Loading...
HomeMy WebLinkAboutDUTCH BROS - PDP190008 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTPRELIMINARY DRAINAGE REPORT Dutch Bros Coffee Kensington Commons Prepared for: M Squared, LLC 1600 East Mulberry St., Unit 1 Fort Collins, CO 80525 Prepared by: Interwest Consulting Group 1218 West Ash, Suite A Windsor, Colorado 80550 (970) 674-3300 April 22, 2019 Job Number 1380-165-00 TABLE OF CONTENTS 1. GENERAL LOCATION AND DESCRIPTION ................................................................. 1 1.1 Location ........................................................................................................................... 1 1.2 Description of Property ................................................................................................. 1 1.3 Floodplain Submittal Requirements ............................................................................. 1 2. DRAINAGE BASINS AND SUB-BASINS .......................................................................... 2 2.1 Major Basin Description ................................................................................................ 2 2.2 Sub-basin Description .................................................................................................... 2 3. DRAINAGE DESIGN CRITERIA ....................................................................................... 2 3.1 Regulations ...................................................................................................................... 2 3.2 Directly Connected Impervious Area (DCIA) Discussion .......................................... 2 3.3 Development Criteria Reference and Constraints ...................................................... 4 3.4 Hydrologic Criteria ........................................................................................................ 4 3.5 Hydraulic Criteria .......................................................................................................... 5 3.6 Floodplain Regulations Compliance ............................................................................. 5 3.7 Modifications of Criteria ............................................................................................... 5 4. DRAINAGE FACILITY DESIGN ....................................................................................... 5 4.1 General Concept ............................................................................................................. 5 4.2 Specific Details ................................................................................................................ 5 5. CONCLUSIONS .................................................................................................................... 6 5.1 Compliance with Standards .......................................................................................... 6 5.2 Drainage Concept ........................................................................................................... 6 6. REFERENCES ....................................................................................................................... 7 APPENDIX APPENDIX A ......................................................................................................................... A APPENDIX B........................................................................................................................... B APPENDIX C .......................................................................................................................... C APPENDIX D ......................................................................................................................... D APPENDIX E ........................................................................................................................... E APPENDIX F ........................................................................................................................... F 1 1. GENERAL LOCATION AND DESCRIPTION 1.1 Location The Dutch Bros Coffee Kensington Commons Development is located in the Southeast Quarter of Section 35, Township 7 North, Range 69 West of the Sixth Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. Please refer to the vicinity map in Appendix A. The project is Lot 1 and 2 of Kensington Commons and is located north of Jiffy Lube at 121 Kensington Drive. South College Avenue is located to the east and Kensington Drive is to the north of the property. The property was originally developed for the Jiffy Lube and a gas station as The Gateway at Harmony P.U.D. First Filing in 1994. 1.2 Description of Property The site is approximately 0.8 acres of land and will consist of a new building, parking and drive aisles, and associated sidewalks. The Jiffy Lube will remain on Lot 2. The site generally slopes in an easterly direction at approximately 3-5%. The land is currently developed with existing parking and buildings. There are no offsite flows contributing to the site. The existing flow drains to an existing onsite inlet (containing an orifice plate) with some parking lot detention (much less than the 1994 design). According to FEMA Panel 08069C1000F (effective 12/19/2006) there are no mapped FEMA Floodways on this property, and the property is within Zone X. Please refer to Appendix F for hydrologic soil and FEMA information. 1.3 Floodplain Submittal Requirements The project is not within any FEMA or City of Fort Collins mapped floodway. Therefore, a Floodplain Submittal is not required and a “City of Fort Collins Floodplain Review Checklist for 50% Submittals” has not been included with this report. 2 2. DRAINAGE BASINS AND SUB-BASINS 2.1 Major Basin Description The proposed development lies within the Fossil Creek Drainage Basin. The site has been previously studied in two reports: “Final Drainage Report the Gateway to Harmony Road P.U.D” (March 9, 1989) and “Final Drainage Report for Lot 1, The Gateway at Harmony Road P.U.D., First Filing for Jiffy Lube, Inc.” (October 13, 1993) both by Stewart and Associates, Inc. 2.2 Sub-basin Description Historically, the site drains to the east where it is collected by an existing inlet and discharged into an existing storm system in College Avenue and ultimately to the Fossil Creek channel. 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations This report was prepared to meet or exceed the “City of Fort Collins Storm Drainage Design Criteria Manual” specifications. Where applicable, the criteria established in the “Urban Storm Drainage Criteria Manual” (UDFCD), developed by the Denver Regional Council of Governments, has been used. 3.2 Directly Connected Impervious Area (DCIA) Discussion Urban Drainage and Flood Control District (UDFCD) recommends a Four Step Process for receiving water protection that focuses on reducing runoff volumes, treating the water quality capture volume (WQCV), stabilizing drainageways and implementing long-term source controls. The Four Step Process applies to the management of smaller, frequently occurring events. 3 Step 1: Employ Runoff Reduction Practices To reduce runoff peaks, volumes, and pollutant loads from urbanizing areas, implement Low Impact Development (LID) strategies, including Minimizing Directly Connected Impervious Areas (MDCIA). Runoff from the majority of this site (parking lot and the existing building) shall drain directly into a pervious paver system thereby slowing runoff and also promoting infiltration. Runoff from the remaining northern portion of the site (drive aisle and proposed building) shall drain directly to a storm system that will release to the subgrade of the pervious paver system that will slow runoff and increase the time of concentration and promote infiltration. The project will lower the imperviousness of the site. Step 2: Implement BMPs that Provide a Water Quality Capture Volume with Slow Release Once runoff has been minimized, the remaining runoff shall be treated through the pervious paver system that allows for settlement of sediments. Step 3: Stabilize Drainageways Natural Drainageways are subject to bed and bank erosion due to increases in frequency, duration, rate and volume of runoff during and following development. Because the site will drain to an existing storm system, bank stabilization is unnecessary with this project. Step 4: Implement Site Specific and Other Source Control BMPs The proposed development will provide the pervious pavement system feature which will eliminate pollution that had previously been exposed during weathering and runoff processes. The proposed project will proactively control pollutants at their source by preventing pollution rather than removing contaminants once they have entered the stormwater system as compared to historic conditions. 4 3.3 Development Criteria Reference and Constraints The runoff from this site has been routed to conform to the requirements of the City Stormwater Department. Water quality capture volume and detention will be provided on site. The release rate for the site is 0.5 cfs per acre. The site’s water quality will be met through the use of a pervious pavement system that includes a varying depth of storage in the voids below the pavers. The impervious area for the site has been reduced from current condition of 81 percent to proposed condition of 69 percent. Runoff reduction practices (LID techniques) are also required. No less than fifty percent of any newly added impervious area must be treated using one or a combination of LID techniques. The impervious area is 24,021 sf. Basin B contains the pervious paver system. Using this LID technique, 17,030 sf of impervious area (71%) will be treated which exceeds the 50% requirement. No less than twenty five percent of any newly added pavement areas must be treated using a permeable pavement technology. The project includes 20,902 sf of pavement area (including sidewalks). This project will incorporate 5,939 of pervious pavers which is 28% of the pavement exceeds the required 25%. The pervious pavement system is oversized and provides full detention and water quality volume for the site. Please refer to Appendix D for LID calculations and information. 3.4 Hydrologic Criteria Runoff computations were prepared for the 10-year minor storm and 100-year major storm frequency utilizing the rational method. All hydrologic calculations associated with the basins are included in Appendix B of this report. Standard Form 8 (SF-8) provides time of concentration calculations for all sub- basins. Standard Form 9 (SF-9) provides a summary of the design flows for all Sub- basins and Design Points associated with this site. 5 3.5 Hydraulic Criteria All hydraulic calculations will be presented in the final drainage report and prepared in accordance with the City of Fort Collins Drainage Criteria. 3.6 Floodplain Regulations Compliance The project is not within any FEMA or City of Fort Collins mapped floodway. Therefore, a Floodplain Submittal is not required and a “City of Fort Collins Floodplain Review Checklist for 50% Submittals” has not been included with this report. 3.7 Modifications of Criteria There are no Modifications of Criteria for this project. 4. DRAINAGE FACILITY DESIGN 4.1 General Concept The majority of the proposed development will be collected and conveyed to the pavers and proposed storm drain system where it will be treated for water quality and detention via an oversized pervious paver system before being released into the Mason Street Interceptor storm drain that ultimately conveys water into the Fossil Creek channel. 4.2 Specific Details A summary of the drainage patterns within each basin is provided in the following paragraphs. Please refer to Appendix A for the drainage plan. Basin A is 0.18 acres and consists of the north drive aisle area and the proposed building. The basin drains to the curb inlet at Design Point a that collects flow from this area and conveys flow to the subgrade of the pervious paver detention system. Roof drains will be directly connected to this storm system. This flow will not filter through the pavers but rather enter the subgrade of the system by backing up in underdrains where detention will occur. 6 Basins B is 0.50 acres and consists of the south parking area and the existing Jiffy Lube building. Flows from this basin will be captured by the pervious paver system where the 100-year developed flow will be detained and reduced to the required 0.5 cfs per acre (0.34 cfs). The water quality capture volume for the entire site was sized based on a 40-hour drain time and is 790 cf. Please refer to Appendix D for water quality information. Based on the allowable release rate of 0.34 cfs, the required 100-year storage volume for the site is 5,205 cf. Therefore, the total required volume with the 790 cf of water quality is 5,995 ft. This volume will be accounted for by the combination of the pervious paver system and 0.4 ft of parking lot detention. Detained flow will be released into the existing inlet an existing storm system in College Avenue and ultimately to the Fossil Creek channel. Please refer to Appendix E for detention information. 5. CONCLUSIONS 5.1 Compliance with Standards All computations that have been completed within this report are in compliance with the City of Fort Collins Storm Drainage Design Criteria Manual. 5.2 Drainage Concept The proposed drainage concepts presented in this report and on the construction plans adequately provides for stormwater quantity and quality treatment of proposed impervious areas. Conveyance elements have been designed to pass required flows and to minimize future maintenance. If, at the time of construction, groundwater is encountered, a Colorado Department of Health Construction Dewatering Permit will be required. 7 6. REFERENCES 1. City of Fort Collins, “Fort Collins Stormwater Criteria Manual”, adopted December 2018. 2. Urban Drainage and Flood Control District, “Urban Storm Drainage Criteria Manual”, Volumes 1 and 2, updated January 2016, and Volume 3 updated November 2010. 3. Stewart and Associates, Inc., “Final Drainage Report for Lot 1, The Gateway at Harmony Road P.U.D., First Filing for Jiffy Lube, Inc.” dated October 13, 1993. A APPENDIX A VICINITY MAP AND DRAINAGE PLAN SITE vicinity map Scale:: 1"=500' PROP BLDG FF= 37.30 FF=37.45 LOT 1 BLANKET UE, DE, AE LOT 2 BLANKET UE, DE, AE Revisions No. Date Description By Revisions No. Date Description By 0 SCALE: 1" = 20' 20 10 20 40 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME KENSINGTON COMMONS DUTCH BROS COFFEE DRAINAGE PLAN 4/22/2019 N/A N/A ES MPO 1380-165-00 5 of 5 M SQUARED, LLC 1600 EAST MULBERRY ST., UNIT 1 FORT COLLINS, COLORADO 80525 CONTACT: NATE FRARY PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR LEGEND PROPOSED DIRECTION OF OVERLAND FLOW MINOR STORM RUNOFF COEFFICIENT DRAINAGE BASIN AREA, ACRES PROPOSED DRAINAGE BASIN ID DESIGN POINT PROPOSED DRAINAGE BASIN DIVIDE LINE B APPENDIX B HYDROLOGIC COMPUTATIONS Interwest Consulting Group DRAINAGE SUMMARY TABLE Design Tributary Area C (10) C (100) tc (10) tc (100) Q(10)tot Q(100)tot Sub-basin REMARKS Point (ac) (min) (min) (cfs) (cfs) a A 0.18 0.88 1.00 5.0 5.0 0.8 1.8 b B 0.50 0.67 0.83 12.8 12.0 1.1 3.0 4-15-19 COFC FLOW.xls Interwest Consulting Group RUNOFF COEFFICIENTS & % IMPERVIOUS LOCATION: Dutch Bros - Kensington PROJECT NO: 1380-165-00 COMPUTATIONS BY: es DATE: 4/15/2019 Recommended Runoff Coefficients from Table 3.2-2 of City of Fort Collins Stormwater Criteria Manual Recommended % Impervious from Table 4.1-3 of City of Fort Collins Stormwater Criteria Manual Type B Soils Runoff % coefficient Impervious C Streets, parking lots (asphalt): 0.95 100 Sidewalks (concrete): 0.95 100 Roofs: 0.95 90 Gravel or Pavers: 0.50 40 Landscape Areas (Avg, sandy) : 0.15 2 Landscape Areas (Steep, sandy) : 0.20 2 SUBBASIN TOTAL TOTAL ROOF PAVED PAVERS SIDEWALK LANDSCAPE RUNOFF % DESIGNATION AREA AREA AREA AREA AREA AREA AREA COEFF. Impervious REMARKS (ac.) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (C) EX 0.67 29,402 2,891 18,047 0 2,918 5,545 0.81 81 A 0.18 7,692 1,034 4,529 0 1,427 701 0.88 90 B 0.50 21,710 2,085 6,698 5,939 2,308 4,680 0.67 61 Pervious Pavers TOTAL 0.67 29,402 3,119 11,227 5,939 3,736 5,382 0.72 69 NOTE: BASIN B EXISTING IMPERVIOUS AREA = 4582 SF Equations - Calculated C coefficients & % Impervious are area weighted C = Σ (Ci Ai) / At Ci = runoff coefficient for specific area, Ai Ai = areas of surface with runoff coefficient of Ci n = number of different surfaces to consider At = total area over which C is applicable; the sum of all Ai's 4-15-19 COFC FLOW.xls Interwest Consulting Group STANDARD FORM SF-2 TIME OF CONCENTRATION - 2 and 10 YR LOCATION: Dutch Bros - Kensington PROJECT NO: 1380-165-00 COMPUTATIONS BY: es DATE: 4/15/2019 2 and 10-yr storm Cf = 1.00 from Table RO-12 of City of Fort Collins Stormwater Code, Volume I SUB-BASIN INITIAL /OVERLAND TRAVEL TIME / GUTTER OR CHANNEL FLOW tc CHECK FINAL REMARKS DATA TIME (ti) (tt) (URBANIZED BASIN) tc DESIGN SUBBASIN(s) Area C Length Slope ti Length Slope n Vel. tt tc = Total L tc=(l/180)+10 PONIT (ac) (ft) (%) (min) (ft) (%) Manning (ft/s) (min) ti + tt (ft) (min) (min) (1) (2) (3) (4) (5) (6) (7) (8) rough. (9) (10) (11) (12) (13) (14) a A 0.18 0.88 10 2.0 1.0 190 2.0 0.012 3.8 0.8 1.9 200 11.1 5.0 b B 0.50 0.67 10 2.0 2.0 1220 0.5 0.012 1.9 10.7 12.8 1230 16.8 12.8 EQUATIONS: tc = ti + tt ti = [1.87 (1.1 - CCf ) L0.5 ] / S 1/3 tt = L/Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + tt and urbanized basin check min. tc = 5 min. due to limits of IDF curves 4-15-19 COFC FLOW.xls Interwest Consulting Group STANDARD FORM SF-2 TIME OF CONCENTRATION - 100 YR LOCATION: Dutch Bros - Kensington PROJECT NO: 1380-165-00 COMPUTATIONS BY: es DATE: 4/15/2019 100-yr storm Cf = 1.25 from Table RO-12 of City of Fort Collins Stormwater Code, Volume I SUB-BASIN INITIAL /OVERLAND TRAVEL TIME / GUTTER OR CHANNEL FLOW tc CHECK FINAL REMARKS DATA TIME (ti) (tt) (URBANIZED BASIN) tc DESIGN SUBBASIN(s) Area C C*Cf Length Slope ti Length Slope n Vel. tt tc = Total L tc=(l/180)+10 PONIT (ac) (ft) (%) (min) (ft) (%) Manning (ft/s) (min) ti + tt (ft) (min) (min) (1) (2) (3) (4) (5) (6) (7) (8) rough. (9) (10) (11) (12) (13) (14) a A 0.18 0.88 1.00 10 2.0 0.5 190 2.0 0.012 3.8 0.8 1.3 200 11.1 5.0 b B 0.50 0.67 0.83 10 2.0 1.3 1220 0.5 0.012 1.9 10.7 12.0 1230 16.8 12.0 EQUATIONS: tc = ti + tt ti = [1.87 (1.1 - CCf ) L0.5 ] / S 1/3 tt = L/Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + tt and urbanized basin check min. tc = 5 min. due to limits of IDF curves 4-15-19 COFC FLOW.xls Interwest Consulting Group RATIONAL METHOD PEAK RUNOFF (City of Fort Collins, 10-Yr Storm) LOCATION: Dutch Bros - Kensington PROJECT NO: 1380-165-00 COMPUTATIONS BY: es DATE: 4/15/2019 10 yr storm, Cf = 1.00 DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Tributary A C Cf tc i Q (10) from Q (10) Q(10)tot Sub-basin Design Point (ac) (min) (in/hr) (cfs) Point (cfs) (cfs) a A 0.18 0.88 5.0 4.87 0.8 0.8 b B 0.50 0.67 12.8 3.43 1.1 1.1 Q = Cf C iA Q = peak discharge (cfs) C = runoff coefficient Cf = frequency adjustment factor i = rainfall intensity (in/hr) from City of Fort Collins IDF curve (4/16/99) A = drainage area (acres) i = 41.44 / (10+ tc)0.7974 4-15-19 COFC FLOW.xls Interwest Consulting Group RATIONAL METHOD PEAK RUNOFF (City of Fort Collins, 100-Yr Storm) LOCATION: Dutch Bros - Kensington PROJECT NO: 1380-165-00 COMPUTATIONS BY: es DATE: 4/15/2019 100 yr storm, Cf = 1.25 DIRECT RUNOFF CARRY OVER TOTAL REMARKS Des. Area A C Cf tc i Q (100) from Q (100) Q(100)tot Design Point Design. (ac) (min) (in/hr) (cfs) Point (cfs) (cfs) a A 0.18 1.00 5.0 9.95 1.8 1.8 b B 0.50 0.83 12.0 7.20 3.0 3.0 Q = C iA Q = peak discharge (cfs) C = runoff coefficient i = rainfall intensity (in/hr) from City of Fort Collins IDF curve (4/16/99) A = drainage area (acres) i = 84.682 / (10+ tc) 0.7975 4-15-19 COFC FLOW.xls City of Fort Collins Stormwater Criteria Manual C APPENDIX C HYDRAULIC CALCULATIONS (PROVIDED AT FINAL) D APPENDIX D WATER QUALITY AND LID INFORMATION Project Name: Dutch Bros Coffee - Kensington Project Number: 1380-165-00 Company: INTERWEST CONSULTING GROUP Designer: ES Date: 4/16/2019 1. Basin Storage Volume A) Tributary Area's Imperviousness Ratio (i=Ia/100) Ia = 69 % i = 0.69 B) Contributing Watershed Area (Area) A = 0.67 acres C) Water Quality Capture Volume (WQCV) WQCV = 0.270584 watershed inches (WQCV = 1.0 * (0.91 * i3 - 1.19 * i2 + 0.78i) ) D) Design Volume: Vol = WQCV/12 * Area * 1.2 Vol. = 0.018 ac-ft 789.7054 cf Impervious Area 24,021 sf Required Minimum Impervious Area to be Treated 12,011 sf Treatment - Pervious Pavers 5,939 sf Treatment - Impervious Area Treated (Basin B) 17,030 sf Treatment - Run-on Ratio (3:1 Max) 1.9 Total Area Treated 17,030 sf Actual % of Impervious Area On-Site Treated by LID 71 % Pavement Area 20,902 sf Required Minimum Area of Pervious Pavement 5,225 sf Area of Pervious Pavers Provided 5,939 sf Actual % of Pervious Pavement Provided 28 % 50% On-Site Treatment by LID Requirement LID Table 25% Porous Pavement Requirement E APPENDIX E DETENTION INFORMATION Interwest Consulting Group DETENTION VOLUME CALCULATIONS Rational Volumetric (FAA) Method 100-Year Event LOCATION: Dutch Bros. Kensington PROJECT NO: 1380-165-00 COMPUTATIONS BY: es DATE: 4/16/2019 Equations: Area trib. to pond = 0.67 acre Developed flow = QD = CIA C (100) = 0.90 Vol. In = Vi = T C I A = T QD Developed C A = 0.6 acre Vol. Out = Vo =K QPO T Release rate, QPO = 0.34 cfs storage = S = Vi - Vo K = 1 (from fig 2.1) Rainfall intensity from City of Fort Collins IDF Curve with updated (3.67") rainfall Storm Rainfall QD Vol. In Vol. Out Storage Storage Duration, T Intensity, I (cfs) Vi Vo S S (min) (in/hr) (ft 3 ) (ft 3 ) (ft 3 ) (ac-ft) 5 9.95 6.0 1800 101 1699 0.04 10 7.77 4.7 2810 201 2609 0.06 20 5.62 3.4 4067 402 3665 0.08 30 4.47 2.7 4850 603 4247 0.10 40 3.74 2.3 5412 804 4608 0.11 50 3.23 1.9 5850 1005 4845 0.11 60 2.86 1.7 6208 1206 5002 0.11 70 2.57 1.6 6511 1407 5104 0.12 80 2.34 1.4 6774 1608 5166 0.12 90 2.15 1.3 7007 1809 5198 0.12 100 1.99 1.2 7215 2010 5205 0.12 110 1.86 1.1 7405 2211 5194 0.12 120 1.75 1.1 7578 2412 5166 0.12 Required Storage Volume: 5205 ft 3 WQCV: 789.71 ft 3 0.119 acre-ft 0.018 acre-ft 4-16-19 Detention.xls,FAA-100yr EXISTING Detention Pond - Stage/Storage - Surface Water LOCATION: Dutch Bros. Kensington PROJECT NO: 1380-165-00 COMPUTATIONS BY: mpo SUBMITTED BY: INTERWEST CONSULTING GROUP DATE: 3/22/2017 V = 1/3 d ( A + B + sqrt(A*B)) where V = volume between contours, ft3 d = depth between contours, ft A = surface area of contour Required Detention Volume= 5205 cf WQCV= 790 cf Total Volume= 5995 cf VOLUME IN PAVERS PARKING LOT DETENTION Surface Incremental VOID (30%) Total Surface Incremental Total Combined Stage Area Storage Storage Storage Stage Area Storage Storage Storage (ft) (ft2) (ac-ft) (ac-ft) (ac-ft) (ft) (ft2) (ac-ft) (ac-ft) (ac-ft) 32.0 0 32.2 1600 107 32 32 32.4 3600 507 152 184 32.6 4900 847 254 438 32.8 5050 995 298 736 33.0 5050 1010 303 1039 33.2 5050 1010 303 1342 33.4 5050 1010 303 1645 33.6 5050 1010 303 1948 33.8 5050 1010 303 2251 34.0 5050 1010 303 2554 34.2 5050 1010 303 2857 34.4 5050 1010 303 3160 34.6 5050 1010 303 3463 34.8 5050 1010 303 3766 35.0 5050 1010 303 4069 35.2 5050 1010 303 4372 35.4 5050 1010 303 4675 35.6 5250 1030 309 4984 100-yr 35.8 5250 1050 315 5299 35.8 0 35.9 5210 523 157 5456 35.9 40 1 1 5458 36.0 5070 514 154 5611 36.0 180 10 11 5622 36.1 4810 494 148 5759 36.1 440 30 42 5800 Total 36.2 4550 468 140 5899 36.2 700 56 98 5997 Spill Over Curb 36.6 4-16-19 Detention.xls F APPENDIX F SOILS INFO AND REFERENCE MATERIALS Hydrologic Soil Group—Larimer County Area, Colorado (Dutch Bros. Kensington) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/3/2019 Page 1 of 4 4485980 4485990 4486000 4486010 4486020 4486030 4486040 4485980 4485990 4486000 4486010 4486020 4486030 4486040 493360 493370 493380 493390 493400 493410 493420 493430 493440 493450 493460 493470 493360 493370 493380 493390 493400 493410 493420 493430 493440 493450 493460 493470 40° 31' 30'' N 105° 4' 42'' W 40° 31' 30'' N 105° 4' 37'' W 40° 31' 28'' N 105° 4' 42'' W 40° 31' 28'' N 105° 4' 37'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 25 50 100 150 Feet 0 5 10 20 30 Meters Map Scale: 1:515 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 4 Altvan-Satanta loams, 3 to 9 percent slopes B 0.9 84.7% 74 Nunn clay loam, 1 to 3 percent slopes C 0.2 15.3% Totals for Area of Interest 1.1 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Hydrologic Soil Group—Larimer County Area, Colorado Dutch Bros. Kensington Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/3/2019 Page 3 of 4 Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado Dutch Bros. Kensington Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/3/2019 Page 4 of 4 USGS The National Map: Orthoimagery. Data refreshed October, 2017. National Flood Hazard Layer FIRMette 0 250 500 1,000 1,500 2,000 Feet Ü 105°4'55.92"W 40°31'38.66"N 105°4'18.47"W 40°31'11.31"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT HAZARD SPECIAL AREAS FLOOD Without Zone A, V, Base A99 Flood Elevation (BFE) With BFE or Depth Zone AE, AO, AH, VE, AR Regulatory Floodway 0.of 2% 1% Annual annual Chance chance Flood flood with Hazard, average Areas depth areasdrainage of less less than than one one foot square or with mile Zone X Future ChanceAnnual Conditions Flood Hazard 1% Zone X Area Levee.to with See Reduced Notes. Flood Risk due Zone X Area with Flood Risk due to LeveeZone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood Hazard Zone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This digital map flood complies maps if with it is FEMA's not void standards as described for the below. use of The accuracy basemap standards shown complies with FEMA's basemap The authoritative flood hazard NFHL information web services is derived provided directly by FEMA. from This the map was reflectnot exported changes on or 4/amendments 3/2019 at 2:50:subsequent 46 PM and to this does date and time. becomeor The superseded NFHL and effective by new data information over time. may change This elementsmap map image do not is appear: void if basemap the one or imagery, more of flood the following zone labels, legend, FIRM panel scale number, bar, map and creation FIRM effective date, community date. Map identifiers,images for unmapped regulatoryfor purposes. and unmodernized areas cannot be used Legend OTHER FLOOD AREAS HAZARD OF OTHER AREAS STRGUECNTUERREASL FEATURES OTHER MAP PANELS 8 1:6,000 B 20.2 The point pin selected displayed by the on the user map and is does an approximate not represent an authoritative property location. of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 13, Sep 10, 2018 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Sep 20, 2015—Oct 21, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado (Dutch Bros. Kensington) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/3/2019 Page 2 of 4