Loading...
HomeMy WebLinkAboutNORTHFIELD FILING 1 EXPANDED - FDP190012 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTFINAL DRAINAGE REPORT FOR Northfield Prepared by: Highland Development Services 6355 Fairgrounds Ave, Suite 100 Windsor, Colorado 80550 Phone: 970.674.7550 Prepared for: Landmark Real Estate Holdings, LLC 6341 Fairgrounds Ave, Suite 100 Windsor, Colorado 80550 Office: 970.460.0567 June 26, 2019 Job Number 18-1000-00 6355 FAIRGROUNDS AVE, SUITE 100, WINDSOR, COLORADO 80550 | PHONE 970.674.7550 June 26, 2019 Mr. Shane Boyle Fort Collins Utilities 700 Wood Street Fort Collins, CO 80522 RE: Final Drainage Report for Northfield Dear Shane, We are pleased to submit for your review, the Final Drainage Report for the Northfield subdivision. This report describes the drainage design intent to be in accordance with the criteria in the City of Fort Collins Storm Drainage Manual. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, Jason T. Claeys, P.E., LEED AP Highland Development Services Page i TABLE OF CONTENTS Table of Contents ............................................................................................................................. i Engineer’s Certification Block ..........................................................................................................ii General Description and Location .................................................................................................. 1 Site Description and Location ...................................................................................................... 1 Site Soils ....................................................................................................................................... 2 Storm Drainage Criteria .................................................................................................................. 3 Hydrologic Criteria ....................................................................................................................... 3 Hydraulic Criteria ......................................................................................................................... 3 Drainage Basins ............................................................................................................................... 5 Drainage Facility Design ................................................................................................................ 11 Drainage Conveyance Design .................................................................................................... 11 Detention/Water Quality Pond Design ..................................................................................... 11 Low Impact Development ............................................................................................................. 13 Stormwater Pollution Prevention ................................................................................................. 15 Conclusions ................................................................................................................................... 16 References .................................................................................................................................... 17 Appendix ....................................................................................................................................... 18 Appendix A – Site Descriptions, Characteristics, & References .................................................. A Appendix B – SWMM Input/Output ............................................................................................ B Appendix C – Rational Calculations ............................................................................................. C Appendix D – Detention Pond Calculations ................................................................................ D Appendix E – Street Capacities & Inlet Calculations ................................................................... E Appendix F – Low Impact Development Calculations ..................................................................F Page ii ENGINEER’S CERTIFICATION BLOCK I hereby certify that this Final Drainage Report for Northfield was prepared by me (or under my direct supervision) for the owners thereof and meets or exceeds the criteria of the City of Fort Collins Stormwater Design Standards. ________________________________________ Jason T. Claeys, PE Registered Professional Engineer State of Colorado No. 42122 Page 1 GENERAL DESCRIPTION AND LOCATION SITE DESCRIPTION AND LOCATION Northfield is located in the Southeast Quarter of Section 1, Township 7 North, Range 67 West of the Sixth Principal Meridian, City of Fort Collins, County of Larimer, within the State of Colorado. More specifically, Northfield is located north of the ALTA Vista Subdivision, west of N. Lemay Avenue, and southeast of the Lake Canal irrigation ditch. The project site is approximately 55.26 acres and is currently undeveloped agricultural land. The site appears to be vegetated with grasses harvested for livestock feed. The site generally slopes from the northwest to the southeast at about 0.5% slope. There are no existing surface improvements currently on the property. The property is proposed to be subdivided into multiple single-family lots and condominium tracts. Northfield will consist of 139 single family attached (fee simple) units and 301 condominium units, a mixed-use building with a combination of retail and apartments, and a community clubhouse. Northfield is located within the City’s Dry Creek Drainage Basin. In addition to the City of Fort Collins Stormwater Design Standards, drainage requirements are also described in the “North East College Corridor Outfall (NECCO) Design Report”, prepared by Ayres Associates, dated August 2009. The improvements associated with Northfield are located within basins 115, 116, 117, 414, 950, 951, 960, 961, 970, 971, 980, and 981 as delineated in the above report. A portion of the Northfield improvements are located within the FEMA regulatory, Dry Creek 100-year Floodplain as shown on FEMA FIRM map numbers 08069C0977G (revised June 17, 2008), and 08069C0981G (revised June 17, 2008). All improvements are outside of the 100-yr floodway, and a portion of the improvements are within the 100-yr floodplain. The first phase of the NECCO improvements were completed early in 2017 with the remaining improvements completed in the spring of 2018. It is anticipated that the LOMR associated with these improvements will be completed by the end of year in 2019. Once the LOMR is complete, the 100-yr floodplain is anticipated to be removed from the site. If circumstances occur that the LOMR is not complete at the time of construction for the Northfield improvements, a Floodplain Use Permit will be required. It is anticipated that the floodplain limits will be adjusted prior to the construction of the residential units. If buildings are constructed prior to the map revision, the buildings will be elevated above the Regulatory Base Floodplain Elevation and adhering to Fort Collins Municipal Code Chapter 10 requirements. A portion of the site is located within the Cache la Poudre River 500-yr floodplain. Critical facilities are prohibited Page 2 within the 100-yr and/or 500-yr floodplains. Critical facilities include facilities for at-risk populations (daycares, schools, nursing homes, etc) and emergency service facilities (urgent care, hospitals, fire stations, police stations, etc). SITE SOILS The Northfield site consists of Loveland clay loam and Nunn clay loam and are classified as Type C hydrologic group. According to USDA/Natural Resource Conservation Group, this soil has a slow infiltration rate when thoroughly wet. These soils consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Per the “Preliminary Subsurface Exploration and Groundwater Report – Schlagel Property”, prepared be Earth Engineering Consultants (EEC), dated August 16, 2017: Vegetation growth and topsoil was encountered at the surface of each boring. Underlying the topsoil/vegetation layer was a zone of cohesive subsoils classified lean to fat clay with varying amounts of sand and clayey sand to approximate depths of 2 to 5-1/2 feet. Underlying the cohesive subsoils was a granular layer of poorly to well graded sand with silt and gravel extending to the depths explored at approximately 14 to 21-1/2 feet or to underlying bedrock. It appears that below the lean to fat clay, there is a granular materials layer that would inhibit more moderate infiltration rates than the surface materials. Groundwater was also observed during the subsurface soil exploration: Groundwater and/or the presence of a piezometric water surface, was generally observed at depths ranging from approximately 3 to 7 feet below ground surface as indicated on the enclosed boring logs. EEC has continued to monitor the groundwater level depths over the last 12 month period after the original borings. Due to the groundwater elevations and in consideration of the infiltration galleries, pond bottoms, and building foundations, the site is anticipated to be dewatered, utilizing the NECCO pipe as the dewatering outfall. Miller Groundwater Engineering is currently finalizing their groundwater study for the site and has provided initial analysis results for the proposed dewatering system. Once complete, the final groundwater study will be provided to the City for review. Supporting figures can be found in Appendix A. Page 3 STORM DRAINAGE CRITERIA This final report was prepared to meet or exceed the City of Fort Collins storm water criteria. The City of Fort Collin’s Storm Drainage Design Criteria and amendments to the Urban Drainage Flood Control District’s (UDFCD) Drainage Criteria Manual (USDCM) Volumes 1, 2 and 3 were referenced as guidelines for this design. HYDROLOGIC CRITERIA The rational method was performed to calculate the peak runoff rates for each basin. Weighted percent impervious and weighted runoff coefficients were calculated for each basin using USDCM Tables RO-3 and RO-5 based on Natural Resources Conservation Service (NRCS) Type C hydrologic soil classification and surface characteristics of each basin. The time of concentration was calculated using City of Fort Collins initial time of concentration and the intensity was calculated using the corresponding storm rainfall depth and USDCM Equation 4- 3. To account for the City of Fort Collins’ IDF Curve, Coefficient 3 of the UDFCD’s intensity formula was adjusted to 0.7867. The City of Fort Collins area has 2-yr 1-hr rainfall depth of 0.82 inches and a 100-yr 1 hr rainfall depth of 2.86 inches. These depths do account for the 1999 adjusted rainfall depths. HYDRAULIC CRITERIA The final Northfield storm drainage system has been designed to convey the minor and major storm events through the combination of streets, inlets, storm sewer pipes, and swales. Per the requirements provided by the City of Fort Collins Storm Drainage Design Criteria, all inlets and storm pipes have been designed such that, during the minor initial storm event, the 2-yr storm, the flows for the Local Street do not top the curb and may only rise to the street crown elevation, and for an Arterial (with Median) do not top the curb and the flow spread will leave at least one 12 ft lane width free of water in each direction. During the major storm event, the 100-yr storm, the water depth for the Local Street is held to a maximum depth of 6” at the street crown, 12” at the gutter flow line, and/or flow must be contained within right-of-way or easements paralleling the right-of-way. The Arterial (with Median) is held to a maximum depth that will not exceed the median gutter elevation, 12” at the gutter flowline, and/or flow must be contained within right-of-way or easements paralleling the right-of-way. The peak basin runoff flows from the rational calculations were then used to determine the street capacities, and on-grade inlet locations. The on-grade and sump inlet capacities have been calculated using UDFCD’s spreadsheet UD-Inlet_v4.05.xlsm. The inlet capacities have been analyzed and the necessary adjustments applied to the street runoff flows based on the Page 4 amount of runoff collected by on-grade inlets. The sump inlets have been sized using the previous mentioned street capacity allowances with overtopping if needed. The captured flows have been analyzed using EPA’s SWMM 5.0 program to design pipe size and slopes. UD-Inlet applies a clogging factor while sizing the inlets, but while sizing the storm pipes, it is assumed that the inlets are free of clogging debris and capturing the maximum amount of street runoff. Orifice rating curves have been utilized for the inlet capture capacities and route the captured runoff through the storm drain system. The program accounts for head losses within manholes and bends and head losses associated with pipe friction. Hydraflow has been used to compute the open channel hydraulics and check the capacities of the drainage swales throughout the site. Flow velocities within these swales have been reviewed and where flows were found to be supercritical, the swales have been protected with turf reinforcement mat. All swale and pipe outlets are protected with riprap or suitable erosion protection methods. Storm sewer pipe outlets are protected using the requirements set by the USDCM for the protection downstream of culverts. All supporting calculations for street sections and inlets are located in the Appendix. Page 5 DRAINAGE BASINS The Northfield site is divided into 5 main drainage systems, which all outlet into the existing NECCO storm system. These basins are broken into smaller sub-basins based on selected design points. The design points were placed in locations where the street capacities were analyzed, in sump locations, and in point locations for runoff values to size drainage swales. The peak 2-yr and 100-yr runoff values were determined for these design points using the rational method. All calculations can be found in the Appendix. Historical drainage analysis was completed for the areas of Northfield located within the NECCO basin map that allows the runoff to be released at historic rates. The remaining areas of Northfield did not calculate the historic runoff rates since the developed runoff is restricted to 0.2 cfs/acre release rate. Seven interconnected extended detention basins located throughout the site were analyzed using EPA SWMM 5.0 as a dynamic routing method. Outlet structures with control orifices were sized in the SWMM model to restrict flows to the allowable release rate. The sub-basin descriptions have been summarized per inlet and are described as follows (refer to the Drainage & Erosion Control Plan located in the Appendix): Drainage System A: Drainage System A consists of 18.10 acres of improvements along the east side of the project site. Runoff from basins in the A system drain to two interconnected extended detention basins, Ponds A1 and A2. Sub-basins A1 thru A2 consist of 0.85 acres of single-family attached residential lots and private drives. Flows from these basins are conveyed via curb and gutter and are collected by 2’ wide concrete channels with sidewalk chases and directed to detention Pond A2. All of sub-basins A1 & A2 are treated by a LID infiltration gallery in Pond A2. Sub-basins A3 thru A4 consist of 2.41 acres of single-family attached and condominium residential lots, public roadways and private drives. These basins include portions of Schlagel Street and Pioneer Trail Road. Runoff from these basins (along with the upstream flows from sub-basins A1 & A2) is conveyed along roadways and is captured by two 10’ Type R curb inlets and directed to detention Pond A2. All of sub-basins A3 & A4 are treated by a LID infiltration gallery in Pond A2. Sub-basins A5 thru A6 consist of 1.49 acres of single-family attached and condominium residential lots and private drives. Runoff from these basins is conveyed along roadways Page 6 and is captured by a double Type 13 valley inlet and directed to detention Pond A2. All of sub-basins A5 & A6 are treated by a LID infiltration gallery in Pond A2. Sub-basins A7 thru A9 consist of 1.99 acres of single-family attached and condominium residential lots, a portion of the community clubhouse lot, and public roadways. These basins include portions of Landmark Way, Collamer Drive, and Pioneer Trail Road. Runoff from these basins is conveyed along roadways and is discharged directly into detention Pond A2 via a CoFC standard curb cut with sidewalk chase. All of sub-basins A7 thru A9 are treated by a LID infiltration gallery in Pond A2. Sub-basins A10 thru A11 consist of 1.82 acres of single-family attached and condominium residential lots, and private drives. Runoff from these basins is conveyed along roadways and is captured by a 10’ Type R curb inlet and directed to detention Pond A2. All of sub- basins A10 & A11 are treated by a LID infiltration gallery in Pond A2. Sub-basin A12 consists of 1.25 acres of condominium residential lots and the open space encompassing detention Pond A2 and infiltration gallery A2. Flows within this basin are conveyed via roof downspouts and concrete pans. All of sub-basin A12 is treated by the A2 LID infiltration gallery. Runoff is conveyed from Pond A2 via storm pipes into Pond A1. Sub-basins A13 thru A14 consist of 1.08 acres of single-family attached and condominium residential lots and private drives. Runoff from these basins is conveyed along roadways and is captured by a double Type 13 valley inlet and directed to detention Pond A1. Sub-basin A15 consists of 2.48 acres of single-family attached and condominium residential lots and public roadways. This basin includes portions of N. Lemay Avenue and Schlagel Street. Runoff from this basin is conveyed along roadways and is captured by a 5’ Type R curb inlet and directed to detention Pond A1. Sub-basin A16 consists of 0.80 acres of single-family attached residential lots and public roadways. This basin includes portions of N. Lemay Avenue and Schlagel Street. Runoff from this basin is conveyed along roadways and is discharged via a 4’ wide curb cut on the east side of Lemay Avenue and into a Type C area inlet to be constructed as part of the A4 NECCO lateral. Sub-basin A17 consists of 0.90 acres of a portion of the private driveway for the adjacent Schlagel property to the north and open space. Runoff from this basin is conveyed along a concrete pan near the north property line and into a Type 13 inlet to be constructed as part of the A4 NECCO lateral. Sub-basin A18 consists of 3.02 acres of single-family attached residential lots and the open space encompassing detention Pond A1. Flows within this basin are conveyed via roof downspouts and concrete pans. Two outlet structures in Pond A1 have been designed with Page 7 orifice plates sized to limit discharge from the Northfield site into the NECCO storm system at the allowable release rate, along with a water quality plate to treat the WQCV. Drainage System B: Drainage System B consists of 19.48 acres of improvements in the central portion of the project site. Runoff from basins in the B system drain to three interconnected extended detention basins, Ponds B1, B2, & B3. Sub-basin B1 consists of 2.13 acres of condominium and multifamily residential lots and open space. Runoff is conveyed via roof downspouts and a concrete pan, and is captured by a Type 13 inlet. All of basin B1 will be treated by a LID infiltration gallery in Pond B3. Sub-basins B2 thru B3 consist of 2.37 acres of single-family attached, condominium, and multifamily residential lots, public roadways and private drives. This basin includes portions of Schlagel Street. Runoff from these basins is conveyed along roadways and is captured by two 10’ Type R curb inlets. All of sub-basins B2 & B3 will be treated by a LID infiltration gallery in Pond B3. Sub-basin B4 consists of 1.32 acres of single-family attached residential lots and private drives. Runoff from this basin is conveyed along roadways and is captured by a double Type 13 valley inlet. All of sub-basin B4 will be treated by a LID infiltration gallery in Pond B3. Sub-basins B5 thru B6 consist of 1.02 acres of single-family attached and condominium residential lots and private drives. Runoff from these basins is conveyed along roadways and is captured by a double Type 13 valley inlet. All of sub-basins B5 & B6 will be treated by a LID infiltration gallery in Pond B3. Sub-basin B7 consists of 0.27 acres of single-family attached and condominium residential lots and private drives. Flows from this basin are conveyed via drain pan and are collected by a 2’ wide concrete channel with sidewalk chase and directed to detention Pond B3. All of sub-basin B7 is treated by a LID infiltration gallery in Pond B3. Sub-basin B8 consists of 0.40 acres of single-family attached residential lots and private drives. Runoff from this basin is conveyed along roadways and is captured by a single Type 13 valley inlet. All of sub-basin B8 will be treated by a LID infiltration gallery in Pond B3. Sub-basin B9 consists of 2.29 acres of single-family attached and condominium residential lots, a portion of the community clubhouse lot, and the open space encompassing detention Pond B3 and infiltration gallery B3. Flows within this basin are conveyed via roof downspouts and concrete pans. All of sub-basin B9 is treated by the B3 LID infiltration Page 8 gallery. An outlet structure in Pond B3 includes an orifice plate sized to restrict the release rate in order to maximize detention volume in Pond B3. Runoff is conveyed from Pond B3 via storm pipes into Pond B1. Sub-basins B10 thru B11 consist of 2.95 acres of single-family attached, condominium, and multifamily residential lots, public roadways and private drives. This basin includes portions of Schlagel Street and Collamer Drive. Runoff from these basins is conveyed along roadways and is captured by two 5’ Type R curb inlets. All of sub-basins B10 & B11 will be treated by a LID infiltration gallery in Pond B2. Sub-basin B12 consists of 0.41 acres of open space encompassing detention Pond B2 and infiltration gallery B2. Flows within this basin are conveyed via roof downspouts and concrete pans. All of sub-basin B12 is treated by the B2 LID infiltration gallery. An outlet structure in Pond B2 includes an orifice plate sized to restrict the release rate in order to maximize detention volume in Pond B2. Runoff is conveyed from Pond B2 via storm pipes into Pond B1. Sub-basins B13 thru B17 consist of 2.53 acres of single-family attached and condominium residential lots and private drives. Runoff from these basins is conveyed along roadways and is captured by a quad Type 13 valley inlet and discharged directly into Pond B1. Sub-basins B18 thru B19 consist of 0.86 acres of condominium residential lots, public roadways and private drives. This basin includes portions of Landmark Way. Runoff from these basins is conveyed along roadways and is captured by two on-grade 5’ Type R curb inlets and discharged directly into Pond B1. Sub-basin B20 consists of 2.94 acres of single-family attached and condominium residential lots and the open space encompassing detention Pond B1. Flows within this basin are conveyed via roof downspouts and concrete pans. An outlet structure in Pond B3 includes an orifice plate sized to restrict the release rate in order to maximize detention volume in Pond B3 and a water quality plate to treat the WQCV. Runoff is conveyed from Pond B1 via storm pipes into Pond A1. Drainage System C: Drainage System C consists of 3.67 acres of improvements along the western side of the project site. Runoff from basins in the C system drain to an extended detention basin, Pond C. Page 9 Sub-basin C1 consists of 1.30 acres of multifamily residential buildings and open space. Runoff is conveyed via concrete pan to a culvert crossing Steeley Drive. Sub-basin C2 consists of 0.14 acres of open space. Runoff is conveyed via overland flow into a Type C area inlet. Sub-basins C3 thru C4 consist of 1.08 acres of condominium residential lots, a portion of the commercial lot, and public roadways. This basin includes portions of Steeley Drive and Schlagel Street. Runoff from these basins is conveyed along roadways and is captured by a 5’ and 10’ Type R curb inlets and discharged directly into Pond C. Sub-basin C5 consists of 1.15 acres of commercial lots and the open space encompassing Pond C. Flows within this basin are conveyed via sheet flow, roof downspouts and concrete pans. An outlet structure in Pond C includes an orifice plate sized to restrict the release rate in order to maximize detention volume in Pond C as well as a water quality plate to treat the WQCV. Runoff is conveyed from Pond C via storm pipes into Pond B1. Drainage System D: Drainage System D consists of 9.21 acres of improvements within the area south of Suniga Road. Runoff from basins in the D system drain to an extended detention basin, Pond D. Sub-basins D1 thru D4 consist of 2.70 acres of multifamily residential lots, private drives, and open space. Runoff is conveyed via roof downspouts, roadways, and concrete pans, and is captured by a double Type 13 inlet. Sub-basin D5 consists of 0.43 acres of multifamily residential lots and open space. Runoff is conveyed via roof downspouts and concrete pans and is captured by a single Type 13 inlet. Sub-basins D6 thru D7 consist of 0.19 acres of multifamily residential lots, and public roadways. This basin includes portions of Steeley Drive. Runoff from these basins is conveyed along roadways and is captured by two 5’ Type R curb inlets, ultimately discharging to Pond D. Sub-basins D8 thru D13 consist of 3.40 acres of multifamily residential lots, private drives, and open space. Runoff from these basins is conveyed via roof downspouts, roadways, and concrete pans, ultimately discharging to a rain garden. Sub-basin D14 consists of 2.50 acres of open space encompassing detention Pond D. This basin’s detention requirements allows a release rate equal to the current/historic runoff rates and is accounted for in the Pond D detention volume calculations. An outlet structure in Pond D has been designed with an orifice plate sized to limit discharge from the Pond into the NECCO storm system at the allowable release rate as well as treat the WCQV. Page 10 Sub-basin D15 consists of 0.44 acres of public roadway along the western half of N. Lemay Avenue. Runoff is conveyed along Lemay Ave and collected by a sump 5’ Type R curb inlet. Runoff is then conveyed by storm drain pipe into the existing 4’x10’ RCBC NECCO storm drain. Due to grade constraints, this sub-basin cannot be routed to Pond D; the difference in 100-yr runoff rate for the developed condition will be subtracted from the calculated allowable release rate from the site to account for the undetained flows. Drainage System E: Drainage System E consists of 8.23 acres of public roadway improvements along Suniga Road. Runoff from basins in the E system are conveyed to the existing NECCO storm drain system, undetained. Sub-basins E1 thru E2 consist of 1.14 acres of public roadway along Suniga Rd. Runoff is conveyed along Suniga Rd and collected by two sump quad Combo curb inlets. The north (downstream) inlet includes a Snout hood to filter debris before runoff enters the existing 54” RCP NECCO storm drain. Sub-basins E3 thru E4 consist of 3.51 acres of public roadway along Suniga Rd. Runoff is conveyed along Suniga Rd and collected by two on-grade triple Combo curb inlets. The north (downstream) inlet includes a Snout hood to filter debris before runoff enters the existing 4’x7’ RCBC NECCO storm drain. Sub-basins E5 thru E8 consist of 2.50 acres of public roadway along Suniga Rd. Runoff is conveyed along Suniga Rd and collected by sump double and triple Combo curb inlets. The north (downstream) inlet includes a Snout hood to filter debris before runoff enters the existing 4’x7’ RCBC NECCO storm drain. Sub-basins E9 thru E10 consist of 0.64 acres of public roadway along Suniga Rd and the eastern half of N. Lemay Avenue. Runoff is conveyed along Suniga Rd and Lemay Ave and collected by two sump 5’ Type R curb inlets. Runoff is then conveyed by storm drain pipe into the existing 4’x10’ RCBC NECCO storm drain. Page 11 DRAINAGE FACILITY DESIGN DRAINAGE CONVEYANCE DESIGN Storm infrastructure to convey runoff will include concrete trickle pans, inlets, storm sewer and culverts. Stormwater detention and water quality enhancement will be achieved through the use of multiple interconnected extended detention basins. Storm inlets, storm sewers and the roadway culverts have been appropriately sized to convey the minor and major storms. DETENTION/WATER QUALITY POND DESIGN Multiple extended detention basins (EDB) with a dry bottom will be utilized as the detention and water quality facility for Northfield. The area north of Suniga Road is required to reduce the 100-yr developed runoff to a rate of 0.2 cfs/acre. A portion of the area south of Suniga Road (delineated as sub-basins D13-D15) is allowed to release at a rate equal to current/historic rates with the remaining area (delineated as sub-basins D1-D12) restricted to the 0.2 cfs/acre rate. Sub-basin D15, representing half-street area of Lemay Avenue adjacent to the development, cannot be routed to Pond D; the difference in 100-yr runoff rate for the developed condition will be subtracted from the calculated allowable release rate to account for the undetained flows. EPA SWWM 5.0 has been utilized for the final drainage design. UDFCD is referenced for the water quality capture volume (WQCV) with a 40-yr drain time. Due to the limited grades on the site, multiple ponds are proposed throughout the site. The pond bottoms have been graded to be 2 ft above the established groundwater levels. These ponds are interconnected via storm pipes and control structures that are designed with orifice plates to restrict flow and maximize pond volume while providing adequate freeboard. Overflow paths from each of the ponds have been provided in the event that the outlet structures clog and overtop. The ultimate outfall is the existing NECCO storm drain system. There are three proposed outlet structures that will discharge runoff from the Northfield site into the NECCO system: one located at the east end of Pond A1 (Structure plan ID Outlet-A01, SWMM ID OA4-Stage 2), one near the center of Pond A1 (Structure plan ID Outlet-A02, SWMM ID OA3-Stage 2), and one in Pond D (Structure plan ID Outlet-D01, SWMM ID OD1). The combined allowable release rate for the Northfield site of 13.87 cfs has been spread across these three outlet structures in order to achieve maximum detention volumes in all the interconnected ponds. Below is a summary of allowable and provided release rates: Page 12 Allowable Release Rate: 47.69 ac = Total area north of Suniga & portion of area south of Suniga with max allowable release rate of 0.20 cfs/ac: 47.69 ac x 0.20 cfs/ac = 9.54 cfs 3.21 ac = Portion of area south of Suniga that can be released at historic rate of 5.51 cfs Flow from undetained Lemay Ave (sub-basin D15) (∆ historic - developed) is -1.18 cfs Total combined allowable release rate from Northfield site = 13.87 cfs Provided orifice-restricted release rates from each proposed three outlet structures: Outlet-A01 5.92 cfs Outlet-A02 6.39 cfs Outlet-D01 1.20 cfs Total provided release rate = 13.51 cfs All supporting calculations are located in the Appendix. Page 13 LOW IMPACT DEVELOPMENT The City of Fort Collins updated the Low Impact Development ordinance in 2016 (Ordinance No. 007, 2016) to require: • Treat at least 75% of any newly developed or redeveloped impervious area using one or a combination of LID techniques, or • Treat at least 50% of any newly developed or redeveloped impervious area using one or a combination of LID techniques when 25% of private driveable surfaces are permeable. To satisfy the required implementation of Low Impact Development (LID) techniques, Northfield will utilize below grade infiltration galleries (such as ADS StormTech chamber system) and bioretention ponds/rain gardens. Details and specifications for these facilities are provided in the Appendix. Other LID techniques were explored, but due to the limited grade available and the amount of detention volume required, shallow infiltration galleries assisted in maintaining storm drain grades and detention volumes. Pavers within the private drives did not treat enough contributing area to justify their use. Infiltration galleries will promote infiltration while capturing fine sediment that drains off the impervious areas. Further soil investigation will occur to confirm the infiltration capacities within the sandy/gravel soil layers approximately 2’ to 5 ½’ below existing grades. It is anticipated that the infiltration gallery aggregates will extend to this sandy/gravel layer. Isolator rows will be implemented at the headworks to the infiltration galleries to allow larger sediment particles to settle prior to entering the infiltration gallery. The isolator rows will be accessible to remove sediments. Standard water quality is also provided within the detention ponds in addition to these LID infiltration galleries. A Standard Operations Procedure will be provided at final design to assist in ensuring that these BMPs will adequately perform over time. Impervious calculations for the areas contributory to each of the LID infiltration galleries along with a colored coded exhibit are provided in the Appendix. Below is a description of the 4-step process for selecting structural BMPs: Urban Drainage and Flood Control District (UDFCD) recommends a Four Step Process for receiving water protection that focuses on reducing runoff volumes, treating the water quality capture volume (WQCV), stabilizing drainageways and implementing long-term source controls. The Four Step Process applies to the management of smaller, frequently occurring events. Page 14 Step 1: Employ Runoff Reduction Practices To reduce runoff peaks, volumes, and pollutant loads from urbanizing areas, implement Low Impact Development (LID) strategies, including Minimizing Directly Connected Impervious Areas (MDCIA). Captured runoff from strategic areas are routed through below grade infiltration galleries and bioretention pond/rain gardens. Infiltration galleries and rain gardens will slow runoff, promote infiltration, and filter runoff prior to being released into the adjacent storm drain system. Step 2: Implement BMPs that Provide a Water Quality Capture Volume with Slow Release The infiltration galleries and rain gardens are designed to provide water quality capture volume per Urban Drainage’s recommendations and calculations. The captured runoff is design for a 12-hr drain time. Step 3: Stabilize Drainageways Natural Drainageways are subject to bed and bank erosion due to increases in frequency, duration, rate and volume of runoff during and following development. Because the site will drain to an existing storm system, bank stabilization is unnecessary with this project. Step 4: Implement Site Specific and Other Source Control BMPs Proactively controlling pollutants at their source by preventing pollution rather than removing contaminants once they have entered the stormwater system or receiving waters is important when protecting storm systems and receiving waters. This can be accomplished through site specific needs such as construction site runoff control, post-construction runoff control and pollution prevention / good housekeeping. It will be the responsibility of the contractor to develop a procedural best management practice for the site. Page 15 STORMWATER POLLUTION PREVENTION Erosion and sedimentation will be controlled on-site by use of sediment control logs, inlet protection, a gravel construction entrance, seeding, mulch, and turf. The measures are designed to limit the overall sediment yield increase due to construction as required by the City of Fort Collins. During overlot and final grading the soil will be roughened and furrowed perpendicular to the prevailing winds. During the performance of the work required by these specifications or any operations appurtenant thereto, whether on right-of-way provided by the City or elsewhere, the contractor shall furnish all labor, equipment, materials, and means required. The Contractor shall carry out proper efficient measures wherever and as necessary to reduce dust nuisance, and to prevent dust nuisance that has originated from his operations from damaging crops, orchards, cultivated fields, and dwellings, or causing naissance to persons. The Contractor will be held liable for any damage resulting from dust originating from his operations under these specifications on right-of-way or elsewhere. It is unlawful to track or cause to be tracked mud or other debris onto city streets or rights-of- way. Wherever construction vehicles access routes or intersect paved public roads, previsions must be made to minimize the transport of sediment by runoff or vehicles tracking onto the paved surface. Stabilized construction entrances are required with base material consisting of 6” coarse aggregate. The contractor will be responsible for clearing mud tracked onto city streets on a daily basis. All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to assure continued performance of their intended function. Silt fence and sediment control logs will require periodic replacement. Maintenance is the responsibility of the contractor. All disturbed areas must be seeded and mulched within 30 days of project start. Vegetation shall not be considered established until a ground cover is achieved which is demonstrated to be mature enough to control soil erosion to the satisfaction of the City Inspector and to survive severe weather condition. Page 16 CONCLUSIONS This Final Drainage Report for Northfield has been prepared to comply with the stormwater criteria set by the City of Fort Collins. The proposed drainage system presented in this report is designed to convey the developed peak storm water runoff through the site to the existing storm drain system and to the development’s LID features, detention and water quality facilities. Storm drains have been sized to provide the required roadway relief in both the 2-yr and 100-yr storm events, and to adequately convey the released runoff from the detention ponds disbursed throughout the site. Overland relief will be provided at all sump locations. The calculated 100-yr peak flows released from Northfield adhere to the allowed rates as established in the NECCO drainage studies. This final drainage report anticipates the implementation of best management practices for erosion control, temporary and permanent, and on-site construction facilities. It can therefore be concluded that development of Northfield complies with the storm water jurisdictional criteria and will not adversely affect the adjacent properties, streets, storm drain system and/or detention/water quality facilities. Controlling the developed runoff from these improvements will improve the situations currently existing on the site. Page 17 REFERENCES 1. Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3), Urban Drainage and Flood Control District, June 2001, Revised November 2010. 2. Storm Drainage Criteria Manual and Construction Standards, City of Fort Collins Storm Water Utility, City of Fort Collins, Colorado, Updated January, 1997 with 2012 amendments. 3. Fort Collins Stormwater Criterial Manual (Draft for Council), Fort Collins Utilities, City of Fort Collins, Colorado, Dated November 2017 [Anticipated to be adopted by City Council in 2018] 4. “Hydrologic Group Rating for Larimer County Area, Colorado”, USDA-Natural Resources Conservation Service, National Cooperative Soil Survey. Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov. [12/06/2017] 5. “Preliminary Subsurface Exploration and Groundwater Report – Schlagel Property”, prepared by Earth Engineering Consultants, LLC, Dated August 16, 2017 6. “Public Improvement Plans, East Vine Drive Relocation”, prepared by Ayres Associates, Dated February 2009, obtained from City of Fort Collins. 7. “Utility Plans for NECCO Ponds and Backbone” – Record Drawings, prepared by Ayres Associates, Dated June 2017, obtained from the City of Fort Collins. 8. “Flood Insurance Rate Map, Larimer County, Colorado – Map Number 08069C0977G”, Federal Emergency Management Agency, Map Revised June 17, 2008. 9. “Flood Insurance Rate Map, Larimer County, Colorado – Map Number 08069C0981G”, Federal Emergency Management Agency, Map Revised June 17, 2008. Page 18 APPENDIX Appendix A – Site Descriptions, Characteristics, & References Appendix B – SWMM Input/Output Appendix C – Rational Calculations Appendix D – Detention Pond Calculations Appendix E – Street Capacities & Inlet Calculations Appendix F – Low Impact Development Calculations Appendix A APPENDIX A – SITE DESCRIPTIONS, CHARACTERISTICS, & REFERENCES SITE Vicinity Map PROJECT DATUM: NAVD88 CITY OF FORT COLLINS BENCHMARK #43-97 ON THE SOUTH END OF THE WEST HEADWALL OF THE LAKE CANAL BRIDGE AT NORTH LEMAY AVENUE, 200 FEET SOUTH OF THE INTERSECTION OF LEMAY AVENUE. AND CONIFER STREET ELEV= 4960.11 CITY OF FORT COLLINS BENCHMARK #12-07 SOUTH SIDE OF VINE DRIVE ON THE SOUTH HEADWALL OF THE BRIDGE OVER DRY CREEK BASIN 0.4 MILES EAST OF NORTH LEMAY AVENUE ELEV= 4947.86 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. IF NGVD29 UNADJUSTED IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATIONS SHOULD BE USED: NGVD UNADJUSTED = 4960.11 (NAVD88) - 3.17 NGVD UNADJUSTED = 4947.81 (NAVD88) - 3.18 NTS Hydrologic Soil Group—Larimer County Area, Colorado (NorthField) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/6/2017 Page 1 of 4 4494130 4494220 4494310 4494400 4494490 4494580 4494670 4494130 4494220 4494310 4494400 4494490 4494580 4494670 494350 494440 494530 494620 494710 494800 494890 494980 495070 495160 494350 494440 494530 494620 494710 494800 494890 494980 495070 495160 40° 36' 11'' N 105° 4' 2'' W 40° 36' 11'' N 105° 3' 23'' W 40° 35' 52'' N 105° 4' 2'' W 40° 35' 52'' N 105° 3' 23'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 200 400 800 1200 Feet 0 50 100 200 300 Meters Map Scale: 1:4,140 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 64 Loveland clay loam, 0 to 1 percent slopes C 11.9 20.9% 73 Nunn clay loam, 0 to 1 percent slopes C 16.6 29.2% 76 Nunn clay loam, wet, 1 to 3 percent slopes C 28.3 49.9% Totals for Area of Interest 56.7 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Hydrologic Soil Group—Larimer County Area, Colorado NorthField Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/6/2017 Page 3 of 4 Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado NorthField Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/6/2017 Page 4 of 4 SUBJECT PROPERTY (APPROX.) SUBJECT PROPERTY (APPROX.) 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 Intensity (in/hr) City of Fort Collins Rainfall Intensity-Duration-Frequency Curve 2-yr (FTC) 10-yr (FTC) 100-yr (FTC) 2-yr (UD) 10-yr (UD) 100-yr (UD) 100-yr 10-yr 0.0 1.0 2.0 3.0 4.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 60.0 65.0 Duration (min) 2-yr 10-yr Duration (minutes) 2-yr Intensity (in/hr) 10-yr Intensity (in/hr) 100-yr Intensity (in/hr) Duration (minutes) 2-yr Intensity (in/hr) 10-yr Intensity (in/hr) 100-yr Intensity (in/hr) 5 2.85 4.87 9.95 33 1.22 2.08 4.24 6 2.67 4.56 9.31 34 1.19 2.04 4.16 7 2.52 4.31 8.80 35 1.17 2.00 4.08 8 2.40 4.10 8.38 36 1.15 1.96 4.01 9 2.30 3.93 8.03 37 1.13 1.93 3.93 10 2.21 3.78 7.72 38 1.11 1.89 3.87 11 2.13 3.63 7.42 39 1.09 1.86 3.80 12 2.05 3.50 7.16 40 1.07 1.83 3.74 13 1.98 3.39 6.92 41 1.05 1.80 3.68 14 1.92 3.29 6.71 42 1.04 1.77 3.62 15 1.87 3.19 6.52 43 1.02 1.74 3.56 16 1.81 3.08 6.30 44 1.01 1.72 3.51 17 1.75 2.99 6.10 45 0.99 1.69 3.46 18 1.70 2.90 5.92 46 0.98 1.67 3.41 19 1.65 2.82 5.75 47 0.96 1.64 3.36 20 1.61 2.74 5.60 48 0.95 1.62 3.31 21 1.56 2.67 5.46 49 0.94 1.60 3.27 22 1.53 2.61 5.32 50 0.92 1.58 3.23 23 1.49 2.55 5.20 51 0.91 1.56 3.18 24 1.46 2.49 5.09 52 0.90 1.54 3.14 25 1.43 2.44 4.98 53 0.89 1.52 3.10 26 1.40 2.39 4.87 54 0.88 1.50 3.07 27 1.37 2.34 4.78 55 0.87 1.48 3.03 28 1.34 2.29 4.69 56 0.86 1.47 2.99 29 1.32 2.25 4.60 57 0.85 1.45 2.96 30 1.30 2.21 4.52 58 0.84 1.43 2.92 31 1.27 2.16 4.42 59 0.83 1.42 2.89 32 1.24 2.12 4.33 60 0.82 1.40 2.86 Figure 3-1a City of Fort Collins Rainfall Intensity-Duration-Frequency Table for using the Rational Method 2-year 5-yr 10-yr 25-yr 50-yr 100-yr 5 0.29 0.40 0.49 0.63 0.79 1.00 10 0.33 0.45 0.56 0.72 0.90 1.14 15 0.38 0.53 0.65 0.84 1.05 1.33 20 0.64 0.89 1.09 1.41 1.77 2.23 25 0.81 1.13 1.39 1.80 2.25 2.84 30 1.57 2.19 2.69 3.48 4.36 5.49 35 2.85 3.97 4.87 6.30 7.90 9.95 40 1.18 1.64 2.02 2.61 3.27 4.12 45 0.71 0.99 1.21 1.57 1.97 2.48 50 0.42 0.58 0.71 0.92 1.16 1.46 55 0.35 0.49 0.60 0.77 0.97 1.22 60 0.30 0.42 0.52 0.67 0.84 1.06 65 0.20 0.28 0.39 0.62 0.79 1.00 70 0.19 0.27 0.37 0.59 0.75 0.95 75 0.18 0.25 0.35 0.56 0.72 0.91 80 0.17 0.24 0.34 0.54 0.69 0.87 85 0.17 0.23 0.32 0.52 0.66 0.84 90 0.16 0.22 0.31 0.50 0.64 0.81 95 0.15 0.21 0.30 0.48 0.62 0.78 100 0.15 0.20 0.29 0.47 0.60 0.75 105 0.14 0.19 0.28 0.45 0.58 0.73 110 0.14 0.19 0.27 0.44 0.56 0.71 115 0.13 0.18 0.26 0.42 0.54 0.69 120 0.13 0.18 0.25 0.41 0.53 0.67 City of Fort Collins Design Storms for using SWMM Figure 3-1c Time (min) Intensity (in/hr) These are the 1-hour storm 2-year 5-yr 10-yr 25-yr 50-yr 100-yr 1-hr 0.82 1.14 1.40 1.81 2.27 2.86 2-hr 0.98 1.36 1.71 2.31 2.91 3.67 Storm Duration Rainfall Depth (in) Note: The City of Fort Collins SWWM input hyetopgrah is used to calculate the 1-hr and 2-hr storm rainfall depths for the different storm events. These are the 1-hour storm depths that are used in the Urban Drainage intensity equation, derived from the CoFC Hyetograph. Table RO-13 SWMM Input Parameters Depth of Storage on Impervious Areas 0.1 inches Depth of Storage on Pervious Areas 0.3 inches Maximum Infiltration Rate 0.51 inches/hour Minimum Infiltration Rate 0.50 inches/hour Decay Rate 0.0018 inches/sec Zero Detention Depth 1% Manning’s n Value for Pervious Surfaces 0.025 Manning’s n Value for Impervious Surfaces 0.016 4.3.2 Pervious-Impervious Area Table RO-14 should be used to determine preliminary percentages of impervious land cover for a given land-use or zoning. The final design must be based on the actual physical design conditions of the site. Table RO-14 Percent Imperviousness Relationship to Land Use* LAND USE OR ZONING PERCENT IMPERVIOUS (%) Business: T CCN, CCR, CN E, RDR, CC, LC C, NC, I, D, HC, CS 20 70 80 90 Residential: RF,UE RL, NCL LMN,NCM MMN, NCB 30 45 50 70 Open Space: Open Space and Parks (POL) Open Space along foothills ridge (POL,RF) RC 10 20 20 *For updated zoning designations and definitions, please refer to Article Four of the City Land Use Code, as amended LEGEND DRAINAGE BASIN BASIN NUMBER BASIN AREA (ACRES) EXHIBIT 4.2 FUTURE DETENTION AND WATER QUALITY REQUIREMENTS RESTRICT AMOUNT OF RUNOFF TO EXISTING CONDITIONS IF RE-DEVELOPED. WATER QUALITY PROVIDED IN REDWOOD POND REQUIRE FUTURE ON-SITE DETENTION & WATER QUALITY. RELEASE RATE @ 0.20 cfs/acre REQUIRE FUTURE ON-SITE DETENTION. WATER QUALITY PROVIDED IN REGIONAL POND. FUTURE RE-ALIGNED VINE DRIVE. WATER QUALITY PROVIDED WITH SNOUTS. DISCHARGE INTO REGIONAL POND WITHOUT FUTURE DETENTION OR WATER QUALITY. RESTRICT AMOUNT OF RUNOFF TO EXISTING CONDITIONS IF RE-DEVELOPED. FUTURE WATER QUALITY REQUIRED. RESTRICT AMOUNT OF RUNOFF TO EXISTING CONDITIONS IF RE-DEVELOPED. WATER QUALITY PROVIDED IN REGINAL POND. BASIN 103: NO DETENTION OR WATER QUALITY REQURED IF DISCHARGING INTO EVERGREEN WEST POND COLLEGE AVENUE RED CEDAR CIRCLE LEMAY AVENUE DRY CREEK BRISTLECONE DRIVE CONIFER STREET NOKOMIS COURT BLUE SPRUCE DRIVE CONIFER STREET LUPINE DRIVE REDWOOD POND REGIONAL POND REDWOOD STREET COLLEGE AVENUE JEROME STREET BONDELL STREET OSIANDER STREET EAST VINE DRIVE 70.0 ac 68.2 ac 13.2 ac 1 Karen Brigman From: Jaclyn Michaelsen <jmichaelsen@iconeng.com> Sent: Thursday, April 11, 2019 3:24 PM To: Jason Claeys; Sandra Bratlie Cc: Linsey Chalfant; Shane Boyle; Karen Brigman Subject: RE: NECCO & Northfield Attachments: EPA SWMM Output for Jason.xlsx Jason, I attached an excel file that has the rating curves for a couple manholes just to make sure that I got your correct tie-in location. Below is a schematic from the model. The City wanted me to let you know that they have not reviewed the master plan model, so it is preliminary. Please let me know if you need any additional information. Thanks! Jaclyn Michaelsen 970.310.1547 From: Jason Claeys <jclaeys@highland-ds.com> Sent: Wednesday, April 10, 2019 10:40 AM To: Sandra Bratlie <sbratlie@fcgov.com> Cc: Linsey Chalfant <lchalfant@fcgov.com>; Shane Boyle <SBOYLE@fcgov.com>; Jaclyn Michaelsen <jmichaelsen@iconeng.com>; Karen Brigman <kbrigman@highland-ds.com> Subject: RE: NECCO & Northfield Good Morning Sandra, I was able to flip through the appendices and reviewed the HGL at our outfalls. The HGL we were using before of 4947.68 appears to be in reference to NGVD29 datum. Using the NAVD conversion of 3.17’, this places the HGL at 4950.85. Not sure the status of the updated model, but would you be able to confirm the 100-yr HGL at MH A7? I may need a time series for the outfall since the HGL will have an impact on our pond designs. Once you are able to share the model, I will see what I can get for outputs from MH A7. Can you confirm the status of the model? Thanks! Jason T. Claeys, P.E., LEED AP Highland Development Services, Inc. | jclaeys@highland-ds.com 6341 Fairgrounds Avenue, Suite 100 | Windsor, CO 80550 D 970.674.7570 | M 970.817.1712 PZ-2 MW-1 PZ-1 PZ-5 PZ-6 MW-2 PZ-3 PZ-4 PZ-7 (4956.1) [4948.9] (4957.3) [4951.3] (4956.1) [4951.0] (4953.5) [4948.5] (4954.2) [4947.4] (4951.8) [4946.5] (4953.2) [4948.6] (4954.6) [4958.5] (4956.5) [4950.8] 4951 4950 4949 4948 4947 Figure 2: Groundwater Contour Map Schlagel Property Fort Collins, Colorado EEC Project #: 1172056 Date: August 2017 EARTH ENGINEERING CONSULTANTS, LLC MW-1 & MW-2: Approximate Monitor Well Locations Legend PZ-1 thru PZ-7: Approximate Piezometer Locations Approximate Ground Surface Elevation Approximate Groundwater Elevation (4950.8) [4950.8] Approximate Groundwater Contours Approximate Groundwater Directional Flow 4950.8 4951.8 Figure 2. Depth to groundwater over time at Northfield monitoring points (in feet). Date MW-1 MW-2 PZ-1 PZ-2 PZ-3 PZ-4 PZ-5 PZ-6 PZ-7 7/27/2017 3.8 5.3 4.7 4.6 5.1 5.0 6.0 6.8 7.2 9/19/2017 4.0 5.7 5.2 4.7 5.8 5.3 7.0 6.7 7.3 10/19/2017 4.0 5.6 5.0 4.6 5.9 5.1 7.1 6.6 7.3 2/12/2018 5.7 7.0 6.8 6.2 7.5 6.5 8.8 8.0 8.9 6/7/2018 3.7 5.2 4.4 4.6 4.4 5.3 5.1 7.2 7.0 2/15/2019 6.5 7.4 7.6 7.3 9.7 6/6/2019 3.8 5.5 4.5 4.4 5.3 6.9 7.5 0 1 2 3 4 5 6 7 8 9 10 6/1/2017 8/31/2017 11/30/2017 3/1/2018 6/1/2018 8/31/2018 11/30/2018 3/2/2019 6/1/2019 8/31/2019 Depth to Water (feet) Date MW-1 MW-2 PZ-1 PZ-2 PZ-3 PZ-4 PZ-5 PZ-6 PZ-7 6/25/2019 Miller Groundwater Engineering, LLC Appendix B APPENDIX B – SWMM INPUT/OUTPUT Northfield PROPOSED DRAINAGE SUMMARY Design Engineer: K. Brigman Design Firm: Highland Development Services Project Number: 18-1000-01 Date: SWMM INPUT SUMMARY TABLE A3 A1, A2, A3 2.39 103,916 75.7% 497 209 A4 A4 0.88 38,291 66.3% 413 93 A6 A5, A6 1.49 64,747 83.4% 287 226 A9 A7, A8, A9 1.99 86,841 69.7% 623 139 A11 A10, A11 1.82 79,390 82.3% 550 144 A12 A12 1.25 54,414 36.8% 321 170 A14 A13, A14 1.08 47,176 84.3% 252 187 A15 A15 2.48 107,951 54.6% 1062 102 A16 A16 0.80 34,957 85.5% 1141 31 A17 A17 0.90 39,162 7.1% 636 62 A18 A18 3.02 131,657 15.3% 441 299 B1 B1 2.13 92,658 37.1% 826 112 B2 B2 1.30 56,628 72.3% 684 83 B3 B3 1.07 46,573 63.3% 603 77 B4 B4 1.32 57,444 85.2% 543 106 B6 B5, B6 1.02 44,619 85.6% 230 194 B9 B7, B9 2.55 111,150 35.3% 515 216 B8 B8 0.40 17,449 74.2% 217 80 B10 B10 0.48 20,847 60.4% 237 88 B11 B11 2.47 107,621 71.7% 623 173 B12 B12 0.41 17,982 1.5% 94 191 B17 B13, B14, B15, B16, B17 2.53 110,074 83.0% 692 159 B18 B18 0.43 18,766 60.9% 362 52 B19 B19 0.43 18,723 63.8% 362 52 B20 B20 2.94 128,184 14.4% 743 173 C1 C1 1.30 56,445 36.3% 577 98 C2 C2 0.14 5,888 0.0% 66 89 C3 C3 0.83 36,164 61.7% 350 103 C4 C4 0.25 11,068 66.2% 186 60 C5 C5 1.15 50,105 22.8% 311 161 D3 D1, D2, D3 2.53 110,296 55.5% 703 157 D4 D4 0.16 7,129 57.7% 201 35 D5 D5 0.43 18,591 45.8% 340 55 D6 D6 0.10 4,463 68.1% 194 23 D7 D7 0.09 3,817 81.6% 129 30 D13 D8, D9, D10, D11, D12, D13 3.40 148,227 61.7% 688 215 D14 D14 2.50 108,741 3.9% 630 173 Percent Impervious Length (ft) Width (ft) June 18, 2019 SWMM SUBCATCH MENT B1 B2 B3 B4 B6 B8 B10B9 B11 B12 B17 B18 B19 B20 C1 A3 A4 A6 A9 A14A11 A15 A18 C2 C5 D3 D4 D5 D6 D7 D13 D14 A12 C3 C4 OPA1 OPA3 OPA4 OPB1 OPB2 OPB3 OP-MHA4 OP-MHA6 OP-MHA7 OP-MHB2 OP-MHB5 PA1 PA10 PA11 PA12 PA13 PA14 PA15 PA16 PA17 PA2 PA3 PA4 PA5 PA6 PA7 PA8 PB1 PB10 [TITLE] Northfield Design Engineer: K. Brigman Design Firm: Highland Development Services Date: June 25, 2019 [OPTIONS] ;;Option Value FLOW_UNITS CFS INFILTRATION HORTON FLOW_ROUTING DYNWAVE LINK_OFFSETS DEPTH MIN_SLOPE 0 ALLOW_PONDING NO SKIP_STEADY_STATE NO START_DATE 03/11/2019 START_TIME 00:00:00 REPORT_START_DATE 03/11/2019 REPORT_START_TIME 00:00:00 END_DATE 03/11/2019 END_TIME 06:00:00 SWEEP_START 01/01 SWEEP_END 12/31 DRY_DAYS 0 REPORT_STEP 00:05:00 WET_STEP 00:05:00 DRY_STEP 00:05:00 ROUTING_STEP 0:00:30 RULE_STEP 00:00:00 INERTIAL_DAMPING PARTIAL NORMAL_FLOW_LIMITED BOTH FORCE_MAIN_EQUATION H-W VARIABLE_STEP 0.75 LENGTHENING_STEP 0 MIN_SURFAREA 12.566 MAX_TRIALS 8 HEAD_TOLERANCE 0.005 SYS_FLOW_TOL 5 LAT_FLOW_TOL 5 MINIMUM_STEP 0.5 THREADS 1 [EVAPORATION] ;;Data Source Parameters ;;-------------- ---------------- CONSTANT 0.0 DRY_ONLY NO [RAINGAGES] ;;Name Format Interval SCF Source ;;-------------- --------- ------ ------ ---------- CoFC_100-yr INTENSITY 0:05 1.0 TIMESERIES CoFC_100-yr [SUBCATCHMENTS] ;;Name Rain Gage Outlet Area %Imperv Width %Slope CurbLen SnowPack ;;-------------- ---------------- ---------------- -------- -------- -------- -------- -------- ---------------- B1 CoFC_100-yr IB1 2.13 37.1 112 0.5 0 B2 CoFC_100-yr IB2 1.30 72.3 83 0.5 0 B3 CoFC_100-yr IB3 1.07 63.3 77 0.5 0 B4 CoFC_100-yr IB4 1.32 85.2 106 0.5 0 B6 CoFC_100-yr IB5 1.02 85.6 191 0.5 0 B8 CoFC_100-yr IB6 0.40 74.2 80 0.5 0 B9 CoFC_100-yr VB3 2.55 35.3 216 0.5 0 B10 CoFC_100-yr IB7 0.48 60.4 88 0.5 0 C1 CoFC_100-yr IC1 1.30 36.3 98 0.5 0 A3 CoFC_100-yr IA1 2.39 75.7 209 0.5 0 A4 CoFC_100-yr IA2 0.88 66.3 93 0.5 0 A6 CoFC_100-yr IA3 1.49 83.4 226 0.5 0 A9 CoFC_100-yr VA2 1.99 69.7 139 0.5 0 A11 CoFC_100-yr IA4 1.82 82.3 144 0.5 0 A14 CoFC_100-yr IA5 1.08 84.3 187 0.5 0 A15 CoFC_100-yr IA6 2.48 54.6 102 0.5 0 A18 CoFC_100-yr VA1 3.02 15.3 299 0.5 0 C2 CoFC_100-yr IC2 0.14 0 89 2 0 C5 CoFC_100-yr VC1 1.15 22.8 161 0.5 0 D3 CoFC_100-yr ID1 2.53 55.5 157 0.5 0 D4 CoFC_100-yr MHD1 0.16 57.7 35 0.5 0 D5 CoFC_100-yr ID2 0.43 45.8 55 0.5 0 D6 CoFC_100-yr ID3 0.10 68.1 23 0.5 0 D7 CoFC_100-yr ID4 0.09 81.6 30 0.5 0 D13 CoFC_100-yr VD1 3.40 61.7 215 0.5 0 D14 CoFC_100-yr VD1 2.50 3.9 173 0.5 0 A12 CoFC_100-yr VA2 1.25 36.8 170 0.5 0 C3 CoFC_100-yr IC3 0.83 61.7 103 0.5 0 C4 CoFC_100-yr IC4 0.25 66.2 60 0.5 0 [SUBAREAS] ;;Subcatchment N-Imperv N-Perv S-Imperv S-Perv PctZero RouteTo PctRouted ;;-------------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- B1 0.01 0.1 .1 .3 1 OUTLET B2 0.01 0.1 .1 .3 1 OUTLET B3 0.01 0.1 .1 .3 1 OUTLET B4 0.01 0.1 .1 .3 1 OUTLET B6 0.01 0.1 .1 .3 1 OUTLET B8 0.01 0.1 .1 .3 1 OUTLET B9 0.01 0.1 .1 .3 1 OUTLET B10 0.01 0.1 .1 .3 1 OUTLET B11 0.01 0.1 .1 .3 1 OUTLET B12 0.01 0.1 .1 .3 1 OUTLET B17 0.01 0.1 .1 .3 1 OUTLET B18 0.01 0.1 .1 .3 1 OUTLET B19 0.01 0.1 .1 .3 1 OUTLET B20 0.01 0.1 .1 .3 1 OUTLET C1 0.01 0.1 .1 .3 1 OUTLET A3 0.01 0.1 .1 .3 1 OUTLET A4 0.01 0.1 .1 .3 1 OUTLET A6 0.01 0.1 .1 .3 1 OUTLET A9 0.01 0.1 .1 .3 1 OUTLET A11 0.01 0.1 .1 .3 1 OUTLET A14 0.01 0.1 .1 .3 1 OUTLET A15 0.01 0.1 .1 .3 1 OUTLET A18 0.01 0.1 .1 .3 1 OUTLET C2 0.01 0.1 .1 .3 1 OUTLET C5 0.01 0.1 .1 .3 1 OUTLET D3 0.01 0.1 .1 .3 1 OUTLET D4 0.01 0.1 .1 .3 1 OUTLET D5 0.01 0.1 .1 .3 1 OUTLET D6 0.01 0.1 .1 .3 1 OUTLET D7 0.01 0.1 .1 .3 1 OUTLET D13 0.01 0.1 .1 .3 1 OUTLET D14 0.01 0.1 .1 .3 1 OUTLET A12 0.01 0.1 .1 .3 1 OUTLET C3 0.01 0.1 .1 .3 1 OUTLET C4 0.01 0.1 .1 .3 1 OUTLET [INFILTRATION] B11 3.0 0.5 6.48 7 0 B12 3.0 0.5 6.48 7 0 B17 3.0 0.5 6.48 7 0 B18 3.0 0.5 6.48 7 0 B19 3.0 0.5 6.48 7 0 B20 3.0 0.5 6.48 7 0 C1 3.0 0.5 6.48 7 0 A3 3.0 0.5 6.48 7 0 A4 3.0 0.5 6.48 7 0 A6 3.0 0.5 6.48 7 0 A9 3.0 0.5 6.48 7 0 A11 3.0 0.5 6.48 7 0 A14 3.0 0.5 6.48 7 0 A15 3.0 0.5 6.48 7 0 A18 3.0 0.5 6.48 7 0 C2 3.0 0.5 6.48 7 0 C5 3.0 0.5 6.48 7 0 D3 3.0 0.5 6.48 7 0 D4 3.0 0.5 6.48 7 0 D5 3.0 0.5 6.48 7 0 D6 3.0 0.5 6.48 7 0 D7 3.0 0.5 6.48 7 0 D13 3.0 0.5 6.48 7 0 D14 3.0 0.5 6.48 7 0 A12 3.0 0.5 6.48 7 0 C3 3.0 0.5 6.48 7 0 C4 3.0 0.5 6.48 7 0 [JUNCTIONS] ;;Name Elevation MaxDepth InitDepth SurDepth Aponded ;;-------------- ---------- ---------- ---------- ---------- ---------- IA1 4948.14 6.4 0 0 0 IA2 4948.1 6.4 0 0 0 IA3 4948.15 6.35 0 0 0 IA4 4946.80 5.8 0 0 0 IA5 4944.07 10.7 0 0 0 IA6 4943.46 8.1 0 0 0 IB1 4950.43 4.27 0 0 0 IB10 4948.38 4.8 0 0 0 IB11 4948.71 4.2 0 0 0 IB2 4948.67 7.53 0 0 0 IB3 4948.58 7.6 0 0 0 IB4 4948.35 8.45 0 0 0 IB5 4949.8 5.2 0 0 0 IB6 4953.11 4.7 0 0 0 IB7 4950.43 6.2 0 0 0 IB8 4949.75 6.9 0 0 0 IB9 4950.63 5.3 0 0 0 IC1 4955.24 4 0 0 0 IC2 4953.89 4.3 0 0 0 IC3 4954.13 4.7 0 0 0 IC4 4953.82 5.0 0 0 0 ID1 4953.09 3.4 0 0 0 ID2 4952.97 3.3 0 0 0 ID3 4952.13 5.0 0 0 0 ID4 4951.45 5.7 0 0 0 IE1 4944.77 6.2 0 0 0 IE2 4944.6 6.4 0 0 0 MHA1 4947.56 7.2 0 0 0 MHA2 4947.04 8.2 0 0 0 MHA3 4945.9 9.1 0 0 0 OA3-Stage1 4943.89 8.1 0 6 0 OA3-Stage2 4943.89 5 0 3.1 0 OA4-Stage1 4943.20 8.8 0 0 0 OA4-Stage2 4943.20 4.8 0 4 0 OB1-Stage1 4947 8 0 0 0 OB1-Stage2 4945.75 5.25 0 4 0 OB2-Stage1 4949.29 7.7 0 0 0 OB2-Stage2 4948.04 5.4 0 2.5 0 OB3-Stage1 4944.59 8.41 0 8 0 OB3-Stage2 4944.59 3.41 0 50 0 OC1 4952.2 3 0 2.8 0 OD1 4945.02 3.6 0 2.4 0 MHD2 4949.78 4.7 0 0 0 [OUTFALLS] ;;Name Elevation Type Stage Data Gated Route To ;;-------------- ---------- ---------- ---------------- -------- ---------------- Out2 4942.91 TIMESERIES NECCO_A6 NO Out1 4943.82 TIMESERIES NECCO_A7 NO Out3 4943.69 TIMESERIES NECCO_A7 NO [DIVIDERS] ;;Name Elevation Diverted Link Type Parameters ;;-------------- ---------- ---------------- ---------- ---------- MHB2 4947.40 OP-MHB2 OVERFLOW 7.6 0 0 0 MHA4 4945.91 OP-MHA4 OVERFLOW 7.9 0 0 0 MHB5 4944.64 OP-MHB5 OVERFLOW 8.9 0 50 0 MHA7 4943.29 OP-MHA7 OVERFLOW 8.7 0 0 0 MHA6 4943.95 OP-MHA6 OVERFLOW 8.1 0 0 0 OA1 4944.25 OPA1 OVERFLOW 10.25 0 0 0 [STORAGE] ;;Name Elev. MaxDepth InitDepth Shape Curve Name/Params N/A Fevap Psi Ksat IMD ;;-------------- -------- ---------- ----------- ---------- ---------------------------- -------- -------- -------- -------- VB3 4951 4.5 0 TABULAR B3 0 0 VB2 4953.5 2 0 TABULAR B2 0 0 VB1 4948 4.5 0 TABULAR B1 0 0 VA2 4950.0 2.8 0 TABULAR A2 0 0 VA1 4948 3.5 0 TABULAR A1 0 0 VC1 4952.2 3.8 0 TABULAR C 0 0 VD1 4945.62 4.4 0 TABULAR D 0 0 [CONDUITS] ;;Name From Node To Node Length Roughness InOffset OutOffset InitFlow MaxFlow ;;-------------- ---------------- ---------------- ---------- ---------- ---------- ---------- ---------- ---------- OPA1 OA1 VA2 10 .001 5.75 .001 0 0 OPA3 OA3-Stage1 VA1 10 .001 4.11 .001 0 0 OPA4 OA4-Stage1 VA1 10 .001 4.8 .001 0 0 OPB1 OB1-Stage1 VB3 10 0.001 4 .001 0 0 OPB2 OB2-Stage1 VB2 10 .001 4.21 .001 0 0 OPB3 OB3-Stage1 VB1 10 .001 3.41 .001 0 0 OP-MHA4 MHA4 VA2 10 .001 4.1 .001 0 0 OP-MHA6 MHA6 VA1 10 .001 4.05 .001 0 0 OP-MHA7 MHA7 VA1 10 .001 4.71 .001 0 0 OP-MHB2 MHB2 VB3 10 .001 3.6 .001 0 0 OP-MHB5 MHB5 VB1 10 .001 3.4 .001 0 0 PA1 IA1 MHA1 28 .016 0 .5 0 0 PA10 MHA5 IA5 53 .016 0 0 0 0 PA11 IA5 MHA6 102 .016 0 0 0 0 PA12 MHA6 OA3-Stage1 51 .016 0 0 0 0 PA13 OA2 OA3-Stage1 1.55 .016 0 0 0 0 PA14 IA6 MHA7 38 .016 0 0 0 0 PA7 IA4 MHA4 131 .016 0 0 0 0 PA8 MHA4 OA1 223 .016 0 1.25 0 0 PB1 IB1 IB2 71 0.016 0 0 0 0 PB10 IB7 IB8 36 .016 0 .5 0 0 PB11 IB8 OB2-Stage1 93 .016 0 0 0 0 PB12 OB2-Stage2 MHB6 41 .016 0 0 0 0 PB13 MHB6 MHB3 320 .016 0 0 0 0 PB14 MHB3 MHB4 347 .016 0 0 0 0 PB15 MHB4 MHB5 42 .016 0 0 0 0 PB16 MHB5 OB3-Stage1 20 .016 0 0 0 0 PB17 IB9 VB1 90 .016 0 2.2 0 0 PB18 IB10 VB1 35 .016 0 .2 0 0 PB19 IB11 IB10 65 .016 0 0 0 0 PB2 IB2 IB3 36 0.016 0 0 0 0 PB20 OB3-Stage2 OA2 133 .016 0 0 0 0 PB3 IB3 IB4 95 0.012 0 0 0 0 PB4 IB4 MHB1 90 0.012 0 0 0 0 PB5 MHB1 MHB2 316 0.012 0 0 0 0 PB6 MHB2 OB1-Stage1 169 0.012 0 0 0 0 PB7 IB5 MHB2 213 0.016 0 0 0 0 PB8 IB6 VB3 55 .016 0 1.1 0 0 PB9 OB1-Stage2 MHB3 75 .016 0 0 0 0 PC1 IC1 IC2 135 .016 0 0 0 0 PC2 IC2 MHC1 57 .016 0 0 0 0 PC3 MHC1 VC1 37 .016 0 1.24 0 0 PC4 IC3 IC4 36 .016 0 0 0 0 PC5 IC4 MHC2 60 .016 0 0 0 0 PC6 MHC2 VC1 88 .016 0 .4 0 0 PC7 OC1 VB1 121 .016 0 3.6 0 0 PD1 ID1 MHD1 171 .016 0 0 0 0 PD2 ID2 MHD1 147 .016 0 0 0 0 PD3 MHD1 ID3 20 .016 0 0 0 0 PD4 ID3 ID4 36 .016 0 .5 0 0 PD7 MHD3 MHD4 115 .016 0 0 0 0 PD8 MHD4 VD1 154 .016 0 1.13 0 0 PD9 OD1 IE1 48 .016 0 .1 0 0 PE1 IE1 IE2 65 .016 0 0 0 0 PE2 IE2 Out3 22 .016 0 0 0 0 PA9 OA1 MHA5 94 .016 0 0 0 0 PD5 ID4 MHD2 335 .016 0 0 0 0 PD6 MHD2 MHD3 335 .016 0 0 0 0 [ORIFICES] ;;Name From Node To Node Type Offset Qcoeff Gated CloseTime ;;-------------- ---------------- ---------------- ------------ ---------- ---------- -------- ---------- OutB2 VB2 OB2-Stage2 SIDE 0 0.65 NO 0 OutA4 VA1 OA4-Stage2 SIDE 0 0.65 NO 0 OutA3 VA1 OA3-Stage2 SIDE 0 0.65 NO 0 OutB3 VB1 OB3-Stage2 SIDE 0 0.65 NO 0 OutB1 VB3 OB1-Stage2 SIDE 0 0.65 NO 0 OutD1 VD1 OD1 SIDE 0 0.65 NO 0 OutC1 VC1 OC1 SIDE 0 0.65 NO 0 [XSECTIONS] ;;Link Shape Geom1 Geom2 Geom3 Geom4 Barrels Culvert ;;-------------- ------------ ---------------- ---------- ---------- ---------- ---------- ---------- OPA1 RECT_OPEN 3 10 0 0 1 OPA3 RECT_OPEN 3 10 0 0 1 OPA4 RECT_OPEN 3 10 0 0 1 OPB1 RECT_OPEN 3 10 0 0 1 OPB2 RECT_OPEN 3 10 0 0 1 OPB3 RECT_OPEN 5 10 0 0 1 PA14 CIRCULAR 2 0 0 0 1 PA15 CIRCULAR 2 0 0 0 1 PA16 CIRCULAR 2 0 0 0 1 PA17 HORIZ_ELLIPSE 1.167 1.917 1 0 1 PA2 CIRCULAR 3 0 0 0 1 PA3 CIRCULAR 3.5 0 0 0 1 PA4 CIRCULAR 3 0 0 0 1 PA5 CIRCULAR 3.5 0 0 0 1 PA6 HORIZ_ELLIPSE 2.000 3.167 4 0 1 PA7 CIRCULAR 2.5 0 0 0 1 PA8 CIRCULAR 2 0 0 0 1 PB1 HORIZ_ELLIPSE 2.000 3.167 4 0 1 PB10 CIRCULAR 1.5 0 0 0 1 PB11 HORIZ_ELLIPSE 2.000 3.167 4 0 1 PB12 CIRCULAR 2 0 0 0 1 PB13 CIRCULAR 2 0 0 0 1 PB14 CIRCULAR 2 0 0 0 1 PB15 CIRCULAR 2 0 0 0 1 PB16 CIRCULAR 2 0 0 0 1 PB17 CIRCULAR 2 0 0 0 1 PB18 CIRCULAR 1.5 0 0 0 1 PB19 CIRCULAR 1.5 0 0 0 1 PB2 HORIZ_ELLIPSE 2.000 3.167 4 0 1 PB20 CIRCULAR 2 0 0 0 1 PB3 CIRCULAR 3 0 0 0 1 PB4 CIRCULAR 3 0 0 0 1 PB5 CIRCULAR 3 0 0 0 1 PB6 CIRCULAR 2 0 0 0 1 PB7 CIRCULAR 2 0 0 0 1 PB8 CIRCULAR 1.5 0 0 0 1 PB9 CIRCULAR 2 0 0 0 1 PC1 CIRCULAR 1.5 0 0 0 1 PC2 CIRCULAR 1.5 0 0 0 1 PC3 CIRCULAR 1.5 0 0 0 1 PC4 CIRCULAR 1.5 0 0 0 1 PC5 CIRCULAR 1.5 0 0 0 1 PC6 CIRCULAR 1.5 0 0 0 1 PC7 CIRCULAR 1.5 0 0 0 1 PD1 CIRCULAR 2.5 0 0 0 1 PD2 CIRCULAR 1.5 0 0 0 1 PD3 CIRCULAR 2.5 0 0 0 1 PD4 CIRCULAR 2.5 0 0 0 1 PD7 CIRCULAR 2.5 0 0 0 1 PD8 CIRCULAR 2.5 0 0 0 1 PD9 CIRCULAR 1.5 0 0 0 1 PE1 CIRCULAR 2.5 0 0 0 1 PE2 CIRCULAR 2 0 0 0 1 PA9 CIRCULAR 2.5 0 0 0 1 PD5 CIRCULAR 2.5 0 0 0 1 PD6 CIRCULAR 2.5 0 0 0 1 OutB2 CIRCULAR 1.4167 0 0 0 OutA4 CIRCULAR 1 0 0 0 OutA3 CIRCULAR 1.0417 0 0 0 OutB3 CIRCULAR .5833 0 0 0 OutB1 CIRCULAR .8333333333 0 0 0 OutD1 CIRCULAR .3958 0 0 0 OutC1 CIRCULAR .083 0 0 0 [CURVES] ;;Name Type X-Value Y-Value ;;-------------- ---------- ---------- ---------- ;Pond A2 A2 Storage 0 1 A2 .5 2039 A2 1 8359 A2 1.5 14667 A2 2 17134 A2 2.5 17846 A2 3 18540 A2 3.5 19251 ; ;Pond B1 B1 Storage 0 1 B1 .5 2005 B1 1 10316 B1 1.5 19903 B1 2 28522 B1 2.5 37241 B1 3 46059 B1 3.5 55188 B1 4 64393 B1 4.5 71487 B1 5 77589 ; ;Pond B2 B2 Storage 0 1 B2 .5 3696 B2 1 6275 B2 1.5 7007 B2 2 7760 B2 2.5 8545 B2 3 9360 B2 3.5 10206 ; ;Pond B3 B3 Storage 0 1 B3 .5 2175 B3 1 8474 B3 1.5 13549 B3 2 23030 B3 2.5 32157 B3 3 35163 B3 3.5 37484 B3 4 39835 B3 4.5 42240 B3 5 47188 ; ;Pond C C Storage 0 1 C .3 309 C .8 1250 C 1.3 6000 C 1.8 10590 C 2.3 11943 C 2.8 13038 C 3.3 14143 C 3.8 15269 C 4.3 16426 C 4.8 17617 C 5.3 18857 C 5.8 20138 D 4.38 59195 D 4.88 64943 D 5.38 69989 [TIMESERIES] ;;Name Date Time Value ;;-------------- ---------- ---------- ---------- ;CoFC Rainfall Data CoFC_100-yr 0:0 0 CoFC_100-yr 0:5 1.00 CoFC_100-yr 0:10 1.14 CoFC_100-yr 0:15 1.33 CoFC_100-yr 0:20 2.23 CoFC_100-yr 0:25 2.84 CoFC_100-yr 0:30 5.49 CoFC_100-yr 0:35 9.95 CoFC_100-yr 0:40 4.12 CoFC_100-yr 0:45 2.48 CoFC_100-yr 0:50 1.46 CoFC_100-yr 0:55 1.22 CoFC_100-yr 0:60 1.06 CoFC_100-yr 1:05 1.00 CoFC_100-yr 1:10 0.95 CoFC_100-yr 1:15 0.91 CoFC_100-yr 1:20 0.87 CoFC_100-yr 1:25 0.84 CoFC_100-yr 1:30 0.81 CoFC_100-yr 1:35 0.78 CoFC_100-yr 1:40 0.75 CoFC_100-yr 1:45 0.73 CoFC_100-yr 1:50 0.71 CoFC_100-yr 1:55 0.59 CoFC_100-yr 2:00 0.67 ; NECCO_A6 FILE "NECCO A6 HGL.dat" ; NECCO_A7 FILE "NECCO A7 HGL.dat" [REPORT] ;;Reporting Options SUBCATCHMENTS ALL NODES ALL LINKS ALL Page 8 EPA STORM WATER MANAGEMENT MODEL - VERSION 5.1 (Build 5.1.013) -------------------------------------------------------------- ********************************************************* NOTE: The summary statistics displayed in this report are based on results found at every computational time step, not just on results from each reporting time step. ********************************************************* **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES RDII ................... NO Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ NO Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... DYNWAVE Surcharge Method ......... EXTRAN Starting Date ............ 03/11/2019 00:00:00 Ending Date .............. 03/11/2019 06:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:05:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 00:05:00 Routing Time Step ........ 30.00 sec Variable Time Step ....... YES Maximum Trials ........... 8 Number of Threads ........ 1 Head Tolerance ........... 0.005000 ft ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 14.793 3.661 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 3.617 0.895 Surface Runoff ........... 11.053 2.735 Final Storage ............ 0.217 0.054 Continuity Error (%) ..... -0.638 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Wet Weather Inflow ....... 11.052 3.601 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.024 0.008 External Outflow ......... 4.962 1.617 Flooding Loss ............ 0.000 0.000 Evaporation Loss ......... 0.000 0.000 Exfiltration Loss ........ 0.000 0.000 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 6.096 1.986 Continuity Error (%) ..... 0.164 ************************* Routing Time Step Summary ************************* Percent in Steady State : -0.00 Average Iterations per Step : 4.52 Percent Not Converging : 5.76 *************************** Subcatchment Runoff Summary *************************** -------------------------------------------------------------------------------------------------------------------- ---------- Total Total Total Total Imperv Perv Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff Coeff Subcatchment in in in in in in in 10^6 gal CFS -------------------------------------------------------------------------------------------------------------------- ---------- B1 3.66 0.00 0.00 1.27 1.33 1.04 2.37 0.14 9.40 0.648 B2 3.66 0.00 0.00 0.50 2.59 0.52 3.11 0.11 9.51 0.850 B3 3.66 0.00 0.00 0.67 2.27 0.68 2.95 0.09 7.38 0.806 B4 3.66 0.00 0.00 0.25 3.05 0.29 3.35 0.12 11.17 0.915 B6 3.66 0.00 0.00 0.24 3.07 0.30 3.37 0.09 9.69 0.920 B8 3.66 0.00 0.00 0.44 2.66 0.52 3.18 0.03 3.63 0.869 B9 3.66 0.00 0.00 1.23 1.27 1.15 2.41 0.17 12.38 0.659 B10 3.66 0.00 0.00 0.69 2.17 0.78 2.95 0.04 3.89 0.805 B11 3.66 0.00 0.00 0.48 2.62 0.51 3.13 0.19 16.57 0.855 B12 3.66 0.00 0.00 1.70 0.05 1.94 2.00 0.02 2.26 0.545 B17 3.66 0.00 0.00 0.30 2.97 0.33 3.30 0.23 20.01 0.903 B18 3.66 0.00 0.00 0.69 2.19 0.75 2.94 0.03 3.24 0.802 B19 3.66 0.00 0.00 0.64 2.29 0.70 2.99 0.03 3.33 0.816 B20 3.66 0.00 0.00 1.78 0.52 1.36 1.88 0.15 7.31 0.514 C1 3.66 0.00 0.00 1.23 1.30 1.11 2.42 0.09 6.23 0.660 A3 3.66 0.00 0.00 0.43 2.71 0.47 3.19 0.21 19.29 0.871 A4 3.66 0.00 0.00 0.60 2.38 0.65 3.03 0.07 6.80 0.827 A6 3.66 0.00 0.00 0.28 2.99 0.34 3.33 0.13 13.76 0.909 A9 3.66 0.00 0.00 0.55 2.50 0.57 3.07 0.17 14.53 0.838 A11 3.66 0.00 0.00 0.31 2.95 0.35 3.30 0.16 15.09 0.901 A14 3.66 0.00 0.00 0.26 3.02 0.32 3.34 0.10 10.15 0.914 A15 3.66 0.00 0.00 0.91 1.96 0.76 2.72 0.18 13.36 0.742 15.41 0.761 D4 3.66 0.00 0.00 0.73 2.07 0.84 2.91 0.01 1.30 0.794 D5 3.66 0.00 0.00 0.98 1.64 1.02 2.66 0.03 2.75 0.728 D6 3.66 0.00 0.00 0.54 2.44 0.64 3.08 0.01 0.89 0.842 D7 3.66 0.00 0.00 0.31 2.93 0.38 3.31 0.01 0.88 0.903 D13 3.66 0.00 0.00 0.71 2.21 0.70 2.91 0.27 22.35 0.795 D14 3.66 0.00 0.00 1.98 0.14 1.55 1.69 0.11 4.39 0.461 A12 3.66 0.00 0.00 1.15 1.32 1.18 2.50 0.08 7.12 0.683 C3 3.66 0.00 0.00 0.68 2.21 0.74 2.95 0.07 6.33 0.807 C4 3.66 0.00 0.00 0.58 2.37 0.68 3.05 0.02 2.21 0.834 ****************** Node Depth Summary ****************** --------------------------------------------------------------------------------- Average Maximum Maximum Time of Max Reported Depth Depth HGL Occurrence Max Depth Node Type Feet Feet Feet days hr:min Feet --------------------------------------------------------------------------------- IA1 JUNCTION 2.16 6.04 4954.18 0 00:40 6.01 IA2 JUNCTION 2.19 6.07 4954.17 0 00:40 6.01 IA3 JUNCTION 2.14 5.97 4954.12 0 00:40 5.97 IA4 JUNCTION 3.35 5.51 4952.31 0 00:48 5.46 IA5 JUNCTION 5.79 7.24 4951.31 0 01:05 7.11 IA6 JUNCTION 6.29 7.13 4950.59 0 01:46 7.13 IB1 JUNCTION 3.34 4.13 4954.56 0 00:39 4.10 IB10 JUNCTION 3.05 3.77 4952.15 0 06:00 3.77 IB11 JUNCTION 2.74 3.44 4952.15 0 06:00 3.44 IB2 JUNCTION 5.01 5.88 4954.55 0 02:03 5.84 IB3 JUNCTION 5.09 5.98 4954.56 0 02:02 5.93 IB4 JUNCTION 5.31 6.19 4954.54 0 02:02 6.18 IB5 JUNCTION 3.90 4.70 4954.50 0 02:04 4.70 IB6 JUNCTION 0.83 1.39 4954.50 0 02:06 1.38 IB7 JUNCTION 3.42 5.09 4955.52 0 00:48 5.06 IB8 JUNCTION 4.08 5.77 4955.52 0 00:50 5.72 IB9 JUNCTION 1.18 2.33 4952.96 0 00:40 2.33 IC1 JUNCTION 0.64 0.94 4956.18 0 00:40 0.94 IC2 JUNCTION 1.78 2.14 4956.03 0 03:04 2.11 IC3 JUNCTION 1.57 2.30 4956.43 0 00:40 1.87 IC4 JUNCTION 1.85 2.38 4956.20 0 00:40 2.18 ID1 JUNCTION 0.29 1.48 4954.57 0 00:40 1.47 ID2 JUNCTION 0.13 0.99 4953.96 0 00:40 0.95 ID3 JUNCTION 0.32 1.59 4953.72 0 00:40 1.56 ID4 JUNCTION 0.33 1.83 4953.28 0 00:40 1.73 IE1 JUNCTION 1.81 2.61 4947.38 0 00:44 2.60 IE2 JUNCTION 1.97 2.78 4947.38 0 00:44 2.77 MHA1 JUNCTION 2.71 6.58 4954.14 0 00:40 6.58 MHA2 JUNCTION 3.20 6.98 4954.02 0 00:40 6.97 MHA3 JUNCTION 4.27 7.60 4953.50 0 00:40 7.57 MHA5 JUNCTION 5.78 7.65 4951.79 0 01:04 7.55 MHB1 JUNCTION 5.50 6.41 4954.55 0 02:02 6.35 MHB3 JUNCTION 6.14 7.87 4953.43 0 00:26 6.85 OA3-Stage2 JUNCTION 2.87 3.68 4947.57 0 00:44 3.68 OA4-Stage1 JUNCTION 6.54 7.39 4950.59 0 01:47 7.39 OA4-Stage2 JUNCTION 2.09 2.94 4946.14 0 02:08 2.94 OB1-Stage1 JUNCTION 6.58 7.50 4954.50 0 02:07 7.49 OB1-Stage2 JUNCTION 5.99 6.74 4952.49 0 00:59 6.73 OB2-Stage1 JUNCTION 4.53 6.14 4955.43 0 00:50 6.14 OB2-Stage2 JUNCTION 3.91 5.20 4953.24 0 00:54 5.18 OB3-Stage1 JUNCTION 6.66 8.95 4953.54 0 03:17 7.56 OB3-Stage2 JUNCTION 5.13 10.30 4954.89 0 03:17 6.02 OC1 JUNCTION 0.10 0.11 4952.31 0 01:59 0.11 OD1 JUNCTION 1.59 2.39 4947.41 0 00:44 2.36 MHD2 JUNCTION 0.33 1.78 4951.56 0 00:41 1.60 Out2 OUTFALL 2.33 3.16 4946.07 0 02:08 3.16 Out1 OUTFALL 2.72 3.56 4947.38 0 00:44 3.55 Out3 OUTFALL 2.85 3.69 4947.38 0 00:44 3.68 MHB2 DIVIDER 6.19 7.10 4954.50 0 02:06 7.09 MHA4 DIVIDER 4.20 6.34 4952.25 0 00:49 6.34 MHB5 DIVIDER 6.61 7.51 4952.15 0 06:00 7.51 MHA7 DIVIDER 6.45 7.30 4950.59 0 01:47 7.30 MHA6 DIVIDER 5.76 6.64 4950.59 0 01:47 6.64 OA1 DIVIDER 5.78 8.40 4952.65 0 00:48 8.33 VB3 STORAGE 2.75 3.50 4954.50 0 02:07 3.49 VB2 STORAGE 0.47 1.93 4955.43 0 00:50 1.93 VB1 STORAGE 3.38 4.15 4952.15 0 06:00 4.15 VA2 STORAGE 0.50 2.25 4952.25 0 00:49 2.25 VA1 STORAGE 1.86 2.59 4950.59 0 01:47 2.59 VC1 STORAGE 3.33 3.79 4955.99 0 02:33 3.79 VD1 STORAGE 3.45 3.94 4949.56 0 02:25 3.94 ******************* Node Inflow Summary ******************* ------------------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Flow Lateral Total Time of Max Inflow Inflow Balance Inflow Inflow Occurrence Volume Volume Error Node Type CFS CFS days hr:min 10^6 gal 10^6 gal Percent ------------------------------------------------------------------------------------------------- IA1 JUNCTION 19.29 19.29 0 00:40 0.207 0.207 0.120 IA2 JUNCTION 6.80 6.80 0 00:40 0.0723 0.0726 0.093 IA3 JUNCTION 13.76 13.76 0 00:40 0.135 0.137 0.513 IA4 JUNCTION 15.09 15.09 0 00:40 0.163 0.163 1.246 IA5 JUNCTION 10.15 37.25 0 00:41 0.0981 0.898 0.321 IA6 JUNCTION 13.36 13.36 0 00:40 0.183 0.183 0.241 IB1 JUNCTION 9.40 9.40 0 00:40 0.137 0.137 0.952 IB10 JUNCTION 3.33 6.45 0 00:40 0.0349 0.0688 1.081 IB11 JUNCTION 3.24 3.24 0 00:40 0.0343 0.0343 1.299 IB2 JUNCTION 9.51 18.90 0 00:40 0.11 0.246 0.816 IB3 JUNCTION 7.38 26.31 0 00:40 0.0857 0.33 1.028 IB4 JUNCTION 11.17 37.48 0 00:40 0.12 0.446 1.109 IB5 JUNCTION 9.69 9.69 0 00:40 0.0932 0.0933 2.669 IB6 JUNCTION 3.63 3.63 0 00:40 0.0346 0.0346 0.216 IB7 JUNCTION 3.89 3.89 0 00:40 0.0384 0.0385 0.687 IB8 JUNCTION 16.57 20.46 0 00:40 0.187 0.225 0.873 IB9 JUNCTION 20.01 20.01 0 00:40 0.227 0.227 0.521 IC1 JUNCTION 6.23 6.23 0 00:40 0.0853 0.0853 0.483 IC2 JUNCTION 1.13 7.28 0 00:40 0.00778 0.0927 1.450 IC3 JUNCTION 6.33 6.33 0 00:40 0.0665 0.0666 0.375 IC4 JUNCTION 2.21 8.42 0 00:40 0.0207 0.087 0.745 ID1 JUNCTION 15.41 15.41 0 00:40 0.191 0.191 -0.005 ID2 JUNCTION 2.75 2.75 0 00:40 0.0311 0.0311 -0.034 MHB3 JUNCTION 0.00 12.63 0 00:49 0 0.788 1.140 MHB4 JUNCTION 0.00 12.63 0 00:49 0 0.793 0.585 MHB6 JUNCTION 0.00 9.12 0 00:50 0 0.243 1.809 MHC1 JUNCTION 0.00 7.19 0 00:40 0 0.0914 0.916 MHC2 JUNCTION 0.00 8.42 0 00:40 0 0.0864 1.232 MHD1 JUNCTION 1.30 19.18 0 00:40 0.0126 0.235 0.009 MHD3 JUNCTION 0.00 20.15 0 00:41 0 0.252 1.609 MHD4 JUNCTION 0.00 19.92 0 00:42 0 0.248 2.367 OA2 JUNCTION 0.00 104.66 0 03:17 0 0.269 0.166 OA3-Stage1 JUNCTION 0.00 226.32 0 03:17 0 0.314 -1.371 OA3-Stage2 JUNCTION 0.00 6.39 0 01:47 0 0.754 0.051 OA4-Stage1 JUNCTION 0.00 0.89 0 03:17 0 0.0158 6.057 OA4-Stage2 JUNCTION 0.00 5.92 0 01:47 0 0.701 0.075 OB1-Stage1 JUNCTION 0.00 1.51 0 00:34 0 0.0303 19.010 OB1-Stage2 JUNCTION 0.00 5.43 0 00:26 0 0.541 0.166 OB2-Stage1 JUNCTION 0.00 20.47 0 00:40 0 0.223 1.253 OB2-Stage2 JUNCTION 0.00 9.11 0 00:50 0 0.243 0.193 OB3-Stage1 JUNCTION 0.00 138.38 0 03:17 0 0.0517 4.916 OB3-Stage2 JUNCTION 0.00 3.56 0 03:17 0 0.267 0.573 OC1 JUNCTION 0.00 0.05 0 02:33 0 0.00794 0.558 OD1 JUNCTION 0.00 1.20 0 05:54 0 0.157 0.125 MHD2 JUNCTION 0.00 20.68 0 00:41 0 0.252 -0.121 Out2 OUTFALL 0.00 5.92 0 01:47 0 0.7 0.000 Out1 OUTFALL 0.00 6.39 0 01:47 0 0.754 0.000 Out3 OUTFALL 0.00 8.10 0 05:59 0 0.171 0.000 MHB2 DIVIDER 0.00 47.27 0 00:40 0 0.554 4.275 MHA4 DIVIDER 0.00 54.92 0 00:40 0 0.628 1.671 MHB5 DIVIDER 0.00 13.32 0 00:49 0 0.833 0.422 MHA7 DIVIDER 0.00 13.36 0 00:40 0 0.192 0.861 MHA6 DIVIDER 0.00 57.16 0 03:17 0 0.948 0.471 OA1 DIVIDER 0.00 99.86 0 01:05 0 1.11 -0.511 VB3 STORAGE 12.38 62.41 0 00:40 0.167 0.731 0.276 VB2 STORAGE 2.26 22.52 0 00:40 0.0222 0.243 0.004 VB1 STORAGE 7.31 101.46 0 03:17 0.15 1.27 0.269 VA2 STORAGE 21.65 98.34 0 00:40 0.251 1.03 0.315 VA1 STORAGE 9.66 417.73 0 03:17 0.166 1.55 0.162 VC1 STORAGE 5.14 20.63 0 00:40 0.0699 0.246 0.435 VD1 STORAGE 26.41 42.54 0 00:42 0.383 0.625 0.213 ********************** Node Surcharge Summary ********************** Surcharging occurs when water rises above the top of the highest conduit. --------------------------------------------------------------------- Max. Height Min. Depth Hours Above Crown Below Rim Node Type Surcharged Feet Feet --------------------------------------------------------------------- IA1 JUNCTION 0.74 3.039 0.361 IA2 JUNCTION 0.76 3.066 0.334 IA3 JUNCTION 0.74 2.974 0.376 IA4 JUNCTION 4.58 3.012 0.288 IA5 JUNCTION 5.62 4.739 3.461 IA6 JUNCTION 5.69 5.131 0.969 IB1 JUNCTION 5.43 2.128 0.142 IB10 JUNCTION 5.32 2.274 1.026 IB11 JUNCTION 5.24 1.944 0.756 IB2 JUNCTION 5.54 3.876 1.654 IB3 JUNCTION 5.50 2.982 1.618 IB4 JUNCTION 5.52 3.187 2.263 IB5 JUNCTION 5.48 2.697 0.503 MHA2 JUNCTION 1.77 3.479 1.221 MHA3 JUNCTION 4.37 4.098 1.502 MHA5 JUNCTION 5.62 5.149 4.451 MHB1 JUNCTION 5.52 3.414 2.886 MHB3 JUNCTION 5.55 5.865 3.535 MHB4 JUNCTION 5.59 5.422 4.578 MHB6 JUNCTION 5.40 3.407 3.093 MHC1 JUNCTION 5.07 0.922 1.878 MHC2 JUNCTION 5.33 1.210 4.490 OA2 JUNCTION 5.62 7.587 0.000 OA3-Stage1 JUNCTION 0.01 3.879 0.000 OA3-Stage2 JUNCTION 5.54 2.511 1.323 OA4-Stage2 JUNCTION 3.55 0.937 1.863 OB1-Stage1 JUNCTION 2.58 0.495 0.505 OB1-Stage2 JUNCTION 5.55 4.738 0.000 OB2-Stage2 JUNCTION 5.39 3.204 0.196 OB3-Stage1 JUNCTION 0.01 0.541 0.000 OB3-Stage2 JUNCTION 5.62 8.300 0.000 OD1 JUNCTION 3.60 0.885 1.215 MHB2 DIVIDER 2.58 0.495 0.505 ********************* Node Flooding Summary ********************* No nodes were flooded. ********************** Storage Volume Summary ********************** -------------------------------------------------------------------------------------------------- Average Avg Evap Exfil Maximum Max Time of Max Maximum Volume Pcnt Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft3 Full Loss Loss 1000 ft3 Full days hr:min CFS -------------------------------------------------------------------------------------------------- VB3 44.266 42 0 0 66.461 62 0 02:07 5.84 VB2 1.688 16 0 0 9.927 95 0 00:50 9.11 VB1 90.362 60 0 0 125.774 84 0 06:00 139.76 VA2 2.372 8 0 0 21.147 68 0 00:49 98.36 VA1 54.229 32 0 0 96.854 57 0 01:47 185.44 VC1 26.711 82 0 0 32.243 99 0 02:33 0.08 VD1 59.528 59 0 0 75.327 75 0 02:25 1.20 *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg Max Total Freq Flow Flow Volume Outfall Node Pcnt CFS CFS 10^6 gal ----------------------------------------------------------- Out2 99.38 4.60 5.92 0.700 Out1 99.33 4.96 6.39 0.754 Out3 99.57 1.04 8.10 0.171 ----------------------------------------------------------- System 99.43 10.61 8.10 1.625 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence |Veloc| Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- OPA1 CONDUIT 98.36 0 01:05 5.70 0.15 0.82 OPA3 CONDUIT 416.29 0 03:17 30.36 0.61 0.86 OPA4 CONDUIT 1.08 0 00:24 2.24 0.00 0.86 OPB1 CONDUIT 1.51 0 00:34 2.35 0.00 1.00 OPB2 CONDUIT 20.26 0 00:40 3.45 0.03 0.64 OPB3 CONDUIT 136.69 0 03:17 3.33 0.10 0.90 OP-MHA4 CONDUIT 53.50 0 00:40 5.69 0.01 0.45 OP-MHA6 CONDUIT 55.98 0 03:17 2.85 0.06 0.65 OP-MHA7 CONDUIT 12.62 0 00:40 2.54 0.02 0.86 OP-MHB2 CONDUIT 46.46 0 00:40 3.34 0.07 1.00 OP-MHB5 CONDUIT 17.39 0 03:17 5.69 0.00 0.83 PA1 CONDUIT 19.29 0 00:40 3.33 0.67 1.00 PA10 CONDUIT 31.43 0 00:48 6.40 2.59 1.00 PA11 CONDUIT 37.25 0 00:41 7.59 3.26 1.00 PA12 CONDUIT 31.47 0 03:17 6.41 2.75 1.00 PA13 CONDUIT 100.45 0 03:17 >50.00 1.09 1.00 PA14 CONDUIT 13.36 0 00:40 4.25 1.09 1.00 PA15 CONDUIT 0.81 0 00:24 0.75 0.07 1.00 PA16 CONDUIT 5.92 0 01:47 1.88 0.48 1.00 PA17 CONDUIT 6.39 0 01:47 3.55 2.18 1.00 PA2 CONDUIT 6.93 0 00:40 2.67 0.18 1.00 PA3 CONDUIT 26.23 0 00:40 3.02 0.44 1.00 PA4 CONDUIT 13.76 0 00:40 2.32 0.28 1.00 PA5 CONDUIT 39.91 0 00:40 4.15 0.66 1.00 PA6 CONDUIT 39.91 0 00:40 7.83 13.67 1.00 PA7 CONDUIT 15.08 0 00:40 3.07 0.55 1.00 PA8 CONDUIT 11.21 0 00:31 3.57 1.42 1.00 PB1 CONDUIT 9.40 0 00:40 1.84 0.17 1.00 PB10 CONDUIT 3.89 0 00:40 2.20 0.64 1.00 PB11 CONDUIT 20.47 0 00:40 4.01 0.85 1.00 PB12 CONDUIT 9.12 0 00:50 3.44 0.60 1.00 PB13 CONDUIT 9.11 0 00:50 2.90 0.60 1.00 PB14 CONDUIT 12.63 0 00:49 4.02 1.41 1.00 PB15 CONDUIT 12.64 0 00:50 4.02 1.41 1.00 PB16 CONDUIT 6.14 0 03:17 1.95 0.67 1.00 PB17 CONDUIT 20.04 0 00:40 6.72 1.58 0.90 PB18 CONDUIT 6.40 0 00:40 3.65 1.05 1.00 PB19 CONDUIT 3.16 0 00:40 1.92 0.52 1.00 PB2 CONDUIT 18.93 0 00:40 3.71 1.11 1.00 PB20 CONDUIT 4.35 0 03:17 1.53 0.48 1.00 PB3 CONDUIT 26.34 0 00:40 3.73 0.74 1.00 PB4 CONDUIT 37.50 0 00:40 5.30 1.07 1.00 PB5 CONDUIT 37.51 0 00:40 5.31 1.07 1.00 PB6 CONDUIT 1.60 0 00:25 0.72 0.13 1.00 PB7 CONDUIT 9.69 0 00:40 3.08 0.50 1.00 PB8 CONDUIT 3.62 0 00:40 5.15 0.31 0.96 PB9 CONDUIT 5.39 0 00:26 1.72 0.58 1.00 PC1 CONDUIT 6.16 0 00:40 4.31 0.72 0.76 PC2 CONDUIT 7.19 0 00:40 4.49 1.18 1.00 PC3 CONDUIT 7.20 0 00:40 5.07 1.28 1.00 PC4 CONDUIT 6.25 0 00:40 3.97 0.79 1.00 PC5 CONDUIT 8.42 0 00:40 4.87 1.08 1.00 PC6 CONDUIT 8.48 0 00:40 4.80 1.10 1.00 PC7 CONDUIT 0.06 0 02:02 1.16 0.01 0.22 PD1 CONDUIT 15.31 0 00:40 4.81 0.65 0.62 PD2 CONDUIT 2.67 0 00:41 1.73 0.44 0.83 PD3 CONDUIT 19.11 0 00:40 5.75 0.81 0.64 PD4 CONDUIT 19.97 0 00:40 6.23 0.85 0.62 PD7 CONDUIT 19.92 0 00:42 5.56 0.84 0.70 PD8 CONDUIT 19.89 0 00:42 5.98 0.84 0.91 OutC1 ORIFICE 0.05 0 02:33 1.00 ************************* Conduit Surcharge Summary ************************* ---------------------------------------------------------------------------- Hours Hours --------- Hours Full -------- Above Full Capacity Conduit Both Ends Upstream Dnstream Normal Flow Limited ---------------------------------------------------------------------------- OPA3 0.01 0.01 0.01 0.01 0.01 OPB1 2.57 2.58 2.58 0.01 0.31 OPB3 0.01 0.01 0.01 0.01 0.01 OP-MHB2 2.58 2.58 2.58 0.01 0.18 PA1 0.74 0.74 0.78 0.01 0.01 PA10 5.62 5.62 5.62 0.90 1.10 PA11 5.62 5.62 5.62 0.99 1.22 PA12 5.62 5.62 5.62 0.01 0.04 PA13 5.62 5.62 5.63 0.01 0.01 PA14 5.69 5.69 5.69 0.03 0.04 PA15 5.69 5.69 5.69 0.01 0.01 PA16 3.55 3.55 4.10 0.01 0.01 PA17 5.54 5.54 5.55 5.15 5.15 PA2 0.76 0.76 0.78 0.01 0.09 PA3 0.78 0.78 1.77 0.01 0.01 PA4 0.74 0.74 2.94 0.01 0.01 PA5 1.77 1.77 4.37 0.01 0.01 PA6 5.59 5.59 5.59 1.50 0.53 PA7 4.58 4.58 5.57 0.01 0.01 PA8 5.59 5.59 5.61 0.06 0.17 PB1 5.43 5.43 5.54 0.01 0.01 PB10 5.63 5.63 5.64 0.01 0.01 PB11 5.64 5.64 5.65 0.01 0.01 PB12 5.39 5.39 5.40 0.01 0.01 PB13 5.40 5.40 5.55 0.01 0.01 PB14 5.55 5.55 5.59 0.74 0.74 PB15 5.59 5.59 5.60 0.73 0.74 PB16 5.60 5.60 5.60 0.01 0.01 PB17 0.01 0.04 0.01 0.14 0.01 PB18 5.32 5.32 5.33 0.01 0.01 PB19 5.24 5.24 5.32 0.01 0.01 PB2 5.54 5.54 5.54 0.04 0.05 PB20 5.62 5.62 5.62 0.01 0.01 PB3 5.50 5.50 5.52 0.01 0.01 PB4 5.52 5.52 5.52 0.03 0.03 PB5 5.52 5.52 5.55 0.03 0.03 PB6 5.60 5.60 5.63 0.01 0.01 PB7 5.48 5.48 5.60 0.01 0.01 PB8 0.01 0.01 3.85 0.01 0.01 PB9 5.55 5.55 5.55 0.01 0.01 PC1 0.01 0.01 4.86 0.01 0.01 PC2 4.86 4.86 5.07 0.07 0.01 PC3 5.07 5.07 5.13 0.08 0.01 PC4 4.56 4.56 4.95 0.01 0.01 PC5 4.95 4.95 5.33 0.03 0.01 PC6 5.33 5.33 5.34 0.02 0.02 PD2 0.01 0.01 0.05 0.01 0.01 PD8 0.01 0.01 4.64 0.01 0.01 PD9 3.60 3.60 3.85 0.01 0.01 PE1 0.07 0.07 0.56 0.01 0.01 PE2 3.35 3.35 5.43 0.01 0.01 Appendix C APPENDIX C – RATIONAL CALCULATIONS LAKE CANAL DITCH DRY CREEK LAKE CANAL DITCH N. LEMAY AVENUE COLLAMER DRIVE PIONEER TRAIL ROAD LANDMARK WAY N. LEMAY AVENUE SCHLAGEL STREET STEELEY DRIVE Pond B3 Pond A2 Pond B1 Pond A1 Pond D Pond C Pond B2 BASIN COEFFICIENT (100-YR) BASIN DESIGNATION BASIN AREA DESIGN POINT DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY DRAINAGE BASIN FLOW PATH LEGEND EX MAJOR CONTOUR EX MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR 0 100' 100 50 100 200 SCALE: 1" = N W E S CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date CALL UTILITY NOTIFICATION AE AG AH AG AE AH AF LAKE CANAL DITCH FUTURE LEMAY AVENUE MATCHLINE SEE SHEET 14 MATCHLINE SEE SHEET 13 N. LEMAY AVENUE COLLAMER DRIVE PIONEER TRAIL ROAD LANDMARK WAY Tract F (Drainage, Utility, & Private Access Easement) Tract A (Drainage, Utility, & Private Access Easement) SCHLAGEL STREET 4956.38 FEET 4956.38 FEET STA: 139+11 STA: 139+11 4954.08 FEET STA: 127+80 4954.08 FEET STA: 127+80 4952.98 FEET STA: 122+37 4951.84 FEET STA: 118+01 4951.84 FEET STA: 118+01 Block 2 Block 1 Block 3 Block 7 Block 6 Block 5 Block 8 Block 14 Block 9 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Lot 1 Lot 2 AH AI AI AJ AJ AK AI AH LAKE CANAL DITCH DRY CREEK E. SUNIGA ROAD MATCHLINE SEE SHEET 12 MATCHLINE SEE SHEET 14 STEELEY DRIVE REDWOOD STREET Tract S (Drainage, Utility, & Private Access Easement) Tract N (Drainage, Utility, & Private Access Easement) Tract U (Drainage, Utility, & Private Access Easement) 4956.38 FEET STA: 139+11 4960.48 FEET STA: 144+91 4960.48 FEET STA: 144+91 4960.77 FEET STA: 147+32 4961.25 FEET STA: 149+48 4956.38 FEET STA: 139+11 A A B B Block 21 Lot 1 Lot 1 Lot 2 Lot 3 Lot 4 Block 20 STEELEY DRIVE Pond C Pond B1 Tract T (Drainage, Utility, & Private Access Easement) KEY MAP AE AF AG E. SUNIGA ROAD MATCHLINE SEE SHEET 12 MATCHLINE SEE SHEET 13 LANDMARK WAY N. LEMAY AVENUE RAIN GARDEN Tract W (Drainage, Utility, & Private Access Easement) Tract T (Drainage, Utility, & Private Access Easement) Tract H (Drainage, Utility, & Private Access Easement) Tract V (Drainage, Utility, & Private Access Easement) 4954.08 FEET STA: 127+80 4952.98 FEET STA: 122+37 4951.84 FEET STA: 118+01 FUTURE SUNIGA ROAD Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Block 20 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Block 16 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Design Engineer: Design Firm: Project Number: Date: % Impervious Runoff Coefficient C Return Period Frequency Adjustment Factor (Cf) 100% 0.95 2-year to 10-year 1.00 90% 0.95 100-year 1.25 90% 0.95 40% 0.50 0% 0.25 C2 to C10 C100 Historic D 139,722 3.208 13,312 0 0 0 126,410 9.5% 0.32 0.40 Apavers (sq feet) Alawn (sq feet) Weighted % Impervious COMPOSITE Northfield EXISTING IMPERVIOUS AREA CALCULATION Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual DESIGN CRITERIA: BASINS: % Impervious values from Table RO-11 in the Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual Sub-basin Designation Atotal (sq feet) Atotal (acres) Apaved (sq feet) Aroof (sq feet) Awalk/RAP (sq feet) Lawns (Heavy, 2-7% Slope) J.Claeys Highland Development Services 18-1000-00 June 26, 2019 Runoff Coefficients and Frequency Adjustment Factors for City of Fort Collins - Storm Water Criteria Manual Land Use Paved Roof Walks/RAP Gravel/Pavers Design Engineer: Design Firm: Project Number: Date: EQUATIONS: -Equation 6-2 -Equation 6-4 -Urbanized Check Equation 6-5 - CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition 500 ft - Overland flow shall not exceed for undeveloped condition Final t c = minimum of t i + t t and urbanized basin check recommended minimum t c = 5 min for urbanized basins Time of Concentration (100-yr) Type of Travel Surface Cv HD Historic D 9.5% 0.40 3.208 300 0.0048 29.20 478 0.0029 Tilage/Field 5 0.27 29.44 58.64 0.0036 31.62 31.62 June 26, 2019 Northfield HISTORIC TIME OF CONCENTRATION J.Claeys Highland Development 18-1000-00 LENGTH (ft) DESIGN CRITERIA: Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual Overland Flow Equations for City of Fort Collins - Storm Water Criteria Manual SUB-BASIN DATA INITIAL/OVERLAND TIME (ti ) TRAVEL TIME (tt ) tc =ti +tt (min) Urban Check Final tc (min) DESIGN POINT Sub-basin % Impervious C100 AREA (acres) tt (min) OVERALL SLOPE (ft/ft) tc (min) SLOPE (ft/ft) ti (min) LENGTH Design Engineer: Design Firm: Project Number: Date: EQUATIONS: I = rainfall intensity (in/hr) Q n = n -yr peak discharge (cfs) P 1 = one-hour point rainfall depth (in) C n = n -yr runoff coefficient t c = time of concentration (min) I n = n -yr rainfall intensity (in/hr) P 1-5yr = 1.14 in A n = Basin drainage area (ac) P 1-10yr = 1.40 in P 1-100yr = 2.86 in BASIN SUMMARY: tc (min) Runoff Coeff (C5) C(A) (acres) Intensity (in/hr) Q (ft3/s) tc (min) Runoff Coeff. (C10) C(A) (acres) Intensity (in/hr) Q (ft3/s) tc (min) Runoff Coeff. (C100) C(A) (acres) Intensity (in/hr) Q (ft3/s) HD Historic D 3.208 31.62 0.32 1.02 1.73 1.76 31.62 0.32 1.02 2.12 2.16 31.62 0.40 1.27 4.34 5.51 June 26, 2019 Northfield HISTORIC PEAK RUNOFF J.Claeys Highland Development Services 18-1000-00 DESIGN CRITERIA: Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual Design Point Sub-basin Area (acres) 5-yr Peak Runoff 10-yr Peak Runoff 100-yr Peak Runoff Q n = C n I n A n (0.786651) 1 ( 10 ) 28 . 5 t c P I + = 18-1000-00 Rational Calcs (FC).xlsx Page 3 of 12 Interwest Consulting Group Design Engineer: Design Firm: Project Number: Date: % Impervious Runoff Coefficient C Return Period Frequency Adjustment Factor (Cf) 100% 0.95 2-year to 10-year 1.00 90% 0.95 100-year 1.25 90% 0.95 40% 0.50 0% 0.25 C2 to C10 C100 A1 28,671 0.658 14,772 8,811 3,183 0 1,905 89.2% 0.90 1.00 A2 8,498 0.195 2,585 4,304 1,511 0 98 92.0% 0.94 1.00 A3 66,747 1.532 18,945 21,727 7,589 0 18,486 67.9% 0.76 0.95 A4 38,291 0.879 11,810 11,735 3,340 0 11,405 66.3% 0.74 0.93 A1+…+A4 142,207 3.265 48,112 46,578 15,623 0 31,895 73.2% 0.79 0.99 A5 15,087 0.346 7,236 4,530 2,746 0 575 91.4% 0.92 1.00 A6 49,660 1.140 9,769 22,345 11,469 0 6,077 81.0% 0.86 1.00 A5+A6 64,747 1.486 17,005 26,875 14,215 0 6,651 83.4% 0.88 1.00 A7 30,015 0.689 12,091 5,588 3,293 0 9,043 66.9% 0.74 0.92 A8 33,317 0.765 15,860 5,037 3,255 0 9,165 70.0% 0.76 0.95 A9 23,509 0.540 9,762 6,201 1,953 0 5,593 72.7% 0.78 0.98 A7+…+A9 86,841 1.994 37,713 16,826 8,501 0 23,801 69.7% 0.76 0.95 A10 57,182 1.313 17,640 21,446 10,928 0 7,168 81.8% 0.86 1.00 A11 22,208 0.510 5,267 10,274 4,524 0 2,143 83.7% 0.88 1.00 A10+A11 79,390 1.823 22,907 31,719 15,452 0 9,311 82.3% 0.87 1.00 A12 54,414 1.249 0 18,135 4,143 0 32,135 36.8% 0.54 0.67 A1+…+A12 427,599 9.816 125,737 140,133 57,935 0 103,793 71.1% 0.78 0.98 A13 24,329 0.559 4,408 12,758 6,089 0 1,074 87.8% 0.92 1.00 A14 22,847 0.525 8,935 7,692 2,805 0 3,415 80.5% 0.85 1.00 A13+A14 47,176 1.083 13,343 20,450 8,894 0 4,489 84.3% 0.88 1.00 A15 107,951 2.478 30,165 22,385 9,545 0 45,855 54.6% 0.65 0.82 A16 34,957 0.802 26,497 1,760 2,022 0 4,678 85.5% 0.86 1.00 A15+A16 142,907 3.281 56,662 24,145 11,567 0 50,533 62.1% 0.70 0.88 A17 39,162 0.899 0 0 3,077 0 36,085 7.1% 0.30 0.38 A18 131,657 3.022 0 12,742 9,633 0 109,283 15.3% 0.37 0.46 A13+…+A18 360,903 8.285 70,005 57,337 33,170 0 200,390 42.0% 0.56 0.70 A1+…+A18 788,502 18.102 195,743 197,471 91,105 0 304,183 57.8% 0.68 0.85 B1 92,658 2.127 0 20,273 17,925 0 54,459 37.1% 0.54 0.67 B2 56,628 1.300 13,566 18,665 11,768 0 12,628 72.3% 0.79 0.99 B3 46,573 1.069 13,310 12,950 5,039 0 15,274 63.3% 0.72 0.90 B2+B3 103,201 2.369 26,877 31,615 16,807 0 27,902 68.3% 0.76 0.95 B4 57,444 1.319 17,148 24,868 10,480 0 4,949 85.2% 0.89 1.00 B5 21,982 0.505 3,885 11,787 5,947 0 364 90.3% 0.94 1.00 B6 22,637 0.520 9,787 6,941 2,591 0 3,317 81.1% 0.85 1.00 Northfield DEVELOPED IMPERVIOUS AREA CALCULATION DESIGN CRITERIA: Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual B5+B6 44,619 1.024 13,672 18,728 8,538 0 3,681 85.6% 0.89 1.00 B7 11,568 0.266 4,469 4,488 1,374 0 1,237 84.2% 0.88 1.00 B8 17,449 0.401 6,524 4,748 2,396 0 3,781 74.2% 0.80 1.00 B9 99,582 2.286 0 17,334 15,484 0 66,764 29.7% 0.48 0.60 B1+…+B9 426,521 9.792 68,690 122,054 73,003 0 162,774 57.3% 0.68 0.85 B10 20,847 0.479 7,050 3,517 2,640 0 7,640 60.4% 0.69 0.87 B11 107,621 2.471 31,018 34,817 16,397 0 25,389 71.7% 0.78 0.98 B10+B11 128,469 2.949 38,069 38,334 19,037 0 33,028 69.8% 0.77 0.96 B12 17,982 0.413 0 0 297 0 17,685 1.5% 0.26 0.33 B10+…+B12 146,450 3.362 38,069 38,334 19,334 0 50,713 61.4% 0.71 0.88 B13 16,667 0.383 5,383 6,858 3,044 0 1,383 85.8% 0.89 1.00 B14 15,717 0.361 4,542 6,379 3,045 0 1,751 82.9% 0.87 1.00 B15 38,702 0.888 13,881 14,288 4,347 0 6,185 79.2% 0.84 1.00 B16 23,554 0.541 4,074 12,758 6,090 0 631 89.3% 0.93 1.00 B17 15,434 0.354 6,116 5,314 1,592 0 2,413 79.9% 0.84 1.00 B13+…+B17 110,074 2.527 33,996 45,597 18,118 0 12,363 83.0% 0.87 1.00 B18 18,766 0.431 6,328 4,222 1,441 0 6,774 60.9% 0.70 0.87 B19 18,723 0.430 6,881 4,185 1,440 0 6,218 63.8% 0.72 0.90 B20 128,184 2.943 0 12,369 8,169 0 107,646 14.4% 0.36 0.45 B13+…+B20 275,747 6.330 47,205 66,374 29,169 0 133,000 48.3% 0.61 0.77 B1+…+B20 826,736 18.979 150,079 214,975 115,559 0 346,123 54.1% 0.66 0.82 C1 56,445 1.296 0 12,391 10,383 0 33,672 36.3% 0.53 0.67 C2 5,888 0.135 0 0 0 0 5,888 0.0% 0.25 0.31 C3 36,164 0.830 13,240 3,800 6,273 0 12,850 61.7% 0.70 0.88 C4 11,068 0.254 5,213 1,155 1,191 0 3,510 66.2% 0.73 0.91 C5 50,105 1.150 6,373 1,762 3,854 0 38,116 22.8% 0.42 0.52 C1+…+C5 159,671 3.666 24,827 19,108 21,700 0 94,036 38.6% 0.54 0.67 D1 25,164 0.578 9,478 10,065 3,610 0 2,011 86.6% 0.89 1.00 D2 28,474 0.654 11,762 8,701 4,872 0 3,139 84.2% 0.87 1.00 D3 56,659 1.301 0 9,329 7,882 0 39,448 27.3% 0.46 0.58 D4 7,129 0.164 0 3,342 1,225 0 2,562 57.7% 0.70 0.87 D1+…+D4 117,425 2.696 21,240 31,437 17,589 0 47,159 55.7% 0.67 0.84 D5 18,591 0.427 0 6,022 3,440 0 9,130 45.8% 0.61 0.76 D6 4,463 0.102 2,593 0 498 0 1,372 68.1% 0.73 0.92 D7 3,817 0.088 2,632 0 536 0 648 81.6% 0.83 1.00 D1+…+D7 144,296 3.313 26,465 37,458 22,063 0 58,309 55.5% 0.67 0.83 D8 31,303 0.719 12,437 10,108 5,119 0 3,639 83.5% 0.87 1.00 D9 26,435 0.607 0 10,663 3,547 0 12,225 48.4% 0.63 0.78 D10 6,832 0.157 0 3,342 714 0 2,776 53.4% 0.67 0.83 D11 38,455 0.883 0 14,556 7,157 0 16,742 50.8% 0.65 0.81 D12 33,210 0.762 11,011 14,018 5,309 0 2,872 85.5% 0.89 1.00 D13 11,992 0.275 0 0 1,007 0 10,985 7.6% 0.31 0.39 D8+…+D13 148,227 3.403 23,448 52,687 22,853 0 49,238 61.7% 0.72 0.90 D14 108,741 2.496 0 0 4,743 0 103,998 3.9% 0.28 0.35 D15 18,989 0.436 12,185 0 1,100 0 5,704 69.4% 0.74 0.92 D13+…+D15 139,722 3.208 12,185 0 6,849 0 120,687 13.1% 0.35 0.43 D1+…+D14 401,263 9.212 49,913 90,146 49,659 0 211,545 43.8% 0.58 0.73 E1 20,919 0.480 14,379 0 2,690 0 3,850 80.3% 0.82 1.00 E2 28,918 0.664 22,155 0 2,778 0 3,985 85.3% 0.85 1.00 E3 67,679 1.554 49,047 0 7,759 0 10,873 82.8% 0.84 1.00 E4 85,144 1.955 54,683 0 7,390 0 23,071 72.0% 0.76 0.95 E5 25,445 0.584 18,366 0 2,735 0 4,345 81.9% 0.83 1.00 E6 24,572 0.564 17,747 0 2,618 0 4,207 81.8% 0.83 1.00 E5+E6 50,017 1.148 36,113 0 5,353 0 8,552 81.8% 0.83 1.00 E7 32,809 0.753 20,545 0 2,736 0 9,528 70.1% 0.75 0.93 E8 26,051 0.598 14,527 0 2,641 0 8,883 64.9% 0.71 0.89 E7+E8 58,860 1.351 35,072 0 5,377 0 18,411 67.8% 0.73 0.91 E9 17,166 0.394 13,803 0 0 0 3,363 80.4% 0.81 1.00 E10 10,597 0.243 8,370 0 892 0 1,334 86.6% 0.86 1.00 E1+…+E10 328,703 7.546 225,251 0 31,348 0 72,104 77.1% 0.80 1.00 Design Engineer: Design Firm: Project Number: Date: EQUATIONS: -Equation 6-2 -Equation 6-4 -Urbanized Check Equation 6-5 - CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition 500 ft - Overland flow shall not exceed for undeveloped condition Final t c = minimum of t i + t t and urbanized basin check recommended minimum t c = 5 min for urbanized basins Time of Concentration (2-yr to 10-yr) Type of Travel Surface Cv A1 A1 89.2% 0.90 0.658 35 0.0200 1.73 273 0.0050 Paved Areas 20 1.41 3.22 5.00 0.0067 6.50 5.00 A2 A2 92.0% 0.94 0.195 47 0.0200 1.61 99 0.0050 Paved Areas 20 1.41 1.17 5.00 0.0098 5.00 5.00 A3 A3 67.9% 0.76 1.532 46 0.0200 3.46 451 0.0050 Paved Areas 20 1.41 5.32 8.78 0.0064 11.48 8.78 A4 A4 66.3% 0.74 0.879 46 0.0200 3.61 367 0.0050 Paved Areas 20 1.41 4.33 7.93 0.0067 11.08 7.93 A5 A5 91.4% 0.92 0.346 47 0.0200 1.80 133 0.0050 Paved Areas 20 1.41 1.57 5.00 0.0089 5.23 5.00 A6 A6 81.0% 0.86 1.140 72 0.0200 2.97 215 0.0050 Paved Areas 20 1.41 2.53 5.50 0.0088 7.48 5.50 A7 A7 66.9% 0.74 0.689 29 0.0200 2.88 594 0.0050 Paved Areas 20 1.41 7.00 9.88 0.0057 12.87 9.88 A8 A8 70.0% 0.76 0.765 22 0.0200 2.38 587 0.0050 Paved Areas 20 1.41 6.92 9.30 0.0055 12.23 9.30 A9 A9 72.7% 0.78 0.540 96 0.0200 4.60 248 0.0050 Paved Areas 20 1.41 2.92 7.53 0.0092 9.12 7.53 A10 A10 81.8% 0.86 1.313 68 0.0200 2.91 482 0.0050 Paved Areas 20 1.41 5.68 8.59 0.0069 9.23 8.59 A11 A11 83.7% 0.88 0.510 71 0.0200 2.72 199 0.0050 Paved Areas 20 1.41 2.35 5.07 0.0089 6.93 5.07 A12 A12 36.8% 0.54 1.249 91 0.0200 7.98 230 0.0050 Paved Areas 21 1.48 2.58 10.56 0.0093 15.14 10.56 A13 A13 87.8% 0.92 0.559 68 0.0200 2.21 184 0.0050 Paved Areas 20 1.41 2.17 5.00 0.0090 6.16 5.00 A14 A14 80.5% 0.85 0.525 47 0.0200 2.59 212 0.0050 Paved Areas 21 1.48 2.38 5.00 0.0077 7.50 5.00 A15 A15 54.6% 0.65 2.478 45 0.0200 4.45 1017 0.0050 Paved Areas 20 1.41 11.99 16.44 0.0056 19.21 16.44 A16 A16 85.5% 0.86 0.802 78 0.0200 3.19 1063 0.0050 Paved Areas 20 1.41 12.53 15.72 0.0060 12.70 12.70 A17 A17 7.1% 0.30 0.899 68 0.0200 9.73 568 0.0050 Paved Areas 20 1.41 6.69 16.42 0.0066 26.46 16.42 A18 A18 15.3% 0.37 3.022 89 0.0200 10.24 352 0.0050 Paved Areas 20 1.41 4.15 14.38 0.0080 20.94 14.38 B1 B1 37.1% 0.54 2.127 52 0.0200 6.01 774 0.0050 Paved Areas 20 1.41 9.12 15.13 0.0059 20.98 15.13 June 26, 2019 Northfield DEVELOPED TIME OF CONCENTRATION J.Claeys 18-1000-00 Highland Development Services LENGTH (ft) DESIGN CRITERIA: Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual Overland Flow Equations for City of Fort Collins - Storm Water Criteria Manual SUB-BASIN DATA INITIAL/OVERLAND TIME (ti ) TRAVEL TIME (tt ) tc =ti +tt (min) Urban Check Final tc (min) DESIGN B2 B2 72.3% 0.79 1.300 76 0.0200 3.96 608 0.0050 Paved Areas 20 1.41 7.17 11.13 0.0067 11.91 11.13 B3 B3 63.3% 0.72 1.069 11 0.0200 1.87 592 0.0050 Paved Areas 20 1.41 6.98 8.85 0.0053 13.59 8.85 B4 B4 85.2% 0.89 1.319 47 0.0200 2.14 496 0.0050 Paved Areas 20 1.41 5.85 7.99 0.0063 8.73 7.99 B5 B5 90.3% 0.94 0.505 68 0.0200 1.98 162 0.0050 Paved Areas 21 1.48 1.82 5.00 0.0094 5.63 5.00 B6 B6 81.1% 0.85 0.520 47 0.0200 2.57 102 0.0050 Paved Areas 22 1.56 1.09 5.00 0.0097 6.63 5.00 B7 B7 84.2% 0.88 0.266 47 0.0200 2.29 147 0.0050 Paved Areas 20 1.41 1.73 5.00 0.0086 6.44 5.00 B8 B8 74.2% 0.80 0.401 49 0.0200 3.13 168 0.0050 Paved Areas 20 1.41 1.98 5.11 0.0084 8.19 5.11 B9 B9 29.7% 0.48 2.286 108 0.0200 9.55 407 0.0050 Paved Areas 20 1.41 4.80 14.35 0.0081 18.53 14.35 B10 B10 60.4% 0.69 0.479 11 0.0200 2.00 226 0.0050 Paved Areas 20 1.41 2.66 5.00 0.0057 10.92 5.00 B11 B11 71.7% 0.78 2.471 76 0.0200 4.08 547 0.0050 Paved Areas 20 1.41 6.45 10.52 0.0068 11.56 10.52 B12 B12 1.5% 0.26 0.413 20 0.0200 5.57 74 0.0200 Tilage/Field 20 2.83 0.44 6.00 0.0200 18.67 6.00 B13 B13 85.8% 0.89 0.383 68 0.0200 2.55 182 0.0050 Paved Areas 24 1.70 1.79 5.00 0.0091 6.48 5.00 B14 B14 82.9% 0.87 0.361 68 0.0200 2.79 171 0.0050 Paved Areas 23 1.63 1.75 5.00 0.0093 6.87 5.00 B15 B15 79.2% 0.84 0.888 30 0.0200 2.13 412 0.0050 Paved Areas 25 1.77 3.88 6.01 0.0060 9.18 6.01 B16 B16 89.3% 0.93 0.541 64 0.0200 2.00 192 0.0050 Paved Areas 21 1.48 2.15 5.00 0.0088 5.97 5.00 B17 B17 79.9% 0.84 0.354 46 0.0200 2.61 212 0.0050 Paved Areas 22 1.56 2.27 5.00 0.0077 7.59 5.00 B18 B18 60.9% 0.70 0.431 60 0.0200 4.63 302 0.0050 Paved Areas 20 1.41 3.56 8.19 0.0075 11.49 8.19 B19 B19 63.8% 0.72 0.430 60 0.0200 4.40 302 0.0050 Paved Areas 20 1.41 3.56 7.96 0.0075 10.99 7.96 B20 B20 14.4% 0.36 2.943 164 0.0200 14.02 579 0.0050 Paved Areas 20 1.41 6.82 20.85 0.0083 24.62 20.85 C1 C1 36.3% 0.53 1.296 48 0.0200 5.84 529 0.0050 Paved Areas 20 1.41 6.23 12.07 0.0062 18.43 12.07 C2 C2 0.0% 0.25 0.135 12 0.0500 3.22 54 0.0050 Paved Areas 20 1.41 0.64 5.00 0.0132 18.80 5.00 C3 C3 61.7% 0.70 0.830 76 0.0200 5.16 274 0.0050 Paved Areas 21 1.48 3.08 8.23 0.0083 11.14 8.23 C4 C4 66.2% 0.73 0.254 26 0.0200 2.82 160 0.0050 Paved Areas 22 1.56 1.71 5.00 0.0071 9.39 5.00 C5 C5 22.8% 0.42 1.150 75 0.0200 8.77 236 0.0050 Paved Areas 23 1.63 2.42 11.19 0.0086 17.77 11.19 D1 D1 86.6% 0.89 0.578 47 0.0200 2.10 254 0.0050 Paved Areas 21 1.48 2.85 5.00 0.0073 6.80 5.00 D2 D2 84.2% 0.87 0.654 47 0.0200 2.31 254 0.0050 Paved Areas 22 1.56 2.72 5.03 0.0073 7.19 5.03 D3 D3 27.3% 0.46 1.301 70 0.0200 7.91 633 0.0050 Paved Areas 20 1.41 7.46 15.37 0.0065 21.73 15.37 D4 D4 57.7% 0.70 0.164 46 0.0200 4.04 155 0.0050 Paved Areas 20 1.41 1.83 5.87 0.0084 10.76 5.87 D5 D5 45.8% 0.61 0.427 45 0.0200 4.92 295 0.0050 Paved Areas 20 1.41 3.48 8.39 0.0070 14.08 8.39 D6 D6 68.1% 0.73 0.102 91 0.0200 5.17 103 0.0050 Paved Areas 20 1.41 1.21 6.38 0.0120 8.82 6.38 D7 D7 81.6% 0.83 0.088 26 0.0200 2.03 103 0.0050 Paved Areas 20 1.41 1.21 5.00 0.0080 6.52 5.00 D8 D8 83.5% 0.87 0.719 47 0.0200 2.35 286 0.0050 Paved Areas 21 1.48 3.21 5.56 0.0071 7.53 5.56 D9 D9 48.4% 0.63 0.607 47 0.0200 4.82 574 0.0050 Paved Areas 20 1.41 6.76 11.58 0.0061 16.34 11.58 D10 D10 53.4% 0.67 0.157 39 0.0200 4.03 144 0.0050 Paved Areas 20 1.41 1.70 5.72 0.0082 11.34 5.72 D11 D11 50.8% 0.65 0.883 40 0.0200 4.27 648 0.0050 Paved Areas 20 1.41 7.64 11.91 0.0059 16.56 11.91 D12 D12 85.5% 0.89 0.762 47 0.0200 2.14 341 0.0050 Paved Areas 22 1.56 3.65 5.80 0.0068 7.58 5.80 D13 D13 7.6% 0.31 0.275 15 0.0200 4.55 29 0.0050 Paved Areas 20 1.41 0.34 5.00 0.0101 17.39 5.00 D14 D14 3.9% 0.28 2.496 37 0.0200 7.40 593 0.0050 Paved Areas 20 1.41 6.99 14.39 0.0059 27.99 14.39 D15 D15 69.4% 0.74 0.436 12 0.0200 1.85 393 0.0050 Paved Areas 21 1.48 4.41 6.26 0.0054 10.79 6.26 E1 E1 80.3% 0.82 0.480 32 0.0200 2.34 362 0.0050 Paved Areas 20 1.41 4.27 6.61 0.0062 8.62 6.61 E2 E2 85.3% 0.85 0.664 51 0.0200 2.61 362 0.0050 Paved Areas 20 1.41 4.27 6.88 0.0069 7.77 6.88 E3 E3 82.8% 0.84 1.554 32 0.0200 2.20 1140 0.0050 Paved Areas 20 1.41 13.44 15.64 0.0054 13.92 13.92 E4 E4 72.0% 0.76 1.955 51 0.0200 3.60 1135 0.0050 Paved Areas 20 1.41 13.38 16.98 0.0056 16.18 16.18 E5 E5 81.9% 0.83 0.584 44 0.0200 2.65 458 0.0050 Paved Areas 20 1.41 5.40 8.05 0.0063 9.05 8.05 E6 E6 81.8% 0.83 0.564 45 0.0200 2.69 440 0.0050 Paved Areas 20 1.41 5.19 7.87 0.0064 8.92 7.87 E7 E7 70.1% 0.75 0.753 39 0.0200 3.27 458 0.0050 Paved Areas 20 1.41 5.40 8.67 0.0062 11.14 8.67 E8 E8 64.9% 0.71 0.598 51 0.0200 4.12 440 0.0050 Paved Areas 20 1.41 5.19 9.31 0.0066 11.93 9.31 E9 E9 80.4% 0.81 0.394 12 0.0200 1.48 393 0.0050 Paved Areas 20 1.41 4.63 6.11 0.0054 8.86 6.11 E10 E10 86.6% 0.86 0.243 12 0.0200 1.22 157 0.0050 Paved Areas 21 1.48 1.76 5.00 0.0061 6.12 5.00 18-1000-00 Rational Calcs (FC).xlsx Page 7 of 12 Highland Development Services Design Engineer: Design Firm: Project Number: Date: EQUATIONS: -Equation 6-2 -Equation 6-4 -Urbanized Check Equation 6-5 - CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition 500 ft - Overland flow shall not exceed for undeveloped condition Final t c = minimum of t i + t t and urbanized basin check recommended minimum t c = 5 min for urbanized basins Time of Concentration (100-yr) Type of Travel Surface Cv A1 A1 89.2% 1.00 0.658 35 0.0200 0.88 303 0.0050 Paved Areas 20 1.41 3.57 5.00 0.0066 6.71 5.00 A2 A2 92.0% 1.00 0.195 47 0.0200 1.02 99 0.0050 Paved Areas 20 1.41 1.17 5.00 0.0098 5.00 5.00 A3 A3 67.9% 0.95 1.532 46 0.0200 1.56 451 0.0050 Paved Areas 20 1.41 5.32 6.87 0.0064 11.48 6.87 A4 A4 66.3% 0.93 0.879 46 0.0200 1.74 367 0.0050 Paved Areas 20 1.41 4.33 6.07 0.0067 11.08 6.07 A5 A5 91.4% 1.00 0.346 47 0.0200 1.02 133 0.0050 Paved Areas 20 1.41 1.57 5.00 0.0089 5.23 5.00 A6 A6 81.0% 1.00 1.140 72 0.0200 1.26 215 0.0050 Paved Areas 20 1.41 2.53 5.00 0.0088 7.48 5.00 A7 A7 66.9% 0.92 0.689 29 0.0200 1.41 594 0.0050 Paved Areas 20 1.41 7.00 8.41 0.0057 12.87 8.41 A8 A8 70.0% 0.95 0.765 22 0.0200 1.07 587 0.0050 Paved Areas 20 1.41 6.92 7.98 0.0055 12.23 7.98 A9 A9 72.7% 0.98 0.540 96 0.0200 1.76 248 0.0050 Paved Areas 20 1.41 2.92 5.00 0.0092 9.12 5.00 A10 A10 81.8% 1.00 1.313 68 0.0200 1.22 482 0.0050 Paved Areas 20 1.41 5.68 6.90 0.0069 9.23 6.90 A11 A11 83.7% 1.00 0.510 71 0.0200 1.25 199 0.0050 Paved Areas 20 1.41 2.35 5.00 0.0089 6.93 5.00 A12 A12 36.8% 0.67 1.249 91 0.0200 6.08 230 0.0050 Paved Areas 20 1.41 2.71 8.79 0.0093 15.14 8.79 A13 A13 87.8% 1.00 0.559 68 0.0200 1.22 184 0.0050 Paved Areas 20 1.41 2.17 5.00 0.0090 6.16 5.00 A14 A14 80.5% 1.00 0.525 47 0.0200 1.02 212 0.0050 Paved Areas 20 1.41 2.50 5.00 0.0077 7.50 5.00 A15 A15 54.6% 0.82 2.478 45 0.0200 2.83 1017 0.0050 Paved Areas 20 1.41 11.99 14.81 0.0056 19.21 14.81 A16 A16 85.5% 1.00 0.802 78 0.0200 1.31 1063 0.0050 Paved Areas 20 1.41 12.53 13.84 0.0060 12.70 12.70 A17 A17 7.1% 0.38 0.899 68 0.0200 8.80 568 0.0050 Paved Areas 20 1.41 6.69 15.49 0.0066 26.46 15.49 A18 A18 15.3% 0.46 3.022 89 0.0200 8.94 352 0.0050 Paved Areas 20 1.41 4.15 13.09 0.0080 20.94 13.09 B1 B1 37.1% 0.67 2.127 52 0.0200 4.57 774 0.0050 Paved Areas 20 1.41 9.12 13.69 0.0059 20.98 13.69 B2 B2 72.3% 0.99 1.300 76 0.0200 1.39 608 0.0050 Paved Areas 20 1.41 7.17 8.56 0.0067 11.91 8.56 June 26, 2019 Northfield DEVELOPED TIME OF CONCENTRATION J.Claeys 18-1000-00 Highland Development Services LENGTH (ft) DESIGN CRITERIA: Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual Overland Flow Equations for City of Fort Collins - Storm Water Criteria Manual SUB-BASIN DATA INITIAL/OVERLAND TIME (ti) TRAVEL TIME (tt) tc=ti+tt (min) Urban Check Final tc (min) DESIGN POINT Sub-basin % B3 B3 63.3% 0.90 1.069 11 0.0200 0.98 592 0.0050 Paved Areas 20 1.41 6.98 7.96 0.0053 13.59 7.96 B4 B4 85.2% 1.00 1.319 47 0.0200 1.02 496 0.0050 Paved Areas 20 1.41 5.85 6.86 0.0063 8.73 6.86 B5 B5 90.3% 1.00 0.505 68 0.0200 1.22 162 0.0050 Paved Areas 20 1.41 1.91 5.00 0.0094 5.63 5.00 B6 B6 81.1% 1.00 0.520 47 0.0200 1.02 102 0.0050 Paved Areas 20 1.41 1.20 5.00 0.0097 6.63 5.00 B7 B7 84.2% 1.00 0.266 47 0.0200 1.02 147 0.0050 Paved Areas 20 1.41 1.73 5.00 0.0086 6.44 5.00 B8 B8 74.2% 1.00 0.401 49 0.0200 1.06 168 0.0050 Paved Areas 20 1.41 1.98 5.00 0.0084 8.19 5.00 B9 B9 29.7% 0.60 2.286 108 0.0200 7.70 407 0.0050 Paved Areas 20 1.41 4.80 12.50 0.0081 18.53 12.50 B10 B10 60.4% 0.87 0.479 11 0.0200 1.15 226 0.0050 Paved Areas 20 1.41 2.66 5.00 0.0057 10.92 5.00 B11 B11 71.7% 0.98 2.471 76 0.0200 1.54 547 0.0050 Paved Areas 20 1.41 6.45 7.99 0.0068 11.56 7.99 B12 B12 1.5% 0.33 0.413 20 0.0200 5.13 74 0.0200 Paved Areas 20 2.83 0.44 5.57 0.0200 18.67 5.57 B13 B13 85.8% 1.00 0.383 68 0.0200 1.22 182 0.0050 Paved Areas 20 1.41 2.14 5.00 0.0091 6.48 5.00 B14 B14 82.9% 1.00 0.361 68 0.0200 1.22 171 0.0050 Paved Areas 20 1.41 2.02 5.00 0.0093 6.87 5.00 B15 B15 79.2% 1.00 0.888 30 0.0200 0.81 412 0.0050 Paved Areas 20 1.41 4.86 5.67 0.0060 9.18 5.67 B16 B16 89.3% 1.00 0.541 64 0.0200 1.19 192 0.0050 Paved Areas 20 1.41 2.26 5.00 0.0088 5.97 5.00 B17 B17 79.9% 1.00 0.354 46 0.0200 1.01 212 0.0050 Paved Areas 20 1.41 2.50 5.00 0.0077 7.59 5.00 B18 B18 60.9% 0.87 0.431 60 0.0200 2.63 302 0.0050 Paved Areas 20 1.41 3.56 6.18 0.0075 11.49 6.18 B19 B19 63.8% 0.90 0.430 60 0.0200 2.33 302 0.0050 Paved Areas 20 1.41 3.56 5.89 0.0075 10.99 5.89 B20 B20 14.4% 0.45 2.943 164 0.0200 12.30 579 0.0050 Paved Areas 20 1.41 6.82 19.13 0.0083 24.62 19.13 C1 C1 36.3% 0.67 1.296 48 0.0200 4.47 529 0.0050 Paved Areas 20 1.41 6.23 10.70 0.0062 18.43 10.70 C2 C2 0.0% 0.31 0.135 12 0.0500 2.98 54 0.0050 Paved Areas 20 1.41 0.64 5.00 0.0132 18.80 5.00 C3 C3 61.7% 0.88 0.830 76 0.0200 2.89 274 0.0050 Paved Areas 20 1.41 3.23 6.12 0.0083 11.14 6.12 C4 C4 66.2% 0.91 0.254 26 0.0200 1.44 160 0.0050 Paved Areas 20 1.41 1.89 5.00 0.0071 9.39 5.00 C5 C5 22.8% 0.52 1.150 75 0.0200 7.43 236 0.0050 Paved Areas 20 1.41 2.78 10.21 0.0086 17.77 10.21 D1 D1 86.6% 1.00 0.578 47 0.0200 1.02 254 0.0050 Paved Areas 20 1.41 2.99 5.00 0.0073 6.80 5.00 D2 D2 84.2% 1.00 0.654 47 0.0200 1.02 254 0.0050 Paved Areas 20 1.41 2.99 5.00 0.0073 7.19 5.00 D3 D3 27.3% 0.58 1.301 70 0.0200 6.48 633 0.0050 Paved Areas 20 1.41 7.46 13.94 0.0065 21.73 13.94 D4 D4 57.7% 0.87 0.164 46 0.0200 2.28 155 0.0050 Paved Areas 20 1.41 1.83 5.00 0.0084 10.76 5.00 D5 D5 45.8% 0.76 0.427 45 0.0200 3.41 295 0.0050 Paved Areas 20 1.41 3.48 6.88 0.0070 14.08 6.88 D6 D6 68.1% 0.92 0.102 91 0.0200 2.57 103 0.0050 Paved Areas 20 1.41 1.21 5.00 0.0120 8.82 5.00 D7 D7 81.6% 1.00 0.088 26 0.0200 0.76 103 0.0050 Paved Areas 20 1.41 1.21 5.00 0.0080 6.52 5.00 D8 D8 83.5% 1.00 0.719 47 0.0200 1.02 286 0.0050 Paved Areas 20 1.41 3.37 5.00 0.0071 7.53 5.00 D9 D9 48.4% 0.78 0.607 47 0.0200 3.23 574 0.0050 Paved Areas 20 1.41 6.76 9.99 0.0061 16.34 9.99 D10 D10 53.4% 0.83 0.157 39 0.0200 2.48 144 0.0050 Paved Areas 20 1.41 1.70 5.00 0.0082 11.34 5.00 D11 D11 50.8% 0.81 0.883 40 0.0200 2.75 648 0.0050 Paved Areas 20 1.41 7.64 10.39 0.0059 16.56 10.39 D12 D12 85.5% 1.00 0.762 47 0.0200 1.02 341 0.0050 Paved Areas 20 1.41 4.02 5.04 0.0068 7.58 5.04 D13 D13 7.6% 0.39 0.275 15 0.0200 4.10 29 0.0050 Paved Areas 20 1.41 0.34 5.00 0.0101 17.39 5.00 D14 D14 3.9% 0.35 2.496 37 0.0200 6.77 593 0.0050 Paved Areas 20 1.41 6.99 13.75 0.0059 27.99 13.75 D15 D15 69.4% 0.92 0.436 12 0.0200 0.90 393 0.0050 Paved Areas 20 1.41 4.63 5.53 0.0054 10.79 5.53 E1 E1 80.3% 1.00 0.480 32 0.0200 0.84 362 0.0050 Paved Areas 20 1.41 4.27 5.11 0.0062 8.62 5.11 E2 E2 85.3% 1.00 0.664 51 0.0200 1.06 362 0.0050 Paved Areas 20 1.41 4.27 5.33 0.0069 7.77 5.33 E3 E3 82.8% 1.00 1.554 32 0.0200 0.84 1140 0.0050 Paved Areas 20 1.41 13.44 14.27 0.0054 13.92 13.92 E4 E4 72.0% 0.95 1.955 51 0.0200 1.59 1135 0.0050 Paved Areas 20 1.41 13.38 14.96 0.0056 16.18 14.96 E5 E5 81.9% 1.00 0.584 44 0.0200 0.98 458 0.0050 Paved Areas 20 1.41 5.40 6.38 0.0063 9.05 6.38 E6 E6 81.8% 1.00 0.564 45 0.0200 1.00 440 0.0050 Paved Areas 20 1.41 5.19 6.18 0.0064 8.92 6.18 E7 E7 70.1% 0.93 0.753 39 0.0200 1.54 458 0.0050 Paved Areas 20 1.41 5.40 6.94 0.0062 11.14 6.94 E8 E8 64.9% 0.89 0.598 51 0.0200 2.24 440 0.0050 Paved Areas 20 1.41 5.19 7.42 0.0066 11.93 7.42 E9 E9 80.4% 1.00 0.394 12 0.0200 0.51 393 0.0050 Paved Areas 20 1.41 4.63 5.15 0.0054 8.86 5.15 E10 E10 86.6% 1.00 0.243 12 0.0200 0.51 157 0.0050 Paved Areas 20 1.41 1.85 5.00 0.0061 6.12 5.00 18-1000-00 Rational Calcs (FC).xlsx Page 9 of 12 Highland Development Services Design Engineer: Design Firm: Project Number: Date: EQUATIONS: I = rainfall intensity (in/hr) Q n = n -yr peak discharge (cfs) P 1 = one-hour point rainfall depth (in) C n = n -yr runoff coefficient t c = time of concentration (min) I n = n -yr rainfall intensity (in/hr) P 1-2yr = 0.82 in A n = Basin drainage area (ac) P 1-10yr = 1.40 in P 1-100yr = 2.86 in BASIN SUMMARY: tc (min) Runoff Coeff (C2-10 ) C(A) (acres) Intensity (in/hr) Q (ft 3 /s) t c (min) Runoff Coeff (C2-10 ) C(A) (acres) Intensity (in/hr) Q (ft 3 /s) t c (min) Runoff Coeff. (C100 ) C(A) (acres) Intensity (in/hr) Q (ft 3 /s) A1 A1 0.658 5.00 0.90 0.59 2.78 1.65 5.00 0.90 0.59 4.87 2.90 5.00 1.00 0.66 9.95 6.55 A2 A2 0.195 5.00 0.94 0.18 2.78 0.51 5.00 0.94 0.18 4.87 0.89 5.00 1.00 0.20 9.95 1.94 A3 A3 1.532 8.78 0.76 1.16 2.33 2.70 8.78 0.76 1.16 3.97 4.60 6.87 0.95 1.45 8.83 12.78 A4 A4 0.879 7.93 0.74 0.65 2.41 1.57 7.93 0.74 0.65 4.12 2.68 6.07 0.93 0.81 9.17 7.47 A5 A5 0.346 5.00 0.92 0.32 2.78 0.89 5.00 0.92 0.32 4.87 1.56 5.00 1.00 0.35 9.95 3.45 A6 A6 1.140 5.50 0.86 0.99 2.71 2.67 5.50 0.86 0.99 4.62 4.55 5.00 1.00 1.14 9.95 11.34 A7 A7 0.689 9.88 0.74 0.51 2.22 1.13 9.88 0.74 0.51 3.80 1.93 8.41 0.92 0.64 8.24 5.25 A8 A8 0.765 9.30 0.76 0.58 2.28 1.32 9.30 0.76 0.58 3.89 2.25 7.98 0.95 0.72 8.40 6.08 A9 A9 0.540 7.53 0.78 0.42 2.46 1.04 7.53 0.78 0.42 4.19 1.77 5.00 0.98 0.53 9.95 5.26 A10 A10 1.313 8.59 0.86 1.13 2.35 2.65 8.59 0.86 1.13 4.00 4.53 6.90 1.00 1.31 8.81 11.57 A11 A11 0.510 5.07 0.88 0.45 2.77 1.24 5.07 0.88 0.45 4.72 2.13 5.00 1.00 0.51 9.95 5.07 A12 A12 1.249 10.56 0.54 0.67 2.17 1.45 10.56 0.54 0.67 3.70 2.48 8.79 0.67 0.84 8.11 6.80 A13 A13 0.559 5.00 0.92 0.51 2.78 1.43 5.00 0.92 0.51 4.87 2.50 5.00 1.00 0.56 9.95 5.56 A14 A14 0.525 5.00 0.85 0.44 2.78 1.23 5.00 0.85 0.44 4.87 2.16 5.00 1.00 0.52 9.95 5.22 A15 A15 2.478 16.44 0.65 1.62 1.78 2.88 16.44 0.65 1.62 3.03 4.91 14.81 0.82 2.02 6.52 13.18 A16 A16 0.802 12.70 0.86 0.69 2.00 1.38 12.70 0.86 0.69 3.42 2.35 12.70 1.00 0.80 6.99 5.61 A17 A17 0.899 16.42 0.30 0.27 1.78 0.49 16.42 0.30 0.27 3.04 0.83 15.49 0.38 0.34 6.38 2.19 A18 A18 3.022 14.38 0.37 1.12 1.89 2.11 14.38 0.37 1.12 3.23 3.61 13.09 0.46 1.39 6.90 9.61 Design Engineer: Design Firm: Project Number: Date: EQUATIONS: I = rainfall intensity (in/hr) Q n = n -yr peak discharge (cfs) P 1 = one-hour point rainfall depth (in) C n = n -yr runoff coefficient t c = time of concentration (min) I n = n -yr rainfall intensity (in/hr) P 1-2yr = 0.82 in A n = Basin drainage area (ac) P 1-10yr = 1.40 in P 1-100yr = 2.86 in BASIN SUMMARY: tc (min) Runoff Coeff (C2-10 ) C(A) (acres) Intensity (in/hr) Q (ft 3 /s) A1 A1 0.658 5.00 0.90 0.59 1.39 0.83 A2 A2 0.195 5.00 0.94 0.18 1.39 0.26 A3 A3 1.532 8.78 0.76 1.16 1.16 1.35 A4 A4 0.879 7.93 0.74 0.65 1.21 0.79 A5 A5 0.346 5.00 0.92 0.32 1.39 0.44 A6 A6 1.140 5.50 0.86 0.99 1.35 1.33 A7 A7 0.689 9.88 0.74 0.51 1.11 0.57 A8 A8 0.765 9.30 0.76 0.58 1.14 0.66 A9 A9 0.540 7.53 0.78 0.42 1.23 0.52 A10 A10 1.313 8.59 0.86 1.13 1.17 1.33 A11 A11 0.510 5.07 0.88 0.45 1.38 0.62 A12 A12 1.249 10.56 0.54 0.67 1.08 0.73 A13 A13 0.559 5.00 0.92 0.51 1.39 0.71 A14 A14 0.525 5.00 0.85 0.44 1.39 0.62 A15 A15 2.478 16.44 0.65 1.62 0.89 1.44 A16 A16 0.802 12.70 0.86 0.69 1.00 0.69 A17 A17 0.899 16.42 0.30 0.27 0.89 0.24 A18 A18 3.022 14.38 0.37 1.12 0.95 1.06 B1 B1 2.127 15.13 0.54 1.15 0.93 1.06 B2 B2 1.300 11.13 0.79 1.03 1.06 1.09 B3 B3 1.069 8.85 0.72 0.77 1.16 0.89 B4 B4 1.319 7.99 0.89 1.17 1.20 1.41 B5 B5 0.505 5.00 0.94 0.47 1.39 0.66 B6 B6 0.520 5.00 0.85 0.44 1.39 0.61 B7 B7 0.266 5.00 0.88 0.23 1.39 0.32 B8 B8 0.401 5.11 0.80 0.32 1.38 0.44 B9 B9 2.286 14.35 0.48 1.10 0.95 1.04 B10 B10 0.479 5.00 0.69 0.33 1.39 0.46 B11 B11 2.471 10.52 0.78 1.94 1.08 2.10 B12 B12 0.413 6.00 0.26 0.11 1.32 0.14 B13 B13 0.383 5.00 0.89 0.34 1.39 0.47 B14 B14 0.361 5.00 0.87 0.31 1.39 0.44 B15 B15 0.888 6.01 0.84 0.74 1.32 0.98 B16 B16 0.541 5.00 0.93 0.50 1.39 0.70 B17 B17 0.354 5.00 0.84 0.30 1.39 0.41 B18 B18 0.431 8.19 0.70 0.30 1.19 0.36 B19 B19 0.430 7.96 0.72 0.31 1.21 0.37 B20 B20 2.943 20.85 0.36 1.07 0.79 0.84 Northfield PROPOSED DRAINAGE SUMMARY Design Engineer: K. Brigman Design Firm: Highland Development Services Project Number: 18-1000-01 Date: DRAINAGE BASIN SUMMARY TABLE C2 C100 tc 2- yr (min) tc 100- yr (min) I2 (in/hr) I100 (in/hr) Q2 (cfs) Q100 (cfs) A1 A1 0.66 0.90 1.00 5.00 5.00 2.78 9.95 1.65 6.55 A2 A2 0.20 0.94 1.00 5.00 5.00 2.78 9.95 0.51 1.94 A3 A3 1.53 0.76 0.95 8.78 6.87 2.33 8.83 2.70 12.78 A4 A4 0.88 0.74 0.93 7.93 6.07 2.41 9.17 1.57 7.47 A5 A5 0.35 0.92 1.00 5.00 5.00 2.78 9.95 0.89 3.45 A6 A6 1.14 0.86 1.00 5.50 5.00 2.71 9.95 2.67 11.34 A7 A7 0.69 0.74 0.92 9.88 8.41 2.22 8.24 1.13 5.25 A8 A8 0.76 0.76 0.95 9.30 7.98 2.28 8.40 1.32 6.08 A9 A9 0.54 0.78 0.98 7.53 5.00 2.46 9.95 1.04 5.26 A10 A10 1.31 0.86 1.00 8.59 6.90 2.35 8.81 2.65 11.57 A11 A11 0.51 0.88 1.00 5.07 5.00 2.77 9.95 1.24 5.07 A12 A12 1.25 0.54 0.67 10.56 8.79 2.17 8.11 1.45 6.80 A13 A13 0.56 0.92 1.00 5.00 5.00 2.78 9.95 1.43 5.56 A14 A14 0.52 0.85 1.00 5.00 5.00 2.78 9.95 1.23 5.22 A15 A15 2.48 0.65 0.82 16.44 14.81 1.78 6.52 2.88 13.18 A16 A16 0.80 0.86 1.00 12.70 12.70 2.00 6.99 1.38 5.61 A17 A17 0.90 0.30 0.38 16.42 15.49 1.78 6.38 0.49 2.19 A18 A18 3.02 0.37 0.46 14.38 13.09 1.89 6.90 2.11 9.61 A Total 18.10 28.33 124.93 B1 B1 2.13 0.54 0.67 15.13 13.69 1.85 6.76 2.12 9.68 B2 B2 1.30 0.79 0.99 11.13 8.56 2.12 8.19 2.19 10.57 B3 B3 1.07 0.72 0.90 8.85 7.96 2.32 8.40 1.79 8.09 B4 B4 1.32 0.89 1.00 7.99 6.86 2.41 8.83 2.82 11.65 B5 B5 0.50 0.88 1.00 5.00 5.00 2.78 9.95 1.31 5.02 B6 B6 0.52 0.94 1.00 5.00 5.00 2.78 9.95 1.22 5.17 B7 B7 0.27 0.85 1.00 5.00 5.00 2.78 9.95 0.65 2.64 B8 B8 0.40 0.80 1.00 5.11 5.00 2.76 9.95 0.88 3.98 B9 B9 2.29 0.85 1.00 5.00 12.50 1.90 7.04 2.08 9.67 B10 B10 0.48 0.69 0.87 5.00 5.00 2.78 9.95 0.92 4.13 B11 B11 2.47 0.78 0.98 10.52 7.99 2.17 8.40 4.21 20.35 B12 B12 0.41 0.26 0.33 6.00 5.57 2.64 9.40 0.28 1.27 B13 B13 0.38 0.89 1.00 5.00 5.00 2.78 9.95 0.95 3.81 B14 B14 0.36 0.87 1.00 5.00 5.00 2.78 9.95 0.87 3.59 B15 B15 0.89 0.84 1.00 6.01 5.67 2.64 9.36 1.96 8.31 B16 B16 0.54 0.93 1.00 5.00 5.00 2.78 9.95 1.40 5.38 B17 B17 0.35 0.84 1.00 5.00 5.00 2.78 9.95 0.83 3.53 B18 B18 0.43 0.70 0.87 8.19 6.18 2.39 9.12 0.72 3.43 B19 B19 0.43 0.72 0.90 7.96 5.89 2.41 9.25 0.74 3.57 B20 B20 2.94 0.36 0.45 20.85 19.13 1.57 5.75 1.68 7.65 B Total 19.48 29.63 131.48 C1 C1 1.30 0.48 0.60 14.35 10.70 2.05 7.52 1.41 6.48 Appendix D APPENDIX D – DETENTION POND CALCULATIONS Pond Req'd WQCV (ac-ft) Req'd Detention Volume (ac-ft) Total Volume Req'd (ac-ft) Total Volume Provided (ac-ft) 100-yr WSE (ft) A1 0.16 1.89 2.05 4.86 4950.59 A2 n/a 0.48 0.48 1.46 4952.25 B1 0.14 2.80 2.94 4.27 4952.15 B2 n/a 0.23 0.23 0.54 4955.43 B3 n/a 1.53 1.53 2.94 4954.5 C 0.06 0.74 0.80 1.79 4955.99 D 0.07 1.88 1.88 0.69 4949.56 Total 9.92 16.55 Pond Summary Northfield Design Engineer: Design Firm: Project Number: Date: Pond Summary Table J.Claeys Highland Development Services 18-1000-00 June 24, 2019 18-1000-00 PondCalcs.xls Page 1 of 8 Highland Development Services Northfield Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA REQUIRED WATER QUALITY CAPTURE VOLUME (WQCV): Tributary Area, A* 8.825 acres *sub-basins A13-A18 (those not treated by LID) Imperviousness, I 42.0% WQCV (watershed inches) 0.185 inches 40-Hour Drain Time (Fig SQ-2) Required WQCV 0.163 acre-feet Including 20% for Sedimentation Stage Storage Volume (pond volume calculated using the prismoidal formula): Pond A1 CONTOUR (FT) AREA (FT 2 ) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4948.00 0 0.00 0.00 0.00 0.00 4948.5 5679 0.13 0.02 0.50 0.02 4949.0 22767 0.52 0.15 1.00 0.17 4949.5 45079 1.03 0.38 1.50 0.56 4950.0 67209 1.54 0.64 2.00 1.20 4950.5 78292 1.80 0.83 2.50 2.03 4951.0 81175 1.86 0.92 3.00 2.95 4951.5 83146 1.91 0.94 3.50 3.89 4952.0 85329 1.96 0.97 4.00 4.86 Critical Pond Elevations - A1 Basin J.Claeys Highland Development 18-1000-00 June 24, 2019 Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual ( ) 3 AAAADepth 1 2 1 2 V + + = * * 1 . 2 12 Area WQCV Volume       = 18-1000-00 PondCalcs.xls Page 2 of 8 Highland Development Services Northfield Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA Stage Storage Volume (pond volume calculated using the prismoidal formula): Pond A2 CONTOUR (FT) AREA (FT 2 ) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4950.00 0 0.00 0.00 0.00 0.00 4950.5 2039 0.05 0.01 0.50 0.01 4951.0 8359 0.19 0.06 1.00 0.06 4951.5 14667 0.34 0.13 1.50 0.19 4952.0 17134 0.39 0.18 2.00 0.38 4952.5 17846 0.41 0.20 2.50 0.58 4953.0 18540 0.43 0.21 3.00 0.79 4953.5 19251 0.44 0.22 3.50 1.00 4954.0 19976 0.46 0.23 4.00 1.23 4954.5 20716 0.48 0.23 4.50 1.46 Critical Pond Elevations - A2 Basin J.Claeys Highland Development 18-1000-00 June 24, 2019 Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual ( ) 3 AAAADepth 1 2 1 2 V + + = 18-1000-00 PondCalcs.xls Page 3 of 8 Highland Development Services Northfield Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA REQUIRED WATER QUALITY CAPTURE VOLUME (WQCV): Tributary Area, A* 6.330 acres *sub-basins B13-B20 (those not treated by LID) Imperviousness, I 54.1% WQCV (watershed inches) 0.218 inches 40-Hour Drain Time (Fig SQ-2) Required WQCV 0.138 acre-feet Including 20% for Sedimentation Stage Storage Volume (pond volume calculated using the prismoidal formula): Pond B1 CONTOUR (FT) AREA (FT2) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4948.0 0 0.00 0.00 0.00 0.00 4948.5 2,005 0.05 0.01 0.50 0.01 4949.0 10,316 0.24 0.06 1.00 0.07 4949.5 19,903 0.46 0.17 1.50 0.24 4950.0 28,522 0.65 0.28 2.00 0.52 4950.5 37,241 0.85 0.38 2.50 0.90 4951.0 46,059 1.06 0.48 3.00 1.37 4951.5 55,188 1.27 0.58 3.50 1.95 4952.0 64,393 1.48 0.69 4.00 2.64 4952.5 71,487 1.64 0.78 4.50 3.42 4953.0 77,589 1.78 0.86 5.00 4.27 Critical Pond Elevations - B1 Basin J.Claeys Highland Development 18-1000-00 June 24, 2019 Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual ( ) 3 AAAADepth 1 2 1 2 V + + = * * 1 . 2 12 Area WQCV Volume       = 18-1000-00 PondCalcs.xls Page 4 of 8 Highland Development Services Northfield Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA Stage Storage Volume (pond volume calculated using the prismoidal formula): Pond B2 CONTOUR (FT) AREA (FT2) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4953.50 0 0.00 0.00 0.00 0.00 4954.0 3,696 0.08 0.01 0.50 0.01 4954.5 6,275 0.14 0.06 1.00 0.07 4955.0 7,007 0.16 0.08 1.50 0.15 4955.5 7,760 0.18 0.08 2.00 0.23 4956.0 8,545 0.20 0.09 2.50 0.33 4956.5 9,360 0.21 0.10 3.00 0.43 4957.0 10,206 0.23 0.11 3.50 0.54 Critical Pond Elevations - B2 Basin J.Claeys Highland Development 18-1000-00 June 24, 2019 Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual ( ) 3 AAAADepth 1 2 1 2 V + + = 18-1000-00 PondCalcs.xls Page 5 of 8 Highland Development Services Northfield Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA Stage Storage Volume (pond volume calculated using the prismoidal formula): Pond B3 CONTOUR (FT) AREA (FT2) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4951.0 0 0.00 0.00 0.00 0.00 4951.5 2,175 0.05 0.01 0.50 0.01 4952.0 8,474 0.19 0.06 1.00 0.07 4952.5 13,549 0.31 0.13 1.50 0.19 4953.0 23,030 0.53 0.21 2.00 0.40 4953.5 32,157 0.74 0.32 2.50 0.71 4954.0 35,163 0.81 0.39 3.00 1.10 4954.5 37,484 0.86 0.42 3.50 1.52 4955.0 39,835 0.91 0.44 4.00 1.96 4955.5 42,240 0.97 0.47 4.50 2.43 4956.0 47,188 1.08 0.51 5.00 2.94 Critical Pond Elevations - B3 Basin J.Claeys Highland Development 18-1000-00 June 24, 2019 Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual ( ) 3 AAAADepth 1 2 1 2 V + + = 18-1000-00 PondCalcs.xls Page 6 of 8 Highland Development Services Northfield Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA REQUIRED WATER QUALITY CAPTURE VOLUME (WQCV): Tributary Area, A 3.666 acres Imperviousness, I 38.6% WQCV (watershed inches) 0.176 inches 40-Hour Drain Time (Fig SQ-2) Required WQCV 0.065 acre-feet Including 20% for Sedimentation Stage Storage Volume (pond volume calculated using the prismoidal formula): Pond C1 CONTOUR (FT) AREA (FT 2 ) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4952.20 0 0.00 0.00 0.00 0.00 4952.50 309 0.01 0.00 0.30 0.00 4953.0 1250 0.03 0.01 0.80 0.01 4953.5 6000 0.14 0.04 1.30 0.05 4954.0 10590 0.24 0.09 1.80 0.14 4954.5 11943 0.27 0.13 2.30 0.27 4955.0 13038 0.30 0.14 2.80 0.41 4955.5 14143 0.32 0.16 3.30 0.57 4956.0 15269 0.35 0.17 3.80 0.74 4956.5 16426 0.38 0.18 4.30 0.92 4957.0 17617 0.40 0.20 4.80 1.12 4957.5 18854 0.43 0.21 5.30 1.33 4958.0 20138 0.46 0.22 5.80 1.55 4958.5 21507 0.49 0.24 6.30 1.79 Critical Pond Elevations - C Basin J.Claeys Highland Development 18-1000-00 June 24, 2019 Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual ( ) 3 AAAADepth 1 2 1 2 V + + = * * 1 . 2 12 Area WQCV Volume       = 18-1000-00 PondCalcs.xls Page 7 of 8 Highland Development Services Northfield Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA REQUIRED WATER QUALITY CAPTURE VOLUME (WQCV): Tributary Area, A* 3.310 acres *sub-basins D1-D7 (those not treated by rain garden) Imperviousness, I 55.5% WQCV (watershed inches) 0.222 inches 40-Hour Drain Time (Fig SQ-2) Required WQCV 0.073 acre-feet Including 20% for Sedimentation Stage Storage Volume (pond volume calculated using the prismoidal formula): Pond D CONTOUR (FT) AREA (FT 2 ) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4945.62 0 0.00 0.00 0.00 0.00 4946.00 1012 0.02 0.00 0.38 0.00 4946.50 4921 0.11 0.03 0.88 0.03 4947.00 8676 0.20 0.08 1.38 0.11 4947.50 12125 0.28 0.12 1.88 0.23 4948.00 19373 0.44 0.18 2.38 0.41 4948.50 29562 0.68 0.28 2.88 0.69 4949.00 42361 0.97 0.41 3.38 1.10 4949.50 52334 1.20 0.54 3.88 1.64 4950.00 59195 1.36 0.64 4.38 2.28 4950.50 64943 1.49 0.71 4.88 2.99 4951.00 69989 1.61 0.77 5.38 3.77 Critical Pond Elevations - D Basin J.Claeys Highland Development 18-1000-00 June 24, 2019 Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual ( ) 3 AAAADepth 1 2 1 2 V + + = * * 1 . 2 12 Area WQCV Volume       = 18-1000-00 PondCalcs.xls Page 8 of 8 Highland Development Services Appendix E APPENDIX E – STREET CAPACITIES & INLET CALCULATIONS CONNECTOR LOCAL NTS MAJOR ARTERIAL NTS NOTES: 1. MINOR STORM - NO CURB-TOPPING. MAXIMUM SIX (6) INCH FLOW DEPTH AT GUTTER. FLOW SPREAD MUST LEAVE AT LEAST A TWELVE (12) FEET WIDE CLEAR TRAVEL LANE IN EACH DIRECTION. 2. MAJOR STORM - THE DEPTH OF WATER MUST NOT EXCEED THE BOTTOM OF THE GUTTER AT THE MEDIAN TO ALLOW OPERATION OF EMERGENCY VEHICLES, THE DEPTH OF WATER OVER THE GUTTER FLOW LINE SHALL NOT EXCEED TWELVE (12) INCHES, AND THE FLOW MUST BE CONTAINED WITHIN THE RIGHT-OF-WAY OR EASEMENTS PARALLELING THE RIGHT-OF-WAY. THE MOST RESTRICTIVE OF THE THREE CRITERIA SHALL GOVERN. NOTES: 1. MINOR STORM - NO CURB-TOPPING. FLOW MAY SPREAD TO CROWN OF STREET. 2. MAJOR STORM - THE DEPTH OF WATER AT THE STREET CROWN SHALL NOT EXCEED SIX (6) INCHES TO ALLOW OPERATION OF EMERGENCY VEHICLES, THE DEPTH OF WATER OVER THE GUTTER FLOW LINE SHALL NOT EXCEED TWELVE (12) INCHES, AND THE FLOW MUST BE CONTAINED WITHIN THE RIGHT-OF-WAY OR EASEMENTS PARALLELING THE RIGHT-OF-WAY. THE MOST RESTRICTIVE OF THE THREE CRITERIA SHALL GOVERN. DEVELOPMENT HIGHLAND SERVCIES 6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550 PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com SHEET OF DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJ # SCALE (V) NORTHFIELD STREET CAPACITY EXHIBIT 1/23/19 N/A N/A JTC JTC 18-1000-00 1 1 Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 19.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.015 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 18.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.005 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 5.8 10.5 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = 9.5 61.8 cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Northfield Connector Local Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' 1282-168-03 Inlet Calcs_Connector Local.xlsm, Inlet 1 8/21/2018, 5:11 PM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 13.8 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.015 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 32.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.005 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 18.67 32.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 9.2 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = 10.3 45.4 cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Northfield Major Arterial Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' 1282-168-03 Inlet Calcs_Major Arterial.xlsm, Inlet 1 8/21/2018, 5:13 PM Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Monday, Mar 4 2019 24' Pitched Alley & Parking - Street Capacity at 0.50% Slope User-defined Invert Elev (ft) = 100.00 Slope (%) = 0.50 N-Value = 0.013 Calculations Compute by: Known Depth Known Depth (ft) = 0.54 (Sta, El, n)-(Sta, El, n)... ( 0.00, 100.54)-(23.00, 100.08, 0.013)-(24.00, 100.00, 0.013)-(25.00, 100.08, 0.013)-(40.00, 100.40, 0.013)-(41.00, 100.44, 0.013)-(41.50, 100.94, 0.013) Highlighted Depth (ft) = 0.54 Q (cfs) = 36.48 Area (sqft) = 10.91 Velocity (ft/s) = 3.34 Wetted Perim (ft) = 41.16 Crit Depth, Yc (ft) = 0.57 Top Width (ft) = 41.10 EGL (ft) = 0.71 -5 0 5 10 15 20 25 30 35 40 45 50 Elev (ft) Depth (ft) Section 99.75 -0.25 100.00 0.00 100.25 0.25 100.50 0.50 100.75 0.75 101.00 1.00 Sta (ft) *Max Alley 100-yr flow @ 70% of Capacity: 36.5 * .70 = 25.6 cfs * Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Monday, Mar 4 2019 26' Alley with Pan & 4in Rolled Curb - Street Capacity at 0.5% Slope User-defined Invert Elev (ft) = 100.00 Slope (%) = 0.50 N-Value = 0.013 Calculations Compute by: Known Depth Known Depth (ft) = 0.65 (Sta, El, n)-(Sta, El, n)... ( 0.00, 100.65)-(0.50, 100.32, 0.013)-(12.50, 100.08, 0.013)-(13.50, 100.00, 0.013)-(14.50, 100.08, 0.013)-(25.50, 100.32, 0.013)-(26.00, 100.65, 0.013) Highlighted Depth (ft) = 0.65 Q (cfs) = 55.62 Area (sqft) = 11.74 Velocity (ft/s) = 4.74 Wetted Perim (ft) = 26.21 Crit Depth, Yc (ft) = 0.65 Top Width (ft) = 26.00 EGL (ft) = 1.00 -5 0 5 10 15 20 25 30 35 Elev (ft) Depth (ft) Section 99.75 -0.25 100.00 0.00 100.25 0.25 100.50 0.50 100.75 0.75 101.00 1.00 Sta (ft) *Max Alley 100-yr flow @ 70% of Capacity: 55.6 * .70 = 38.9 cfs * Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Monday, Jun 24 2019 26' Alley with Pan & 4in Rolled Curb - Street Capacity at 2.07% Slope User-defined Invert Elev (ft) = 100.00 Slope (%) = 2.07 N-Value = 0.013 Calculations Compute by: Known Depth Known Depth (ft) = 0.65 (Sta, El, n)-(Sta, El, n)... ( 0.00, 100.65)-(0.50, 100.32, 0.013)-(12.50, 100.08, 0.013)-(13.50, 100.00, 0.013)-(14.50, 100.08, 0.013)-(25.50, 100.32, 0.013)-(26.00, 100.65, 0.013) Highlighted Depth (ft) = 0.65 Q (cfs) = 113.17 Area (sqft) = 11.74 Velocity (ft/s) = 9.64 Wetted Perim (ft) = 26.21 Crit Depth, Yc (ft) = 0.65 Top Width (ft) = 26.00 EGL (ft) = 2.10 -5 0 5 10 15 20 25 30 35 Elev (ft) Depth (ft) Section 99.75 -0.25 100.00 0.00 100.25 0.25 100.50 0.50 100.75 0.75 101.00 1.00 Sta (ft) *Max Alley 100-yr flow @ 70% of Capacity: 113.2 * .70 = 79.2 cfs Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Monday, Mar 4 2019 24' Alley with Pan & 4in Rolled Curb - Street Capacity at 0.5% Slope User-defined Invert Elev (ft) = 100.00 Slope (%) = 0.50 N-Value = 0.013 Calculations Compute by: Known Depth Known Depth (ft) = 0.63 (Sta, El, n)-(Sta, El, n)... ( 0.00, 100.63)-(0.50, 100.30, 0.013)-(11.50, 100.08, 0.013)-(12.50, 100.00, 0.013)-(13.50, 100.08, 0.013)-(24.50, 100.30, 0.013)-(25.00, 100.63, 0.013) Highlighted Depth (ft) = 0.63 Q (cfs) = 51.25 Area (sqft) = 11.00 Velocity (ft/s) = 4.66 Wetted Perim (ft) = 25.21 Crit Depth, Yc (ft) = 0.63 Top Width (ft) = 25.00 EGL (ft) = 0.97 -5 0 5 10 15 20 25 30 Elev (ft) Depth (ft) Section 99.75 -0.25 100.00 0.00 100.25 0.25 100.50 0.50 100.75 0.75 101.00 1.00 Sta (ft) *Max Alley 100-yr flow @ 70% of Capacity: 51.3 * .70 = 35.9 cfs * Northfield PROPOSED DRAINAGE SUMMARY Design Engineer: K. Brigman Design Firm: Highland Development Services Project Number: Date: INLET/STREET CAPACITY SUMMARY TABLE Minor Major Minor Major A1 A1 1.65 6.55 25.6 24' Pitched Private Drive @ S=0.5% No Basin Runoff to Sidewalk Chase, Flows to A3 A2 A2 0.51 1.94 79.2 26' Pvt Dr w/ 4" Rolled Curb @ S=2.07% No Basin Runoff to Sidewalk Chase, Flows to A3 A3 A3 2.70 12.78 9.4 Connector Local @ S=0.50% Yes 3.38 Basin Runoff A1+…+A3 4.86 21.27 9.4 Connector Local @ S=0.50% Yes 11.87 Basin Runoff A3 4.86 14.37 Sump Inlet (10' Type R) (DPs A1, A2, A3) 100-yr Flow Splits with A4 A4 A4 1.57 7.47 9.4 Connector Local @ S=0.50% No Basin Runoff A4 1.57 14.37 Sump Inlet (10' Type R) (DP A4) 100-yr Flow Splits with A3 A5 A5 0.89 3.45 38.9 26' Pvt Dr w/ 4" Rolled Curb @ S=0.50% No Basin Runoff, Flows to DP A6 A6 A6 2.67 11.34 35.9 24' Pvt Dr w/ 4" Rolled Curb @ S=0.50% No Basin Runoff A5+A6 3.55 14.79 35.9 24' Pvt Dr w/ 4" Rolled Curb @ S=0.50% No Sump Inlet (Double Type 13) (DPs A5, A6) A7 A7 1.13 5.25 9.4 Connector Local @ S=0.50% No Basin Runoff A8 A8 1.32 6.08 9.4 Connector Local @ S=0.50% No Basin Runoff A9 A9 1.04 5.26 9.4 Connector Local @ S=0.50% No Basin Runoff A7+…+A9 3.49 16.59 Sump Inlet/Sidewalk Chase (5' Opening) (DPs A7, A8, A9) A10 A10 2.65 11.57 38.9 26' Pvt Dr w/ 4" Rolled Curb @ S=0.50% No Basin Runoff A11 A11 1.24 5.07 60.8 26' Pvt Dr w/ 4" Rolled Curb @ S=1.22% No Basin Runoff A10+A11 3.90 16.64 38.9 26' Pvt Dr w/ 4" Rolled Curb @ S=0.50% No Sump Inlet (10' Type R) (DPs A10, A11) A13 A13 1.43 5.56 38.9 26' Pvt Dr w/ 4" Rolled Curb @ S=0.50% No Basin Runoff, Flows to DP A14 A14 A14 1.23 5.22 38.9 26' Pvt Dr w/ 4" Rolled Curb @ S=0.50% No Basin Runoff A13+A14 2.66 10.78 38.9 26' Pvt Dr w/ 4" Rolled Curb @ S=0.50% No Sump Inlet (Double Type 13) (DPs A13, A14) A15 A15 2.88 13.18 9.4 Connector Local @ S=0.50% Yes 3.78 Basin Runoff A15 2.88 9.39 Sump Inlet (5' Type R) (DP A15, 100-yr Flow Splits with A16) A16 A16 1.38 5.61 9.4 Connector Local @ S=0.50% No Basin Runoff A16 1.38 9.39 Sump Inlet (Type C) (DP A16, 100-yr Flow Splits with A15) A17 A17 0.49 2.19 n/a Sump (area) Inlet (Single Type 13) (DP A17) . B1 B1 2.19 9.68 n/a Basin Runoff to Sump (area) Inlet (Single Type 13) B2 B2 2.19 10.57 9.4 Connector Local @ S=0.50% Yes 1.17 Basin Runoff B2 1.99 9.33 Sump Inlet (5' Type R), 100-yr Flow splits with B3 B3 B3 1.79 8.09 9.4 Connector Local @ S=0.50% No Basin Runoff B3 1.99 9.33 Sump Inlet (5' Type R), 100-yr Flow splits with B2 B4 B4 2.82 11.65 38.9 26' Pvt Dr w/ 4" Rolled Curb @ S=0.50% No Basin Runoff to Sump Inlet (Double Type 13) B5 B5 1.31 5.02 38.9 26' Pvt Dr w/ 4" Rolled Curb @ S=0.50% No Basin Runoff, Flows to DP B6 B6 B6 1.22 5.17 35.9 24' Pvt Dr w/ 4" Rolled Curb @ S=0.50% No Basin Runoff B5+B6 2.54 10.19 38.9 26' Pvt Dr w/ 4" Rolled Curb @ S=0.50% No Sump Inlet (Double Type 13), (DPs B5 & B6) B7 B7 0.65 2.64 38.9 26' Pvt Dr w/ 4" Rolled Curb @ S=0.50% No Basin Runoff Curb Cut & Sidewalk Chase, Flows into Pond B3 B8 B8 2.12 3.98 38.9 26' Pvt Dr w/ 4" Rolled Curb @ S=0.50% No Basin Runoff to Sump Inlet (Single Type 13) B10 B10 0.92 4.13 9.4 Connector Local @ S=0.50% No Basin Runoff B10 2.56 12.24 Sump Inlet (10' Type R), 100-yr Flow splits with B11 B11 B11 4.21 20.35 9.4 Connector Local @ S=0.50% Yes 10.95 Basin Runoff B11 2.56 12.24 Sump Inlet (10' Type R), 100-yr Flow splits with B10 B13 B13 0.95 3.81 35.9 24' Pvt Dr w/ 4" Rolled Curb @ S=0.50% No Basin Runoff, Flows to DP B15 B14 B14 0.87 3.59 35.9 24' Pvt Dr w/ 4" Rolled Curb @ S=0.50% No Basin Runoff, Flows to DP B15 B15 B15 1.96 8.31 47.0 26' Pvt Dr w/ 4" Rolled Curb @ S=0.73% No Basin Runoff B16 B16 1.40 5.38 35.9 24' Pvt Dr w/ 4" Rolled Curb @ S=0.50% No Basin Runoff, Flows to DP B17 B17 B17 0.83 3.53 38.9 26' Pvt Dr w/ 4" Rolled Curb @ S=0.50% No Basin Runoff B13+…+B17 6.01 24.62 47.0 26' Pvt Dr w/ 4" Rolled Curb @ S=0.73% No Sump Inlet (Quad Type 13) (DPs B13-B17) B18 B18 0.72 3.43 0.69 2.52 0.67 2.34 0.05 1.09 19.9 Connector Local w Median @ S=2.54% No On-Grade Inlet (5' Type R), Flow-by to DP E7 B19 B19 0.74 3.57 0.74 2.57 0.74 2.38 0.00 1.19 19.9 Connector Local w Median @ S=2.54% No On-Grade Inlet (5' Type R), Flow-by to DP E7 C1 C1 1.41 6.48 n/a Basin Runoff to Culvert C2 C2 0.09 0.42 n/a Basin Runoff to Sump Inlet (Type C) C3 C3 1.39 6.66 9.4 Connector Local @ S=0.50% No Sump Inlet (10' Type R), (DP C3) C4 C4 0.51 2.30 9.4 Connector Local @ S=0.50% No Sump Inlet (5' Type R), (DP C4) D1 D1 1.43 5.75 8.0 24' Pvt Dr @ S=0.5%, 3% Cross Slope No Basin Runoff, Flows to DP D3 D2 D2 1.58 6.50 8.0 24' Pvt Dr @ S=0.5%, 3% Cross Slope No Basin Runoff, Flows to DP D3 D3 D3 1.10 5.04 n/a Basin Runoff D1+…+D3 4.12 17.29 D4 D4 0.30 1.42 n/a Basin Runoff to Sump (area) Inlet (Single Type 13) D1+…+D4 4.42 18.72 Sump (area) Inlet (Double Type 13) (DPs D1, D2, D3, D4) D5 D5 0.61 2.85 n/a Basin Runoff to Sump (area) Inlet (Single Type 13) D6 D6 0.20 0.94 0.20 0.94 0.20 0.94 0.00 0.00 15.7 Connector Local @ S=1.43% No Basin Runoff to On-Grade Inlet (5' Type R) D7 D7 0.20 0.87 0.20 0.87 0.20 0.87 0.00 0.00 15.7 Connector Local @ S=1.43% No Basin Runoff to On-Grade Inlet (5' Type R) D8 D8 1.68 7.15 8.0 24' Pvt Dr @ S=0.5%, 3% Cross Slope No Basin Runoff, Flows to DP D9 D9 D9 0.79 3.67 n/a Basin Runoff to Culvert D10 D10 0.28 1.30 n/a Basin Runoff D11 D11 1.17 5.42 n/a Basin Runoff D12 D12 1.81 7.37 8.0 24' Pvt Dr @ S=0.5%, 3% Cross Slope No Basin Runoff, Flows to DP D11 D8+…D12 5.74 24.90 Sum of Flows Entering Rain Garden (Sidewalk Culvert) D13 D13 0.24 1.06 n/a RG Basin Runoff D8+…+D13 5.97 25.96 Total Q in RG E1 E1 1.01 4.62 11.8 Major Arterial @ S=0.65% No Basin Runoff to Sump Inlet (Single combo) E2 E2 1.43 6.32 11.8 Major Arterial @ S=0.65% No Basin Runoff to Sump Inlet (Sinlge combo) E3 E3 2.50 10.42 2.70 9.83 2.51 8.13 -0.01 2.29 11.8 Major Arterial @ S=0.65% No On-Grade Inlet (Triple Combo), Flow-by to DP E5 E4 E4 2.66 12.05 2.87 11.15 2.65 9.13 0.01 2.92 11.8 Major Arterial @ S=0.65% Yes 0.25 On-Grade Inlet (Triple Combo), Flow-by to DP E7 E5 E5 1.16 5.28 11.8 Major Arterial @ S=0.65% No Basin Runoff E6 E6 1.13 5.15 10.3 Major Arterial @ S=0.50% No Basin Runoff E5+…+E3 2.29 12.72 Sump Inlet (Double Combo) (DPs E5, E6, with Flow-by from E3) E7 E7 1.31 6.19 11.8 Major Arterial @ S=0.65% No Basin Runoff E8 E8 0.97 4.58 10.3 Major Arterial @ S=0.50% No Basin Runoff E7+...+B3 2.35 15.96 Sump Inlet (Double Combo) (DPs E7, E8, with Flow-by from E4, B2, B3) E9 E9 0.89 3.58 10.3 Major Arterial @ S=0.50% No Basin Runoff to Sump Inlet (5' Type R) (DP E9) E10 E10 0.80 3.24 9.4 Connector Local @ S=0.50% No Basin Runoff to Sump Inlet (5' Type R) (DP E10) 18-1000-00 Rational Calcs (FC).xlsx Page 2 of 2 Highland Development Services Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 19.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.015 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 18.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 5.8 10.5 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Northfield Inlet A01 (Design Point A15) 18-1000-00 UD-Inlet_v4.05.xlsm, A15 6/25/2019, 10:43 AM Design Information (Input) MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above) alocal = 3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = 5.8 10.5 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = N/A N/A feet Width of a Unit Grate Wo = N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67 Grate Flow Analysis (Calculated) MINOR MAJOR Clogging Coefficient for Multiple Units Coef = N/A N/A Clogging Factor for Multiple Units Clog = N/A N/A Grate Capacity as a Weir (based on Modified HEC22 Method) MINOR MAJOR Interception without Clogging Qwi = N/A N/A cfs Interception with Clogging Qwa = N/A N/A cfs Grate Capacity as a Orifice (based on Modified HEC22 Method) MINOR MAJOR Interception without Clogging Qoi = N/A N/A cfs Interception with Clogging Qoa = N/A N/A cfs Grate Capacity as Mixed Flow MINOR MAJOR Interception without Clogging Qmi = N/A N/A cfs Interception with Clogging Qma = N/A N/A cfs Resulting Grate Capacity (assumes clogged condition) QGrate = N/A N/A cfs Curb Opening Flow Analysis (Calculated) MINOR MAJOR Clogging Coefficient for Multiple Units Coef = 1.00 1.00 Clogging Factor for Multiple Units Clog = 0.10 0.10 Curb Opening as a Weir (based on Modified HEC22 Method) MINOR MAJOR Interception without Clogging Qwi Northfield Inlet Flow Calculation for Area Inlets Design Engineer: Design Firm: Project Number: Date: Objective: to find the number of grates required for area inlets in grassy areas Geometry at inlet : Width (W): 1.87 feet Length (L): 3.27 feet Opening Ratio (R): 0.6 sq ft/sq ft Reduction Factor (F): 50% Grate Flow: See Hydraulic Design Handbook by McGraw-Hill for verificaiton of equation use and C value C = Orifice discharge coefficient= 0.67 A = Orifice area (ft2) - open area of grate g = gravitational constant = 32.2 ft/s2 H = head on grate centroid, ponding depth (feet) Then multiply by the reduction factor for the allowable capacity. Inlet A03 (DP A17) Q = 2.19 cfs H = 2.7 ft Single Type 13 Inlet Double Type 13 Inlet Triple Type 13 Inlet A = W*L*R A = 2*W*L*R A = 3*W*L*R = 3.67 ft2 = 7.34 ft2 = 11.01 ft2 Qi = C*A*SQRT(2*g*H) Qi = C*A*SQRT(2*g*H) Qi = C*A*SQRT(2*g*H) = 32.41 cfs = 64.83 cfs = 97.24 cfs QG = Qi * F QG = Qi * F QG = Qi * F = 16.21 cfs = 32.41 cfs = 48.62 cfs USE : Single Type 13 Inlet Grate Dimensions and information: K. Brigman Highland Development Services 18-1000-00 June 24, 2019 WSEL �� = CA 2�� �� � �� �1 � �� Page1 Northfield Inlet Flow Calculation for Area Inlets Design Engineer: Design Firm: Project Number: Date: Objective: to find the number of grates required for area inlets Geometry at inlet : Width (W): 1.87 feet Length (L): 3.27 feet Opening Ratio (R): 0.6 sq ft/sq ft Reduction Factor (F): 50% Grate Flow: See Hydraulic Design Handbook by McGraw-Hill for verificaiton of equation use and C value C = Orifice discharge coefficient= 0.67 A = Orifice area (ft2) - open area of grate g = gravitational constant = 32.2 ft/s2 H = head on grate centroid, ponding depth (feet) Then multiply by the reduction factor for the allowable capacity. Inlet A04 (Design Point A14) Q = 10.78 cfs H = 0.57 ft *Depth of flow in 26' alley with 4" curb at 70% max 100-yr Q Single Type 13 Inlet Double Type 13 Inlet Triple Type 13 Inlet A = W*L*R A = 2*W*L*R A = 3*W*L*R = 3.67 ft2 = 7.34 ft2 = 11.01 ft2 Qi = C*A*SQRT(2*g*H) Qi = C*A*SQRT(2*g*H) Qi = C*A*SQRT(2*g*H) = 14.89 cfs = 29.79 cfs = 44.68 cfs QG = Qi * F QG = Qi * F QG = Qi * F = 7.45 cfs = 14.89 cfs = 22.34 cfs USE : Double Type 13 Inlet K. Brigman Highland Development Services 18-1000-00 June 24, 2019 Grate Dimensions and information: WSEL �� = CA 2�� �� � �� �1 � �� Page1 Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 19.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.015 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 18.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 5.8 10.5 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Northfield Inlets A05 & A07 (Design Points A3 & A4) 18-1000-00 UD-Inlet_v4.05.xlsm, A3 & A4 6/25/2019, 10:37 AM Design Information (Input) MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above) alocal = 3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 2 2 Water Depth at Flowline (outside of local depression) Ponding Depth = 5.8 10.5 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = N/A N/A feet Width of a Unit Grate Wo = N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67 Grate Flow Analysis (Calculated) MINOR MAJOR Clogging Coefficient for Multiple Units Coef = N/A N/A Clogging Factor for Multiple Units Clog = N/A N/A Grate Capacity as a Weir (based on Modified HEC22 Method) MINOR MAJOR Interception without Clogging Qwi = N/A N/A cfs Interception with Clogging Qwa = N/A N/A cfs Grate Capacity as a Orifice (based on Modified HEC22 Method) MINOR MAJOR Interception without Clogging Qoi = N/A N/A cfs Interception with Clogging Qoa = N/A N/A cfs Grate Capacity as Mixed Flow MINOR MAJOR Interception without Clogging Qmi = N/A N/A cfs Interception with Clogging Qma = N/A N/A cfs Resulting Grate Capacity (assumes clogged condition) QGrate = N/A N/A cfs Curb Opening Flow Analysis (Calculated) MINOR MAJOR Clogging Coefficient for Multiple Units Coef = 1.25 1.25 Clogging Factor for Multiple Units Clog = 0.06 0.06 Curb Opening as a Weir (based on Modified HEC22 Method) MINOR MAJOR Interception without Clogging Qwi Northfield Inlet Flow Calculation for Area Inlets Design Engineer: Design Firm: Project Number: Date: Objective: to find the number of grates required for area inlets Geometry at inlet : Width (W): 1.87 feet Length (L): 3.27 feet Opening Ratio (R): 0.6 sq ft/sq ft Reduction Factor (F): 50% Grate Flow: See Hydraulic Design Handbook by McGraw-Hill for verificaiton of equation use and C value C = Orifice discharge coefficient= 0.67 A = Orifice area (ft2) - open area of grate g = gravitational constant = 32.2 ft/s2 H = head on grate centroid, ponding depth (feet) Then multiply by the reduction factor for the allowable capacity. Inlet A06 (DP A6) Q = 14.79 cfs H = 0.57 ft *Depth of flow in 26' alley with 4" curb at 70% max 100-yr Q Single Type 13 Inlet Double Type 13 Inlet Triple Type 13 Inlet A = W*L*R A = 2*W*L*R A = 3*W*L*R = 3.67 ft2 = 7.34 ft2 = 11.01 ft2 Qi = C*A*SQRT(2*g*H) Qi = C*A*SQRT(2*g*H) Qi = C*A*SQRT(2*g*H) = 14.89 cfs = 29.79 cfs = 44.68 cfs QG = Qi * F QG = Qi * F QG = Qi * F = 7.45 cfs = 14.89 cfs = 22.34 cfs USE : Double Type 13 Inlet K. Brigman Highland Development Services 18-1000-00 June 24, 2019 Grate Dimensions and information: WSEL �� = CA 2�� �� � �� �1 � �� Page1 Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 43.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.011 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.011 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 43.0 43.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Northfield Inlet A08 (Design Point A10&A11) 18-1000-00 UD-Inlet_v4.05.xlsm, A10&A11 6/25/2019, 10:40 AM Design Information (Input) MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above) alocal = 3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 2 2 Water Depth at Flowline (outside of local depression) Ponding Depth = 4.5 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = N/A N/A feet Width of a Unit Grate Wo = N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67 Low Head Performance Reduction (Calculated) MINOR MAJOR Depth for Grate Midwidth dGrate = N/A N/A ft Depth for Curb Opening Weir Equation dCurb = 0.35 0.48 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination = 0.42 0.57 Curb Opening Performance Reduction Factor for Long Inlets RFCurb = 0.83 0.93 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate = N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Qa = 9.9 16.8 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK) Q PEAK REQUIRED = 3.9 16.6 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION Version 4.05 Released March 2017 H-Vert H-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 18-1000-00 UD-Inlet_v4.05.xlsm, A10&A11 6/25/2019, 10:40 AM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 19.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.015 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 18.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 5.8 10.5 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Northfield B01 & B03 (Design Points B2 & B3) 18-1000-00 UD-Inlet_v4.05.xlsm, B2&B3 6/25/2019, 10:59 AM Design Information (Input) MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above) alocal = 3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = 5.8 10.5 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = N/A N/A feet Width of a Unit Grate Wo = N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67 Low Head Performance Reduction (Calculated) MINOR MAJOR Depth for Grate Midwidth dGrate = N/A N/A ft Depth for Curb Opening Weir Equation dCurb = 0.32 0.71 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination = 0.74 1.00 Curb Opening Performance Reduction Factor for Long Inlets RFCurb = 1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate = N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Qa = 5.0 11.5 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK) Q PEAK REQUIRED = 2.0 9.3 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION Version 4.05 Released March 2017 H-Vert H-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 18-1000-00 UD-Inlet_v4.05.xlsm, B2&B3 6/25/2019, 10:59 AM Northfield Inlet Flow Calculation for Area Inlets Design Engineer: Design Firm: Project Number: Date: Objective: to find the number of grates required for area inlets Geometry at inlet : Width (W): 1.87 feet Length (L): 3.27 feet Opening Ratio (R): 0.6 sq ft/sq ft Reduction Factor (F): 50% Grate Flow: See Hydraulic Design Handbook by McGraw-Hill for verificaiton of equation use and C value C = Orifice discharge coefficient= 0.67 A = Orifice area (ft2) - open area of grate g = gravitational constant = 32.2 ft/s2 H = head on grate centroid, ponding depth (feet) Then multiply by the reduction factor for the allowable capacity. Inlet B02 (DP B4) Q = 11.65 cfs H = 0.57 ft *Depth of flow in 26' alley with 4" curb at 70% max 100-yr Q Single Type 13 Inlet Double Type 13 Inlet Triple Type 13 Inlet A = W*L*R A = 2*W*L*R A = 3*W*L*R = 3.67 ft2 = 7.34 ft2 = 11.01 ft2 Qi = C*A*SQRT(2*g*H) Qi = C*A*SQRT(2*g*H) Qi = C*A*SQRT(2*g*H) = 14.89 cfs = 29.79 cfs = 44.68 cfs QG = Qi * F QG = Qi * F QG = Qi * F = 7.45 cfs = 14.89 cfs = 22.34 cfs USE : Double Type 13 Inlet K. Brigman Highland Development Services 18-1000-00 March 6, 2019 Grate Dimensions and information: WSEL �� = CA 2�� �� � �� �1 � �� Page1 Northfield Inlet Flow Calculation for Area Inlets Design Engineer: Design Firm: Project Number: Date: Objective: to find the number of grates required for area inlets in grassy areas Geometry at inlet : Width (W): 1.87 feet Length (L): 3.27 feet Opening Ratio (R): 0.6 sq ft/sq ft Reduction Factor (F): 50% Grate Flow: See Hydraulic Design Handbook by McGraw-Hill for verificaiton of equation use and C value C = Orifice discharge coefficient= 0.67 A = Orifice area (ft2) - open area of grate g = gravitational constant = 32.2 ft/s2 H = head on grate centroid, ponding depth (feet) Then multiply by the reduction factor for the allowable capacity. Inlet B04 (DP B1) Q = 9.68 cfs H = 2.3 ft Single Type 13 Inlet Double Type 13 Inlet Triple Type 13 Inlet A = W*L*R A = 2*W*L*R A = 3*W*L*R = 3.67 ft2 = 7.34 ft2 = 11.01 ft2 Qi = C*A*SQRT(2*g*H) Qi = C*A*SQRT(2*g*H) Qi = C*A*SQRT(2*g*H) = 29.92 cfs = 59.83 cfs = 89.75 cfs QG = Qi * F QG = Qi * F QG = Qi * F = 14.96 cfs = 29.92 cfs = 44.88 cfs USE : Single Type 13 Inlet K. Brigman Highland Development Services 18-1000-00 June 24, 2019 Grate Dimensions and information: WSEL �� = CA 2�� �� � �� �1 � �� Page1 Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 19.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.015 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 18.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 5.8 10.5 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Northfield B05 & B06 (Design Points B10 & B11) 18-1000-00 UD-Inlet_v4.05.xlsm, B10&B11 6/25/2019, 11:07 AM Design Information (Input) MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above) alocal = 3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 2 2 Water Depth at Flowline (outside of local depression) Ponding Depth = 5.8 10.5 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = N/A N/A feet Width of a Unit Grate Wo = N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67 Low Head Performance Reduction (Calculated) MINOR MAJOR Depth for Grate Midwidth dGrate = N/A N/A ft Depth for Curb Opening Weir Equation dCurb = 0.32 0.71 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination = 0.55 0.99 Curb Opening Performance Reduction Factor for Long Inlets RFCurb = 0.92 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate = N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Qa = 9.6 23.9 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK) Q PEAK REQUIRED = 2.6 12.2 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION Version 4.05 Released March 2017 H-Vert H-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 18-1000-00 UD-Inlet_v4.05.xlsm, B10&B11 6/25/2019, 11:07 AM Northfield Inlet Flow Calculation for Area Inlets Design Engineer: Design Firm: Project Number: Date: Objective: to find the number of grates required for area inlets in grassy areas Geometry at inlet : Width (W): 1.87 feet Length (L): 3.27 feet Opening Ratio (R): 0.6 sq ft/sq ft Reduction Factor (F): 50% Grate Flow: See Hydraulic Design Handbook by McGraw-Hill for verificaiton of equation use and C value C = Orifice discharge coefficient= 0.67 A = Orifice area (ft2) - open area of grate g = gravitational constant = 32.2 ft/s2 H = head on grate centroid, ponding depth (feet) Then multiply by the reduction factor for the allowable capacity. Inlet B07 (DP B6) Q = 10.2 cfs H = 0.57 ft *Depth of flow in 26' alley with 4" curb at 70% max 100-yr Q Single Type 13 Inlet Double Type 13 Inlet Triple Type 13 Inlet A = W*L*R A = 2*W*L*R A = 3*W*L*R = 3.67 ft2 = 7.34 ft2 = 11.01 ft2 Qi = C*A*SQRT(2*g*H) Qi = C*A*SQRT(2*g*H) Qi = C*A*SQRT(2*g*H) = 14.89 cfs = 29.79 cfs = 44.68 cfs QG = Qi * F QG = Qi * F QG = Qi * F = 7.45 cfs = 14.89 cfs = 22.34 cfs USE : Double Type 13 Inlet K. Brigman Highland Development Services 18-1000-00 March 6, 2019 Grate Dimensions and information: WSEL �� = CA 2�� �� � �� �1 � �� Page1 Northfield Inlet Flow Calculation for Area Inlets Design Engineer: Design Firm: Project Number: Date: Objective: to find the number of grates required for area inlets in grassy areas Geometry at inlet : Width (W): 1.87 feet Length (L): 3.27 feet Opening Ratio (R): 0.6 sq ft/sq ft Reduction Factor (F): 50% Grate Flow: See Hydraulic Design Handbook by McGraw-Hill for verificaiton of equation use and C value C = Orifice discharge coefficient= 0.67 A = Orifice area (ft 2 ) - open area of grate g = gravitational constant = 32.2 ft/s 2 H = head on grate centroid, ponding depth (feet) Then multiply by the reduction factor for the allowable capacity. Inlet B08 (DP B17) Q = 24.62 cfs H = 0.57 ft *Depth of flow in 26' alley with 4" curb at 70% max 100-yr Q Single Type 13 Inlet Double Type 13 Inlet Triple Type 13 Inlet Quad Type 13 Inlet A = W*L*R A = 2*W*L*R A = 3*W*L*R A = 4*W*L*R = 3.67 ft 2 = 7.34 ft 2 = 11.01 ft 2 = 14.68 ft 2 Qi = C*A*SQRT(2*g*H) Qi = C*A*SQRT(2*g*H) Qi = C*A*SQRT(2*g*H) Qi = C*A*SQRT(2*g*H) = 14.89 cfs = 29.79 cfs = 44.68 cfs = 59.57 cfs QG = Qi * F QG = Qi * F QG = Qi * F QG = Qi * F = 7.45 cfs = 14.89 cfs = 22.34 cfs = 29.79 cfs USE : Quad Type 13 Inlet K. Brigman Highland Development Services 18-1000-00 June 24, 2019 Grate Dimensions and information: WSEL �� = CA 2�� Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 0.8 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.015 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 19.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.025 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 19.0 19.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 6.1 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = 19.9 19.9 cfs Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Northfield B09 (Design Point B18) 18-1000-00 UD-Inlet_v4.05.xlsm, B18 6/25/2019, 11:14 AM Design Information (Input) MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a') aLOCAL = 3.0 3.0 inches Total Number of Units in the Inlet (Grate or Curb Opening) No = 1 1 Length of a Single Unit Inlet (Grate or Curb Opening) Lo = 5.00 5.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width) Wo = N/A N/A ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5) Cf-G = N/A N/A Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1) Cf-C = 0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity' MINOR MAJOR Design Discharge for Half of Street (from Sheet Inlet Management ) Qo = 0.7 3.4 cfs Water Spread Width T = 2.1 8.1 ft Water Depth at Flowline (outside of local depression) d = 2.1 3.5 inches Water Depth at Street Crown (or at TMAX) dCROWN = 0.0 0.0 inches Ratio of Gutter Flow to Design Flow Eo = 0.000 0.682 Discharge outside the Gutter Section W, carried in Section Tx Qx = 0.0 1.1 cfs Discharge within the Gutter Section W Qw = 0.0 2.3 cfs Discharge Behind the Curb Face QBACK = 0.0 0.0 cfs Flow Area within the Gutter Section W AW = 0.19 0.41 sq ft Velocity within the Gutter Section W VW = 0.0 5.7 fps Water Depth for Design Condition dLOCAL = 5.1 6.5 inches Grate Analysis (Calculated) MINOR MAJOR Total Length of Inlet Grate Opening L = N/A N/A ft Ratio of Grate Flow to Design Flow Eo-GRATE = N/A N/A Under No-Clogging Condition MINOR MAJOR Minimum Velocity Where Grate Splash-Over Begins Vo = N/A N/A fps Interception Rate of Frontal Flow Rf = N/A N/A Interception Rate of Side Flow Rx = N/A N/A Interception Capacity Qi = N/A N/A cfs Under Clogging Condition MINOR MAJOR Clogging Coefficient for Multiple-unit Grate Inlet GrateCoef = N/A N/A Clogging Factor for Multiple-unit Grate Inlet GrateClog = N/A N/A Effective (unclogged) Length of Multiple-unit Grate Inlet Le = N/A N/A ft Minimum Velocity Where Grate Splash-Over Begins Vo = N/A N/A fps Interception Rate of Frontal Flow Rf = N/A N/A Interception Rate of Side Flow Rx = N/A N/A Actual Interception Capacity Qa = N/A N/A cfs Carry-Over Flow = Qo-Qa (to be applied to curb opening or next d/s inlet) Qb = N/A N/A cfs Curb or Slotted Inlet Opening Analysis (Calculated) MINOR MAJOR Equivalent Slope Se (based on grate carry-over) Se = 0.084 0.148 ft/ft Required Length LT to Have 100% Interception LT = 5.53 9.57 ft Under No-Clogging Condition MINOR MAJOR Effective Length of Curb Opening or Slotted Inlet (minimum of L, LT) L = 5.00 5.00 ft Interception Capacity Qi = 0.69 2.52 cfs Under Clogging Condition MINOR MAJOR Clogging Coefficient CurbCoef = 1.00 1.00 Clogging Factor for Multiple-unit Curb Opening or Slotted Inlet CurbClog = 0.10 0.10 Effective (Unclogged) Length Le = 4.50 4.50 ft Actual Interception Capacity Qa = 0.67 2.34 cfs Carry-Over Flow = Qb(GRATE)-Qa Qb = 0.03 1.09 cfs Summary MINOR MAJOR Total Inlet Interception Capacity Q = 0.67 2.34 cfs Total Inlet Carry-Over Flow (flow bypassing inlet) Qb = 0.03 1.09 cfs Capture Percentage = Qa/Qo = C% = 95 68 % INLET ON A CONTINUOUS GRADE Version 4.05 Released March 2017 CDOT Type R Curb Opening CDOT Type R Curb Opening 18-1000-00 UD-Inlet_v4.05.xlsm, B18 6/25/2019, 11:14 AM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 19.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.015 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 18.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.023 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 5.8 10.5 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = 19.8 98.4 cfs Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Northfield B10 (Design Point B19) 18-1000-00 UD-Inlet_v4.05.xlsm, B19 6/25/2019, 11:15 AM Design Information (Input) MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a') aLOCAL = 3.0 3.0 inches Total Number of Units in the Inlet (Grate or Curb Opening) No = 1 1 Length of a Single Unit Inlet (Grate or Curb Opening) Lo = 5.00 5.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width) Wo = N/A N/A ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5) Cf-G = N/A N/A Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1) Cf-C = 0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity' MINOR MAJOR Design Discharge for Half of Street (from Sheet Inlet Management ) Qo = 0.7 3.6 cfs Water Spread Width T = 2.2 8.5 ft Water Depth at Flowline (outside of local depression) d = 2.0 3.6 inches Water Depth at Street Crown (or at TMAX) dCROWN = 0.0 0.0 inches Ratio of Gutter Flow to Design Flow Eo = 1.009 0.658 Discharge outside the Gutter Section W, carried in Section Tx Qx = 0.0 1.2 cfs Discharge within the Gutter Section W Qw = 0.7 2.3 cfs Discharge Behind the Curb Face QBACK = 0.0 0.0 cfs Flow Area within the Gutter Section W AW = 0.17 0.43 sq ft Velocity within the Gutter Section W VW = 4.3 5.5 fps Water Depth for Design Condition dLOCAL = 5.0 6.6 inches Grate Analysis (Calculated) MINOR MAJOR Total Length of Inlet Grate Opening L = N/A N/A ft Ratio of Grate Flow to Design Flow Eo-GRATE = N/A N/A Under No-Clogging Condition MINOR MAJOR Minimum Velocity Where Grate Splash-Over Begins Vo = N/A N/A fps Interception Rate of Frontal Flow Rf = N/A N/A Interception Rate of Side Flow Rx = N/A N/A Interception Capacity Qi = N/A N/A cfs Under Clogging Condition MINOR MAJOR Clogging Coefficient for Multiple-unit Grate Inlet GrateCoef = N/A N/A Clogging Factor for Multiple-unit Grate Inlet GrateClog = N/A N/A Effective (unclogged) Length of Multiple-unit Grate Inlet Le = N/A N/A ft Minimum Velocity Where Grate Splash-Over Begins Vo = N/A N/A fps Interception Rate of Frontal Flow Rf = N/A N/A Interception Rate of Side Flow Rx = N/A N/A Actual Interception Capacity Qa = N/A N/A cfs Carry-Over Flow = Qo-Qa (to be applied to curb opening or next d/s inlet) Qb = N/A N/A cfs Curb or Slotted Inlet Opening Analysis (Calculated) MINOR MAJOR Equivalent Slope Se (based on grate carry-over) Se = 0.208 0.144 ft/ft Required Length LT to Have 100% Interception LT = 3.72 9.84 ft Under No-Clogging Condition MINOR MAJOR Effective Length of Curb Opening or Slotted Inlet (minimum of L, LT) L = 3.72 5.00 ft Interception Capacity Qi = 0.74 2.57 cfs Under Clogging Condition MINOR MAJOR Clogging Coefficient CurbCoef = 1.00 1.00 Clogging Factor for Multiple-unit Curb Opening or Slotted Inlet CurbClog = 0.10 0.10 Effective (Unclogged) Length Le = 4.50 4.50 ft Actual Interception Capacity Qa = 0.74 2.38 cfs Carry-Over Flow = Qb(GRATE)-Qa Qb = 0.00 1.19 cfs Summary MINOR MAJOR Total Inlet Interception Capacity Q = 0.74 2.38 cfs Total Inlet Carry-Over Flow (flow bypassing inlet) Qb = 0.00 1.19 cfs Capture Percentage = Qa/Qo = C% = 100 67 % INLET ON A CONTINUOUS GRADE Version 4.05 Released March 2017 CDOT Type R Curb Opening CDOT Type R Curb Opening 18-1000-00 UD-Inlet_v4.05.xlsm, B19 6/25/2019, 11:15 AM Northfield Inlet Flow Calculation for Area Inlets Design Engineer: Design Firm: Project Number: Date: Objective: to find the number of grates required for area inlets in grassy areas Geometry at inlet : Width (W): 1.87 feet Length (L): 3.27 feet Opening Ratio (R): 0.6 sq ft/sq ft Reduction Factor (F): 50% Grate Flow: See Hydraulic Design Handbook by McGraw-Hill for verificaiton of equation use and C value C = Orifice discharge coefficient= 0.67 A = Orifice area (ft2) - open area of grate g = gravitational constant = 32.2 ft/s2 H = head on grate centroid, ponding depth (feet) Then multiply by the reduction factor for the allowable capacity. Inlet B11 (DP B8) Q = 4 cfs H = 0.24 ft Single Type 13 Inlet Double Type 13 Inlet Triple Type 13 Inlet A = W*L*R A = 2*W*L*R A = 3*W*L*R = 3.67 ft2 = 7.34 ft2 = 11.01 ft2 Qi = C*A*SQRT(2*g*H) Qi = C*A*SQRT(2*g*H) Qi = C*A*SQRT(2*g*H) = 9.66 cfs = 19.33 cfs = 28.99 cfs QG = Qi * F QG = Qi * F QG = Qi * F = 4.83 cfs = 9.66 cfs = 14.50 cfs USE : Single Type 13 Inlet K. Brigman Highland Development Services 18-1000-00 June 24, 2019 Grate Dimensions and information: WSEL �� = CA 2�� �� � �� �1 � �� Page1 Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 19.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.015 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 18.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 5.8 10.5 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Northfield Inlet C02 (Design Point C3) 18-1000-00 UD-Inlet_v4.05.xlsm, C3 6/25/2019, 11:20 AM Design Information (Input) MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above) alocal = 3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 2 2 Water Depth at Flowline (outside of local depression) Ponding Depth = 5.8 5.8 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = N/A N/A feet Width of a Unit Grate Wo = N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67 Low Head Performance Reduction (Calculated) MINOR MAJOR Depth for Grate Midwidth dGrate = N/A N/A ft Depth for Curb Opening Weir Equation dCurb = 0.32 0.32 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination = 0.55 0.55 Curb Opening Performance Reduction Factor for Long Inlets RFCurb = 0.92 0.92 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate = N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Qa = 9.6 9.7 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK) Q PEAK REQUIRED = 1.4 6.7 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION Version 4.05 Released March 2017 H-Vert H-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 18-1000-00 UD-Inlet_v4.05.xlsm, C3 6/25/2019, 11:20 AM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 19.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.015 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 18.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 5.8 10.5 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Northfield Inlet C03 (Design Point C4) 18-1000-00 UD-Inlet_v4.05.xlsm, C4 6/25/2019, 11:21 AM Design Information (Input) MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above) alocal = inches Number of Unit Inlets (Grate or Curb Opening) No = Water Depth at Flowline (outside of local depression) Ponding Depth = inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = feet Width of a Unit Grate Wo = feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = feet Height of Vertical Curb Opening in Inches Hvert = inches Height of Curb Orifice Throat in Inches Hthroat = inches Angle of Throat (see USDCM Figure ST-5) Theta = degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = Low Head Performance Reduction (Calculated) MINOR MAJOR Depth for Grate Midwidth dGrate = N/A N/A ft Depth for Curb Opening Weir Equation dCurb = N/A N/A ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination = N/A N/A Curb Opening Performance Reduction Factor for Long Inlets RFCurb = N/A N/A Grated Inlet Performance Reduction Factor for Long Inlets RFGrate = N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Qa = cfs Q PEAK REQUIRED = cfs INLET IN A SUMP OR SAG LOCATION Version 4.05 Released March 2017 H-Vert H-Curb W Lo (C) Lo (G) Wo WP Override Depths 18-1000-00 UD-Inlet_v4.05.xlsm, C4 6/25/2019, 11:21 AM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 19.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.015 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 18.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.014 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 5.8 10.5 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = 15.7 103.7 cfs Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Northfield D01 (Design Point D7) 18-1000-00 UD-Inlet_v4.05, D7 3/14/2019, 10:57 AM Design Information (Input) MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a') aLOCAL = 3.0 3.0 inches Total Number of Units in the Inlet (Grate or Curb Opening) No = 1 1 Length of a Single Unit Inlet (Grate or Curb Opening) Lo = 5.00 5.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width) Wo = N/A N/A ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5) Cf-G = N/A N/A Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1) Cf-C = 0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity' MINOR MAJOR Design Discharge for Half of Street (from Sheet Inlet Management ) Qo = 0.2 0.9 cfs Water Spread Width T = 1.5 4.2 ft Water Depth at Flowline (outside of local depression) d = 1.5 2.5 inches Water Depth at Street Crown (or at TMAX) dCROWN = 0.0 0.0 inches Ratio of Gutter Flow to Design Flow Eo = 1.003 0.942 Discharge outside the Gutter Section W, carried in Section Tx Qx = 0.0 0.1 cfs Discharge within the Gutter Section W Qw = 0.2 0.8 cfs Discharge Behind the Curb Face QBACK = 0.0 0.0 cfs Flow Area within the Gutter Section W AW = 0.08 0.25 sq ft Velocity within the Gutter Section W VW = 2.5 3.2 fps Water Depth for Design Condition dLOCAL = 4.5 5.5 inches Grate Analysis (Calculated) MINOR MAJOR Total Length of Inlet Grate Opening L = N/A N/A ft Ratio of Grate Flow to Design Flow Eo-GRATE = N/A N/A Under No-Clogging Condition MINOR MAJOR Minimum Velocity Where Grate Splash-Over Begins Vo = N/A N/A fps Interception Rate of Frontal Flow Rf = N/A N/A Interception Rate of Side Flow Rx = N/A N/A Interception Capacity Qi = N/A N/A cfs Under Clogging Condition MINOR MAJOR Clogging Coefficient for Multiple-unit Grate Inlet GrateCoef = N/A N/A Clogging Factor for Multiple-unit Grate Inlet GrateClog = N/A N/A Effective (unclogged) Length of Multiple-unit Grate Inlet Le = N/A N/A ft Minimum Velocity Where Grate Splash-Over Begins Vo = N/A N/A fps Interception Rate of Frontal Flow Rf = N/A N/A Interception Rate of Side Flow Rx = N/A N/A Actual Interception Capacity Qa = N/A N/A cfs Carry-Over Flow = Qo-Qa (to be applied to curb opening or next d/s inlet) Qb = N/A N/A cfs Curb or Slotted Inlet Opening Analysis (Calculated) MINOR MAJOR Equivalent Slope Se (based on grate carry-over) Se = 0.208 0.197 ft/ft Required Length LT to Have 100% Interception LT = 1.86 4.03 ft Under No-Clogging Condition MINOR MAJOR Effective Length of Curb Opening or Slotted Inlet (minimum of L, LT) L = 1.86 4.03 ft Interception Capacity Qi = 0.20 0.87 cfs Under Clogging Condition MINOR MAJOR Clogging Coefficient CurbCoef = 1.00 1.00 Clogging Factor for Multiple-unit Curb Opening or Slotted Inlet CurbClog = 0.10 0.10 Effective (Unclogged) Length Le = 4.50 4.50 ft Actual Interception Capacity Qa = 0.20 0.87 cfs Carry-Over Flow = Qb(GRATE)-Qa Qb = 0.0 0.0 cfs Summary MINOR MAJOR Total Inlet Interception Capacity Q = 0.20 0.87 cfs Total Inlet Carry-Over Flow (flow bypassing inlet) Qb = 0.0 0.0 cfs Capture Percentage = Qa/Qo = C% = 100 100 % INLET ON A CONTINUOUS GRADE Version 4.05 Released March 2017 CDOT Type R Curb Opening CDOT Type R Curb Opening 18-1000-00 UD-Inlet_v4.05, D7 3/14/2019, 10:57 AM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 19.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.015 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 18.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.014 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 5.8 10.5 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = 15.7 103.7 cfs Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Northfield D02 (Design Point D6) 18-1000-00 UD-Inlet_v4.05, D6 3/14/2019, 10:57 AM Design Information (Input) MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a') aLOCAL = 3.0 3.0 inches Total Number of Units in the Inlet (Grate or Curb Opening) No = 1 1 Length of a Single Unit Inlet (Grate or Curb Opening) Lo = 5.00 5.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width) Wo = N/A N/A ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5) Cf-G = N/A N/A Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1) Cf-C = 0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity' MINOR MAJOR Design Discharge for Half of Street (from Sheet Inlet Management ) Qo = 0.2 0.9 cfs Water Spread Width T = 1.5 4.4 ft Water Depth at Flowline (outside of local depression) d = 1.5 2.6 inches Water Depth at Street Crown (or at TMAX) dCROWN = 0.0 0.0 inches Ratio of Gutter Flow to Design Flow Eo = 1.003 0.927 Discharge outside the Gutter Section W, carried in Section Tx Qx = 0.0 0.1 cfs Discharge within the Gutter Section W Qw = 0.2 0.9 cfs Discharge Behind the Curb Face QBACK = 0.0 0.0 cfs Flow Area within the Gutter Section W AW = 0.08 0.26 sq ft Velocity within the Gutter Section W VW = 2.5 3.3 fps Water Depth for Design Condition dLOCAL = 4.5 5.6 inches Grate Analysis (Calculated) MINOR MAJOR Total Length of Inlet Grate Opening L = N/A N/A ft Ratio of Grate Flow to Design Flow Eo-GRATE = N/A N/A Under No-Clogging Condition MINOR MAJOR Minimum Velocity Where Grate Splash-Over Begins Vo = N/A N/A fps Interception Rate of Frontal Flow Rf = N/A N/A Interception Rate of Side Flow Rx = N/A N/A Interception Capacity Qi = N/A N/A cfs Under Clogging Condition MINOR MAJOR Clogging Coefficient for Multiple-unit Grate Inlet GrateCoef = N/A N/A Clogging Factor for Multiple-unit Grate Inlet GrateClog = N/A N/A Effective (unclogged) Length of Multiple-unit Grate Inlet Le = N/A N/A ft Minimum Velocity Where Grate Splash-Over Begins Vo = N/A N/A fps Interception Rate of Frontal Flow Rf = N/A N/A Interception Rate of Side Flow Rx = N/A N/A Actual Interception Capacity Qa = N/A N/A cfs Carry-Over Flow = Qo-Qa (to be applied to curb opening or next d/s inlet) Qb = N/A N/A cfs Curb or Slotted Inlet Opening Analysis (Calculated) MINOR MAJOR Equivalent Slope Se (based on grate carry-over) Se = 0.208 0.194 ft/ft Required Length LT to Have 100% Interception LT = 1.86 4.22 ft Under No-Clogging Condition MINOR MAJOR Effective Length of Curb Opening or Slotted Inlet (minimum of L, LT) L = 1.86 4.22 ft Interception Capacity Qi = 0.20 0.94 cfs Under Clogging Condition MINOR MAJOR Clogging Coefficient CurbCoef = 1.00 1.00 Clogging Factor for Multiple-unit Curb Opening or Slotted Inlet CurbClog = 0.10 0.10 Effective (Unclogged) Length Le = 4.50 4.50 ft Actual Interception Capacity Qa = 0.20 0.94 cfs Carry-Over Flow = Qb(GRATE)-Qa Qb = 0.0 0.0 cfs Summary MINOR MAJOR Total Inlet Interception Capacity Q = 0.20 0.94 cfs Total Inlet Carry-Over Flow (flow bypassing inlet) Qb = 0.00 0.00 cfs Capture Percentage = Qa/Qo = C% = 100 100 % INLET ON A CONTINUOUS GRADE Version 4.05 Released March 2017 CDOT Type R Curb Opening CDOT Type R Curb Opening 18-1000-00 UD-Inlet_v4.05, D6 3/14/2019, 10:57 AM Northfield Inlet Flow Calculation for Area Inlets Design Engineer: Design Firm: Project Number: Date: Objective: to find the number of grates required for area inlets in grassy areas Geometry at inlet : Width (W): 1.87 feet Length (L): 3.27 feet Opening Ratio (R): 0.6 sq ft/sq ft Reduction Factor (F): 50% Grate Flow: See Hydraulic Design Handbook by McGraw-Hill for verificaiton of equation use and C value C = Orifice discharge coefficient= 0.67 A = Orifice area (ft2) - open area of grate g = gravitational constant = 32.2 ft/s2 H = head on grate centroid, ponding depth (feet) Then multiply by the reduction factor for the allowable capacity. Inlet D03 (DP D05) Q = 2.85 cfs H = 0.37 ft Single Type 13 Inlet Double Type 13 Inlet Triple Type 13 Inlet A = W*L*R A = 2*W*L*R A = 3*W*L*R = 3.67 ft2 = 7.34 ft2 = 11.01 ft2 Qi = C*A*SQRT(2*g*H) Qi = C*A*SQRT(2*g*H) Qi = C*A*SQRT(2*g*H) = 12.00 cfs = 24.00 cfs = 36.00 cfs QG = Qi * F QG = Qi * F QG = Qi * F = 6.00 cfs = 12.00 cfs = 18.00 cfs USE : Single Type 13 Inlet K. Brigman Highland Development Services 18-1000-00 March 6, 2019 Grate Dimensions and information: WSEL �� = CA 2�� �� � �� �1 � �� Page1 Northfield Inlet Flow Calculation for Area Inlets Design Engineer: Design Firm: Project Number: Date: Objective: to find the number of grates required for area inlets in grassy areas Geometry at inlet : Width (W): 1.87 feet Length (L): 3.27 feet Opening Ratio (R): 0.6 sq ft/sq ft Reduction Factor (F): 50% Grate Flow: See Hydraulic Design Handbook by McGraw-Hill for verificaiton of equation use and C value C = Orifice discharge coefficient= 0.67 A = Orifice area (ft2) - open area of grate g = gravitational constant = 32.2 ft/s2 H = head on grate centroid, ponding depth (feet) Then multiply by the reduction factor for the allowable capacity. Inlet D04 (DP D1/D4) Q = 17.05 cfs H = 2.33 ft Single Type 13 Inlet Double Type 13 Inlet Triple Type 13 Inlet A = W*L*R A = 2*W*L*R A = 3*W*L*R = 3.67 ft2 = 7.34 ft2 = 11.01 ft2 Qi = C*A*SQRT(2*g*H) Qi = C*A*SQRT(2*g*H) Qi = C*A*SQRT(2*g*H) = 30.11 cfs = 60.22 cfs = 90.34 cfs QG = Qi * F QG = Qi * F QG = Qi * F = 15.06 cfs = 30.11 cfs = 45.17 cfs USE : Double Type 13 Inlet K. Brigman Highland Development Services 18-1000-00 March 6, 2019 Grate Dimensions and information: WSEL �� = CA 2�� �� � �� �1 � �� Page1 Appendix F APPENDIX F – LOW IMPACT DEVELOPMENT CALCULATIONS ONLY ONLY ONLY ONLY ONLY ONLY E. SUNIGA ROAD REDWOOD STREET DRY CREEK LAKE CANAL DITCH FUTURE LEMAY AVENUE N. LEMAY AVENUE COLLAMER DRIVE PIONEER TRAIL ROAD STEELEY DRIVE LANDMARK WAY N. LEMAY AVENUE RAIN GARDEN D1 SCHLAGEL STREET FUTURE SUNIGA ROAD POND D POND C POND B1 POND B3 POND A2 POND A1 POND B2 SUNIGA ROAD AREA DETENTION / LANDSCAPE AREA PROPOSED SINGLE FAMILY AREA PROPOSED MULTI-FAMILY AREA AREA CONTRIBUTING TO LID TREATMENT LEGEND 0 100' 100 50 100 200 SCALE: 1" = NO. REVISION BY DATE HIGHLAND DEVELOPMENT SERVCIES 6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550 PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION SHEET OF DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA Low Impact Development Summary Sq-Ft Acres Impervious Area (sq- ft) % of Impervious Area Requiring Treatment Impervious Area Requiring Treatment 537,816 12.35 376,071 50% 188,035 1,189,400 27.30 810,001 75% 607,501 40,986 0.94 21,370 75% 16,028 304,148 6.98 248,720 0% N/A 445,251 10.22 0 0% N/A 2,517,600 57.80 1,456,162 - 811,564 LID Facility Contributing Basins Area Drainage to LID (sq-ft) % Impervious Impervious Area Treated (sq-ft) WQCV12-hr (watershed inches) WQCV12-hr (cu-ft) Treatment Method A2 A1+…+A12 427,599 71.1% 323,806 0.22 7,984 Infiltration Gallery B2 B10+…+B12 146,450 61.4% 95,737 0.19 2,352 Infiltration Gallery B3 B1+…+B9 426,521 57.3% 263,747 0.18 6,467 Infiltration Gallery D1 D8+…+D13 148,227 61.7% 98,989 0.19 2,391 Rain Garden 811,564 782,279 96% Description Single Family Area Multifamily Area Commercial Area Suniga Road (no treatment) Northfield Low Impact Development Total % Treatment Development Area Breakdown City of Fort Collins - Ordinance No. 007, 2016 - Treat at least 75% of any newly developed or redeveloped impervious area using one or a combination of LID techniques, or - Treat at least 50% of any newly developed or redeveloped impervious area using one or a combination of LID techniques when 25% of private driveable surfaces are permeable. Total Impervious Area Treated (sq-ft) Total Impervious Area Required for Treatment (sq-ft) Allowed Filter Fabric Flow Rate a (cfs) 0.35 gpm/sq-ft SC-106LP 14 10 6 6 85.4 25 12 14.8 0.012 6.9 15.0 SC-310 18 8 6 6 85.4 34 16 20.2 0.016 14.7 31.0 SC-740 18 8 6 6 85.4 51 30 30.2 0.024 45.9 74.9 DC-780 18 12 6 9 85.4 51 30 30.2 0.024 46.2 78.4 MC-3500 24 8 12 9 90 77 45 48.1 0.038 109.9 178.9 14.9 46 MC-4500 24 7 12 9 52 100 60 36.1 0.028 106.5 162.6 35.7 108.7 LID Facility Chamber Type Total Release Rate f (cfs) WQ Flow g (cfs) Req'd Storage Volume h (cu-ft) Minimum No. of Chambers i Chamber Storage j (cu-ft) No. of Endcaps k Endcap Storage l (cu-ft) Total Chamber Volume m (cu-ft) Total Installed System Volume n (cu-ft) WQCV12-hr (cu-ft) A2 SC-740 2.39 7.56 4,654 101 4,654 16 0 4,654 8,155 7,984 B2 SC-740 0.72 2.09 1,410 31 1,410 14 0 1,410 2,726 2,352 B3 SC-740 2.08 4.93 4,047 88 4,047 12 0 4,047 7,144 6,467 Max Cover (ft) Min Cover (in) Chamber DESIGN CRITERIA 0.78 1.00 0.78 ft3 acre-ft 9.82 acres 4,654 0.11 2.39 cfs Time (min) 1/2 2-yr Intensity (I , in/hr) Q100 (cfs) Accumulative Runoff Volume (ft3) Accumulative Release Volume (ft3) Detained Volume (ft3) Detained Volume (acre-ft) 0 0.000 0.00 0 0 0 0.00 5 1.425 10.91 3,273 717 2,556 0.06 10 1.105 8.46 5,076 1,435 3,642 0.08 15 0.935 7.16 6,443 2,152 4,291 0.10 20 0.805 6.16 7,396 2,870 4,527 0.10 25 0.715 5.47 8,212 3,587 4,625 0.11 30 0.650 4.98 8,958 4,305 4,654 0.11 35 0.585 4.48 9,406 5,022 4,384 0.10 40 0.535 4.10 9,831 5,739 4,092 0.09 45 0.495 3.79 10,233 6,457 3,776 0.09 50 0.460 3.52 10,566 7,174 3,392 0.08 55 0.435 3.33 10,991 7,892 3,100 0.07 60 0.410 3.14 11,301 8,609 2,692 0.06 Design Firm: Project Number: Date: Allowed Release Rate Northfield WQ Treatment Volume - FAA Method - City of Fort Collins accepts 1/2 of the 2-yr runoff as the WQ inflow rate WQ Treatment Volume Calculation - A2 Infiltration Gallery Runoff Coefficient (C ) Frequency Factor (C f ) Required Detention Adjusted Runoff Coefficient (CC f ) Area (A ) J.Claeys Highland Development Services 18-1000-00 June 17, 2019 - City of Fort Collins - Storm Water Criteria Manual Design Engineer: DESIGN CRITERIA 0.69 1.00 0.69 ft3 acre-ft 3.36 acres 1,410 0.03 0.72 cfs Time (min) 1/2 2-yr Intensity (I , in/hr) Q100 (cfs) Accumulative Runoff Volume (ft3) Accumulative Release Volume (ft3) Detained Volume (ft3) Detained Volume (acre-ft) 0 0.000 0.00 0 0 0 0.00 5 1.425 3.31 992 217 774 0.02 10 1.105 2.56 1,538 435 1,103 0.03 15 0.935 2.17 1,952 652 1,300 0.03 20 0.805 1.87 2,241 869 1,371 0.03 25 0.715 1.66 2,488 1,087 1,401 0.03 30 0.650 1.51 2,714 1,304 1,410 0.03 35 0.585 1.36 2,850 1,522 1,328 0.03 40 0.535 1.24 2,979 1,739 1,240 0.03 45 0.495 1.15 3,100 1,956 1,144 0.03 50 0.460 1.07 3,201 2,174 1,028 0.02 55 0.435 1.01 3,330 2,391 939 0.02 60 0.410 0.95 3,424 2,608 816 0.02 Adjusted Runoff Coefficient (CC f ) Area (A ) Allowed Release Rate - City of Fort Collins - Storm Water Criteria Manual - City of Fort Collins accepts 1/2 of the 2-yr runoff as the WQ inflow rate WQ Treatment Volume Calculation - B3 Infiltration Gallery Runoff Coefficient (C ) Frequency Factor (C f ) Required Detention Northfield WQ Treatment Volume - FAA Method J.Claeys Highland Development Services 18-1000-00 June 17, 2019 Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA 0.68 1.00 0.68 ft3 acre-ft 9.79 acres 4,047 0.09 2.08 cfs Time (min) 1/2 2-yr Intensity (I , in/hr) Q100 (cfs) Accumulative Runoff Volume (ft3) Accumulative Release Volume (ft3) Detained Volume (ft3) Detained Volume (acre-ft) 0 0.000 0.00 0 0 0 0.00 5 1.425 9.49 2,846 624 2,223 0.05 10 1.105 7.36 4,414 1,248 3,167 0.07 15 0.935 6.23 5,603 1,872 3,731 0.09 20 0.805 5.36 6,432 2,495 3,936 0.09 25 0.715 4.76 7,141 3,119 4,022 0.09 30 0.650 4.33 7,790 3,743 4,047 0.09 35 0.585 3.90 8,180 4,367 3,813 0.09 40 0.535 3.56 8,549 4,991 3,558 0.08 45 0.495 3.30 8,899 5,615 3,284 0.08 50 0.460 3.06 9,188 6,239 2,950 0.07 55 0.435 2.90 9,558 6,863 2,695 0.06 60 0.410 2.73 9,828 7,486 2,341 0.05 Adjusted Runoff Coefficient (CC f ) Area (A ) Allowed Release Rate - City of Fort Collins - Storm Water Criteria Manual - City of Fort Collins accepts 1/2 of the 2-yr runoff as the WQ inflow rate WQ Treatment Volume Calculation - B2 Infiltration Gallery Runoff Coefficient (C ) Frequency Factor (C f ) Required Detention Northfield WQ Treatment Volume - FAA Method J.Claeys Highland Development Services 18-1000-00 June 17, 2019 Design Engineer: Design Firm: Project Number: Date: User Inputs Chamber Model: SC-740 Outlet Control Structure: No Project Name: Northfield - LID B2 Engineer: Jason Claeys Project Location: Colorado Measurement Type: Imperial Required Storage Volume: 2700 cubic ft. Stone Porosity: 40% Stone Foundation Depth: 6 in. Stone Above Chambers: 6 in. Average Cover Over Chambers: 18 in. Design Constraint Dimensions: (35 ft. x 45 ft.) Results System Volume and Bed Size Installed Storage Volume: 2725.60 cubic ft. Storage Volume Per Chamber: 45.90 cubic ft. Number Of Chambers Required: 31 Number Of End Caps Required: 14 Chamber Rows: 7 Maximum Length: 43.11 ft. Maximum Width: 34.75 ft. Approx. Bed Size Required: 1337.04 square ft. System Components Amount Of Stone Required: 120.62 cubic yards Volume Of Excavation (Not Including Fill): 173.32 cubic yards User Inputs Chamber Model: SC-740 Outlet Control Structure: No Project Name: Northfield - LID B3 Engineer: Jason Claeys Project Location: Colorado Measurement Type: Imperial Required Storage Volume: 7100 cubic ft. Stone Porosity: 40% Stone Foundation Depth: 6 in. Stone Above Chambers: 6 in. Average Cover Over Chambers: 18 in. Design Constraint Dimensions: (30 ft. x 115 ft.) Results System Volume and Bed Size Installed Storage Volume: 7143.96 cubic ft. Storage Volume Per Chamber: 45.90 cubic ft. Number Of Chambers Required: 88 Number Of End Caps Required: 12 Chamber Rows: 6 Maximum Length: 114.65 ft. Maximum Width: 30 ft. Approx. Bed Size Required: 3371.74 square ft. System Components Amount Of Stone Required: 287.48 cubic yards Volume Of Excavation (Not Including Fill): 437.08 cubic yards User Inputs Chamber Model: SC-740 Outlet Control Structure: No Project Name: Northfield - LID A2 Engineer: Jason Claeys Project Location: Colorado Measurement Type: Imperial Required Storage Volume: 8150 cubic ft. Stone Porosity: 40% Stone Foundation Depth: 6 in. Stone Above Chambers: 6 in. Average Cover Over Chambers: 18 in. Design Constraint Dimensions: (40 ft. x 110 ft.) Results System Volume and Bed Size Installed Storage Volume: 8154.79 cubic ft. Storage Volume Per Chamber: 45.90 cubic ft. Number Of Chambers Required: 101 Number Of End Caps Required: 16 Chamber Rows: 8 Maximum Length: 100.41 ft. Maximum Width: 39.50 ft. Approx. Bed Size Required: 3838.04 square ft. System Components Amount Of Stone Required: 325.82 cubic yards Volume Of Excavation (Not Including Fill): 497.52 cubic yards LID Facilities A2, B2, & B3 SHEET OF DATE: PROJECT #: DRAWN: CHECKED: THIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS UNDER THE DIRECTION OF THE SITE DESIGN ENGINEER OR OTHER PROJECT REPRESENTATIVE. THE SITE DESIGN ENGINEER SHALL REVIEW THIS DRAWING PRIOR TO CONSTRUCTION. IT IS THE ULTIMATE RESPONSIBILITY OF THE SITE DESIGN ENGINEER TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS. 4640 TRUEMAN BLVD HILLIARD, OH 43026 ADVANCED DRAINAGE SYSTEMS, INC. 1-800-733-7473 R REV DRW CHK DESCRIPTION NORTHFIELD - LID A2 FORT COLLINS, CO JC N/A 2 6 70 INWOOD ROAD, SUITE 3 | ROCKY HILL | CT | 06067 860-529-8188 |888-892-2694 | WWW.STORMTECH.COM Detention Retention Water Quality NOTES ‡ MANIFOLD SIZE TO BE DETERMINED BY SITE DESIGN ENGINEER. SEE TECH SHEET #7 FOR MANIFOLD SIZING GUIDANCE. ‡ DUE TO THE ADAPTATION OF THIS CHAMBER SYSTEM TO SPECIFIC SITE AND DESIGN CONSTRAINTS, IT MAY BE NECESSARY TO CUT AND COUPLE ADDITIONAL PIPE TO STANDARD MANIFOLD COMPONENTS IN THE FIELD. ‡ THE SITE DESIGN ENGINEER MUST REVIEW ELEVATIONS AND IF NECESSARY ADJUST GRADING TO ENSURE THE CHAMBER COVER REQUIREMENTS ARE MET. ‡ THIS CHAMBER SYSTEM WAS DESIGNED WITHOUT SITE-SPECIFIC INFORMATION ON SOIL CONDITIONS OR BEARING CAPACITY. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR DETERMINING THE SUITABILITY OF THE SOIL AND PROVIDING THE BEARING CAPACITY OF THE INSITU SOILS. THE BASE STONE DEPTH MAY BE INCREASED OR DECREASED ONCE THIS INFORMATION IS PROVIDED. PROPOSED ELEVATIONS MAXIMUM ALLOWABLE GRADE (TOP OF PAVEMENT/UNPAVED): 111.00 MINIMUM ALLOWABLE GRADE (UNPAVED WITH TRAFFIC): 105.00 MINIMUM ALLOWABLE GRADE (UNPAVED NO TRAFFIC): 104.50 MINIMUM ALLOWABLE GRADE (TOP OF RIGID CONCRETE PAVEMENT): 104.50 MINIMUM ALLOWABLE GRADE (BASE OF FLEXIBLE PAVEMENT): 104.50 TOP OF STONE: 103.50 TOP OF SC-740 CHAMBER: 103.00 18" x 18" TOP MANIFOLD INVERT: 100.92 24" ISOLATOR ROW INVERT: 100.51 BOTTOM OF SC-740 CHAMBER: 100.50 BOTTOM OF STONE: 100.00 PROPOSED LAYOUT 101 STORMTECH SC-740 CHAMBERS 16 STORMTECH SC-740 END CAPS 6 STONE ABOVE (in) 6 STONE BELOW (in) 40 % STONE VOID 8155 INSTALLED SYSTEM VOLUME (CF) (PERIMETER STONE INCLUDED) (COVER STONE INCLUDED) (BASE STONE INCLUDED) 3838 SYSTEM AREA (SF) 279.82 SYSTEM PERIMETER (ft) 100.41' 94.12' 39.50' SHEET OF DATE: PROJECT #: DRAWN: CHECKED: THIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS UNDER THE DIRECTION OF THE SITE DESIGN ENGINEER OR OTHER PROJECT REPRESENTATIVE. THE SITE DESIGN ENGINEER SHALL REVIEW THIS DRAWING PRIOR TO CONSTRUCTION. IT IS THE ULTIMATE RESPONSIBILITY OF THE SITE DESIGN ENGINEER TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS. 4640 TRUEMAN BLVD HILLIARD, OH 43026 ADVANCED DRAINAGE SYSTEMS, INC. 1-800-733-7473 R REV DRW CHK DESCRIPTION NORTHFIELD - LID B2 FORT COLLINS, CO JC N/A 2 6 70 INWOOD ROAD, SUITE 3 | ROCKY HILL | CT | 06067 860-529-8188 |888-892-2694 | WWW.STORMTECH.COM Detention Retention Water Quality NOTES ‡ MANIFOLD SIZE TO BE DETERMINED BY SITE DESIGN ENGINEER. SEE TECH SHEET #7 FOR MANIFOLD SIZING GUIDANCE. ‡ DUE TO THE ADAPTATION OF THIS CHAMBER SYSTEM TO SPECIFIC SITE AND DESIGN CONSTRAINTS, IT MAY BE NECESSARY TO CUT AND COUPLE ADDITIONAL PIPE TO STANDARD MANIFOLD COMPONENTS IN THE FIELD. ‡ THE SITE DESIGN ENGINEER MUST REVIEW ELEVATIONS AND IF NECESSARY ADJUST GRADING TO ENSURE THE CHAMBER COVER REQUIREMENTS ARE MET. ‡ THIS CHAMBER SYSTEM WAS DESIGNED WITHOUT SITE-SPECIFIC INFORMATION ON SOIL CONDITIONS OR BEARING CAPACITY. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR DETERMINING THE SUITABILITY OF THE SOIL AND PROVIDING THE BEARING CAPACITY OF THE INSITU SOILS. THE BASE STONE DEPTH MAY BE INCREASED OR DECREASED ONCE THIS INFORMATION IS PROVIDED. PROPOSED ELEVATIONS MAXIMUM ALLOWABLE GRADE (TOP OF PAVEMENT/UNPAVED): 111.00 MINIMUM ALLOWABLE GRADE (UNPAVED WITH TRAFFIC): 105.00 MINIMUM ALLOWABLE GRADE (UNPAVED NO TRAFFIC): 104.50 MINIMUM ALLOWABLE GRADE (TOP OF RIGID CONCRETE PAVEMENT): 104.50 MINIMUM ALLOWABLE GRADE (BASE OF FLEXIBLE PAVEMENT): 104.50 TOP OF STONE: 103.50 TOP OF SC-740 CHAMBER: 103.00 12" x 12" TOP MANIFOLD INVERT: 101.54 24" ISOLATOR ROW INVERT: 100.51 BOTTOM OF SC-740 CHAMBER: 100.50 BOTTOM OF STONE: 100.00 PROPOSED LAYOUT 31 STORMTECH SC-740 CHAMBERS 14 STORMTECH SC-740 END CAPS 6 STONE ABOVE (in) 6 STONE BELOW (in) 40 % STONE VOID 2726 INSTALLED SYSTEM VOLUME (CF) (PERIMETER STONE INCLUDED) (COVER STONE INCLUDED) (BASE STONE INCLUDED) 1337 SYSTEM AREA (SF) 155.73 SYSTEM PERIMETER (ft) 43.11' 37.18' 34.75' SHEET OF DATE: PROJECT #: DRAWN: CHECKED: THIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS UNDER THE DIRECTION OF THE SITE DESIGN ENGINEER OR OTHER PROJECT REPRESENTATIVE. THE SITE DESIGN ENGINEER SHALL REVIEW THIS DRAWING PRIOR TO CONSTRUCTION. IT IS THE ULTIMATE RESPONSIBILITY OF THE SITE DESIGN ENGINEER TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS. 4640 TRUEMAN BLVD HILLIARD, OH 43026 ADVANCED DRAINAGE SYSTEMS, INC. 1-800-733-7473 R REV DRW CHK DESCRIPTION NORTHFIELD - LID B3 FORT COLLINS, CO JC N/A 2 6 70 INWOOD ROAD, SUITE 3 | ROCKY HILL | CT | 06067 860-529-8188 |888-892-2694 | WWW.STORMTECH.COM Detention Retention Water Quality NOTES ‡ MANIFOLD SIZE TO BE DETERMINED BY SITE DESIGN ENGINEER. SEE TECH SHEET #7 FOR MANIFOLD SIZING GUIDANCE. ‡ DUE TO THE ADAPTATION OF THIS CHAMBER SYSTEM TO SPECIFIC SITE AND DESIGN CONSTRAINTS, IT MAY BE NECESSARY TO CUT AND COUPLE ADDITIONAL PIPE TO STANDARD MANIFOLD COMPONENTS IN THE FIELD. ‡ THE SITE DESIGN ENGINEER MUST REVIEW ELEVATIONS AND IF NECESSARY ADJUST GRADING TO ENSURE THE CHAMBER COVER REQUIREMENTS ARE MET. ‡ THIS CHAMBER SYSTEM WAS DESIGNED WITHOUT SITE-SPECIFIC INFORMATION ON SOIL CONDITIONS OR BEARING CAPACITY. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR DETERMINING THE SUITABILITY OF THE SOIL AND PROVIDING THE BEARING CAPACITY OF THE INSITU SOILS. THE BASE STONE DEPTH MAY BE INCREASED OR DECREASED ONCE THIS INFORMATION IS PROVIDED. PROPOSED ELEVATIONS MAXIMUM ALLOWABLE GRADE (TOP OF PAVEMENT/UNPAVED): 111.00 MINIMUM ALLOWABLE GRADE (UNPAVED WITH TRAFFIC): 105.00 MINIMUM ALLOWABLE GRADE (UNPAVED NO TRAFFIC): 104.50 MINIMUM ALLOWABLE GRADE (TOP OF RIGID CONCRETE PAVEMENT): 104.50 MINIMUM ALLOWABLE GRADE (BASE OF FLEXIBLE PAVEMENT): 104.50 TOP OF STONE: 103.50 TOP OF SC-740 CHAMBER: 103.00 18" x 18" TOP MANIFOLD INVERT: 100.92 24" ISOLATOR ROW INVERT: 100.51 BOTTOM OF SC-740 CHAMBER: 100.50 BOTTOM OF STONE: 100.00 PROPOSED LAYOUT 88 STORMTECH SC-740 CHAMBERS 12 STORMTECH SC-740 END CAPS 6 STONE ABOVE (in) 6 STONE BELOW (in) 40 % STONE VOID 7144 INSTALLED SYSTEM VOLUME (CF) (PERIMETER STONE INCLUDED) (COVER STONE INCLUDED) (BASE STONE INCLUDED) 3372 SYSTEM AREA (SF) 289.29 SYSTEM PERIMETER (ft) 114.65' 108.35' 30.00' SHEET OF DATE: PROJECT #: DRAWN: CHECKED: THIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS UNDER THE DIRECTION OF THE SITE DESIGN ENGINEER OR OTHER PROJECT REPRESENTATIVE. THE SITE DESIGN ENGINEER SHALL REVIEW THIS DRAWING PRIOR TO CONSTRUCTION. IT IS THE ULTIMATE RESPONSIBILITY OF THE SITE DESIGN ENGINEER TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS. 4640 TRUEMAN BLVD HILLIARD, OH 43026 1-800-733-7473 ADVANCED DRAINAGE SYSTEMS, INC. R REV DRW CHK DESCRIPTION Tool --- 70 NIWOOD ROAD, SUTIE 3 | ROCKY HLIL | CT | 06067 860-529-8188 |888-892-2694 | WWW.STORMTECH.COM Detention Retention Water Quality ACCEPTABLE FILL MATERIALS: STORMTECH MC-3500 CHAMBER SYSTEMS PLEASE NOTE: 1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE". 2. STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 9" (230 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR. 3. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. NOTES: 1. MC-3500 CHAMBERS SHALL CONFORM TO THE REQUIREMENTS OF ASTM F2418 "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 2. MC-3500 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 3. "ACCEPTABLE FILL MATERIALS" TABLE ABOVE PROVIDES MATERIAL LOCATIONS, DESCRIPTIONS, GRADATIONS, AND COMPACTION REQUIREMENTS FOR FOUNDATION, EMBEDMENT, AND FILL MATERIALS. 4. THE "SITE DESIGN ENGINEER" REFERS TO THE ENGINEER RESPONSIBLE FOR THE DESIGN AND LAYOUT OF THE STORMTECH CHAMBERS FOR THIS PROJECT. 5. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. 6. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. 7. ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION. MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT D FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE TOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THAT PAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS. CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS. N/A PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND PREPARATION REQUIREMENTS. C INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 24" (600 mm) ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENT SUBBASE MAY BE A PART OF THE 'C' LAYER. SHEET OF DATE: PROJECT #: DRAWN: CHECKED: THIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS UNDER THE DIRECTION OF THE SITE DESIGN ENGINEER OR OTHER PROJECT REPRESENTATIVE. THE SITE DESIGN ENGINEER SHALL REVIEW THIS DRAWING PRIOR TO CONSTRUCTION. IT IS THE ULTIMATE RESPONSIBILITY OF THE SITE DESIGN ENGINEER TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS. 4640 TRUEMAN BLVD HILLIARD, OH 43026 1-800-733-7473 ADVANCED DRAINAGE SYSTEMS, INC. R REV DRW CHK DESCRIPTION Tool --- 70 NIWOOD ROAD, SUTIE 3 | ROCKY HLIL | CT | 06067 860-529-8188 |888-892-2694 | WWW.STORMTECH.COM Detention Retention Water Quality INSPECTION & MAINTENANCE STEP 1) INSPECT ISOLATOR ROW FOR SEDIMENT A. INSPECTION PORTS (IF PRESENT) A.1. REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN A.2. REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED A.3. USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG A.4. LOWER A CAMERA INTO ISOLATOR ROW FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL) A.5. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. B. ALL ISOLATOR ROWS B.1. REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW B.2. USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW THROUGH OUTLET PIPE i) MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRY ii) FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE B.3. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. STEP 2) CLEAN OUT ISOLATOR ROW USING THE JETVAC PROCESS A. A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERRED B. APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN C. VACUUM STRUCTURE SUMP AS REQUIRED STEP 3) REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS. STEP 4) INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM. NOTES 1. INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS. 2. CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY. MC-3500 CHAMBER 18" (450 mm) MIN WIDTH CONCRETE SLAB 8" (200 mm) MIN THICKNESS PAVEMENT FLEXSTORM CATCH IT PART# 6212NYFX WITH USE OF OPEN GRATE 12" (300 mm) NYLOPLAST INLINE DRAIN BODY W/SOLID HINGED COVER OR GRATE PART# 2712AG06N SOLID COVER: 1299CGC GRATE: 1299CGS CONCRETE COLLAR NOT REQUIRED FOR UNPAVED APPLICATIONS 6" (150 mm) INSERTA TEE SHEET OF DATE: PROJECT #: DRAWN: CHECKED: THIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS UNDER THE DIRECTION OF THE SITE DESIGN ENGINEER OR OTHER PROJECT REPRESENTATIVE. THE SITE DESIGN ENGINEER SHALL REVIEW THIS DRAWING PRIOR TO CONSTRUCTION. IT IS THE ULTIMATE RESPONSIBILITY OF THE SITE DESIGN ENGINEER TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS. 4640 TRUEMAN BLVD HILLIARD, OH 43026 1-800-733-7473 ADVANCED DRAINAGE SYSTEMS, INC. R REV DRW CHK DESCRIPTION Tool --- 70 NIWOOD ROAD, SUTIE 3 | ROCKY HLIL | CT | 06067 860-529-8188 |888-892-2694 | WWW.STORMTECH.COM Detention Retention Water Quality PART # STUB B C MC3500IEPP06T 6" (150 mm) 33.21" (844 mm) --- MC3500IEPP06B --- 0.66" (17 mm) MC3500IEPP08T 8" (200 mm) 31.16" (791 mm) --- MC3500IEPP08B --- 0.81" (21 mm) MC3500IEPP10T 10" (250 mm) 29.04" (738 mm) --- MC3500IEPP10B --- 0.93" (24 mm) MC3500IEPP12T 12" (300 mm) 26.36" (670 mm) --- MC3500IEPP12B --- 1.35" (34 mm) MC3500IEPP15T 15" (375 mm) 23.39" (594 mm) --- MC3500IEPP15B --- 1.50" (38 mm) MC3500IEPP18TC 18" (450 mm) 20.03" (509 mm) --- MC3500IEPP18BC --- 1.77" (45 mm) MC3500IEPP24TC 24" (600 mm) 14.48" (368 mm) --- MC3500IEPP24BC --- 2.06" (52 mm) MC3500IEPP30BC 30" (750 mm) --- NOMINAL CHAMBER SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH) 77.0" X 45.0" X 86.0" (1956 mm X 1143 mm X 2184 mm) CHAMBER STORAGE 109.9 CUBIC FEET (3.11 m³) MINIMUM INSTALLED STORAGE* 178.9 CUBIC FEET (5.06 m³) WEIGHT 135.0 lbs. (61.2 kg) NOMINAL END CAP SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH) 77.0" X 45.0" X 22.5" (1956 mm X 1143 mm X 571 mm) END CAP STORAGE 14.9 CUBIC FEET (0.42 m³) MINIMUM INSTALLED STORAGE* 46.0 CUBIC FEET (1.30 m³) WEIGHT 50.0 lbs. (22.7 kg) *ASSUMES 12" (305 mm) STONE ABOVE, 9" (229 mm) STONE FOUNDATION AND BETWEEN CHAMBERS, 12" (305 mm) STONE PERIMETER IN FRONT OF END CAPS AND 40% STONE POROSITY MC-3500 TECHNICAL SPECIFICATION NTS 90.0" (2286 mm) ACTUAL LENGTH 86.0" (2184 mm) INSTALLED Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 61.7 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.617 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.19 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 148,227 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 2,391 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 1829 sq ft D) Actual Flat Surface Area AActual = sq ft E) Area at Design Depth (Top Surface Area) ATop = sq ft F) Rain Garden Total Volume VT= cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 12" CoFC Bioretention Sand Media 4. Underdrain System A) Are underdrains provided? 1 B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = cu ft iii) Orifice Diameter, 3/8" Minimum DO = in Design Procedure Form: Rain Garden (RG) J.Claeys HDS June 25, 2019 Northfield LID Facility D1 - Rain Garden UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO 18-1000-00 UD-BMP_v3.07.xlsm, RG 6/25/2019, 10:19 AM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation NO SPRINKLER HEADS ON FLAT SURFACE A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) J.Claeys HDS June 25, 2019 Northfield LID Facility D1 - Rain Garden Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO 18-1000-00 UD-BMP_v3.07.xlsm, RG 6/25/2019, 10:19 AM BUILD ROW IN THIS DIRECTION NOTE: ALL DIMENSIONS ARE NOMINAL CUSTOM PRECORED INVERTS ARE AVAILABLE UPON REQUEST. INVENTORIED MANIFOLDS INCLUDE 12-24" (300-600 mm) SIZE ON SIZE AND 15-48" (375-1200 mm) ECCENTRIC MANIFOLDS. CUSTOM INVERT LOCATIONS ON THE MC-3500 END CAP CUT IN THE FIELD ARE NOT RECOMMENDED FOR PIPE SIZES GREATER THAN 10" (250 mm) THE INVERT LOCATION IN COLUMN 'B' ARE THE HIGHTEST POSSIBLE FOR THE PIPE SIZE. LOWER JOINT CORRUGATION WEB CREST CREST STIFFENING RIB VALLEY STIFFENING RIB B C 77.0" (1956 mm) 45.0" (1143 mm) 25.7" (653 mm) FOOT 77.0" (1956 mm) 45.0" (1143 mm) STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" UPPER JOINT CORRUGATION 22.5" (571 mm) INSTALLED INSERTA TEE DETAIL NTS INSERTA TEE CONNECTION CONVEYANCE PIPE MATERIAL MAY VARY (PVC, HDPE, ETC.) PLACE ADS GEOSYNTHETICS 315 WOVEN GEOTEXTILE (CENTERED ON INSERTA-TEE INLET) OVER BEDDING STONE FOR SCOUR PROTECTION AT SIDE INLET CONNECTIONS. GEOTEXTILE MUST EXTEND 6" (150 mm) PAST CHAMBER FOOT INSERTA TEE TO BE INSTALLED, CENTERED OVER CORRUGATION SECTION A-A SIDE VIEW A A DO NOT INSTALL INSERTA-TEE AT CHAMBER JOINTS NOTE: PART NUMBERS WILL VARY BASED ON INLET PIPE MATERIALS. CONTACT STORMTECH FOR MORE INFORMATION. CHAMBER MAX DIAMETER OF INSERTA TEE HEIGHT FROM BASE OF CHAMBER (X) SC-310 6" (150 mm) 4" (100 mm) SC-740 10" (250 mm) 4" (100 mm) DC-780 10" (250 mm) 4" (100 mm) MC-3500 12" (300 mm) 6" (150 mm) MC-4500 12" (300 mm) 8" (200 mm) INSERTA TEE FITTINGS AVAILABLE FOR SDR 26, SDR 35, SCH 40 IPS GASKETED & SOLVENT WELD, N-12, HP STORM, C-900 OR DUCTILE IRON (X) MC-SERIES END CAP INSERTION DETAIL NTS NOTE: MANIFOLD STUB MUST BE LAID HORIZONTAL FOR A PROPER FIT IN END CAP OPENING. 12" (300 mm) MIN SEPARATION 12" (300 mm) MIN INSERTION MANIFOLD HEADER MANIFOLD STUB STORMTECH END CAP 12" (300 mm) MIN SEPARATION 12" (300 mm) MIN INSERTION MANIFOLD HEADER MANIFOLD STUB 5 5 Northfield LID Facility A1 03/13/2019 JC LID Facilities A2, B2, & B3 PART#06N12ST35IP INSERTA TEE TO BE CENTERED ON CORRUGATION CREST MC-3500 6" INSPECTION PORT DETAIL NTS 6" (150 mm) ADS N-12 HDPE PIPE CONCRETE COLLAR SUMP DEPTH TBD BY SITE DESIGN ENGINEER (24" [600 mm] MIN RECOMMENDED) 24" (600 mm) HDPE ACCESS PIPE REQUIRED USE FACTORY PRE-CORED END CAP PART #: MC3500IEPP24BC TWO LAYERS OF ADS GEOSYNTHETICS 315WTM WOVEN GEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS 8.25' (2.51 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS CATCH BASIN OR MANHOLE COVER PIPE CONNECTION TO END CAP WITH ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE MC-3500 CHAMBER MC-3500 END CAP MC-3500 ISOLATOR ROW DETAIL NTS OPTIONAL INSPECTION PORT STORMTECH HIGHLY RECOMMENDS FLEXSTORM PURE INSERTS IN ANY UPSTREAM STRUCTURES WITH OPEN GRATES 4 5 Northfield LID Facility A1 03/13/2019 JC LID Facilities A2, B2, & B3 GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% FINES OR PROCESSED AGGREGATE. MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS LAYER. AASHTO M145¹ A-1, A-2-4, A-3 OR AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10 BEGIN COMPACTIONS AFTER 24" (600 mm) OF MATERIAL OVER THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN 12" (300 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FOR PROCESSED AGGREGATE MATERIALS. B EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS FROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER ABOVE. CLEAN, CRUSHED, ANGULAR STONE, NOMINAL SIZE DISTRIBUTION BETWEEN 3/4-2 INCH (20-50 mm) AASHTO M43¹ 3, 4 A FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER. CLEAN, CRUSHED, ANGULAR STONE, NOMINAL SIZE DISTRIBUTION BETWEEN 3/4-2 INCH (20-50 mm) AASHTO M43¹ 3, 4 PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE. ² ³ 6" (150 mm) MIN 45" (1140 mm) 24" (600 mm) MIN* 8' (2.4 m) MAX 77" (1950 mm) 12" (300 mm) TYP ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS SUBGRADE SOILS (SEE NOTE 5) PAVEMENT LAYER (DESIGNED BY SITE DESIGN ENGINEER) MC-3500 END CAP 12" (300 mm) MIN 9" (230 mm) MIN DEPTH OF STONE TO BE DETERMINED BY DESIGN ENGINEER 9" (230 mm) MIN D C B A *TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR, PERIMETER STONE INCREASE COVER TO 30" (750 mm). (SEE NOTE 6) EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) NO COMPACTION REQUIRED. 3 5 Northfield LID Facility A1 03/13/2019 JC LID Facilities A2, B2, & B3 28.00' *INVERT ABOVE BASE OF CHAMBER ITEMDESCRIPTION ON INVERT* MAX FLOW PART TYPE LAYOUT 24" BOTTOM PREFABRICATED END CAP/TYP OF ALL 24" BOTTOM CONNECTIONS AND 0.10" PREFABRICATED END CAP A ISOLATOR ROWS PREFABRICATED END CAP B 18" TOP PREFABRICATED END CAP/TYP OF ALL 18" TOP CONNECTIONS 5.00" MANIFOLD C 18" X 18" TOP, ADS N-12 5.00" NYLOPLAST (INLET W/ ISO ROW) D 30" DIAMETER (24" SUMP MIN) 14.0 CFS IN ISOLATOR ROW (SEE DETAIL) PLACE MINIMUM 12.50' OF ADS GEOSYNTHETICS 315WTK WOVEN GEOTEXTILE OVER BEDDING STONE AND UNDERNEATH CHAMBER FEET FOR SCOUR PROTECTION AT ALL CHAMBER INLET ROWS BED LIMITS C B A D 010'20' 32.75' *INVERT ABOVE BASE OF CHAMBER ITEMDESCRIPTION ON INVERT* MAX FLOW PART TYPE LAYOUT 24" BOTTOM PREFABRICATED END CAP/TYP OF ALL 24" BOTTOM CONNECTIONS AND 0.10" PREFABRICATED END CAP A ISOLATOR ROWS MANIFOLD B 12" X 12" TOP, ADS N-12 12.50" NYLOPLAST (INLET W/ ISO ROW) C 30" DIAMETER (24" SUMP MIN) 5.7 CFS IN ISOLATOR ROW (SEE DETAIL) PLACE MINIMUM 12.50' OF ADS GEOSYNTHETICS 315WTK WOVEN GEOTEXTILE OVER BEDDING STONE AND UNDERNEATH CHAMBER FEET FOR SCOUR PROTECTION AT ALL CHAMBER INLET ROWS BED LIMITS B A C 010'20' 37.50' *INVERT ABOVE BASE OF CHAMBER ITEMDESCRIPTION ON INVERT* MAX FLOW PART TYPE LAYOUT 24" BOTTOM PREFABRICATED END CAP/TYP OF ALL 24" BOTTOM CONNECTIONS AND 0.10" PREFABRICATED END CAP A ISOLATOR ROWS PREFABRICATED END CAP B 18" TOP PREFABRICATED END CAP/TYP OF ALL 18" TOP CONNECTIONS 5.00" MANIFOLD C 18" X 18" TOP, ADS N-12 5.00" NYLOPLAST (INLET W/ ISO ROW) D 30" DIAMETER (24" SUMP MIN) 14.4 CFS IN ISOLATOR ROW (SEE DETAIL) PLACE MINIMUM 12.50' OF ADS GEOSYNTHETICS 315WTK WOVEN GEOTEXTILE OVER BEDDING STONE AND UNDERNEATH CHAMBER FEET FOR SCOUR PROTECTION AT ALL CHAMBER INLET ROWS BED LIMITS C B A D 010'20' Model J.Claeys Highland Development Services 18-1000-00 June 17, 2019 Min Installed Chamber/Aggregate Volume c (cu-ft) Northfield Low Impact Development StormTech Chamber Configuration Summary StormTech Chamber Data Design Engineer: Design Firm: Project Number: Date: Length (in) Width (in) Height (in) Floor Area (sq-ft) Chamber Volume b (cu-ft) Min Aggregate Base (in) Min Aggregate Cover (in) Negligible Endcap Volume d (cu-ft) Min Installed Endcap/Aggregate Volume e (cu-ft) Negligible Negligible Negligible Note: a. Release rate per chamber, limited by flow through geotextile with accumulated sediment. City acceptable flow rates determined to be approximately 1/2 of the Nov-07 Qmax from Figure 17 of the "Final Report on Field Verification Testing of the StormTech Isoloator Row Treatement Unit", prepard by the University of New Hamphire Stormwater Center, dated Setpember 2010. b. Volume within chamber only, not accounting for void spaces in surrounding aggregate. c. Volume includes chamber and void spaces (40%) in surrounding aggregate, per chamber unit. d. Volume within endcap only, not accounting for void spaces in surrounding aggregate. e. Volume includes endcap and void spaces (40%) in surrounding aggregate, per chamber unit. f. Release rate per chamber times number of chambers. This is used as the allowed release rate for the FAA calculations. g. WQ flow, equal to 1/2 of the 2-yr peak runoff rate, referenced to size flow control structure. h. Required detention volume determined using the FAA Method based on the acceptable release rate of sediment accumulated filter fabric of the chambers and the 1/2 of the 2yr in flow rate. i. Number of chambers required to provide required FAA storage volume stored within the chamber and endcaps only (no aggregate storage). j. Total volume provided in chambers only (no aggregate storage). k. Number of endcaps based on desired chamber layout. l. Total volume provided in endcaps only (no aggregate storage). m. Total chamber and endcap storage (not aggregate storage). This number must meet or exceed the required FAA storage volume. Summary Treatment Areas Detention / Landscape Areas (no treatment) J.Claeys Highland Development Services 18-1000-00 June 17, 2019 Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised January 2016) Totals NORTHFIELD LID TREATMENT AREAS EXHIBIT 6/18/19 1" = 100' N/A KRB JTC 18-1000-00 ---- 1 1 N W E S PROPOSED COMMERCIAL AREA �� � �� �1 � �� Page1 = 10.2 37.0 cfs Interception with Clogging Qwa = 9.6 34.7 cfs Curb Opening as an Orifice (based on Modified HEC22 Method) MINOR MAJOR Interception without Clogging Qoi = 19.2 25.5 cfs Interception with Clogging Qoa = 18.0 23.9 cfs Curb Opening Capacity as Mixed Flow MINOR MAJOR Interception without Clogging Qmi = 13.0 28.6 cfs Interception with Clogging Qma = 12.2 26.8 cfs Resulting Curb Opening Capacity (assumes clogged condition) QCurb = 9.6 23.9 cfs Resultant Street Conditions MINOR MAJOR Total Inlet Length L = 10.00 10.00 feet Resultant Street Flow Spread (based on street geometry from above) T = 17.9 37.5 ft.>T-Crown Resultant Flow Depth at Street Crown d CROWN = 0.0 4.7 inches Low Head Performance Reduction (Calculated) MINOR MAJOR Depth for Grate Midwidth dGrate = N/A N/A ft Depth for Curb Opening Weir Equation dCurb = 0.32 0.71 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination = 0.55 0.99 Curb Opening Performance Reduction Factor for Long Inlets RFCurb = 0.92 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate = N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Qa = 9.6 23.9 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK) Q PEAK REQUIRED = 4.9 14.4 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION Version 4.05 Released March 2017 H-Vert H-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 18-1000-00 UD-Inlet_v4.05.xlsm, A3 & A4 6/25/2019, 10:37 AM = 5.5 18.5 cfs Interception with Clogging Qwa = 5.0 16.6 cfs Curb Opening as an Orifice (based on Modified HEC22 Method) MINOR MAJOR Interception without Clogging Qoi = 9.6 12.8 cfs Interception with Clogging Qoa = 8.6 11.5 cfs Curb Opening Capacity as Mixed Flow MINOR MAJOR Interception without Clogging Qmi = 6.8 14.3 cfs Interception with Clogging Qma = 6.1 12.9 cfs Resulting Curb Opening Capacity (assumes clogged condition) QCurb = 5.0 11.5 cfs Resultant Street Conditions MINOR MAJOR Total Inlet Length L = 5.00 5.00 feet Resultant Street Flow Spread (based on street geometry from above) T = 17.9 37.5 ft.>T-Crown Resultant Flow Depth at Street Crown d CROWN = 0.0 4.7 inches Low Head Performance Reduction (Calculated) MINOR MAJOR Depth for Grate Midwidth dGrate = N/A N/A ft Depth for Curb Opening Weir Equation dCurb = 0.32 0.71 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination = 0.74 1.00 Curb Opening Performance Reduction Factor for Long Inlets RFCurb = 1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate = N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Qa = 4.98 11.49 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK) Q PEAK REQUIRED = 2.88 9.39 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION Version 4.05 Released March 2017 H-Vert H-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 18-1000-00 UD-Inlet_v4.05.xlsm, A15 6/25/2019, 10:43 AM 18-1000-01 Q100 (cfs) DRAINAGE STRUCTURE REMARKS Flow-by Q2 (cfs) Flow-by Q100 (cfs) 1/2 Street or Private Drive Capacity (cfs) Does Q100 Overtop CL (Yes/No)? Q100 Overtopping (cfs) Inlet Capacity Including Clogging Factor (cfs) Street Section June 18, 2019 DESIGN POINT TRIBUTARY SUB-BASIN Q2 (cfs) Inlet Capacity (cfs) To Be Used in StormCAD 18-1000-00 Rational Calcs (FC).xlsx Page 1 of 2 Highland Development Services C2 C2 0.14 0.53 0.67 12.07 5.00 2.78 9.95 0.09 0.42 C3 C3 0.83 0.25 0.31 5.00 6.12 2.38 9.15 1.39 6.66 C4 C4 0.25 0.70 0.88 8.23 5.00 2.78 9.95 0.51 2.30 C5 C5 1.15 0.73 0.91 5.00 10.21 2.12 7.66 1.02 4.60 C Total 3.67 4.42 20.46 D1 D1 0.58 0.46 0.58 15.37 5.00 2.78 9.95 1.43 5.75 D2 D2 0.65 0.89 1.00 5.00 5.00 2.77 9.95 1.58 6.50 D3 D3 1.30 0.25 0.31 5.00 13.94 1.84 6.70 1.10 5.04 D4 D4 0.16 0.61 0.76 8.39 5.00 2.66 9.95 0.30 1.42 D5 D5 0.43 0.87 1.00 5.03 6.88 2.36 8.82 0.61 2.85 D6 D6 0.10 0.70 0.87 5.87 5.00 2.59 9.95 0.20 0.94 D7 D7 0.09 0.73 0.92 6.38 5.00 2.78 9.95 0.20 0.87 D8 D8 0.72 0.63 0.78 11.58 5.00 2.70 9.95 1.68 7.15 D9 D9 0.61 0.83 1.00 5.00 9.99 2.09 7.72 0.79 3.67 D10 D10 0.16 0.65 0.81 11.91 5.00 2.68 9.95 0.28 1.30 D11 D11 0.88 0.89 1.00 5.80 10.39 2.06 7.61 1.17 5.42 D12 D12 0.76 0.87 1.00 5.56 5.04 2.67 9.67 1.81 7.37 D13 D13 0.28 0.67 0.83 5.72 5.00 2.78 9.95 0.24 1.06 D14 D14 2.50 0.31 0.39 5.00 13.75 1.89 6.75 1.33 5.90 D15 D15 0.44 0.72 0.90 14.39 5.53 2.61 9.42 0.84 3.80 D Total 9.65 13.57 59.04 E1 E1 0.48 0.28 0.35 14.39 5.11 2.56 9.63 1.01 4.62 E2 E2 0.66 0.82 1.00 6.61 5.33 2.53 9.52 1.43 6.32 E3 E3 1.55 0.85 1.00 6.88 13.92 1.92 6.71 2.50 10.42 E4 E4 1.95 0.84 1.00 13.92 14.96 1.79 6.49 2.66 12.05 E5 E5 0.58 0.76 0.95 16.18 6.38 2.40 9.03 1.16 5.28 E6 E6 0.56 0.83 1.00 8.05 6.18 2.42 9.12 1.13 5.15 E7 E7 0.75 0.83 1.00 7.87 6.94 2.34 8.80 1.31 6.19 E8 E8 0.60 0.75 0.93 8.67 7.42 2.28 8.61 0.97 4.58 E9 E9 0.39 0.71 0.89 9.31 5.15 2.78 9.95 0.89 3.58 E10 E10 0.24 0.81 1.00 5.00 5.00 3.82 13.32 0.80 3.24 E Total 7.79 13.88 61.43 Overall 58.69 89.84 397.34 June 18, 2019 *NOTE - Flows represented above are to the design point and do not account for any excess flow from another basin. Please refer to the Inlet Summary Sheet for overflow. DRAINAGE REMARKS DESIGN POINT Runoff Coefficient Time of Concentration Rainfaill Intensity AREA (acres) TRIBUTARY SUB-BASIN Peak Runoff 18-1000-00 Rational Calcs (FC).xlsx Page 12 of 12 Highland Development Services C1 C1 1.296 12.07 0.53 0.69 1.02 0.71 C2 C2 0.135 5.00 0.25 0.03 1.39 0.05 C3 C3 0.830 8.23 0.70 0.58 1.19 0.69 C4 C4 0.254 5.00 0.73 0.18 1.39 0.26 C5 C5 1.150 11.19 0.42 0.48 1.06 0.51 D1 D1 0.578 5.00 0.89 0.52 1.39 0.72 D2 D2 0.654 5.03 0.87 0.57 1.39 0.79 D3 D3 1.301 15.37 0.46 0.60 0.92 0.55 D4 D4 0.164 5.87 0.70 0.11 1.33 0.15 D5 D5 0.427 8.39 0.61 0.26 1.18 0.31 D6 D6 0.102 6.38 0.73 0.08 1.30 0.10 D7 D7 0.088 5.00 0.83 0.07 1.39 0.10 D8 D8 0.719 5.56 0.87 0.62 1.35 0.84 D9 D9 0.607 11.58 0.63 0.38 1.04 0.40 D10 D10 0.157 5.72 0.67 0.10 1.34 0.14 D11 D11 0.883 11.91 0.65 0.57 1.03 0.59 D12 D12 0.762 5.80 0.89 0.68 1.33 0.90 D13 D13 0.275 5.00 0.31 0.09 1.39 0.12 D14 D14 2.496 14.39 0.28 0.70 0.95 0.66 D15 D15 0.436 6.26 0.74 0.32 1.30 0.42 E1 E1 0.480 6.61 0.82 0.39 1.28 0.51 E2 E2 0.664 6.88 0.85 0.57 1.27 0.72 E3 E3 1.554 13.92 0.84 1.30 0.96 1.25 E4 E4 1.955 16.18 0.76 1.49 0.90 1.33 E5 E5 0.584 8.05 0.83 0.49 1.20 0.58 E6 E6 0.564 7.87 0.83 0.47 1.21 0.57 E7 E7 0.753 8.67 0.75 0.56 1.17 0.66 E8 E8 0.598 9.31 0.71 0.43 1.14 0.48 E9 E9 0.394 5.00 0.73 0.29 1.39 0.40 E10 E10 0.243 0.00 0.81 0.20 1.91 0.38 DESIGN CRITERIA: Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual Design Point Sub-basin Area (acres) 1/2 2-yr Peak Runoff June 26, 2019 Northfield DEVELOPED 1/2 2-YR PEAK RUNOFF (FOR LID SIZE DETERMINATION) J.Claeys Highland Development Services 18-1000-00 Q n = C n I n A n (0.786651) 1 (10 ) 28 . 5 t c P I + = 18-1000-00 Rational Calcs (FC).xlsx Page 11 of 12 Highland Development Services B1 B1 2.127 15.13 0.54 1.15 1.85 2.12 15.13 0.54 1.15 3.16 3.62 13.69 0.67 1.43 6.76 9.68 B2 B2 1.300 11.13 0.79 1.03 2.12 2.19 11.13 0.79 1.03 3.62 3.74 8.56 0.99 1.29 8.19 10.57 B3 B3 1.069 8.85 0.72 0.77 2.32 1.79 8.85 0.72 0.77 3.96 3.05 7.96 0.90 0.96 8.40 8.09 B4 B4 1.319 7.99 0.89 1.17 2.41 2.82 7.99 0.89 1.17 4.11 4.82 6.86 1.00 1.32 8.83 11.65 B5 B5 0.505 5.00 0.94 0.47 2.78 1.31 5.00 0.94 0.47 4.87 2.31 5.00 1.00 0.50 9.95 5.02 B6 B6 0.520 5.00 0.85 0.44 2.78 1.22 5.00 0.85 0.44 4.87 2.14 5.00 1.00 0.52 9.95 5.17 B7 B7 0.266 5.00 0.88 0.23 2.78 0.65 5.00 0.88 0.23 4.87 1.13 5.00 1.00 0.27 9.95 2.64 B8 B8 0.401 5.11 0.80 0.32 2.76 0.88 5.11 0.80 0.32 4.71 1.51 5.00 1.00 0.40 9.95 3.98 B9 B9 2.286 14.35 0.48 1.10 1.90 2.08 14.35 0.48 1.10 3.24 3.56 12.50 0.60 1.37 7.04 9.67 B10 B10 0.479 5.00 0.69 0.33 2.78 0.92 5.00 0.69 0.33 4.87 1.62 5.00 0.87 0.41 9.95 4.13 B11 B11 2.471 10.52 0.78 1.94 2.17 4.21 10.52 0.78 1.94 3.70 7.18 7.99 0.98 2.42 8.40 20.35 B12 B12 0.413 6.00 0.26 0.11 2.64 0.28 6.00 0.26 0.11 4.51 0.49 5.57 0.33 0.13 9.40 1.27 B13 B13 0.383 5.00 0.89 0.34 2.78 0.95 5.00 0.89 0.34 4.87 1.66 5.00 1.00 0.38 9.95 3.81 B14 B14 0.361 5.00 0.87 0.31 2.78 0.87 5.00 0.87 0.31 4.87 1.53 5.00 1.00 0.36 9.95 3.59 B15 B15 0.888 6.01 0.84 0.74 2.64 1.96 6.01 0.84 0.74 4.50 3.35 5.67 1.00 0.89 9.36 8.31 B16 B16 0.541 5.00 0.93 0.50 2.78 1.40 5.00 0.93 0.50 4.87 2.45 5.00 1.00 0.54 9.95 5.38 B17 B17 0.354 5.00 0.84 0.30 2.78 0.83 5.00 0.84 0.30 4.87 1.45 5.00 1.00 0.35 9.95 3.53 B18 B18 0.431 8.19 0.70 0.30 2.39 0.72 8.19 0.70 0.30 4.07 1.22 6.18 0.87 0.38 9.12 3.43 B19 B19 0.430 7.96 0.72 0.31 2.41 0.74 7.96 0.72 0.31 4.11 1.27 5.89 0.90 0.39 9.25 3.57 B20 B20 2.943 20.85 0.36 1.07 1.57 1.68 20.85 0.36 1.07 2.69 2.86 19.13 0.45 1.33 5.75 7.65 C1 C1 1.296 12.07 0.53 0.69 2.05 1.41 12.07 0.53 0.69 3.50 2.41 10.70 0.67 0.86 7.52 6.48 C2 C2 0.135 5.00 0.25 0.03 2.78 0.09 5.00 0.25 0.03 4.87 0.16 5.00 0.31 0.04 9.95 0.42 C3 C3 0.830 8.23 0.70 0.58 2.38 1.39 8.23 0.70 0.58 4.07 2.37 6.12 0.88 0.73 9.15 6.66 C4 C4 0.254 5.00 0.73 0.18 2.78 0.51 5.00 0.73 0.18 4.87 0.90 5.00 0.91 0.23 9.95 2.30 C5 C5 1.150 11.19 0.42 0.48 2.12 1.02 11.19 0.42 0.48 3.61 1.73 10.21 0.52 0.60 7.66 4.60 D1 D1 0.578 5.00 0.89 0.52 2.78 1.43 5.00 0.89 0.52 4.87 2.52 5.00 1.00 0.58 9.95 5.75 D2 D2 0.654 5.03 0.87 0.57 2.77 1.58 5.03 0.87 0.57 4.73 2.70 5.00 1.00 0.65 9.95 6.50 D3 D3 1.301 15.37 0.46 0.60 1.84 1.10 15.37 0.46 0.60 3.13 1.89 13.94 0.58 0.75 6.70 5.04 D4 D4 0.164 5.87 0.70 0.11 2.66 0.30 5.87 0.70 0.11 4.53 0.52 5.00 0.87 0.14 9.95 1.42 D5 D5 0.427 8.39 0.61 0.26 2.36 0.61 8.39 0.61 0.26 4.04 1.04 6.88 0.76 0.32 8.82 2.85 D6 D6 0.102 6.38 0.73 0.08 2.59 0.20 6.38 0.73 0.08 4.42 0.33 5.00 0.92 0.09 9.95 0.94 D7 D7 0.088 5.00 0.83 0.07 2.78 0.20 5.00 0.83 0.07 4.87 0.35 5.00 1.00 0.09 9.95 0.87 D8 D8 0.719 5.56 0.87 0.62 2.70 1.68 5.56 0.87 0.62 4.60 2.87 5.00 1.00 0.72 9.95 7.15 D9 D9 0.607 11.58 0.63 0.38 2.09 0.79 11.58 0.63 0.38 3.56 1.35 9.99 0.78 0.48 7.72 3.67 D10 D10 0.157 5.72 0.67 0.10 2.68 0.28 5.72 0.67 0.10 4.57 0.48 5.00 0.83 0.13 9.95 1.30 D11 D11 0.883 11.91 0.65 0.57 2.06 1.17 11.91 0.65 0.57 3.52 2.00 10.39 0.81 0.71 7.61 5.42 D12 D12 0.762 5.80 0.89 0.68 2.67 1.81 5.80 0.89 0.68 4.55 3.09 5.04 1.00 0.76 9.67 7.37 D13 D13 0.275 5.00 0.31 0.09 2.78 0.24 5.00 0.31 0.09 4.87 0.41 5.00 0.39 0.11 9.95 1.06 D14 D14 2.496 14.39 0.28 0.70 1.89 1.33 14.39 0.28 0.70 3.23 2.26 13.75 0.35 0.88 6.75 5.90 D15 D15 0.436 6.26 0.74 0.32 2.61 0.84 6.26 0.74 0.32 4.45 1.43 5.53 0.92 0.40 9.42 3.80 E1 E1 0.480 6.61 0.82 0.39 2.56 1.01 6.61 0.82 0.39 4.38 1.73 5.11 1.00 0.48 9.63 4.62 E2 E2 0.664 6.88 0.85 0.57 2.53 1.43 6.88 0.85 0.57 4.32 2.45 5.33 1.00 0.66 9.52 6.32 E3 E3 1.554 13.92 0.84 1.30 1.92 2.50 13.92 0.84 1.30 3.28 4.27 13.92 1.00 1.55 6.71 10.42 E4 E4 1.955 16.18 0.76 1.49 1.79 2.66 16.18 0.76 1.49 3.06 4.55 14.96 0.95 1.86 6.49 12.05 E5 E5 0.584 8.05 0.83 0.49 2.40 1.16 8.05 0.83 0.49 4.10 1.99 6.38 1.00 0.58 9.03 5.28 E6 E6 0.564 7.87 0.83 0.47 2.42 1.13 7.87 0.83 0.47 4.13 1.93 6.18 1.00 0.56 9.12 5.15 E7 E7 0.753 8.67 0.75 0.56 2.34 1.31 8.67 0.75 0.56 3.99 2.24 6.94 0.93 0.70 8.80 6.19 E8 E8 0.598 9.31 0.71 0.43 2.28 0.97 9.31 0.71 0.43 3.89 1.65 7.42 0.89 0.53 8.61 4.58 E9 E9 0.394 5.00 0.81 0.32 2.78 0.89 5.00 0.73 0.29 4.87 1.40 5.00 0.91 0.36 9.95 3.58 E9 E9 0.394 5.00 0.81 0.32 2.78 0.89 5.00 0.81 0.32 4.87 1.56 5.00 1.00 0.39 9.95 3.92 E10 E10 0.243 0.00 0.86 0.21 3.82 0.80 0.00 0.86 0.21 6.52 1.37 0.00 1.00 0.24 13.32 3.24 Overall 58.84 89.93 154.23 398.02 10-yr Peak Runoff 100-yr Peak Runoff Northfield DEVELOPED PEAK RUNOFF Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual DESIGN CRITERIA: Design Point Sub-basin Area (acres) J.Claeys Highland Development Services 18-1000-00 June 26, 2019 2-yr Peak Runoff Q n = C n I n A n (0.786651) 1 (10 ) 28 . 5 t c P I + = 18-1000-00 Rational Calcs (FC).xlsx Page 10 of 12 Highland Development Services Impervious C100 AREA (acres) tt (min) OVERALL SLOPE (ft/ft) tc (min) SLOPE (ft/ft) ti (min) LENGTH (ft) SLOPE (ft/ft) Table RO-2 VELOCITY (ft/s) t c = t i + t t 0 . 5 V = C v S w V L tt 60 = �� = 18 − 15� + � 60 24� + 12 � �� = 1.87(1.1 − �� �� ) � � � 18-1000-00 Rational Calcs (FC).xlsx Page 8 of 12 Highland Development Services POINT Sub-basin % Impervious C2-10 AREA (acres) tt (min) OVERALL SLOPE (ft/ft) tc (min) SLOPE (ft/ft) ti (min) LENGTH (ft) SLOPE (ft/ft) Table RO-2 VELOCITY (ft/s) t c = t i + t t 0 . 5 V = C v S w V L tt 60 = �� = 18 − 15� + � 60 24� + 12 � �� = 1.87(1.1 − �� �� ) � � � 18-1000-00 Rational Calcs (FC).xlsx Page 6 of 12 Highland Development Services Overall 2,504,876 57.504 645,813 521,700 309,372 0 1,027,991 55.6% 0.66 0.83 18-1000-00 Rational Calcs (FC).xlsx Page 5 of 12 Highland Development Services BASINS: Highland Development Services % Impervious values from Table RO-11 in the Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual J.Claeys 18-1000-00 June 26, 2019 Land Use Paved Roof Walks Runoff Coefficients and Frequency Adjustment Factors for City of Fort Collins - Storm Water Criteria Manual Gravel/Pavers Lawns (Heavy, 2-7% Slope) Sub-basin Designation Atotal (sq feet) Atotal (acres) Weighted % Impervious Apaved COMPOSITE (sq feet) Aroof (sq feet) Awalk (sq feet) Agravel/pavers (sq feet) Alawn (sq feet) 18-1000-00 Rational Calcs (FC).xlsx Page 4 of 12 Highland Development Services (ft) SLOPE (ft/ft) Table RO-2 VELOCITY (ft/s) t c = t i + t t 0 . 5 V = C v S w V L tt 60 = �� = 18 − 15� + � 60 24� + 12 � �� = 1.87(1.1 − �� �� ) � � � 18-1000-00 Rational Calcs (FC).xlsx Page 2 of 12 Interwest Consulting Group 18-1000-00 Rational Calcs (FC).xlsx Page 1 of 12 Interwest Consulting Group Block 17 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Block 15 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Block 18 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Block 19 Pond A2 Pond A1 Pond B1 Pond D Pond D KEY MAP NTS N W E S CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date 0 50' 50 25 50 100 SCALE: 1" = N W E S CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know Call what'sbelow. before you dig. R NO. REVISION BY DATE HIGHLAND DEVELOPMENT SERVICES 6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550 PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION SHEET OF DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) NORTHFIELD DRAINAGE & EROSION CONTROL PLAN 6/26/19 1" = 50' N/A KRB JTC 18-1000-00 ---- 14 95 AH BASIN COEFFICIENT (100-YR) BASIN DESIGNATION BASIN AREA DESIGN POINT DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY LEGEND EX MAJOR CONTOUR EX MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR CROSS-SECTION (FEMA) 100-YR FLOODPLAIN (FEMA) 100-YR FLOODWAY (FEMA) 500-YR FLOODPLAIN (FEMA) 100-YR FLOODPLAIN (NECCO) 100-YR FLOODWAY (NECCO) NOTES 1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH OWNER'S APPROVAL FOR REMOVAL. 2. THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND MINIMIZE DOWNSTREAM WATERWAY POLLUTION. 3. LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. 4. STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT. 5. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS. 6. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS. 7. AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE SOIL. 8. REFERENCE NORTHFIELD FINAL DRAINAGE REPORT. 9. REFERENCE SHEETS 86 - 87 FOR EROSION CONTROL DETAILS. 10. RETAINING WALL DESIGN AND DETAILS TO BE PROVIDED WITH WALL PERMIT. 11. COORDINATION OF TRAIL LOCATION WITH THE LAKE CANAL DITCH COMPANY IS REQUIRED PRIOR TO DESIGN AND CONSTRUCTION OF THE REGIONAL RECREATIONAL TRAIL. FLOODPLAIN NOTES 1. THE CURRENT EFFECTIVE (JUNE 17, 2008) FEMA FLOOD INSURANCE RATE MAP (FIRM, MAP NUMBERS 08096C0977G & 08069C0981G) DEPICTS THE 100-YR FLOODPLAIN IN SOME AREAS OF THE PROPOSED DEVELOPMENT. HOWEVER, IT IS ANTICIPATED THAT, AT THE TIME OF BUILDING CONSTRUCTION ON THE AFFECTED LOTS, THE NORTHEAST COLLEGE CORRIDOR OUTFALL PROJECT (NECCO) WILL HAVE REMAPPED THE FLOODPLAIN SUCH THAT THE 100-YR FLOODPLAIN WILL NO LONGER BE PRESENT ON THE PROPOSED DEVELOPMENT. IT IS ANTICIPATED THAT THE MAP REVISION WILL BE COMPLETED BY THE END OF 2019. 2. IF THE DEVELOPER DECIDES TO CONSTRUCT STRUCTURES OR OTHER CONSTRUCTION ELEMENTS IN THE CURRENT EFFECTIVE 100-YR FLOODPLAIN BEFORE THE REMAPPING EFFORTS ARE COMPLETE AND DOCUMENTED BY NECCO AND FEMA, IT SHOULD BE NOTED THAT ADDITIONAL ANALYSIS OF THE BFE IS NECESSARY, AND THE FOLLOWING NOTES WILL ALSO APPLY: 2.1 FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR EACH STRUCTURE AND EACH SITE CONSTRUCTION ELEMENT (DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITIES, ETC.) IN THE FLOODPLAIN 2.2.A FEMA ELEVATION OR FLOODPROOFING CERTIFICATE MUST BE COMPLETED AND APPROVED BEFORE THE CERTIFICATE OF OCCUPANCY (CO) IS ISSUED FOR ANY STRUCTURES IN THE FLOODPLAIN. 3. THE 500 -YR FLOODPLAIN (SHADED ZONE X - NOT SHOWN HEREON) IS DUE TO THE FLOODING OF THE POUDRE RIVER, CRITICAL FACILITIES ARE PROHIBITED WITHIN THE 500-YR FLOODPLAIN, FACILITIES FOR AT-RISK POPULATIONS (DAYCARES, SCHOOLS, NURSING HOMES, ETC.) AND EMERGENCY SERVICES FACILITIES (E.G. URGENT CARE, HOSPITALS, FIRE, POLICE). CONSTRUCTION ENTRANCE W/ VEHICLE TRACKING CONTROL CONCRETE WASHOUT AREA SILT FENCE INLET PROTECTION OUTLET STRUCTURE PROTECTION ROCK SOCKS SEDIMENT CONTROL LOGS TEMPORARY SEDIMENT BASIN SURFACE ROUGHENING COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES 1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2. ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5. THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. NTS N W E S REGIONAL TRAIL SECTION A-A 4950 4955 4960 4965 4970 4950 4955 4960 4965 4970 -0+25 0+00 0+50 1+00 1+25 REGIONAL TRAIL SECTION B-B HORIZ. SCALE: 1"=50' VERT. SCALE: 1"=10' 4950 4955 4960 4965 4970 4950 4955 4960 4965 4970 -0+25 0+00 0+50 1+00 1+25 0 50' 50 25 50 100 SCALE: 1" = CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know Call what'sbelow. before you dig. R N W E S NO. REVISION BY DATE HIGHLAND DEVELOPMENT SERVICES 6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550 PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION SHEET OF DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) NORTHFIELD DRAINAGE & EROSION CONTROL PLAN 6/26/19 1" = 50' N/A KRB JTC 18-1000-00 ---- 13 95 AH BASIN COEFFICIENT (100-YR) BASIN DESIGNATION BASIN AREA DESIGN POINT DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY LEGEND EX MAJOR CONTOUR EX MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR CROSS-SECTION (FEMA) 100-YR FLOODPLAIN (FEMA) 100-YR FLOODWAY (FEMA) 500-YR FLOODPLAIN (FEMA) 100-YR FLOODPLAIN (NECCO) 100-YR FLOODWAY (NECCO) NOTES 1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH OWNER'S APPROVAL FOR REMOVAL. 2. THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND MINIMIZE DOWNSTREAM WATERWAY POLLUTION. 3. LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. 4. STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT. 5. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS. 6. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS. 7. AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE SOIL. 8. REFERENCE NORTHFIELD FINAL DRAINAGE REPORT. 9. REFERENCE SHEETS 86 - 87 FOR EROSION CONTROL DETAILS. 10. RETAINING WALL DESIGN AND DETAILS TO BE PROVIDED WITH WALL PERMIT. 11. COORDINATION OF TRAIL LOCATION WITH THE LAKE CANAL DITCH COMPANY IS REQUIRED PRIOR TO DESIGN AND CONSTRUCTION OF THE REGIONAL RECREATIONAL TRAIL. FLOODPLAIN NOTES 1. THE CURRENT EFFECTIVE (JUNE 17, 2008) FEMA FLOOD INSURANCE RATE MAP (FIRM, MAP NUMBERS 08096C0977G & 08069C0981G) DEPICTS THE 100-YR FLOODPLAIN IN SOME AREAS OF THE PROPOSED DEVELOPMENT. HOWEVER, IT IS ANTICIPATED THAT, AT THE TIME OF BUILDING CONSTRUCTION ON THE AFFECTED LOTS, THE NORTHEAST COLLEGE CORRIDOR OUTFALL PROJECT (NECCO) WILL HAVE REMAPPED THE FLOODPLAIN SUCH THAT THE 100-YR FLOODPLAIN WILL NO LONGER BE PRESENT ON THE PROPOSED DEVELOPMENT. IT IS ANTICIPATED THAT THE MAP REVISION WILL BE COMPLETED BY THE END OF 2019. 2. IF THE DEVELOPER DECIDES TO CONSTRUCT STRUCTURES OR OTHER CONSTRUCTION ELEMENTS IN THE CURRENT EFFECTIVE 100-YR FLOODPLAIN BEFORE THE REMAPPING EFFORTS ARE COMPLETE AND DOCUMENTED BY NECCO AND FEMA, IT SHOULD BE NOTED THAT ADDITIONAL ANALYSIS OF THE BFE IS NECESSARY, AND THE FOLLOWING NOTES WILL ALSO APPLY: 2.1 FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR EACH STRUCTURE AND EACH SITE CONSTRUCTION ELEMENT (DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITIES, ETC.) IN THE FLOODPLAIN 2.2.A FEMA ELEVATION OR FLOODPROOFING CERTIFICATE MUST BE COMPLETED AND APPROVED BEFORE THE CERTIFICATE OF OCCUPANCY (CO) IS ISSUED FOR ANY STRUCTURES IN THE FLOODPLAIN. 3. THE 500 -YR FLOODPLAIN (SHADED ZONE X - NOT SHOWN HEREON) IS DUE TO THE FLOODING OF THE POUDRE RIVER, CRITICAL FACILITIES ARE PROHIBITED WITHIN THE 500-YR FLOODPLAIN, FACILITIES FOR AT-RISK POPULATIONS (DAYCARES, SCHOOLS, NURSING HOMES, ETC.) AND EMERGENCY SERVICES FACILITIES (E.G. URGENT CARE, HOSPITALS, FIRE, POLICE). CONSTRUCTION ENTRANCE W/ VEHICLE TRACKING CONTROL CONCRETE WASHOUT AREA SILT FENCE INLET PROTECTION OUTLET STRUCTURE PROTECTION ROCK SOCKS SEDIMENT CONTROL LOGS TEMPORARY SEDIMENT BASIN SURFACE ROUGHENING COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES 1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2. ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5. THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 1 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Block 4 Block 9 Block 10 Block 11 L ot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Block 12 Block 13 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Pond B3 Pond A2 Tract R (Drainage, Utility, & Private Access Easement) Pond B2 Tract O (Drainage, Utility, & Private Access Easement) KEY MAP NTS N W E S 0 50' 50 25 50 100 SCALE: 1" = CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date AH BASIN COEFFICIENT (100-YR) BASIN DESIGNATION BASIN AREA DESIGN POINT DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY LEGEND EX MAJOR CONTOUR EX MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR CROSS-SECTION (FEMA) 100-YR FLOODPLAIN (FEMA) 100-YR FLOODWAY (FEMA) 500-YR FLOODPLAIN (FEMA) 100-YR FLOODPLAIN (NECCO) 100-YR FLOODWAY (NECCO) NOTES 1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH OWNER'S APPROVAL FOR REMOVAL. 2. THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND MINIMIZE DOWNSTREAM WATERWAY POLLUTION. 3. LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. 4. STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT. 5. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS. 6. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS. 7. AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE SOIL. 8. REFERENCE NORTHFIELD FINAL DRAINAGE REPORT. 9. REFERENCE SHEETS 86 - 87 FOR EROSION CONTROL DETAILS. 10. RETAINING WALL DESIGN AND DETAILS TO BE PROVIDED WITH WALL PERMIT. 11. COORDINATION OF TRAIL LOCATION WITH THE LAKE CANAL DITCH COMPANY IS REQUIRED PRIOR TO DESIGN AND CONSTRUCTION OF THE REGIONAL RECREATIONAL TRAIL. N W E S CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know Call what'sbelow. before you dig. R NO. REVISION BY DATE HIGHLAND DEVELOPMENT SERVICES 6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550 PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION SHEET OF DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) NORTHFIELD DRAINAGE & EROSION CONTROL PLAN 6/26/19 1" = 50' N/A KRB JTC 18-1000-00 ---- 12 95 FLOODPLAIN NOTES 1. THE CURRENT EFFECTIVE (JUNE 17, 2008) FEMA FLOOD INSURANCE RATE MAP (FIRM, MAP NUMBERS 08096C0977G & 08069C0981G) DEPICTS THE 100-YR FLOODPLAIN IN SOME AREAS OF THE PROPOSED DEVELOPMENT. HOWEVER, IT IS ANTICIPATED THAT, AT THE TIME OF BUILDING CONSTRUCTION ON THE AFFECTED LOTS, THE NORTHEAST COLLEGE CORRIDOR OUTFALL PROJECT (NECCO) WILL HAVE REMAPPED THE FLOODPLAIN SUCH THAT THE 100-YR FLOODPLAIN WILL NO LONGER BE PRESENT ON THE PROPOSED DEVELOPMENT. IT IS ANTICIPATED THAT THE MAP REVISION WILL BE COMPLETED BY THE END OF 2019. 2. IF THE DEVELOPER DECIDES TO CONSTRUCT STRUCTURES OR OTHER CONSTRUCTION ELEMENTS IN THE CURRENT EFFECTIVE 100-YR FLOODPLAIN BEFORE THE REMAPPING EFFORTS ARE COMPLETE AND DOCUMENTED BY NECCO AND FEMA, IT SHOULD BE NOTED THAT ADDITIONAL ANALYSIS OF THE BFE IS NECESSARY, AND THE FOLLOWING NOTES WILL ALSO APPLY: 2.1 FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR EACH STRUCTURE AND EACH SITE CONSTRUCTION ELEMENT (DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITIES, ETC.) IN THE FLOODPLAIN 2.2.A FEMA ELEVATION OR FLOODPROOFING CERTIFICATE MUST BE COMPLETED AND APPROVED BEFORE THE CERTIFICATE OF OCCUPANCY (CO) IS ISSUED FOR ANY STRUCTURES IN THE FLOODPLAIN. 3. THE 500 -YR FLOODPLAIN (SHADED ZONE X - NOT SHOWN HEREON) IS DUE TO THE FLOODING OF THE POUDRE RIVER, CRITICAL FACILITIES ARE PROHIBITED WITHIN THE 500-YR FLOODPLAIN, FACILITIES FOR AT-RISK POPULATIONS (DAYCARES, SCHOOLS, NURSING HOMES, ETC.) AND EMERGENCY SERVICES FACILITIES (E.G. URGENT CARE, HOSPITALS, FIRE, POLICE). CONSTRUCTION ENTRANCE W/ VEHICLE TRACKING CONTROL CONCRETE WASHOUT AREA SILT FENCE INLET PROTECTION OUTLET STRUCTURE PROTECTION ROCK SOCKS SEDIMENT CONTROL LOGS TEMPORARY SEDIMENT BASIN SURFACE ROUGHENING COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES 1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2. ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5. THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Know Call what'sbelow. before you dig. R NO. REVISION BY DATE HIGHLAND DEVELOPMENT SERVICES 6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550 PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION SHEET OF DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) NORTHFIELD OVERALL GRADING & DRAINAGE PLAN 6/26/19 1" = 100' N/A KRB JTC 18-1000-00 ---- 11 95 100-YR FLOODPLAIN (FEMA) 100-YR FLOODWAY (FEMA) 500-YR FLOODPLAIN (FEMA) 100-YR FLOODPLAIN (NECCO) 100-YR FLOODWAY (NECCO) PA9 5.62 5.62 5.62 0.93 1.16 Analysis begun on: Tue Jun 25 07:59:50 2019 Analysis ended on: Tue Jun 25 07:59:52 2019 Total elapsed time: 00:00:02 Page 8 PD9 CONDUIT 1.75 0 05:59 2.17 0.37 1.00 PE1 CONDUIT 3.81 0 05:59 2.27 0.22 1.00 PE2 CONDUIT 8.10 0 05:59 3.05 0.22 1.00 PA9 CONDUIT 31.41 0 00:48 6.40 2.76 1.00 PD5 CONDUIT 20.68 0 00:41 5.51 0.88 0.72 PD6 CONDUIT 20.15 0 00:41 5.50 0.85 0.70 OutB2 ORIFICE 9.11 0 00:50 1.00 OutA4 ORIFICE 5.92 0 01:47 1.00 OutA3 ORIFICE 6.39 0 01:47 1.00 OutB3 ORIFICE 2.68 0 03:17 1.00 OutB1 ORIFICE 4.31 0 01:52 1.00 OutD1 ORIFICE 1.20 0 05:54 1.00 Page 7 Page 6 IB7 JUNCTION 5.63 3.587 1.113 IB8 JUNCTION 5.64 3.766 1.134 IB9 JUNCTION 0.04 0.328 2.972 IC2 JUNCTION 4.86 0.639 2.161 IC3 JUNCTION 4.56 0.803 2.397 IC4 JUNCTION 4.95 0.881 2.619 IE1 JUNCTION 0.07 0.112 3.588 IE2 JUNCTION 0.56 0.281 3.619 MHA1 JUNCTION 0.78 3.083 0.617 Page 5 ID3 JUNCTION 0.89 19.94 0 00:40 0.00837 0.243 0.001 ID4 JUNCTION 0.88 20.79 0 00:40 0.00808 0.252 -0.019 IE1 JUNCTION 0.00 2.98 0 05:59 0 0.158 0.410 IE2 JUNCTION 0.00 9.53 0 05:59 0 0.164 0.371 MHA1 JUNCTION 0.00 26.17 0 00:40 0 0.285 0.469 MHA2 JUNCTION 0.00 39.91 0 00:40 0 0.421 1.950 MHA3 JUNCTION 0.00 39.91 0 00:40 0 0.411 2.436 MHA5 JUNCTION 0.00 31.41 0 00:48 0 0.804 0.340 MHB1 JUNCTION 0.00 37.50 0 00:40 0 0.443 2.474 Page 4 MHB4 JUNCTION 6.56 7.42 4952.16 0 06:00 7.42 MHB6 JUNCTION 4.16 5.41 4953.17 0 00:55 5.38 MHC1 JUNCTION 2.03 2.42 4956.02 0 02:57 2.40 MHC2 JUNCTION 2.29 2.71 4956.03 0 03:00 2.69 MHD1 JUNCTION 0.31 1.62 4953.85 0 00:40 1.58 MHD3 JUNCTION 1.24 1.74 4949.84 0 00:42 1.57 MHD4 JUNCTION 1.73 2.04 4949.56 0 02:25 2.04 OA2 JUNCTION 5.44 9.59 4953.86 0 03:17 6.33 OA3-Stage1 JUNCTION 5.82 10.99 4954.88 0 03:17 6.70 Page 3 A18 3.66 0.00 0.00 1.63 0.55 1.48 2.03 0.17 9.66 0.554 C2 3.66 0.00 0.00 1.68 0.00 2.05 2.05 0.01 1.13 0.559 C5 3.66 0.00 0.00 1.42 0.82 1.42 2.24 0.07 5.14 0.611 D3 3.66 0.00 0.00 0.84 1.99 0.80 2.79 0.19 Page 2 Minimum Time Step : 0.50 sec Average Time Step : 0.88 sec Maximum Time Step : 30.00 sec Page 1 OUTPUT C 6.3 21507 ; ;Pond D D Storage 0 0 D .38 1012 D 0.88 4921 D 1.38 8676 D 1.88 12125 D 2.38 19373 D 2.88 29562 D 3.38 42361 D 3.88 52334 Page 7 ;Pond A1 A1 Storage 0 1 A1 .5 5679 A1 1 22767 A1 1.5 45079 A1 2 67209 A1 2.5 78292 A1 3 81175 A1 3.5 83146 A1 4 85329 ; Page 6 OP-MHA4 RECT_OPEN 5 10 0 0 1 OP-MHA6 RECT_OPEN 4 10 0 0 1 OP-MHA7 RECT_OPEN 3 10 0 0 1 OP-MHB2 RECT_OPEN 3 10 0 0 1 OP-MHB5 RECT_OPEN 5 10 0 0 1 PA1 CIRCULAR 3 0 0 0 1 PA10 CIRCULAR 2.5 0 0 0 1 PA11 CIRCULAR 2.5 0 0 0 1 PA12 CIRCULAR 2.5 0 0 0 1 PA13 CIRCULAR 2 0 0 0 1 Page 5 PA15 MHA7 OA4-Stage1 23 .016 0 0 0 0 PA16 OA4-Stage2 Out2 65 .016 0 0 0 0 PA17 OA3-Stage2 Out1 60 .016 0 0 0 0 PA2 IA2 MHA1 8 .016 0 .5 0 0 PA3 MHA1 MHA2 96 .016 0 0 0 0 PA4 IA3 MHA2 138 .016 0 0 0 0 PA5 MHA2 MHA3 210 .016 0 0 0 0 PA6 MHA3 MHA4 137 .016 0 0 0 0 Page 4 MHA5 4944.14 12.1 0 0 0 MHB1 4948.14 9.3 0 0 0 MHB3 4945.56 11.4 0 0 0 MHB4 4944.74 12 0 0 0 MHB6 4947.76 8.5 0 0 0 MHC1 4953.6 4.3 0 0 0 MHC2 4953.32 7.2 0 0 0 MHD1 4952.23 5.7 0 0 0 MHD3 4948.10 6.0 0 0 0 MHD4 4947.52 4.9 0 0 0 OA2 4944.27 3.7 0 8 0 Page 3 ;;Subcatchment MaxRate MinRate Decay DryTime MaxInfil ;;-------------- ---------- ---------- ---------- ---------- ---------- B1 3.0 0.5 6.48 7 0 B2 3.0 0.5 6.48 7 0 B3 3.0 0.5 6.48 7 0 B4 3.0 0.5 6.48 7 0 B6 3.0 0.5 6.48 7 0 B8 3.0 0.5 6.48 7 0 B9 3.0 0.5 6.48 7 0 B10 3.0 0.5 6.48 7 0 Page 2 B11 CoFC_100-yr IB8 2.2 73 155 0.5 0 B12 CoFC_100-yr VB2 .41 1.5 191 0.5 0 B17 CoFC_100-yr IB9 2.53 83.0 159 0.5 0 B18 CoFC_100-yr IB11 0.43 60.9 52 0.5 0 B19 CoFC_100-yr IB10 0.43 63.8 52 0.5 0 B20 CoFC_100-yr VB1 2.94 14.4 173 0.5 0 Page 1 INPUT PB11 PB12 PB13 PB14 PB15 PB16 PB17 PB18 PB19 PB2 PB20 PB3 PB4 PB5 PB6 PB7 PB8 PB9 PC1 PC2 PC3 PC4 PC5 PC6 PC7 PD1 PD2 PD3PD4 PD7 PD8 PD9 PE1 PE2 PA9 PD5 PD6 OutB2 OutA4 OutA3 OutB3 OutB1 OutD1 OutC1 IA1 IA2 IA3 IA4 IA5 IA6 IB1 IB10 IB11 IB2 IB3 IB4 IB5 IB6 IB7 IB8 IB9 IC1 IC2 IC3 IC4 ID1 ID2 ID3 ID4 IE1 IE2 MHA1 MHA2 MHA3 MHA5 MHB1 MHB3 MHB4 MHB6 MHC1 MHC2 MHD1 MHD3 MHD4 OA2 OA3-Stage1 OA3-Stage2 OA4-Stage1 OA4-Stage2 OB1-Stage1 OB2-Stage2Stage1 OB1- OB2-Stage2 OB3-Stage1 OB3-Stage2 OC1 OD1 MHD2 Out1 Out2 Out3 MHB2 MHA4 MHB5 MHA7 MHA6 OA1 VB3 VB2 VB1 VA2 VA1 VC1 VD1 CoFC_100-yr 03/11/2019 00:05:00 SWMM 5.1 Page 1 BASIN ID TRIBUTARY SUB-BASINS AREA (acres) AREA (sq ft) 18-1000-00 Rational Calcs (FC).xlsx Page 1 of 1 Highland Development Services 18.5 ac 8.7 ac 29.3 ac 11.4 ac 9.8 ac 11.4 ac 4.8 ac 16.4 ac 3.3 ac 1.3 ac 31.6 ac 52.7 ac 21.3 ac 7.4 ac 18.1 ac 17.0 ac 2.5 ac 2.7 ac 2.0 ac 4.6 ac 2.5 ac 13.1 ac 3.9 ac 13.7 ac 1.8 ac 0.2 ac 7.2 ac 6.0 ac 3.8 ac 0.6 ac 2.4 ac 5.2 ac 1.6 ac 2.6 ac 35.7 ac 2.6 ac 1.8 ac 1.8 ac 1.6 ac 1.2 ac 0.7 ac 4.2 ac 2.6 ac 13.6 ac 13.0 ac 8.6 ac 7.1 ac 5.1 ac 4.5 ac 4.2 ac 10.9 ac 8.2 ac 19.2 ac 16.0 ac 32.4 ac 17.5 ac 9.8 ac 16.6 ac 29.3 ac 6.0 ac 10.3 ac 5.9 ac 1.5 ac 1.3 ac 21.2 ac 1.ac5 ac 1.2 1.1 ac 1.1 ac 8.2 ac 1.0 ac 8.6 ac 5.2 ac 14.8 ac 2.0 ac 1.6 ac 3.3 ac 1.4 ac 5.3 ac 1.2 ac 1.0 ac 2.7 ac 2.2 ac 3.9 ac 3.3 ac 3.4 ac 4.4 ac 7.9 ac 0.2 ac 4.2 ac 1.1 ac 1.7 ac 2.4 ac 2.0 ac 1.0 ac 36.2 ac 5.5 ac 49.1 ac APPROX NORTHFIELD PROPRETY LINE of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 12, Oct 10, 2017 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Mar 20, 2015—Oct 15, 2016 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado (NorthField) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/6/2017 Page 2 of 4