Loading...
HomeMy WebLinkAboutHANSEN FARM - FDP190010 - DOCUMENT MARKUPS - ROUND 3 - STORMWATER MANAGEMENT PLANX X X X X X X X X X X X X X UD UD UD UD RS RS RS RS RS RS RS RS RS WD WD WD WD OP WD RS BLOCK 2 BLOCK 5 BLOCK 6 BLOCK 13 BLOCK 14 BLOCK 4 BLOCK 12 BLOCK 7 BLOCK 8 BLOCK 11 BLOCK 10 BLOCK 9 BLOCK 2 BLOCK 2 BLOCK 2 BLOCK 3 BLOCK 3 BLOCK 3 BLOCK 1 TRACT F DRAINAGE, UTILITY & PEDESTRIAN ACCESS EASEMENT MU MU CF CF CF CF CF E E E E E E 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W T TELE M GAS X X X F.O. MM M F.O. 8" W T S T S T S T S UD UD UD UD BLOCK 3 BLOCK 1 RS RS RS RS RS RS RS RS RS WD WD WD WD WD WD WD WD IP IP IP IP IP IP IP IP IP VTC OP VTC CWA OP OP WD X X X X X X X X X X X X X X UD UD UD UD BLOCK 2 BLOCK 5 BLOCK 6 BLOCK 13 BLOCK 14 BLOCK 4 BLOCK 12 BLOCK 7 BLOCK 8 BLOCK 11 BLOCK 10 BLOCK 9 BLOCK 2 BLOCK 2 BLOCK 2 BLOCK 3 BLOCK 3 BLOCK 3 BLOCK 1 TRACT F DRAINAGE, UTILITY & PEDESTRIAN ACCESS EASEMENT 6.2% 4.8% 7.2% 5.5% 3.3% 3.0% 2.0% 2.0% 2.0% 2.1% 2.1% 1.6% 3.2% 5.9% 6.2% 6.8% 4.2% 5.5% 6.2% 7.9% 12.8% 23.1% E E E E E E 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W T TELE M GAS X X X F.O. MM M F.O. 8" W T S T S T S UD UD UD UD BLOCK 3 BLOCK 1 BLOCK 5 BLOCK 13 BLOCK 14 BLOCK 4 BLOCK 2 BLOCK 3 BLOCK 3 BLOCK 3 BLOCK 1 TRACT E FUTURE DEVELOPMENT TRACT L D&UE TRACT D FUTURE DEVELOPMENT TRACT B FUTURE PUBLIC PARK TRACT F DRAINAGE, UTILITY & PEDESTRIAN ACCESS EASEMENT TRACT K D&UE 6.2% 6.8% 4.2% 5.5% 6.2% 7.9% 12.8% 23.1% 17.4% 12.8% 16.3% 17.9% 15.9% 23.6% 25.2% 25.6% 13.4% 13.1% 7.3% 7.3% 10.4% 18.7% 10.6% 6.5% 4.9% 3.6% 14.4% 12.3% 6.0% 8.1% 12.4% 6.5% 3.0% 3.2% 14.9% 20.8% 6.1% DETENTION POND 3 STORM DRAIN E STORM DRAIN A STORM DRAIN D STORM DRAIN B1 STORM DRAIN A STORM DRAIN C DETENTION POND 1 DETENTION POND 2 DETENTION POND 4 STORM DRAIN F STORM DRAIN G STORM DRAIN H STORM DRAIN I STORM DRAIN J RAIN GARDEN RAIN GARDEN Sheet of 74 HANSEN SUBDIVISION These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com ( IN FEET ) 0 1 INCH = 80 FEET 80 80 160 240 DYN2 EROSION CONTROL PLAN DYNAMIC PLAN 72 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R NORTH NOTE: ALL BMPS SHOWN ON THIS PLAN ARE GRAPHIC REPRESENTATIONS ONLY. FINAL DETERMINATION OF SIZE AND LOCATION SHALL BE DETERMINED BY THE CONTRACTOR AND DOCUMENTED ON THE DYNAMIC SITE PLAN. LEGEND: PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET PROPOSED UNDERDRAIN UD WATTLE DIKE INLET PROTECTION IP VEHICLE TRACKING CONTROL PAD VTC SILT FENCE SF SF ROCK SOCK RS RIP RAP RR 1. CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR SIMILAR METHODS. CONTRACTOR TO USE CDOT STRAW MULCH SPECS UNLESS OTHERWISE DIRECTED. 2. SWMP ADMINISTRATOR: Contact ________________________________ Company ________________________________ Address ________________________________ Phone ________________________________ 3. CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF ACCESS IS OFF PAVEMENT. 4. DRYWELLS AND BIORETENTION MEDIA TO BE INSTALLED AFTER STABILIZATION OF OVERLOT GRADING. 5. ALL DISTURBED SOILS SHALL BE RESEEDED WITH A COVER CROP UPON COMPLETION OF THE INFRASTRUCTURE IMPROVEMENTS. THE RECOMMENDED SPECIES AND APPLICATION RATES OF PURE LIVE SEED FOR COVER CROPS ARE AS FOLLOWS: GREAT BASIN WILRYE 3LBS/ACRE GREEN NEEDLEGRASS2LBS/ACRE INDIAN RICEGRASS 1LBS/ACRE SLENDER WHEATGRASS 2LBS/ACRE THICKSPIKE WHEATGRASS 3LBS/ACRE WESTERN WHEATGRASS 4LBS/ACRE TRITICALE 10LBS/ACRE WINTER WHEAT 5LBS/ACRE 6. REFER TO THE FINAL DRAINAGE AND EROSION CONTROL REPORT FOR HANSEN PROPERTY DATED: MAY 24, 2019 FOR ADDITIONAL INFORMATION. GENERAL NOTES: WD TRAFFIC CONTROL BARRICADE TCB CONCRETE WASH AREA CWA OUTLET PROTECTION OP CONSTRUCTION FENCE CF CF CF LIMITS OF DISTURBANCE LOD MULCH MU 1. IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES. 2. THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED. 4. CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION. 5. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, PONDS AND RAIN GARDENS UNTIL SITE IS FULLY STABILIZED. 6. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT. 7. INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL OR GRAVEL SOCKS FOR PAVEMENT, ETC.) 8. CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE. 9. CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT FROM UNSTABILIZED LANDSCAPE AREAS FROM MIGRATING ONTO AND ENTERING THE PERMEABLE PAVER SYSTEMS UNTIL UPGRADIENT TRIBUTARY AREAS ARE FULLY STABILIZED. 10. ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO ENSURE THAT EACH BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS. 11. CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR PAVEMENT, ETC.) 12. FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. 13. CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN. 14. THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE. 15. WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION. 16. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE STABILIZATION METHODS. 17. INDIVIDUAL RESIDENTIAL LOT CONSTRUCTION SHALL IMPLEMENT EROSION CONTROL MEASURES SHOWN IN DETAIL 011 ON SHEET EC4 EROSION CONTROL NOTES: MATCHLINE-SEE SHEET DYN 1 MATCHLINE-SEE SHEET DYN1 TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION/REMOVAL Contractor to utilize this table to indicate when construction activities occur and when each associated BMP is installed or removed. CONSTRUCTION PHASE (Monthly) 1 2 3 4 5 6 7 8 9 10 11 12 Comments Grading Overlot Swales, Drainageways Pipeline Installation Stormwater Concrete Installation Building Structure Miscellaneous Hardscape Amenities BEST MANAGEMENT PRACTICES Temporary Contour Furrows and Diversion Dikes (Ripping/Disking) Inlet Protection (IP) Vehicle Tracking Control (VTC) Flow Barriers (Bales, Wattles, Etc) (WD) Concrete Washout Area (CWA) Preventative Maintenance Activities/Meetings/ etc. Permanent Mulching/Sealant Permanent Seed Planting Water Service Sanitary Sewer Service Curb and Gutter Concrete Parking and Drive Aisle Bio-Swale Permeable Pavers 17.4% 12.8% 3.6% DETENTION POND 1 STORM DRAIN G STORM DRAIN H STORM DRAIN I STORM DRAIN J RAIN GARDEN RAIN GARDEN Sheet of 74 HANSEN SUBDIVISION These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com DYN1 EROSION CONTROL PLAN DYNAMIC PLAN 71 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R NORTH NOTE: ALL BMPS SHOWN ON THIS PLAN ARE GRAPHIC REPRESENTATIONS ONLY. FINAL DETERMINATION OF SIZE AND LOCATION SHALL BE DETERMINED BY THE CONTRACTOR AND DOCUMENTED ON THE DYNAMIC SITE PLAN. LEGEND: PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET PROPOSED UNDERDRAIN UD WATTLE DIKE INLET PROTECTION IP VEHICLE TRACKING CONTROL PAD VTC SILT FENCE SF SF ROCK SOCK RS RIP RAP RR 1. CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR SIMILAR METHODS. CONTRACTOR TO USE CDOT STRAW MULCH SPECS UNLESS OTHERWISE DIRECTED. 2. SWMP ADMINISTRATOR: Contact ________________________________ Company ________________________________ Address ________________________________ Phone ________________________________ 3. CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF ACCESS IS OFF PAVEMENT. 4. DRYWELLS AND BIORETENTION MEDIA TO BE INSTALLED AFTER STABILIZATION OF OVERLOT GRADING. 5. ALL DISTURBED SOILS SHALL BE RESEEDED WITH A COVER CROP UPON COMPLETION OF THE INFRASTRUCTURE IMPROVEMENTS. THE RECOMMENDED SPECIES AND APPLICATION RATES OF PURE LIVE SEED FOR COVER CROPS ARE AS FOLLOWS: GREAT BASIN WILRYE 3LBS/ACRE GREEN NEEDLEGRASS2LBS/ACRE INDIAN RICEGRASS 1LBS/ACRE SLENDER WHEATGRASS 2LBS/ACRE THICKSPIKE WHEATGRASS 3LBS/ACRE WESTERN WHEATGRASS 4LBS/ACRE TRITICALE 10LBS/ACRE WINTER WHEAT 5LBS/ACRE 6. REFER TO THE FINAL DRAINAGE AND EROSION CONTROL REPORT FOR HANSEN PROPERTY DATED: MAY 24, 2019 FOR ADDITIONAL INFORMATION. GENERAL NOTES: WD TRAFFIC CONTROL BARRICADE TCB CONCRETE WASH AREA CWA OUTLET PROTECTION OP CONSTRUCTION FENCE CF CF CF LIMITS OF DISTURBANCE LOD MULCH MU MATCHLINE-SEE SHEET EC2 MATCHLINE-SEE SHEET EC2 ( IN FEET ) 0 1 INCH = 80 FEET 1. IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY 80 80 160 240 AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES. 2. THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED. 4. CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION. 5. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, PONDS AND RAIN GARDENS UNTIL SITE IS FULLY STABILIZED. 6. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT. 7. INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL OR GRAVEL SOCKS FOR PAVEMENT, ETC.) 8. CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE. 9. CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT FROM UNSTABILIZED LANDSCAPE AREAS FROM MIGRATING ONTO AND ENTERING THE PERMEABLE PAVER SYSTEMS UNTIL UPGRADIENT TRIBUTARY AREAS ARE FULLY STABILIZED. 10. ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO ENSURE THAT EACH BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS. 11. CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR PAVEMENT, ETC.) 12. FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. 13. CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN. 14. THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE. 15. WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION. 16. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE STABILIZATION METHODS. 17. INDIVIDUAL RESIDENTIAL LOT CONSTRUCTION SHALL IMPLEMENT EROSION CONTROL MEASURES SHOWN IN DETAIL 011 ON SHEET EC4 TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION/REMOVAL EROSION CONTROL NOTES: Contractor to utilize this table to indicate when construction activities occur and when each associated BMP is installed or removed. CONSTRUCTION PHASE (Monthly) 1 2 3 4 5 6 7 8 9 10 11 12 Comments Grading Overlot Swales, Drainageways Pipeline Installation Stormwater Concrete Installation Building Structure Miscellaneous Hardscape Amenities BEST MANAGEMENT PRACTICES Temporary Contour Furrows and Diversion Dikes (Ripping/Disking) Inlet Protection (IP) Vehicle Tracking Control (VTC) Flow Barriers (Bales, Wattles, Etc) (WD) Concrete Washout Area (CWA) Preventative Maintenance Activities/Meetings/ etc. Permanent Mulching/Sealant Permanent Seed Planting Water Service Sanitary Sewer Service Curb and Gutter Concrete Parking and Drive Aisle Bio-Swale Permeable Pavers RS BLOCK 5 BLOCK 13 BLOCK 14 BLOCK 4 BLOCK 2 BLOCK 3 BLOCK 3 BLOCK 3 BLOCK 1 TRACT E FUTURE DEVELOPMENT TRACT L D&UE TRACT D FUTURE DEVELOPMENT TRACT B FUTURE PUBLIC PARK TRACT F DRAINAGE, UTILITY & PEDESTRIAN ACCESS EASEMENT TRACT K D&UE MU MU MU MU MU C F CF CF CF CF CF CF CF CF CF CF CF CF CF CF CONSTRUCTION FENCE ECB WD WD 6.2% 6.8% 4.2% 5.5% 6.2% 7.9% 12.8% 23.1% 17.4% 12.8% WD OP 16.3% 17.9% 15.9% 23.6% 25.2% 25.6% 13.4% 13.1% 7.3% 7.3% 10.4% 18.7% 10.6% 6.5% 4.9% 3.6% 14.4% 12.3% 6.0% 8.1% 12.4% 6.5% 3.0% 3.2% 14.9% 20.8% 6.1% ECB ECB TRM TRM TRM TRM TRM TRM DETENTION POND 3 STORM DRAIN E STORM DRAIN A STORM DRAIN A STORM DRAIN D STORM DRAIN B1 STORM DRAIN A STORM DRAIN C DETENTION POND 1 DETENTION POND 2 DETENTION POND 4 STORM DRAIN F STORM DRAIN G STORM DRAIN H STORM DRAIN I STORM DRAIN J RAIN GARDEN RAIN GARDEN MU MU MU WD WD WD WD IP IP IP Sheet of 74 HANSEN SUBDIVISION These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com ( IN FEET ) 0 1 INCH = 80 FEET 80 80 160 240 STAT2 EROSION CONTROL PLAN STATIC PLAN 72 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R NORTH NOTE: ALL BMPS SHOWN ON THIS PLAN ARE GRAPHIC REPRESENTATIONS ONLY. FINAL DETERMINATION OF SIZE AND LOCATION SHALL BE DETERMINED BY THE CONTRACTOR AND DOCUMENTED ON THE DYNAMIC SITE PLAN. TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION CONSTRUCTION PHASE MOBILIZATION DEMOLITION GRADING BEST MANAGEMENT PRACTICES (BMPS) STRUCTURAL "INSTALLATION" Construction & Silt Fence Barriers * Flow Barriers (Wattles) * Inlet Filter Bags * Rip Rap Vegetative Temporary Seeding Planting Mulching / Sealant Permanent Seeding Planting Sod Installation Rolled Products : Netting / Blankets / Mats Contour Furrows (Ripping / Disking) Sediment Basin Rock Bags * UTILITIES INSTALLATION FLAT WORK INSTALLATION VERTICAL INSTALLATION LANDSCAPE DEMOBILIZATION Vehicle Tracking Pad * * All Temporary BMPs to be Removed once Construction is Complete Other: Any prior inlets that could use protecting Any prior inlets that could use protecting Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days LEGEND: PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET PROPOSED UNDERDRAIN UD WATTLE DIKE INLET PROTECTION IP VEHICLE TRACKING CONTROL PAD VTC SILT FENCE SF SF ROCK SOCK RS RIP RAP RR 1. CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR SIMILAR METHODS. CONTRACTOR TO USE CDOT STRAW MULCH SPECS UNLESS OTHERWISE DIRECTED. 2. SWMP ADMINISTRATOR: Contact ________________________________ Company ________________________________ Address ________________________________ Phone ________________________________ 3. CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF ACCESS IS OFF PAVEMENT. 4. DRYWELLS AND BIORETENTION MEDIA TO BE INSTALLED AFTER STABILIZATION OF OVERLOT GRADING. 5. ALL DISTURBED SOILS SHALL BE RESEEDED WITH A COVER CROP UPON COMPLETION OF THE INFRASTRUCTURE IMPROVEMENTS. THE RECOMMENDED SPECIES AND APPLICATION RATES OF PURE LIVE SEED FOR COVER CROPS ARE AS FOLLOWS: GREAT BASIN WILRYE 3LBS/ACRE GREEN NEEDLEGRASS2LBS/ACRE INDIAN RICEGRASS 1LBS/ACRE SLENDER WHEATGRASS 2LBS/ACRE THICKSPIKE WHEATGRASS 3LBS/ACRE WESTERN WHEATGRASS 4LBS/ACRE TRITICALE 10LBS/ACRE WINTER WHEAT 5LBS/ACRE 6. REFER TO THE FINAL DRAINAGE AND EROSION CONTROL REPORT FOR HANSEN PROPERTY DATED: MAY 24, 2019 FOR ADDITIONAL INFORMATION. GENERAL NOTES: WD TRAFFIC CONTROL BARRICADE TCB CONCRETE WASH AREA CWA OUTLET PROTECTION OP CONSTRUCTION FENCE CF CF CF LIMITS OF DISTURBANCE LOD MULCH MU Under slope stabilization rolled products. Reseeding may be required. 1. IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES. 2. THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED. 4. CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION. 5. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, PONDS AND RAIN GARDENS UNTIL SITE IS FULLY STABILIZED. 6. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT. 7. INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL OR GRAVEL SOCKS FOR PAVEMENT, ETC.) 8. CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE. 9. CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT FROM UNSTABILIZED LANDSCAPE AREAS FROM MIGRATING ONTO AND ENTERING THE PERMEABLE PAVER SYSTEMS UNTIL UPGRADIENT TRIBUTARY AREAS ARE FULLY STABILIZED. 10. ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO ENSURE THAT EACH BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS. 11. CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR PAVEMENT, ETC.) 12. FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. 13. CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN. 14. THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE. 15. WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION. 16. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE STABILIZATION METHODS. 17. INDIVIDUAL RESIDENTIAL LOT CONSTRUCTION SHALL IMPLEMENT EROSION CONTROL MEASURES SHOWN IN DETAIL 011 ON SHEET EC4 EROSION CONTROL NOTES: MATCHLINE-SEE SHEET EC1 MATCHLINE-SEE SHEET EC1 CF CF CF CF CF CF CF CF MU WD WD MU 6.2% 4.8% 7.2% 5.5% 3.3% 3.0% 2.0% 2.0% 2.0% 2.1% 2.1% 1.6% 3.2% 5.9% 6.2% 6.8% 4.2% 5.5% 6.2% 7.9% 12.8% 23.1% 17.4% 12.8% CONSTRUCTION FENCE WD 3.6% TRM TRM DETENTION POND 1 STORM DRAIN G STORM DRAIN H STORM DRAIN I STORM DRAIN J RAIN GARDEN RAIN GARDEN WD IP IP Sheet of 74 HANSEN SUBDIVISION These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com STAT1 EROSION CONTROL PLAN STATIC PLAN 71 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R NORTH NOTE: ALL BMPS SHOWN ON THIS PLAN ARE GRAPHIC REPRESENTATIONS ONLY. FINAL DETERMINATION OF SIZE AND LOCATION SHALL BE DETERMINED BY THE CONTRACTOR AND DOCUMENTED ON THE DYNAMIC SITE PLAN. TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION CONSTRUCTION PHASE MOBILIZATION DEMOLITION GRADING BEST MANAGEMENT PRACTICES (BMPS) STRUCTURAL "INSTALLATION" Construction & Silt Fence Barriers * Flow Barriers (Wattles) * Inlet Filter Bags * Rip Rap Vegetative Temporary Seeding Planting Mulching / Sealant Permanent Seeding Planting Sod Installation Rolled Products : Netting / Blankets / Mats Contour Furrows (Ripping / Disking) Sediment Basin Rock Bags * UTILITIES INSTALLATION FLAT WORK INSTALLATION VERTICAL INSTALLATION LANDSCAPE DEMOBILIZATION Vehicle Tracking Pad * * All Temporary BMPs to be Removed once Construction is Complete Other: Any prior inlets that could use protecting Any prior inlets that could use protecting Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days LEGEND: PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET PROPOSED UNDERDRAIN UD WATTLE DIKE INLET PROTECTION IP VEHICLE TRACKING CONTROL PAD VTC SILT FENCE SF SF ROCK SOCK RS RIP RAP RR 1. CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR SIMILAR METHODS. CONTRACTOR TO USE CDOT STRAW MULCH SPECS UNLESS OTHERWISE DIRECTED. 2. SWMP ADMINISTRATOR: Contact ________________________________ Company ________________________________ Address ________________________________ Phone ________________________________ 3. CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF ACCESS IS OFF PAVEMENT. 4. DRYWELLS AND BIORETENTION MEDIA TO BE INSTALLED AFTER STABILIZATION OF OVERLOT GRADING. 5. ALL DISTURBED SOILS SHALL BE RESEEDED WITH A COVER CROP UPON COMPLETION OF THE INFRASTRUCTURE IMPROVEMENTS. THE RECOMMENDED SPECIES AND APPLICATION RATES OF PURE LIVE SEED FOR COVER CROPS ARE AS FOLLOWS: GREAT BASIN WILRYE 3LBS/ACRE GREEN NEEDLEGRASS2LBS/ACRE INDIAN RICEGRASS 1LBS/ACRE SLENDER WHEATGRASS 2LBS/ACRE THICKSPIKE WHEATGRASS 3LBS/ACRE WESTERN WHEATGRASS 4LBS/ACRE TRITICALE 10LBS/ACRE WINTER WHEAT 5LBS/ACRE 6. REFER TO THE FINAL DRAINAGE AND EROSION CONTROL REPORT FOR HANSEN PROPERTY DATED: MAY 24, 2019 FOR ADDITIONAL INFORMATION. GENERAL NOTES: WD TRAFFIC CONTROL BARRICADE TCB CONCRETE WASH AREA CWA OUTLET PROTECTION OP CONSTRUCTION FENCE CF CF CF LIMITS OF DISTURBANCE LOD MULCH MU Under slope stabilization rolled products. Reseeding may be required. MATCHLINE-SEE SHEET EC2 MATCHLINE-SEE SHEET EC2 ( IN FEET ) 0 1 INCH = 80 FEET 1. IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY 80 80 160 240 AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES. 2. THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED. 4. CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION. 5. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, PONDS AND RAIN GARDENS UNTIL SITE IS FULLY STABILIZED. 6. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT. 7. INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL OR GRAVEL SOCKS FOR PAVEMENT, ETC.) 8. CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE. 9. CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT FROM UNSTABILIZED LANDSCAPE AREAS FROM MIGRATING ONTO AND ENTERING THE PERMEABLE PAVER SYSTEMS UNTIL UPGRADIENT TRIBUTARY AREAS ARE FULLY STABILIZED. 10. ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO ENSURE THAT EACH BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS. 11. CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR PAVEMENT, ETC.) 12. FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. 13. CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN. 14. THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE. 15. WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION. 16. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE STABILIZATION METHODS. 17. INDIVIDUAL RESIDENTIAL LOT CONSTRUCTION SHALL IMPLEMENT EROSION CONTROL MEASURES SHOWN IN DETAIL 011 ON SHEET EC4 EROSION CONTROL NOTES: