Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutSPIRIT AT THE RIVER (FORMERLY LINCOLN CORRIDOR HOTEL) - FDP180015 - SUBMITTAL DOCUMENTS - ROUND 3 - DRAINAGE REPORTSPIRIT AT THE RIVER HOTEL
FINAL DRAINAGE REPORT
PREPARED FOR
Spirit at the River Hotel
Fort Collins, Colorado
PREPARED BY
Olsson Associates
1880 Fall River Drive, Suite 200
Loveland, CO 80538
970.461.7733
Contact: Mike Maurer, PE
March 2019
Olsson Project No. 017-0150
i
Table of Contents
1.0 General Location and Description ...................................................................................... 1
1.1 Location ................................................................................................................... 1
1.2 Description of Property ............................................................................................. 1
1.3 Floodplain ................................................................................................................. 1
2.0 Drainage Basin and Sub-Basins ........................................................................................ 1
2.1 Major Basin Description ............................................................................................ 1
2.2 Sub-Basin Description .............................................................................................. 2
3.0 Drainage basin criteria ....................................................................................................... 2
3.1 Development Criteria Reference and Constraints ..................................................... 2
3.2 Hydrological Criteria ................................................................................................. 2
3.3 Hydraulic Criteria ...................................................................................................... 2
3.4 Floodplain Regulations Compliance ......................................................................... 3
3.5 Modifications of Criteria ............................................................................................ 3
4.0 Drainage Facility Design .................................................................................................... 3
4.1 General Concept ...................................................................................................... 3
4.2 Specific Details ......................................................................................................... 3
1. Low Impact Design ............................................................................................... 3
2. Minimum Required Storage Volume ..................................................................... 4
3. Outlet Structure and Spillway ................................................................................ 4
5.0 Conclusions ....................................................................................................................... 5
5.1 Compliance with Standards .................................................................................. 5
5.2 Drainage Concept ................................................................................................. 5
6.0 References ............................................................................................................... 5
List of Tables
Table 1: Proposed Basins.………………………………………………………………………………2
Table 2: Rain Garden Parameters..…….………………………………………………………………3
Table 3: Detention Pond Parmaters…………………………………………………………………….4
ii
List of Appendices
Appendix A: Hydrologic Calculations
Imperviousness, Time of Concentration, Runoff Calculation
Appendix B: Hydraulic Calculations
Detention Volume by the Modified FAA Method
Pond Stage Storage
Detention basin Outlet Structure Design
Rain Garden Sizing Calculations
Storm Sewer Calculations
Appendix C: Referenced Information
Vicinity Map
NRCS Web Soil Survey
FEMA Firm Map
Fort Collins Floodplain map
City of Fort Collins Rainfall Intensity-Duration-Frequency Curves
Urban Drainage Imperviousness Values
Drainage Basin Map
1 | P a g e
1.0 GENERAL LOCATION AND DESCRIPTION
1.1 Location
The proposed project is located in the southeast quarter of section 12, township 7 north, range
69 west of the 6th P.M. City of Fort Collins, County of Larimer, State of Colorado. The proposed
site is bordered on the north by Lincoln Avenue, on the south by the Cache La Poudre River, on
the west by commercial development, and east by a future parking lot for commercial
development. The property address is 301 Lincoln Avenue.
1.2 Description of Property
Currently the site consists of an office building, some storage sheds, a workshop, a paved
parking lot, and a gravel storage area. Development of the site will require demolition of the
existing structures, the paved parking lot and the gravel storage area. The proposed site is 4.37
acres and is being subdivided into 2 lots. One will be waterfront property containing a public
recreational trail and the other will consist of a hotel building with its associated parking, drive
aisles, and detention pond.
Based on the NRCS soil survey the soil present on the site is classified as Hydrologic Group C.
The site currently slopes north to south towards the Cache La Poudre River with an average
slope of 1%.
Changes to the site grading are proposed to ensure proper drainage around the proposed
building and include the construction of a detention pond in the south portion of the property.
1.3 Floodplain
Portions of the property are located within the FEMA-regulatory, Poudre River floodplain and
must conform to the safety regulations of Chapter 10 of City Municipal Code. Any development
in the floodplain must be preceded by an approved floodplain use permit. FEMA Approved
LOMR Effective November 24, 2017, by Case no. 17-08-0075P revising FIRM Panel
08069C0979H Date: May 2, 2012
2.0 DRAINAGE BASIN AND SUB-BASINS
2.1 Major Basin Description
In the existing condition, the site drains to the south into the Cache La Poudre River by overland
flow. Using the rational method, runoff generated on site was calculated to be 2.30 cfs and 9.44
cfs for the 2-year and 100-year storm events respectively.
The existing drainage patterns for the land surrounding the property will not be impacted and
there will be no drainage routed through the site from the surrounding properties.
2 | P a g e
2.2 Sub-Basin Description
Due to proposed changes to the site grading, the site was divided up into 4 drainage basins.
Basin A consists of the proposed building. Runoff generated in this basin will be primarily
captured by roof drains and conveyed to the detention pond via underground storm sewer
system. During short term, high intensity 100-year storms, the roof drains will capture 2.61cfs
while the remaining 5.31cfs will spill into basin D and travel via overland flow towards the
detention pond.
Basin B consists of the detention pond, rain garden, and landscape berm. Runoff generated in
this basin will flow overland into the detention pond
Basin C consists of the portion of this site that does not get conveyed to the detention pond.
This basin consists of mostly landscape and parts of the Poudre Trail expansion.
Basin D consists of the remainder of the site that is tributary to the detention pond and contains
parking, drive aisles, landscape, and hardscape features. Runoff generated in this basin is
designed to flow via overland, curb and gutter, and underground storm sewer to the detention
pond.
Basin Q2 (cfs) Q100 (cfs)
A 2.16 7.92
B 0.23 1.00
C 0.57 2.50
D 2.78 11.96
Table 1. Proposed Basin Runoff
3.0 DRAINAGE BASIN CRITERIA
3.1 Development Criteria Reference and Constraints
The design of the proposed drainage system was completed in accordance with the criteria set
forth in Colorado Urban Drainage and Flood Control District Manual and the amendments that
pertain to Fort Collins.
3.2 Hydrological Criteria
Hydrologic calculations have been prepared in accordance with criteria set forth in Colorado
Urban Drainage and Flood Control District Manual and the amendments that pertain to Fort
Collins.
3.3 Hydraulic Criteria
Hydraulic calculations have been prepared in accordance with the criteria set forth in Colorado
Urban Drainage and Flood Control District Manual and the amendments that pertain to Fort
Collins.
The Colorado Urban Drainage and Flood Control District Stormwater Best Management
3 | P a g e
Practice Design Workbook Rain Garden spreadsheet was used to size the rain garden that is
providing the water quality treatment for the site. The City of Fort Collins Modified FAA Method
spreadsheet was used to size the detention pond.
3.4 Floodplain Regulations Compliance
Portions of the property are located within the FEMA-regulatory, Poudre River floodplain and must
conform to the safety regulations of Chapter 10 of City Municipal Code. Any development in the
floodplain must be preceded by an approved floodplain use permit. FEMA Approved LOMR
Effective November 24, 2017, by Case no. 17-08-0075P revising FIRM Panel 08069C0979H
Date: May 2, 2012.
3.5 Modifications of Criteria
There are no modifications to the criteria for this project.
4.0 DRAINAGE FACILITY DESIGN
4.1 General Concept
In the developed condition, the majority of runoff generated on-site is designed to flow to the
detention pond located in the south portion of the site. Runoff will be conveyed via sheet flow
and curb and gutter to the storm sewer system. Runoff from the building roof will be collected
and conveyed in roof drains, and runoff from the parking and landscape areas will be conveyed
to a curb inlet at the south portion of the site. Flows entering the storm sewer system will be
conveyed to the detention pond before being discharged at a rate no greater than the historic 2-
year runoff rate. An emergency overflow spillway is provided in the detention pond to convey
flows generated in storm events greater than the 100-year event. Considerations were taken to
ensure that the 100-year event would be safely conveyed to the detention pond assuming
complete cogging of inlets on-site.
4.2 Specific Details
1. Low Impact Design
The City of Fort Collins requires Low Impact Design (LID) for new projects. For this project it has
been determined that a rain garden will be used to treat 100% of the impervious area excluding
the undetained flow at the access drives. The rain garden was sized using the Colorado Urban
Drainage and Flood Control District Stormwater Best Management Practice Design Workbook
Rain Garden spreadsheet. The rain garden was designed to drain the WQCV in 12 hours. This
is accomplished by installing an underdrain pipe with an orifice to control the release rate of the
treated stormwater. See Appendix B for the rain garden spreadsheet and Table 2 below for
more details on the raingarden. Refer to the landscape plans for the planted vegetation within
the rain garden.
4 | P a g e
Parameter Value
Bottom of Rain Garden Elevation 4942.50
Top of Rain Garden Elevation 4943.50
Required Volume of Rain Garden 2,085 cubic feet
Provided Volume of Rain Garden 2,183 cubic feet
Required Flat Surface Area 1,599 square feet
Provided Flat Surface Area 1,778 square feet
Table 2. Rain Garden Parameters
2. Minimum Required Storage Volume
The minimum required storage volume for the detention pond was determined using The City of
Fort Collins Modified FAA method spreadsheet (see Appendix B). The WQCV for the site was
determined to be 2,085 cubic feet based on The Colorado Urban Drainage and Flood Control
District Stormwater Best Management Practice Design Workbook Rain Garden spreadsheet.
The WQCV will be treated using the rain garden.
2-Year 100-Year
Required Volume (CF) 1,024 16,730
Provided Volume (CF) 1,350 17,199
WSEL 4943.18 4944.40
Allowable Release Rate (CFS) 1.97 1.97
Provided Release Rate (CFS) 0.6 1.85
Table 3. Detention Pond Parameters
3. Outlet Structure and Spillway
The Outlet structure is designed to release the 100-year volume at the site’s historic 2-year
runoff rate of 1.97 cfs by means of an orifice cut into the side of a CDOT Type C Grate Inlet.
The rim of the inlet is set at the 100-year WSEL and acts as a primary emergency overflow
before the emergency overflow spillway is engaged. This limits the amount of flow going over
the public trail and the potential for erosion in areas downstream of the spillway. The emergency
overflow spillway is also designed with enough width to minimize velocities of flows overtopping
the spillway so that riprap protection of the areas downstream of the spillway will not be
necessary. Flows overtopping the spillway will be conveyed over the bike trail and discharge
directly into the Cache La Poudre River.
5 | P a g e
5.0 CONCLUSIONS
5.1 Compliance with Standards
This report has been prepared in accordance with common engineering practices, the criteria
set forth in Colorado Urban Drainage and Flood Control District Manual and the amendments
that pertain to Fort Collins.
5.2 Drainage Concept
Developed runoff generated on the proposed site will be directed to the rain garden and
detention pond located in the south portion of the site. The rain garden is designed to treat 100
percent of the site WQCV, and the pond outlet structure is designed to release the 100-year
volume at the site’s 2-year historic runoff rate of 1.97 cfs. The raingarden outfall is designed to
release to the detention pond outlet structure via an underdrain system. Raingarden outfall
calculations can be found in Appendix A.
6.0 References
Drainage Criteria Manual, Volumes 1, 2, & 3, Urban Drainage and Flood Control District,
Volumes 1 & 2 – Originally Published September 1969, updated January 2016; Volume 3 –
Originally Published September 1992, updated November 2010
Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual
dated December 2011
6 | P a g e
APPENDIX A
HYDROLOGIC CALCULATIONS
7 | P a g e
APPENDIX B
HYDRAULIC CALCULATIONS
100 Year
This is to convert % imp. to a C value
100-year (must insert % imp. and C pervious).
ft3
acre-ft.
'C' value 0.662 16729.8 0.384
'C' * 1.25 0.83
Area 2.77 acres Modified Modified
Release Rate 1.97 M. FATER D. JUDISH C. LI
May-95 Nov-97 Nov-98
DETENTION POND SIZING
TIME TIME INTENSITY Q 100 Runoff Release Required Required
cum 100 year Volume Cum total Detention Detention
(mins) (secs) (in/hr) (cfs) (ft^3) (ft^3) (ft^3) (ac-ft)
0 0 0 0.00 0 0.0 0.0 0.0000
5 300 9.950 22.81 6842.142 591.0 6251.1 0.1435
10 600 7.720 17.70 10617.35 1182.0 9435.4 0.2166
15 900 6.520 14.94 13450.48 1773.0 11677.5 0.2681
20 1200 5.600 12.84 15403.42 2364.0 13039.4 0.2993
25 1500 4.980 11.42 17122.55 2955.0 14167.5 0.3252
30 1800 4.520 10.36 18649.14 3546.0 15103.1 0.3467
35 2100 4.080 9.35 19639.36 4137.0 15502.4 0.3559
40 2400 3.740 8.57 20574.56 4728.0 15846.6 0.3638
45 2700 3.460 7.93 21413.5 5319.0 16094.5 0.3695
50 3000 3.230 7.40 22211.18 5910.0 16301.2 0.3742
55 3300 3.030 6.95 22919.46 6501.0 16418.5 0.3769
60 3600 2.860 6.56 23600.23 7092.0 16508.2 0.3790
65 3900 2.720 6.23 24315.39 7683.0 16632.4 0.3818
70 4200 2.590 5.94 24934.28 8274.0 16660.3 0.3825
75 4500 2.480 5.68 25580.67 8865.0 16715.7 0.3837
80 4800 2.380 5.46 26185.81 9456.0 16729.8 0.3841
85 5100 2.290 5.25 26770.31 10047.0 16723.3 0.3839
90 5400 2.210 5.07 27354.82 10638.0 16716.8 0.3838
95 5700 2.130 4.88 27829.3 11229.0 16600.3 0.3811
100 6000 2.060 4.72 28331.28 11820.0 16511.3 0.3790
105 6300 2.000 4.58 28881.41 12411.0 16470.4 0.3781
110 6600 1.940 4.45 29349.01 13002.0 16347.0 0.3753
115 6900 1.890 4.33 29892.25 13593.0 16299.3 0.3742
120 7200 1.840 4.22 30366.73 14184.0 16182.7 0.3715
Required detention
Page 1
Project:
Basin ID:
Depth Increment = 0.1 ft
Required Volume Calculation Top of Micropool -- 0.00 -- -- -- 9 0.000
Selected BMP Type = EDB 4942.3 -- 0.10 -- -- -- 106 0.002 6 0.000
Watershed Area = 2.77 acres 4942.4 -- 0.20 -- -- -- 300 0.007 23 0.001
Watershed Length = 600 ft 4942.5 -- 0.30 -- -- -- 2,387 0.055 137 0.003
Watershed Slope = 0.012 ft/ft 4942.6 -- 0.40 -- -- -- 2,832 0.065 393 0.009
Watershed Imperviousness = 66.2% percent 4942.7 -- 0.50 -- -- -- 3,319 0.076 696 0.016
Percentage Hydrologic Soil Group A = 0.0% percent 4942.8 -- 0.60 -- -- -- 3,829 0.088 1,048 0.024
Percentage Hydrologic Soil Group B = 2.7% percent 4942.9 -- 0.70 -- -- -- 4,343 0.100 1,451 0.033
Percentage Hydrologic Soil Groups C/D = 97.3% percent 4943 -- 0.80 -- -- -- 4,862 0.112 1,907 0.044
Desired WQCV Drain Time = 40.0 hours 4943.1 -- 0.90 -- -- -- 5,429 0.125 2,415 0.055
Location for 1-hr Rainfall Depths = User Input 4943.2 -- 1.00 -- -- -- 6,065 0.139 2,984 0.068
Water Quality Capture Volume (WQCV) = 0.060 acre-feet 4943.3 -- 1.10 -- -- -- 6,769 0.155 3,619 0.083
Excess Urban Runoff Volume (EURV) = 0.178 acre-feet 4943.4 -- 1.20 -- -- -- 7,541 0.173 4,326 0.099
2-yr Runoff Volume (P1 = 0.82 in.) = 0.117 acre-feet 0.82 inches 4943.5 -- 1.30 -- -- -- 8,386 0.193 5,114 0.117
5-yr Runoff Volume (P1 = 0 in.) = 0.000 acre-feet inches 4943.6 -- 1.40 -- -- -- 9,229 0.212 5,987 0.137
10-yr Runoff Volume (P1 = 1.4 in.) = 0.234 acre-feet 1.40 inches 4943.7 -- 1.50 -- -- -- 9,976 0.229 6,939 0.159
25-yr Runoff Volume (P1 = 0 in.) = 0.000 acre-feet inches 4943.8 -- 1.60 -- -- -- 10,678 0.245 7,965 0.183
50-yr Runoff Volume (P1 = 0 in.) = 0.000 acre-feet inches 4943.9 -- 1.70 -- -- -- 11,374 0.261 9,061 0.208
100-yr Runoff Volume (P1 = 2.86 in.) = 0.582 acre-feet 2.86 inches 4944 -- 1.80 -- -- -- 12,070 0.277 10,226 0.235
500-yr Runoff Volume (P1 = 0 in.) = 0.000 acre-feet inches 4944.1 -- 1.90 -- -- -- 12,785 0.293 11,462 0.263
Approximate 2-yr Detention Volume = 0.109 acre-feet 4944.2 -- 2.00 -- -- -- 13,464 0.309 12,767 0.293
Approximate 5-yr Detention Volume = 0.000 acre-feet 4944.3 -- 2.10 -- -- -- 14,055 0.323 14,277 0.328
Approximate 10-yr Detention Volume = 0.205 acre-feet 4944.4 -- 2.20 -- -- -- 14,612 0.335 15,711 0.361
Approximate 25-yr Detention Volume = 0.000 acre-feet 4944.5 -- 2.30 -- -- -- 15,151 0.348 17,199 0.395
Approximate 50-yr Detention Volume = 0.000 acre-feet -- -- -- --
Approximate 100-yr Detention Volume = 0.348 acre-feet -- -- -- --
-- -- -- --
Stage-Storage Calculation -- -- -- --
Zone 1 Volume (100-year) = 0.348 acre-feet
-- -- -- --
Select Zone 2 Storage Volume (Optional) = acre-feet
-- -- -- --
Select Zone 3 Storage Volume (Optional) = acre-feet
-- -- -- --
Total Detention Basin Volume = 0.348 acre-feet
-- -- -- --
Initial Surcharge Volume (ISV) = user ft^3
-- -- -- --
Initial Surcharge Depth (ISD) = user ft
-- -- -- --
Total Available Detention Depth (Htotal) = user
ft -- -- -- --
Depth of Trickle Channel (HTC) = user ft
-- -- -- --
Slope of Trickle Channel (STC) = user
ft/ft -- -- -- --
Slopes of Main Basin Sides (Smain) = user
H:V -- -- -- --
Basin Length-to-Width Ratio (RL/W) = user -- -- -- --
-- -- -- --
Initial Surcharge Area (AISV) = user ft^2
-- -- -- --
Surcharge Volume Length (LISV) = user ft
-- -- -- --
Surcharge Volume Width (WISV) = user ft
-- -- -- --
Depth of Basin Floor (HFLOOR) = user ft
Project:
Basin ID:
Stage (ft) Zone Volume (ac-ft) Outlet Type
Zone 1 (100-year) 2.17 0.348 Rectangular Orifice
Zone 2
Zone 3
0.348 Total
User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP) Calculated Parameters for Underdrain
Underdrain Orifice Invert Depth = N/A ft (distance below the filtration media surface) Underdrain Orifice Area = N/A ft2
Underdrain Orifice Diameter = N/A inches Underdrain Orifice Centroid = N/A feet
User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP) Calculated Parameters for Plate
Invert of Lowest Orifice = N/A ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row = N/A ft2
Depth at top of Zone using Orifice Plate = N/A ft (relative to basin bottom at Stage = 0 ft) Elliptical Half-Width = N/A feet
Orifice Plate: Orifice Vertical Spacing = N/A inches Elliptical Slot Centroid = N/A feet
Orifice Plate: Orifice Area per Row = N/A inches Elliptical Slot Area = N/A ft2
User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest)
Row 1 (optional) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional)
Stage of Orifice Centroid (ft) N/A N/A N/A N/A N/A N/A N/A N/A
Orifice Area (sq. inches) N/A N/A N/A N/A N/A N/A N/A N/A
Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional)
Stage of Orifice Centroid (ft) N/A N/A N/A N/A N/A N/A N/A N/A
Orifice Area (sq. inches) N/A N/A N/A N/A N/A N/A N/A N/A
User Input: Vertical Orifice (Circular or Rectangular) Calculated Parameters for Vertical Orifice
Zone 1 Rectangular Not Selected Zone 1 Rectangular Not Selected
Invert of Vertical Orifice = 0.00 ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area = 0.25 ft2
Depth at top of Zone using Vertical Orifice = 2.17 ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid = 0.13 feet
Vertical Orifice Height = 3.00 inches
Vertical Orifice Width = 12.00 inches
User Input: Overflow Weir (Dropbox) and Grate (Flat or Sloped) Calculated Parameters for Overflow Weir
Not Selected Not Selected Not Selected Not Selected
Overflow Weir Front Edge Height, Ho = 2.17 ft (relative to basin bottom at Stage = 0 ft) Height of Grate Upper Edge, Ht = 2.17 feet
Overflow Weir Front Edge Length = 2.92 feet Over Flow Weir Slope Length = 2.92 feet
Overflow Weir Slope = 0.00 H:V (enter zero for flat grate) Grate Open Area / 100-yr Orifice Area = 4.86 should be > 4
Horiz. Length of Weir Sides = 2.92 feet Overflow Grate Open Area w/o Debris = 5.97 ft2
Overflow Grate Open Area % = 70% %, grate open area/total area Overflow Grate Open Area w/ Debris = 2.98 ft2
Debris Clogging % = 50% %
User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice) Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate
Not Selected Not Selected Not Selected Not Selected
Depth to Invert of Outlet Pipe = 1.86 ft (distance below basin bottom at Stage = 0 ft) Outlet Orifice Area = 1.23 ft2
Circular Orifice Diameter = 15.00 inches Outlet Orifice Centroid = 0.63 feet
Half-Central Angle of Restrictor Plate on Pipe = N/A N/A radians
User Input: Emergency Spillway (Rectangular or Trapezoidal) Calculated Parameters for Spillway
Spillway Invert Stage= 2.30 ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= 0.64 feet
Spillway Crest Length = 3.00 feet Stage at Top of Freeboard = 3.94 feet
Spillway End Slopes = 4.00 H:V Basin Area at Top of Freeboard = 0.35 acres
Freeboard above Max Water Surface = 1.00 feet
Routed Hydrograph Results
Design Storm Return Period = WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 Year
One-Hour Rainfall Depth (in) = 0.53 1.07 0.82 0.00 1.40 0.00 0.00 2.86 0.00
Calculated Runoff Volume (acre-ft) = 0.060 0.178 0.117 0.000 0.234 0.000 0.000 0.582 0.000
OPTIONAL Override Runoff Volume (acre-ft) =
Inflow Hydrograph Volume (acre-ft) = 0.059 0.177 0.117 #N/A 0.233 #N/A #N/A 0.581 #N/A
Predevelopment Unit Peak Flow, q (cfs/acre) = 0.00 0.00 0.01 0.00 0.21 0.00 0.00 1.23 0.00
Predevelopment Peak Q (cfs) = 0.0 0.0 0.0 0.0 0.6 0.0 0.0 3.4 0.0
Peak Inflow Q (cfs) = 0.8 2.4 1.6 #N/A 3.2 #N/A #N/A 7.9 #N/A
Peak Outflow Q (cfs) = 0.6 1.1 0.9 #N/A 1.246 #N/A #N/A 1.85 #N/A
Ratio Peak Outflow to Predevelopment Q = N/A N/A N/A #N/A 2.2 #N/A #N/A 0.5 #N/A
Structure Controlling Flow = Vertical Orifice 1 Vertical Orifice 1 Vertical Orifice 1 #N/A Vertical Orifice 1 #N/A #N/A Overflow Grate 1 #N/A
Max Velocity through Grate 1 (fps) = N/A N/A N/A #N/A N/A #N/A #N/A 0.0 #N/A
Max Velocity through Grate 2 (fps) = N/A N/A N/A #N/A N/A #N/A #N/A N/A #N/A
COUNTA for Basin Tab = 1 Ao Dia WQ Plate Type Vert Orifice 1 Vert Orifice 2
Count_Underdrain = 0 0.11(diameter = 3/8 inch) 1 3 1
Count_WQPlate = 0 0.1(4diameter = 7/16 inch)
Count_VertOrifice1 = 1 0.18(diameter = 1/2 inch) Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean
Count_VertOrifice2 = 0 0.2(4diameter = 9/16 inch) 2 1 5yr, <72hr #N/A 0
Count_Weir1 = 1 0.29(diameter = 5/8 inch) >5yr, <120hr #N/A 0
Count_Weir2 = 0 0.(36 diameter = 11/16 inch) Max Depth Row
Count_OutletPipe1 = 1 0.42(diameter = 3/4 inch) WQCV 38 Watershed Constraint Check
Count_OutletPipe2 = 0 0.(50 diameter = 13/16 inch) 2 Year 68 Slope 0.012
COUNTA_2 (Standard FSD Setup)= 0 0.58(diameter = 7/8 inch) EURV 97 Shape 2.98
MaxPondDepth_Error? FALSE 0.(67 diameter = 15/16 inch) 5 Year #N/A
Hidden Parameters & Calculations 0.76 (diameter = 1 inch) 10 Year 120 Spillway Depth
(diameter 0.86 = 1-1/16 inches) 25 Year #N/A 0.64
WQ Plate Flow at 100yr depth = 0.00 (0.diameter 97 = 1-1/8 inches) 50 Year #N/A
CLOG #1= 35% (diameter 1.08 = 1-3/16 inches) 100 Year 221 1 Z1_Boolean
Cdw #1 = 1.15 (1.diameter 20 = 1-1/4 inches) 500 Year #N/A 1 Z2_Boolean
Cdo #1 = 1.07 (diameter 1.32 = 1-5/16 inches) Zone3_Pulldown Message 1 Z3_Boolean
Overflow Weir #1 Angle = 0.000 (1.diameter 45 = 1-3/8 inches) 1 Opening Message
CLOG #2= 0% (diameter 1.59 = 1-7/16 inches) Draintime Running
Cdw #2 = (1.diameter 73 = 1-1/2 inches) Outlet Boolean Outlet Rank Total (1 to 4)
Cdo #2 = (diameter 1.88 = 1-9/16 inches) Vertical Orifice 1 1 1 2
Overflow Weir #2 Angle = (2.diameter 03 = 1-5/8 inches) Vertical Orifice 2 0 0 Boolean
Underdrain Q at 100yr depth = 0.00 (diameter 2.20 = 1-11/16 inches) Overflow Weir 1 1 2 0 Max Depth
VertOrifice1 Q at 100yr depth = 1.73 (2.diameter 36 = 1-3/4 inches) Overflow Weir 2 0 0 0 500yr Depth
VertOrifice2 Q at 100yr depth = 0.00 (diameter 2.54 = 1-13/16 inches) Outlet Pipe 1 1 2 0 Freeboard
EURV_draintime_user = (2.diameter 72 = 1-7/8 inches) Outlet Pipe 2 0 0 1 Spillway
Count_User_Hydrographs #N/A (diameter 2.90 = 1-15/16 inches) 0 Spillway Length
CountA_3 (EURV & 100yr) = 1 3.09(diameter = 2 inches) Button Visibility Boolean FALSE Time Interval
CountA_4 (100yr Only) = 1 (use 3.29 rectangular openings) 1 Button_Trigger
0 Underdrain
0 WQCV Plate
0 EURV-WQCV Plate
0 EURV-WQCV VertOrifice
0 Outlet 90% Qpeak
0 Outlet Undetained
S-A-V-D Chart Axis Override X-axis Left Y-Axis Right Y-Axis
minimum bound
maximum bound
UD-Detention, Version 3.07 (February 2017)
Detention Basin Outlet Structure Design
0
1
2
3
4
5
6
7
8
9
0.1 1 10
FLOW [cfs]
TIME [hr]
500YR IN
500YR OUT
100YR IN
100YR OUT
50YR IN
50YR OUT
25YR IN
Outflow Hydrograph Workbook Filename:
Storm Inflow Hydrographs
The user can override the calculated inflow hydrographs from this workbook with inflow hydrographs developed in a separate program.
SOURCE WORKBOOK WORKBOOK WORKBOOK #N/A WORKBOOK #N/A #N/A WORKBOOK #N/A
Time Interval TIME WQCV [cfs] EURV [cfs] 2 Year [cfs] 5 Year [cfs] 10 Year [cfs] 25 Year [cfs] 50 Year [cfs] 100 Year [cfs] 500 Year [cfs]
6.14 min 0:00:00 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
0:06:08 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
Hydrograph 0:12:17 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
Constant 0:18:25 0.04 0.11 0.07 #N/A 0.14 #N/A #N/A 0.35 #N/A
0.814 0:24:34 0.10 0.30 0.20 #N/A 0.39 #N/A #N/A 0.94 #N/A
0:30:42 0.26 0.76 0.50 #N/A 0.99 #N/A #N/A 2.41 #N/A
0:36:50 0.71 2.09 1.39 #N/A 2.72 #N/A #N/A 6.63 #N/A
0:42:59 0.82 2.44 1.61 #N/A 3.19 #N/A #N/A 7.86 #N/A
0:49:07 0.78 2.32 1.53 #N/A 3.03 #N/A #N/A 7.50 #N/A
0:55:16 0.71 2.11 1.39 #N/A 2.76 #N/A #N/A 6.83 #N/A
1:01:24 0.62 1.87 1.23 #N/A 2.45 #N/A #N/A 6.09 #N/A
1:07:32 0.53 1.60 1.05 #N/A 2.10 #N/A #N/A 5.26 #N/A
1:13:41 0.46 1.40 0.92 #N/A 1.84 #N/A #N/A 4.58 #N/A
1:19:49 0.42 1.26 0.83 #N/A 1.66 #N/A #N/A 4.15 #N/A
1:25:58 0.34 1.03 0.67 #N/A 1.36 #N/A #N/A 3.42 #N/A
1:32:06 0.27 0.83 0.54 #N/A 1.10 #N/A #N/A 2.79 #N/A
1:38:14 0.20 0.63 0.40 #N/A 0.83 #N/A #N/A 2.15 #N/A
1:44:23 0.14 0.45 0.29 #N/A 0.61 #N/A #N/A 1.60 #N/A
1:50:31 0.10 0.33 0.21 #N/A 0.44 #N/A #N/A 1.16 #N/A
1:56:40 0.08 0.26 0.17 #N/A 0.35 #N/A #N/A 0.90 #N/A
2:02:48 0.07 0.22 0.14 #N/A 0.29 #N/A #N/A 0.74 #N/A
2:08:56 0.06 0.19 0.12 #N/A 0.24 #N/A #N/A 0.63 #N/A
2:15:05 0.05 0.16 0.11 #N/A 0.22 #N/A #N/A 0.55 #N/A
2:21:13 0.05 0.15 0.10 #N/A 0.19 #N/A #N/A 0.50 #N/A
2:27:22 0.04 0.14 0.09 #N/A 0.18 #N/A #N/A 0.46 #N/A
2:33:30 0.03 0.10 0.07 #N/A 0.13 #N/A #N/A 0.34 #N/A
2:39:38 0.02 0.07 0.05 #N/A 0.10 #N/A #N/A 0.25 #N/A
2:45:47 0.02 0.05 0.03 #N/A 0.07 #N/A #N/A 0.18 #N/A
2:51:55 0.01 0.04 0.03 #N/A 0.05 #N/A #N/A 0.13 #N/A
2:58:04 0.01 0.03 0.02 #N/A 0.04 #N/A #N/A 0.09 #N/A
3:04:12 0.01 0.02 0.01 #N/A 0.03 #N/A #N/A 0.07 #N/A
3:10:20 0.00 0.01 0.01 #N/A 0.02 #N/A #N/A 0.05 #N/A
3:16:29 0.00 0.01 0.01 #N/A 0.01 #N/A #N/A 0.03 #N/A
3:22:37 0.00 0.00 0.00 #N/A 0.01 #N/A #N/A 0.02 #N/A
3:28:46 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.01 #N/A
3:34:54 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
3:41:02 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
3:47:11 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
3:53:19 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
3:59:28 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
4:05:36 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
4:11:44 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
4:17:53 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
4:24:01 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
4:30:10 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
4:36:18 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
4:42:26 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
4:48:35 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
4:54:43 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
5:00:52 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
5:07:00 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
5:13:08 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
5:19:17 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
5:25:25 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
5:31:34 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia = 66.2 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.662
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.21 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area) Area = 120,802 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = 0.43 in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 2,084.7 cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum) DWQCV = 12.0 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin = 1599 sq ft
D) Actual Flat Surface Area AActual = 1778 sq ft
E) Area at Design Depth (Top Surface Area) ATop = 2588 sq ft
F) Rain Garden Total Volume VT= 2,183 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y = 2.0 ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 = 2,085 cu ft
iii) Orifice Diameter, 3/8" Minimum DO = 1 in
Design Procedure Form: Rain Garden (RG)
Mark Gibbs
Olsson Assocaites
September 4, 2018
Spirit at the River Hotel (017-0150)
Fort Collins, CO
UD-BMP (Version 3.06, November 2016)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
Rain Garden Calcs, RG 9/4/2018, 10:16 AM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
PROVIDE A 30 MIL (MIN) PVC LINER WITH CDOT CLASS B
GEOTEXTILE ABOVE IT. USE THE SAME GEOTEXTILE BELOW
THE LINER IF THE SUBGRADE IS ANGULAR
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
Mark Gibbs
Olsson Assocaites
September 4, 2018
Spirit at the River Hotel (017-0150)
Fort Collins, CO
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
Rain Garden Calcs, RG 9/4/2018, 10:16 AM
8"
3"
8"
8" FIRE LINE
SHOWN FOR REFERENCE
ONLY
3" DOMESTIC WATER TAP
RE: CIVIL FOR CONT.
8"W RE: CIVIL FOR
CONTINUATION
GR GR
4"GR OUT TO WARMING
KITCHEN
WASTE BELOW SLAB
WASTE BELOW SLAB
SD
SD
SD
STR
157
ELEC.
118
DEN
116
FITNESS
120
POOL EQUIP.
124A
POOL
124
MEN
118A
WOMEN
118B
GUEST
LAUNDRY
122
STR
149
WASTE UP TO
FLOOR CLEANOUT
ABOVE
MG
2" 14"WC GAS RE: CIVIL FOR CONTINUATION
3"CW UP THROUGH SLAB
8" FIRE UP THROUGH
SLAB SHOWN FOR
REF. ONLY
3"
8"
WASTE UP TO
FLOOR CLEANOUT
ABOVE
8"W UP TO 8"FLOOR
SINK
4"
4"WASTE RISER UP
TO GARAGE CEILING
SPACE
8" 6" 6"
SN Element X Coordinate Y Coordinate Invert Ground/Rim Ground/Rim Initial Surcharge Minimum Peak Peak Maximum Maximum Minimum Average Average Time of
ID Elevation (Max) (Max) Water Elevation Pipe Cover Inflow Lateral HGL HGL Freeboard HGL HGL Maximum
Elevation Offset Elevation Inflow Elevation Depth Attained Elevation Depth HGL
Attained Attained Attained Attained Occurrence
(ft) (ft) (ft) (ft) (ft) (inches) (cfs) (cfs) (ft) (ft) (ft) (ft) (ft) (days hh:mm)
1 AI-300 3120847.26 1457322.12 4945.08 4947.35 2.27 4945.08 4947.35 17.23 1.00 0.10 4945.62 0.54 1.73 4945.58 0.50 0 00:05
2 AI-420 3120863.26 1457397.62 4946.41 4949.98 3.57 4946.41 4949.98 36.87 1.49 0.57 4949.50 3.09 0.47 4946.58 0.17 0 00:05
3 AI-421 3120835.42 1457439.99 4947.33 4950.98 3.65 4947.33 4950.98 37.81 0.97 0.97 4950.98 3.65 0.00 4947.50 0.17 0 00:03
4 BEND-100 3120690.57 1457225.12 4943.50 4945.21 1.71 4943.50 4945.21 12.52 0.70 0.00 4944.22 0.72 1.00 4943.92 0.42 0 00:09
5 BEND-101 3120690.57 1457492.28 4949.90 4951.27 1.37 4949.90 4951.27 12.40 0.25 0.00 4950.13 0.23 1.14 4950.12 0.22 0 00:01
6 BEND-301 3120803.81 1457182.72 4943.23 4945.29 2.06 4943.23 4945.29 14.71 1.09 0.00 4944.59 1.36 0.70 4943.82 0.59 0 00:05
7 BEND-302 3120864.10 1457222.34 4943.88 4945.94 2.06 4943.88 4945.94 14.73 1.00 0.00 4944.55 0.67 1.39 4944.26 0.38 0 00:07
8 BEND-303 3120875.08 1457275.42 4944.37 4946.44 2.07 4944.37 4946.44 14.88 0.99 0.00 4944.81 0.44 1.63 4944.77 0.40 0 00:05
9 BEND-304 3120875.08 1457298.52 4944.57 4946.76 2.18 4944.57 4946.76 16.20 1.00 0.00 4945.07 0.50 1.69 4945.03 0.46 0 00:05
10 BEND-305 3120851.48 1457322.12 4945.03 4947.06 2.03 4945.03 4947.06 14.41 1.00 0.00 4945.44 0.41 1.61 4945.41 0.38 0 00:05
11 BEND-306 3120789.30 1457346.67 4946.89 4947.98 1.10 4946.89 4947.98 7.18 0.08 0.00 4946.97 0.08 1.01 4946.97 0.08 0 00:01
12 BEND-310 3120781.14 1457322.12 4945.58 4946.73 1.15 4945.58 4946.73 3.81 0.34 0.00 4946.03 0.45 0.70 4946.02 0.44 0 00:59
13 BEND-401 3120805.70 1457180.38 4943.09 4945.16 2.07 4943.09 4945.16 14.85 1.90 0.00 4944.81 1.72 0.35 4943.77 0.68 0 00:04
14 BEND-402 3120866.78 1457220.52 4943.45 4945.46 2.00 4943.45 4945.46 14.03 1.97 0.00 4945.46 2.01 0.00 4943.98 0.53 0 00:04
15 BEND-403 3120922.00 1457563.47 4947.71 4949.08 1.37 4947.71 4949.08 12.40 0.07 0.00 4947.84 0.13 1.24 4947.83 0.12 0 00:03
16 BEND-404 3120922.00 1457487.38 4946.78 4948.18 1.39 4946.78 4948.18 12.72 0.07 0.00 4946.90 0.12 1.27 4946.90 0.12 0 00:05
17 BEND-410 3120874.66 1457469.23 4948.55 4950.09 1.54 4948.55 4950.09 12.45 0.72 0.00 4948.84 0.29 1.25 4948.84 0.29 0 00:00
18 CI-601 3120821.55 1457180.43 4943.79 4945.59 1.81 4943.79 4945.59 6.68 11.67 11.67 4945.59 1.80 0.00 4944.02 0.23 0 00:04
19 OS-1 3120697.83 1457085.88 4940.34 4944.37 4.03 4940.34 4944.37 33.42 0.00 0.00 4940.34 0.00 4.03 4940.34 0.00 0 00:00
20 RD-100 3120718.28 1457413.28 4950.77 4952.40 1.62 4950.77 4952.40 13.48 0.43 0.43 4950.95 0.18 1.44 4950.95 0.18 0 00:01
21 RD-101 3120715.66 1457492.28 4951.13 4952.49 1.37 4951.13 4952.49 12.40 0.23 0.23 4951.34 0.21 1.16 4951.31 0.18 0 00:00
22 RD-200 3120783.54 1457230.01 4943.50 4946.94 3.44 4943.50 4946.94 33.28 0.33 0.33 4946.83 3.33 0.11 4943.81 0.31 0 00:05
23 RD-300 3120818.71 1457322.12 4945.47 4947.35 1.88 4945.47 4947.35 12.55 0.90 0.31 4945.87 0.40 1.48 4945.87 0.40 0 01:00
24 RD-301 3120789.30 1457343.33 4946.58 4948.92 2.34 4946.58 4948.92 22.08 0.32 0.24 4946.77 0.19 2.15 4946.76 0.18 0 00:00
25 RD-302 3120786.30 1457346.67 4947.16 4949.04 1.88 4947.16 4949.04 16.58 0.08 0.08 4947.26 0.10 1.78 4947.25 0.09 0 00:00
26 RD-310 3120781.14 1457321.53 4945.58 4948.72 3.13 4945.58 4948.72 27.60 0.27 0.27 4946.04 0.46 2.67 4946.04 0.46 0 00:59
27 RD-400 3120775.27 1457563.47 4950.72 4951.91 1.19 4950.72 4951.91 10.28 0.06 0.06 4950.83 0.11 1.08 4950.82 0.10 0 00:01
28 RD-410 3120824.54 1457469.23 4950.35 4951.89 1.54 4950.35 4951.89 12.45 0.28 0.28 4950.53 0.18 1.35 4950.52 0.17 0 00:00
29 RD-411 3120857.35 1457472.98 4950.07 4952.11 2.04 4950.07 4952.11 18.42 0.38 0.38 4950.29 0.22 1.81 4950.24 0.17 0 00:00
30 REDUCER-100 3120690.57 1457417.15 4948.10 4949.81 1.71 4948.10 4949.81 12.53 0.24 0.00 4948.35 0.25 1.47 4948.34 0.24 0 00:01
31 REDUCER-200 3120783.54 1457179.11 4943.04 4945.09 2.05 4943.04 4945.09 12.60 0.38 0.00 4944.60 1.56 0.49 4943.75 0.71 0 00:05
32 REDUCER-400 3120917.80 1457467.08 4946.53 4948.44 1.91 4946.53 4948.44 12.96 0.17 0.00 4946.78 0.25 1.66 4946.77 0.24 0 00:01
33 TEE-100 3120690.57 1457413.28 4948.01 4949.17 1.16 4948.01 4949.17 5.90 0.66 0.00 4948.29 0.28 0.88 4948.27 0.26 0 00:01
34 TEE-300 3120789.31 1457322.12 4945.55 4947.43 1.88 4945.55 4947.43 12.55 0.59 0.00 4946.01 0.46 1.42 4946.01 0.46 0 01:00
35 TEE-401 3120916.46 1457460.58 4946.45 4948.36 1.92 4946.45 4948.36 12.99 0.72 0.00 4946.78 0.33 1.59 4946.77 0.32 0 00:01
36 TEE-410 3120857.35 1457469.23 4949.33 4950.87 1.54 4949.33 4950.87 12.45 0.69 0.00 4949.69 0.36 1.17 4949.65 0.32 0 00:00
37 TEE-411 3120901.78 1457389.65 4945.56 4947.54 1.97 4945.56 4947.54 13.67 2.21 0.00 4946.40 0.84 1.14 4945.89 0.33 0 00:06
38 WYE-200 3120783.54 1457158.56 4942.85 4944.90 2.05 4942.85 4944.90 12.60 3.11 0.00 4944.38 1.53 0.52 4943.68 0.83 0 00:05
39 WYE-201 3120783.54 1457162.77 4942.89 4944.95 2.06 4942.89 4944.95 12.75 1.48 0.00 4944.39 1.50 0.56 4943.74 0.85 0 00:05
40 WYE-202 3120783.54 1457132.15 4942.61 4944.66 2.05 4942.61 4944.66 12.60 3.68 0.00 4943.87 1.26 0.79 4943.49 0.88 0 00:05
SSA 100 YEAR STORM RESULTS
+ ,-./0.12345. 637101893-
+ ,-./0.12345. 637101893-
Project:
Inlet ID:
Gutter Geometry (Enter data in the blue cells)
Maximum Allowable Width for Spread Behind Curb TBACK = 5.0 ft
Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.140 ft/ft
Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.020
Height of Curb at Gutter Flow Line HCURB = 6.00 inches
Distance from Curb Face to Street Crown TCROWN = 26.0 ft
Gutter Width W = 2.00 ft
Street Transverse Slope SX = 0.024 ft/ft
Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft
Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft
Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.015
Minor Storm Major Storm
Max. Allowable Spread for Minor & Major Storm TMAX = 26.0 26.0 ft
Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 12.0 inches
Check boxes are not applicable in SUMP conditions
MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm
MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs
Version 4.05 Released March 2017
ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm)
(Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread)
SPIRIT AT THE RIVER
CI-601
UD-Inlet_v4.05 (1).xlsm, CI-601 12/12/2018, 2:21 PM
Design Information (Input) MINOR MAJOR
Type of Inlet Type =
Local Depression (additional to continuous gutter depression 'a' from above) alocal = 3.00 3.00 inches
Number of Unit Inlets (Grate or Curb Opening) No = 2 2
Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 8.9 inches
Grate Information MINOR MAJOR
Length of a Unit Grate Lo (G) = N/A N/A feet
Width of a Unit Grate Wo = N/A N/A feet
Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A
Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A
Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A
Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A
Curb Opening Information MINOR MAJOR
Length of a Unit Curb Opening Lo (C) = 5.00 5.00 feet
Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches
Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches
Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees
Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet
Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10
Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.60 3.60
Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67
Low Head Performance Reduction (Calculated) MINOR MAJOR
Depth for Grate Midwidth dGrate = N/A N/A ft
Depth for Curb Opening Weir Equation dCurb = 0.33 0.58 ft
Combination Inlet Performance Reduction Factor for Long Inlets RFCombination = 0.57 0.84
Curb Opening Performance Reduction Factor for Long Inlets RFCurb = 0.93 1.00
Grated Inlet Performance Reduction Factor for Long Inlets RFGrate = N/A N/A
MINOR MAJOR
Total Inlet Interception Capacity (assumes clogged condition) Qa = 10.5 22.0 cfs
Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK) Q PEAK REQUIRED = 2.8 17.3 cfs
CDOT Type R Curb Opening
INLET IN A SUMP OR SAG LOCATION
Version 4.05 Released March 2017
H-Vert
H-Curb
W
Lo (C)
Lo (G)
Wo
WP
CDOT Type R Curb Opening
Override Depths
UD-Inlet_v4.05 (1).xlsm, CI-601 12/12/2018, 2:21 PM
Project Description
Solve For Headwater Elevation
Input Data
Discharge 6.60 ft³/s
Crest Elevation 0.00 ft
Tailwater Elevation 0.00 ft
Crest Surface Type Gravel
Crest Breadth 60.00 ft
Crest Length 22.00 ft
Results
Headwater Elevation 0.24 ft
Headwater Height Above Crest 0.24 ft
Tailwater Height Above Crest 0.00 ft
Weir Coefficient 2.60 US
Submergence Factor 1.00
Adjusted Weir Coefficient 2.60 US
Flow Area 5.21 ft²
Velocity 1.27 ft/s
Wetted Perimeter 22.47 ft
Top Width 22.00 ft
Spillway Calculation
7/23/2018 1:00:06 PM
Bentley Systems, Inc. Haestad Methods Solution Bentley Center FlowMaster V8i (SELECTseries 1) [08.11.01.03]
27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1
Project Description
Friction Method Manning Formula
Solve For Normal Depth
Input Data
Roughness Coefficient 0.010
Channel Slope 1.79000 %
Diameter 15.00 in
Discharge 11.96 ft³/s
Results
Normal Depth 1.12 ft
Flow Area 1.16 ft²
Wetted Perimeter 3.11 ft
Hydraulic Radius 0.37 ft
Top Width 0.76 ft
Critical Depth 1.22 ft
Percent Full 89.7 %
Critical Slope 0.01793 ft/ft
Velocity 10.30 ft/s
Velocity Head 1.65 ft
Specific Energy 2.77 ft
Froude Number 1.47
Maximum Discharge 12.09 ft³/s
Discharge Full 11.23 ft³/s
Slope Full 0.02029 ft/ft
Flow Type SuperCritical
GVF Input Data
Downstream Depth 0.00 ft
Length 0.00 ft
Number Of Steps 0
GVF Output Data
Upstream Depth 0.00 ft
Profile Description
Profile Headloss 0.00 ft
Average End Depth Over Rise 0.00 %
Normal Depth Over Rise 89.74 %
Downstream Velocity Infinity ft/s
STRM-600 100-YR FLOW CALCULATION
9/4/2018 10:14:19 AM
Bentley Systems, Inc. Haestad Methods Solution Bentley Center FlowMaster V8i (SELECTseries 1) [08.11.01.03]
27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2
GVF Output Data
Upstream Velocity Infinity ft/s
Normal Depth 1.12 ft
Critical Depth 1.22 ft
Channel Slope 1.79000 %
Critical Slope 0.01793 ft/ft
STRM-600 100-YR FLOW CALCULATION
9/4/2018 10:14:19 AM
Bentley Systems, Inc. Haestad Methods Solution Bentley Center FlowMaster V8i (SELECTseries 1) [08.11.01.03]
27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2
1880 Fall River Drive
Suite 200
Loveland, CO 80538
TEL 970.461.7733
8 | P a g e
APPENDIX C
REFERENCED INFORMATION
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
R
1880 Fall River Drive
Vicinity Map Lincoln Ave Suite 200
Site
SITE
9
Custom Soil Resource Report
Soil Map
4492850 4492880 4492910 4492940 4492970 4493000 4493030 4493060 4493090 4493120
4492850 4492880 4492910 4492940 4492970 4493000 4493030 4493060 4493090 4493120
494370 494400 494430 494460 494490 494520 494550
494370 494400 494430 494460 494490 494520 494550
40° 35' 20'' N
105° 4' 0'' W
40° 35' 20'' N
105° 3' 51'' W
40° 35' 10'' N
105° 4' 0'' W
40° 35' 10'' N
105° 3' 51'' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84
0 50 100 200 300
Feet
0 20 40 80 120
Meters
Map Scale: 1:1,410 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
64 Loveland clay loam, 0 to 1
percent slopes
4.0 97.3%
105 Table Mountain loam, 0 to 1
percent slopes
0.1 2.7%
Totals for Area of Interest 4.1 100.0%
Map Unit Descriptions
The map units delineated on the detailed soil maps in a soil survey represent the
soils or miscellaneous areas in the survey area. The map unit descriptions, along
with the maps, can be used to determine the composition and properties of a unit.
A map unit delineation on a soil map represents an area dominated by one or more
major kinds of soil or miscellaneous areas. A map unit is identified and named
according to the taxonomic classification of the dominant soils. Within a taxonomic
class there are precisely defined limits for the properties of the soils. On the
landscape, however, the soils are natural phenomena, and they have the
characteristic variability of all natural phenomena. Thus, the range of some
observed properties may extend beyond the limits defined for a taxonomic class.
Areas of soils of a single taxonomic class rarely, if ever, can be mapped without
including areas of other taxonomic classes. Consequently, every map unit is made
up of the soils or miscellaneous areas for which it is named and some minor
components that belong to taxonomic classes other than those of the major soils.
Most minor soils have properties similar to those of the dominant soil or soils in the
map unit, and thus they do not affect use and management. These are called
noncontrasting, or similar, components. They may or may not be mentioned in a
particular map unit description. Other minor components, however, have properties
and behavioral characteristics divergent enough to affect use or to require different
management. These are called contrasting, or dissimilar, components. They
generally are in small areas and could not be mapped separately because of the
scale used. Some small areas of strongly contrasting soils or miscellaneous areas
are identified by a special symbol on the maps. If included in the database for a
given area, the contrasting minor components are identified in the map unit
descriptions along with some characteristics of each. A few areas of minor
components may not have been observed, and consequently they are not
mentioned in the descriptions, especially where the pattern was so complex that it
was impractical to make enough observations to identify all the soils and
miscellaneous areas on the landscape.
The presence of minor components in a map unit in no way diminishes the
usefulness or accuracy of the data. The objective of mapping is not to delineate
pure taxonomic classes but rather to separate the landscape into landforms or
landform segments that have similar use and management requirements. The
delineation of such segments on the map provides sufficient information for the
development of resource plans. If intensive use of small areas is planned, however,
Custom Soil Resource Report
11
onsite investigation is needed to define and locate the soils and miscellaneous
areas.
An identifying symbol precedes the map unit name in the map unit descriptions.
Each description includes general facts about the unit and gives important soil
properties and qualities.
Soils that have profiles that are almost alike make up a soil series. Except for
differences in texture of the surface layer, all the soils of a series have major
horizons that are similar in composition, thickness, and arrangement.
Soils of one series can differ in texture of the surface layer, slope, stoniness,
salinity, degree of erosion, and other characteristics that affect their use. On the
basis of such differences, a soil series is divided into soil phases. Most of the areas
shown on the detailed soil maps are phases of soil series. The name of a soil phase
commonly indicates a feature that affects use or management. For example, Alpha
silt loam, 0 to 2 percent slopes, is a phase of the Alpha series.
Some map units are made up of two or more major soils or miscellaneous areas.
These map units are complexes, associations, or undifferentiated groups.
A complex consists of two or more soils or miscellaneous areas in such an intricate
pattern or in such small areas that they cannot be shown separately on the maps.
The pattern and proportion of the soils or miscellaneous areas are somewhat similar
in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example.
An association is made up of two or more geographically associated soils or
miscellaneous areas that are shown as one unit on the maps. Because of present
or anticipated uses of the map units in the survey area, it was not considered
practical or necessary to map the soils or miscellaneous areas separately. The
pattern and relative proportion of the soils or miscellaneous areas are somewhat
similar. Alpha-Beta association, 0 to 2 percent slopes, is an example.
An undifferentiated group is made up of two or more soils or miscellaneous areas
that could be mapped individually but are mapped as one unit because similar
interpretations can be made for use and management. The pattern and proportion
of the soils or miscellaneous areas in a mapped area are not uniform. An area can
be made up of only one of the major soils or miscellaneous areas, or it can be made
up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example.
Some surveys include miscellaneous areas. Such areas have little or no soil
material and support little or no vegetation. Rock outcrop is an example.
Custom Soil Resource Report
12
Larimer County Area, Colorado
64—Loveland clay loam, 0 to 1 percent slopes
Map Unit Setting
National map unit symbol: jpx9
Elevation: 4,800 to 5,500 feet
Mean annual precipitation: 13 to 15 inches
Mean annual air temperature: 48 to 50 degrees F
Frost-free period: 135 to 150 days
Farmland classification: Prime farmland if irrigated
Map Unit Composition
Loveland and similar soils: 90 percent
Minor components: 10 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Loveland
Setting
Landform: Flood plains, stream terraces
Landform position (three-dimensional): Tread
Down-slope shape: Linear
Across-slope shape: Linear
Parent material: Alluvium
Typical profile
H1 - 0 to 15 inches: clay loam
H2 - 15 to 32 inches: clay loam, silty clay loam, loam
H2 - 15 to 32 inches: very gravelly sand, gravelly sand, gravelly coarse sand
H2 - 15 to 32 inches:
H3 - 32 to 60 inches:
H3 - 32 to 60 inches:
H3 - 32 to 60 inches:
Properties and qualities
Slope: 0 to 1 percent
Depth to restrictive feature: More than 80 inches
Natural drainage class: Poorly drained
Runoff class: Medium
Capacity of the most limiting layer to transmit water (Ksat): Moderately high (0.20
to 0.60 in/hr)
Depth to water table: About 18 to 36 inches
Frequency of flooding: Occasional
Frequency of ponding: None
Calcium carbonate, maximum in profile: 15 percent
Salinity, maximum in profile: Very slightly saline to slightly saline (2.0 to 4.0
mmhos/cm)
Available water storage in profile: Very high (about 16.7 inches)
Interpretive groups
Land capability classification (irrigated): 3w
Land capability classification (nonirrigated): 3w
Hydrologic Soil Group: C
Hydric soil rating: No
Custom Soil Resource Report
13
Minor Components
Poudre
Percent of map unit: 5 percent
Hydric soil rating: No
Aquolls
Percent of map unit: 5 percent
Landform: Swales
Hydric soil rating: Yes
105—Table Mountain loam, 0 to 1 percent slopes
Map Unit Setting
National map unit symbol: jpty
Elevation: 4,800 to 5,600 feet
Mean annual precipitation: 13 to 15 inches
Mean annual air temperature: 48 to 50 degrees F
Frost-free period: 135 to 150 days
Farmland classification: Prime farmland if irrigated
Map Unit Composition
Table mountain and similar soils: 85 percent
Minor components: 15 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Table Mountain
Setting
Landform: Flood plains, stream terraces
Landform position (three-dimensional): Tread
Down-slope shape: Linear
Across-slope shape: Linear
Parent material: Alluvium
Typical profile
H1 - 0 to 36 inches: loam
H2 - 36 to 60 inches: silt loam, clay loam, loam
H2 - 36 to 60 inches:
H2 - 36 to 60 inches:
Properties and qualities
Slope: 0 to 1 percent
Depth to restrictive feature: More than 80 inches
Natural drainage class: Well drained
Runoff class: Low
Capacity of the most limiting layer to transmit water (Ksat): Moderately high to
high (0.60 to 2.00 in/hr)
Depth to water table: More than 80 inches
Frequency of flooding: None
Custom Soil Resource Report
14
Frequency of ponding: None
Calcium carbonate, maximum in profile: 15 percent
Salinity, maximum in profile: Nonsaline to very slightly saline (0.0 to 2.0
mmhos/cm)
Sodium adsorption ratio, maximum in profile: 5.0
Available water storage in profile: Very high (about 18.0 inches)
Interpretive groups
Land capability classification (irrigated): 1
Land capability classification (nonirrigated): 3c
Hydrologic Soil Group: B
Ecological site: Overflow (R049XY036CO)
Hydric soil rating: No
Minor Components
Caruso
Percent of map unit: 7 percent
Hydric soil rating: No
Fluvaquentic haplustolls
Percent of map unit: 4 percent
Landform: Terraces
Hydric soil rating: Yes
Paoli
Percent of map unit: 4 percent
Hydric soil rating: No
Custom Soil Resource Report
15
4,514
752.3
FCMaps
This map is a user generated static output from the City of Fort Collins FCMaps
Internet mapping site and is for reference only. Data layers that appear on this
map may or may not be accurate, current, or otherwise reliable.
City of Fort Collins - GIS
572.0
1:
WGS_1984_Web_Mercator_Auxiliary_Sphere
0 286.00 572.0 Feet
Notes
Legend
3,430
FEMA Floodplain
FEMA High Risk - Floodway
FEMA High Risk - 100 Year
FEMA Moderate Risk - 100 / 500 Year
FEMA Map Panel
City Floodplains
City High Risk - Floodway
City High Risk - 100 Year
City Moderate Risk - 100 Year
City Limits
Project Site
RAINFALL INTENSITY-DURATION-FREQUENCY CURVE
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
0.00 10.00 20.00 30.00 40.00 50.00 60.00
STORM DURATION (minutes)
RAINFALL INTENSITY (inches/hour)
2-Year Storm 10-Year Storm 100-Year Storm
Figure RA-16 City of Fort Collins Rainfall Intensity-Duration-Frequency Curves
Runoff Chapter 6
6-8 Urban Drainage and Flood Control District January 2016
Urban Storm Drainage Criteria Manual Volume 1
Table 6-3. Recommended percentage imperviousness values
Land Use or Percentage Imperviousness
Surface Characteristics (%)
Business:
Downtown Areas 95
Suburban Areas 75
Residential:
Single-family
2.5 acres or larger 12
0.75 – 2.5 acres 20
0.25 – 0.75 acres 30
0.25 acres or less 45
Apartments 75
Industrial:
Light areas 80
Heavy areas 90
Parks, cemeteries 10
Playgrounds 25
Schools 55
Railroad yard areas 50
Undeveloped Areas:
Historic flow analysis 2
Greenbelts, agricultural 2
Off-site flow analysis (when land use not
defined) 45
Streets:
Paved 100
Gravel (packed) 40
Drive and walks 90
Roofs 90
Lawns, sandy soil 2
Lawns, clayey soil 2
E LINCOLN AVE
0.64
C
0.36
0.45
0.65
B
0.16
0.20
0.80
A
0.95
1.00
1.32
D
0.81
1.00
LEGEND
EXISTING PROPOSED
PROPERTY LINE
FLOWLINE
BACK OF CURB
EASEMENT
SETBACK LINE
MAJOR CONTOURS
MINOR CONTOURS
GRADE BREAK
ROADWAY CENTERLINE
BASIS OF BEARINGS (RECORD): SOUTH 09° 06' 15" WEST
ALONG THE EAST LINE OF LOT 1, BALDWIN MINOR
SUBDIVISION, SAID EAST LINE MONUMENTED AT THE
NORTHEAST CORNER OF SAID LOT 1 BY A 5/8 INCH REBAR
WITH A GREEN CAP MARKED "PLS 38430" AND AT THE
SOUTHEAST CORNER OF SAID LOT 1 BY A FOUND 1/2 INCH
REBAR WITH A CAP MARKED "PLS 14823" (NOW UPGRADED
AND RESET WITH A 5/8 REBAR WITH A GREEN CAP MARKED
"PLS 38430", HAVING A GROUND DISTANCE OF 773.39 FEET, AS
SHOWN ON THE RECORDED PLAT OF SAID BALDWIN MINOR
SUBDIVISION.
BASIS OF BEARING
BENCHMARKS
BASIN PARAMETERS
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
ENVIRONMENTAL PLANNER
DRAINAGE BASIN MAP
FORT COLLINS, CO 2019
03-27-2019
017-0150
SPIRIT AT THE RIVER HOTEL
MM
C_DRN_70150.dwg
MM
MG
A
PRELIMINARY DESIGN PLANS
MG
NOTES
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Larimer County Area, Colorado
Survey Area Data: Version 12, Oct 10, 2017
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Mar 20, 2015—Oct
15, 2016
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
10
!"
##7:
$ 1;32<%&'(
=56!()*> "! !
???@@@?A? B? ?
??E@@@C? D? ??
E@E@E@A? B? C?
E@A@A@D? ?A? ?
?@?? ?@?F ?@E? ?@EF ?@A? ?@AF ?@G? ?@GF ?@B? ?@BF ?@F? ?@FF ?@C? ?@CF ?@H? ?@HF ?@D? ?@DF ?@I? ?@IF E@?? E@?F E@E?
JKLKMNOPQRMSTU
VWKXQRSOU
YPZ[LZKTOQE?\Q][^WQ_`KOWQabZWOQJKLKMNOPQJcK`O
!"
##7:
$ 1;32<%&'(
=56!()*> "! !
????@@@@?A? B? C? ?
????@@@@D? E? F? G?
??A@A@@@H? I? ?A? ?
A@B?
?@?? ?@?E ?@A? ?@AE ?@B? ?@BE ?@C? ?@CE ?@D? ?@DE ?@E? ?@EE ?@F? ?@FE ?@G? ?@GE ?@H? ?@HE ?@I? ?@IE A@?? A@?E A@A?
JKLKMNOPQRMSTU
VWKXQRSOU
YPZ[LZKTOQH\Q][^WQ_`KOWQabZWOQJKLKMNOPQJcK`O
8"
6" 6"
SD
SD
1
1
2
2
3
3
3
2
1
M
L
K
I
H
G
E
D
C
B
NN
OO
PP
QQ
RR
SS
3.3 3.7 4.7 5.7 5.8 6.3
J
7.3 8.3 9.3 11.3 12.3 12.7 13.7 15.315.5 15.6 15.7 16.7 17.718.3
A
7' - 10"
12' - 10"
1
2
3
1
2
3
2"
GI-1
2500 GALLON
7'-10"x12'-10"x6' DEEP
APPROX. T.O.P
APPROX. B.O.P
APPROX. T.O.P
APPROX. B.O.P
APPROX. T.O.P
APPROX. B.O.P
91' - 2 7/8"
90' - 6 1/4"
APPROX. T.O.P
APPROX. B.O.P
93' - 9 9/32"
93' - 2 21/32"
APPROX. T.O.P
APPROX. B.O.P
APPROX. T.O.P
APPROX. B.O.P
APPROX. T.O.P
APPROX. B.O.P
FOOD PREP.
108
GR
96' - 10 31/32"
96' - 6 15/32"
APPROX. T.O.P
APPROX. B.O.P
4"
4"
4"GR RE: CIVIL FOR
CONTINUATION
6"
170 GPM
1 6"
2
SD 3
124 GPM
3"
29 GPM
2
3
SD
3
2
1
1
193 GPM
103 GPM
4"
4"
107 GPM
1
3
2
122 GPM 6"
6"
141 GPM
6"
SD
149 GPM
90' - 10 13/32"
90' - 3 25/32"
93' - 7 3/16"
93' - 0 9/16"
98' - 3 7/8"
97' - 11 3/8"
99' - 0 1/32"
98' - 7 17/32"
APPROX. T.O.P
APPROX. B.O.P
98' - 9 29/32"
98' - 3 9/32"
6"
98' - 6 1/8"
98' - 2 5/8"
98' - 4 13/16"
97' - 10 3/16"
APPROX. T.O.P
APPROX. B.O.P
98' - 0 7/8"
98' - 0 7/8"
1 3"
35 GPM
ARCHITECT'S PROJECT NUMBER
COPYRIGHT © 2013 PAUL T. BERGNER, AIA, ARCHITECT, PC/ALL RIGHTS RESERVED
SHEET NUMBER
SHEET TITLE
CURRENT PHASE
ISSUE DATE
THESE DRAWINGS ARE INCOMPLETE AND ARE
INTENDED FOR CONVEYING DESIGN SYSTEM
CONCEPTS. ANY PRICING OR BUDGETING
PERFORMED WITH THESE DRAWINGS MUST
CARRY A CONTINGENCY TO COVER WHAT
ITEMS MAY CHANGE OR BE ADDED AS THE
DESIGN PROCESS IS COMPLETED.
WILLCO XIV
LLLP
4100 Wadsworth Blvd.
Wheat Ridge, CO 80033
p. 303.985.3260
7/25/2018 2:00:03 PM
P101
PLUMBING OVERALL -
SLAB PLAN
WASTE/VENT/WATER/GAS
STAYBRIDGE SUITES
301 EAST LINCOLN AVE.
FORT COLLINS, CO
Project Number
CD PROGRESS
06.01.2018
3/32" = 1'-0"
1
SLAB/PODIUM PLAN - LEVEL 1
WASTE/VENT/WATER/GAS
SHEET NOTES:
1. SD UP TO FLOOR ABOVE.
2. SD UP TO GCO ABOVE.
3. RE: CIVIL FOR CONTINUATION.
No. Description Date
5401 SF
3942 SF
660 SF
3304 SF
6173 SF
4774 SF
4511 SF
3430 SF
3894 SF
1096 SF
37,185 SF TOTAL
SQUARE FOOTAGE TAKE OF OF OVERALL
ROOF 27, 366 SF
.2383 CFS
.0780 CFS
.2718 CFS
.3141 CFS
.3319 CFS
.2763 CFS
.3788 CFS
.0646 CFS
.2294 CFS
.4300 CFS
5:37:42 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
5:43:50 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
5:49:59 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
5:56:07 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
6:02:16 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
6:08:24 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
6:14:32 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
6:20:41 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
6:26:49 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
6:32:58 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
6:39:06 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
6:45:14 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
6:51:23 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
6:57:31 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
7:03:40 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
7:09:48 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
7:15:56 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
7:22:05 0.00 0.00 0.00 #N/A 0.00 #N/A #N/A 0.00 #N/A
UD-Detention, Version 3.07 (February 2017)
Detention Basin Outlet Structure Design
25YR OUT
10YR IN
10YR OUT
5YR IN
5YR OUT
2YR IN
2YR OUT
EURV IN
EURV OUT
WQCV IN
WQCV OUT
0
0.5
1
1.5
2
2.5
0.1 1 10 100
PONDING DEPTH [ft]
DRAIN TIME [hr]
500YR
100YR
50YR
25YR
10YR
5YR
2YR
EURV
WQCV
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
20,000
0.00 0.50 1.00 1.50 2.00 2.50
OUTFLOW [cfs]
AREA [ft^2], VOLUME [ft^3]
PONDING DEPTH [ft]
User Area [ft^2]
Interpolated Area [ft^2]
Summary Area [ft^2]
Volume [ft^3]
Summary Volume [ft^3]
Outflow [cfs]
Summary Outflow [cfs]
Time to Drain 97% of Inflow Volume (hours) = 2 3 2 #N/A 3 #N/A #N/A 5 #N/A
Time to Drain 99% of Inflow Volume (hours) = 2 3 2 #N/A 3 #N/A #N/A 5 #N/A
Maximum Ponding Depth (ft) = 0.38 0.97 0.68 #N/A 1.20 #N/A #N/A 2.20 #N/A
Area at Maximum Ponding Depth (acres) = 0.06 0.13 0.10 #N/A 0.17 #N/A #N/A 0.33 #N/A
Maximum Volume Stored (acre-ft) = 0.008 0.064 0.031 #N/A 0.099 #N/A #N/A 0.357 #N/A
Detention Basin Outlet Structure Design
UD-Detention, Version 3.07 (February 2017)
Example Zone Configuration (Retention Pond)
-- -- -- --
Length of Basin Floor (LFLOOR) = user ft
-- -- -- --
Width of Basin Floor (WFLOOR) = user ft
-- -- -- --
Area of Basin Floor (AFLOOR) = user ft^2
-- -- -- --
Volume of Basin Floor (VFLOOR) = user ft^3
-- -- -- --
Depth of Main Basin (HMAIN) = user ft
-- -- -- --
Length of Main Basin (LMAIN) = user ft
-- -- -- --
Width of Main Basin (WMAIN) = user ft
-- -- -- --
Area of Main Basin (AMAIN) = user ft^2
-- -- -- --
Volume of Main Basin (VMAIN) = user ft^3
-- -- -- --
Calculated Total Basin Volume (Vtotal) = user acre-feet
-- -- -- --
-- -- -- --
DETENTION BASIN STAGE-STORAGE TABLE BUILDER
Optional
Override
Area (ft^2)
Length
(ft)
Optional
Override
Stage (ft)
Stage
(ft)
Stage - Storage
Description
Area
(ft^2)
Width
(ft)
UD-Detention, Version 3.07 (February 2017)
Volume
(ft^3)
Volume
(ac-ft)
Area
(acre)
Optional User Override
1-hr Precipitation
WQCV not provided!
Example Zone Configuration (Retention Pond)
UD-Detention, Basin 9/4/2018, 9:22 AM