HomeMy WebLinkAboutMEYERS SUBDIVISION - FDP190006 - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTSKEEFE CIVIL, LLC
825 Union Street
Golden, Colorado 80401
(970) 215-6808
April 4, 2019 Keefe Civil Project Number: 2018-025
Brandy Bethurem Harras
Development Review Coordinator
City of Fort Collins
Community Development and Neighborhood Services
281 North College Avenue
Fort Collins, Colorado 80522
RE: Meyer Subdivision, FDP190006, Round Number 1 Reponses
Dear Brandy:
The purpose of this letter is to provide a written response to the City’s first round of comments on
the Meyer Subdivision (March 29, 2019).
Planning Services
1. The planning and utility drawings have been split into two different sets.
2. Land use table has been provided on cover sheet of planning set.
3. The word “future” has been removed from pole barn.
4. The requested standard notes have been added to the cover sheet of the planning set.
Engineering Development Review
1. As directed by Marc Virata in an email on April 1, 2019, driveway improvements within the
right-of-way and an access permit are no longer required by the City for this project.
2. All stricken marks have been removed from the general notes.
3. Keefe Civil has previously met with Terry Ferrill with FCLWD/SFCSD to review the project.
No construction will be required for the project between the existing water meter and the
water main within Kechter Road. The existing water service from the modular home (to be
relocated) will be extended to the proposed building.
4. The required attorney certification and necessary signature blocks have been added to the
plat.
5. The requested information sheet for the development agreement provided by the Client.
Meyer Subdivision, FDP190006 Keefe Civil Project No.: 2018-025
Page 2 of 2 April 4, 2019
Traffic Operation
1. Client acknowledges the note regarding working with the Engineering Department on the
required frontage improvements agreement.
Poudre Fire Authority
1. The project’s plat and plan sets have been updated to reflect a 16-foot wide fire lane and
easement from the Kechter Road right-of-way up to the circular driveway. Within the
turnaround, the fire lane was widened to 20 feet at the direction of Andrew Rosen (April 1,
2019). Note has been added to the utility plans that the fire lane must meet Poudre Fire
Authority requirements (capable of supporting 40T).
Stormwater Engineering
1. The total area of site disturbance will be over 10,000 square feet and Erosion and
Sediment Control Materials are included with this submittal.
2. The pole barn has been included as part of this submittal.
Forestry
1. As requested, the entire tree inventory has been included on the site plans.
Technical Services
1. The benchmark statements have been updated on the Utility Plans are requested.
2. The easement descriptions have been updated to match the subdivision plat.
3. The line over text issues have been corrected on the plans.
4. All text has been masked within the plans.
Plat
1. Redline comments have been addressed.
Thank you for the opportunity to submit this drainage memo. Please do not hesitate to reach
out to me if you have any questions or comments regarding the above items. (970) 215-6808
Best regards,
Megan L. Keefe, PE / Manager
Keefe Civil, LLC
Enclosures
Cc: Adam Meyer, Owner
Kim Rose, Rose Custom Homes