March 08, 2019
Courtney Lockwood
Lockwood Architects, inc
415 E Pitkin St
Fort Collins, CO 80524
RE: Taft Place, FDP180028, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Development Review Coordinator, Tenae Beane, at 970-224-6119 or tbeane@fcgov.com.
UComment Summary:
Department: Planning Services
Contact: Pete Wray, 970-221-6754, Upwray@fcgov.com
Topic: General
Comment Number: Comment Originated: 03/04/2019
FOR FINAL: Ready for mylars.
Department: Engineering Development Review
Contact: Katie Andrews, 970-221-6501, Ukandrews@fcgov.com
Topic: General
Comment Number: 25 Comment Originated: 03/04/2019
03/04/2019: FOR APPROVAL:
Please provide a recorded copy of the offsite grading easements prior to final
plan approval.The offsite easements are in process.
Comment Number: 26 Comment Originated: 03/04/2019
03/04/2019: FOR APPROVAL/REPEAT COMMENT:
The flowline profiles on both Harmony and Taft still are not showing how the
grades tie into existing – please provide so that the limits of the grading
easement can be verified.See revised profiles.
Comment Number: 27 Comment Originated: 03/04/2019
2
03/04/2019: FOR APPROVAL:
Thank you for adjusting for ADA and flowline standards – there is one area that
still needs some clarification: on the profile for Taft, at ST 0+76.84, the flowline
appears to diverge as if around a corner, however on the plan view this location
is only halfway between CR38E and the new private drive. Please clarify what’s
happening in this area and note that 0.5% to 1% does exceed the max grade
break of 0.4%. Can an additional grade break be provided to smooth this out?
Please reach out if this would cause adverse effects elsewhere in the design,
etc.That was an error and has been corrected.
Comment Number: 28 Comment Originated: 03/04/2019
03/04/2019: FOR APPROVAL:
Thank you for providing the ultimate striping exhibit as well as the cross sections
on the cover; however, there appears to be a disconnect between the two –
some of the widths shown on the striping plan don’t match what’s being shown
as the ultimate cross section. The ROW dedication appears to be correct, as
we had worked out from the beginning, but the exhibit and sections are showing
different things – please clarify.See revised typical ultimate cross sections on the cover.
Comment Number: 29 Comment Originated: 03/04/2019
03/04/2019: INFORMATION ONLY:
The City Engineering department is currently reviewing ramp details, particularly
for the use of truncated domes. Although domes are included in the driveway
detail, staff does not believe that the vehicular crossings at this location will be
frequent enough to require the use of truncated domes. These can be removed
from the driveway crossings. Also, the CR38E ramp flares can be changed to
curb to better direct pedestrians across the driveway.The domes have been removed and the flares
have been modified.
Comment Number: 30 Comment Originated: 03/04/2019
03/04/2019: FOR APPROVAL:
Thank you for adding the driveway variance to Note 48, please also add the
utility easement reduction to the approved variances list – I apologize for not
listing out the variances in my comment last round, this should be the last
addition to this note that I am aware of.This variance has been added.
Comment Number: 31 Comment Originated: 03/04/2019
03/04/2019: DEVELOPMENT AGREEMENT:
Staff is drafting the DA and will be sending a draft for developer review as soon
as possible.Thank you, we will look for this.
Comment Number: 32 Comment Originated: 03/05/2019
03/04/2019: DCP:
Please feel free to send the public improvements cost estimate when you feel
confident about quantities, even ahead of DCP application if desired – this will
give us our final security amount. For more information on the DCP and what
steps need to be completed prior to application, please see:
30TUhttps://www.fcgov.com/engineering/devrev.phpUThis cost estimate is in progress & will send when
30T complete.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
3
Comment Number: 1 Comment Originated: 12/17/2018
03/05/2019: It does not appear that the redlines were addressed. They
included pavement markings on both CR 28E and Taft, and conduit needs for
the signal. These need to be addressed before mylars.
12/17/2018: final redlines for signing, striping and signal work have been
forwarded with the review letter on Friday.These comments on the redlines have been incorporated
into the revised drawings.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 8 Comment Originated: 03/01/2019
03/01/2019: The StromTech notes on sheet 6 are for a different size of
chamber and not for the SC160LP. Please revise.The notes have been updated to reflect the
SC160LP chambers.
Comment Number: 9 Comment Originated: 03/01/2019
03/01/2019: The Utility Plan references the StormTech design on Sheet 5. This
should be Sheet 6.This reference has been corrected.
Comment Number: 10 Comment Originated: 03/01/2019
03/01/2019: On Sheet 19, The weir elevation for the water quality volume is
incorrect. It looks like it should be 1 foot higher. Please revise.The weir elevation has been
corrected.
Comment Number: 11 Comment Originated: 03/01/2019
03/01/2019: There are some conflicts with shade trees and storm sewer. 10
feet is the standard for separation. Please try to maximize the distances close
to this standard.The storm layout has been modified to maximize the clearance to trees, etc.
Comment Number: 12 Comment Originated: 03/01/2019
03/01/2019: Please label Storm 4 & 5 lines as RCP Class III.A note was added to the storm profile
Sheet that all RCP shall be Class III.
Department: Water-Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 03/01/2019
03/01/2019: Please relocate the cleanout for the sanitary sewer service at least
2 feet from the sidewalk.The sewer cleanout has been moved.
Department: Forestry
Contact: Molly Roche, 224-616-1992, mroche@fcgov.com
Topic: Landscape Plans
Comment Number: 11 Comment Originated: 03/05/2019
11
3/5/19: FOR APPROVAL
Wes Lamarque in Stormwater/Waste Water Utilities informed me that the
northern most Shumard Oak is too close to the Storm Drain. Please allow 10 ft
between the tree and this utility. Include site distance triangle at this corner to
4
ensure that the canopy shade tree does not encroach with its adjusted location.
The Strom Drain has been moved to provide the 10’ separation.
In the meeting, traffic confirmed that this tree would not interfere with Sight Distance.
Department: PFA
Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 12/13/2018
02/26/2019:
>Please confirm the location of the FDC in the south-west corner of the building
and show on the Utility or Site plan.The location of the FDC is shown on the utility plan.
>The areas for the address are noted on the elevations. Please note that the
exact address notated will depend on the final address allocated by GIS.
>All other PFA comments have been resolved.
When you submit for your building permit though the City of Fort Collins please
be advised Poudre Fire Authority is an additional and separate submittal. The
link for Poudre Fire Authority’s plan review application can be found at
30Thttps://www.poudre-fire.org/online-services/contractors-plan-reviews-and-permits/new-building-plan-review
-application30T
Department: Internal Services
Contact: Jonathon Nagel, 970-416-2701, jnagel@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/27/2019
02/27/2019: INFORMATION ONLY: Please note because the trash enclosure is
over 6' tall it will require a separate building permit. Noted, thank you.
Department: Light And Power
Contact: Luke Unruh, 9704162724, lunruh@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/18/2018
12/18/2018: Informational;
Electric Capacity Fee, Building Site charges, and any necessary system
modification charges will apply at owners expense. Please see the Electric
Estimating Calculator and Electric Construction Policies, Practices &
Procedures at the following link:
30Thttp://www.fcgov.com/utilities/business/builders-and-developers30T
Comment Number: 2 Comment Originated: 03/04/2019
03/04/2019: Before Construction;
A commercial service information form (C-1 form) and a one-line diagram will
need to be completed and submitted to Light & Power Engineering for review.
A link to the C-1 form is below:
30Thttp://www.fcgov.com/utilities/business/builders-and-developers/development-
30Tforms-guidelines-regulations30T
Department: Environmental Planning
5
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/15/2018
12/15/2018: Ready for mylar. No further comments. Thank you.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/01/2019
03/01/2019: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Noted, thank you.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 14 Comment Originated: 12/14/2018
03/07/2019: FOR APPROVAL-UPDATED:
There are spelling issues. See redlines.The spelling has been corrected.
12/14/2018: FOR APPROVAL:
The Benchmark Statement has been revised. The City has moved to the
NAVD88 vertical datum, and as of January 1, 2015, all projects are required to
be on NAVD88 datum. Please provide the following information for the
Benchmark Statement in the EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR
VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NGVD29 UNADJUSTED (PRIOR CITY OF FORT
COLLINS DATUM) = NAVD88 - X.XX¿.
Comment Number: 15 Comment Originated: 12/14/2018
6
03/07/2019: FOR APPROVAL-UNRESOLVED:
There are line over text issues. See redlines.Drawings have been revised.
12/14/2018: FOR APPROVAL:
There are line over text issues. See redlines.
Comment Number: 19 Comment Originated: 12/14/2018
03/07/2019: FOR APPROVAL-UNRESOLVED:
There is text that needs to be masked. Mask all text in hatched areas. See
redlines.Drawings have been revised.
12/14/2018: FOR APPROVAL:
There is text that needs to be masked. Mask all text in hatched areas. See
redlines.
Comment Number: 22 Comment Originated: 03/07/2019
03/07/2019: FOR APPROVAL:
There are sheet numbering issues. See redlines.Drawings have been revised.
Topic: Landscape Plans
Comment Number: 8 Comment Originated: 12/14/2018
03/07/2019: FOR APPROVAL-UPDATED:
There are line over text issues. See redlines. Drawings have been revised.
12/14/2018: FOR APPROVAL:
There are line over text issues. See redlines. Drawings have been revised.
Comment Number: 21 Comment Originated: 03/07/2019
03/07/2019: FOR APPROVAL:
Some of the easement descriptions shown are incorrect. If they are going to
stay on the plan, they should match what is shown on the Subdivision Plat.
Drawings have been revised.
Topic: Plat
Comment Number: 1 Comment Originated: 12/14/2018
03/07/2019: FOR APPROVAL-UPDATED:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response
letter. Drawings have been revised.
12/14/2018: FOR APPROVAL:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response
letter. Drawings have been revised.
Topic: Site Plan
Comment Number: 3 Comment Originated: 12/14/2018
03/07/2019: FOR APPROVAL-UNRESOLVED:
Some of the bearings shown are incorrect. If they are going to stay on the plan,
they should match what is shown on the Subdivision Plat.
Drawings have been revised.
12/14/2018: FOR APPROVAL:
Some of the bearings & distances shown are incorrect. If they are going to stay
on the plan, they should match what is shown on the Subdivision Plat.
7
Drawings have been revised.
Comment Number: 6 Comment Originated: 12/14/2018
03/07/2019: FOR APPROVAL-UPDATED:
There are line over text issues. See redlines. Drawings have been revised.
12/14/2018: FOR APPROVAL:
There are line over text issues. See redlines. Drawings have been revised.
Comment Number: 20 Comment Originated: 03/07/2019
03/07/2019: FOR APPROVAL:
There is a note that duplicates notes near it. Is this needed? See redlines.
This note has been removed.
Department: Outside Agencies
Contact: Terry Farrill- 970-226-3104 ext 104, tfarrill@fclwd.com,
Topic: General
Comment Number: 1 Comment Originated: 12/20/2018
12/20/2018: The existing 3/4 inch water tap is classified as single family
residential. To reclassify to multi-family the tap must be under one ownership
and all outside irrigation must be by a separate source. The tap fee would be
$32,412.60 for a 1 1/2 inch tap to serve the four dwelling units as multi-family.
The existing tap would have to be abandoned at the main and a new 1 1/2 tap
installed for the proposed configuration.
Tap will be under one ownership.
How will the landscape be irrigated?
The irrigation line will be off the commercial tap.
A reduced pressure principle device is required on the domestic taps.
See notes on utility sheet.
Please do not hesitate to contact me if you have any questions or require