August 23, 2018
Studio PBA
1575 Gilpin St
Denver, CO
RE: Spirit at the River (formerly Lincoln Corridor Hotel), FDP180015, Round Number
2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Clay Frickey, at 970-224-6045 or cfrickey@fcgov.com.
UComment Summary:
Department: Engineering Development Review
Contact: Katie Andrews, 970-221-6501, Ukandrews@fcgov.com
Topic: General
Comment Number: 4 Comment Originated: 07/02/2018
08/20/2018: This comment was not addressed with the 2nd round FDP
submittal. 07/02/2018: Please list approved variance for parking setback in
note 48. Approved parking Variance Listed under note 48 on Sheet C1.1
Comment Number: 8 Comment Originated: 07/02/2018
08/20/2018: This comment was not addressed with the 2nd round FDP
submittal. 07/02/2018: Please add City of Fort Collins Utility Plan signature
block to each page in the utility plan set. . –The City of Fort Collins Utility Plan Signature Block has been
added to each page in the Utility Plan Set.
Comment Number: 9 Comment Originated: 07/02/2018
08/20/2018: No reception number was sent or provided on the plans with 2nd
round FDP submittal. This comment will be retained until the reception number
is included on the plans. 07/02/2018: The offsite easement will need to be
dedicated and reception number provided prior to plan approval ¿ this appears
to be a private easement which will not be dedicated to the public and will not
go through the public easement dedication process, however, we will require
the reception number prior to approving the plans. Please send me the
reception number when it¿s been recorded. The reception number is: 20180013424
Comment Number: 12 Comment Originated: 07/02/2018
08/20/2018: This comment was not addressed with the 2nd round FDP
submittal. To clarify, the sidewalk and parkway labels needed are for the Lincoln
Street sidewalk and parkway within the ROW. 07/02/2018: Please label the
public sidewalk and parkway widths on the horizontal control plan. – E Lincoln Ave has been dimensioned
as has the sidewalk along the ROW.
Comment Number: 13 Comment Originated: 07/02/2018
08/20/2018: Based on the existing conditions/demo plan, there seems to be
more than 80 feet of new curb and gutter directly east of the new western-most
driveway access, which is not bolded as new infrastructure on the horizontal
control plan. 07/02/2018: Please bold/label new curb, gutter, and sidewalk on
the horizontal control plan, so it¿s easy to differentiate from what¿s existing and
planned to remain. – Curb and gutter of the Western-most driveway access has been updated to display as
new infrastructure.
Comment Number: 17 Comment Originated: 08/20/2018
08/20/2018: Please coordinate with technical services and engineering on
resolving the conflict between the newly shown irrigation easement and the
proposed building. Please refer to the enclosed documentation that the easement has been vacated
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-2625, Ureverette@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 06/29/2018
06/29/2018: DEVELOPMENT AGREEMENT: Language for the Natural
Resources section of the Development Agreement has been provided to
Engineering. The following items must be submitted prior to the issuance of a
Development Construction Permit:
1. A cost estimate for landscaping in the Natural Habitat Buffer Zone (including
plant material, labor and irrigation)
2. A cost estimate for three years of monitoring and annual reporting of
landscape establishment in the Natural Habitat Buffer Zone
3. A bond, letter of credit, or escrow warranting the landscape installation,
establishment, monitoring, and reporting for the Natural Habitat Buffer Zone
(125% of cost estimates)
4. A weed management plan
5. An annual monitoring and reporting plan
Response: Estimates and weed management plan have been submitted.
We can provide examples and additional detail for any of these items if needed.
Please contact us if you have any questions.
Comment Number: 5 Comment Originated: 07/06/2018
06/29/2018: NEW CONTACT: There will be a new contact for Environmental
Planning moving forward. Please contact Stephanie Blochowiak, Environmental
Planner, at sblochowiak@fcgov.com or 970-416-4290 with any questions or
follow-up.
Response: Noted.
Contact: Stephanie Blochowiak, 970-416-4290, Usblochowiak@fcgov.com
Topic: General
Comment Number: 6 Comment Originated: 08/20/2018
08/20/2018: Natural Habitat Buffer Zone security bond letter and/or letter of
credit (LOC) template can be provided by staff if needed. Once installation and
monitoring estimates are created and accepted by City staff, then 125% of
estimated costs will serve as securities. Annual inspections begin the first full
growing season after installation.
Response: Landscape estimate has been submitted.
Department: Internal Services
Contact: Jonathon Nagel, , Ujnagel@fcgov.com
Topic: General
Comment Number: 4 Comment Originated: 08/13/2018
08/13/2018: Please include a label for the proposed capacities for the trash
and recycling dumpsters shown on the plan enlargement on A.202
Response: The trash and recycling dumpsters will be Waste Management standard front loading 8 yard
containers (6'-0" deep x 5'-4" wide x 6'-8" tall).
Comment Number: 5 Comment Originated: 08/13/2018
08/13/2018: The pedestrian entrance on the trash and recycling enclosure
should provide unobstructed access to all dumpsters located in the enclosure
without having to open the main service gates. The current proposal only shows
the pedestrian entrance having access to the nearest dumpster.
Response: The dumpsters have been reoriented to face outward towards the main service gates. The
trash room now has a 3'-0" min. unobstructed access path in front of the dumpsters with access to both
dumpsters inside the room without opening the main service gates.
Comment Number: 6 Comment Originated: 08/13/2018
08/13/2018: Please update the site/landscaping plans to reflect the pedestrian
entrance on the trash and recycling enclosure that is shown on the plan
enlargement provided on A.202
Response: Trash enclosure has been updated to match architectural detail.
Department: Light And Power
Contact: Austin Kreager, 970-224-6152, Uakreager@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 07/03/2018
07/03/2018: I received the C-1 and one-line diagrams. Everything seems to be
in order. Thank you
Response: Noted.
Comment Number: 3 Comment Originated: 07/03/2018
07/03/2018: Please contact Austin Kreager if you have any questions at
224-6152. Please reference our policies, development charge processes, and
use our fee estimator at
30TUhttp://www.fcgov.com/utilities/business/builders-and-developersU30T.
Response: Noted.
Comment Number: 4 Comment Originated: 08/21/2018
08/21/2018: Is the relocated transformer moving off of your property on to the
neighboring property? If so, I need to see a utility easement or expressed
written consent by Woodward that they will allow this to happen. I cannot place
the transformer on their property without their permission. All costs associated
with moving this transformer will be charged to this project. If any secondary
work needs to be done, it will be your electrician's responsibility. Based on email correspondences with
Woodward representatives the building being served by the transformer will be demolished prior to the
commencement of construction for this site.
Comment Number: 5 Comment Originated: 08/21/2018
08/21/2018: The proposed transformer location for the new hotel is acceptable
to us. We have no issues with the placement of this transformer. Thank you.
Response: Noted.
Department: Park Planning
Contact: Suzanne Bassinger, 970-416-4340, sbassinger@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 07/03/2018
07/03/2018: Thank you for working with the City to assure the relocation and
stability of the Poudre Trail. Please contact Suzanne Bassinger at
sbassinger@fcgov.com or 416-4340 with questions.
Response: Noted.
Comment Number: 4 Comment Originated: 07/03/2018
07/03/2018:
Park Planning & Development will reimburse the Developer for trail
construction, and demolition (if performed by contractor). All unit prices and
estimated quantities for work to be reimbursed must be specified in the
development agreement. Reimbursement will occur after final acceptance of
the improvements by the City. The request for reimbursement must include
proof of payment to the contractor.
Response: Noted.
Comment Number: 5 Comment Originated: 08/20/2018
08/20/2018: No closure of, or work on, the existing Poudre Trail shall be
initiated without approval by Park Planning & Development Department. At
least 2-weeks notice is requested for closure of the trail. Trail closure for
reconstruction shall be minimized to the greatest extent possible and shall be
coordinated with Park Planning & Development.
Response: Noted.
Comment Number: 6 Comment Originated: 08/21/2018
08/21/2018: Informational only: Poudre River bank stabilization work can only
be performed in the spring and fall seasons. The City would prefer to perform
stabilization in late winter/early spring 2019 to avoid damage to the existing trail
during spring 2019 runoff flows. Depending on the timing of site work for the
hotel, it may be possible to postpone work until Fall 2019. Bank stabilization
work will be coordinated with applicant to the greatest extent possible.
Response: Noted.
Topic: Plat
Comment Number: 1 Comment Originated: 08/21/2018
08/21/2018: Please add a note regarding the temporary construction
easement for bank stabilization work: "The Temporary Construction Easement
for the Poudre River bank stabilization work performed for the City of Fort
Collins shall expire at the completion of the work."
Response: Note added to Plat
Department: PFA
Contact: Andrew Rosen, 970-416-2599, arosen@fcgov.com
Topic: General
Comment Number: 4 Comment Originated: 08/19/2018
08/19/2018: FIRE LANE SIGNAGE
> Comment from last round: "Two additional signs are required at the SE
corner, positioned both inside and outside the curve."
> Per project team, two signs have been added at this location (sheet C3.0).
> Please label signs as per Keynote Table. Thank you.
– Signs have been labeled per keynote table
Department: Planning Services
Contact: Clay Frickey, 970-224-6045, cfrickey@fcgov.com
Topic: Landscape Plans
Comment Number: 2 Comment Originated: 06/27/2018
08/09/2018: Please resolve the following discrepancies between the plant list
and what is shown on the landscape plan:
PSA - Plans show 3, plant list shows 4, corrected
ACA - Plans show 13, plant list shows 11, correct label was wrong for ACN
ACN - Plans show 24, plant list shows 26, 26 correct, label was wrong with ACA
CBR - Plans show 131, plant list shows 124, label had wrong quantity
Response: Quantities corrected.
Comment Number: 3 Comment Originated: 06/27/2018
06/27/2018: There's a floating label for PAP on the eastern parking lot that
does not correspond to any plantings. Please remove this label.
Response: removed from plans.
Comment Number: 8 Comment Originated: 08/09/2018
08/09/2018: There is a period before the amount of PMI proposed on the plant
list that makes it look like you're proposing 0.8 PMI. Since the landscape plan
shows 8 PMI, I assume all that needs to be done to resolve this issue is to
remove the period on the plant list.
Response: Corrected.
Topic: Site Plan
Comment Number: 6 Comment Originated: 06/27/2018
08/09/2018: This has not been resolved. Please update the parking table to
show 21 enclosed bike parking spaces.
Response: Corrected. Fixed bike counts are updated as well to 16 – 37 total spaces.
06/27/2018: The site plan shows 21 enclosed bike parking spaces while the
parking table indicates only 17 are covered. Please update the land use table
so that it is consistent with what is shown on the site plan.
Comment Number: 7 Comment Originated: 06/27/2018
08/09/2018: This note is cut off. Please make sure the entire note is displayed
on the site plan notes.
06/27/2018: Please add the following note to the site plan: DESIGN AND
INSTALLATION OF ALL PARKWAY/TREE LAWN AND MEDIAN AREAS IN
THE RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH CITY
STANDARDS. UNLESS OTHERWISE AGREED TO BY THE CITY WITH THE
FINAL PLANS, ALL ONGOING MAINTENANCE OF SUCH AREAS IS THE
RESPONSIBILITY OF THE OWNER/DEVELOPER.
Response: Fixed.
Department: Stormwater Engineering
Contact: Basil Hamdan, 970-224-6035, bhamdan@fcgov.com
Topic: Erosion Control
Comment Number: 11 Comment Originated: 06/28/2018
08/08/2018: This site is very close to the Poudre River, therefore it is very
important that a treatment train type of Erosion and Sediment Control measures
be used to protect the river from sediment discharge in case one of these
measures fails during a rainfall event. Maintenance of proposed measures is
very important especially at the downstream end in the detention pond.
Additional permanent sediment forebays should be placed in the rain garden to
protect the river from sediment loading over the long run. Please refer to the
redlined report and plans for additional detailed comments.
– Erosion control plans updated per redlines
06/28/2018: The erosion control requirements are in the Stormwater Design
Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. The
current Erosion Control Materials Submitted do not meet requirements. See
redlines of the submitted ESC Plan and Report for specific comments and
corrections. The Erosion Control Report (Stormwater Management Control)
submitted was incomplete and not acceptable neither for City Erosion Control
Requirements nor for State SWMP requirements. The Site will also have to
supply new Erosion Control Escrow Calculations which were not provided at
this time. The currently submitted ESC report is a generic report that does not
address the specifics of the site. Any subsequent submittal must provide a
substantive report that describes construction activities on this site, addresses
what specific measures are being implemented and provides a sequencing of
ESC activities for the contractor to follow. Failure to provide a specific report for
this site will result in the rejection of your next submittal. For reference please
follow the guidelines provided on the City's website at and use the checklist to
ensure a complete submittal is provided.
These guidelines can be found at the following link:
https://www.fcgov.com/utilities/business/builders-and-developers/development-f
orms-guidelines-regulations/erosion/
Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com
Topic: General
Comment Number: 14 Comment Originated: 07/02/2018
08/21/2018: Please add a note on the grading and landscape plans that the
rain garden is to be built very last in the construction sequence after the rest of
the site has been landscaped.
Response: Note has been added to grading and landscape plans.
07/02/2018: The rain garden will need to be protected during construction so
please show some sort of protection around the perimeter of the rain garden -
straw wattles or silt fence perhaps.
Response: Rain garden is protected with wattles during construction. Refer to SWMP
Comment Number: 20 Comment Originated: 07/02/2018
08/22/2018: The ST-600 shows a flared-end section on the upstream end.
This should be an inlet.
– ST-600 has been redesigned to use a curb inlet instead of a FES.
07/02/2018: Storm Sewer Plan - I'm questioning many of the callouts on the
storm plan including: Wye callouts - what are these actually indicating? Are
these cleanouts or other? grated tops or solid? why are you calling out for an
area inlet at the curb in the parking lot? The type C inlet in the rain garden
seems like overkill; it would be best to minimize the amount of pipes coming
into the rain garden to also minimize the amount of forebays that need to be
constructed.
Response: The Storm Sewer system has been re-designed and updated to minimize the number of pipes
coming into the rain garden
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/20/2018
08/21/2018: Due to the location of the pond to the natural area, the City would
prefer a more natural forebay option. The City suggests a meeting to discuss
options.
. – the rain garden has been redesigned to option discussed with city
06/20/2018: Forbays are required for the entry points into the rain garden.
These are required to collect sediment and reduce the erosion at the pipe
outlets. Please coordinate with the City on design options.
Response: Forebays added to entry points into the rain garden
Comment Number: 4 Comment Originated: 06/20/2018
08/21/2018: The outlet structure has a WQ plate which I think is not needed.
More discussion is needed.
– WQ plate has been removed
06/20/2018: Please use a more standard trash rack for the quantity detention
outlet structure. The proposed well screen would most likely get clogged in this
application where the screen is on an incline and not placed vertical.
Response: Outlet structure updated to be more standard
Comment Number: 8 Comment Originated: 06/20/2018
08/21/2018: Repeat Comment. Additional conflicts near the hotel building.
Response: Utility conflicts have been addressed by relocating utilities and storm sewer to not be in conflict
06/20/2018: There are some conflicts with the storm sewers and trees in the
ponds area. Please provide 10 feet of separation.
Response: Adjustments made – note of min typ. Dimension has been added to plans.
Comment Number: 21 Comment Originated: 08/20/2018
08/20/2018: The rain garden is now located in the bottom of the quantity
detention pond. Generally, The City requires the LID basin to be located
outside of the quantity detention pond. Discussion is required for the best
option to place the rain garden within the quantity detention pond. – Rain garden has been moved to the
east of the bottom of the pond and has been sized to hold 100% of the WQCV.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 11 Comment Originated: 07/03/2018
08/21/2018: Please change "Construction Documents" back to "Utility Plans".
See redlines. - Changed
07/03/2018: Please revise the sub-title as marked. See redlines.
Comment Number: 12 Comment Originated: 07/03/2018
08/21/2018: This has not been corrected. – Basis of Bearings Statement has been updated to match the
most current Subdivision Plat.
07/03/2018: The Basis Of Bearings statement should match the Subdivision
Plat.
Comment Number: 13 Comment Originated: 07/03/2018
08/21/2018: This has not been corrected. – Benchmark Statement updated to match exact format
provided
07/03/2018: Please provide the following information for the Benchmark
Statement in the EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR
VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NGVD29 UNADJUSTED (PRIOR CITY OF FORT
COLLINS DATUM) = NAVD88 - X.XX¿.
Comment Number: 15 Comment Originated: 07/03/2018
08/21/2018: There are line over text issues. See redlines. – Line over text issues addressed per redlines.
07/03/2018: There are line over text issues. See redlines.
Comment Number: 16 Comment Originated: 07/03/2018
08/21/2018: There is text that needs to be masked. Mask all text in hatched
areas. See redlines. – Text masked per redlines
07/03/2018: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
Comment Number: 19 Comment Originated: 08/21/2018
08/21/2018: There are text over text issues. See redlines.
– Text over text issues fixed per redlines
Topic: Plat
Comment Number: 1 Comment Originated: 07/03/2018
08/16/2018: Please make changes as marked. If changes are not made or you
disagree with comments, please provide written response of why corrections
were not made. Please provide any responses on redlined sheets and/or in
response letter.
–Revisions made, refer to attached letter from Darrell Delap for written responses of why corrections were
not made.
07/03/2018: Please make changes as marked. If changes are not made or you
disagree with comments, please provide written response of why corrections
were not made. Please provide any responses on redlined sheets and/or in
response letter.
Topic: Site Plan
Comment Number: 4 Comment Originated: 07/03/2018
08/21/2018: Some of the easement descriptions shown are still incorrect.
Response: Discussion with staff on this resolved what was shown, easement to remain as shown.
07/03/2018: Some of the easement descriptions shown are incorrect. If they
are going to stay on the plan, they should match what is shown on the
Subdivision Plat.
Comment Number: 5 Comment Originated: 07/03/2018
08/21/2018: There are line over text issues. See redlines.
Response: corrected.
07/03/2018: There are line over text issues. See redlines.
Comment Number: 18 Comment Originated: 08/21/2018
08/21/2018: There are spelling issues. See redlines.
Response: Spelling corrected.
Department: Traffic Operation
Contact: Tim Tuttle, 970-221-6820, TTUTTLE@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/28/2018
06/28/2018: The signage plan looks complete, no comments from Traffic
Operations.
Response: noted.
Department: Water-Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 06/20/2018
08/21/2018: The profile water meter detail is not the correct one. Please
provide the detail for the 2-inch meters.
Response: 2-in Water meter detail added to detail sheet
06/20/2018: Please add the meter detail that shows the profile of the meter
vault in addition to the plan view already on the plans.
Response: 2-in Water meter detail added to detail sheet that shows the profile of the meter vault.