Loading...
HomeMy WebLinkAbout614 LESSER DRIVE CARRIAGE HOUSE - FDP190013 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWCommunity Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com May 17, 2019 Mike Hutsell Highcraft Builders Re:614 Lesser Drive Carriage House Description of project: This is a request to build a carriage house at 614 Lesser Dr (parcel #9713115016). Access is taken from Lesser Dr to the west. The property is within the Neighborhood Conservation, Buffer (NCB) zone district and is subject to Administrative (Type 1) Review. Please see the following summary of comments regarding the project request referenced above. The comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. Please direct all questions regarding these comments or the next steps in the review process to your Development Review Coordinator, Todd Sullivan. Comment Summary Development Review Coordinator Contact: Todd Sullivan, 970-221-6695, tsullivan@fcgov.com 1. The proposed development project is subject to a Type 1 (Administrative Hearing) review. The hearing is a public meeting with an attorney presiding as the hearing officer. A Public Notice will be mailed to property owners and residents within an 800-foot radius (less public Right of Way, parks, trails, etc.) of the property under review 14 days prior to the Administrative Hearing, and the hearing will be an opportunity for public comments to be heard. The applicant for this development is not required to hold a neighborhood meeting for a Page 1 of 10 Type 1 review, however, if you would like to have one to notify your neighbors of the proposal, please let me know and I can help you in setting a date, time and location for a meeting. Neighborhood Meetings are a great way to get public feedback and avoid potential hiccups that may occur later in the review process. We do not intend to hold a neighborhood meeting at this time. 2. Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color-coded flowchart with comprehensive, easy to read information on each step in the process. This guide includes links to just about every resource you need during development review. No response needed. 3. Please see the Submittal Requirements and sample Checklist at: http://www.fcgov.com/developmentreview/applications.php A Submittal Checklist specific to your project will be provided to you with this letter. See submittal checklist. 4. The request will be subject to the Development Review Fee Schedule that is available in the Community Development and Neighborhood Services office. The fees are due at the time of submittal of the required documents for the appropriate development review process by City staff and affected outside reviewing agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal. I will provide an estimated fee schedule for Development Review with this letter. No response needed. 5. This letter is being provided to you in Microsoft Word format. Please use this copy to provide written responses to each comment in the letter, using a different font color. Please avoid responses such as "Acknowledge" or "Noted", and reference plans and pages when appropriate. No response needed. 6. I will be your primary point of contact throughout the development review process through building permit to Certificate of Occupancy. Please work through me with questions you have, meetings needing coordinated, etc. I ask that any communication you have with individual department reviewers be shared with me as well (copy me on emails, follow up phone calls, etc.). This allows me to best serve you and your project. No response needed. Planning Services Contact: Kai Kleer, 970-416-4284, kkleer@fcgov.com 1. The following off-street parking requirements apply: 3.2.2(K)(1)(c) Single-Family Detached: For each single-family dwelling there shall be one (1) parking space on lots with greater than forty (40) feet of street frontage or two (2) parking spaces on lots with forty (40) feet or less of street frontage. Page 2 of 10 4.9(E)(3)(a)(2). A minimum of one (1) off-street parking space must be provided for every bedroom contained within a carriage house. light of conversation Todd relayed to me about the proposed two-bedroom carriage house it may be possible that four off-street spaces may be required (2 for 2-bedroom carriage house & 2 for lot <=40 feet of frontage). At time of submittal please verify that the plan meets the above-mentioned standards. See Site Plan on sheet A0.0 for location of (4) designated off street parking spots required. Also see Land Use Summary tabulation on sheet A0.0. 2. INFORMATION ONLY: SOLAR STANDARDS Further information about our residential solar requirements can be found by visiting, https://library.municode.com/co/fort_collins/codes/land_use? nodeId=ART3GEDEST_DIV3.8SURE_3.8.32SOENSY No response needed. 3. The design of the building appears to meet all design criteria as described under 4.9 Neighborhood Conservation, Buffer District. Please make sure that at time of submittal that the plan set is clear when calculating gross floor area. See Land Use Summary on Site Plan sheet A0.0 of plans submitted. 6. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code (LUC), including Article 3 General Development Standards. The entire LUC is available for your review on the web at http://www.colocode.com/ftcollins/landuse/begin.htm No response needed. 7. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a Modification of Standard Request will need to be submitted with your formal development proposal. Please see Section 2.8.2 of the LUC for more information on criteria to apply for a Modification of Standard. All requirements of the LUC have been met. See Land Use Summary and Site Plan on sheet A0.0, as well as building plans and elevations on sheets A2.0 and A3.0. Department: Engineering Development Review Contact: Morgan Uhlman, 970-416-4344, muhlman@fcgov.com 1. Site Specific: The current right-of-way for Lesser Street is less than our standard cross section for a Residential Local Street. For this property to meet its local half street obligation, this project will need to dedicate the additional 6 feet of right of way. With the new dedication of right-of-way a new 9' utility easement will need to be dedicated behind the new right-of-way. Please see my comment below on links to the process of dedicating the right-of-way and utility easement. See dedications for Right of Way and Utility Easement prepared for this project, included in submittal documents. 2. Larimer County Road Impact Fees and Transportation Expansion Fees are due at the time of building permit. Please contact Kyle Lambrecht at 221-6566 if you have any questions. No response needed. 3. The City's Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional information on these fees, please see: Page 3 of 10 http://www.fcgov.com/engineering/dev-review.php No response needed. 4. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. No response needed. 5. All public sidewalk, driveways and ramps existing or proposed adjacent or within the site need to meet ADA standards, if they currently do not, they will need to be reconstructed so that they do meet current ADA standards as a part of this project. Per Morgan Uhlman, Engineering Department, the scope of the project would exclude the need to change current sidewalk/driveway conditions. 6. Any public improvements must be designed and built in accordance with the Larimer County Urban Area Street Standards (LCUASS). They are available online at: https://www.larimer.org/engineering/standards-and-guides/urban-area-street-standards No response needed. 7. This project is responsible for dedicating any right-of-way and easements that are necessary or required by the City for this project. This shall include the standard utility easements that are to be provided behind the right-of-way (15 foot along an arterial, 8 foot along an alley, and 9 foot along all other street classifications). No easements could be found on this property in the country recorders files. The following easements will need to be dedicated on the plat or separate document. Information on the dedication process can be found at: http://www.fcgov.com/engineering/devrev.php 8. LCUASS parking setbacks (Figure 19-6) apply and will need to be followed depending on parking design. See off street parking spot locations on site plan, on Sheet A0.0. Off street parking is more than 20’ from street curb face to parking spots. Actual closest spot is ±67’ from street curb face. 9. All fences, barriers, posts or other encroachments within the public right-of-way are only permitted upon approval of an encroachment permit. Applications for encroachment permits shall be made to Engineering Department for review and approval prior to installation. Encroachment items shall not be shown on the site plan as they may not be approved, need to be modified or moved, or if the permit is revoked then the site/ landscape plan is in non-compliance. No changes to area in public right of way. 10. The development/ site cannot use the right-of-way for any rain gardens to treat the storm runoff. We can look at the use of rain gardens to treat street flows – the design standards for these are still in development. No changes to area in public right of way. 11. Doors are not allowed to open out into the right-of-way. This requirement is met; see plans on sheet A2.0. 12. Bike parking required for the project cannot be placed within the right-of-way and if placed just behind the right-of-way need to be placed so that when bikes are parked they do not extend into the right-of-way. Page 4 of 10 No bicycle parking requirements apply, since neither the existing house nor the carriage house is an extra-occupancy rental house. 13. In regard to construction of this site, the public right-of-way shall not be used for staging or storage of materials or equipment associated with the Development, nor shall it be used for parking by any contractors, subcontractors, or other personnel working for or hired by the Developer to construct the Development. The Developer will need to find a location(s) on private property to accommodate any necessary staging and/or parking needs associated with the completion of the Development. Information on the location(s) of these areas will be required to be provided to the City as a part of the Development Construction Permit application. No response needed Department: Traffic Operations Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com 1. The addition of a carriage house does not generate a significant amount of new vehicular traffic. Per Chapter 4 of the Larimer County Urban Area Street Standards, the need for a traffic review is waived. No response needed Department: Fire Authority Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.org 1. ACCESS Access is required to within 150ft of all portions of the exterior perimeter of the carriage house. This can be measured and achieved from Lesser Dr. No further action required for access. Existing conditions meet this requirement. Rear property line is less than 150 feet from Lesser Drive. 2. HYDRANT A hydrant is required within 400ft of the carriage house. The hydrant located to the north at Myrtle St is appropriately located but it is the applicant's responsibility to verify output. Please reach out to Fort Collins Utilities at WaterUtilitiesEng@fcgov.com for assistance. A letter from the Water Utility Department stating the testing results should be provided to you directly. Please provide a copy of this letter to the Development Review Coordinator as soon as it is received. See flow test from 4/13/2015. Meets requirements according to Andew Rosen. Approved flow test emailed to Development Review Coordinator on 6/4/2019 3. ADDRESSING/WAYFINDING To assist with prompt emergency response the address shall be clearly visible from the street in no less than 6" tall numerals on a contrasting background. The carriage house shall be designated Unit A or B, for example, and wayfinding signage shall be installed to indicate the best access. See Address Signage notes on Sheet A0.0. Department: Water-Wastewater Engineering Page 5 of 10 Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com 1. Existing Water Infrastructure (site specific comment): There is an existing 6-inch water main in Lesser Drive with an existing ¾ inch water service to the site. No response needed 2. Existing Sewer Infrastructure (site specific comment): There is an existing 8-inch sanitary sewer main in Lesser Drive with an existing sanitary sewer service to the site. No response needed 3. Service requirements (standard comment): City Code Section 26-94 allows the proposed carriage house on this lot to utilize the same water service as the main house if the requirements of this section of code are met. 4. Service abandonment (standard comment): Any existing water and sewer services that are not planned to be re-used with this project will be required to be abandoned at the main. All existing water and sewer services are to be reused. 5. Sewer discharge (standard comment): Please note that all City of Fort Collins Utility Customers are subject to City Code requirements for wastewater. These requirements include Section 26-306 Wastewater Discharge Permit Requirements and Section 26-332 Prohibitive Discharge Standards. A permit may be required depending on activities on the site; however, discharge standards apply to every customer, both large and small, regardless of what activities take place on the site. Please contact Industrial Pretreatment, (970) 221-6900, to discuss these requirements and how they apply to this development. Spoke to Industrial Pretreatment on 06/05, project does not need to meet any wastewater discharge requirements because there are no commercial uses associated with the property. 6. Water conservation (standard comment): The water conservation standards for landscape and irrigation will apply. Information on these requirements can be found at: http://www.fcgov.com/standards No response needed. 7. Fees (standard comment): Development fees and water rights will be due at building permit. These fees are to be paid at the time each building permit is issued. Information on fees can be found at: http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-develo pment-fees or contact our Utility Fee and Rate Specialists at (970) 416-4252 for questions on fees. No response needed. Department: Stormwater Engineering Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com 2. Master plan and criteria compliance (site specific comment): The design of this site must conform to the drainage basin design of the Old Town Page 6 of 10 Master Drainage Plan as well the Fort Collins Stormwater Criteria Manual. See site plan on page A0.0 and accompanying drainage letter from Professional Engineer. 3. Documentation requirements (site specific comment): Since the existing buildings are to remain, a drainage letter will be required. The letter will need to document the existing drainage patterns, discuss the water quality measures being provided, if required. The letter will also need to address where the runoff generated by the new impervious area is going and may need to mitigate any additional runoff directed onto adjacent properties. The drainage letter must be prepared by a Professional Engineer registered in Colorado. See accompanying drainage letter from Professional Engineer. 4. Stormwater outfall (site specific comment): The stormwater outfall options for this site appear to be the curb and gutter in Lesser Drive. No response needed. 5. Imperviousness documentation (standard comment): It is important to document the existing impervious area since drainage requirements and fees are based on new impervious area. An exhibit showing the existing and proposed impervious areas with a table summarizing the areas is required prior to the time fees are calculated for each building permit. See impervious area tabulation in the Land Use Summary on Sheet A0.0 6. Detention requirements (site specific comment): When improvements are being added to an existing developed site, onsite detention is only required if there is an increase in impervious area greater than 5000 square feet. If it is greater, onsite detention is required with a 2-year historic release rate for water quantity. Increase in impervious area is less than 5000 sq. ft. See impervious area tabulation in the Land Use Summary on Sheet A0.0. 7. Standard water quality requirements (standard comment): If the site is required to meet present Land Use Code requirements, onsite water quality treatment of the runoff may be required. Water quality treatment methods are described in the Fort Collins Stormwater Manual, Volume 3-Best Management Practices (BMPs). A method that could be used on an existing site is to direct the downspouts to a landscape area. Another is if perimeter landscape buffers or parking lot medians are required, they could be used to treat the runoff in bio-retention areas or rain gardens. (http://www.fcgov.com/utilities/business/builders-and-developers/development-forms-gui delines-regulations/stormwater-criteria) No response needed. 8. Erosion control requirements (standard comment): The erosion control report requirements are in Section 1.3.3, Volume 3, Chapter 7 of the Fort Collins Stormwater Criteria Manual. If you need clarification concerning this section, please contact the Erosion Control Inspector, Jesse Schlam at 224-6015 or jschlam@fcgov.com . No response needed. 9. Inspection and maintenance (standard comment): There will be a final site inspection of the stormwater facilities when the project is Page 7 of 10 complete and the maintenance is handed over to an HOA or another maintenance organization. Standard operating procedures (SOPs) for on-going maintenance of all onsite drainage facilities will be included as part of the Development Agreement. More information and links can be found at: http://www.fcgov.com/utilities/what-we-do/stormwater/stormwater-quality/low-impact-dev elopment No response needed. 10. Fees (standard comment): The 2019 city wide Stormwater development fee (PIF) is $8,217/acre for new impervious area over 350 square feet and there is a $1,045/acre of site review fee. No fee is charged for existing impervious area. These fees are to be paid at the time each building permit is issued. Information on fees can be found at: http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-develo pment-fees or contact our Utility Fee and Rate Specialists at (970) 416-4252 for questions on fees. There is also an erosion control escrow required before the Development Construction permit is issued. The amount of the escrow is determined by the design engineer, and is based on the site disturbance area, cost of the measures, or a minimum amount in accordance with the Fort Collins Stormwater Manual. No response needed. Department: Stormwater Engineering – Erosion Control Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com 1. Information Only: No Comment from Erosion Control. Based upon the submitted Planning Materials it has been determined that this project; will disturb less than 10,000 sq. ft., is not proposed to be in a sensitive area, has no steep slopes (greater than 3H:1V) within or adjacent to the project, and is not part of a larger common development that will or is under construction. Therefore, no Erosion Control Material submittal is needed. If this project substantially changes in size or design where the above criteria now apply, erosion control materials should be submitted. Though the project, at this time, requires no erosion control material submittal, the project still must be swept and maintained to prevent dirt, saw cuttings, concrete wash, trash & debris, landscape materials and other pollutants from the potential of leaving the site and entering the storm sewer at all times during the project in accordance with City Code 26-498. If complaint driven or site observation of the project seems not to prevent the pollutant discharge the City may require the project to install erosion and sediment control measures. Nearby inlets that may be impacted by the pollutants, in particular dirt, should be protected as a good preventative practice and individual lots should be protected from material escaping onto the sidewalk. If at building permit issuance any issues arise please email erosion@fcgov.com to help facilitate getting these permits signed off. No response needed. Department: Electric Engineering Page 8 of 10 Contact: Cody Snowdon, 970-416-2306, csnowdon@fcgov.com 1. The existing lot is currently served with a single #4TCU, which has the capacity of 125 amps. This service is routed from a secondary box located at the northwest corner of the property. The Carriage House would require a separate service. With the complexity of the lot and landscaping, it would be cost effective to have the trench excavated by the contractor. No response needed. 2. This area is supplied by a 25 kVA Transformer, which is near capacity. The additional capacity for the addition and new service for the carriage house will require the transformer to be upgraded to a 50 kVA transformer, which would cost $778.98. That system modification would be at the expense of the project. 3. The Carriage House would be required to be individually metered. The meter location will need to be coordinated with Light and Power. Please refer to Section 8 of the Electric Service Standards for addition requirements for metering. A link has been provided below. https://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandards_FIN AL_18November2016_Amendment.pdf 4. Electric capacity fees, development fees, building site charges and any system modification charges necessary to feed the site will apply to this development. Please contact me or visit the following website for an estimate of charges and fees related to this project: http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-develo pment-fees 5. Please contact Cody Snowdon with Light & Power Engineering if you have any questions at (970) 416-2306. Please reference our policies, construction practices, development charge processes, electric services standards, and fee estimator at http://www.fcgov.com/utilities/business/builders-and-developers Department: Environmental Planning Contact: Kelly Smith, , ksmith@fcgov.com 1. FOR INFORMATION: You may want to consider looking into our Solar Rebate Program to see if solar panels are a good option for you. The program offers rebates of up to $1500 for residential buildings. For more information, see www.fcgov.com/solar , or contact Rhonda Gatzke at 970-416-2312 or rgatzke@fcgov.com . No installation of solar panels are planned at this time. Department: Building Inspection Contact: Katy Hand, , khand@fcgov.com 1. The New Building and area remodeled will need to be designed to the 2018 International Residential Code and local amendments. See website for more information: https://www.fcgov.com/building/codes.php No response needed. 2. A passing blower door test will be required at the end of the project. No response needed. 3. It is unclear how the building will be heated. Be aware, if using electric heat, prescriptive Page 9 of 10 insulation for electrically heated building is required (i.e. greater insulation). See web link for details: https://www.fcgov.com/building/files/2015-irc-residential-energy-code-compliance-form- v2.pdf?1557771491 Carriage house will be heated by a gas forced air unit in the crawlspace. 4. New homes must be EV and PV ready (conduit in place) per 2018 IRC local amendments E3401.5 and E3401.6 See Electrical Notes on Sheet A1.0. Page 10 of 10