RE: Meyer Subdivision, FDP190006, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you please contact your Development Review Coordinator, Brandy Bethurem Harras at
970.416.2744 or bbethuremharras@fcgov.com.
UComment Summary:
Department: Planning Services
Contact: Kai Kleer, 970-416-4284, Ukkleer@fcgov.com
Topic: General
Comment Number: 1
04/09/2019 READY FOR HEARING:
Minor clean up items for Land Use Table:
Allowable Density: 2 units / gross acre
Proposed Density: 0.86 units / gross acre
Parking Summary
Required: 1 / single-family detached dwelling (2 total)
Provided: 6
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, Umvirata@fcgov.com
Topic: General
Comment Number: 6
04/15/2019: INFORMATION ONLY:
Previous comments have been addressed and no additional
comments/concerns. I'm awaiting information on development agreement
language from other departments at this time.
2
Department: PFA
Contact: Andrew Rosen, 970-416-2599, Uarosen@poudre-fire.org
Topic: General
Comment Number: 1
04/10/2019:
ALL PFA COMMENTS RESOLVED. THANK YOU
03/27/2019: UPDATE from staff review
The applicant will show 16ft wide access for the full extent of the fire lane
Please contact the Fort Collins Building Department for assistance with the P2904 sprinkler system.
03/18/2019:
ACCESS - The Fire Lane is required to be 16ft wide and capable of supporting 40T from
Kechter Road its entire length to the residence. The provided documents show
10ft, 16ft and 25ft wide in different locations
Department: Stormwater Engineering
Contact: Shane Boyle, 970-221-6339, Usboyle@fcgov.com
Topic: General
Comment Number: 3
04/16/2019: Please add a statement in the Drainage Report such as: "In my
professional opinion, the additional runoff generated by this development will
not cause adverse impacts to downstream private properties".
Contact: Jesse Schlam, 970-218-2932, Ujschlam@fcgov.com
Topic: Erosion Control
Comment Number: 2
04/16/2019: FOR FINAL APPROVAL:
Erosion Control Plan materials look acceptable, notes, details and escrow
figures all look acceptable based upon the 2019 Criteria, Thank you. The only
thing that looks to be missing is calling out a seed mixture. Please add a
proposed seed mix to the landscape plans for the native seeding being
proposed or at the very least add the seed blend to the erosion control sheet.
03/26/2019: Based upon discussion it appears that size and scope of project
will be changing to over 10,000 SF with the installation of a wider fire lane. As
the site disturbs more than 10,000 sq. ft. and therefore Erosion and Sediment
Control Materials need to be submitted. The erosion control requirements can
be located in the Stormwater Design Criteria under the Amendments of Volume
3 Chapter 7 Section 1.3.3. a copy of the erosion control requirements can be
found at www.fcgov.com/eroison. The Erosion Control Materials will need to be
submitted. If you need clarification concerning the Erosion Control Material
Requirements or Comments presented above please contact myself. Jesse
Schlam (970) 224-6015 jschlam@fcgov.com
3
Department: Technical Services
Contact: Jeff County, 970-221-6588, Ujcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 3
04/17/2019: FOR APPROVAL-UNRESOLVED:
Some of the easement descriptions shown are incorrect. If they are going to
stay on the plan, they should match what is shown on the Subdivision Plat.
03/25/2019: FOR APPROVAL:
Some of the easement descriptions shown are incorrect. If they are going to
stay on the plan, they should match what is shown on the Subdivision Plat.
Comment Number: 4
04/17/2019: FOR APPROVAL-UNRESOLVED:
Some of the right of way descriptions shown are incorrect. If they are going to
stay on the plan, they should match what is shown on the Subdivision Plat.
03/25/2019: FOR APPROVAL:
Some of the right of way descriptions shown are incorrect. If they are going to
stay on the plan, they should match what is shown on the Subdivision Plat.
Comment Number: 5
04/17/2019: FOR APPROVAL-UPDATED:
There are line over text issues. See redlines.
03/25/2019: FOR APPROVAL:
There are line over text issues. See redlines.
Topic: Plat
Comment Number: 1
04/17/2019: FOR APPROVAL-UPDATED:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response letter.
03/25/2019: FOR APPROVAL:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response letter.
Topic: Site Plan
Comment Number: 7
04/17/2019: FOR APPROVAL:
There are line over text issues. See redlines.
Comment Number: 8
04/17/2019: FOR APPROVAL:
Some of the easement descriptions shown are incorrect. If they are going to
stay on the plan, they should match what is shown on the Subdivision Plat.
Comment Number: 9
04/17/2019: FOR APPROVAL:
Some of the right of way descriptions shown are incorrect. If they are going to
stay on the plan, they should match what is shown on the Subdivision Plat.