Loading...
HomeMy WebLinkAboutHANSEN FARM - FDP190010 - DOCUMENT MARKUPS - ROUND 2 - STREET RELATED DOCUMENT (7)∆ FALLEN BRANCH DR KNOBBY PINE DR SEE SHT R6 VERTICAL CURB & GUTTER 9' UTILITY EASEMENT 4.5' SIDEWALK STOP SIGN w/ STREET NAME 9' UTILITY EASEMENT 4.5' SIDEWALK LOT 25 LOT 2 TRACT G D,U&PAE LOT 5 LOT 4 LOT 3 LOT 1 LOT 2 LOT 21 LOT 18 LOT 22 LOT 20 LOT 19 LOT 17 LOT 23 LOT 24 LOT 2 LOT 1 LOT 4 LOT 3 DRIVE-OVER CURB & GUTTER STA. = 14+58.41 (FALLEN BRANCH DR) STA. = 22+14.93 (KNOBBY PINE DR) STA. = 12+42.95 (FALLEN BRANCH DR) STA. = 19+08.87 (ALLEY) 12' CONCRETE PAN BLOCK 14 BLOCK 4 TRACT I D,U&PAE TRACT F DRAINAGE, UTILITY & PEDESTRIAN ACCESS EASEMENT KNOBBY PINE DR SEE SHT R6 FLOATING LEAF DR HAPPY WOODLAND DR KNOBBY PINE DR 70.28 70.57 70.85 71.40 72.04 72.43 72.76 71.88 71.54 71.21 71.73 72.10 72.48 70.77 70.25 73.30 72.77 2.3% 2.3% 2.3% 2.3% 2.3% 2.5% 2.4% 2.7% 2.1% 71.20 71.64 2.4% 2.4% 2.5% 2.3% 2.5% 73.00 72.48 2.3% 71.14 70.61 2.4% 2.2% 2.3% 72.65 72.11 1.2% 1.1% 0.9% 0.6% 0.6% 1.0% 1.5% 1.4% 1.5% 1.5% 1.9% 1.9% 1.5% 1.5% 1.2% 1.5% 1.5% 1.1% 16" W 16" W 16" W 16" W 16" W 16" W CTV CTV CTV VAULT F.O. T VAULT F.O. X 8" W T S T S T S T S ZEPHYR ROAD TIMBERLINE RD BURLY TREE DR TRACT M D&UE 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 VERTICAL CURB & GUTTER 76' ROW 54' FL-FL STORM DRAIN E STORM DRAIN A END PROPOSED ROADWAY PROPERTY BOUNDARY UTILITY AND TEMPORARY CONSTRUCTION EASEMENT (BY SEPARATE DOCUMENT) ROW DEDICATION (BY SEPARATE DOCUMENT) 9' UTIL ESMT 5' SIDEWALK 9' UTIL ESMT 5' SIDEWALK SECTION LINE Horizontal Scale 1" = 50' Vertical Scale 1" = 10' 11+00 4955 4956 4960 4964 4968 4972 4955 4956 4960 4964 4968 4972 -40 -20 0 20 40 SECTION LINE Horizontal Scale 1" = 50' Vertical Scale 1" = 10' 11+50 4955 4956 4960 4964 4968 4972 4955 4956 4960 4964 4968 4972 -40 -20 0 20 40 SECTION LINE Horizontal Scale 1" = 50' Vertical Scale 1" = 10' 12+00 4955 4956 4960 4964 4968 4972 4955 4956 4960 4964 4968 4972 -40 -20 0 20 40 SECTION LINE Horizontal Scale 1" = 50' Vertical Scale 1" = 10' 12+50 4955 4956 4960 4964 4968 4972 4955 4956 4960 4964 4968 4972 -40 -20 0 20 40 SECTION LINE Horizontal Scale 1" = 50' Vertical Scale 1" = 10' 13+00 4955 4956 4960 4964 4968 4972 4955 4956 4960 4964 4968 4972 -40 -20 0 20 40 SECTION LINE Horizontal Scale 1" = 50' Vertical Scale 1" = 10' 13+50 4955 4956 4960 4964 4968 4972 4955 4956 4960 4964 4968 4972 -40 -20 0 20 40 SECTION LINE Horizontal Scale 1" = 50' Vertical Scale 1" = 10' 14+00 4955 4956 4960 4964 4968 4972 4955 4956 4960 4964 4968 4972 -40 -20 0 20 40 SECTION LINE Horizontal Scale 1" = 50' Vertical Scale 1" = 10' 14+50 4955 4956 4960 4964 4968 4972 4955 4956 4960 4964 4968 4972 -40 -20 0 20 40 SECTION LINE Horizontal Scale 1" = 50' Vertical Scale 1" = 10' 15+00 4955 4956 4960 4964 4968 4972 4955 4956 4960 4964 4968 4972 -40 -20 0 20 40 SECTION LINE Horizontal Scale 1" = 50' Vertical Scale 1" = 10' 15+50 4955 4956 4960 4964 4968 4972 4955 4956 4960 4964 4968 4972 -40 -20 0 20 40 -2.00% -1.93% -2.03% -2.03% -2.00% -2.00% -2.00% -2.00% -2.00% -2.00% -2.00% -2.00% -2.00% -2.00% -2.00% -2.00% -2.00% -2.00% 4962.1 4961.55 4962.1 4961.52 4962.6 4961.89 4963.0 4962.69 4963.5 4963.90 4964.0 4965.40 4964.9 4966.89 4965.5 4968.10 4968.2 4968.89 4969.2 4969.26 EXISTING GROUND PROPOSED GROUND KEYMAP B M VAULT ELEC TIMBERLINE RD ZEPHYR RD EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER EXISTING STORM SEWER LIMITS OF DEVELOPMENT LOD PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 5. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 6. PROPOSED EMERGENCY ACCESS GATE AT EAST END OF TWISTED ROOT DR SHALL REMAIN UNTIL COMPLETION OF THE CAPITAL IMPROVEMENTS ALONG TIMBERLINE RD OR OTHERWISE REMOVED BY THE CITY OF FORT COLLINS. 7. CONSTRUCTION ON DITCH LATERAL WILL BE LIMITED FROM OCTOBER 1 TO MAY 1 WHEN NOT IN USE. PROPOSED STORM INLET PROPERTY BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE EXISTING LOT LINE Sheet of 74 HANSEN SUBDIVISION These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com XS2 CROSS-SECTIONS ZEPHYR ROAD 56 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R NORTH ( IN FEET ) 0 1 INCH = 50 FEET 50 50 100 150 XS2 6/18/19 **All circled are line over text.** 1.1% 1.1% 1.5% 1.2% 4.5' SIDEWALK 9' UTILITY EASEMENT 4.5' SIDEWALK 9' UTILITY EASEMENT 4.5' SIDEWALK 9' UTILITY EASEMENT 4.5' SIDEWALK 9' UTILITY EASEMENT FLOATING LEAF DR HAPPY WOODLAND DR 72.63 72.44 72.25 71.91 72.80 72.17 72.62 72.03 71.87 72.37 71.01 71.32 71.57 73.12 72.59 72.09 71.80 71.50 70.98 2.3% 2.3% 2.2% 2.5% 2.9% 2.7% 2.1% 2.3% 2.3% 2.2% 2.4% 2.4% 2.4% 73.00 72.47 2.3% 2.4% 72.88 72.31 71.85 71.32 71.69 72.18 71.66 2.3% 2.2% 2.2% 0.5% 0.8% 0.8% 0.8% 0.5% 0.5% 0.7% 1.0% 1.4% 1.4% 1.2% 1.1% 0.6% 0.9% 1.4% 1.3% 1.4% 1.4% 1.2% 1.0% 0.7% 0.5% 0.5% 0.5% 4.5' SIDEWALK 9' UTILITY EASEMENT 4.5' SIDEWALK 9' UTILITY EASEMENT 4.5' SIDEWALK 9' UTILITY EASEMENT 4.5' SIDEWALK 9' UTILITY EASEMENT KNOBBY PINE DR KNOBBY PINE DR 67.45 67.33 67.21 66.96 66.71 66.59 66.47 66.91 67.00 67.10 67.74 67.62 67.50 67.95 67.42 66.96 66.43 66.85 67.11 2.3% 2.3% 2.6% 2.8% 3.0% 2.4% 67.17 66.62 67.87 67.30 67.18 67.79 67.37 66.79 2.4% 2.6% 2.2% 2.4% 2.1% 2.3% 2.5% 2.3% 2.3% 2.0% 2.8% 2.5% 2.4% 4.5' SIDEWALK 9' UTILITY EASEMENT 4.5' SIDEWALK 9' UTILITY EASEMENT 4.5' SIDEWALK 9' UTILITY EASEMENT 4.5' SIDEWALK 9' UTILITY EASEMENT FALLEN BRANCH DR BURLY TREE DR BLOCK LOT 23 3 TRACT G D,U&PAE TRACT A 9' UTILITY EASEMENT 4.5' SIDEWALK 9' UTILITY EASEMENT 4.5' SIDEWALK 4.5' SIDEWALK 9' UTILITY EASEMENT 64.11 64.43 64.74 64.89 64.17 64.08 63.76 65.27 64.78 64.40 64.66 64.17 64.50 64.67 64.36 63.55 63.03 63.06 2.3% 2.2% 82' CROWN TRANSITION 2.3% 2.3% 2.3% 2.3% 2.3% 2.0% 2.0% 0.6% 0.6% 1.2% 2.3% 2.0% 1.0% 2.2% 1.0% 0.6% 1.0% 0.6% 64.25 FALLEN BRANCH DR KNOBBY PINE DR LOT 1 LOT 18 BLOCK LOT 17 3 BLOCK 2 TRACT J OPEN SPACE TRACT N OPEN SPACE TRACT I D,U&PAE 4.5' SIDEWALK 9' UTILITY EASEMENT 4.5' SIDEWALK 9' UTILITY EASEMENT 4.5' SIDEWALK 9' UTILITY EASEMENT 4.5' SIDEWALK 9' UTILITY EASEMENT 64.28 63.76 63.89 63.68 63.01 63.32 63.08 62.84 64.29 63.89 63.78 63.68 63.01 63.34 63.10 62.87 63.84 64.78 63.29 63.29 0.5% 1.6% 63.37 3.0% 2.0% 2.0% 0.5% 2.2% 1.6% 0.8% 1.6% 1.6% 0.7% 3.0% 0.5% 63.76 0.8% 1.8% 90.5' CROWN TRANSITION 64.19 64.68 64.16 2.2% 2.3% 63.78 2.2% 1.6% 1.8% 1.5% 1.5% 0.7% 1.7% 0.7% 2.3% 2.3% 2.3% 2.3% 2.2% 2.3% 90.5' CROWN TRANSITION 63.63 64.12 63.63 2.3% 2.3% 4.5' SIDEWALK 9' UTILITY EASEMENT 4.5' SIDEWALK 9' UTILITY EASEMENT 4.5' SIDEWALK 9' UTILITY EASEMENT 4.5' SIDEWALK 9' UTILITY EASEMENT EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER EXISTING STORM SEWER LIMITS OF DEVELOPMENT LOD PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 5. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 6. PROPOSED EMERGENCY ACCESS GATE AT EAST END OF TWISTED ROOT DR SHALL REMAIN UNTIL COMPLETION OF THE CAPITAL IMPROVEMENTS ALONG TIMBERLINE RD OR OTHERWISE REMOVED BY THE CITY OF FORT COLLINS. 7. CONSTRUCTION ON DITCH LATERAL WILL BE LIMITED FROM OCTOBER 1 TO MAY 1 WHEN NOT IN USE. PROPOSED STORM INLET PROPERTY BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE EXISTING LOT LINE Sheet of 74 HANSEN SUBDIVISION These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com KEYMAP B M VAULT ELEC TIMBERLINE RD ZEPHYR RD INT1 INTERSECTION DETAILS 53 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R KEYMAP B M VAULT ELEC TIMBERLINE RD ZEPHYR RD NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 A INTERSECTION DETAIL B INTERSECTION DETAIL C INTERSECTION DETAIL D INTERSECTION DETAIL E INTERSECTION DETAIL A B C D E F H I J K Text Over Text 6/18/19 SEE SHT R2 FLOATING LEAF DR SEE SHT R2 59' ROW 36' FL-FL R20' R20' R20' R20' STOP SIGN w/ STREET NAME STOP SIGN w/ STREET NAME PROPOSED TYPE III BARRICADE 2'x3' RCBC FUTURE FALLEN BRANCH DR END PROPOSED ROADWAY PROPERTY BOUNDARY UTILITY AND TEMPORARY CONSTRUCTION EASEMENT (BY SEPARATE DOCUMENT) ∆ ∆ ALLEY STA. = 10+00.00 (FALLEN BRANCH DR) STA. = 18+43.54 (BURLY TREE DR) ROW DEDICATION (BY SEPARATE DOCUMENT) 5.58' PARKWAY 6.5' PARKWAY DRIVE-OVER CURB & GUTTER DRIVE-OVER CURB & GUTTER 4.5' SIDEWALK 5.58' PARKWAY 4.5' SIDEWALK 5.58' PARKWAY 4955 4960 4965 4970 4975 4955 4960 4965 4970 4975 9+75 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 END PROPOSED ROADWAY STA.=16+62.13 EL. = 4971.655 4966.99 4964.86 4962.74 4961.67 4961.61 4962.68 4966.74 4973.11 4966.47 4965.94 4965.39 4964.35 4963.79 4963.23 4962.41 4962.11 4961.82 4961.51 4961.49 4961.55 4961.71 4961.93 4962.14 4963.70 4964.71 4965.73 4967.92 4970.99 4972.33 4973.89 4974.02 4974.01 EXISTING GROUND PROPOSED GRADE EXISTING GROUND PROPOSED GRADE FUTURE GRADE 24"x36" RCBC STA.=16+58.79 INV.=4967.93 0.50% 4.00% 4.40% -2.25% -0.53% -1.23% PVI STA = 10+00.00 PVI ELEV = 4964.89 PVI STA = 10+16.42 PVI ELEV = 4964.52 PVI STA = 12+62.91 PVI ELEV = 4962.14 PVI STA = 12+68.91 PVI ELEV = 4961.99 PVI STA = 12+74.91 PVI ELEV = 4962.14 PVI STA = 15+71.41 PVI ELEV = 4967.67 75.0' VC PVI STA = 12+25.41 PVI ELEV = 4962.82 BVCS: 11+87.91 BVCE: 4963.02 EVCS: 12+62.91 EVCE: 4962.14 A.D. = 1.29 K = 58.19 75.0' VC PVI STA = 13+12.41 PVI ELEV = 4962.83 BVCS: 12+74.91 BVCE: 4962.14 EVCS: 13+49.91 EVCE: 4963.01 A.D. = 1.34 K = 56.15 208.0' VC HP ELEV = 4973.35 HP STA = 17+44.55 PVI STA = 17+60.55 PVI ELEV = 4975.99 BVCS: 16+56.55 BVCE: 4971.42 A.D. = 10.40 K = 20.00 75.0' VC PVI STA = 11+00.22 PVI ELEV = 4963.49 BCVS: 10+62.72 BVCE: 4963.95 ECVS: 11+37.72 EVCE: 4963.29 A.D. = 0.70 K = 107.41 105.0' VC PVI STA = 14+70.00 PVI ELEV = 4963.61 BCVS: 14+17.50 BVCE: 4963.35 ECVS: 15+22.50 EVCE: 4965.71 A.D. = 3.50 K = 30.00 0.50% 4.00% 4.40% -2.25% -0.53% -1.23% PVI STA = 10+00.00 PVI ELEV = 4964.89 PVI STA = 10+16.42 PVI ELEV = 4964.52 PVI STA = 12+62.91 PVI ELEV = 4962.14 PVI STA = 12+68.91 PVI ELEV = 4961.99 PVI STA = 12+74.91 PVI ELEV = 4962.14 PVI STA = 15+71.41 PVI ELEV = 4967.67 75.0' VC PVI STA = 12+25.41 PVI ELEV = 4962.82 BVCS: 11+87.91 BVCE: 4963.02 EVCS: 12+62.91 EVCE: 4962.14 A.D. = 1.29 K = 58.19 75.0' VC PVI STA = 13+12.41 PVI ELEV = 4962.83 BVCS: 12+74.91 BVCE: 4962.14 EVCS: 13+49.91 EVCE: 4963.01 A.D. = 1.34 K = 56.15 208.0' VC HP ELEV = 4973.35 HP STA = 17+44.55 PVI STA = 17+60.55 PVI ELEV = 4975.99 BVCS: 16+56.55 BVCE: 4971.42 A.D. = 10.40 K = 20.00 75.0' VC PVI STA = 11+00.22 PVI ELEV = 4963.49 BCVS: 10+62.72 BVCE: 4963.95 ECVS: 11+37.72 EVCE: 4963.29 A.D. = 0.70 K = 107.41 105.0' VC PVI STA = 14+70.00 PVI ELEV = 4963.61 BCVS: 14+17.50 BVCE: 4963.35 ECVS: 15+22.50 EVCE: 4965.71 A.D. = 3.50 K = 30.00 4955 4960 4965 4970 4975 4980 4955 4960 4965 4970 4975 4980 9+75 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 4963.07 4962.50 4962.01 4962.73 4964.12 4968.03 4972.14 4963.61 4963.31 4962.88 4962.75 4962.62 4962.28 4962.06 4961.92 4962.22 4962.45 4962.60 4962.85 4963.07 4963.49 4964.96 4965.95 4966.95 4969.13 4970.23 4971.31 4972.65 4972.86 4972.75 -0.50% 0.50% 4.00% 4.40% -0.90% -0.50% -1.23% 0.50% 0.90% PVI STA = 10+38.00 PVI ELEV = 4963.76 PVI STA = 12+02.27 PVI ELEV = 4962.49 PVI STA = 12+53.13 PVI ELEV = 4962.03 PVI STA = 12+78.13 PVI ELEV = 4961.90 PVI STA = 13+03.13 PVI ELEV = 4962.03 PVI STA = 13+56.46 PVI ELEV = 4962.51 PVI STA = 15+80.63 PVI ELEV = 4967.18 208.0' VC HP ELEV = 4972.86 HP STA = 17+53.77 PVI STA = 17+69.77 PVI ELEV = 4975.50 BVCS: 16+65.77 BVCE: 4970.92 A.D. = 10.40 K = 20.00 75.0' VC PVI STA = 11+00.22 PVI ELEV = 4963.00 BCVS: 10+62.72 BVCE: 4963.46 ECVS: 11+37.72 EVCE: 4962.81 A.D. = 0.73 K = 102.57 105.0' VC PVI STA = 14+79.22 PVI ELEV = 4963.12 BCVS: 14+26.72 BVCE: 4962.86 ECVS: 15+31.72 EVCE: 4965.22 A.D. = 3.50 K = 30.00 EXISTING GROUND PROPOSED GRADE EXISTING GROUND PROPOSED GRADE END PROPOSED ROADWAY STA.=16+71.35 EL. = 4971.162 FUTURE GRADE 24"x36" RCBC STA.=16+67.25 INV.=4967.90 4955 4960 4965 4970 4975 4980 4955 4960 4965 4970 4975 4980 9+75 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 4963.03 4962.39 4962.28 4962.78 4964.72 4968.84 4972.55 4963.84 4963.36 4962.83 4962.68 4962.54 4962.26 4962.13 4962.16 4962.41 4962.53 4962.66 4962.96 4963.34 4963.92 4965.69 4966.69 4967.74 4969.94 4971.04 4971.95 4972.83 4972.81 4972.47 -0.50% 0.50% 0.50% 4.00% 4.40% -2.37% -0.66% -0.57% PVI STA = 10+38.00 PVI ELEV = 4964.12 PVI STA = 11+35.26 PVI ELEV = 4962.76 PVI STA = 12+17.21 PVI ELEV = 4962.29 PVI STA = 12+59.69 PVI ELEV = 4962.08 PVI STA = 13+03.19 PVI ELEV = 4962.30 PVI STA = 15+62.19 PVI ELEV = 4967.18 75.0' VC PVI STA = 10+79.34 PVI ELEV = 4963.13 BCVS: 10+41.84 BVCE: 4964.02 ECVS: 11+16.84 EVCE: 4962.88 A.D. = 1.71 K = 43.92 105.0' VC PVI STA = 14+59.83 PVI ELEV = 4963.08 BCVS: 14+07.33 BVCE: 4962.82 ECVS: 15+12.33 EVCE: 4965.18 A.D. = 3.50 K = 30.00 EXISTING GROUND PROPOSED GRADE EXISTING GROUND PROPOSED GRADE END PROPOSED ROADWAY STA.=16+52.91 EL. = 4971.162 FUTURE GRADE 24"x36" RCBC STA.=16+50.33 INV.=4967.96 208.0' VC HP ELEV = 4972.86 HP STA = 17+35.33 PVI STA = 17+51.33 PVI ELEV = 4975.50 BVCS: 16+47.33 BVCE: 4970.92 A.D. = 10.40 K = 20.00 Sheet of 74 HANSEN SUBDIVISION These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com R8 PLAN AND PROFILE FALLEN BRANCH DR 43 EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER EXISTING STORM SEWER LIMITS OF DEVELOPMENT LOD PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 5. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 6. PROPOSED EMERGENCY ACCESS GATE AT EAST END OF TWISTED ROOT DR SHALL REMAIN UNTIL COMPLETION OF THE CAPITAL IMPROVEMENTS ALONG TIMBERLINE RD OR OTHERWISE REMOVED BY THE CITY OF FORT COLLINS. 7. CONSTRUCTION ON DITCH LATERAL WILL BE LIMITED FROM OCTOBER 1 TO MAY 1 WHEN NOT IN USE. PROPOSED STORM INLET PROPERTY BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE EXISTING LOT LINE 8. PARKWAY WIDTH SHOWN ON THIS SHEET IS MEASURED FROM BACK OF CURB TO FACE OF WALK KEYMAP B M VAULT ELEC TIMBERLINE RD ZEPHYR RD CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R ( IN FEET ) 0 1 INCH = 40 FEET 40 40 80 120 NORTH CENTERLINE FALLEN BRANCH DR SCALE : 1" = 40' (H) 1" = 5' (V) LINE MATCH STA 18+00 SEE SHT R9 MATCH LINE SEE SHEET R9 STA 18+00 R8 R9 LEFT FLOWLINE FALLEN BRANCH DR SCALE : 1" = 40' (H) 1" = 5' (V) MATCH LINE SEE SHEET R9 STA 18+00 RIGHT FLOWLINE FALLEN BRANCH DR SCALE : 1" = 40' (H) 1" = 5' (V) MATCH LINE SEE SHEET R9 STA 18+00 Line Over Text & Text Over Text 6/18/19