Loading...
HomeMy WebLinkAboutMONTAVA PUD - ODP180002 - MONTAVA SUBMITTAL DOCUMENTS - ROUND 4 - BIKE PLANSheet Number: Project Number: Project: Client: /USERS/MATT/ELC/SHARED/PROJECTS-2015_2019/1725-MONTAVA/1725-02-FILES/1725-MASTERPLAN/01-RESOURCE/TITLE_BLOCK/PUD_SUBMITTAL/24X36_TITLE_BLOCK_PUD_CONSULTANT.DWG Plot Date:9/13/2018 10:34 AM Plotted By: Matthew Lambert Date Created:9/13/2018 Produced by: Date: Revision & Date: X.X. X.X.XXX 1734 HF2M MONTAVA MONTAVA OVERALL UTILITY PLAN PUD MASTER PLAN 10/05/18 DPZ CODESIGN BICYCLE PLAN Dedicated Lane Off-street Trail Low Volume Street 10 10.23.2018 No. 8 Canal Grade-Separated Crossing At-grade Crossing Town Center Community Park NE Regional Trail BIKE AND TRAIL PLAN EXISTING NO. 8 DITCH CROSS-SECTION PROPOSED DITCH WIDENING CROSS-SECTION CATCH SLOPE CENTERLINE & FLOWLINE OF NO. 8 IRRIGATION DITCH FREEBOARD CLAY LINER Paved Trail Gravel Path RAISE BOTTOM OF DITCH 5’ 4:1 SLOPE EAST SIDE EXISTING GRADE WEST SIDE EXISTING GRADE 20’ - 40’ CATCH SLOPE 20’ - 40’ MAINT. ACCESS RD. 55’ EASEMENT APPROX. 95’ TO 160’ 15’ 12.5’ 15’ 12.5’ 18’-21’ EXISTING DITCH CROSS-SECTION