Loading...
HomeMy WebLinkAboutWEST VINE STORAGE - FDP180019 - SUBMITTAL DOCUMENTS - ROUND 3 - (5)NATURAL HABITAT AREA WEST VINE STORAGE COST ESTIMATE The following is a cost estimate to provide for turf cover, trees, shrubs, and irrigation for the Natural Habitat Area for the West Vine Storage Project. Turf Cover Includes tilling, soil amendments and hydro seeding 34,691 S.F. @ $ 0.90 / S.F. $ 31,222.00 Cobble material and Labor are a part of the Storm Drainage Cost estimate Shrub Plantings Rain Gardens 90 shrubs @ $ 60.00 ea $ 5,400.00 2 ornamental trees @ $500.00 ea $ 1,000.00 Natural Area 14 shrubs @ $ 60.00 ea $ 840.00 14 evergreens @ 650.00 ea $ 9,100.00 15 deciduous trees @ $ 500.00 ea $ 7,500.00 Irrigation 34,691 S.F. @ $ 0.45 / S.F. $ 15,611.00 TOTAL $ 70,673.00