Loading...
HomeMy WebLinkAboutSPIRIT AT THE RIVER (FORMERLY LINCOLN CORRIDOR HOTEL) - FDP180015 - SUBMITTAL DOCUMENTS - ROUND 3 - RESPONSE TO STAFF REVIEW COMMENTSCommunity Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview August 23, 2018 Studio PBA 1575 Gilpin St Denver, CO RE: Spirit at the River (formerly Lincoln Corridor Hotel), FDP180015, Round Number 2 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Clay Frickey, at 970-224-6045 or cfrickey@fcgov.com. UComment Summary: Department: Engineering Development Review Contact: Katie Andrews, 970-221-6501, Ukandrews@fcgov.com Topic: General Comment Number: 4 Comment Originated: 07/02/2018 08/20/2018: This comment was not addressed with the 2nd round FDP submittal. 07/02/2018: Please list approved variance for parking setback in note 48. Approved parking Variance Listed under note 48 on Sheet C1.1 Comment Number: 8 Comment Originated: 07/02/2018 08/20/2018: This comment was not addressed with the 2nd round FDP submittal. 07/02/2018: Please add City of Fort Collins Utility Plan signature block to each page in the utility plan set. . –The City of Fort Collins Utility Plan Signature Block has been added to each page in the Utility Plan Set. Comment Number: 9 Comment Originated: 07/02/2018 08/20/2018: No reception number was sent or provided on the plans with 2nd round FDP submittal. This comment will be retained until the reception number is included on the plans. 07/02/2018: The offsite easement will need to be dedicated and reception number provided prior to plan approval ¿ this appears to be a private easement which will not be dedicated to the public and will not go through the public easement dedication process, however, we will require the reception number prior to approving the plans. Please send me the reception number when it¿s been recorded. The reception number is: 20180013424 Comment Number: 12 Comment Originated: 07/02/2018 08/20/2018: This comment was not addressed with the 2nd round FDP submittal. To clarify, the sidewalk and parkway labels needed are for the Lincoln Street sidewalk and parkway within the ROW. 07/02/2018: Please label the public sidewalk and parkway widths on the horizontal control plan. – E Lincoln Ave has been dimensioned as has the sidewalk along the ROW. Comment Number: 13 Comment Originated: 07/02/2018 08/20/2018: Based on the existing conditions/demo plan, there seems to be more than 80 feet of new curb and gutter directly east of the new western-most driveway access, which is not bolded as new infrastructure on the horizontal control plan. 07/02/2018: Please bold/label new curb, gutter, and sidewalk on the horizontal control plan, so it¿s easy to differentiate from what¿s existing and planned to remain. – Curb and gutter of the Western-most driveway access has been updated to display as new infrastructure. Comment Number: 17 Comment Originated: 08/20/2018 08/20/2018: Please coordinate with technical services and engineering on resolving the conflict between the newly shown irrigation easement and the proposed building. Please refer to the enclosed documentation that the easement has been vacated Department: Environmental Planning Contact: Rebecca Everette, 970-416-2625, Ureverette@fcgov.com Topic: General Comment Number: 2 Comment Originated: 06/29/2018 06/29/2018: DEVELOPMENT AGREEMENT: Language for the Natural Resources section of the Development Agreement has been provided to Engineering. The following items must be submitted prior to the issuance of a Development Construction Permit: 1. A cost estimate for landscaping in the Natural Habitat Buffer Zone (including plant material, labor and irrigation) 2. A cost estimate for three years of monitoring and annual reporting of landscape establishment in the Natural Habitat Buffer Zone 3. A bond, letter of credit, or escrow warranting the landscape installation, establishment, monitoring, and reporting for the Natural Habitat Buffer Zone (125% of cost estimates) 4. A weed management plan 5. An annual monitoring and reporting plan Response: Estimates and weed management plan have been submitted. We can provide examples and additional detail for any of these items if needed. Please contact us if you have any questions. Comment Number: 5 Comment Originated: 07/06/2018 06/29/2018: NEW CONTACT: There will be a new contact for Environmental Planning moving forward. Please contact Stephanie Blochowiak, Environmental Planner, at sblochowiak@fcgov.com or 970-416-4290 with any questions or follow-up. Response: Noted. Contact: Stephanie Blochowiak, 970-416-4290, Usblochowiak@fcgov.com Topic: General Comment Number: 6 Comment Originated: 08/20/2018 08/20/2018: Natural Habitat Buffer Zone security bond letter and/or letter of credit (LOC) template can be provided by staff if needed. Once installation and monitoring estimates are created and accepted by City staff, then 125% of estimated costs will serve as securities. Annual inspections begin the first full growing season after installation. Response: Landscape estimate has been submitted. Department: Internal Services Contact: Jonathon Nagel, , Ujnagel@fcgov.com Topic: General Comment Number: 4 Comment Originated: 08/13/2018 08/13/2018: Please include a label for the proposed capacities for the trash and recycling dumpsters shown on the plan enlargement on A.202 Response: The trash and recycling dumpsters will be Waste Management standard front loading 8 yard containers (6'-0" deep x 5'-4" wide x 6'-8" tall). Comment Number: 5 Comment Originated: 08/13/2018 08/13/2018: The pedestrian entrance on the trash and recycling enclosure should provide unobstructed access to all dumpsters located in the enclosure without having to open the main service gates. The current proposal only shows the pedestrian entrance having access to the nearest dumpster. Response: The dumpsters have been reoriented to face outward towards the main service gates. The trash room now has a 3'-0" min. unobstructed access path in front of the dumpsters with access to both dumpsters inside the room without opening the main service gates. Comment Number: 6 Comment Originated: 08/13/2018 08/13/2018: Please update the site/landscaping plans to reflect the pedestrian entrance on the trash and recycling enclosure that is shown on the plan enlargement provided on A.202 Response: Trash enclosure has been updated to match architectural detail. Department: Light And Power Contact: Austin Kreager, 970-224-6152, Uakreager@fcgov.com Topic: General Comment Number: 1 Comment Originated: 07/03/2018 07/03/2018: I received the C-1 and one-line diagrams. Everything seems to be in order. Thank you Response: Noted. Comment Number: 3 Comment Originated: 07/03/2018 07/03/2018: Please contact Austin Kreager if you have any questions at 224-6152. Please reference our policies, development charge processes, and use our fee estimator at 30TUhttp://www.fcgov.com/utilities/business/builders-and-developersU30T. Response: Noted. Comment Number: 4 Comment Originated: 08/21/2018 08/21/2018: Is the relocated transformer moving off of your property on to the neighboring property? If so, I need to see a utility easement or expressed written consent by Woodward that they will allow this to happen. I cannot place the transformer on their property without their permission. All costs associated with moving this transformer will be charged to this project. If any secondary work needs to be done, it will be your electrician's responsibility. Based on email correspondences with Woodward representatives the building being served by the transformer will be demolished prior to the commencement of construction for this site. Comment Number: 5 Comment Originated: 08/21/2018 08/21/2018: The proposed transformer location for the new hotel is acceptable to us. We have no issues with the placement of this transformer. Thank you. Response: Noted. Department: Park Planning Contact: Suzanne Bassinger, 970-416-4340, sbassinger@fcgov.com Topic: General Comment Number: 1 Comment Originated: 07/03/2018 07/03/2018: Thank you for working with the City to assure the relocation and stability of the Poudre Trail. Please contact Suzanne Bassinger at sbassinger@fcgov.com or 416-4340 with questions. Response: Noted. Comment Number: 4 Comment Originated: 07/03/2018 07/03/2018: Park Planning & Development will reimburse the Developer for trail construction, and demolition (if performed by contractor). All unit prices and estimated quantities for work to be reimbursed must be specified in the development agreement. Reimbursement will occur after final acceptance of the improvements by the City. The request for reimbursement must include proof of payment to the contractor. Response: Noted. Comment Number: 5 Comment Originated: 08/20/2018 08/20/2018: No closure of, or work on, the existing Poudre Trail shall be initiated without approval by Park Planning & Development Department. At least 2-weeks notice is requested for closure of the trail. Trail closure for reconstruction shall be minimized to the greatest extent possible and shall be coordinated with Park Planning & Development. Response: Noted. Comment Number: 6 Comment Originated: 08/21/2018 08/21/2018: Informational only: Poudre River bank stabilization work can only be performed in the spring and fall seasons. The City would prefer to perform stabilization in late winter/early spring 2019 to avoid damage to the existing trail during spring 2019 runoff flows. Depending on the timing of site work for the hotel, it may be possible to postpone work until Fall 2019. Bank stabilization work will be coordinated with applicant to the greatest extent possible. Response: Noted. Topic: Plat Comment Number: 1 Comment Originated: 08/21/2018 08/21/2018: Please add a note regarding the temporary construction easement for bank stabilization work: "The Temporary Construction Easement for the Poudre River bank stabilization work performed for the City of Fort Collins shall expire at the completion of the work." Response: Note added to Plat Department: PFA Contact: Andrew Rosen, 970-416-2599, arosen@fcgov.com Topic: General Comment Number: 4 Comment Originated: 08/19/2018 08/19/2018: FIRE LANE SIGNAGE > Comment from last round: "Two additional signs are required at the SE corner, positioned both inside and outside the curve." > Per project team, two signs have been added at this location (sheet C3.0). > Please label signs as per Keynote Table. Thank you. – Signs have been labeled per keynote table Department: Planning Services Contact: Clay Frickey, 970-224-6045, cfrickey@fcgov.com Topic: Landscape Plans Comment Number: 2 Comment Originated: 06/27/2018 08/09/2018: Please resolve the following discrepancies between the plant list and what is shown on the landscape plan: PSA - Plans show 3, plant list shows 4, corrected ACA - Plans show 13, plant list shows 11, correct label was wrong for ACN ACN - Plans show 24, plant list shows 26, 26 correct, label was wrong with ACA CBR - Plans show 131, plant list shows 124, label had wrong quantity Response: Quantities corrected. Comment Number: 3 Comment Originated: 06/27/2018 06/27/2018: There's a floating label for PAP on the eastern parking lot that does not correspond to any plantings. Please remove this label. Response: removed from plans. Comment Number: 8 Comment Originated: 08/09/2018 08/09/2018: There is a period before the amount of PMI proposed on the plant list that makes it look like you're proposing 0.8 PMI. Since the landscape plan shows 8 PMI, I assume all that needs to be done to resolve this issue is to remove the period on the plant list. Response: Corrected. Topic: Site Plan Comment Number: 6 Comment Originated: 06/27/2018 08/09/2018: This has not been resolved. Please update the parking table to show 21 enclosed bike parking spaces. Response: Corrected. Fixed bike counts are updated as well to 16 – 37 total spaces. 06/27/2018: The site plan shows 21 enclosed bike parking spaces while the parking table indicates only 17 are covered. Please update the land use table so that it is consistent with what is shown on the site plan. Comment Number: 7 Comment Originated: 06/27/2018 08/09/2018: This note is cut off. Please make sure the entire note is displayed on the site plan notes. 06/27/2018: Please add the following note to the site plan: DESIGN AND INSTALLATION OF ALL PARKWAY/TREE LAWN AND MEDIAN AREAS IN THE RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH CITY STANDARDS. UNLESS OTHERWISE AGREED TO BY THE CITY WITH THE FINAL PLANS, ALL ONGOING MAINTENANCE OF SUCH AREAS IS THE RESPONSIBILITY OF THE OWNER/DEVELOPER. Response: Fixed. Department: Stormwater Engineering Contact: Basil Hamdan, 970-224-6035, bhamdan@fcgov.com Topic: Erosion Control Comment Number: 11 Comment Originated: 06/28/2018 08/08/2018: This site is very close to the Poudre River, therefore it is very important that a treatment train type of Erosion and Sediment Control measures be used to protect the river from sediment discharge in case one of these measures fails during a rainfall event. Maintenance of proposed measures is very important especially at the downstream end in the detention pond. Additional permanent sediment forebays should be placed in the rain garden to protect the river from sediment loading over the long run. Please refer to the redlined report and plans for additional detailed comments. – Erosion control plans updated per redlines 06/28/2018: The erosion control requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. The current Erosion Control Materials Submitted do not meet requirements. See redlines of the submitted ESC Plan and Report for specific comments and corrections. The Erosion Control Report (Stormwater Management Control) submitted was incomplete and not acceptable neither for City Erosion Control Requirements nor for State SWMP requirements. The Site will also have to supply new Erosion Control Escrow Calculations which were not provided at this time. The currently submitted ESC report is a generic report that does not address the specifics of the site. Any subsequent submittal must provide a substantive report that describes construction activities on this site, addresses what specific measures are being implemented and provides a sequencing of ESC activities for the contractor to follow. Failure to provide a specific report for this site will result in the rejection of your next submittal. For reference please follow the guidelines provided on the City's website at and use the checklist to ensure a complete submittal is provided. These guidelines can be found at the following link: https://www.fcgov.com/utilities/business/builders-and-developers/development-f orms-guidelines-regulations/erosion/ Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com Topic: General Comment Number: 14 Comment Originated: 07/02/2018 08/21/2018: Please add a note on the grading and landscape plans that the rain garden is to be built very last in the construction sequence after the rest of the site has been landscaped. Response: Note has been added to grading and landscape plans. 07/02/2018: The rain garden will need to be protected during construction so please show some sort of protection around the perimeter of the rain garden - straw wattles or silt fence perhaps. Response: Rain garden is protected with wattles during construction. Refer to SWMP Comment Number: 20 Comment Originated: 07/02/2018 08/22/2018: The ST-600 shows a flared-end section on the upstream end. This should be an inlet. – ST-600 has been redesigned to use a curb inlet instead of a FES. 07/02/2018: Storm Sewer Plan - I'm questioning many of the callouts on the storm plan including: Wye callouts - what are these actually indicating? Are these cleanouts or other? grated tops or solid? why are you calling out for an area inlet at the curb in the parking lot? The type C inlet in the rain garden seems like overkill; it would be best to minimize the amount of pipes coming into the rain garden to also minimize the amount of forebays that need to be constructed. Response: The Storm Sewer system has been re-designed and updated to minimize the number of pipes coming into the rain garden Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com Topic: General Comment Number: 1 Comment Originated: 06/20/2018 08/21/2018: Due to the location of the pond to the natural area, the City would prefer a more natural forebay option. The City suggests a meeting to discuss options. . – the rain garden has been redesigned to option discussed with city 06/20/2018: Forbays are required for the entry points into the rain garden. These are required to collect sediment and reduce the erosion at the pipe outlets. Please coordinate with the City on design options. Response: Forebays added to entry points into the rain garden Comment Number: 4 Comment Originated: 06/20/2018 08/21/2018: The outlet structure has a WQ plate which I think is not needed. More discussion is needed. – WQ plate has been removed 06/20/2018: Please use a more standard trash rack for the quantity detention outlet structure. The proposed well screen would most likely get clogged in this application where the screen is on an incline and not placed vertical. Response: Outlet structure updated to be more standard Comment Number: 8 Comment Originated: 06/20/2018 08/21/2018: Repeat Comment. Additional conflicts near the hotel building. Response: Utility conflicts have been addressed by relocating utilities and storm sewer to not be in conflict 06/20/2018: There are some conflicts with the storm sewers and trees in the ponds area. Please provide 10 feet of separation. Response: Adjustments made – note of min typ. Dimension has been added to plans. Comment Number: 21 Comment Originated: 08/20/2018 08/20/2018: The rain garden is now located in the bottom of the quantity detention pond. Generally, The City requires the LID basin to be located outside of the quantity detention pond. Discussion is required for the best option to place the rain garden within the quantity detention pond. – Rain garden has been moved to the east of the bottom of the pond and has been sized to hold 100% of the WQCV. Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Construction Drawings Comment Number: 11 Comment Originated: 07/03/2018 08/21/2018: Please change "Construction Documents" back to "Utility Plans". See redlines. - Changed 07/03/2018: Please revise the sub-title as marked. See redlines. Comment Number: 12 Comment Originated: 07/03/2018 08/21/2018: This has not been corrected. – Basis of Bearings Statement has been updated to match the most current Subdivision Plat. 07/03/2018: The Basis Of Bearings statement should match the Subdivision Plat. Comment Number: 13 Comment Originated: 07/03/2018 08/21/2018: This has not been corrected. – Benchmark Statement updated to match exact format provided 07/03/2018: Please provide the following information for the Benchmark Statement in the EXACT format shown below. PROJECT DATUM: NAVD88 BENCHMARK # w/ DESCRIPTION ELEVATION: BENCHMARK # w/ DESCRIPTION ELEVATION: PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 - X.XX¿. Comment Number: 15 Comment Originated: 07/03/2018 08/21/2018: There are line over text issues. See redlines. – Line over text issues addressed per redlines. 07/03/2018: There are line over text issues. See redlines. Comment Number: 16 Comment Originated: 07/03/2018 08/21/2018: There is text that needs to be masked. Mask all text in hatched areas. See redlines. – Text masked per redlines 07/03/2018: There is text that needs to be masked. Mask all text in hatched areas. See redlines. Comment Number: 19 Comment Originated: 08/21/2018 08/21/2018: There are text over text issues. See redlines. – Text over text issues fixed per redlines Topic: Plat Comment Number: 1 Comment Originated: 07/03/2018 08/16/2018: Please make changes as marked. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Please provide any responses on redlined sheets and/or in response letter. –Revisions made, refer to attached letter from Darrell Delap for written responses of why corrections were not made. 07/03/2018: Please make changes as marked. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Please provide any responses on redlined sheets and/or in response letter. Topic: Site Plan Comment Number: 4 Comment Originated: 07/03/2018 08/21/2018: Some of the easement descriptions shown are still incorrect. Response: Discussion with staff on this resolved what was shown, easement to remain as shown. 07/03/2018: Some of the easement descriptions shown are incorrect. If they are going to stay on the plan, they should match what is shown on the Subdivision Plat. Comment Number: 5 Comment Originated: 07/03/2018 08/21/2018: There are line over text issues. See redlines. Response: corrected. 07/03/2018: There are line over text issues. See redlines. Comment Number: 18 Comment Originated: 08/21/2018 08/21/2018: There are spelling issues. See redlines. Response: Spelling corrected. Department: Traffic Operation Contact: Tim Tuttle, 970-221-6820, TTUTTLE@fcgov.com Topic: General Comment Number: 1 Comment Originated: 06/28/2018 06/28/2018: The signage plan looks complete, no comments from Traffic Operations. Response: noted. Department: Water-Wastewater Engineering Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com Topic: General Comment Number: 2 Comment Originated: 06/20/2018 08/21/2018: The profile water meter detail is not the correct one. Please provide the detail for the 2-inch meters. Response: 2-in Water meter detail added to detail sheet 06/20/2018: Please add the meter detail that shows the profile of the meter vault in addition to the plan view already on the plans. Response: 2-in Water meter detail added to detail sheet that shows the profile of the meter vault.