAJOR CONTOUR
MINOR CONTOUR
LEGEND
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
DETAILED GRADING PLAN
6/26/19
1" = 30'
N/A
JTC
JTC
18-1000-00
----
21 95
1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL
MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION.
2. SPOT ELEVATIONS ARE SHOWN ARE ON FLOWLINE OR BACK OF WALK UNLESS
OTHERWISE LABELED.
3. WALKWAYS SLOPE 2.0% AWAY FROM BUILDINGS AND/OR TOWARD
PARKING/DRIVE AREAS. WALK LABELS ARE SHOWN ON THE HIGH SIDE OF THE
WALK.
4. TW AND BW ELEVATIONS REFER TO TOP OF WALL AND BOTTOM OF WALL AT THE
FINISHED GRADE AND DO NOT NECESSARILY INDICATE OVERALL HEIGHT OF
RETAINING WALLS. REFER TO LANDSCAPING, ARCHITECTURAL, AND
STRUCTURAL PLANS FOR ADDITIONAL WALL INFORMATION. RETAINING WALL
DESIGN TO BE PROVIDED WITH WALL PERMIT.
5. ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER
RECOMMENDATIONS.
6. THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS
REQUIRED FOR PROTECTION FROM THE 100 YEAR STORM. THE LOWEST
OPENING ELEVATIONS SHOWN ARE AT LEAST ONE FOOT ABOVE THE 100 YEAR
STORM ELEVATION OF ADJACENT STREETS, CHANNELS, DITCHES, SWALES, OR
OTHER DRAINAGE FACILITIES. MINIMUM FINISHED FLOOR ELEVATIONS ABOVE
100-YEAR WATER SURFACE IN STREETS, CHANNELS, DITCHES, SWALES, OR OTHER
DRAINAGE FACILITIES, AS ILLUSTRATED BY A MASTER GRADING PLAN ARE TO BE
SHOWN.
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
MAJOR CONTOUR
MINOR CONTOUR
LEGEND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
DETAILED GRADING PLAN
6/26/19
1" = 30'
N/A
JTC
JTC
18-1000-00
----
20 95
0
30'
30 15 30 60
SCALE: 1" =
N
W E
S
1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL
MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION.
2. SPOT ELEVATIONS ARE SHOWN ARE ON FLOWLINE OR BACK OF WALK UNLESS
OTHERWISE LABELED.
3. WALKWAYS SLOPE 2.0% AWAY FROM BUILDINGS AND/OR TOWARD
PARKING/DRIVE AREAS. WALK LABELS ARE SHOWN ON THE HIGH SIDE OF THE
WALK.
4. TW AND BW ELEVATIONS REFER TO TOP OF WALL AND BOTTOM OF WALL AT THE
FINISHED GRADE AND DO NOT NECESSARILY INDICATE OVERALL HEIGHT OF
RETAINING WALLS. REFER TO LANDSCAPING, ARCHITECTURAL, AND
STRUCTURAL PLANS FOR ADDITIONAL WALL INFORMATION. RETAINING WALL
DESIGN TO BE PROVIDED WITH WALL PERMIT.
5. ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER
RECOMMENDATIONS.
6. THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS
REQUIRED FOR PROTECTION FROM THE 100 YEAR STORM. THE LOWEST
OPENING ELEVATIONS SHOWN ARE AT LEAST ONE FOOT ABOVE THE 100 YEAR
STORM ELEVATION OF ADJACENT STREETS, CHANNELS, DITCHES, SWALES, OR
OTHER DRAINAGE FACILITIES. MINIMUM FINISHED FLOOR ELEVATIONS ABOVE
100-YEAR WATER SURFACE IN STREETS, CHANNELS, DITCHES, SWALES, OR OTHER
DRAINAGE FACILITIES, AS ILLUSTRATED BY A MASTER GRADING PLAN ARE TO BE
SHOWN.
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
MAJOR CONTOUR
MINOR CONTOUR
LEGEND
Date
Date
Date
Date
Date
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
DETAILED GRADING PLAN
6/26/19
1" = 30'
N/A
JTC
JTC
18-1000-00
----
19 95
0
30'
30 15 30 60
SCALE: 1" =
N
W E
S
1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL
MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION.
2. SPOT ELEVATIONS ARE SHOWN ARE ON FLOWLINE OR BACK OF WALK UNLESS
OTHERWISE LABELED.
3. WALKWAYS SLOPE 2.0% AWAY FROM BUILDINGS AND/OR TOWARD
PARKING/DRIVE AREAS. WALK LABELS ARE SHOWN ON THE HIGH SIDE OF THE
WALK.
4. TW AND BW ELEVATIONS REFER TO TOP OF WALL AND BOTTOM OF WALL AT THE
FINISHED GRADE AND DO NOT NECESSARILY INDICATE OVERALL HEIGHT OF
RETAINING WALLS. REFER TO LANDSCAPING, ARCHITECTURAL, AND
STRUCTURAL PLANS FOR ADDITIONAL WALL INFORMATION. RETAINING WALL
DESIGN TO BE PROVIDED WITH WALL PERMIT.
5. ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER
RECOMMENDATIONS.
6. THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS
REQUIRED FOR PROTECTION FROM THE 100 YEAR STORM. THE LOWEST
OPENING ELEVATIONS SHOWN ARE AT LEAST ONE FOOT ABOVE THE 100 YEAR
STORM ELEVATION OF ADJACENT STREETS, CHANNELS, DITCHES, SWALES, OR
OTHER DRAINAGE FACILITIES. MINIMUM FINISHED FLOOR ELEVATIONS ABOVE
100-YEAR WATER SURFACE IN STREETS, CHANNELS, DITCHES, SWALES, OR OTHER
DRAINAGE FACILITIES, AS ILLUSTRATED BY A MASTER GRADING PLAN ARE TO BE
SHOWN.
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
MAJOR CONTOUR
MINOR CONTOUR
LEGEND
Block 14, Bldg 7d
COMMUNITY CLUBHOUSE
Pond B3
Pond A2
Pond A1
Tract I
(D,U,&PAE)
Tract M
(D,U,&PAE)
Tract G
(D,U,&PAE)
Tract H
(D,U,&PAE)
Tract 3
(D,U,&PAE)
Tract 3
(D,U,&PAE)
Tract 3
(D,U,&PAE)
Tract Q
(D,U,&PAE)
Tract R
(D,U,&PAE)
Tract H
(D,U,&PAE)
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
DETAILED GRADING PLAN
6/26/19
1" = 30'
N/A
JTC
JTC
18-1000-00
----
18 95
0
30'
30 15 30 60
SCALE: 1" =
N
W E
S
1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL
MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION.
2. SPOT ELEVATIONS ARE SHOWN ARE ON FLOWLINE OR BACK OF WALK UNLESS
OTHERWISE LABELED.
3. WALKWAYS SLOPE 2.0% AWAY FROM BUILDINGS AND/OR TOWARD
PARKING/DRIVE AREAS. WALK LABELS ARE SHOWN ON THE HIGH SIDE OF THE
WALK.
4. TW AND BW ELEVATIONS REFER TO TOP OF WALL AND BOTTOM OF WALL AT THE
FINISHED GRADE AND DO NOT NECESSARILY INDICATE OVERALL HEIGHT OF
RETAINING WALLS. REFER TO LANDSCAPING, ARCHITECTURAL, AND
STRUCTURAL PLANS FOR ADDITIONAL WALL INFORMATION. RETAINING WALL
DESIGN TO BE PROVIDED WITH WALL PERMIT.
5. ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER
RECOMMENDATIONS.
6. THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS
REQUIRED FOR PROTECTION FROM THE 100 YEAR STORM. THE LOWEST
OPENING ELEVATIONS SHOWN ARE AT LEAST ONE FOOT ABOVE THE 100 YEAR
STORM ELEVATION OF ADJACENT STREETS, CHANNELS, DITCHES, SWALES, OR
OTHER DRAINAGE FACILITIES. MINIMUM FINISHED FLOOR ELEVATIONS ABOVE
100-YEAR WATER SURFACE IN STREETS, CHANNELS, DITCHES, SWALES, OR OTHER
DRAINAGE FACILITIES, AS ILLUSTRATED BY A MASTER GRADING PLAN ARE TO BE
SHOWN.
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
MAJOR CONTOUR
MINOR CONTOUR
LEGEND
Bldg 1b
Block 9, Bldg 10d
Pond B2
Pond B1
Pond
A1
Pond B3
Tract T
(Drainage, Utility, &
Private Access Easement)
Tract K
(D,U,&PAE)
Tract F
(D,U,&PAE)
Tract 2
(D,U,&PAE)
Tract N
(D,U,&PAE)
Tract O
(D,U,&PAE)
Tract 5
(D,U,&PAE)
Tract 5
(D,U,&PAE)
Tract P
(D,U,&PAE)
Tract Q
(D,U,&PAE)
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
DETAILED GRADING PLAN
6/26/19
1" = 30'
N/A
JTC
JTC
18-1000-00
----
17 95
0
30'
30 15 30 60
SCALE: 1" =
N
W E
S
1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL
MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION.
2. SPOT ELEVATIONS ARE SHOWN ARE ON FLOWLINE OR BACK OF WALK UNLESS
OTHERWISE LABELED.
3. WALKWAYS SLOPE 2.0% AWAY FROM BUILDINGS AND/OR TOWARD
PARKING/DRIVE AREAS. WALK LABELS ARE SHOWN ON THE HIGH SIDE OF THE
WALK.
4. TW AND BW ELEVATIONS REFER TO TOP OF WALL AND BOTTOM OF WALL AT THE
FINISHED GRADE AND DO NOT NECESSARILY INDICATE OVERALL HEIGHT OF
RETAINING WALLS. REFER TO LANDSCAPING, ARCHITECTURAL, AND
STRUCTURAL PLANS FOR ADDITIONAL WALL INFORMATION. RETAINING WALL
DESIGN TO BE PROVIDED WITH WALL PERMIT.
5. ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER
RECOMMENDATIONS.
6. THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS
REQUIRED FOR PROTECTION FROM THE 100 YEAR STORM. THE LOWEST
OPENING ELEVATIONS SHOWN ARE AT LEAST ONE FOOT ABOVE THE 100 YEAR
STORM ELEVATION OF ADJACENT STREETS, CHANNELS, DITCHES, SWALES, OR
OTHER DRAINAGE FACILITIES. MINIMUM FINISHED FLOOR ELEVATIONS ABOVE
100-YEAR WATER SURFACE IN STREETS, CHANNELS, DITCHES, SWALES, OR OTHER
DRAINAGE FACILITIES, AS ILLUSTRATED BY A MASTER GRADING PLAN ARE TO BE
SHOWN.
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
MAJOR CONTOUR
MINOR CONTOUR
LEGEND
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
DETAILED GRADING PLAN
6/26/19
1" = 30'
N/A
JTC
JTC
18-1000-00
----
16 95
0
30'
30 15 30 60
SCALE: 1" =
N
W E
S
1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL
MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION.
2. SPOT ELEVATIONS ARE SHOWN ARE ON FLOWLINE OR BACK OF WALK UNLESS
OTHERWISE LABELED.
3. WALKWAYS SLOPE 2.0% AWAY FROM BUILDINGS AND/OR TOWARD
PARKING/DRIVE AREAS. WALK LABELS ARE SHOWN ON THE HIGH SIDE OF THE
WALK.
4. TW AND BW ELEVATIONS REFER TO TOP OF WALL AND BOTTOM OF WALL AT THE
FINISHED GRADE AND DO NOT NECESSARILY INDICATE OVERALL HEIGHT OF
RETAINING WALLS. REFER TO LANDSCAPING, ARCHITECTURAL, AND
STRUCTURAL PLANS FOR ADDITIONAL WALL INFORMATION. RETAINING WALL
DESIGN TO BE PROVIDED WITH WALL PERMIT.
5. ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER
RECOMMENDATIONS.
6. THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS
REQUIRED FOR PROTECTION FROM THE 100 YEAR STORM. THE LOWEST
OPENING ELEVATIONS SHOWN ARE AT LEAST ONE FOOT ABOVE THE 100 YEAR
STORM ELEVATION OF ADJACENT STREETS, CHANNELS, DITCHES, SWALES, OR
OTHER DRAINAGE FACILITIES. MINIMUM FINISHED FLOOR ELEVATIONS ABOVE
100-YEAR WATER SURFACE IN STREETS, CHANNELS, DITCHES, SWALES, OR OTHER
DRAINAGE FACILITIES, AS ILLUSTRATED BY A MASTER GRADING PLAN ARE TO BE
SHOWN.
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
MAJOR CONTOUR
MINOR CONTOUR
LEGEND
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Bldg 12d
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Bldg 14c Bldg 15c
Block 13, Bldg 17d
Block 12, Bldg 16d
Block 4, Bldg 15d Block 3, Bldg 18d
Block 1, Bldg 20d
Block 2, Bldg 19d
Block 5, Bldg 13d
Block 11, Bldg 14d
Bldg 2c
Pond
B3
Tract A
(D,U,&PAE)
Tract H
(D,U,&PAE)
Tract G
(D,U,&PAE)
Tract 1
(D,U,&PAE)
Tract Y
(D,U,&PAE)
Tract X
(D,U,&PAE)
Tract D
(D,U,&PAE)
Tract C
(D,U,&PAE)
Tract 2
(D,U,&PAE)
Tract B
(D,U,&PAE)
Tract 3
(D,U,&PAE)
Tract 3
(D,U,&PAE)
Tract F
(D,U,&PAE)
Tract E
(D,U,&PAE)
Tract 4
(D,U,&PAE)
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
DETAILED GRADING PLAN
6/26/19
1" = 30'
N/A
JTC
JTC
18-1000-00
----
15 95
0
30'
30 15 30 60
SCALE: 1" =
N
W E
S
1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL
MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION.
2. SPOT ELEVATIONS ARE SHOWN ARE ON FLOWLINE OR BACK OF WALK UNLESS
OTHERWISE LABELED.
3. WALKWAYS SLOPE 2.0% AWAY FROM BUILDINGS AND/OR TOWARD
PARKING/DRIVE AREAS. WALK LABELS ARE SHOWN ON THE HIGH SIDE OF THE
WALK.
4. TW AND BW ELEVATIONS REFER TO TOP OF WALL AND BOTTOM OF WALL AT THE
FINISHED GRADE AND DO NOT NECESSARILY INDICATE OVERALL HEIGHT OF
RETAINING WALLS. REFER TO LANDSCAPING, ARCHITECTURAL, AND
STRUCTURAL PLANS FOR ADDITIONAL WALL INFORMATION. RETAINING WALL
DESIGN TO BE PROVIDED WITH WALL PERMIT.
5. ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER
RECOMMENDATIONS.
6. THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS
REQUIRED FOR PROTECTION FROM THE 100 YEAR STORM. THE LOWEST
OPENING ELEVATIONS SHOWN ARE AT LEAST ONE FOOT ABOVE THE 100 YEAR
STORM ELEVATION OF ADJACENT STREETS, CHANNELS, DITCHES, SWALES, OR
OTHER DRAINAGE FACILITIES. MINIMUM FINISHED FLOOR ELEVATIONS ABOVE
100-YEAR WATER SURFACE IN STREETS, CHANNELS, DITCHES, SWALES, OR OTHER
DRAINAGE FACILITIES, AS ILLUSTRATED BY A MASTER GRADING PLAN ARE TO BE
SHOWN.
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
MAJOR CONTOUR
MINOR CONTOUR
LEGEND
Block 17
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 15
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 18
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Block 19
Pond A2
Pond A1
Pond B1
Pond D
Pond D
KEY MAP
NTS
N
W E
S
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
DRAINAGE & EROSION CONTROL PLAN
6/26/19
1" = 50'
N/A
KRB
JTC
18-1000-00
----
14 95
AH
BASIN COEFFICIENT (100-YR)
BASIN DESIGNATION
BASIN AREA
DESIGN POINT
DRAINAGE FLOW ARROW
DRAINAGE BASIN BOUNDARY
LEGEND
EX MAJOR CONTOUR
EX MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
CROSS-SECTION (FEMA)
100-YR FLOODPLAIN (FEMA)
100-YR FLOODWAY (FEMA)
500-YR FLOODPLAIN (FEMA)
100-YR FLOODPLAIN (NECCO)
100-YR FLOODWAY (NECCO)
NOTES
1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND
THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM
FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL
CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH OWNER'S
APPROVAL FOR REMOVAL.
2. THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING
CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL CONTROL
MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND MINIMIZE DOWNSTREAM WATERWAY
POLLUTION.
3. LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL
BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. ALL DISTURBED AREAS SHALL BE
PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL
MIGRATION.
4. STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO
CONSTRUCTION COMMENCEMENT.
5. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL
DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS.
6. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS.
7. AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED NOT
BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION
CONTROL BLANKETS TO STABILIZE THE SOIL.
8. REFERENCE NORTHFIELD FINAL DRAINAGE REPORT.
9. REFERENCE SHEETS 86 - 87 FOR EROSION CONTROL DETAILS.
10. RETAINING WALL DESIGN AND DETAILS TO BE PROVIDED WITH WALL PERMIT.
11. COORDINATION OF TRAIL LOCATION WITH THE LAKE CANAL DITCH COMPANY IS REQUIRED PRIOR TO DESIGN
AND CONSTRUCTION OF THE REGIONAL RECREATIONAL TRAIL.
FLOODPLAIN NOTES
1. THE CURRENT EFFECTIVE (JUNE 17, 2008) FEMA FLOOD INSURANCE RATE
MAP (FIRM, MAP NUMBERS 08096C0977G & 08069C0981G) DEPICTS THE
100-YR FLOODPLAIN IN SOME AREAS OF THE PROPOSED DEVELOPMENT.
HOWEVER, IT IS ANTICIPATED THAT, AT THE TIME OF BUILDING
CONSTRUCTION ON THE AFFECTED LOTS, THE NORTHEAST COLLEGE
CORRIDOR OUTFALL PROJECT (NECCO) WILL HAVE REMAPPED THE
FLOODPLAIN SUCH THAT THE 100-YR FLOODPLAIN WILL NO LONGER BE
PRESENT ON THE PROPOSED DEVELOPMENT. IT IS ANTICIPATED THAT THE
MAP REVISION WILL BE COMPLETED BY THE END OF 2019.
2. IF THE DEVELOPER DECIDES TO CONSTRUCT STRUCTURES OR OTHER
CONSTRUCTION ELEMENTS IN THE CURRENT EFFECTIVE 100-YR FLOODPLAIN
BEFORE THE REMAPPING EFFORTS ARE COMPLETE AND DOCUMENTED BY
NECCO AND FEMA, IT SHOULD BE NOTED THAT ADDITIONAL ANALYSIS OF
THE BFE IS NECESSARY, AND THE FOLLOWING NOTES WILL ALSO APPLY:
2.1 FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR EACH STRUCTURE
AND EACH SITE CONSTRUCTION ELEMENT (DETENTION PONDS, BIKE
PATHS, PARKING LOTS, UTILITIES, ETC.) IN THE FLOODPLAIN
2.2.A FEMA ELEVATION OR FLOODPROOFING CERTIFICATE MUST BE
COMPLETED AND APPROVED BEFORE THE CERTIFICATE OF
OCCUPANCY (CO) IS ISSUED FOR ANY STRUCTURES IN THE
FLOODPLAIN.
3. THE 500 -YR FLOODPLAIN (SHADED ZONE X - NOT SHOWN HEREON) IS DUE
TO THE FLOODING OF THE POUDRE RIVER, CRITICAL FACILITIES ARE
PROHIBITED WITHIN THE 500-YR FLOODPLAIN, FACILITIES FOR AT-RISK
POPULATIONS (DAYCARES, SCHOOLS, NURSING HOMES, ETC.) AND
EMERGENCY SERVICES FACILITIES (E.G. URGENT CARE, HOSPITALS, FIRE,
POLICE).
CONSTRUCTION ENTRANCE W/
VEHICLE TRACKING CONTROL
CONCRETE WASHOUT AREA
SILT FENCE
INLET PROTECTION
OUTLET STRUCTURE PROTECTION
ROCK SOCKS
SEDIMENT CONTROL LOGS
TEMPORARY SEDIMENT BASIN
SURFACE ROUGHENING
COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES
1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY
CONSTRUCTION ON THIS SITE.
2. ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL
REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED
IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT.
3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING
VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST
PRACTICAL PERIOD OF TIME.
4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL
BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER
PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY
LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G.
SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT.
5. THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED
EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES,
AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT.
6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY
AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL
RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND
LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY.
7. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY
SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED
AND MULCHED.
8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR
FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR.
NTS
N
W E
S
REGIONAL TRAIL SECTION A-A
4950
4955
4960
4965
4970
4950
4955
4960
4965
4970
-0+25 0+00 0+50 1+00 1+25
REGIONAL TRAIL SECTION B-B
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=10'
4950
4955
4960
4965
4970
4950
4955
4960
4965
4970
-0+25 0+00 0+50 1+00 1+25
0
50'
50 25 50 100
SCALE: 1" =
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
N
W E
S
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
DRAINAGE & EROSION CONTROL PLAN
6/26/19
1" = 50'
N/A
KRB
JTC
18-1000-00
----
13 95
AH
BASIN COEFFICIENT (100-YR)
BASIN DESIGNATION
BASIN AREA
DESIGN POINT
DRAINAGE FLOW ARROW
DRAINAGE BASIN BOUNDARY
LEGEND
EX MAJOR CONTOUR
EX MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
CROSS-SECTION (FEMA)
100-YR FLOODPLAIN (FEMA)
100-YR FLOODWAY (FEMA)
500-YR FLOODPLAIN (FEMA)
100-YR FLOODPLAIN (NECCO)
100-YR FLOODWAY (NECCO)
NOTES
1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO
AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS
DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN
PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED
WITH OWNER'S APPROVAL FOR REMOVAL.
2. THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED
DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION
CONTROL CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND MINIMIZE
DOWNSTREAM WATERWAY POLLUTION.
3. LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL
BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. ALL DISTURBED AREAS
SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION
POTENTIAL AND SOIL MIGRATION.
4. STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO
CONSTRUCTION COMMENCEMENT.
5. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL
DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS
STANDARDS.
6. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED
AREAS.
7. AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED
NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND
EROSION CONTROL BLANKETS TO STABILIZE THE SOIL.
8. REFERENCE NORTHFIELD FINAL DRAINAGE REPORT.
9. REFERENCE SHEETS 86 - 87 FOR EROSION CONTROL DETAILS.
10. RETAINING WALL DESIGN AND DETAILS TO BE PROVIDED WITH WALL PERMIT.
11. COORDINATION OF TRAIL LOCATION WITH THE LAKE CANAL DITCH COMPANY IS REQUIRED PRIOR TO
DESIGN AND CONSTRUCTION OF THE REGIONAL RECREATIONAL TRAIL.
FLOODPLAIN NOTES
1. THE CURRENT EFFECTIVE (JUNE 17, 2008) FEMA FLOOD INSURANCE RATE MAP (FIRM, MAP NUMBERS
08096C0977G & 08069C0981G) DEPICTS THE 100-YR FLOODPLAIN IN SOME AREAS OF THE PROPOSED
DEVELOPMENT. HOWEVER, IT IS ANTICIPATED THAT, AT THE TIME OF BUILDING CONSTRUCTION ON THE
AFFECTED LOTS, THE NORTHEAST COLLEGE CORRIDOR OUTFALL PROJECT (NECCO) WILL HAVE REMAPPED
THE FLOODPLAIN SUCH THAT THE 100-YR FLOODPLAIN WILL NO LONGER BE PRESENT ON THE PROPOSED
DEVELOPMENT. IT IS ANTICIPATED THAT THE MAP REVISION WILL BE COMPLETED BY THE END OF 2019.
2. IF THE DEVELOPER DECIDES TO CONSTRUCT STRUCTURES OR OTHER CONSTRUCTION ELEMENTS IN THE
CURRENT EFFECTIVE 100-YR FLOODPLAIN BEFORE THE REMAPPING EFFORTS ARE COMPLETE AND
DOCUMENTED BY NECCO AND FEMA, IT SHOULD BE NOTED THAT ADDITIONAL ANALYSIS OF THE BFE IS
NECESSARY, AND THE FOLLOWING NOTES WILL ALSO APPLY:
2.1 FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR EACH STRUCTURE AND EACH SITE CONSTRUCTION
ELEMENT (DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITIES, ETC.) IN THE FLOODPLAIN
2.2.A FEMA ELEVATION OR FLOODPROOFING CERTIFICATE MUST BE COMPLETED AND APPROVED BEFORE
THE CERTIFICATE OF OCCUPANCY (CO) IS ISSUED FOR ANY STRUCTURES IN THE FLOODPLAIN.
3. THE 500 -YR FLOODPLAIN (SHADED ZONE X - NOT SHOWN HEREON) IS DUE TO THE FLOODING OF THE
POUDRE RIVER, CRITICAL FACILITIES ARE PROHIBITED WITHIN THE 500-YR FLOODPLAIN, FACILITIES FOR
AT-RISK POPULATIONS (DAYCARES, SCHOOLS, NURSING HOMES, ETC.) AND EMERGENCY SERVICES
FACILITIES (E.G. URGENT CARE, HOSPITALS, FIRE, POLICE).
CONSTRUCTION ENTRANCE W/
VEHICLE TRACKING CONTROL
CONCRETE WASHOUT AREA
SILT FENCE
INLET PROTECTION
OUTLET STRUCTURE PROTECTION
ROCK SOCKS
SEDIMENT CONTROL LOGS
TEMPORARY SEDIMENT BASIN
SURFACE ROUGHENING
COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES
1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY
CONSTRUCTION ON THIS SITE.
2. ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL
REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED
IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT.
3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING
VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST
PRACTICAL PERIOD OF TIME.
4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL
BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER
PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY
LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G.
SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT.
5. THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED
EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES,
AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT.
6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY
AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL
RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND
LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY.
7. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY
SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED
AND MULCHED.
8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR
FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR.
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 4
Block 9
Block 10 Block 11
L
ot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 12
Block 13
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Pond B3
Pond A2
Tract R
(Drainage,
Utility, &
Private Access
Easement)
Pond B2
Tract O
(Drainage, Utility, &
Private Access
Easement)
KEY MAP
NTS
N
W E
S
0
50'
50 25 50 100
SCALE: 1" =
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
AH
BASIN COEFFICIENT (100-YR)
BASIN DESIGNATION
BASIN AREA
DESIGN POINT
DRAINAGE FLOW ARROW
DRAINAGE BASIN BOUNDARY
LEGEND
EX MAJOR CONTOUR
EX MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
CROSS-SECTION (FEMA)
100-YR FLOODPLAIN (FEMA)
100-YR FLOODWAY (FEMA)
500-YR FLOODPLAIN (FEMA)
100-YR FLOODPLAIN (NECCO)
100-YR FLOODWAY (NECCO)
NOTES
1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND
THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS
DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE
UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH OWNER'S
APPROVAL FOR REMOVAL.
2. THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING
CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL CONTROL
MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND MINIMIZE DOWNSTREAM WATERWAY
POLLUTION.
3. LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL
BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. ALL DISTURBED AREAS SHALL BE
PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL
MIGRATION.
4. STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO
CONSTRUCTION COMMENCEMENT.
5. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL
DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS
STANDARDS.
6. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS.
7. AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED NOT
BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION
CONTROL BLANKETS TO STABILIZE THE SOIL.
8. REFERENCE NORTHFIELD FINAL DRAINAGE REPORT.
9. REFERENCE SHEETS 86 - 87 FOR EROSION CONTROL DETAILS.
10. RETAINING WALL DESIGN AND DETAILS TO BE PROVIDED WITH WALL PERMIT.
11. COORDINATION OF TRAIL LOCATION WITH THE LAKE CANAL DITCH COMPANY IS REQUIRED PRIOR TO DESIGN
AND CONSTRUCTION OF THE REGIONAL RECREATIONAL TRAIL.
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
DRAINAGE & EROSION CONTROL PLAN
6/26/19
1" = 50'
N/A
KRB
JTC
18-1000-00
----
12 95
FLOODPLAIN NOTES
1. THE CURRENT EFFECTIVE (JUNE 17, 2008) FEMA FLOOD INSURANCE RATE MAP (FIRM, MAP NUMBERS 08096C0977G & 08069C0981G)
DEPICTS THE 100-YR FLOODPLAIN IN SOME AREAS OF THE PROPOSED DEVELOPMENT. HOWEVER, IT IS ANTICIPATED THAT, AT THE TIME
OF BUILDING CONSTRUCTION ON THE AFFECTED LOTS, THE NORTHEAST COLLEGE CORRIDOR OUTFALL PROJECT (NECCO) WILL
HAVE REMAPPED THE FLOODPLAIN SUCH THAT THE 100-YR FLOODPLAIN WILL NO LONGER BE PRESENT ON THE PROPOSED
DEVELOPMENT. IT IS ANTICIPATED THAT THE MAP REVISION WILL BE COMPLETED BY THE END OF 2019.
2. IF THE DEVELOPER DECIDES TO CONSTRUCT STRUCTURES OR OTHER CONSTRUCTION ELEMENTS IN THE CURRENT EFFECTIVE 100-YR
FLOODPLAIN BEFORE THE REMAPPING EFFORTS ARE COMPLETE AND DOCUMENTED BY NECCO AND FEMA, IT SHOULD BE NOTED
THAT ADDITIONAL ANALYSIS OF THE BFE IS NECESSARY, AND THE FOLLOWING NOTES WILL ALSO APPLY:
2.1 FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR EACH STRUCTURE AND EACH SITE CONSTRUCTION ELEMENT (DETENTION
PONDS, BIKE PATHS, PARKING LOTS, UTILITIES, ETC.) IN THE FLOODPLAIN
2.2.A FEMA ELEVATION OR FLOODPROOFING CERTIFICATE MUST BE COMPLETED AND APPROVED BEFORE THE CERTIFICATE OF
OCCUPANCY (CO) IS ISSUED FOR ANY STRUCTURES IN THE FLOODPLAIN.
3. THE 500 -YR FLOODPLAIN (SHADED ZONE X - NOT SHOWN HEREON) IS DUE TO THE FLOODING OF THE POUDRE RIVER, CRITICAL
FACILITIES ARE PROHIBITED WITHIN THE 500-YR FLOODPLAIN, FACILITIES FOR AT-RISK POPULATIONS (DAYCARES, SCHOOLS, NURSING
HOMES, ETC.) AND EMERGENCY SERVICES FACILITIES (E.G. URGENT CARE, HOSPITALS, FIRE, POLICE).
CONSTRUCTION ENTRANCE W/
VEHICLE TRACKING CONTROL
CONCRETE WASHOUT AREA
SILT FENCE
INLET PROTECTION
OUTLET STRUCTURE PROTECTION
ROCK SOCKS
SEDIMENT CONTROL LOGS
TEMPORARY SEDIMENT BASIN
SURFACE ROUGHENING
COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES
1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY
CONSTRUCTION ON THIS SITE.
2. ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL
REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED
IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT.
3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING
VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST
PRACTICAL PERIOD OF TIME.
4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL
BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER
PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY
LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G.
SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT.
5. THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED
EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES,
AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT.
6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY
AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL
RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND
LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY.
7. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY
SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED
AND MULCHED.
8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR
FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR.
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
OVERALL GRADING & DRAINAGE PLAN
6/26/19
1" = 100'
N/A
KRB
JTC
18-1000-00
----
11 95
100-YR FLOODPLAIN (FEMA)
100-YR FLOODWAY (FEMA)
500-YR FLOODPLAIN (FEMA)
100-YR FLOODPLAIN (NECCO)
100-YR FLOODWAY (NECCO)
Lot 5
Lot 6
Lot 7
Lot 8
Block 18
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Block 19
Bldg 10a
Bldg 11a
Bldg 12a
Bldg 13a
Bldg 1d Bldg 2d Bldg 3d Bldg 4d
Bldg 5d Bldg 6d
Bldg 2c
Bldg 1c
Bldg 3c Bldg 4c Bldg 5c Bldg 6c Bldg 8c
Bldg 9c
Bldg 7c
Drive 'F' Drive 'F'
Drive 'E'
Drive 'I'
Drive 'H'
Drive 'G'
Drive 'J'
Drive 'I'
Tract V
(Drainage, Utility, & Private Access Easement)
MAIN STREET
ALTA VISTA STREET
N. LEMAY AVENUE
MARTINEZ STREET
SWARTZ, DAVID A,
MILCAN, SUSAN MARIE
LOT 29
ARREOLA, MANUEL L
LOT 30
CUSACK, JOAN E
LOT 37
EMMERICH, KARLA J
LOT 41
TALLENT, CHARLES G / TAMI A
BAZOIN-LAPPARTIENT,
ANDREA MARIE, GREGORY C
LOT 40
MONDRAGON, LUCY
V / CHRISTINA M,
LOT 28
ALTA VISTA
SUBDIVISION
ROCKY MOUNTAIN
RAPTOR PROGRAM
Graham, John
C/Ginger L
Kederike Lemay, LLC
Tract R
(Drainage, Utility,
& Private Access
Easement)
Tract P
(Drainage, Utility, &
Private Access
Easement) Tract Q
(Drainage, Utility, &
Private Access
Easement)
Tract 5
(D, U, & PAE) Tract 3
(D, U, & PAE)
KEY MAP
NTS
N
W E
S
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
N
W E
S
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
HORIZONTAL CONTROL PLAN
6/26/19
1" = 50'
N/A
KRB
JTC
18-1000-00
----
9 95
NOTES:
1. ALL ROAD AND PARKING DIMENSIONS BASED ON FLOWLINE OR CURB. VERIFY BUILDING PLAN DIMENSIONS
PRIOR TO CONSTRUCTION
2. CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL PLANS FOR STREET RIGHT-OF-WAY WORK.
3. TRAFFIC CONTROL, PERMITS, CONSTRUCTION AND FEES ASSOCIATED WITH THE RIGHT-OF-WAY WORK, ARE THE
SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR.
4. ALL CURB SHALL BE CATCH GUTTER UNLESS NOTED AS SPILL GUTTER. TRANSITION SHALL BE MADE IN 3 FEET OR
AT CORNERS.
5. ALL PAVEMENTS AND EARTHWORK SHALL CONFORM TO THE GEOTECHNICAL REPORT FOR THE SITE.
6. ALL WORK SHALL CONFORM TO LARIMER COUNTY URBAN AREA STREET STANDARDS.
7. COORDINATE LOCATION, HEIGHTS, ETC. OF WALLS FENCES, AND SITE FEATURES WITH LANDSCAPE
ARCHITECT.
8. COORDINATION OF TRAIL LOCATION WITH THE LAKE CANAL DITCH COMPANY IS REQUIRED PRIOR TO DESIGN
AND CONSTRUCTION OF THE REGIONAL RECREATIONAL TRAIL.
DARK GREY COLORED
CONCRETE PAVEMENT
(BIKE LANE)
CONCRETE SIDEWALK
CONCRETE PAVEMENT
HEAVY DUTY ASPHALT
PAVEMENT
LEGEND
STOP
P
FIRE LANE
LIGHT DUTY ASPHALT
PAVEMENT
CONCRETE PAVEMENT
(BIKE LANE BUFFER)
4" MOUNTABLE CURB &
1' SPILL GUTTER
4" MOUNTABLE CURB &
1' CATCH GUTTER
6" VERTICAL CURB &
1' SPILL GUTTER
6" VERTICAL CURB &
2' CATCH GUTTER
FLUSH CURB
2' CURB TRANSITION
6" VERTICAL CURB &
1' CATCH GUTTER
NO
PARKING
ANY
TIME
NO
PARKING
ANY
TIME
DO NOT
ENTER
KEY MAP
NTS
N
W E
S
0
50'
50 25 50 100
SCALE: 1" =
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
N
W E
S
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
HORIZONTAL CONTROL PLAN
6/26/19
1" = 50'
N/A
KRB
JTC
18-1000-00
----
8 95
DARK GREY COLORED
CONCRETE PAVEMENT
(BIKE LANE)
CONCRETE SIDEWALK
NOTES:
1. ALL ROAD AND PARKING DIMENSIONS BASED ON FLOWLINE OR CURB. VERIFY BUILDING PLAN DIMENSIONS
PRIOR TO CONSTRUCTION
2. CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL PLANS FOR STREET RIGHT-OF-WAY WORK.
3. TRAFFIC CONTROL, PERMITS, CONSTRUCTION AND FEES ASSOCIATED WITH THE RIGHT-OF-WAY WORK, ARE THE
SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR.
4. ALL CURB SHALL BE CATCH GUTTER UNLESS NOTED AS SPILL GUTTER. TRANSITION SHALL BE MADE IN 3 FEET OR
AT CORNERS.
5. ALL PAVEMENTS AND EARTHWORK SHALL CONFORM TO THE GEOTECHNICAL REPORT FOR THE SITE.
6. ALL WORK SHALL CONFORM TO LARIMER COUNTY URBAN AREA STREET STANDARDS.
7. COORDINATE LOCATION, HEIGHTS, ETC. OF WALLS FENCES, AND SITE FEATURES WITH LANDSCAPE
ARCHITECT.
8. COORDINATION OF TRAIL LOCATION WITH THE LAKE CANAL DITCH COMPANY IS REQUIRED PRIOR TO DESIGN
AND CONSTRUCTION OF THE REGIONAL RECREATIONAL TRAIL.
CONCRETE PAVEMENT
HEAVY DUTY ASPHALT
PAVEMENT
LEGEND
STOP
P
FIRE LANE
LIGHT DUTY ASPHALT
PAVEMENT
CONCRETE PAVEMENT
(BIKE LANE BUFFER)
4" MOUNTABLE CURB &
1' SPILL GUTTER
4" MOUNTABLE CURB &
1' CATCH GUTTER
6" VERTICAL CURB &
1' SPILL GUTTER
6" VERTICAL CURB &
2' CATCH GUTTER
FLUSH CURB
2' CURB TRANSITION
6" VERTICAL CURB &
1' CATCH GUTTER
NO
PARKING
ANY
TIME
NO
PARKING
ANY
TIME
Lot 4
Lot 5
Lot 6
Lot 1
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Tract F
(Drainage, Utility, &
Private Access
Easement)
Tract A Block 4
(Drainage, Utility, &
Private Access Easement)
Tract A
(Drainage, Utility, &
Private Access
Easement)
Tract H
(Drainage, Utility,
& Private Access
Easement)
Tract O
(Drainage, Utility, &
Private Access
Easement)
Tract N
(Drainage, Utility, &
Private Access
Easement)
Tract R
(Drainage, Utility, &
Private Access
Easement)
MATCHLINE
SEE SHEET 9
FUTURE LEMAY AVENUE
Block 9
Block 10 Block 11
L
ot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 12
Block 13
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Bldg 5b
Bldg 4b
Bldg 3b
Bldg 2b
Bldg 15a
Bldg 16a
Bldg 17a
Bldg 2c Bldg 3c Bldg 4c Bldg 5c Bldg 6c Bldg 8c
Bldg 9c
Bldg 12c Bldg 13c
Bldg 14c Bldg 15c
Bldg 10c Bldg 11c
Bldg 7d
Bldg 19d Bldg 20d
Bldg 15d Bldg 18d
Bldg 16d
Bldg 17d
Bldg 8d
Bldg 9d
Bldg 10d Bldg 12d
Bldg 11d
Bldg 13d
Bldg 14d
COMMUNITY
CLUBHOUSE
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
LANDMARK WAY
Drive 'B'
Drive 'B'
Drive 'A' Drive 'A'
Drive 'B'
Drive D'
Drive 'C'
Drive 'E'
Drive 'I'
Drive 'H'
SCHLAGEL, DONALD E
/CHERYL D
SCHLAGEL, LEONARD L
/JUNE S
UNTERBERGER,
LORIN
Graham, John
C/Ginger L
Tract 1
(D, U, & PAE)
Tract Y
(D, U, & PAE)
Tract X
(D, U, & PAE)
Tract C
(D, U, & PAE)
Tract D
(D, U, & PAE)
Tract G
(Drainage, Utility,
& Private Access
Easement)
Tract 3
(D, U, & PAE)
Tract 2
(D, U, & PAE)
Tract 4
(D, U, & PAE)
Tract J
(Drainage, Utility,
& Private Access
Easement)
Tract M (D, U, & PAE)
Tract 2
(D, U, & PAE)
Tract K
(D, U, & PAE)
Tract L (D, U, & PAE)
Tract P
(Drainage, Utility, &
Tract B
(D, U, & PAE)
Tract E
(D, U, & PAE)
Tract I
(D, U, & PAE)
KEY MAP
NTS
N
W E
S
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
HORIZONTAL CONTROL PLAN
6/26/19
1" = 50'
N/A
KRB
JTC
18-1000-00
----
7 95
NOTES:
1. ALL ROAD AND PARKING DIMENSIONS BASED ON FLOWLINE OR CURB. VERIFY BUILDING PLAN DIMENSIONS
PRIOR TO CONSTRUCTION
2. CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL PLANS FOR STREET RIGHT-OF-WAY WORK.
3. TRAFFIC CONTROL, PERMITS, CONSTRUCTION AND FEES ASSOCIATED WITH THE RIGHT-OF-WAY WORK, ARE THE
SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR.
4. ALL CURB SHALL BE CATCH GUTTER UNLESS NOTED AS SPILL GUTTER. TRANSITION SHALL BE MADE IN 3 FEET OR
AT CORNERS.
5. ALL PAVEMENTS AND EARTHWORK SHALL CONFORM TO THE GEOTECHNICAL REPORT FOR THE SITE.
6. ALL WORK SHALL CONFORM TO LARIMER COUNTY URBAN AREA STREET STANDARDS.
7. COORDINATE LOCATION, HEIGHTS, ETC. OF WALLS FENCES, AND SITE FEATURES WITH LANDSCAPE
ARCHITECT.
8. COORDINATION OF TRAIL LOCATION WITH THE LAKE CANAL DITCH COMPANY IS REQUIRED PRIOR TO DESIGN
AND CONSTRUCTION OF THE REGIONAL RECREATIONAL TRAIL.
RESERVED
PARKING
VAN
ACCESSIBLE
DARK GREY COLORED
CONCRETE PAVEMENT
(BIKE LANE)
CONCRETE SIDEWALK
CONCRETE PAVEMENT
HEAVY DUTY ASPHALT
PAVEMENT
LEGEND
STOP
P
FIRE LANE
LIGHT DUTY ASPHALT
PAVEMENT
CONCRETE PAVEMENT
(BIKE LANE BUFFER)
4" MOUNTABLE CURB &
1' SPILL GUTTER
4" MOUNTABLE CURB &
1' CATCH GUTTER
6" VERTICAL CURB &
1' SPILL GUTTER
6" VERTICAL CURB &
2' CATCH GUTTER
FLUSH CURB
2' CURB TRANSITION
6" VERTICAL CURB &
1' CATCH GUTTER
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
EXISTING CONDITIONS & DEMOLITION PLAN
6/26/19
1" = 50'
N/A
KRB
JTC
18-1000-00
----
6 95
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
N
W E
S
KEY MAP
NTS
S
E
N
W
VICINITY PRIOR TO BEGINNING WORK. THE CONTRACTOR SHALL COORDINATE AND PROVIDE PROTECTION OF
CONFLICTING UTILITIES. NOTIFY OWNER/ENGINEER IF ANY CONFLICTS ARE ENCOUNTERED. THE OWNER
AND/OR ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS SHOWN.
2. COORDINATE DEMOLITION REQUIREMENTS, LIMITS OF DEMOLITION, SALVAGE ITEMS, PROTECTION OF ITEMS TO
REMAIN, TREES, FENCING, ETC. WITH OWNER, ARCHITECT, AND RELEVANT CONSTRUCTION AND/OR PHASING
PLANS. ADDITIONAL DEMOLITION OF PAVING, TREES, UTILITIES, STRUCTURES, ETC. TO BE PERFORMED AS
REQUIRED.
3. ALL EXISTING UTILITIES TO REMAIN SHALL BE ADJUSTED TO FINAL GRADE.
4. CONTRACTOR RESPONSIBLE FOR ALL SURFACE REPAIR/REPLACEMENT TO RESTORE SIDEWALKS, PAVEMENT,
CURB/GUTTER AND SOD AREAS DISTURBED BY NEW WORK. REPAIR/REPLACEMENTS SHALL BE COMPLETED PER
CITY OF FORT COLLINS STANDARDS AT CONTRACTOR EXPENSE.
5. EXISTING CONCRETE AND ASPHALT PAVING SHALL BE SAWCUT AND REMOVED PRIOR TO EXCAVATION.
REMOVE CONCRETE TO THE NEAREST JOINT.
6. CONTRACTOR TO PROVIDE ALL NECESSARY EROSION CONTROL MEASURES DURING CONSTRUCTION. PLACE
EROSION CONTROL PROTECTION AT ALL PROPOSED AND EXISTING INLETS DOWNSTREAM FROM
CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS
COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED.
7. LIMITS OF STREET CUTS, ASPHALT, AND CONCRETE REMOVALS ARE APPROXIMATE. LIMITS OF REMOVAL TO BE
DETERMINED IN THE FIELD TO ADEQUATELY COMPLETE THE PROPOSED IMPROVEMENTS, WHILE MAINTAINING,
IF NOT IMPROVING, EXISTING CONDITIONS. ADDITIONAL REMOVAL IDENTIFIED IN THE FIELD SHALL BE
COMPLETED AT CONTRACTOR EXPENSE. ALL REPAIRS TO BE COMPLETED IN ACCORDANCE WITH CITY STREET
REPAIRS STANDARDS.
8. REFER TO LANDSCAPE TREE MITIGATION PLAN (IF APPLICABLE) FOR TREE REMOVAL, RELOCATION AND
PROTECTION. TREE REMOVAL INFORMATION SHOWN FOR COORDINATION PURPOSES ONLY.
9. REFERENCE LANDSCAPE PLANS FOR ADDITIONAL SITE DEMOLITION.
10. ALL UTILITIES TO BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED.
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
EXISTING CONDITIONS & DEMOLITION PLAN
6/26/19
1" = 50'
N/A
KRB
JTC
18-1000-00
----
5 95
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
N
W E
S
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
EXISTING CONDITIONS & DEMOLITION PLAN
6/26/19
1" = 50'
N/A
JTC
JTC
18-1000-00
----
4 95
0
50'
50 25 50 100
SCALE: 1" =
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
N
W E
S
4. CONTRACTOR RESPONSIBLE FOR ALL SURFACE REPAIR/REPLACEMENT TO RESTORE SIDEWALKS, PAVEMENT,
CURB/GUTTER AND SOD AREAS DISTURBED BY NEW WORK. REPAIR/REPLACEMENTS SHALL BE COMPLETED PER CITY
OF FORT COLLINS STANDARDS AT CONTRACTOR EXPENSE.
5. EXISTING CONCRETE AND ASPHALT PAVING SHALL BE SAWCUT AND REMOVED PRIOR TO EXCAVATION. REMOVE
CONCRETE TO THE NEAREST JOINT.
6. CONTRACTOR TO PROVIDE ALL NECESSARY EROSION CONTROL MEASURES DURING CONSTRUCTION. PLACE
EROSION CONTROL PROTECTION AT ALL PROPOSED AND EXISTING INLETS DOWNSTREAM FROM CONSTRUCTION
AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL
DISTURBED GROUND IS ADEQUATELY VEGETATED.
7. LIMITS OF STREET CUTS, ASPHALT, AND CONCRETE REMOVALS ARE APPROXIMATE. LIMITS OF REMOVAL TO BE
DETERMINED IN THE FIELD TO ADEQUATELY COMPLETE THE PROPOSED IMPROVEMENTS, WHILE MAINTAINING, IF NOT
IMPROVING, EXISTING CONDITIONS. ADDITIONAL REMOVAL IDENTIFIED IN THE FIELD SHALL BE COMPLETED AT
CONTRACTOR EXPENSE. ALL REPAIRS TO BE COMPLETED IN ACCORDANCE WITH CITY STREET REPAIRS STANDARDS.
8. REFER TO LANDSCAPE TREE MITIGATION PLAN (IF APPLICABLE) FOR TREE REMOVAL, RELOCATION AND
PROTECTION. TREE REMOVAL INFORMATION SHOWN FOR COORDINATION PURPOSES ONLY.
9. REFERENCE LANDSCAPE PLANS FOR ADDITIONAL SITE DEMOLITION.
10. ALL UTILITIES TO BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED.
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
N
W E
S
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
EXISTING CONDITIONS & DEMOLITION PLAN
6/26/19
1" = 50'
N/A
JTC
JTC
18-1000-00
----
3 95
THE DISCRETION OF THE WATER UTILITY PROVIDER, A PRE-CONSTRUCTION MEETING MAY BE REQUIRED PRIOR TO COMMENCEMENT OF ANY
WORK.
12. THE DEVELOPER SHALL SEQUENCE INSTALLATION OF UTILITIES IN SUCH A MANNER AS TO MINIMIZE POTENTIAL UTILITY CONFLICTS. IN GENERAL,
STORM SEWER AND SANITARY SEWER SHOULD BE CONSTRUCTED PRIOR TO INSTALLATION OF THE WATER LINES AND DRY UTILITIES.
13. THE MINIMUM COVER OVER WATER LINES IS 4.5 FEET AND THE MAXIMUM COVER IS 5.5 FEET UNLESS OTHERWISE NOTED IN THE PLANS AND
APPROVED BY THE WATER UTILITY.
14. A STATE CONSTRUCTION DEWATERING WASTEWATER DISCHARGE PERMIT IS REQUIRED IF DEWATERING IS REQUIRED IN ORDER TO INSTALL
UTILITIES OR WATER IS DISCHARGED INTO A STORM SEWER, CHANNEL, IRRIGATION DITCH OR ANY WATERS OF THE UNITED STATES.
15. THE DEVELOPER SHALL COMPLY WITH ALL TERMS AND CONDITIONS OF THE COLORADO PERMIT FOR STORM WATER DISCHARGE (CONTACT
COLORADO DEPARTMENT OF HEALTH, WATER QUALITY CONTROL DIVISION, (303) 692-3590), THE STORM WATER MANAGEMENT PLAN, AND
THE EROSION CONTROL PLAN.
16. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE PROPERTY.
MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S).
17. PRIOR TO FINAL INSPECTION AND ACCEPTANCE BY THE LOCAL ENTITY, CERTIFICATION OF THE DRAINAGE FACILITIES, BY A REGISTERED
ENGINEER, MUST BE SUBMITTED TO AND APPROVED BY THE STORMWATER UTILITY DEPARTMENT. CERTIFICATION SHALL BE SUBMITTED TO THE
STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OF OCCUPANCY FOR SINGLE FAMILY
UNITS. FOR COMMERCIAL PROPERTIES, CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS
PRIOR TO THE RELEASE OF ANY BUILDING PERMITS IN EXCESS OF THOSE ALLOWED PRIOR TO CERTIFICATION PER THE DEVELOPMENT
AGREEMENT.
18. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR ANY DAMAGES OR INJURIES SUSTAINED IN THIS DEVELOPMENT AS A RESULT OF
GROUNDWATER SEEPAGE, WHETHER RESULTING FROM GROUNDWATER FLOODING, STRUCTURAL DAMAGE OR OTHER DAMAGE UNLESS
SUCH DAMAGE OR INJURIES ARE SUSTAINED AS A RESULT OF THE LOCAL ENTITY FAILURE TO PROPERLY MAINTAIN ITS WATER, WASTEWATER,
AND/OR STORM DRAINAGE FACILITIES IN THE DEVELOPMENT.
19. ALL RECOMMENDATIONS OF THE "FINAL DRAINAGE REPORT FOR NORTHFIELD", DATED JUNE 2019, AND "EROSION CONTROL
REPORT/STORMWATER MANAGEMENT PLAN FOR NORTHFIELD", DATED JUNE 2019 BY HIGHLAND DEVELOPMENT SERVICES SHALL BE
FOLLOWED AND IMPLEMENTED.
20. TEMPORARY EROSION CONTROL DURING CONSTRUCTION SHALL BE PROVIDED AS SHOWN ON THE EROSION CONTROL PLAN. ALL EROSION
CONTROL MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE DEVELOPER, UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS IS
STABILIZED WITH HARD SURFACE OR LANDSCAPING.
21. THE DEVELOPER SHALL BE RESPONSIBLE FOR INSURING THAT NO MUD OR DEBRIS SHALL BE TRACKED ONTO THE EXISTING PUBLIC STREET
SYSTEM. MUD AND DEBRIS MUST BE REMOVED WITHIN 24 HOURS BY AN APPROPRIATE MECHANICAL METHOD (I.E. MACHINE BROOM SWEEP,
LIGHT DUTY FRONT-END LOADER, ETC.) OR AS APPROVED BY THE LOCAL ENTITY STREET INSPECTOR.
22. NO WORK MAY COMMENCE WITHIN ANY IMPROVED OR UNIMPROVED PUBLIC RIGHT-OF-WAY UNTIL A RIGHT-OF-WAY PERMIT OR
DEVELOPMENT CONSTRUCTION PERMIT IS OBTAINED, IF APPLICABLE.
23. THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FOR ALL APPLICABLE AGENCIES PRIOR TO
COMMENCEMENT OF CONSTRUCTION. THE DEVELOPER SHALL NOTIFY THE LOCAL ENTITY ENGINEERING INSPECTOR (FORT COLLINS -
221-6605) AND THE LOCAL ENTITY EROSION CONTROL INSPECTOR (FORT COLLINS - 221-6700) AT LEAST 2 WORKING DAYS PRIOR TO THE START
OF ANY EARTH DISTURBING ACTIVITY, OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS. IF THE LOCAL ENTITY ENGINEER IS NOT
AVAILABLE AFTER PROPER NOTICE OF CONSTRUCTION ACTIVITY HAS BEEN PROVIDED, THE DEVELOPER MAY COMMENCE WORK IN THE
ENGINEER ABSENCE. HOWEVER, THE LOCAL ENTITY RESERVES THE RIGHT NOT TO ACCEPT THE IMPROVEMENT IF SUBSEQUENT TESTING REVEALS
AN IMPROPER INSTALLATION.
24. THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING SOILS TESTS WITHIN THE PUBLIC RIGHT-OF-WAY AFTER RIGHT OF WAY GRADING AND
ALL UTILITY TRENCH WORK IS COMPLETE AND PRIOR TO THE PLACEMENT OF CURB, GUTTER, SIDEWALK AND PAVEMENT. IF THE FINAL
SOILS/PAVEMENT DESIGN REPORT DOES NOT CORRESPOND WITH THE RESULTS OF THE ORIGINAL GEOTECHNICAL REPORT, THE DEVELOPER
SHALL BE RESPONSIBLE FOR A RE-DESIGN OF THE SUBJECT PAVEMENT SECTION OR, THE DEVELOPER MAY USE THE LOCAL ENTITY'S DEFAULT
PAVEMENT THICKNESS SECTION(S). REGARDLESS OF THE OPTION USED, ALL FINAL SOILS/PAVEMENT DESIGN REPORTS SHALL BE PREPARED BY
A LICENSED PROFESSIONAL ENGINEER. THE FINAL REPORT SHALL BE SUBMITTED TO THE INSPECTOR A MINIMUM OF 10 WORKING DAYS PRIOR
TO PLACEMENT OF BASE AND ASPHALT. PLACEMENT OF CURB, GUTTER, SIDEWALK, BASE AND ASPHALT SHALL NOT OCCUR UNTIL THE LOCAL
ENTITY ENGINEER APPROVES THE FINAL REPORT.
25. THE CONTRACTOR SHALL HIRE A LICENSED ENGINEER OR LAND SURVEYOR TO SURVEY THE CONSTRUCTED ELEVATIONS OF THE STREET
SUBGRADE AND THE GUTTER FLOWLINE AT ALL INTERSECTIONS, INLETS, AND OTHER LOCATIONS REQUESTED BY THE LOCAL ENTITY INSPECTOR.
THE ENGINEER OR SURVEYOR MUST CERTIFY IN A LETTER TO THE LOCAL ENTITY THAT THESE ELEVATIONS CONFORM TO THE APPROVED PLANS
AND SPECIFICATIONS. ANY DEVIATIONS SHALL BE NOTED IN THE LETTER AND THEN RESOLVED WITH THE LOCAL ENTITY BEFORE INSTALLATION
OF BASE COURSE OR ASPHALT WILL BE ALLOWED ON THE STREETS.
26. ALL UTILITY INSTALLATIONS WITHIN OR ACROSS THE ROADBED OF NEW RESIDENTIAL ROADS MUST BE COMPLETED PRIOR TO THE FINAL STAGES
OF ROAD CONSTRUCTION. FOR THE PURPOSES OF THESE STANDARDS, ANY WORK EXCEPT C/G ABOVE THE SUBGRADE IS CONSIDERED FINAL
STAGE WORK. ALL SERVICE LINES MUST BE STUBBED TO THE PROPERTY LINES AND MARKED SO AS TO REDUCE THE EXCAVATION NECESSARY
FOR BUILDING CONNECTIONS.
27. PORTIONS OF LARIMER COUNTY ARE WITHIN OVERLAY DISTRICTS. THE LARIMER COUNTY FLOODPLAIN RESOLUTION SHOULD BE REFERRED TO
FOR ADDITIONAL CRITERIA FOR ROADS WITHIN THESE DISTRICTS.
28. ALL ROAD CONSTRUCTION IN AREAS DESIGNATED AS WILD FIRE HAZARD AREAS SHALL BE DONE IN ACCORDANCE WITH THE CONSTRUCTION
CRITERIA AS ESTABLISHED IN THE WILD FIRE HAZARD AREA MITIGATION REGULATIONS IN FORCE AT THE TIME OF FINAL PLAT APPROVAL.
29. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT THE LOCAL ENTITY FORESTER TO SCHEDULE A
SITE INSPECTION FOR ANY TREE REMOVAL REQUIRING A PERMIT.
30. THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO, EXCAVATION, TRENCHING, SHORING,
TRAFFIC CONTROL, AND SECURITY. REFER TO OSHA PUBLICATION 2226, EXCAVATING AND TRENCHING.
31. THE DEVELOPER SHALL SUBMIT A CONSTRUCTION TRAFFIC CONTROL PLAN, IN ACCORDANCE WITH MUTCD, TO THE APPROPRIATE
RIGHT-OF-WAY AUTHORITY. (LOCAL ENTITY, COUNTY OR STATE), FOR APPROVAL, PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN, OR
AFFECTING, THE RIGHT-OF-WAY. THE DEVELOPER SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY
BE REQUIRED BY THE CONSTRUCTION ACTIVITIES.
32. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION THAT WILL AFFECT TRAFFIC SIGNS OF ANY TYPE, THE CONTRACTOR SHALL
CONTACT LOCAL ENTITY TRAFFIC OPERATIONS DEPARTMENT, WHO WILL TEMPORARILY REMOVE OR RELOCATE THE SIGN AT NO COST TO THE
CONTRACTOR; HOWEVER, IF THE CONTRACTOR MOVES THE TRAFFIC SIGN THEN THE CONTRACTOR WILL BE CHARGED FOR THE LABOR,
MATERIALS AND EQUIPMENT TO REINSTALL THE SIGN AS NEEDED.
33. THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR THE INITIAL INSTALLATION OF TRAFFIC SIGNING AND STRIPING FOR THE DEVELOPMENT
RELATED TO THE DEVELOPMENT'S LOCAL STREET OPERATIONS. IN ADDITION, THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR TRAFFIC
SIGNING AND STRIPING RELATED TO DIRECTING TRAFFIC ACCESS TO AND FROM THE DEVELOPMENT.
34. THERE SHALL BE NO SITE CONSTRUCTION ACTIVITIES ON SATURDAYS, UNLESS SPECIFICALLY APPROVED BY THE LOCAL ENTITY ENGINEER, AND
NO SITE CONSTRUCTION ACTIVITIES ON SUNDAYS OR HOLIDAYS, UNLESS THERE IS PRIOR WRITTEN APPROVAL BY THE LOCAL ENTITY.
35. THE DEVELOPER IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDED
IMPROVEMENTS, SHOWN ON THESE DRAWINGS, OR DESIGNATED TO BE PROVIDED, INSTALLED, OR CONSTRUCTED, UNLESS SPECIFICALLY
NOTED OTHERWISE.
36. DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. IF PERTINENT DIMENSIONS ARE NOT SHOWN,
CONTACT THE DESIGNER FOR CLARIFICATION, AND ANNOTATE THE DIMENSION ON THE AS-BUILT RECORD DRAWINGS.
37. THE DEVELOPER SHALL HAVE, ONSITE AT ALL TIMES, ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE
STANDARDS AND SPECIFICATIONS, AND A COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB.
38. IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN
THE PLANS OR SPECIFICATIONS, THE DEVELOPER SHALL CONTACT THE DESIGNER AND THE LOCAL ENTITY ENGINEER IMMEDIATELY.
39. THE DEVELOPER SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON A SET OF RECORD DRAWINGS KEPT ON THE
CONSTRUCTION SITE, AND AVAILABLE TO THE LOCAL ENTITY'S INSPECTOR AT ALL TIMES. UPON COMPLETION OF THE WORK, THE
CONTRACTOR(S) SHALL SUBMIT RECORD DRAWINGS TO THE LOCAL ENTITY ENGINEER.
40. PROJECT BENCHMARKS:
PROJECT DATUM: NAVD88
CITY OF FORT COLLINS BENCHMARK #43-97
ON THE SOUTH END OF THE WEST HEADWALL OF THE LAKE CANAL BRIDGE AT NORTH LEMAY AVENUE, 200 FEET SOUTH OF THE INTERSECTION
OF LEMAY AVENUE. AND CONIFER STREET
ELEV= 4960.11
CITY OF FORT COLLINS BENCHMARK #12-07
SOUTH SIDE OF VINE DRIVE ON THE SOUTH HEADWALL OF THE BRIDGE OVER DRY CREEK BASIN 0.4 MILES EAST OF NORTH LEMAY AVENUE
ELEV= 4947.86
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM.
IF NGVD29 UNADJUSTED IS REQUIRED FOR ANY PURPOSE,THE FOLLOWING EQUATIONS SHOULD BE USED:
NGVD29 UNADJUSTED = 4960.11 (NAVD88) - 3.17
NGVD29 UNADJUSTED = 4947.86 (NAVD88) - 3.18
HORIZONTAL DATUM: COLORADO STATE PLAN COORDINATES NAD 83(2007) DATUM. HORIZONTAL CONTROL BASED VRS.
41. ALL STATIONING IS BASED ON FLOWLINE OF ROADWAYS UNLESS OTHERWISE NOTED.
42. DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS EXISTING FENCES, TREES, STREETS, SIDEWALKS,
CURBS AND GUTTERS, LANDSCAPING, STRUCTURES, AND IMPROVEMENTS DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF
THIS PROJECT, SHALL BE REPLACED OR RESTORED IN LIKE KIND AT THE DEVELOPER'S EXPENSE, UNLESS OTHERWISE INDICATED ON THESE PLANS,
PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY.
43. WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS ORIGINAL
CONDITION. THE EXISTING STREET CONDITION SHALL BE DOCUMENTED BY THE LOCAL ENTITY CONSTRUCTION INSPECTOR BEFORE ANY CUTS
ARE MADE. PATCHING SHALL BE DONE IN ACCORDANCE WITH THE LOCAL ENTITY STREET REPAIR STANDARDS. THE FINISHED PATCH SHALL
BLEND IN SMOOTHLY INTO THE EXISTING SURFACE. ALL LARGE PATCHES SHALL BE PAVED WITH AN ASPHALT LAY-DOWN MACHINE. IN STREETS
WHERE MORE THAN ONE CUT IS MADE, AN OVERLAY OF THE ENTIRE STREET WIDTH, INCLUDING THE PATCHED AREA, MAY BE REQUIRED. THE
DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE LOCAL ENTITY ENGINEER AND/OR THE LOCAL ENTITY
INSPECTOR AT THE TIME THE CUTS ARE MADE.
44. UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT
WHICH EXISTED BEFORE CONSTRUCTION, OR TO THE GRADES AND CONDITION AS REQUIRED BY THESE PLANS.
45. STANDARD HANDICAP RAMPS ARE TO BE CONSTRUCTED AT ALL CURB RETURNS AND AT ALL "T" INTERSECTIONS.
46. AFTER ACCEPTANCE BY THE LOCAL ENTITY, PUBLIC IMPROVEMENTS DEPICTED IN THESE PLANS SHALL BE GUARANTEED TO BE FREE FROM
MATERIAL AND WORKMANSHIP DEFECTS FOR A MINIMUM PERIOD OF TWO YEARS FROM THE DATE OF ACCEPTANCE.
47. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF ROADWAY AND APPURTENANT IMPROVEMENTS, INCLUDING
STORM DRAINAGE STRUCTURES AND PIPES, FOR THE FOLLOWING PRIVATE STREETS: NO PRIVATE STREET PROPOSED.
48. APPROVED VARIANCES ARE LISTED AS FOLLOWS: APF MITIGATION VARIANCE, NO WESTBOUND RIGHT TURN LANE ON SUNIGA RD AT
LANDMARK WAY VARIANCE.
CITY OF FORT COLLINS CONSTRUCTION NOTES
A. STANDARD GRADING AND EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES
1. THE EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE.
2. THERE SHALL BE NO EARTH-DISTURBING ACTIVITY OUTSIDE THE LIMITS DESIGNATED ON THE ACCEPTED PLANS.
3. ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING,
STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE
CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT.
4. AT ALL TIMES DURING CONSTRUCTION, THE DEVELOPER SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSION
INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO MINIMIZE WIND BLOWN SEDIMENT. THE DEVELOPER SHALL ALSO BE
RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN.
5. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING
VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL
PERIOD OF TIME.
6. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE
KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT
EROSION CONTROL BMPS ARE INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS-OF-WAY SHALL REMAIN EXPOSED BY LAND
DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G.
SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE LOCAL ENTITY.
7. IN ORDER TO MINIMIZE EROSION POTENTIAL, ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES SHALL:
a. BE INSPECTED AT A MINIMUM OF ONCE EVERY TWO (2) WEEKS AND AFTER EACH SIGNIFICANT STORM EVENT AND REPAIRED OR
RECONSTRUCTED AS NECESSARY IN ORDER TO ENSURE THE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION.
b. REMAIN IN PLACE UNTIL SUCH TIME AS ALL THE SURROUNDING DISTURBED AREAS ARE SUFFICIENTLY STABILIZED AS DETERMINED BY THE
EROSION CONTROL INSPECTOR.
c. BE REMOVED AFTER THE SITE HAS BEEN SUFFICIENTLY STABILIZED AS DETERMINED BY THE EROSION CONTROL INSPECTOR.
8. WHEN TEMPORARY EROSION CONTROL MEASURES ARE REMOVED, THE DEVELOPER SHALL BE RESPONSIBLE FOR THE CLEAN UP AND
REMOVAL OF ALL SEDIMENT AND DEBRIS FROM ALL DRAINAGE INFRASTRUCTURE AND OTHER PUBLIC FACILITIES.
9. THE CONTRACTOR SHALL CLEAN UP ANY INADVERTENT DEPOSITED MATERIAL IMMEDIATELY AND MAKE SURE STREETS ARE FREE OF ALL
MATERIALS BY THE END OF EACH WORKING DAY.
10. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER
AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY WATERS OF THE UNITED STATES.
11. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY
SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER THIRTY (30) DAYS SHALL BE
SEEDED AND MULCHED.
12. THE STORMWATER VOLUME CAPACITY OF DETENTION PONDS WILL BE RESTORED AND STORM SEWER LINES WILL BE CLEANED UPON
COMPLETION OF THE PROJECT AND BEFORE TURNING THE MAINTENANCE OVER TO THE LOCAL ENTITY OR HOMEOWNERS ASSOCIATION
(HOA).
13. CITY ORDINANCE AND COLORADO DISCHARGE PERMIT SYSTEM (CDPS) REQUIREMENTS MAKE IT UNLAWFUL TO DISCHARGE OR ALLOW THE
DISCHARGE OF ANY POLLUTANT OR CONTAMINATED WATER FROM CONSTRUCTION SITES. POLLUTANTS INCLUDE, BUT ARE NOT LIMITED TO
DISCARDED BUILDING MATERIALS, CONCRETE TRUCK WASHOUT, CHEMICALS, OIL AND GAS PRODUCTS, LITTER, AND SANITARY WASTE. THE
DEVELOPER SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF
POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS.
14. A DESIGNATED AREA SHALL BE PROVIDED ON SITE FOR CONCRETE TRUCK CHUTE WASHOUT. THE AREA SHALL BE CONSTRUCTED SO AS TO
CONTAIN WASHOUT MATERIAL AND LOCATED AT LEAST FIFTY (50) FEET AWAY FROM ANY WATERWAY DURING CONSTRUCTION. UPON
COMPLETION OF CONSTRUCTION ACTIVITIES THE CONCRETE WASHOUT MATERIAL WILL BE REMOVED AND PROPERLY DISPOSED OF PRIOR TO
THE AREA BEING RESTORED.
15. TO ENSURE THAT SEDIMENT DOES NOT MOVE OFF OF INDIVIDUAL LOTS ONE OR MORE OF THE FOLLOWING SEDIMENT/EROSION CONTROL
BMPS SHALL BE INSTALLED AND MAINTAINED UNTIL THE LOTS ARE SUFFICIENTLY STABILIZED, AS DETERMINED BY THE EROSION CONTROL
INSPECTOR.
a. BELOW ALL GUTTER DOWNSPOUTS.
b. OUT TO DRAINAGE SWALES.
c. ALONG LOT PERIMETER.
d. OTHER LOCATIONS, IF NEEDED.
16. CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS SHOWN ON THESE PLANS. THE DEVELOPER
SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY, AS DIRECTED BY THE CITY/COUNTY.
17. A VEHICLE TRACKING CONTROL PAD SHALL BE INSTALLED WHEN NEEDED FOR CONSTRUCTION EQUIPMENT, INCLUDING BUT NOT LIMITED TO
PERSONAL VEHICLES EXITING EXISTING ROADWAYS. NO EARTHEN MATERIALS, I.E. STONE, DIRT, ETC. SHALL BE PLACED IN THE CURB & GUTTER
OR ROADWAY AS A RAMP TO ACCESS TEMPORARY STOCKPILES, STAGING AREAS, CONSTRUCTION MATERIALS, CONCRETE WASHOUT AREAS,
AND/OR BUILDING SITES.
18. AN ONSITE DETENTION POND WILL BE PROVIDED TO CONTROL STORMWATER RUNOFF FROM THE SITE.
B. STREET IMPROVEMENT NOTES
1. ALL STREET CONSTRUCTION IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS AS WELL AS THE STREET IMPROVEMENTS
NOTES LISTED HERE.
2. A PAVING SECTION DESIGN, SIGNED AND STAMPED BY A COLORADO LICENSED ENGINEER, MUST BE SUBMITTED TO THE LOCAL ENTITY
ENGINEER FOR APPROVAL, PRIOR TO ANY STREET CONSTRUCTION ACTIVITY, (FULL DEPTH ASPHALT SECTIONS ARE NOT PERMITTED AT A DEPTH
GREATER THAN 8 INCHES OF ASPHALT). THE JOB MIX SHALL BE SUBMITTED FOR APPROVAL PRIOR TO PLACEMENT OF ANY ASPHALT.
3. WHERE PROPOSED PAVING ADJOINS EXISTING ASPHALT, THE EXISTING ASPHALT SHALL BE SAW CUT, A MINIMUM DISTANCE OF 12 INCHES
FROM THE EXISTING EDGE, TO CREATE A CLEAN CONSTRUCTION JOINT. THE DEVELOPER SHALL BE REQUIRED TO REMOVE EXISTING PAVEMENT
TO A DISTANCE WHERE A CLEAN CONSTRUCTION JOINT CAN BE MADE. WHEEL CUTS SHALL NOT BE ALLOWED UNLESS APPROVED BY THE
LOCAL ENTITY ENGINEER IN LOVELAND.
4. STREET SUBGRADES SHALL BE SCARIFIED THE TOP 12 INCHES AND RE-COMPACTED PRIOR TO SUBBASE INSTALLATION. NO BASE MATERIAL
SHALL BE LAID UNTIL THE SUBGRADE HAS BEEN INSPECTED AND APPROVED BY THE LOCAL ENTITY ENGINEER.
5. FT. COLLINS ONLY. VALVE BOXES AND MANHOLES ARE TO BE BROUGHT UP TO GRADE AT THE TIME OF PAVEMENT PLACEMENT OR OVERLAY.
VALVE BOX ADJUSTING RINGS ARE NOT ALLOWED.
6. WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS ORIGINAL
CONDITION. THE EXISTING STREET CONDITION SHALL BE DOCUMENTED BY THE INSPECTOR BEFORE ANY CUTS ARE MADE. CUTTING AND
PATCHING SHALL BE DONE IN CONFORMANCE WITH CHAPTER 25, RECONSTRUCTION AND REPAIR. THE FINISHED PATCH SHALL BLEND
SMOOTHLY INTO THE EXISTING SURFACE. THE DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE LOCAL ENTITY
ENGINEER. ALL OVERLAY WORK SHALL BE COORDINATED WITH ADJACENT LANDOWNERS SUCH THAT FUTURE PROJECTS DO NOT CUT THE
NEW ASPHALT OVERLAY WORK.
7. ALL TRAFFIC CONTROL DEVICES SHALL BE IN CONFORMANCE WITH THESE PLANS OR AS OTHERWISE SPECIFIED IN M.U.T.C.D. (INCLUDING
COLORADO SUPPLEMENT) AND AS PER THE RIGHT-OF-WAY WORK PERMIT TRAFFIC CONTROL PLAN.
8. THE DEVELOPER IS REQUIRED TO PERFORM A GUTTER WATER FLOW TEST IN THE PRESENCE OF THE LOCAL ENTITY INSPECTOR AND PRIOR TO
INSTALLATION OF ASPHALT. GUTTERS THAT HOLD MORE THAN ¼ INCH DEEP OR 5 FEET LONGITUDINALLY, OF WATER, SHALL BE COMPLETELY
REMOVED AND RECONSTRUCTED TO DRAIN PROPERLY.
9. PRIOR TO PLACEMENT OF H.B.P. OR CONCRETE WITHIN THE STREET AND AFTER MOISTURE/DENSITY TESTS HAVE BEEN TAKEN ON THE SUBGRADE
MATERIAL (WHEN A FULL DEPTH SECTION IS PROPOSED) OR ON THE SUBGRADE AND BASE MATERIAL (WHEN A COMPOSITE SECTION IS
PROPOSED), A MECHANICAL "PROOF ROLL" WILL BE REQUIRED. THE ENTIRE SUBGRADE AND/OR BASE MATERIAL SHALL BE ROLLED WITH A
HEAVILY LOADED VEHICLE HAVING A TOTAL GVW OF NOT LESS THAN 50,000 LBS. AND A SINGLE AXLE WEIGHT OF AT LEAST 18,000 LBS. WITH
PNEUMATIC TIRES INFLATED TO NOT LESS THAT 90 P.S.I.G. “PROOF ROLL” VEHICLES SHALL NOT TRAVEL AT SPEEDS GREATER THAN 3 M.P.H. ANY
PORTION OF THE SUBGRADE OR BASE MATERIAL WHICH EXHIBITS EXCESSIVE PUMPING OR DEFORMATION, AS DETERMINED BY THE LOCAL
ENTITY ENGINEER, SHALL BE REWORKED, REPLACED OR OTHERWISE MODIFIED TO FORM A SMOOTH, NON-YIELDING SURFACE. THE LOCAL
ENTITY ENGINEER SHALL BE NOTIFIED AT LEAST 24 HOURS PRIOR TO THE “PROOF ROLL.” ALL “PROOF ROLLS” SHALL BE PREFORMED IN THE
PRESENCE OF AN INSPECTOR.
C. TRAFFIC SIGNING AND PAVEMENT MARKING CONSTRUCTION NOTES
1. ALL SIGNAGE AND MARKING IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS, AS WELL AS THE TRAFFIC SIGNING
AND MARKING CONSTRUCTION NOTES LISTED HERE.
2. ALL SYMBOLS, INCLUDING ARROWS, ONLYS, CROSSWALKS, STOP BARS, ETC. SHALL BE PRE-FORMED THERMO-PLASTIC.
3. ALL SIGNAGE SHALL BE PER LOCAL ENTITY STANDARDS AND THESE PLANS OR AS OTHERWISE SPECIFIED IN MUTCD.
4. ALL LANE LINES FOR ASPHALT PAVEMENT SHALL RECEIVE TWO COATS OF LATEX PAINT WITH GLASS BEADS.
5. ALL LANE LINES FOR CONCRETE PAVEMENT SHOULD BE EPOXY PAINT.
6. PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE
DEPICTING ALIGNMENT AND PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE LOCAL ENTITY ENGINEER PRIOR TO
PERMANENT INSTALLATION OF STRIPING AND SYMBOLS.
7. PRE-FORMED THERMO-PLASTIC APPLICATIONS SHALL BE AS SPECIFIED IN THESE PLANS AND/OR THESE STANDARDS.
8. EPOXY APPLICATIONS SHALL BE APPLIED AS SPECIFIED IN CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
9. ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF STRIPING OR MARKINGS.
10. ALL SIGN POSTS SHALL UTILIZE BREAK-AWAY ASSEMBLIES AND FASTENERS PER THE STANDARDS.
11. A FIELD INSPECTION OF LOCATION AND INSTALLATION OF ALL SIGNS SHALL BE PERFORMED BY THE LOCAL ENTITY ENGINEER. ALL
DISCREPANCIES IDENTIFIED DURING THE FIELD INSPECTION MUST BE CORRECTED BEFORE THE 2-YEAR WARRANTY PERIOD WILL BEGIN.
12. THE DEVELOPER INSTALLING SIGNS SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES.
13. SPECIAL CARE SHALL BE TAKEN IN SIGN LOCATION TO ENSURE AN UNOBSTRUCTED VIEW OF EACH SIGN.
14. SIGNAGE AND STRIPING HAS BEEN DETERMINED BY INFORMATION AVAILABLE AT THE TIME OF REVIEW. PRIOR TO INITIATION OF THE
WARRANTY PERIOD, THE LOCAL ENTITY ENGINEER RESERVES THE RIGHT TO REQUIRE ADDITIONAL SIGNAGE AND/OR STRIPING IF THE LOCAL
ENTITY ENGINEER DETERMINES THAT AN UNFORESEEN CONDITION WARRANTS SUCH SIGNAGE ACCORDING TO THE MUTCD OR THE CDOT M
AND S STANDARDS. ALL SIGNAGE AND STRIPING SHALL FALL UNDER THE REQUIREMENTS OF THE 2-YEAR WARRANTY PERIOD FOR NEW
CONSTRUCTION (EXCEPT FAIR WEAR ON TRAFFIC MARKINGS).
15. SLEEVES FOR SIGN POSTS SHALL BE REQUIRED FOR USE IN ISLANDS/MEDIANS. REFER TO CHAPTER 14, TRAFFIC CONTROL DEVICES, FOR
ADDITIONAL DETAIL.
B. STORM DRAINAGE NOTES
1. THE CITY OF FORT COLLINS SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE
PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S).
2. ALL RECOMMENDATIONS OF THE "FINAL DRAINAGE REPORT FOR NORTHFIELD", DATED JUNE 2019, AND "EROSION CONTROL
REPORT/STORMWATER MANAGEMENT PLAN FOR NORTHFIELD", DATED JUNE 2019 BY HIGHLAND DEVELOPMENT SERVICES SHALL BE
FOLLOWED AND IMPLEMENTED.
3. PRIOR TO FINAL INSPECTION AND ACCEPTANCE BY THE CITY OF FORT COLLINS, CERTIFICATION OF THE DRAINAGE FACILITIES, BY A
REGISTERED ENGINEER, MUST BY SUBMITTED TO AND APPROVED BY THE STORMWATER UTILITY DEPARTMENT. CERTIFICATION SHALL BE
SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OF OCCUPANCY FOR
SINGLE FAMILY UNITS. FOR COMMERCIAL PROPERTIES, CERTIFICATION SHALL BY SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT
LEAST TWO WEEKS PRIOR TO THE RELEASE OF ANY BUILDING PERMITS IN EXCESS OF THOSE ALLOWED PRIOR TO CERTIFICATION PER THE
DEVELOPMENT AGREEMENT.
E. WATERLINE NOTE
1. THE MINIMUM COVER OVER WATER LINES IS 4.5 FEET AND THE MAXIMUM COVER IS 5.5 FEET UNLESS OTHERWISE NOTED IN THE PLANS AND
APPROVED BY THE WATER UTILITY.
F. WATER & SEWER NOTES
1. ALL WATER LINE CONSTRUCTION SHALL CONFORM TO THE CITY OF FORT COLLINS UTILITIES STANDARDS AND SPECIFICATIONS CURRENT TO
THE DATE OF CONSTRUCTION.
2. ALL SANITARY SEWER LINE CONSTRUCTION SHALL CONFORM TO THE CITY OF FORT COLLINS UTILITIES STANDARDS AND SPECIFICATIONS
CURRENT TO THE DATE OF CONSTRUCTION.
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
GENERAL NOTES
6/26/19
N/A
N/A
KRB
JTC
18-1000-00
----
2 95
EXISTING FIBER OPTIC LINE
PROPOSED HANDICAP RAMP
EXISTING OVERHEAD ELECTRIC LINE
EXISTING OVERHEAD TELEPHONE LINE
PROPOSED OVERHEAD ELECTRIC LINE
PROPOSED FIBER OPTIC LINE
PROPOSED OVERHEAD TELEPHONE LINE
EXISTING FENCE
PROPOSED OVERHEAD UTILITY
PROPOSED LIGHT POLES
EXISTING CABLE TV LINE PROPOSED CABLE TV
PROPOSED WATER SERVICE W/ CURB
STOP AND METER PIT
PROPOSED SANITARY SEWER SERVICE W/
CLEANOUT
EXISTING ROW
Vicinity Map
Scale: 1" = 1000'
PROJECT DATUM: NAVD88
CITY OF FORT COLLINS BENCHMARK #43-97
ON THE SOUTH END OF THE WEST HEADWALL OF THE LAKE CANAL BRIDGE AT NORTH LEMAY AVENUE, 200 FEET SOUTH OF
THE INTERSECTION OF LEMAY AVENUE. AND CONIFER STREET
ELEV= 4960.11
CITY OF FORT COLLINS BENCHMARK #12-07
SOUTH SIDE OF VINE DRIVE ON THE SOUTH HEADWALL OF THE BRIDGE OVER DRY CREEK BASIN 0.4 MILES EAST OF NORTH
LEMAY AVENUE
ELEV= 4947.86
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED
NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATIONS SHOULD BE USED:
NGVD UNADJUSTED = 4960.11 (NAVD88) - 3.17
NGVD UNADJUSTED = 4947.86 (NAVD88) - 3.18
UTILITY CONTACTS:
LIGHT & POWER
City of Fort Collins Light & Power
Contact: Janet McTague
Ph. 970.224.6154
STORMWATER,WATER & WASTEWATER
City of Fort Collins Utilities
700 Wood Street
Fort Collins, Colorado 80522
Contact: Heather McDowell
Ph. 970.221.6339
NATURAL GAS
Xcel Energy
1901 E. Horsetooth Road
Fort Collins, Colorado 80525
Contact: Stephanie Rich
Ph. 970.225.7828
TELEPHONE SERVICE
Century Link (Qwest)
3351 Eastbrook Drive
Fort Collins, Colorado 80525
Contact: Bill Johnson
Ph. 970.490.7501
CABLE SERVICE
Comcast
1201 University Dr.
Fort Collins, Colorado 80521
Contact: Don Kapperman
Ph. 970.567.0245
DEVELOPER
Landmark Real Estate Holdings
1170 Ash Street, Suite 100
Windsor, CO 80550
Ph. 970.460.0567
ENGINEER
Highland Development Services
6355 Fairgrounds Ave, Suite 100
Windsor, CO 80550
Ph. 970.674.7550
LANDSCAPE ARCHITECT
The Birdsall Group
444 Mountain Ave
Berthoud CO, 80513
Ph. 970.532.5891
SURVEYOR
PLS Group
532 W 66th Street
Loveland, CO 80538
Ph. 970.669.2100
INDEX OF SHEETS
Sheet No. Description of Sheets
1 COVER SHEET
2 GENERAL NOTES
3 - 6 EXISTING CONDITIONS & DEMOLITION PLANS
7 - 9 HORIZONTAL CONTROL PLANS
11 OVERALL GRADING & DRAINAGE PLAN
12 - 14 DRAINAGE & EROSION CONTROL PLANS
15 - 22 DETAILED GRADING PLANS
23 OVERALL UTILITY PLAN
24 - 26 UTILITY PLANS
## - 31 OFFSITE SANITARY SEWER PLAN & PROFILES
32 - 42 SANITARY SEWER PLAN & PROFILES
43 - 55 STORM PLAN & PROFILES
56 PERMANENT DEWATERING PLAN
68 - 67 STREET PLAN & PROFILES
73 - 74 SUNIGA ROAD MEDIAN PLANS
75 - 78 SUNIGA ROAD CROSS SECTIONS
79 - 81 INTERSECTION DETAILS
82 SUNIGA RD SIGNAGE & STRIPING PLAN
83 LEMAY AVE SIGNAGE & STRIPING PLAN
84 - 85 SITE DETAILS
86 - 87 EROSION CONTROL DETAILS
88 - 92 DRAINAGE DETAILS
93 - 95 UTILITY DETAILS
UTILITY PLANS FOR
NORTHFIELD
LOCATED IN THE SOUTHEAST 1/4 SECTION 1, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M
CITY OF FORT COLLINS, LARIMER COUNTY, COLORADO
JUNE 2019
ABBREVIATION LIST
ABC AGGREGATE BASE COURSE
AD ALGEBRAIC DIFFERENCE
AE ACCESS EASEMENT
ARCH ARCHITECT
ARV AIR RELEASE VALVE
ASPH ASPHALT
BLDG BUILDING
BFV BUTTERFLY VALVE
BOV BLOW OFF VALVE
BOS BOTTOM OF STEP
BOW BACK OF WALK
BW BOTTOM OF WALL
C&G CURB & GUTTER
CATV CABLE TELEVISION
CDOT COLORADO DEPARTMENT OF
TRANSPORTATION
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CO CLEAN OUT
CoFC CITY OF FORT COLLINS
COMM COMMUNICATION
CON CONDENSATE
CONC CONCRETE
COORD COORDINATION
CW CHILL WATER
CWR CHILL WATER RETURN
CWS CHILL WATER SUPPLY
DE DRAINAGE EASEMENT
D,U,&PAE DRAINAGE, UTILITY, & PRIVATE ACCESS
EASEMENT
DEMO DEMOLITION
DIA DIAMETER
DIP DUCTILE IRON PIPE
DOM DOMESTIC
E EAST(ING)
EAE EMERGENCY ACCESS EASEMENT
EG EXISTING GROUND
EL ELEVATION
ELCO EAST LARIMER COUNTY WATER DISTRICT
ELEC ELECTRIC
EOA EDGE OF ASPHALT
EOC EDGE OF CONCRETE
EX EXISTING
ESMT EASEMENT
EST ESTIMATE(D)
F FIRE LINE
FCP FINAL COMPLIANCE PLAN
FDC FIRE DEPARTMENT CONNECTION
FES FLARED END SECTION
FF FINISHED FLOOR
FFE FINISHED FLOOR ELEVATION
FG FINISHED GRADE
FH FIRE HYDRANT
FL FLOWLINE
FO FIBER OPTIC
G GAS
GB GRADE BREAK
GF GARAGE FLOOR
GND GROUND
GV GATE VALVE
HBP HOT BITUMINOUS PAVEMENT
HERCP HORIZONTAL ELLIPTICAL REINFORCED
CONCRETE PIPE
HORZ HORIZONTAL
HDPE HIGH DENSITY POLYETHYLENE
HP HIGH POINT
HW HEADWALL
IE IRRIGATION EASEMENT
INV INVERT
IRR IRRIGATION
LA LANDSCAPE (PLAN/ACRH)
LCUASS LARIMER COUNTY URBAN AREA STREET
STANDARDS
LF LINEAR FEET
LP LOW POINT
LT LEFT
MAX MAXIMUM
ME MATCH EXISTING
MEP MECHANICAL, ELECTRICAL, PLUMBING
ENGINEER
MH MANHOLE
MIN MINIMUM
N NORTH(ING)
NA NOT APPLICABLE
NECCO NORTHEAST COLLEGE CORRIDOR OUTFALL
NHBZ NATURAL HABITAT BUFFER ZONE
NTS NOT TO SCALE
NWCWD NORTH WELD COUNTY WATER DISTRICT
OC ON CENTER
OHE OVERHEAD ELECTRIC
OHT OVERHEAD TELEPHONE
OHU OVERHEAD UTILITY
P&UE PEDESTRIAN & UTILITY EASEMENT
PE PEDESTRIAN EASEMENT
PERF PERFORATED
PC POINT OF CURVATURE
PCC PORTLAND CEMENT CONCRETE
PCR POINT OF CURB RETURN
PH POTHOLE
PI POINT OF INTERSECTION
PL PROPERTY LINE
PT POINT OF TANGENCY
PVC POLYVINYL CHLORIDE
R&R REMOVAL & REPLACEMENT
RCBC REINFORCED CONCRETE BOX CULVERT
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN
RE REFERENCE
RJ RESTRAINT JOINT
ROW RIGHT-OF-WAY
RT RIGHT
SCH SCHEDULE
S SOUTH
SD STORM DRAIN PIPE
SDMH STORM DRAIN MANHOLE
SRVC SERVICE
SS SANITARY SEWER
SSCO SANITARY SEWER CLEAN-OUT
SSMH SANITARY SEWER MANHOLE
SSWR SANITARY SEWER
STA STATION
STD STANDARD
STM STEAM
SWMP STORMWATER MANAGEMENT PLAN
T TELEPHONE
TB THRUST BLOCK
TBC TOP BACK OF CURB
TBV TO BE VACATED
TBR TO BE REMOVED
TELE TELEPHONE
TEMP TEMPORARY
TF TOP OF FOUNDATION
TOS TOP OF STEP
TW TOP OF WALL
TYP TYPICAL
XS CROSS SECTION
UD UNDERDRAIN
UE UTILITY EASEMENT
UGE UNDERGROUND ELECTRIC
UTIL UTILITY
VCP VITRIFIED CLAY PIPE
VIF VERIFY IN FIELD
VERT VERTICAL
VPC VERTICAL POINT OF CURVATURE
VPI VERTICAL POINT OF INTERSECTION
VPT VERTICAL POINT OF TANGENCY
W WATERLINE OR WEST
WL WATERLINE
WQ WATER QUALITY
WQCV WATER QUALITY CAPTURE VOLUME
WSE WATER SURFACE ELEVATION
WTR WATER
I HEREBY AFFIRM THAT THESE FINAL CONSTRUCTION PLANS WERE PREPARED UNDER MY
DIRECT SUPERVISION, IN ACCORDANCE WITH ALL APPLICABLE CITY OF FORT COLLINS
AND STATE OF COLORADO STANDARDS AND STATUTES, RESPECTIVELY, AND THAT I AM
FULLY RESPONSIBLE FOR THE ACCURACY OF ALL DESIGN, REVISIONS AND RECORD
CONDITIONS THAT I HAVE NOTED ON THESE PLANS.
INDEMNIFICATION STATEMENT:
THESE PLANS HAVE BEEN REVIEWED BY THE LOCAL ENTITY FOR CONCEPT ONLY. THE
REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE LOCAL
ENTITY ENGINEER, OR THE LOCAL ENTITY FOR ACCURACY AND CORRECTNESS OF THE
CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT QUANTITIES OF ITEMS
ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE
CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE
LOCAL ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED
DURING THE CONSTRUCTION PHASE.
JASON T. CLAEYS
P.E. NO. 42122
Lake Canal Company
UTILITY PLAN Approval
District Manager
APPROVED:
Date
North Weld County Water District
UTILITY PLAN Approval
District Manager
APPROVED:
Date
East Larimer County Water District
UTILITY PLAN Approval
District Manager
APPROVED:
Date
City of Greeley
UTILITY PLAN Approval
City Official
APPROVED:
Date
TYPICAL CONNECTOR LOCAL W/ MEDIAN STREET SECTION
TURN LANE MEDIAN DETAIL
TYPICAL CONNECTOR LOCAL STREET SECTION
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
COVER SHEET
6/26/19
N/A
N/A
JTC
JTC
18-1000-00
----
1 95
TYPICAL 4-LANE ARTERIAL STREET SECTION