HomeMy WebLinkAboutCOUNTRY CLUB RESERVE - FDP180030 - SUBMITTAL DOCUMENTS - ROUND 3 - STORMWATER-RELATED DOCUMENTSSF
SF
SF SF
SF
SF SF
SF SF SF SF SF SF SF
SF
SF
SF SF
SF SF
SF
SF SF SF SF SF SF SF SF
SF
SF SF SF SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
V
.P.
V.P.
A.R.V.
GAS
GAS
V.P. V.P.
X X
X X
X
X
G
G
G
G
G
G
G
G
G
G
G G
G G G
G
G
G
G
G
V.P.
V.P.
A.R.V.
GAS
X
X
X X
X
X
G
G G G G G
G G
E E
E
E
E
E
E E E E
E E E E E E
E
E
E
E E
E
E
E
E
WV
WV
X
X
X X
X X
X
X
X
X
X
M
X
X X
X
X X
X X X X
F
E
S
M
M
F
E
S
X
X
T
ELE
F.O.
TELE
X
X
V.P.
WV
WV
WV
WV
WV
WV
X
X
F
E
S
M
F
E
S
X X X X X X X X X
W
S
O
X
V.P.
V
AULT
CABLE
BOX
CABLE
H2O
X
OHE
OHE
OHE
OHE OHE OHE
ST
B
B
LOD LOD
LOD
LOD
LOD
LOD
UD
UD
ED FOOT DR.
KIAWAH DR.
FES
NATURAL HABITAT
BUFFER ZONE
FES
INLET (2)
INLET OUTFALL
INLET
RAIN GARDEN 1
RIPRAP RIPRAP
RIPRAP
8'x8'
9" DEEP INTO
FOREBAY. TOP OF
FOREBAY TO BE
FLUSH WITH RAIN
GAS
X
X
V.P. V.P.
X
X X
X
G
G
G G
G
G G G
G
G
G
G G G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
E E
E
E
E
E
E
E E
E
E
E
E
E E
E
E
E E
E E E E
E
E
E
E
E
E E
E
X
X X X X
X
X X
X
X
V.P.
X X X
X
X
G
G
G
G
G
G
G
G G G
G G G
G G
G
G G
E E
E
E
E E E E E
E
E
E
E
E E
E
E
X
X
X X
X
X X X X X
X
X
V
.P.
X
M
GAS
X
X X
OHE OHE
OHE
OHE OHE
OHE
B
B
ST ST
LOD LOD
LOD LOD
LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
UD UD
UD UD
UD
UD
SWALE
ROYAL TROON AVE.
ARNOUSTIE DR.
RAIN GARDEN 2
CONCRETE
CULVERT
POND 1
SITE OUTFALL
SIDEWALK AND
CONCRETE CHASE
EXISTING 24" CMP
TURNBERRY ROAD
OUTFALL FES
RIPRAP
8'x8'
9" DEEP INTO
FOREBAY. TOP OF
FOREBAY TO BE
FLUSH WITH RAIN
GARDEN.
EC6
DYNAMIC EROSION CONTROL PLAN 4
##
Sheet
of 70
COUNTRY CLUB RESERVE These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
E NGINEER ING
N O R T H E RN
PHONE: 970.221.4158
www.northernengineering.com
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
( IN FEET )
0
1 INCH = 30 FEET
30 30 60 90
BENCHMARK/BASIS OF BEARING
PROPOSED CONTOUR
EXISTING STORM SEWER
PROPOSED SWALE
EXISTING CONTOUR
SILT FENCE SF
WATTLE PROTECTION W
VEHICLE TRACKING PAD VTC
SF
ILP
INDIVIDUAL LOT PROTECTION
1. CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP
MULCHING OR SIMILAR METHODS (AS APPLICABLE).
2. TOTAL DISTURBED AREA = 2.69 ACRES
3. SWMP ADMINISTRATOR:
Contact ________________________________
Company ________________________________
Address ________________________________
Phone________________________________
4. CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE
WASHOUT AREA IF ACCESS IS OFF PAVEMENT.
5. REFER TO THE SEE FINAL STORM WATER MANAGMENT PLAN BY NORTHERN
ENGINEERING SERVICES, DATED NOVEMBER 13, 2017 FOR ADDITIONAL
INFORMATION.
GENERAL NOTES:
PROJECT DATUM: NAVD88
BENCHMARK #1:
CITY OF FORT COLLINS BENCHMARK 34-92: WEST SIDE OF TAFT HILL RD. NORTH OF
STUART ST. ON A STORM WATER DIVERSION STRUCTURE.
ELEVATION: 5088.78
BENCHMARK #2:
CITY OF FORT COLLINS BENCHMARK 12-97: ON WEST STUART ST. BETWEEN ZENITH
COURT AND RYELAND LANE, ON THE SOUTH END OF THE EAST HEADWALL OF THE CANAL
BRIDGE.
ELEVATION: 5116.62
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING
DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING
EQUATION SHOULD BE USED:
NGVD29 UNADJUSTED = NAVD88 - 3.18.
BASIS OF BEARINGS
THE BASIS OF BEARINGS IS THE WEST LINE OF THE SOUTHWEST QUARTER OF SECTION
22-T7N-R69W AS BEARING SOUTH 00°06'35" WEST
LEGEND:
ROCK SOCK WITH MARKER RS
EROSION CONTROL BLANKET ECB
CONCRETE WASHOUT AREA CWA
OP
OUTFALL PROTECTION
1. IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE
CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED.
ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY
DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL
AUTHORITIES.
2. THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT
BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT,
ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY
MAINTAINED AND FOLLOWED.
4. CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING
THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION.
5. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORMWATER
FACILITIES UNTIL SITE IS FULLY STABILIZED.
6. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT
CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH
DOWNSPOUT.
7. INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND
CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.)
8. CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN
6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND
ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND
STABILIZE THE SLOPE.
9. ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO INSURE THAT
EACH BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. AT NO TIME SHALL SEDIMENT BE
ALLOWED TO CROSS THE PUBLIC SIDEWALKS.
10. CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING
DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE
SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR
SILT FENCE FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR PAVEMENT, ETC.)
11. FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY
OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS
AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO
DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE
WAY.
12. CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION
TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND,
OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW
POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER,
WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND
CONSTRUCTION TOILETS SHALL BE STAKED DOWN.
13. THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION
INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE
BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND
WELFARE.
14. WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT
SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR
OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION.
15. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE
AND OTHER PERMANENT SITE STABILIZATION METHODS.
EROSION CONTROL NOTES:
TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION/REMOVAL
Project: BRICK STONE APARTMENTS ON HARMONY Date: 11.30.17
Contractor to utilize this table to indicate when construction activities occur and when each associated BMP is installed or removed.
CONSTRUCTION PHASE (Monthly) 1 2 3 4 5 6 7 8 9 10 11 12 Comments
Grading
Overlot
Swales, Drainageways
Pipeline Installation
Stormwater
Concrete Installation
Building Structure
Miscellaneous
Hardscape Amenities
BEST MANAGEMENT PRACTICES
Temporary
Contour Furrows and Diversion Dikes (Ripping/Disking)
Inlet Protection (IP)
Vehicle Tracking Control (VTC)
Flow Barriers (Bales, Wattles, Etc) (WD)
Concrete Washout Area (CWA)
Preventative Maintenance Activities/Meetings/ etc.
Permanent
Mulching/Sealant
Permanent Seed Planting
Water Service
Sanitary Sewer Service
Curb and Gutter
Concrete Parking and Drive Aisle
Bio-Swale
Permeable Pavers
KEYMAP
DOUGLAS RD
TURNBERRY RD
DEC1 DEC2
DEC3 DEC4
X
X
X X X
X
X X
X
X X
X X X X X
X
B
B
A.V.
E
E
E
E
E E
E
LOD
LOD LOD
LOD LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
CARNOUSTIE DR.
BALTUSROL DR.
BALTUSROL CT.
EC5
DYNAMIC EROSION CONTROL PLAN 3
##
Sheet
of 70
COUNTRY CLUB RESERVE These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
E NGINEER ING
N O R T H E RN
PHONE: 970.221.4158
www.northernengineering.com
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
( IN FEET )
0
1 INCH = 30 FEET
30 30 60 90
BENCHMARK/BASIS OF BEARING
PROPOSED CONTOUR
EXISTING STORM SEWER
PROPOSED SWALE
EXISTING CONTOUR
SILT FENCE SF
WATTLE PROTECTION W
VEHICLE TRACKING PAD VTC
SF
ILP
INDIVIDUAL LOT PROTECTION
1. CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP
MULCHING OR SIMILAR METHODS (AS APPLICABLE).
2. TOTAL DISTURBED AREA = 2.69 ACRES
3. SWMP ADMINISTRATOR:
Contact ________________________________
Company ________________________________
Address ________________________________
Phone________________________________
4. CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE
WASHOUT AREA IF ACCESS IS OFF PAVEMENT.
5. REFER TO THE SEE FINAL STORM WATER MANAGMENT PLAN BY NORTHERN
ENGINEERING SERVICES, DATED NOVEMBER 13, 2017 FOR ADDITIONAL
INFORMATION.
GENERAL NOTES:
PROJECT DATUM: NAVD88
BENCHMARK #1:
CITY OF FORT COLLINS BENCHMARK 34-92: WEST SIDE OF TAFT HILL RD. NORTH OF
STUART ST. ON A STORM WATER DIVERSION STRUCTURE.
ELEVATION: 5088.78
BENCHMARK #2:
CITY OF FORT COLLINS BENCHMARK 12-97: ON WEST STUART ST. BETWEEN ZENITH
COURT AND RYELAND LANE, ON THE SOUTH END OF THE EAST HEADWALL OF THE CANAL
BRIDGE.
ELEVATION: 5116.62
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING
DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING
EQUATION SHOULD BE USED:
NGVD29 UNADJUSTED = NAVD88 - 3.18.
BASIS OF BEARINGS
THE BASIS OF BEARINGS IS THE WEST LINE OF THE SOUTHWEST QUARTER OF SECTION
22-T7N-R69W AS BEARING SOUTH 00°06'35" WEST
LEGEND:
ROCK SOCK WITH MARKER RS
EROSION CONTROL BLANKET ECB
CONCRETE WASHOUT AREA CWA
OP
OUTFALL PROTECTION
1. IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE
CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED.
ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY
DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL
AUTHORITIES.
2. THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT
BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT,
ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY
MAINTAINED AND FOLLOWED.
4. CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING
THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION.
5. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORMWATER
FACILITIES UNTIL SITE IS FULLY STABILIZED.
6. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT
CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH
DOWNSPOUT.
7. INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND
CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.)
8. CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN
6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND
ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND
STABILIZE THE SLOPE.
9. ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO INSURE THAT
EACH BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. AT NO TIME SHALL SEDIMENT BE
ALLOWED TO CROSS THE PUBLIC SIDEWALKS.
10. CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING
DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE
SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR
SILT FENCE FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR PAVEMENT, ETC.)
11. FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY
OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS
AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO
DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE
WAY.
12. CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION
TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND,
OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW
POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER,
WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND
CONSTRUCTION TOILETS SHALL BE STAKED DOWN.
13. THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION
INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE
BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND
WELFARE.
14. WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT
SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR
OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION.
15. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE
AND OTHER PERMANENT SITE STABILIZATION METHODS.
EROSION CONTROL NOTES:
TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION/REMOVAL
Project: BRICK STONE APARTMENTS ON HARMONY Date: 11.30.17
Contractor to utilize this table to indicate when construction activities occur and when each associated BMP is installed or removed.
CONSTRUCTION PHASE (Monthly) 1 2 3 4 5 6 7 8 9 10 11 12 Comments
Grading
Overlot
Swales, Drainageways
Pipeline Installation
Stormwater
Concrete Installation
Building Structure
Miscellaneous
Hardscape Amenities
BEST MANAGEMENT PRACTICES
Temporary
Contour Furrows and Diversion Dikes (Ripping/Disking)
Inlet Protection (IP)
Vehicle Tracking Control (VTC)
Flow Barriers (Bales, Wattles, Etc) (WD)
Concrete Washout Area (CWA)
Preventative Maintenance Activities/Meetings/ etc.
Permanent
Mulching/Sealant
Permanent Seed Planting
Water Service
Sanitary Sewer Service
Curb and Gutter
Concrete Parking and Drive Aisle
Bio-Swale
Permeable Pavers
KEYMAP
DOUGLAS RD
TURNBERRY RD
DEC1 DEC2
DEC3 DEC4
GARDEN.
EC4
DYNAMIC EROSION CONTROL PLAN 2
##
Sheet
of 70
COUNTRY CLUB RESERVE These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
E NGINEER ING
N O R T H E RN
PHONE: 970.221.4158
www.northernengineering.com
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
( IN FEET )
0
1 INCH = 60 FEET
60 60 120 180
BENCHMARK/BASIS OF BEARING
PROPOSED CONTOUR
EXISTING STORM SEWER
PROPOSED SWALE
EXISTING CONTOUR
SILT FENCE SF
WATTLE PROTECTION W
VEHICLE TRACKING PAD VTC
SF
ILP
INDIVIDUAL LOT PROTECTION
1. CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP
MULCHING OR SIMILAR METHODS (AS APPLICABLE).
2. TOTAL DISTURBED AREA = 2.69 ACRES
3. SWMP ADMINISTRATOR:
Contact ________________________________
Company ________________________________
Address ________________________________
Phone________________________________
4. CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE
WASHOUT AREA IF ACCESS IS OFF PAVEMENT.
5. REFER TO THE SEE FINAL STORM WATER MANAGMENT PLAN BY NORTHERN
ENGINEERING SERVICES, DATED NOVEMBER 13, 2017 FOR ADDITIONAL
INFORMATION.
GENERAL NOTES:
PROJECT DATUM: NAVD88
BENCHMARK #1:
CITY OF FORT COLLINS BENCHMARK 34-92: WEST SIDE OF TAFT HILL RD. NORTH OF
STUART ST. ON A STORM WATER DIVERSION STRUCTURE.
ELEVATION: 5088.78
BENCHMARK #2:
CITY OF FORT COLLINS BENCHMARK 12-97: ON WEST STUART ST. BETWEEN ZENITH
COURT AND RYELAND LANE, ON THE SOUTH END OF THE EAST HEADWALL OF THE CANAL
BRIDGE.
ELEVATION: 5116.62
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING
DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING
EQUATION SHOULD BE USED:
NGVD29 UNADJUSTED = NAVD88 - 3.18.
BASIS OF BEARINGS
THE BASIS OF BEARINGS IS THE WEST LINE OF THE SOUTHWEST QUARTER OF SECTION
22-T7N-R69W AS BEARING SOUTH 00°06'35" WEST
LEGEND:
ROCK SOCK WITH MARKER RS
EROSION CONTROL BLANKET ECB
CONCRETE WASHOUT AREA CWA
OP
OUTFALL PROTECTION
1. IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE
CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED.
ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY
DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL
AUTHORITIES.
2. THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT
BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT,
ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY
MAINTAINED AND FOLLOWED.
4. CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING
THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION.
5. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORMWATER
FACILITIES UNTIL SITE IS FULLY STABILIZED.
6. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT
CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH
DOWNSPOUT.
7. INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND
CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.)
8. CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN
6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND
ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND
STABILIZE THE SLOPE.
9. ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO INSURE THAT
EACH BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. AT NO TIME SHALL SEDIMENT BE
ALLOWED TO CROSS THE PUBLIC SIDEWALKS.
10. CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING
DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE
SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR
SILT FENCE FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR PAVEMENT, ETC.)
11. FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY
OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS
AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO
DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE
WAY.
12. CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION
TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND,
OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW
POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER,
WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND
CONSTRUCTION TOILETS SHALL BE STAKED DOWN.
13. THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION
INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE
BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND
WELFARE.
14. WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT
SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR
OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION.
15. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE
AND OTHER PERMANENT SITE STABILIZATION METHODS.
EROSION CONTROL NOTES:
TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION/REMOVAL
Project: BRICK STONE APARTMENTS ON HARMONY Date: 11.30.17
Contractor to utilize this table to indicate when construction activities occur and when each associated BMP is installed or removed.
CONSTRUCTION PHASE (Monthly) 1 2 3 4 5 6 7 8 9 10 11 12 Comments
Grading
Overlot
Swales, Drainageways
Pipeline Installation
Stormwater
Concrete Installation
Building Structure
Miscellaneous
Hardscape Amenities
BEST MANAGEMENT PRACTICES
Temporary
Contour Furrows and Diversion Dikes (Ripping/Disking)
Inlet Protection (IP)
Vehicle Tracking Control (VTC)
Flow Barriers (Bales, Wattles, Etc) (WD)
Concrete Washout Area (CWA)
Preventative Maintenance Activities/Meetings/ etc.
Permanent
Mulching/Sealant
Permanent Seed Planting
Water Service
Sanitary Sewer Service
Curb and Gutter
Concrete Parking and Drive Aisle
Bio-Swale
Permeable Pavers
KEYMAP
DOUGLAS RD
TURNBERRY RD
DEC1 DEC2
DEC3 DEC4
X X
F
E
S
M
F
E
S
TELE
B
B
AW
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD
LOD
LOD LOD
LOD
UD UD UD UD
WINGED FOOT DR.
CARNOUSTIE DR.
BETHPAGE DR.
SIDEWALK CHASE
POND 3
RAIN GARDEN 3
INLET
E. DOUGLAS ROAD
RIPRAP
8'x8'
9" DEEP INTO
FOREBAY. TOP OF
FOREBAY TO BE
FLUSH WITH RAIN
GARDEN.
EC3
DYNAMIC EROSION CONTROL PLAN 1
##
Sheet
of 70
COUNTRY CLUB RESERVE These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
E NGINEER ING
N O R T H E RN
PHONE: 970.221.4158
www.northernengineering.com
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
( IN FEET )
0
1 INCH = 60 FEET
60 60 120 180
BENCHMARK/BASIS OF BEARING
PROPOSED CONTOUR
EXISTING STORM SEWER
PROPOSED SWALE
EXISTING CONTOUR
SILT FENCE SF
WATTLE PROTECTION W
VEHICLE TRACKING PAD VTC
SF
ILP
INDIVIDUAL LOT PROTECTION
1. CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP
MULCHING OR SIMILAR METHODS (AS APPLICABLE).
2. TOTAL DISTURBED AREA = 2.69 ACRES
3. SWMP ADMINISTRATOR:
Contact ________________________________
Company ________________________________
Address ________________________________
Phone________________________________
4. CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE
WASHOUT AREA IF ACCESS IS OFF PAVEMENT.
5. REFER TO THE SEE FINAL STORM WATER MANAGMENT PLAN BY NORTHERN
ENGINEERING SERVICES, DATED NOVEMBER 13, 2017 FOR ADDITIONAL
INFORMATION.
GENERAL NOTES:
PROJECT DATUM: NAVD88
BENCHMARK #1:
CITY OF FORT COLLINS BENCHMARK 34-92: WEST SIDE OF TAFT HILL RD. NORTH OF
STUART ST. ON A STORM WATER DIVERSION STRUCTURE.
ELEVATION: 5088.78
BENCHMARK #2:
CITY OF FORT COLLINS BENCHMARK 12-97: ON WEST STUART ST. BETWEEN ZENITH
COURT AND RYELAND LANE, ON THE SOUTH END OF THE EAST HEADWALL OF THE CANAL
BRIDGE.
ELEVATION: 5116.62
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING
DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING
EQUATION SHOULD BE USED:
NGVD29 UNADJUSTED = NAVD88 - 3.18.
BASIS OF BEARINGS
THE BASIS OF BEARINGS IS THE WEST LINE OF THE SOUTHWEST QUARTER OF SECTION
22-T7N-R69W AS BEARING SOUTH 00°06'35" WEST
LEGEND:
ROCK SOCK WITH MARKER RS
EROSION CONTROL BLANKET ECB
CONCRETE WASHOUT AREA CWA
OP
OUTFALL PROTECTION
1. IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE
CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED.
ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY
DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL
AUTHORITIES.
2. THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT
BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT,
ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY
MAINTAINED AND FOLLOWED.
4. CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING
THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION.
5. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORMWATER
FACILITIES UNTIL SITE IS FULLY STABILIZED.
6. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT
CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH
DOWNSPOUT.
7. INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND
CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.)
8. CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN
6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND
ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND
STABILIZE THE SLOPE.
9. ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO INSURE THAT
EACH BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. AT NO TIME SHALL SEDIMENT BE
ALLOWED TO CROSS THE PUBLIC SIDEWALKS.
10. CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING
DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE
SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR
SILT FENCE FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR PAVEMENT, ETC.)
11. FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY
OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS
AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO
DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE
WAY.
12. CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION
TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND,
OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW
POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER,
WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND
CONSTRUCTION TOILETS SHALL BE STAKED DOWN.
13. THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION
INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE
BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND
WELFARE.
14. WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT
SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR
OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION.
15. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE
AND OTHER PERMANENT SITE STABILIZATION METHODS.
EROSION CONTROL NOTES:
TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION/REMOVAL
Project: BRICK STONE APARTMENTS ON HARMONY Date: 11.30.17
Contractor to utilize this table to indicate when construction activities occur and when each associated BMP is installed or removed.
CONSTRUCTION PHASE (Monthly) 1 2 3 4 5 6 7 8 9 10 11 12 Comments
Grading
Overlot
Swales, Drainageways
Pipeline Installation
Stormwater
Concrete Installation
Building Structure
Miscellaneous
Hardscape Amenities
BEST MANAGEMENT PRACTICES
Temporary
Contour Furrows and Diversion Dikes (Ripping/Disking)
Inlet Protection (IP)
Vehicle Tracking Control (VTC)
Flow Barriers (Bales, Wattles, Etc) (WD)
Concrete Washout Area (CWA)
Preventative Maintenance Activities/Meetings/ etc.
Permanent
Mulching/Sealant
Permanent Seed Planting
Water Service
Sanitary Sewer Service
Curb and Gutter
Concrete Parking and Drive Aisle
Bio-Swale
Permeable Pavers
KEYMAP
DOUGLAS RD
TURNBERRY RD
DEC1 DEC2
DEC3 DEC4
G
G
G
G
G
G
G
E
E
E
E
E
E
E
E
E E E
E
E
E
E E E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E
E
E
WV
WV WV
WV
WV
WV
X
X
X
X
X
V.P.
WV
WV
X X X
X X
X X
X X
X
X X
X X X X X X
X
M
X X X
X
F
E
S
M
M
F
E
S
F
E
S
MM
X
TELE
F.O.
TELE
F
E
S
MGAS
X X
F
E
S
M
F
E
S
TELE
X
F
E
S
M
F
E
S
X
X X X
X
W
S
O
X
V.P. X
VAULT
CABLE
BOX
CABLE
H2O
V.GAS P.
GAS
OHE
OHE
OHE
OHE
OHE
OHE
OHE OHE
OHE
B
B
B
B
B
B
B
B
ST ST
A.V.
AW
E
E
E
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
UD
UD
UD
UD
UD
UD
SWALE
WINGED FOOT DR.
KIAWAH DR.
ROYAL TROON AVE.
CARNOUSTIE DR.
BALTUSROL DR.
BETHPAGE DR.
RAIN GARDEN 2
BALTUSROL CT.
W W
W
W
W
W
W
IP
OP
SF SF
W
W
FES
CONCRETE
CULVERT
POND 1
SITE OUTFALL
SIDEWALK CHASE
NATURAL HABITAT
BUFFER ZONE
FES
POND 3
RAIN GARDEN 3
INLET (2)
CWA
IP
IP IP
OP
SF SF
SF
W
IP
SF
RS
RS RS
OUTFALL
INLET
INLET
INLET
E. DOUGLAS ROAD
VTC
VTC IP IP IP
RS RS RS
RS
VTC
W
RS
RS
RAIN GARDEN 1
RS
SIDEWALK AND
CONCRETE CHASE
EXISTING 24" CMP
TURNBERRY ROAD
IP
SF
SF
IP
IP
RS
RS
OUTFALL FES
OP
W
W
ECB
ECB
W W
RIPRAP
RIPRAP
RIPRAP RIPRAP
SF
SF
RIPRAP
8'x8'
9" DEEP INTO
FOREBAY. TOP OF
FOREBAY TO BE
FLUSH WITH RAIN
GARDEN.
8'x8'
9" DEEP INTO
FOREBAY. TOP OF
FOREBAY TO BE
FLUSH WITH RAIN
GARDEN.
8'x8'
9" DEEP INTO
FOREBAY. TOP OF
FOREBAY TO BE
FLUSH WITH RAIN
GARDEN.
ECB
60'
20'
ECB
EC1
EROSION CONTROL PLAN
14
Sheet
of 70
COUNTRY CLUB RESERVE These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
E NGINEER ING
N O R T H E RN
PHONE: 970.221.4158
www.northernengineering.com
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
BENCHMARK/BASIS OF BEARING
PROPOSED CONTOUR
EXISTING STORM SEWER
PROPOSED SWALE
EXISTING CONTOUR
SILT FENCE
WATTLE PROTECTION
VEHICLE TRACKING PAD
SF
INLET PROTECTION
1. CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP
MULCHING OR SIMILAR METHODS (AS APPLICABLE).
2. TOTAL DISTURBED AREA = 2.69 ACRES
3. SWMP ADMINISTRATOR:
Contact ________________________________
Company ________________________________
Address ________________________________
Phone________________________________
4. CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE
WASHOUT AREA IF ACCESS IS OFF PAVEMENT.
5. REFER TO THE FINAL STORM WATER MANAGMENT PLAN BY NORTHERN
ENGINEERING SERVICES, DATED 05.29.19 FOR ADDITIONAL INFORMATION.
6. ALL DISTURBED AREAS SHOULD BE REVEGETATED PER THE APPROVED
LANDSCAPING PLANS.
7. RAIN GARDENS SHALL BE INSTALLED IN THE LAST PHASE OF DEVELOPMENT TO
MINIMIZE POTENTIAL FOR SEDIMENT TO INFILTRATE AND CLOG THE SYSTEM.
GENERAL NOTES:
LEGEND:
ROCK SOCK WITH MARKER
EROSION CONTROL BLANKET
1. IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES
ONLY AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR
PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED.
ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY
DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO
CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL
AUTHORITIES.
2. THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH,
GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY
NECESSARILY SHOWN IN THEIR EXACT LOCATION.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING
(CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH
GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION
CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED.
4. CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION
CONTROL MEASURES ACCORDING THE THE CONSTRUCTION
SEQUENCING AND LEVEL OF SITE STABILIZATION.
5. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION
FOR ALL STORM DRAINS, SWALES, PONDS AND RAIN GARDENS UNTIL
SITE IS FULLY STABILIZED.
6. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION
FOR DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN SYSTEM,
UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT.
7. INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE
SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN
WATTLES FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR
PAVEMENT, ETC.)
8. CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES,
PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING,
HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND
ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO
ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE.
9. ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE
NECESSARY TO INSURE THAT EACH BUILDING PAD IS STABILIZED
THROUGHOUT CONSTRUCTION. AT NO TIME SHALL SEDIMENT BE
ALLOWED TO CROSS THE PUBLIC SIDEWALKS.
10. CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER
PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE.
PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO
THE SURROUNDING SURFACE TYPE AND CONDITION (i.e.,
STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE
SOIL, SAND BAGS OR GRAVEL SOCKS FOR PAVEMENT, ETC.)
11. FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED
(100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL
DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS
AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT
WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF,
OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE
WAY.
12. CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE
SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT
LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND,
OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A
CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO
DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF
WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE
LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS
SHALL BE STAKED DOWN.
13. THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE
WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING
OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO
CREATE BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS
HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE.
14. WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND
WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS,
DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH
TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL
STAFF TO PREVENT EROSION.
15. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON
PLANTING, REVEGETATION, HARDSCAPE AND OTHER PERMANENT
SITE STABILIZATION METHODS.
16. ALL DOWNSTREAM INLETS ALONG DOUGLAS ROAD AND TURNBERRY
ROAD SHOULD HAVE INLET PROTECTION.
TABLE OF CONSTRUCTION SEQUENCE AND BMP EROSION CONTROL NOTES:
APPLICATION
CONSTRUCTION PHASE
(DESCRIPTION)
PHASE I
(GRADING)
PHASE II
(INFRASTRUCTURE)
PHASE III
(VERTICAL
CONSTRUCITON)
PHASE IV
(PERMANENT
BMP'S)
Grading (Include Offsite)
Overlot
Pipeline Installation
Stormwater
Concrete Installation
Site Walls
Building Structure
Miscellaneous
Hardscape Amenities
BEST MANAGEMENT PRACTICES
Temporary
Inlet Protection (IP)
Vehicle Tracking Control (VTC)
Flow Barriers (Wattles, Rock Socks, etc.) (WD)
Concrete Washout Area (CWA)
Preventative Maintenance Activities/Meetings/etc.
Silt Fence (SF)
Permanent
Mulching/Sealant
Permanent Seed Planting
Sewer Service
Water Service
Curb and Gutter
CONCRETE WASHOUT AREA
OUTFALL PROTECTION
INDIVIDUAL LOT PROTECTION
LIMITS OF DISTURBANCE LOD
SF
W
VTC
IP
RS
ECB
CWA
OP
ILP
OVERLAND FLOW
DIRECT FLOW
PROJECT DATUM: NAVD 88
BENCHMARK #1: CITY OF FORT COLLINS BENCHMARK 92-14
NORTHEAST CORNER OF DOUGLAS ROAD AND TURNBERRY ROAD, ON TOP OF AN IRRIGATION
STRUCTURE.
ELEVATION = 5075.10
BENCHMARK #2: CITY OF FORT COLLINS BENCHMARK 92-15
DOUGLAS ROAD AND COUNTY ROAD 13, ON A LARIMER COUNTRY BRASS CAP, ON THE
SOUTHWEST CORNER OF A BRIDGE OVER LARIMER CANAL DITCH.
ELEVATION = 5123.89
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING
DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED (PRIOR CITY OF FORT COLLINS DATUM)
FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR
ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED:
NGVD29 UNADJUSTED(PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 - 3.17
BASIS OF BEARING:
THE BASIS OF BEARINGS IS THE NORTH LINE OF THE NORTHEAST QUARTER OF SECTION
30-T8N-R68W AS BEARING SOUTH 89°21'11" EAST.
NORTH
( IN FEET )
0
1 INCH = 40 FEET
40 40 80 120