HomeMy WebLinkAboutFIRST STOP PLAZA - BDR180031 - SUBMITTAL DOCUMENTS - ROUND 3 - RESPONSE TO STAFF REVIEW COMMENTS1
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com/developmentreview
November 23, 2018
Stephanie Hansen
Ripley Design, Inc
419 Canyon Ave Suite 200
Fort Collins, CO 80521
RE: First Stop Plaza, BDR180031, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Development Review Coordinator, Tenae Beane, at 970-224-6119 or tbeane@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Clay Frickey, 970-224-6045, cfrickey@fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 11/14/2018
11/14/2018: Thank you for addressing Planning's comments. I'm ready for
mylars.
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 10/18/2018
10/18/2018: Please add a note that any new or relocation of signs will be
reviewed through a separate sign permit.
Ripley Response: A sign permit has been applied for.
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: General
Comment Number: 7 Comment Originated: 10/15/2018
2
11/19/2018: information only:
Carried over just for reference. It is still anticipated that the development
agreement will be required.
10/15/2018: development agreement:
A development agreement will be required with this project, further identification
on the terms of the development agreement will be made as the timing of this
project compared to the City's project is known. Should the City's process for
Suniga Road right-of-way move ahead of the development proposal, it should
be understood that the development agreement for this proposal will contain
language requiring the reimbursement to the City of the City's cost to acquire
right-of-way for Suniga Road attributable to the property owner's local street
obligation, and also a repay to the City for the local street portion of roadway
cost to Suniga Road. In addition repays for the College Avenue construction is
required as well. These repay obligations would be required prior to a building
permit.
The discussion with the project proposal and its timing with the Suniga Road
project resulted in an outcome where the City will be looking to have a condition
in the development agreement that indicates the development agreement rights
under the development agreement would be void should the City project's
process for Suniga Road right-of-way not be completed.
Northern Response: We are coordinating with Interwest and Capital Projects regarding the construction of
the driveway improvements.
Comment Number: 10 Comment Originated: 11/19/2018
11/19/2018: for approval:
The plans show a proposed storm sewer manhole that's located on a storm
sewer shown as being designed by Interwest. Is this intended to be done the
road project? If so, this would seem to be an item that should be coordinated.
Northern Response: The storm sewer manhole was removed and the site’s drainage system was modified
per feedback from City of Fort Collins and Interwest.
Comment Number: 11 Comment Originated: 11/19/2018
11/19/2018: for approval:
In general the construction sequencing of this development and the road project
should be coordinated to address potential timing concerns. I understand that
the City's Suniga project is looking to complete the sidewalk and road work
ahead of the grading work for this development that would tie into the sidewalk.
We'll want to further coordinate these discussions and have the sequencing
indicated in the development agreement.
Northern Response: We are coordinating with Interwest and Capital Projects regarding the construction of
the driveway improvements.
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
3
Topic: General
Comment Number: 1 Comment Originated: 10/17/2018
10/17/2018: See comments from Forestry re: tree mitigation.
Department: Forestry
Contact: Molly Roche, 224-616-1992, mroche@fcgov.com
Topic: General
Comment Number: 5 Comment Originated: 11/19/2018
11/19/2018:
At the on-site meeting with Forestry and Stephanie Hansen, it was discussed
that a planting bed north of the existing drive that accesses College Ave will be
eliminated due to the widened approach. Is this still the case? If so, will
landscaping be replaced near this area?
Ripley Response: Landscape bed has shifted to the south of the entry drive.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 10/16/2018
11/19/2018: If the coordination and agreements with the capital project are
complete, then this comments is resolved.
10/16/2018: FOR APPROVAL:
This project is requesting a change in access location for two properties. As a
stand alone project, the submittal will need to provide information on access
location, spacing, type of movement, and adherence to local and state
engineering standards (such as access spacing.)
Northern Response: We are coordinating with Interwest and Capital Projects regarding the construction of
the driveway improvements.
Comment Number: 2 Comment Originated: 10/16/2018
11/19/2018: If the coordination and agreements with the capital project are
complete, then this comments is resolved.
10/16/2018: FOR APPROVAL:
This project is showing a reconfigured access onto North College. North
College is a state highway and under the jurisdiction of the Colorado
Department of Transportation (CDOT) with an adopted Access Control Plan.
As a stand alone project, a change in access for a development needs to be
approved by them, and concurrence from CDOT is needed prior to hearing.
Northern Response: We are coordinating with Interwest and Capital Projects regarding the construction of
the driveway improvements.
Comment Number: 3 Comment Originated: 10/16/2018
10/16/2018: FOR APPROVAL:
4
If the project is in concurrence with the adjacent capital project, the above
comments can be resolved. The capital project would complete the required
design review and CDOT approvals. Therefore this project can be approved if
conditioned on the resolution of all needed item for the capital project. If the
capital project items aren't resolved, then the first two comments stand.
Northern Response: We are coordinating with Interwest and Capital Projects regarding the construction of
the driveway improvements.
Department: Water-Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 10/16/2018
11/16/2018: This fire line is now to be abandoned. Please remove Note 13 on
sheet C1.0 and Note 10 on the Utility Plan sheet as this line will be abandoned
and can not be used for a fire service on Lot 1.
Northern Response: The water and fire services were modified per meetings with City of Fort Collins and
feedback from Interwest.
10/16/2018: The relocated fire hydrant is too close to the tree and can not have
a bend in the fire service line. 10 feet of separation is required from hydrant to
a tree. The City prefers that this fire hydrant be abandoned with this application.
Northern Response: The fire hydrant was removed from this location per meetings with City of Fort
Collins and feedback from Interwest.
Comment Number: 4 Comment Originated: 11/16/2018
11/16/2018: Coordination is required for the existing water and fire services to
the existing building and updates shown on the plans.
Northern Response: The water and fire services were modified per meetings with City of Fort Collins and
feedback from Interwest.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 7 Comment Originated: 11/16/2018
11/16/2018: A Development Agreement is required to document how the
NECCO cost share and LID requirements for Lot 1 will be deferred until the
development of Lot 1. The Stormwater PIFs will be required with this BDR
application.
Response: Understood.
Comment Number: 8 Comment Originated: 11/16/2018
11/16/2018: The proposed storm sewer manhole is not desirable due to two
other manholes in the near vicinity. Please remove this manhole and use one of
the other manholes(most likely the east one) to drain the area.
5
Response: Revised.
Department: PFA
Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 10/15/2018
11-18-2018 UPDATE FOR INFORMATIOM
>It is noted on the provided Site Plan that the EAE is located correctly, however,
there are trees located on the traffic/parking islands that are shown as
impacting the EAE vertical clearance. Please note that there shall be 14ft of
vertical clearance on all portions on the required EAE.
Response: Trees can be pruned as needed.
10-17-2018 UPDATE AFTER MEETING
>Due to the uncertainty of what type and timing of development that may occur
on Lot 1, the project team will not be designating the drive aisle shown on Lot 1
as an EAE. An approved hammerhead turnaround is shown on Lot 2.
Fire Lane signage will be determined by phone conversation before the next
submittal.
10/15/2018:
ACCESS
The Emergency Access Easement is noted from College Ave. The drive aisle
shown on the south side of Lot 1 should also be shown as an Emergency
Access Easement at this time.
PFA will have further comments when Lot 1 develops
Department: Internal Services
Contact: Clay Frickey, 970-224-6045, cfrickey@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 11/06/2018
11/06/2018: Comment from Real Estate Services: Staff has concerns with the
way the current legal description is written on page 1 of the dedication. Please
revise the legal description to match the format below depending on what
direction the ROW acquisition takes:
Lot one and Lot two, 1st stop Plaza Minor Subdivision, Except that portion
conveyed in deed recorded _____ __, 20__ at Reception No. _______.
OR
Lot one and Lot two, 1st stop Plaza Minor Subdivision, Except that portion
conveyed in Final Rule and order recorded _____ __, 20__ at Reception No. _____.
Northern Response: No revision to the dedication language was made. We are waiting on the recorded
document.
Comment Number: 2 Comment Originated: 11/06/2018
11/06/2018: Comment from Real Estate Services: Page two also has a similar
notation. Staff recommends amending this to City of Fort Collins per deed
recorded ____ __, 20__ at Reception No. _____. (or final rule and order,
6
whichever the case may be).
Northern Response: No revision to the dedication language was made. We are waiting on the recorded
document.
Comment Number: 3 Comment Originated: 11/06/2018
11/06/2018: Please see redlines for further comments. Please contact Kerri
Allison if you have any further questions about these comments. You may reach
Kerri at 970.416.2669 or kallison@fcgov.com.
Department: Light And Power
Contact: Luke Unruh, 9704162724, lunruh@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 10/16/2018
10/16/2018: Any changes to the existing electric system will initiate electric
system modification charges. Please coordinate any electric modifications with
Light and Power Engineering.
Northern Response: It is anticipated there will be no changes to the electric system. According to Light
and Power, an electric service line that conflicts with a proposed storm inlet is inactive
Department: Outside Agencies
Contact: CDOT - Timothy Bilobran timothy.bilobran@state.co.us, ,
Topic: General
Comment Number: 1 Comment Originated: 10/24/2018
10/24/2018: CDOT's only comment regarding this proposal would be that the
applicant will need to obtain an access permit if any of the improvements on
Suniga encroach onto the State's right-of-way. - Gloria Hice-Idler 970-381-8629
Northern Response: This project does not include any work within the right of way. That work is being
performed under a separate project.
Department: Park Planning
Contact: Jill Wuertz, 970-416-2062, jwuertz@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 11/14/2018
11/14/2018: Streetscapes along College are currently maintained by Parks.
Modifications to the parkway on College will need to be added to plans,
including irrigation modifications. Work will need to be inspected by Parks.
Ripley Response: This project does not include any work within the right of way. That work is being
performed under a separate project.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 7 Comment Originated: 10/16/2018
7
11/16/2018: FOR APPROVAL:
Please revise the Benchmark Statement on sheet C0.1. See redlines.
10/16/2018: FOR APPROVAL:
The Benchmark Statement has been revised. The City has moved to the
NAVD88 vertical datum, and as of January 1, 2015, all projects are required to
be on NAVD88 datum. Please provide the following information for the
Benchmark Statement in the EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR
VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NGVD29 UNADJUSTED (PRIOR CITY OF FORT
COLLINS DATUM) = NAVD88 - X.XX'.
Northern Response: The Benchmark Statement was revised as noted.
Comment Number: 9 Comment Originated: 10/16/2018
11/16/2018: FOR APPROVAL:
There are line over text issues. See redlines.
10/16/2018: FOR APPROVAL:
There are line over text issues. See redlines.
Northern Response: The line over text issues per the redlines were corrected
Comment Number: 10 Comment Originated: 10/16/2018
11/16/2018: FOR APPROVAL:
Some of the easement descriptions shown are incorrect. If they are going to
stay on the plan, they should match what is shown on the Subdivision Plat.
10/16/2018: FOR APPROVAL:
Some of the easement descriptions shown are incorrect. If they are going to
stay on the plan, they should match what is shown on the Subdivision Plat.
Northern Response: The easements descriptions correspond to the Subdivision Plat
Topic: Plat
Comment Number: 1 Comment Originated: 10/15/2018
11/16/2018: FOR APPROVAL:
8
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response
letter.
10/15/2018: FOR APPROVAL:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response
letter.
Northern Response: The revisions were made per the received redlines.
Topic: Site Plan
Comment Number: 3 Comment Originated: 10/15/2018
11/16/2018: FOR APPROVAL:
There are line over text issues. See redlines.
10/15/2018: FOR APPROVAL:
There are line over text issues. See redlines.
Ripley Response: Line over text issues resolved.