Loading...
HomeMy WebLinkAboutNEC LAKE AND SHIELDS - FDP190008 - DOCUMENT MARKUPS - ROUND 2 - UTILITY PLANSSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF Sheet NEC LAKE & SHIELDS These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 15 C5.01 EROSION CONTROL DETAILS 10 City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R 05 TURF REINFORCEMENT MAT - SCOUR STOP 36" ANCHOR STRAP BULLET ANCHOR RECESSED LOCK WASHER TRANSITION MAT TURF REINFORCEMENT MAT ANCHOR PATTERN ANCHOR ILLUSTRATION MAX. 1"-2" DROP FROM CULVERT FLOWLINE ONTO SCOURSTOP MATS PROFILE VIEW SECTION VIEW AA OUTLET AND CHANNEL SCOUR PROTECTION (TRANSITION MATS) DIRECTION OF FLOW TURF REINFORCEMENT MAT WIDTH OF PROTECTION LENGTH OF PROTECTION D D= CULVERT DIAMETER TRANSITION MATS SOIL COVER A A CULVERT OUTLET PROTECTION - PLAN VIEW INSTALL ANCHORS PER SCOURSTOP INSTALLATION GUIDELINES MINIMUM DEPTH 24" IN COMPACTED, COHESIVE SOIL. MINIMUM DEPTH 30" IN LOOSE, SANDY, OR WET SOIL EXTRA ANCHORS AS NEEDED TO SECURE MAT TIGHTLY OVER SOIL COVER ABUT TRANSITIONS MATS TO END OF CULVERT OR CULVERT APRON. ADJACENT MATS ABUT TOGETHER LATERALLY AND LONGITUDINALLY. MINIMUM 8 ANCHORS PER MAT. EXTRA ANCHORS AS NEEDED FOR LOOSE OR WET SOILS. PROTECT BARE/ DISTURBED DOWNSTREAM SOILS FROM EROSION WITH APPROPRIATE SOIL COVER. NOTE: 1. SCOUR STOP MAT PRODUCT UTILIZED FOR TURF REINFORCEMENT MAT DIMENSIONS. OTHER TURF REINFORCEMENT MAT PRODUCTS EQUAL TO OR BETTER ALLOWED WITH APPROVAL OF THE ENGINEER AND CITY. 2. SEEDING AT OUTFALL OF STORM SEWER SHALL BE COMPLETED PRIOR TO INSTALLATION OF TURF REINFORCEMENT MAT. CWA VTC 01 CONCRETE WASHOUT AREA 02 ROCK SOCK DETAIL ROCK SOCK SECTION ROCK SOCK PLAN ROCK SOCK JOINTING GRADATION TABLE SIEVE SIZE MASS PERCENT PASSING SQUARE MESH SIEVES NO. 4 2" 100 1-1/2" 90-100 1" 20-55 3/4" 0-15 3/8" 0-5 MATCHES SPECIFICATIONS FOR NO. 4 COARSE AGGREGATE FOR CONCRETE PER AASHTO M43. ALL ROCK SHALL BE FRACTURED FACE, ALL SIDES RS 03 VEHICLE CONTROL TRACKING PAD 04 FES INLET PROTECTION 06 SILT FENCE IP Scourstop Schedule Storm Line Pipe Diameter (in) Velocity (cfs) Transition Mat W x L A 15 4.54 4' x 4' B 12 3.82 4' x 4' C 12 12.06 4' x 8' D 12 3.43 4' x 4' E 12 2.83 4' x 4' Curb Cuts and Sidewalk Chases Design Point Width (in) Velocity (cfs) Transition Mat W x L s1 3 3.56 8'x8' s2 2 2.06 8'x8' SS SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF UD UD M ONITORING WELL TRAFFIC RATED MONITORING WELL TRAFFIC RATED CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV T CTV CTV CTV CTV T T T T ST ST ST ST ST ST ST ST ST ST ST ST X X X X X X X X X X ELEC E BRKR VAULT ELEC F E S F E S F E S D X X X X X X X X X X X X X X X X X X X X X G AS GAS T CABLE D VAULT ELEC C VAULT ELEC VAULT ELEC ELEC VAULT ELEC TRAFFIC VAULT VAULT T S F.O. F.O. TRAFFIC VAULT C VAULT ELEC VAULT ELEC X X X X T S ELEC T C BRKR CWA VTC IP IP IP IP IP SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF VTC SW RS SF RS RS RS SF SF OP OP OP RS RS RS VAULT ELEC TRAFFIC C S SHIELDS ST. LAKE ST. JAMES CT. IP GLENWOOD COMMONS PORTION OF BLOCK 1 COLLEGE HEIGHTS CARRIAGE HOUSE APARTMENTS UNPLATTED UNPLATTED CAMPUS GARDENS ADDITION BLOCK 1 LOT 1 LOT 1 LOT 2 LOT 3 LOT 4 CAMPUS GARDENS ADDITION BLOCK 3 UNPLATTED UNPLATTED UNPLATTED BENNETT RD. SS SS SS SS SS SS SS Sheet NEC LAKE & SHIELDS These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 15 C5.00 EROSION CONTROL PLAN 09 NORTH ( IN FEET ) 0 1 INCH = 30 FEET 30 30 60 90 GRAPHIC SCALE: City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION Project: STANDARD AT FORT COLLINS CONSTRUCTION PHASE MOBILIZATION DEMOLITION GRADING BEST MANAGEMENT PRACTICES (BMPS) STRUCTURAL "INSTALLATION" Silt Fence Barriers * Flow Barriers (Wattles) * Inlet Filter Bags * Vegetative Temporary Seeding Planting Mulching / Sealant Permanent Seeding Planting Sod Installation Rolled Products : Netting / Blankets / Mats Contour Furrows (Ripping / Disking) Rock Bags * UTILITIES INSTALLATION FLAT WORK INSTALLATION VERTICAL INSTALLATION LANDSCAPE DEMOBILIZATION Vehicle Tracking Pad * * All Temporary BMPs to be Removed once Construction is Complete Any prior inlets that could use protecting Any prior inlets that could use protecting Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Riprap 1. IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES. 2. THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED. 4. CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION. 5. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, PONDS AND RAIN GARDENS UNTIL SITE IS FULLY STABILIZED. 6. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT. 7. INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR PAVEMENT, ETC.) 8. CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE. 9. ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO INSURE THAT EACH BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS. 10. CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR PAVEMENT, ETC.) 11. FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. 12. CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN. 13. THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE. 14. WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION. 15. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE STABILIZATION METHODS. 16. ALL ROOF DRAIN SYSTEM INLETS SHAL BE PLUGGED UNTIL CONNECTED TO BUILDINGS. EROSION CONTROL NOTES: 1. CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR SIMILAR METHODS (AS APPLICABLE). 2. TOTAL DISTURBED AREA = 2.17 ACRES 3. SWMP ADMINISTRATOR: Contact ________________________________ Company ________________________________ Address ________________________________ Phone ________________________________ 4. REMOVE SEDIMENT THAT IS TRACKED ONTO THE PUBLIC RIGHT OF WAY DAILY OR MORE FREQUENTLY ASS NEEDED. EXCESS SEDIMENT IN THE ROADWAY INDICATES THAT THE STABILIZED CONSTRUCTION ENTRANCE NEEDS MAINTENANCE. 5. CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF ACCESS IS OFF PAVEMENT. 6. REFER TO THE STORM WATER MANAGEMENT PLAN & EROSION CONTROL REPORT FOR "NEC LAKE AND SHIELDS", DATED 10.02.2018 FOR ADDITIONAL INFORMATION. EXISTING STORM SEWER ST PROJECT BOUNDARY PROPOSED CURB & GUTTER SILT FENCE SF PROPOSED STORM SEWER D NOTES: PROJECT BOUNDARY PROPOSED CURB & GUTTER PROPOSED PERFORATED STROM UD PROPOSED PERFORATED STROM INLET PROTECTION IPX STRAW WATTLE PROTECTION SW VEHICLE TRACKING PAD VTC ROCK SOCK WITH MARKER RS SS OUTFALL PROTECTION OP CONCRETE WASHOUT AREA CWA SCOUR STOP SF LEGEND: