HomeMy WebLinkAboutCENTERPOINT PLAZA REPLAT - BDR190003 - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTS1
RESPONSE TO ROUND 1 COMMENTS
TO: Tenae Beane, Development Review Coordinator
City of Fort Collins
FROM: Jennifer D. Zezlina, Architectural Intern,
RMG-Rocky Mountain Group
DATE: April 12, 2019
SUBJECT: Centerpoint Plaza Replat, BDR190003, Round Number 1– Response Letter
Dear Ms. Beane:
Please find the following response to Comment Summary, March 14, 2019.
Response: (In Red)
Comment Summary:
Department: Planning Services
Contact: Jason Holland, 970-224-6126, jholland@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/12/2019
03/12/2019: PRIOR TO HEARING: The linework and boundary shown for the
building envelope on the Second Replat doesn't match the approved plans. This
must be changed to be the same as the approved plans.
The boundary line work has been revised to match the approved plans.
Comment Number: 2 Comment Originated: 03/12/2019
03/12/2019: PRIOR TO HEARING: The second replat document is difficult to
compare to the existing plat due to the different linetypes used and lack of direct
dimensions that were included on the first replat. The first replat is more clear. I
need written acknowledgement that all of the linework on the plat isn't changing
and that the only element that is changing is the addition of a lot line to create
Lot 2.
The only element that is changing is the addition of a lot line to create lot 2.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Plat
Comment Number: 1 Comment Originated: 03/11/2019
03/11/2019: FOR APPROVAL:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
2
made. Please provide any responses on redlined sheets and/or in response
letter.
All comments have been addressed except for the Leinholder signature as there is not a lienholder
for this property.
Department: PFA
Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 03/07/2019
03/07/2019:
2018 IFC CODE ADOPTION
Poudre Fire Authority and the City of Fort Collins (Town of Timnath, Larimer
County) are in the process of adopting the 2018 International Fire Code. Code
adoption is anticipated in early 2019. Building plan reviews shall be subject to
the adopted version of the fire code in place at the time of plan review submittal
and permit application.
Noted.
Comment Number: 2 Comment Originated: 03/07/2019
03/07/2019:
>The 24ft wide easement shown on lot 1 is required as an emergency access
easement (EAE) to serve the building but is shown as an easement only.
Should it not be an EAE at this time, it should now be shown on the Plat as such
or dedicated by separate legal document.
The label has been revised to indicate that the 24’ easement is an Emergency access easement as it
was originally platted.
Comment Number: 3 Comment Originated: 03/07/2019
03/07/2019:
As the project develops PFA will have comments regarding access, hydrants
and addressing.
Noted.
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/06/2019
03/06/2019: No comments.
Department: Forestry
Contact: Nils Saha, , nsaha@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 03/12/2019
03/12/2019: No comments at this stage
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
3
Topic: Erosion Control
Comment Number: 1 Comment Originated: 03/12/2019
03/12/2019: Information only:
Any future projects or planned work after the replat that disturbs greater than
10,000 square feet will trigger erosion control requirements. The erosion control
requirements are located in the Stormwater Design Criteria in Chapter 2
Section 6.0 a copy of the requirements can be found at www.fcgov.com/erosion
Noted. Storm water measures were part of the approved development plan. There will not be any
land disturbance at this time.
Please contact me with any questions.
Jennifer Zezlina
RMG – Rocky Mountain Group | Architectural Intern III
19375 Beacon Lite Rd. | Monument, CO 80132
719-488-2145 (office) | 719-434-5630 (direct) | 719-548-0223 (fax)
jzezlina@rmg-engineers.com | www.rmg-engineers.com
4
5