HomeMy WebLinkAbout308 CHERRY STREET CARRIAGE HOUSE - FDP190011 - CORRESPONDENCE - STAFF'S PROJECT COMMENTS1
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6689
970.224.6134 - fax
fcgov.com/developmentreview
June 11, 2019
Kim Medina
Cherry Street LLC
308 Cherry Street
Fort Collins, CO 80521
RE: 308 Cherry Street - Carriage House, FDP190011, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, please contact your Development Review Coordinator Brandy Bethurem Harras at
970.416.2744 or bbethuremharras@fcgov.com.
Comment Summary:
Department: Stormwater Engineering
Contact: Dan Mogen, 970-305-5989, dmogen@fcgov.com
Topic: General
Comment Number: 1
06/10/2019: FOR APPROVAL:
Please document the net change in impervious area as there are areas being
removed and added to the site. Please note that there are multiple versions of
the site plan that need to be aligned as there is currently variation between them.
Comment Number: 2
06/10/2019: FOR APPROVAL:
Please clarify the proposed grading. Currently, it appears runoff from at least a
portion of the proposed impervious areas is directed east onto adjacent
property. Please show proposed grading will be routed to either the north or
south property boundary and not adversely affect adjacent properties.
Also, the grading/swale on the west side of the proposed carriage house needs
to be clarified to show it is directed between the proposed carriage house and the adjacent off-site building.
Comment Number: 3
06/10/2019: FOR APPROVAL:
Please see redlines provided via PDF. I encourage you to reach out with any
questions or to review potential revisions, and I’d be happy to set up a meeting or conference call to do so.
2
Department: Water-Wastewater Engineering
Contact: Dan Mogen, 970-305-5989, dmogen@fcgov.com
Topic: General
Comment Number: 1
06/10/2019: FOR APPROVAL:
In the comment response letter, I see that a fire sprinkler system is proposed to
be installed. Has this system been designed to determine if the proposed
water service will be adequate or if a separate fire service will be required? If
this has not been determined, I encourage early investigation into what is
needed for the fire protection system as a 3/4" service is typically inadequate or
requires additional considerations such as a tank/pump in the building. Please
contact me with any questions.
Comment Number: 2
06/10/2019: FOR APPROVAL:
It appears the proposed water and sewer services run under existing trees and
do not provide adequate separation. Please review and revise to meet
separation requirements as shown on the landscape plan.
Comment Number: 3
06/10/2019: FOR APPROVAL:
Please see redlines provided via PDF. I encourage you to reach out with any
questions or to review potential revisions, and I’d be happy to set up a meeting or conference call to do so.
Department: Light And Power
Contact: Austin Kreager, 970-224-6152, akreager@fcgov.com
Topic: General
Comment Number: 1
06/11/2019: FOR APPROVAL:
According to our standards as well as City Municipal Code, every dwelling unit
must be individually metered. This carriage house is to be considered a
dwelling unit, therefore, this unit must have their own meter and separate electric
service. Please show this new electric service on your next submittal. Thank you.
Comment Number: 2
06/11/2019: INFORMATION ONLY:
Light and Power would like to remind you that all of our facilities must have a ten
foot clearance away from all water, wastewater, and storm sewer facilities. We
also require a three foot clearance away from all other utilities with the exception of communication lines.
Comment Number: 3
06/11/2019: INFORMATION ONLY:
Development charges, electric Capacity Fee, Building Site charges and any
system modification charges necessary will apply to this development.
Comment Number: 4
06/11/2019: INFORMATION ONLY:
You may contact Austin Kreager, project engineering if you have questions.
(970) 224-6152. You may reference Light & Power’s Electric Service Standards at
http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandar
3
ds_FINAL_18November2016_Amendment.pdf
You may reference our policies, development charge processes, and use our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers.
Department: Engineering Development Review
Contact: Morgan Uhlman, 970-416-4344, muhlman@fcgov.com
Topic: General
Comment Number: 1
06/10/2019: FOR APPROVAL:
Please provide a cover sheet for the utility plan set. Larimer County Urban Area
Street Standard Appendix E-4 lists what is needed on a coversheet that is
submitted to the City. Here is a link to that list:
https://www.larimer.org/sites/default/files/apdxe.pdf
Department: Planning Services
Contact: Pete Wray, 970-221-6754, pwray@fcgov.com
Topic: General
Comment Number: 1
BY HEARING: Site Plan. Existing driveway and parking lot needs to provide
unobstructed access to 2 new parking spaces. This may require signage or
marking for the existing 3 spaces leave drive clear for access. The new 2
parking spaces should be moved perpendicular to lot and allow back-up space
for turn around.
Comment Number: 2
BY HEARING. Site Plan. Please show sidewalk from carriage house entrance
on main level and from stair pad to parking. The driveway can act as
pedestrian access to street if that is intent.
Comment Number: 3
BY HEARING. NCB zoning standards. Please include on cover page the
metrics for meeting building lot coverage, rear lot floor area, and number of
proposed bedrooms. One parking space is required for each bedroom.
Department: PFA
Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.org
Topic: General
Comment Number: 1
06/07/2019: FOR APPROVAL:
The applicant states that Carriage House will be designed with a residential
sprinkler system to offset the lack of access availability.
Comment Number: 2
06/07/2019: FOR APPROVAL:
The address including unit identifier will be clearly visible from the street or
wayfinding signage will be used.
4
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 6
06/10/2019: FOR APPROVAL:
There are line over text issues. See redlines.
Comment Number: 7
06/10/2019: FOR APPROVAL:
There are text over text issues. See redlines.
Topic: General
Comment Number: 1
06/10/2019: FOR APPROVAL:
There are two sheets labeled as Site Plan. Please change sheet C1 to Utility Plan.
Topic: Landscape Plans
Comment Number: 4
06/10/2019: FOR APPROVAL:
There are line over text issues. See redlines.
Comment Number: 5
06/10/2019: FOR APPROVAL:
There is text that needs to be masked. Mask all text in hatched areas. See redlines.
Topic: Site Plan
Comment Number: 2
06/10/2019: FOR APPROVAL:
Abbreviated legal descriptions are not acceptable. Please add the legal
description from the Warranty Deed recorded at Reception # 20140014994.
Comment Number: 3
06/10/2019: FOR APPROVAL:
There are line over text issues. See redlines.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 1
06/11/2019: INFORMATION ONLY:
no comments
Department: Forestry
Contact: Molly Roche, 224-616-1992, mroche@fcgov.com
Topic: General
Comment Number: 1
06/10/2019: INFORMATION ONLY:
No comments for Forestry.
5
Department: Building Services
Contact: Katy Hand, khand@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1
06/10/2019: BUILDING PERMIT:
If the building will be sprinkled with a residential sprinkler system
for fire access, a sprinkler system design in accordance with plumbing code
P2904 will need to be submitted at time of building permit application.
Comment Number: 2
06/10/2019: BUILDING PERMIT:
The current adopted codes and amendments are listed on our website:
https://www.fcgov.com/building/codes.php
Comment Number: 3
06/10/2019: 06/10/2019: BUILDING PERMIT:
An air tightness test will be required at the end of the project.
Comment Number: 4
06/10/2019: BUILDING PERMIT:
The new dwelling must be PV ready (conduit in place) - Local amendment