Loading...
HomeMy WebLinkAbout644 REMINGTON STREET EXTRA OCCUPANCY - BDR190010 - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTDevelopment Review Center – 281 N College Ave – Fort Collins, CO 80522-0580 – 970.221.6689 DRCoord@fcgov.com Page 1 September 4, 2018 Submittal Instructions • Appointments are required for all submittals or resubmittals – A paper copy of this checklist, all submittal materials and fee payments are due at the time of project submittal. Please contact a Development Review Coordinator at 970-221-6689 to schedule a submittal appointment and for assistance with this checklist. • Only complete submittals are accepted. The submittal may be returned to the applicant if any required PDWHULDOVRUDSSOLFDWLRQIHHVDUHPLVVLQJRULQVXI¿FLHQW6XEPLWWDOVUHFHLYHG0RQGD\PRUQLQJWKURXJK Wednesday noon will be routed for review the same week and submittals received after Wednesday noon will be held and routed the following week. • This checklist shall be used in tandem with the 6XEPLWWDO5HTXLUHPHQWV'RFXPHQW. The applicant must FRPSOHWHWKLVFKHFNOLVWDQGDFNQRZOHGJHPHQWRIWKH6XEPLWWDO5HTXLUHPHQWV'RFXPHQW • The applicant shall be the designated contact person who will receive correspondence from city staff and referral agencies. Additional Resources • Development Review Guide and Flowchart: https://www.fcgov.com/drg/ • 'HYHORSPHQW5HYLHZ$SSOLFDWLRQVDQG6XEPLWWDO5HTXLUHPHQWV0DLQ3DJH https://www.fcgov.com/developmentreview/applications.php • City Land Use Code: https://library.municode.com/co/fort_collins/codes/land_use • City Utilities: Development Forms, Guidelines & Regulations • City Engineering main page: https://www.fcgov.com/engineering/ • The City’s Comprehensive Plans: City Plan and 7UDQVSRUWDWLRQ0DVWHU3ODQ • 2QOLQH&LW\0DS5HVRXUFHV https://www.fcgov.com/gis/maps.php Development Application Complete Submittal Checklist Page 2 Development Application Submittal Checklist September 4, 2018 Project Development Plan (PDP) Complete Submittal Checklist Project Name: Applicant Name: 2I¿FH8VH2QO\ Project Type: Project Number (if assigned): 1HZ6XEPLWWDO Revision -- Review Round 6XEPLWWDO'DWH 6WDII5HYLHZ0HHWLQJ'DWH 6WDII&RRUGLQDWRU In addition to PDP reviews, this checklist may be used for the pre-hearing review of the following review types: 0DMRU$PHQGPHQWV 0-$ Page 3 Development Application Submittal Checklist September 4, 2018 Electronic Copies: $OOFRSLHVPXVWEHSURYLGHGSHU&LW\¿OHQDPLQJVWDQGDUGVDQGVXEPLWWHGRQDÀDVKGULYHRU&' See: Submittal Requirements Section M – File Naming Standards 1) General Information: Staff Code Applicant Validation Item Description Submittal Requirement Resources $IIHFWHG3URSHUW\2ZQHU $32 Page  Development Application Submittal Checklist September 4, 2018 &LW\)RUHVWU\ Existing Tree Removal Feasibility Letter; Existing Tree ,QYHQWRU\3ODQ([LVWLQJ7UHH0LWLJDWLRQ3ODQ LIDSSOLFDEOH  The applicant must schedule an on-site meeting with City Forestry to obtain tree inventory and mitigation information for all existing trees on-site prior to review submittal. (;,67,1*75((65(029('35,2572'(9(/230(17 $33/,&$7,210$<%(,19,2/$7,212)&,7<&2'( 6HFWLRQV+DQG/ City Forestry: forestry@fcgov.com 970.221.6660 Applicant Acknowledgement: ,KDYHUHYLHZHGWKH'HYHORSPHQW$SSOLFDWLRQ6XEPLWWDO5HTXLUHPHQWV6HFWLRQV$±0$OOGRFXPHQWVVXEPLWWHG DUHFRPSOHWHDQGWKH'HYHORSPHQW$SSOLFDWLRQ6XEPLWWDO5HTXLUHPHQWVKDYHEHHQLQFRUSRUDWHGLQWRWKHSODQV 6HH'HYHORSPHQW$SSOLFDWLRQ6XEPLWWDO5HTXLUHPHQWVIRUGHWDLOHGGHVFULSWLRQRIUHTXLUHPHQWV $OOGRFXPHQWV submitted have been compared and consistent design information is shown on all plan sheets and reports. I XQGHUVWDQGWKDWVXEPLWWDOUHTXLUHPHQWVQRWVXI¿FLHQWO\DGGUHVVHGRUGHIHUUHGPD\UHVXOWLQDGGHGUHYLHZWLPH $SSOLFDQW1DPH &KHFNER[WRFRQ¿UPDFNQRZOHGJHPHQW (See Development Application Submittal Requirements for detailed description of requirements) Kate Penning 1RWL¿FDWLRQ/LVW IROORZLQJ WKHQRWL¿FDWLRQERXQGDU\SURYLGHGE\FLW\VWDII 6XEPLWWDO5HTXLUHPHQWV 6HFWLRQ& Development Review Coordination staff 970-221- 6689 DRCoord@fcgov.com Conceptual Review (CR) or Preliminary Development Review (PDR) comment response letter; or for resubmittals include a comment response letter from the prior round of review 3URMHFW,QIRUPDWLRQDQG'HVLJQ1DUUDWLYH VHH6XEPLWWDO 5HTXLUHPHQWV6HFWLRQ&  2) Planning Submittal Package: Staff Code Applicant Validation Item Description Submittal Requirement Resources Title Block information on all plan sheets 6HFWLRQ' Land Use Table 6HFWLRQ( 6KHHW,QGH[ 6HFWLRQ' 6LJQDWXUH%ORFNV 6HFWLRQ' 6LWH3ODQ1RWHV 6WDQGDUG1RWHV (also available in Word IRUPDWDWWKH6XEPLWWDO Requirements web page) 6LWH/RFDWLRQ0DS 6HFWLRQ' Legal Description 6HFWLRQ' 6LWH3ODQ6KHHW V  DQGUHODWHGKDUGVFDSHGHVLJQGHWDLO VKHHWV6HH6HFWLRQ,IRU5HTXLUHPHQWV 6HFWLRQ) $UFKLWHFWXUDO(OHYDWLRQV SKRWRV 6HFWLRQ* Existing Conditions and/or Demolition Plan (if applicable) )ORRU3ODQV GRFXPHQWLQJLQWHULRUVSDFHV  N/A N/A WRDSSURYHG3'3¶V$38DQG63$55HIHUWRWKH6XEPLWWDO5HTXLUHPHQWV'RFXPHQW for a description of these review types. $OOFKHFNOLVWLWHPVDUHUHTXLUHGXQOHVVFLW\VWDIILQGLFDWHVDQLWHPLV : DLYHG ' HIHUUHG 1$ 1RW$SSOLFDEOHRUDOUHDG\ 5 HFHLYHG ,IWKHVWDIIFRGHLVEODQN JUH\RUEOXH  WKHQWKHLWHPLVUHTXLUHGThis checklist must be reviewed, completed and accepted by staff prior to project routing. Additional information may be requested from the applicant during the review process if necessary to DGGUHVVVSHFL¿FLVVXHVWKDWDULVH3OHDVHQRWHWKDWDOODSSOLFDWLRQPDWHULDOVRQFHVXEPLWWHGEHFRPHDPDWWHU of public record. Paper Copies: Staff Code Applicant Validation Item Description Submittal Requirement Resources One paper copy is required (with the initial submittal only) for the following3ODQQLQJ6XEPLWWDO3DFNDJH38'VXEGLYLVLRQ plat, Civil Construction Plans. Plan sets shall be provided at full scale (24” x 36”); staple together each plan set; do not fold sets Development Review Coordination staff 970-221- 6689 One paper copy of this checklist, completed and signed by applicant Development Review Coordination staff 970-221- 6689 DRCoord@fcgov.com One signed paper copy of Development Application Form Application Form.pdf One signed paper copy of Transportation Development Review (TDR) Application and Fee TDR Fees and Application. pdf Contact Engineering at 221- 6605 for TDR fee information Check for the above application forms payable to the “City of Fort Collins” (fees may be consolidated into one check) Development Review Coordination staff 970-221- 6689 FDP 644 Remington Street Extra Occupancy Tom Marsh