HomeMy WebLinkAboutMEYERS SUBDIVISION - FDP190006 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSFORT COLLINS, COLORADO
SHEET
MEYER SUBDIVISION UTILITY PLANS
KEEFE CIVIL, LLC
825 UNION STREET
GOLDEN, CO 80401
(970) 215-6808
MEG@KEEFECIVIL.COM
City of Ft. Collins, Colorado
UTILITY PLAN APPROVAL
FORT COLLINS - LOVELAND
WATER DISTRICT
SOUTH FORT COLLINS
SANITATION DISTRICT
UTILITY PLANS
FOR
MEYER SUBDIVISION
Situate in the Southwest Quarter of Section 5, Township 6 North, Range 68 West of the 6th P.M.
City of Fort Collins, County of Larimer, State of Colorado
March 2019
Sheet Title Sheet
Number
COVER SHEET 1
GENERAL NOTES 2
SITE PLAN 3
GRADING AND DRAINAGE PLAN 4
UTILITY PLAN 5
GEOTECHNICAL ENGINEERING REPORT:
NORTHERN COLORADO GEOTECH
PROJECT NO. 259-18
DECEMBER 28, 2018
I HEREBY AFFIRM THAT THESE FINAL CONSTRUCTION PLANS WERE PREPARED UNDER
MY DIRECT SUPERVISION, IN ACCORDANCE WITH ALL APPLICABLE CITY OF FORT
COLLINS AND STATE OF COLORADO STANDARDS AND STATUTES, RESPECTIVELY; AND
THAT I AM FULLY RESPONSIBLE FOR THE ACCURACY OF ALL DESIGN, REVISIONS, AND
RECORD CONDITIONS THAT I HAVE NOTED ON THESE PLANS.
GENERAL INDEMNIFICATION STATEMENT:
THESE PLANS HAVE BEEN REVIEWED BY THE LOCAL ENTITY FOR CONCEPT ONLY. THE
REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE
LOCAL ENTITY ENGINEER, OR THE LOCAL ENTITY FOR ACCURACY AND CORRECTNESS
OF THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT
QUANTITIES OF ITEMS ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED. THE
REVIEW SHALL NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL
RESPONSIBILITY BY THE LOCAL ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN
THAT MAY BE REQUIRED DURING THE CONSTRUCTION PHASE.
PROJECT BENCHMARK
B.M.NUMBER 16-01
ELEVATION = 4956.98 (NAVD88 VERTICAL DATUM)
DESCRIPTION: SOUTH SIDE OF WILLOW SPRINGS WAY APPROX. 50 FT. WEST OF THE
INTERSECTION OF WILLOW SPRINGS WAY AND TIMBERLINE ROAD ON THE SOUTHWEST
CORNER OF A STORM INLET.
HORIZONTAL DATUM: CITY OF FORT COLLINS GROUNDMASTER
OWNER:
ADAM MEYER AND LESLIE PEZZUTI
2503 ROCK CREEK DRIVE
FORT COLLINS, COLORADO 80528
(720) 468-2235
ADAMMEYER@GMAIL.COM
GENERAL CONTRACTOR:
ROSE CUSTOM HOMES, LLC
FORT COLLINS, COLORADO
SHEET
MEYER SUBDIVISION UTILITY PLANS
KEEFE CIVIL, LLC
825 UNION STREET
GOLDEN, CO 80401
(970) 215-6808
MEG@KEEFECIVIL.COM
City of Ft. Collins, Colorado
UTILITY PLAN APPROVAL
FORT COLLINS - LOVELAND
WATER DISTRICT
SOUTH FORT COLLINS
SANITATION DISTRICT
2 OF 5
GENERAL NOTES
GENERAL NOTES:
1. ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS AND SPECIFICATIONS
SET FORTH IN THE LARIMER COUNTY URBAN AREA STREET STANDARDS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT
BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE MOST RESTRICTIVE STANDARD SHALL APPLY. ALL WORK SHALL
BE INSPECTED AND APPROVED BY THE LOCAL ENTITY.
2. ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESS SPECIFICALLY STATED
OTHERWISE.
3. THESE PUBLIC IMPROVEMENT CONSTRUCTION PLANS SHALL BE VALID FOR A PERIOD OF THREE YEARS FROM THE DATE OF APPROVAL BY THE LOCAL
ENTITY ENGINEER. USE OF THESE PLANS AFTER THE EXPIRATION DATE WILL REQUIRE A NEW REVIEW AND APPROVAL PROCESS BY THE LOCAL ENTITY
PRIOR TO COMMENCEMENT OF ANY WORK SHOWN IN THESE PLANS.
4. THE ENGINEER WHO HAS PREPARED THESE PLANS, BY EXECUTION AND/OR SEAL HEREOF, DOES HEREBY AFFIRM RESPONSIBILITY TO THE LOCAL
ENTITY, AS BENEFICIARY OF SAID ENGINEER'S WORK, FOR ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS, AND APPROVAL OF THESE PLANS BY
THE LOCAL ENTITY ENGINEER SHALL NOT RELIEVE THE ENGINEER WHO HAS PREPARED THESE PLANS OF ALL SUCH RESPONSIBILITY. FURTHER, TO THE
EXTENT PERMITTED BY LAW, THE ENGINEER HEREBY AGREES TO HOLD HARMLESS AND INDEMNIFY THE LOCAL ENTITY, AND ITS OFFICERS AND
EMPLOYEES, FROM AND AGAINST ALL LIABILITIES, CLAIMS, AND DEMANDS WHICH MAY ARISE FROM ANY ERRORS AND OMISSIONS CONTAINED IN THESE
PLANS.
5. ALL SANITARY SEWER, STORM SEWER, AND WATER LINE CONSTRUCTION, AS WELL AS POWER AND OTHER “DRY” UTILITY INSTALLATIONS, SHALL
CONFORM TO THE LOCAL ENTITY STANDARDS AND SPECIFICATIONS CURRENT AT THE DATE OF APPROVAL OF THE PLANS BY THE LOCAL ENTITY ENGINEER.
6. THE TYPE, SIZE, LOCATION AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THE DRAWINGS. IT SHALL BE
THE RESPONSIBILITY OF THE DEVELOPER TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF THE WORK
BEFORE COMMENCING NEW CONSTRUCTION. THE DEVELOPER SHALL BE RESPONSIBLE FOR UNKNOWN UNDERGROUND UTILITIES.
7. THE ENGINEER SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) AT 1-800-922-1987, AT LEAST 2 WORKING DAYS PRIOR TO
BEGINNING EXCAVATION OR GRADING, TO HAVE ALL REGISTERED UTILITY LOCATIONS MARKED. OTHER UNREGISTERED UTILITY ENTITIES (I.E. DITCH /
IRRIGATION COMPANY) ARE TO BE LOCATED BY CONTACTING THE RESPECTIVE REPRESENTATIVE. UTILITY SERVICE LATERALS ARE ALSO TO BE LOCATED
PRIOR TO BEGINNING EXCAVATION OR GRADING. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO RELOCATE ALL EXISTING UTILITIES THAT
CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.
8. THE DEVELOPER SHALL BE RESPONSIBLE FOR PROTECTING ALL UTILITIES DURING CONSTRUCTION AND FOR COORDINATING WITH THE APPROPRIATE
UTILITY COMPANY FOR ANY UTILITY CROSSINGS REQUIRED.
9. IF A CONFLICT EXISTS BETWEEN EXISTING AND PROPOSED UTILITIES AND/OR A DESIGN MODIFICATION IS REQUIRED, THE DEVELOPER SHALL
COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN. DESIGN MODIFICATION(S) MUST BE APPROVE D BY THE LOCAL ENTITY PRIOR TO BEGINNING
CONSTRUCTION.
10. THE DEVELOPER SHALL COORDINATE AND COOPERATE WITH THE LOCAL ENTITY, AND ALL UTILITY COMPANIES INVOLVED, TO ASSURE THAT THE
WORK IS ACCOMPLISHED IN A TIMELY FASHION AND WITH A MINIMUM DISRUPTION OF SERVICE. THE DEVELOPER SHALL BE RESPONSIBLE FOR CONTACTING,
IN ADVANCE, ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE AS WELL AS THE UTILITY COMPANIES.
11. NO WORK MAY COMMENCE WITHIN ANY PUBLIC STORM WATER, SANITARY SEWER OR POTABLE WATER SYSTEM UNTIL THE DEVELOPER NOTIFIES THE
UTILITY PROVIDER. NOTIFICATION SHALL BE A MINIMUM OF 2 WORKING DAYS PRIOR TO COMMENCEMENT OF ANY WORK. AT THE DISCRETION OF THE
WATER UTILITY PROVIDER, A PRE-CONSTRUCTION MEETING MAY BE REQUIRED PRIOR TO COMMENCEMENT OF ANY WORK.
12. THE DEVELOPER SHALL SEQUENCE INSTALLATION OF UTILITIES IN SUCH A MANNER AS TO MINIMIZE POTENTIAL UTILITY CONFLICTS. IN GENERAL,
STORM SEWER AND SANITARY SEWER SHOULD BE CONSTRUCTED PRIOR TO INSTALLATION OF THE WATER LINES AND DRY UTILITIES.
13. THE MINIMUM COVER OVER WATER LINES IS 4.5 FEET AND THE MAXIMUM COVER IS 5.5 FEET UNLESS OTHERWISE NOTED IN THE PLAN S AND
APPROVED BY THE WATER UTILITY.
14. A STATE CONSTRUCTION DEWATERING WASTEWATER DISCHARGE PERMIT IS REQUIRED IF DEWATERING IS REQUIRED IN ORDER TO INSTALL
UTILITIES OR WATER IS DISCHARGED INTO A STORM SEWER, CHANNEL, IRRIGATION DITCH OR ANY WATERS OF THE UNITED STATES.
15. THE DEVELOPER SHALL COMPLY WITH ALL TERMS AND CONDITIONS OF THE COLORADO PERMIT FOR STORM WATER DISCHARGE (CONTACT
LOT 1, THORLAND
SUBDIVISION
UNPLATTED
UNPLATTED
UNPLATTED
OWNER: KENNETH DELGRANDE ET.AL.
SITE PLAN NOTES:
1. REFER TO FINAL UTILITY PLANS FOR EXACT LOCATIONS AND CONSTRUCTION INFORMATION FOR STORM DRAINAGE STRUCTURES, UTILITY MAINS AND SERVICES, PROPOSED TOPOGRAPHY,
STREET IMPROVEMENTS.
2. REFER TO THE SUBDIVISION PLAT AND UTILITY PLANS FOR EXACT LOCATIONS, AREAS AND DIMENSIONS OF ALL EASEMENTS, LOTS, TRACTS, STREETS, WALKS AND OTHER SURVEY
INFORMATION.
3. THE PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE FINAL PLANS. AMENDMENTS TO THE PLANS MUST BE REVIEWED AND APPROVED BY THE CITY PRIOR TO THE
IMPLEMENTATION OF ANY CHANGES TO THE PLANS.
4. ALL ROOFTOP AND GROUND MOUNTED MECHANICAL EQUIPMENT MUST BE SCREENED FROM VIEW FROM ADJACENT PROPERTY AND PUBLIC STREETS. IN CASES WHERE BUILDING PARAPETS
DO NOT ACCOMPLISH SUFFICIENT SCREENING, THEN FREE-STANDING SCREEN WALLS MATCHING THE PREDOMINANT COLOR OF THE BUILDING SHALL BE CONSTRUCTED. OTHER MINOR
EQUIPMENT SUCH AS CONDUIT, METERS AND PLUMBING VENTS SHALL BE SCREENED OR PAINTED TO MATCH SURROUNDING BUILDING SURFACES.
5. ALL CONSTRUCTION WITH THIS DEVELOPMENT PLAN MUST BE COMPLETED IN ONE PHASE UNLESS A PHASING PLAN IS SHOWN WITH THESE PLANS.
6. ALL EXTERIOR LIGHTING PROVIDED SHALL COMPLY WITH THE FOOT-CANDLE REQUIREMENTS IN SECTION 3.2.4 OF THE LAND USE CODE AND SHALL USE A CONCEALED, FULLY SHIELDED
LIGHT SOURCE WITH SHARP CUT-OFF CAPABILITY SO AS TO MINIMIZE UP-LIGHT, SPILL LIGHT, GLARE AND UNNECESSARY DIFFUSION.
7. SIGNAGE AND ADDRESSING ARE NOT PERMITTED WITH THIS PLANNING DOCUMENT AND MUST BE APPROVED BY SEPARATE CITY PERMIT PRIOR TO CONSTRUCTION. SIGNS MUST COMPLY
WITH CITY SIGN CODE UNLESS A SPECIFIC VARIANCE IS GRANTED BY THE CITY.
8. DESIGN AND INSTALLATION OF ALL PARKWAY/TREE LAWN AND MEDIAN AREAS IN THE RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH CITY STANDARDS. UNLESS OTHERWISE AGREED TO BY
THE CITY WITH THE FINAL PLANS, ALL ONGOING MAINTENANCE OF SUCH AREAS IS THE RESPONSIBILITY OF THE OWNER/DEVELOPER.
9. THE PROPERTY OWNER FOR EACH RESIDENTIAL LOT IS RESPONSIBLE FOR SNOW REMOVAL ON ALL STREET SIDEWALKS ADJACENT TO EACH RESIDENTIAL LOT.
10.PRIVATE CONDITIONS, COVENANTS, AND RESTRICTIONS (CC&R'S), OR ANY OTHER PRIVATE RESTRICTIVE COVENANT IMPOSED ON LANDOWNERS WITHIN THE DEVELOPMENT, MAY NOT
BE CREATED OR ENFORCED HAVING THE EFFECT OF PROHIBITING OR LIMITING THE INSTALLATION OF XERISCAPE LANDSCAPING, SOLAR/PHOTO-VOLTAIC COLLECTORS (IF MOUNTED FLUSH
UPON ANY ESTABLISHED ROOF LINE), CLOTHES LINES (IF LOCATED IN BACK YARDS), ODOR- CONTROLLED COMPOST BINS, OR WHICH HAVE THE EFFECT OF REQUIRING THAT A PORTION OF
ANY INDIVIDUAL LOT BE PLANTED IN TURF GRASS.
11.ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED
DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF
COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY.
12.FIRE LANE MARKING: A FIRE LANE MARKING PLAN MUST BE REVIEWED AND APPROVED BY THE FIRE OFFICIAL PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. WHERE
REQUIRED BY THE FIRE CODE OFFICIAL, APPROVED SIGNS OR OTHER APPROVED NOTICES THAT INCLUDE THE WORDS NO PARKING FIRE LANE SHALL BE PROVIDED FOR FIRE APPARATUS
ACCESS ROADS TO IDENTIFY SUCH ROADS OR PROHIBIT THE OBSTRUCTION THEREOF. THE MEANS BY WHICH FIRE LANES ARE DESIGNATED SHALL BE MAINTAINED IN A CLEAN AND LEGIBLE
CONDITION AT ALL TIMES AD BE REPLACED OR REPAIRED WHEN NECESSARY TO PROVIDE ADEQUATE VISIBILITY.
TREE PROTECTION NOTES:
1. ALL EXISTING TREES WITHIN THE LIMITS OF THE DEVELOPMENT AND WITHIN ANY NATURAL AREA BUFFER ZONES SHALL REMAIN AND BE PROTECTED UNLESS NOTED ON THESE PLANS FOR
REMOVAL.
2. WITHIN THE DRIP LINE OF ANY PROTECTED EXISTING TREE, THERE SHALL BE NO CUT OR FILL OVER A FOUR-INCH DEPTH UNLESS A QUALIFIED ARBORIST OR FORESTER HAS EVALUATED AND
APPROVED THE DISTURBANCE.
3. ALL PROTECTED EXISTING TREES SHALL BE PRUNED TO THE CITY OF FORT COLLINS FORESTRY STANDARDS. TREE PRUNING AND REMOVAL SHALL BE PERFORMED BY A BUSINESS THAT
HOLDS A CURRENT CITY OF FORT COLLINS ARBORIST LICENSE WHERE REQUIRED BY CODE.
4. PRIOR TO AND DURING CONSTRUCTION, BARRIERS SHALL BE ERECTED AROUND ALL PROTECTED EXISTING TREES WITH SUCH BARRIERS TO BE OF ORANGE FENCING A MINIMUM OF FOUR (4)
FEET IN HEIGHT, SECURED WITH METAL T- POSTS, NO CLOSER THAN SIX (6) FEET FROM THE TRUNK OR ONE-HALF (½) OF THE DRIP LINE, WHICHEVER IS GREATER. THERE SHALL BE NO
STORAGE OR MOVEMENT OF EQUIPMENT, MATERIAL, DEBRIS OR FILL WITHIN THE FENCED TREE PROTECTION ZONE.
5. DURING THE CONSTRUCTION STAGE OF DEVELOPMENT, THE APPLICANT SHALL PREVENT THE CLEANING OF EQUIPMENT OR MATERIAL OR THE STORAGE AND DISPOSAL OF WASTE MATERIAL
SUCH AS PAINTS, OILS, SOLVENTS, ASPHALT, CONCRETE, MOTOR OIL OR ANY OTHER MATERIAL HARMFUL TO THE LIFE OF A TREE WITHIN THE DRIP LINE OF ANY PROTECTED TREE OR GROUP
OF TREES.
6. NO DAMAGING ATTACHMENT, WIRES, SIGNS OR PERMITS MAY BE FASTENED TO ANY PROTECTED TREE.
7. LARGE PROPERTY AREAS CONTAINING PROTECTED TREES AND SEPARATED FROM CONSTRUCTION OR LAND CLEARING AREAS, ROAD RIGHTS-OF-WAY AND UTILITY EASEMENTS MAY BE
"RIBBONED OFF," RATHER THAN ERECTING PROTECTIVE FENCING AROUND EACH TREE AS REQUIRED IN SUBSECTION (G)(3) ABOVE. THIS MAY BE ACCOMPLISHED BY PLACING METAL T-POST
STAKES A MAXIMUM OF FIFTY (50) FEET APART AND TYING RIBBON OR ROPE FROM STAKE- TO-STAKE ALONG THE OUTSIDE PERIMETERS OF SUCH AREAS BEING CLEARED.
8. THE INSTALLATION OF UTILITIES, IRRIGATION LINES OR ANY UNDERGROUND FIXTURE REQUIRING EXCAVATION DEEPER THAN SIX (6) INCHES SHALL BE ACCOMPLISHED BY BORING UNDER
THE ROOT SYSTEM OF PROTECTED EXISTING TREES AT A MINIMUM DEPTH OF TWENTY-FOUR (24) INCHES. THE AUGER DISTANCE IS ESTABLISHED FROM THE FACE OF THE TREE (OUTER
BARK) AND IS SCALED FROM TREE DIAMETER AT BREAST HEIGHT AS DESCRIBED IN THE CHART BELOW:
9. ALL TREE REMOVAL SHOWN SHALL BE COMPLETED OUTSIDE OF THE SONGBIRD NESTING SEASON (FEB 1 - JULY 31) OR CONDUCT A SURVEY OF TREES ENSURING NO ACTIVE NESTS IN THE
AREA.
# Species DBH Condition Mitigaion Status Notes
1
BLUE SPRUCE 2.5" FAIR MINUS 0 Remain Trunk Wound
FORT COLLINS, COLORADO
SHEET
MEYER SUBDIVISION UTILITY PLANS
KEEFE CIVIL, LLC
825 UNION STREET
GOLDEN, CO 80401
(970) 215-6808
MEG@KEEFECIVIL.COM
City of Ft. Collins, Colorado
UTILITY PLAN APPROVAL
APPROVED:
City Engineer Date
CHECKED BY:
Water & Wastewater Utility Date
CHECKED BY:
Stormwater Utility Date
CHECKED BY:
Parks & Recreation Date
CHECKED BY:
Traffic Engineer Date
CHECKED BY:
Natural Resources Date
FORT COLLINS - LOVELAND
WATER DISTRICT
SOUTH FORT COLLINS
SANITATION DISTRICT
Mr. Chris Matkins, Manager Date
Mr. Terry Ferrill, P.E., District Manager Date
All changes, addendums, additions, deletions and
modifications to these drawings must be approved,
in writing, by the Fort Collins-Loveland
EXISTING IMPERVIOUS AREA: Water District and the South Fort Collins Sanitation District.
ROOFTOP 4,917 SF
CONCRETE 300 SF
GRAVEL DRIVEWAY 9,560 SF
TOTAL 14,577 SF
NEW IMPERVIOUS AREA:
ROOFTOP 6,717 SF
CONCRETE 805 SF
COMPACTED ROAD BASE 3,758 SF
GRAVEL DRIVEWAY 3,798 SF
NEW TOTAL 15,078 SF
CHANGE IN IMPERVIOUS AREA = + 501 SF
GRADING NOTES:
1. TOP OF FOUNDATION MUST BE AT LEAST 6" ABOVE THE HIGHEST GRADE
SURROUNDING THE STRUCTURE.
2. THERE MUST BE A MINIMUM GRADE OF 5% AWAY FROM THE STRUCTURE
WITHIN THE FIRST 5 TO 10 FEET ADJACENT TO THE RESIDENCE.
3. ALL SLOPES MUST MEET THE MINIMUM REQUIREMENT OF 1% AND ARE
NOT TO BE STEEPER THAN 33% (3:1).
PROPOSED BUILDING
TOF = 4948.60'
KECHTER ROAD
FUTURE SAGE CREEK ROAD
(51' ROW)
1
2.15
THORLAND SUBDIVISION
DS
DS
X X
X
X
X
X
X
X
X
X
X X X X X X X X
X
X
X
X
X X X X X X X X X X X X X X X X
X
X X
X X X X
X X X
X
X
X
X
X X
X
X X
X X X
X
X X X
X X
X X X X X X X X
X
X X
X X X
X X X X X X X
X
X X X X X X
X
X X
X X X
X
X X
X X X X X
FORT COLLINS, COLORADO
SHEET
MEYER SUBDIVISION UTILITY PLANS
KEEFE CIVIL, LLC
825 UNION STREET
GOLDEN, CO 80401
(970) 215-6808
MEG@KEEFECIVIL.COM
City of Ft. Collins, Colorado
UTILITY PLAN APPROVAL
APPROVED:
City Engineer Date
CHECKED BY:
Water & Wastewater Utility Date
CHECKED BY:
Stormwater Utility Date
CHECKED BY:
Parks & Recreation Date
CHECKED BY:
Traffic Engineer Date
CHECKED BY:
Natural Resources Date
FORT COLLINS - LOVELAND
WATER DISTRICT
SOUTH FORT COLLINS
SANITATION DISTRICT
Mr. Chris Matkins, Manager Date
Mr. Terry Ferrill, P.E., District Manager Date
All changes, addendums, additions, deletions and
modifications to these drawings must be approved,
in writing, by the Fort Collins-Loveland
Water District and the South Fort Collins Sanitation District.
PROPOSED BUILDING
TOF = 4948.60'
KECHTER ROAD
FUTURE SAGE CREEK ROAD
DS
DS
DS DS
DS
LEGEND:
5 OF 5
UTILITY PLAN
FUTURE SAGE CREEK ROAD
(51' ROW)
THORLAND SUBDIVISION
ABBREVIATION LEGEND:
DS DS
DS
LEGEND:
4 OF 5
GRADING AND DRAINAGE PLAN
1
2.15
ABBREVIATION LEGEND:
2
ASH 39" FAIR PLUS 3 Remain
3
EASTERN RED CEDAR 1" FAIR 0 Remain
4
ASH 13" POOR 1 Remain
5
ASH 9" FAIR MINUS 1 Remain
6
ASH 8" FAIR MINUS 1 Remain
7
MULBERRY 15" FAIR MINUS 1.5 Remain
8
EASTERN RED CEDAR 2" FAIR 0 Remain 6 TREES
9
BLUE SPRUCE 18" GOOD 3 Remain
10
BLUE SPRUCE 20" GOOD 3 Remain
11
EASTERN RED CEDAR 3" FAIR 0 Remain
12
EASTERN RED CEDAR 2" FAIR 0 Remain
13
ASH 7" FAIR MINUS 1 Remain
14
ASH 7" FAIR MINUS 1 Remain
15
ASH <6" FAIR MINUS 0 Remain 3 STEMS
16
NORWAY MAPLE 12" FAIR MINUS 1.5 Remain
17
TREE OF HEAVEN 4" FAIR 0 Remain
18
ASH 3" FAIR 0 Remain 5 TREES
19
ASH 11,12" FAIR MINUS 1.5 Remain 2 STEMS
20
CRABAPPLE 17" FAIR PLUS 1.5 Remain
21
ASH 22" FAIR 2 Remain
22
ASH 22" FAIR MINUS 2 Remain
23
WHITE POPLAR 8,8" POOR 1 Remain 2 STEMS
24
ASH 4,6" FAIR 1 Remain 2 TREES
25
ASH 42" POOR PLUS 3 Remain
Tree Inventory and Mitigation Information: Meyer Subdivision 2.13.19
FORT COLLINS, COLORADO
SHEET
MEYER SUBDIVISION UTILITY PLANS
KEEFE CIVIL, LLC
825 UNION STREET
GOLDEN, CO 80401
(970) 215-6808
MEG@KEEFECIVIL.COM
City of Ft. Collins, Colorado
UTILITY PLAN APPROVAL
APPROVED:
City Engineer Date
CHECKED BY:
Water & Wastewater Utility Date
CHECKED BY:
Stormwater Utility Date
CHECKED BY:
Parks & Recreation Date
CHECKED BY:
Traffic Engineer Date
CHECKED BY:
Natural Resources Date
FORT COLLINS - LOVELAND
WATER DISTRICT
SOUTH FORT COLLINS
SANITATION DISTRICT
Mr. Chris Matkins, Manager Date
Mr. Terry Ferrill, P.E., District Manager Date
All changes, addendums, additions, deletions and
modifications to these drawings must be approved,
in writing, by the Fort Collins-Loveland
Water District and the South Fort Collins Sanitation District.
LEGEND:
3 OF 5
SITE PLAN
PROPOSED LAND USES
COLORADO DEPARTMENT OF HEALTH, WATER QUALITY CONTROL DIVISION, (303) 692-3590), THE STORM WATER MANAGEMENT PLAN, AND THE EROSION
CONTROL PLAN.
16. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE PROPERTY.
MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S).
17. PRIOR TO FINAL INSPECTION AND ACCEPTANCE BY THE LOCAL ENTITY, CERTIFICATION OF THE DRAINAGE FACILITIES, BY A REGISTERED ENGINEER,
MUST BE SUBMITTED TO AND APPROVED BY THE STORMWATER UTILITY DEPARTMENT. CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER UTILITY
DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OF OCCUPANCY FOR SINGLE FAMILY UNITS. FOR COMMERCIAL
PROPERTIES, CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF ANY
BUILDING PERMITS IN EXCESS OF THOSE ALLOWED PRIOR TO CERTIFICATION PER THE DEVELOPMENT AGREEMENT.
18. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR ANY DAMAGES OR INJURIES SUSTAINED IN THIS DEVELOPMENT AS A RESULT OF
GROUNDWATER SEEPAGE, WHETHER RESULTING FROM GROUNDWATER FLOODING, STRUCTURAL DAMAGE OR OTHER DAMAGE UNLESS SUCH DAMAGE OR
INJURIES ARE SUSTAINED AS A RESULT OF THE LOCAL ENTITY FAILURE TO PROPERLY MAINTAIN ITS WATER, WASTEWATER, AND/OR STORM DRAINAGE
FACILITIES IN THE DEVELOPMENT.
19. ALL RECOMMENDATIONS OF THE FINAL DRAINAGE MEMO DATED FEBRUARY 27, 2019 BY KEEFE CIVIL SHALL BE FOLLOWED AND IMPLEMENTED.
20. TEMPORARY EROSION CONTROL DURING CONSTRUCTION SHALL BE PROVIDED AS SHOWN ON THE EROSION CONTROL PLAN. ALL EROSION CONTROL
MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE DEVELOPER, UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS IS STABILIZED WITH HARD
SURFACE OR LANDSCAPING.
21. THE DEVELOPER SHALL BE RESPONSIBLE FOR INSURING THAT NO MUD OR DEBRIS SHALL BE TRACKED ONTO THE EXISTING PUBLIC STREET SYSTEM.
MUD AND DEBRIS MUST BE REMOVED WITHIN 24 HOURS BY AN APPROPRIATE MECHANICAL METHOD (I.E. MACHINE BROOM SWEEP, LIGHT DUTY FRONT-END
LOADER, ETC.) OR AS APPROVED BY THE LOCAL ENTITY STREET INSPECTOR.
22. NO WORK MAY COMMENCE WITHIN ANY IMPROVED OR UNIMPROVED PUBLIC RIGHT-OF-WAY UNTIL A RIGHT-OF-WAY PERMIT OR DEVELOPMENT
CONSTRUCTION PERMIT IS OBTAINED, IF APPLICABLE.
23. THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FOR ALL APPLICABLE AGENCIES PRIOR TO COMMENCEMENT OF
CONSTRUCTION. THE DEVELOPER SHALL NOTIFY THE LOCAL ENTITY ENGINEERING INSPECTOR (FORT COLLINS - 221-6605) AND THE LOCAL ENTITY EROSION
CONTROL INSPECTOR (FORT COLLINS - 221-6700) AT LEAST 2 WORKING DAYS PRIOR TO THE START OF ANY EARTH DISTURBING ACTIVITY, OR
CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS. IF THE LOCAL ENTITY ENGINEER IS NOT AVAILABLE AFTER PROPER NOTICE OF CONSTRUCTION
ACTIVITY HAS BEEN PROVIDED, THE DEVELOPER MAY COMMENCE WORK IN THE ENGINEER ABSENCE. HOWEVER, THE LOCAL ENTITY RESERVES THE RIGHT
NOT TO ACCEPT THE IMPROVEMENT IF SUBSEQUENT TESTING REVEALS AN IMPROPER INSTALLATION.
24. THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING SOILS TESTS WITHIN THE PUBLIC RIGHT-OF-WAY AFTER RIGHT-OF-WAY GRADING AND ALL
UTILITY TRENCH WORK IS COMPLETE AND PRIOR TO THE PLACEMENT OF CURB, GUTTER, SIDEWALK AND PAVEMENT. IF THE FINAL SOILS/PAVEMENT DESIGN
REPORT DOES NOT CORRESPOND WITH THE RESULTS OF THE ORIGINAL GEOTECHNICAL REPORT, THE DEVELOPER SHALL BE RESPONSIBLE FOR A
RE-DESIGN OF THE SUBJECT PAVEMENT SECTION OR, THE DEVELOPER MAY USE THE LOCAL ENTITY'S DEFAULT PAVEMENT THICKNESS SECTION(S).
REGARDLESS OF THE OPTION USED, ALL FINAL SOILS/PAVEMENT DESIGN REPORTS SHALL BE PREPARED BY A LICENSED PROFESSIONAL ENGINEER. THE
FINAL REPORT SHALL BE SUBMITTED TO THE INSPECTOR A MINIMUM OF 10 WORKING DAYS PRIOR TO PLACEMENT OF BASE AND ASPHALT. PLACEMENT OF
CURB, GUTTER, SIDEWALK, BASE AND ASPHALT SHALL NOT OCCUR UNTIL THE LOCAL ENTITY ENGINEER APPROVES THE FINAL REPORT.
25. THE CONTRACTOR SHALL HIRE A LICENSED ENGINEER OR LAND SURVEYOR TO SURVEY THE CONSTRUCTED ELEVATIONS OF THE STREET SUBGRADE
AND THE GUTTER FLOWLINE AT ALL INTERSECTIONS, INLETS, AND OTHER LOCATIONS REQUESTED BY THE LOCAL ENTITY INSPECTOR. THE ENGINEER OR
SURVEYOR MUST CERTIFY IN A LETTER TO THE LOCAL ENTITY THAT THESE ELEVATIONS CONFORM TO THE APPROVED PLANS AND SPECIFICATIONS. ANY
DEVIATIONS SHALL BE NOTED IN THE LETTER AND THEN RESOLVED WITH THE LOCAL ENTITY BEFORE INSTALLATION OF BASE COURSE OR ASPHALT WILL BE
ALLOWED ON THE STREETS.
26. ALL UTILITY INSTALLATIONS WITHIN OR ACROSS THE ROADBED OF NEW RESIDENTIAL ROADS MUST BE COMPLETED PRIOR TO THE FINAL STAGES OF
ROAD CONSTRUCTION. FOR THE PURPOSES OF THESE STANDARDS, ANY WORK EXCEPT C/G ABOVE THE SUBGRADE IS CONSIDERED FINAL STAGE WORK.
ALL SERVICE LINES MUST BE STUBBED TO THE PROPERTY LINES AND MARKED SO AS TO REDUCE THE EXCAVATION NECESSARY FOR BUILDING
CONNECTIONS.
27. PORTIONS OF LARIMER COUNTY ARE WITHIN OVERLAY DISTRICTS. THE LARIMER COUNTY FLOODPLAIN RESOLUTION SHOULD BE REFERRED TO FOR
ADDITIONAL CRITERIA FOR ROADS WITHIN THESE DISTRICTS.
28. ALL ROAD CONSTRUCTION IN AREAS DESIGNATED AS WILD FIRE HAZARD AREAS SHALL BE DONE IN ACCORDANCE WITH THE CONSTRUCTION
CRITERIA AS ESTABLISHED IN THE WILD FIRE HAZARD AREA MITIGATION REGULATIONS IN FORCE AT THE TIME OF FINAL PLAT APPROVAL.
29. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT THE LOCAL ENTITY FORESTER TO SCHEDULE A SITE
INSPECTION FOR ANY TREE REMOVAL REQUIRING A PERMIT.
30. THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO, EXCAVATION, TRENCHING, SHORING,
TRAFFIC CONTROL, AND SECURITY. REFER TO OSHA PUBLICATION 2226, EXCAVATING AND TRENCHING.
31. THE DEVELOPER SHALL SUBMIT A CONSTRUCTION TRAFFIC CONTROL PLAN, IN ACCORDANCE WITH MUTCD, TO THE APPROPRIATE RIGHT-OF-WAY
AUTHORITY. (LOCAL ENTITY, COUNTY OR STATE), FOR APPROVAL, PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN, OR AFFECTING, THE RIGHT-OF-WAY.
THE DEVELOPER SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY THE CONSTRUCTION
ACTIVITIES.
32. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION THAT WILL AFFECT TRAFFIC SIGNS OF ANY TYPE, THE CONTRACTOR SHALL CONTACT LOCAL
ENTITY TRAFFIC OPERATIONS DEPARTMENT, WHO WILL TEMPORARILY REMOVE OR RELOCATE THE SIGN AT NO COST TO THE CONTRACTOR; HOWEVER, IF
THE CONTRACTOR MOVES THE TRAFFIC SIGN THEN THE CONTRACTOR WILL BE CHARGED FOR THE LABOR, MATERIALS AND EQUIPMENT TO REINSTALL THE
SIGN AS NEEDED.
33. THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR THE INITIAL INSTALLATION OF TRAFFIC SIGNING AND STRIPING FOR THE DEVELOPMENT
RELATED TO THE DEVELOPMENT'S LOCAL STREET OPERATIONS. IN ADDITION, THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR TRAFFIC SIGNING AND
STRIPING RELATED TO DIRECTING TRAFFIC ACCESS TO AND FROM THE DEVELOPMENT.
34. THERE SHALL BE NO SITE CONSTRUCTION ACTIVITIES ON SATURDAYS, UNLESS SPECIFICALLY APPROVED BY THE LOCAL ENTITY ENGINEER, AND NO
SITE CONSTRUCTION ACTIVITIES ON SUNDAYS OR HOLIDAYS, UNLESS THERE IS PRIOR WRITTEN APPROVAL BY THE LOCAL ENTITY.
35. THE DEVELOPER IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDED
IMPROVEMENTS, SHOWN ON THESE DRAWINGS, OR DESIGNATED TO BE PROVIDED, INSTALLED, OR CONSTRUCTED, UNLESS SPECIFICALLY NOTED
OTHERWISE.
36. DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. IF PERTINENT DIMENSIONS ARE NOT SHOWN, CONTACT
THE DESIGNER FOR CLARIFICATION, AND ANNOTATE THE DIMENSION ON THE AS-BUILT RECORD DRAWINGS.
37. THE DEVELOPER SHALL HAVE, ONSITE AT ALL TIMES, ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE
STANDARDS AND SPECIFICATIONS, AND A COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB.
38. IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE
PLANS OR SPECIFICATIONS, THE DEVELOPER SHALL CONTACT THE DESIGNER AND THE LOCAL ENTITY ENGINEER IMMEDIATELY.
39. THE DEVELOPER SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON A SET OF RECORD DRAWINGS KEPT ON THE CONSTRUCTION
SITE, AND AVAILABLE TO THE LOCAL ENTITY'S INSPECTOR AT ALL TIMES. UPON COMPLETION OF THE WORK, THE CONTRACTOR(S) SHALL SUBMIT RECORD
DRAWINGS TO THE LOCAL ENTITY ENGINEER.
40. THE DESIGNER SHALL PROVIDE, IN THIS LOCATION ON THE PLAN, THE LOCATION AND DESCRIPTION OF THE NEAREST SURVEY BENCHMARKS (2) FOR
THE PROJECT AS WELL AS THE BASIS OF BEARINGS. THE INFORMATION SHALL BE AS FOLLOWS:
BENCHMARKS--LOCAL ENTITY SURVEY.
B.M.NUMBER 16-01, ELEV.= 4956.98 (NAVD88 VERTICAL DATUM)
DESCRIPTION: SOUTH SIDE OF WILLOW SPRINGS WAY APPROX. 50 FT. WEST OF THE INTERSECTION OF WILLOW SPRINGS WAY AND TIMBERLINE ROAD ON
THE SOUTHWEST CORNER OF A STORM INLET.
HORIZONTAL DATUM: CITY OF FORT COLLINS GROUNDMASTER
41. ALL STATIONING IS BASED ON CENTERLINE/FLOWLINE (INSERT PROPER WORD) OF ROADWAYS UNLESS OTHERWISE NOTED.
42. DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS EXISTING FENCES, TREES, STREETS, SIDEWALKS, CURBS
AND GUTTERS, LANDSCAPING, STRUCTURES, AND IMPROVEMENTS DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL
BE REPLACED OR RESTORED IN LIKE KIND AT THE DEVELOPER'S EXPENSE, UNLESS OTHERWISE INDICATED ON THESE PLANS, PRIOR TO THE ACCEPTANCE
OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY.
43. WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS ORIGINAL
CONDITION. THE EXISTING STREET CONDITION SHALL BE DOCUMENTED BY THE LOCAL ENTITY CONSTRUCTION INSPECTOR BEFORE ANY CUTS ARE MADE.
PATCHING SHALL BE DONE IN ACCORDANCE WITH THE LOCAL ENTITY STREET REPAIR STANDARDS. THE FINISHED PATCH SHALL BLEND IN SMOOTHLY INTO
THE EXISTING SURFACE. ALL LARGE PATCHES SHALL BE PAVED WITH AN ASPHALT LAY-DOWN MACHINE. IN STREETS WHERE MORE THAN ONE CUT IS MADE,
AN OVERLAY OF THE ENTIRE STREET WIDTH, INCLUDING THE PATCHED AREA, MAY BE REQUIRED. THE DETERMINATION OF NEED FOR A COMPLETE
OVERLAY SHALL BE MADE BY THE LOCAL ENTITY ENGINEER AND/OR THE LOCAL ENTITY INSPECTOR AT THE TIME THE CUTS ARE MADE.
44. UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH
EXISTED BEFORE CONSTRUCTION, OR TO THE GRADES AND CONDITION AS REQUIRED BY THESE PLANS.
45. STANDARD HANDICAP RAMPS ARE TO BE CONSTRUCTED AT ALL CURB RETURNS AND AT ALL “T” INTERSECTIONS.
46. AFTER ACCEPTANCE BY THE LOCAL ENTITY, PUBLIC IMPROVEMENTS DEPICTED IN THESE PLANS SHALL BE GUARANTEED TO BE FREE FROM
MATERIAL AND WORKMANSHIP DEFECTS FOR A MINIMUM PERIOD OF TWO YEARS FROM THE DATE OF ACCEPTANCE.
47. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF ROADWAY AND APPURTENANT IMPROVEMENTS, INCLUDING STORM
DRAINAGE STRUCTURES AND PIPES, FOR THE FOLLOWING PRIVATE STREETS: (LIST).
48. APPROVED VARIANCES ARE LISTED AS FOLLOWS: NOT APPLICABLE.
KIM ROSE
3147 TWIN WASH SQ.
FORT COLLINS, COLORADO 80528
(970) 226-1241
KIM@RCHLLC.NET
CIVIL ENGINEER:
KEEFE CIVIL
MEGAN KEEFE, P.E.
825 UNION STREET
GOLDEN, COLORADO 80401
(970) 215-6808
MEG@KEEFECIVIL.COM
SURVEYOR:
MAJESTIC SURVEYING
STEVEN PARKS, PLS
(970) 443-0882
STEVENP@MAJESTICSURVEYING.COM
GEOTECHNICAL ENGINEER:
NORTHERN COLORADO GEOTECH
DOUG LEAFGREN, P.G.
2956 29TH STREET, UNIT 21
GREELEY, COLORADO 80631
(970) 506-9244
ARCHITECT:
MARKLEY DESIGNS
1019 39TH AVENUE, SUITE L
GREELEY, COLORADO 80634
(970) 673-8248
PROJECT LOCATION
1 OF 5
COVER SHEET