Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutGROWTH LEASING COLORADO - BDR190008 - SUBMITTAL DOCUMENTS - ROUND 1 -Conceptual Review Agenda
Schedule for 12/06/18
281 Conference Room A
Applicant Info
Thursday, December 6, 2018
Time Project Name Project Description
This is a request to build a 7,000 sq ft marijuana
manufacturing facility at 1237 Red Cedar Circle (parcel
#9701213017). This will be a secure site for manufacturing
only, no sales or distribution on site. The immediate area
surrounding the building will be fenced with metal security
fencing. Access to the site is taken from Red Cedar Circle to
the east and a back alley to the west. Thirteen parking
spaces will be provided for employees. The proposed project
is located in the Industrial (I) zone district and will be subject
to Basic Development Review.
11:00 Tom Orfanos
505-570-7745
torfanos@growthleasing.com
Agenda as of 11/28/18 at 11:00 am Page 1 of 1
Growth Leasing
Marijuana Manufacturing
CDR180090
This is a request to build 49 single-family detached homes as
part of the second phase of the Fox Grove Subdivision
located southeast of E Mulberry St and Interstate 25 (parcel
#871220001). Access is taken from Vixen Drive and Fox
Grove Drive to the east, connecting phase one and phase
two. The proposed project is located in the Low Density
Mixed-Use Neighborhood (LMN) zone district and will be
subject to Administrative (Type 1) Review.
9:30
Planner Kai Kleer
DRC
Fox Grove Phase 2
CDR180088
Brandy BH
Planner Jason Holland
DRC Tenae Beane
Klara Rossouw
970-224-5828
klara@ripleydesigninc.com
This is a request to annex, zone, subdivide, and plat
approximately 35.25 acres of property contiguous to the City
Limits along S Timberline Rd north of E Trilby Rd (parcel
#8607400003). The proposed project would seek to rezone
the property with 13 acres of MMN and the remaining 22.25
acres to LMN. The applicant anticipates the MMN to contain
a Memory Care, Assisted Living or Multi-Family Use. The
LMN zoned area would could contain single family or town
home uses. Access is taken from S Timberline Rd to the
east. Proposed access from the north will be taken from
Weeping Willow Dr, Red Willow Drive, and Corona Dr. The
proposed project will be annexed, zoned, subdivided and
platted and will be subject to Planning and Zoning Board
(Type 2) Review.
10:15 Josh Guernsey
970-218-2331
jguernsey@waypointre.com
South Timberline
Legacy Park
2«¬87
«¬14
Hemlock St
Red Cedar Cir
Bristlecone Dr
Lupine Dr
Hibdon Ct
N Mason St
Hickory St
Jerome St
Conifer St
N College Ave
©
Marijuana Growth Manufacturing Leasing
These map products and all underlying data are developed for use by the City of Fort Collins for its internal purposes only, and were not designed or intended for general use by members
of the public. The City makes no representation or warranty as to its accuracy, timeliness, or completeness, and in particular, its accuracy in labeling or displaying dimensions, contours,
property boundaries, or placement of location of any map features thereon. THE CITY OF FORT COLLINS MAKES NO WARRANTY OF MERCHANTABILITY OR WARRANTY FOR
FITNESS OF USE FOR PARTICULAR PURPOSE, EXPRESSED OR IMPLIED, WITH RESPECT TO THESE MAP PRODUCTS OR THE UNDERLYING DATA. Any users of these map
products, map applications, or data, accepts same AS IS, WITH ALL FAULTS, and assumes all responsibility of the use thereof, and further covenants and agrees to hold the City harmless
from and against all damage, loss, or liability arising from any use of this map product, in consideration of the City's having made this information available. Independent verification
of all data
contained herein should be obtained by any users of these products, or underlying data. The City disclaims, and shall not be held liable for any and all damage, loss, or liability, whether
direct,
indirect, or consequential, which arises or may arise from these map products or the use thereof by any person or entity.
1 inch = 333 feet
^_
¤£287
¤£287
¤£287
VU14
«¬1
¦¨§25
¦¨§25
¦¨§25
D
ouglas
Vine
Mountain Vista
Mulberry
Trilby
Lemay
Shields
Harmony
Taft Hill
Prospect
Horsetooth
Drake
Timberline
I
CS
CCN
¤£287
«¬14
Red Cedar Cir
Lupine Dr
Hibdon Ct
Conifer St
J
e
Growth Leasing LLC PDR Application 11.20.18 Page 1 of 2
PRELIMINARY DESIGN REVIEW APPLICATION
FOR GROWTH LEASING INDUSTRIAL SITE AT 1237 RED CEDAR CIRCLE
PROJECT NARRATIVE
Proposed Use – The approximately 1.10 acre site located in north Fort Collins is zoned industrial
and proposed as a manufacturing facility to process marijuana infused products. This will be a
secure site for manufacturing only, no sales or distribution on site. The applicant, Growth Leasing
LLC, will remain the landlord for the property, not the licensee.
Existing improvements – None, undeveloped green field site.
Site Design, Circulation and Architecture – Site will consist of a +/-7000 square foot building placed
on the site to allow for required setbacks, parking, circulation, detention and utilities. The applicant
intends to build a pre-engineered metal building, however, they continue to research other building
materials for the best product for the site and building program. The immediate area surrounding
the building will be fenced with metal security fencing to meet the requirements of Code section
3.8.11. Similar to adjacent properties, there will be a small parking lot for employees with sidewalks
for internal circulation (see site plan for more detail). The applicant prefers to keep all circulation
internal to the site as there will be no public access to the facility.
Compatibility with surrounding area – The surrounding area contains metal buildings similar in form
and layout for industrial use.
Drainage, Detention and Runoff – The consultant team includes Northern Engineering who is
currently completing a survey to determine existing grades and drainage patterns which will
determine the size and location of required detention. There is approximately 0.33 acres (or more)
available on the site with the current layout to accommodate detention (see site plan). All runoff will
be channelized along the drainage swales as well as the parking lot curb and gutter, detained and
released at historic rates to the existing storm sewer infrastructure.
Natural Features – To our knowledge, there are no natural features on the site that would be
affected by the development.
Fire Sprinklers – The facility will utilize fire suppression in critical areas as required by code.
Landscape and Lighting – There are no existing trees on site that would be impacted by the
development. Street trees, parking lot landscape and perimeter landscape will be designed to meet
the requirements of code section 3.2.1 Landscaping and Tree Protection. Site lighting will be
provided for safety and security per code section 3.2.4.
Growth Leasing LLC PDR Application 11.20.18 Page 2 of 2
SPECIFIC QUESTIONS FOR STAFF:
1. Will a connection to the public sidewalk be required since this is intended as a secure
facility with no public access?
2. Per code section 4.28 – Industrial District, subsection E(2)(a) regarding building design, it
appears that industrial manufacturing facilities are exempt from section 3.5.3 – building
standards. Can you please confirm what building improvements will be required for the site?
SCALE: 1” = 30’
Growth Leasing Industrial Site - Fort Collins, CO
PRELIMINARY DEVELOPMENT REVIEW SITE PLAN 0 15 30 60
rome St
Hickory St
N College Ave
Vicinity Map Aerial Site Map
Zoning Map
1 inch = 500 feet
1 inch = 19,081 feet
Mixed Use
CDR180089
Planner Ted Shepard
DRC Todd Sullivan