HomeMy WebLinkAbout644 REMINGTON STREET EXTRA OCCUPANCY - BDR190010 - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTDevelopment Review Center – 281 N College Ave – Fort Collins, CO 80522-0580 – 970.221.6689
DRCoord@fcgov.com
Page 1 September 4, 2018
Submittal Instructions
• Appointments are required for all submittals or resubmittals – A paper copy of this checklist, all submittal
materials and fee payments are due at the time of project submittal. Please contact a Development
Review Coordinator at 970-221-6689 to schedule a submittal appointment and for assistance with this
checklist.
• Only complete submittals are accepted. The submittal may be returned to the applicant if any required
PDWHULDOVRUDSSOLFDWLRQIHHVDUHPLVVLQJRULQVXI¿FLHQW6XEPLWWDOVUHFHLYHG0RQGD\PRUQLQJWKURXJK
Wednesday noon will be routed for review the same week and submittals received after Wednesday
noon will be held and routed the following week.
• This checklist shall be used in tandem with the 6XEPLWWDO5HTXLUHPHQWV'RFXPHQW. The applicant must
FRPSOHWHWKLVFKHFNOLVWDQGDFNQRZOHGJHPHQWRIWKH6XEPLWWDO5HTXLUHPHQWV'RFXPHQW
• The applicant shall be the designated contact person who will receive correspondence from city staff
and referral agencies.
Additional Resources
• Development Review Guide and Flowchart:
https://www.fcgov.com/drg/
• 'HYHORSPHQW5HYLHZ$SSOLFDWLRQVDQG6XEPLWWDO5HTXLUHPHQWV0DLQ3DJH
https://www.fcgov.com/developmentreview/applications.php
• City Land Use Code:
https://library.municode.com/co/fort_collins/codes/land_use
• City Utilities:
Development Forms, Guidelines & Regulations
• City Engineering main page:
https://www.fcgov.com/engineering/
• The City’s Comprehensive Plans:
City Plan and 7UDQVSRUWDWLRQ0DVWHU3ODQ
• 2QOLQH&LW\0DS5HVRXUFHV
https://www.fcgov.com/gis/maps.php
Development Application
Complete Submittal Checklist
Page 2 Development Application Submittal Checklist September 4, 2018
Project Development Plan (PDP) Complete Submittal Checklist
Project Name:
Applicant Name:
2I¿FH8VH2QO\
Project Type: Project Number (if assigned):
1HZ6XEPLWWDO Revision -- Review Round 6XEPLWWDO'DWH
6WDII5HYLHZ0HHWLQJ'DWH 6WDII&RRUGLQDWRU
In addition to PDP reviews, this checklist may be used for the pre-hearing review of the following review types:
0DMRU$PHQGPHQWV 0-$
Page 3 Development Application Submittal Checklist September 4, 2018
Electronic Copies:
$OOFRSLHVPXVWEHSURYLGHGSHU&LW\¿OHQDPLQJVWDQGDUGVDQGVXEPLWWHGRQDÀDVKGULYHRU&'
See: Submittal Requirements Section M – File Naming Standards
1) General Information:
Staff
Code
Applicant
Validation
Item Description
Submittal Requirement
Resources
$IIHFWHG3URSHUW\2ZQHU $32
Page Development Application Submittal Checklist September 4, 2018
&LW\)RUHVWU\
Existing Tree Removal Feasibility Letter; Existing Tree
,QYHQWRU\3ODQ([LVWLQJ7UHH0LWLJDWLRQ3ODQ LIDSSOLFDEOH
The applicant must schedule an on-site meeting with City
Forestry to obtain tree inventory and mitigation information
for all existing trees on-site prior to review submittal.
(;,67,1*75((65(029('35,2572'(9(/230(17
$33/,&$7,210$<%(,19,2/$7,212)&,7<&2'(
6HFWLRQV+DQG/
City Forestry:
forestry@fcgov.com
970.221.6660
Applicant Acknowledgement:
,KDYHUHYLHZHGWKH'HYHORSPHQW$SSOLFDWLRQ6XEPLWWDO5HTXLUHPHQWV6HFWLRQV$±0$OOGRFXPHQWVVXEPLWWHG
DUHFRPSOHWHDQGWKH'HYHORSPHQW$SSOLFDWLRQ6XEPLWWDO5HTXLUHPHQWVKDYHEHHQLQFRUSRUDWHGLQWRWKHSODQV
6HH'HYHORSPHQW$SSOLFDWLRQ6XEPLWWDO5HTXLUHPHQWVIRUGHWDLOHGGHVFULSWLRQRIUHTXLUHPHQWV
$OOGRFXPHQWV
submitted have been compared and consistent design information is shown on all plan sheets and reports. I
XQGHUVWDQGWKDWVXEPLWWDOUHTXLUHPHQWVQRWVXI¿FLHQWO\DGGUHVVHGRUGHIHUUHGPD\UHVXOWLQDGGHGUHYLHZWLPH
$SSOLFDQW1DPH &KHFNER[WRFRQ¿UPDFNQRZOHGJHPHQW
(See Development Application Submittal Requirements for detailed description of requirements)
Kate Penning
1RWL¿FDWLRQ/LVW IROORZLQJ
WKHQRWL¿FDWLRQERXQGDU\SURYLGHGE\FLW\VWDII 6XEPLWWDO5HTXLUHPHQWV
6HFWLRQ&
Development Review
Coordination staff 970-221-
6689
DRCoord@fcgov.com
Conceptual Review (CR) or Preliminary Development
Review (PDR) comment response letter; or for resubmittals
include a comment response letter from the prior round of
review
3URMHFW,QIRUPDWLRQDQG'HVLJQ1DUUDWLYH VHH6XEPLWWDO
5HTXLUHPHQWV6HFWLRQ&
2) Planning Submittal Package:
Staff
Code
Applicant
Validation
Item Description
Submittal Requirement
Resources
Title Block information on all plan sheets 6HFWLRQ'
Land Use Table 6HFWLRQ(
6KHHW,QGH[ 6HFWLRQ'
6LJQDWXUH%ORFNV 6HFWLRQ'
6LWH3ODQ1RWHV
6WDQGDUG1RWHV
(also available in Word
IRUPDWDWWKH6XEPLWWDO
Requirements web page)
6LWH/RFDWLRQ0DS 6HFWLRQ'
Legal Description 6HFWLRQ'
6LWH3ODQ6KHHW V
DQGUHODWHGKDUGVFDSHGHVLJQGHWDLO
VKHHWV6HH6HFWLRQ,IRU5HTXLUHPHQWV 6HFWLRQ)
$UFKLWHFWXUDO(OHYDWLRQV SKRWRV 6HFWLRQ*
Existing Conditions and/or Demolition Plan (if applicable)
)ORRU3ODQV GRFXPHQWLQJLQWHULRUVSDFHV
N/A
N/A
WRDSSURYHG3'3¶V$38DQG63$55HIHUWRWKH6XEPLWWDO5HTXLUHPHQWV'RFXPHQW
for a description of these review types. $OOFKHFNOLVWLWHPVDUHUHTXLUHGXQOHVVFLW\VWDIILQGLFDWHVDQLWHPLV
:
DLYHG '
HIHUUHG 1$
1RW$SSOLFDEOHRUDOUHDG\ 5
HFHLYHG ,IWKHVWDIIFRGHLVEODQN JUH\RUEOXH
WKHQWKHLWHPLVUHTXLUHGThis checklist must be reviewed, completed and accepted by staff prior to project
routing. Additional information may be requested from the applicant during the review process if necessary to
DGGUHVVVSHFL¿FLVVXHVWKDWDULVH3OHDVHQRWHWKDWDOODSSOLFDWLRQPDWHULDOVRQFHVXEPLWWHGEHFRPHDPDWWHU
of public record.
Paper Copies:
Staff
Code
Applicant
Validation
Item Description
Submittal Requirement
Resources
One paper copy is required (with the initial submittal only) for
the following3ODQQLQJ6XEPLWWDO3DFNDJH38'VXEGLYLVLRQ
plat, Civil Construction Plans. Plan sets shall be provided at
full scale (24” x 36”); staple together each plan set; do not
fold sets
Development Review
Coordination staff 970-221-
6689
One paper copy of this checklist, completed and signed by
applicant
Development Review
Coordination staff 970-221-
6689
DRCoord@fcgov.com
One signed paper copy of Development Application Form Application Form.pdf
One signed paper copy of Transportation Development
Review (TDR) Application and Fee
TDR Fees and Application.
pdf
Contact Engineering at 221-
6605 for TDR fee information
Check for the above application forms payable to the “City of
Fort Collins” (fees may be consolidated into one check)
Development Review
Coordination staff 970-221-
6689
FDP
644 Remington Street Extra Occupancy
Tom Marsh