Loading...
HomeMy WebLinkAboutMONTAVA PUD - ODP180002 - MONTAVA SUBMITTAL DOCUMENTS - ROUND 4 - STREET RELATED DOCUMENTSheet Number: Project Number: Project: Client: /USERS/MATT/ELC/SHARED/PROJECTS-2015_2019/1725-MONTAVA/1725-02-FILES/1725-MASTERPLAN/01-RESOURCE/TITLE_BLOCK/PUD_SUBMITTAL/24X36_TITLE_BLOCK_PUD_CONSULTANT.DWG Plot Date:9/13/2018 10:34 AM Plotted By: Matthew Lambert Date Created:9/13/2018 Produced by: Date: Revision & Date: X.X. X.X.XXX 1734 HF2M MONTAVA MONTAVA OVERALL UTILITY PLAN PUD MASTER PLAN 02/13/19 DPZ CODESIGN ARTERIAL INTERSECTIONS Intersections Along Arterials 1 Full Movement, Roundabout or Signal 2 Full Movement Functional Classification 3 Arterial (4-lane) 4 Arterial (2-lane) 5 Collector Notes: A minimum intersection spacing of 460 feet is proposed along arterials. Local street access is shown in concept only. Final locations, spacing, and control type to be determined at PDP. MOUNTAIN VISTA GIDDINGS RICHARD’S LAKE TIMBERLINE COUNTRY CLUB