HomeMy WebLinkAboutMONTAVA PUD - ODP180002 - MONTAVA SUBMITTAL DOCUMENTS - ROUND 3 - PLANSSheet Number:
Project Number:
Project:
Client:
1603 Oakridge Drive
Fort Collins, CO 80525
p. (970) 223-7577
www.BHADesign.com
Landscape Architecture
Urban Design
Master Planning
L:\PROJECTS\MONTAVA\DWGS\ACAD\PUD\DWG\PUD_EX-COND-PLAN.DWG
Plot Date:1/23/2019 8:28 AM Plotted By: Angie Milewski
Date Created:9/18/2018
Produced by:
Date:
Revision & Date:
AKM
1/23/2019
1734
HF2M
MONTAVA MONTAVA
COVER SHEET
PUD MASTER PLAN
1. THIS MONTAVA - PUD MASTER PLAN CONSISTS OF: MONTAVA - PUD MASTER PLAN SHEETS 1 THROUGH 7, IDENTIFIED IN THE
SHEET INDEX; THE MONTAVA PUD MASTER PLAN PUD DESIGN NARRATIVE; THE MONTAVA PUD MASTER PLAN USES, DENSITIES
AND DEVELOPMENT STANDARDS; VARIANCES FROM ENGINEERING DESIGN STANDARDS; AND THE APPLICANT'S REQUEST FOR
VESTED PROPERTY RIGHTS.
2. PURSUANT TO ORDINANCE NO. _____, 2019 OF THE CITY COUNCIL OF THE CITY OF FORT COLLINS, COLORADO, THIS MONTAVA -
PUD MASTER PLAN AND THE MONTAVA PUD MASTER PLAN DEVELOPMENT AGREEMENT ARE APPROVED AS SITE SPECIFIC
DEVELOPMENT PLANS FOR THE PURPOSE OF GRANTING VESTED PROPERTY RIGHTS FOR THE USES, DENSITIES, DEVELOPMENT
STANDARDS AND VARIANCES FROM ENGINEERING DESIGN STANDARDS ALL AS SET FORTH IN THIS MONTAVA - PUD MASTER
PLAN AND THE MONTAVA PUD MASTER PLAN DEVELOPMENT AGREEMENT FOR A PERIOD OF TWENTY-FIVE (25) YEARS AFTER
THE EFFECTIVE DATE OF ORDINANCE NO. ____, 2019.
3. THE FOLLOWING DOCUMENTS WERE SUBMITTED TO THE CITY OF FORT COLLINS AS PART OF THE MONTAVA - PUD MASTER
PLAN SUBMITTAL, ARE ON FILE IN THE PLANNING DEPARTMENT OF THE CITY OF FORT COLLINS AND INCORPORATED INTO THE
MONTAVA RECORD:
EXISTING CONDITIONS & NATURAL FEATURES MAP
MASTER DRAINAGE REPORT
MASTER TRAFFIC IMPACT STUDY
PHASE 1 ENVIRONMENTAL ASSESSMENT
PRELIMINARY SUBSURFACE EXPLORATION REPORT
ECOLOGICAL CHARACTERIZATION REPORT
PARKS DIAGRAM
BICYCLE PLAN
BLOCK LEVEL DETAIL STUDIES
ARTERIAL INTERSECTIONS DIAGRAM
PEDESTRIAN SHEDS
GRADING AND UTILITY PLANS
STAFF COMMENT AND RESPONSES
4. PUBLIC STREETS SHALL COMPLY WITH THE "LARIMER COUNTY URBAN AREA STREET STANDARDS" OR APPROVED VARIANCES
THERETO. THE ACCESS POINTS SHOWN ON THIS MONTAVA - PUD MASTER PLAN ARE APPROXIMATE LOCATIONS ONLY. FINAL
LOCATIONS OF ACCESS POINTS WILL BE DETERMINED AT THE TIME OF INDIVIDUAL PROJECT DEVELOPMENT PLAN REVIEW AND
APPROVAL.
5. PER LUC SECTION 3.7.3(E)(1), ALL TRANSPORTATION, WATER AND WASTEWATER, STORM DRAINAGE, EMERGENCY SERVICES,
AND ELECTRIC POWER FACILITIES SHALL MEET THE REQUIREMENTS OF ADEQUATE PUBLIC FACILITIES AT THE TIME OF
INDIVIDUAL PROJECT DEVELOPMENT PLAN REVIEW AND APPROVAL.
6. THIS MONTAVA - PUD MASTER PLAN SHOWS THE GENERAL LOCATION AND APPROXIMATE SIZE OF NATURAL AREAS, HABITATS
AND FEATURES WITHIN ITS BOUNDARIES AND THE PROPOSED ROUGH ESTIMATE OF THE NATURAL AREA BUFFER ZONE AS
IDENTIFIED AND REQUIRED BY LAND USE CODE SECTION 3.4.1(E). DETAILED MAPPING OF NATURAL AREAS, HABITATS, AND
EXISTING TREE WITH ACTIVE
RED-TAIL HAWK NEST
50' BUFFER ZONE FROM
IRRIGATION DITCH
100'
100'
80'
50'
CENTER PIVOT
ACCESS ROAD
IRRIGATION DITCH 1
IRRIGATION DITCH 2
IRRIGATION DITCH 3
IRRIGATION DITCH 5
IRRIGATION DITCH 4
WETLAND 1
WETLAND 2
WETLAND 3
GRAVEL ROAD
EXT. BUILDING, TYP.
50' OVERHEAD POWER ESMT.
100' SANITARY SEWER ESMT.
100' SANITARY
SEWER ESMT.
EXT. GRAVEL
ROAD
LIMITS OF DEVELOPMENT
TEMPORARY 450' LOD RADIUS
DURING ACTIVE NESTING
SEASON FEB 15 - JUL 15
MOUNTAIN VISTA DRIVE (CR 50)
STATE OF COLORADO
RICHARDS LAKE ROAD (CR 52)
NORTH GIDDINGS ROAD
BUSCH DR.
I-25 SOUTH BOUND
I-25 NORTH BOUND
I-25 SOUTH BOUND
I-25 NORTH BOUND
BUSCH DR.
ANHEUSER BUSCH LLC
L&W CANAL
STORYBROOK SUBDIVISION
MAPLE HILL SUBDIVISION
MAPLE HILL
PARK
WATERGLEN SUBDIVISION
TURNBERRY ROAD (CR 11)
LIND SUBDIVISION
FORT COLLINS FARM LLC.
ANHEUSER
BUSCH LLC.
POUDRE R-1
SCHOOL
DISTRICT
K AND M CO.
COUNTRY CLUB ROAD
RICHARDS LAKE ROAD (CR 52)
MOUNTAIN VISTA DRIVE (CR 50)
NORTH GIDDINGS ROAD
Sheet Number:
Project Number:
Project:
Client:
/USERS/MATT/ELC/SHARED/PROJECTS-2015_2019/1725-MONTAVA/1725-02-FILES/1725-MASTERPLAN/01-RESOURCE/TITLE_BLOCK/PUD_SUBMITTAL/24X36_TITLE_BLOCK_PUD_CONSULTANT.DWG
Plot Date:9/13/2018 10:34 AM Plotted By: Matthew Lambert
Date Created:9/13/2018
Produced by:
Date:
Revision & Date:
X.X.
X.X.XXX
1734
HF2M
MONTAVA MONTAVA
OVERALL UTILITY PLAN
PUD MASTER PLAN
01/22/19
DPZ CODESIGN
CITY OF FORT COLLINS PARK
PSD HIGH SCHOOL
PSD MIDDLE SCHOOL
PSD ELEMENTARY
SCHOOL
OVERALL MASTER PLAN
MOUNTAIN VISTA DR
N TIMBERLINE RD
RICHARDS LAKE RD
N GIDDINGS RD
INTERSTATE 25
TURNBERRY RD
Civic Building
T5 Town Center Building
T5 Town Center Employment
T5 Urban Center Neighborhood
T4 General Urban Neighborhood
T3 Sub-urban Neighborhood
T2 Rural Neighborhood
Industrial Land
Parks, Schools, Open Space
Natural Areas & Stormwater
Farm
0’ 200’ 400’ 600’ 800’ 1,600’
3
Sheet Number:
Project Number:
Project:
Client:
/USERS/MATT/ELC/SHARED/PROJECTS-2015_2019/1725-MONTAVA/1725-02-FILES/1725-MASTERPLAN/01-RESOURCE/TITLE_BLOCK/PUD_SUBMITTAL/24X36_TITLE_BLOCK_PUD_CONSULTANT.DWG
Plot Date:9/13/2018 10:34 AM Plotted By: Matthew Lambert
Date Created:9/13/2018
Produced by:
Date:
Revision & Date:
X.X.
X.X.XXX
1734
HF2M
MONTAVA MONTAVA
OVERALL UTILITY PLAN
PUD MASTER PLAN
01/22/19
DPZ CODESIGN
CITY OF FORT COLLINS PARK
PSD HIGH SCHOOL
PSD MIDDLE SCHOOL
PSD ELEMENTARY
SCHOOL
ANNOTATED MASTER PLAN
MOUNTAIN VISTA DR
N TIMBERLINE RD
RICHARDS LAKE RD
N GIDDINGS RD
TURNBERRY RD
Civic Program
1 Library
2 Civic Building Reserve
3 Fire Station
4 Elementary School
5 Middle School
6 High School
Civic Space Program
7 Park - City of Fort Collins Park
8 Plaza - With Active Programming
9 Square - Passive
10 Square - With Active Programming and
Stormwater Area
11 Green - Passive
12 Green - With Active Programming
13 Green - With Passive Recreation /
Stormwater Area
14 Compact Green - Passive
15 Linear Greenway - Passive
16 Linear Greenway - With Stormwater
Conveyance
17 Natural Areas & Stormwater
Management
Miscellaneous
18 Red-tailed Hawk Nest
19 Gas Well
Civic Space Program Activities
Formal Gatherings, Performances: 8, 12
Community Gardens: 7, 10, 11, 13, 14
Playgrounds: 7, 9, 10, 11, 13, 14
Sheet Number:
Project Number:
Project:
Client:
/USERS/MATT/ELC/SHARED/PROJECTS-2015_2019/1725-MONTAVA/1725-02-FILES/1725-MASTERPLAN/01-RESOURCE/TITLE_BLOCK/PUD_SUBMITTAL/24X36_TITLE_BLOCK_PUD_CONSULTANT.DWG
Plot Date:9/13/2018 10:34 AM Plotted By: Matthew Lambert
Date Created:9/13/2018
Produced by:
Date:
Revision & Date:
X.X.
X.X.XXX
1734
HF2M
MONTAVA MONTAVA
OVERALL UTILITY PLAN
PUD MASTER PLAN
10/16/18
DPZ CODESIGN
CITY OF FORT COLLINS PARK
PSD HIGH SCHOOL
PSD MIDDLE SCHOOL
PSD ELEMENTARY
SCHOOL
PUD DISTRICTS - ILLUSTRATIVE
MOUNTAIN VISTA DR
N TIMBERLINE RD
RICHARDS LAKE RD
N GIDDINGS RD
INTERSTATE 25
TURNBERRY RD
0’ 200’ 400’ 600’ 800’ 1,600’
T5 Urban Center / Mixed-use
T4 General Urban Neighborhood
T3.2 Sub-urban Neighborhood
T3.1 Rural Neighborhood
T2 Rural / Farm
City Park & Open Space
Poudre School District
Natural Areas & Stormwater
Industrial & Employment
L - M - N -
LOW -DENSITY
MIXED USE
NEIGHBORHOOD
E - EMPLOYMENT
E - EMPLOYMENT I - INDUSTRIAL Existing Zoning
BHA DESIGN, INC.
10/22/18
EXISTING ZONING
7
10.23.2018
5
Sheet Number:
Project Number:
Project:
Client:
/USERS/MATT/ELC/SHARED/PROJECTS-2015_2019/1725-MONTAVA/1725-02-FILES/1725-MASTERPLAN/01-RESOURCE/TITLE_BLOCK/PUD_SUBMITTAL/24X36_TITLE_BLOCK_PUD_CONSULTANT.DWG
Plot Date:9/13/2018 10:34 AM Plotted By: Matthew Lambert
Date Created:9/13/2018
Produced by:
Date:
Revision & Date:
X.X.
X.X.XXX
1734
HF2M
MONTAVA MONTAVA
OVERALL UTILITY PLAN
PUD MASTER PLAN
10/16/18
DPZ CODESIGN
CITY OF FORT COLLINS PARK
PSD
PSDL
PSD
PUD DISTRICTS
MOUNTAIN VISTA DR
N TIMBERLINE RD
RICHARDS LAKE RD
N GIDDINGS RD
INTERSTATE 25
TURNBERRY RD
0’ 200’ 400’ 600’ 800’ 1,600’
(T5) Urban Center / Mixed-use
(T4) General Urban Neighborhood
(T3.2) Sub-urban Neighborhood
(T3.1) Rural Neighborhood
(T2) Rural / Farm
City of Fort Collins Park
(PSD) Poudre School District
(S) Natural Areas & Stormwater
(I) Industrial & Employment
T2
T5
T4
T4
T4
T5
T3.2
T3.1 T3.1
T3.2
T4
T4
T4
T4
T4
T5 T5
T5
T5 T5
T4
T3.2
T3.2
Sheet Number:
Project Number:
Project:
Client:
/USERS/MATT/ELC/SHARED/PROJECTS-2015_2019/1725-MONTAVA/1725-02-FILES/1725-MASTERPLAN/01-RESOURCE/TITLE_BLOCK/PUD_SUBMITTAL/24X36_TITLE_BLOCK_PUD_CONSULTANT.DWG
Plot Date:9/13/2018 10:34 AM Plotted By: Matthew Lambert
Date Created:9/13/2018
Produced by:
Date:
Revision & Date:
X.X.
X.X.XXX
1734
HF2M
MONTAVA MONTAVA
OVERALL UTILITY PLAN
PUD MASTER PLAN
10/16/18
DPZ CODESIGN
CITY OF FORT COLLINS PARK
PSD HIGH SCHOOL
PSD MIDDLE SCHOOL
PSD ELEMENTARY
SCHOOL
PUD DISTRICTS - ILLUSTRATIVE
MOUNTAIN VISTA DR
N TIMBERLINE RD
RICHARDS LAKE RD
N GIDDINGS RD
INTERSTATE 25
TURNBERRY RD
0’ 200’ 400’ 600’ 800’ 1,600’
T5 Urban Center / Mixed-use
T4 General Urban Neighborhood
T3.2 Sub-urban Neighborhood
T3.1 Rural Neighborhood
T2 Rural / Farm
City Park & Open Space
Poudre School District
Natural Areas & Stormwater
Industrial & Employment
14
CITY OF FORT COLLINS PARK
PSD HIGH SCHOOL
PSD MIDDLE SCHOOL
PSD ELEMENTARY
SCHOOL
PHASE 1A
PHASE 1B
PHASE 2A
PHASE 2B
PHASE 3B
PHASE 1B
PHASE 3A
PHASE 4A
PHASE 3B
PHASE 4B
PHASE 5B
PHASE 5A
PHASE 6
PHASE 1B PHASE 3 - 6
CONCEPTUAL PHASING PLAN
10.23.2018
CONCEPTUAL DEVELOPMENT PHASING PLAN
7
T3.1
S
S
S
S
I
8
10.23.2018
6
PUD TRANSECT DISTRICTS
AND SPECIAL DISTRICTS
0’ 200’ 400’ 600’ 800’ 1,600’
3
1
2
2
4
5
6
7
7
13
8
10
15
15
15
16
16
16
16
16
16
16
15
15
8 8
14
9
12
12
11
14
14
13
17
17
17
17
17
17
17
16
16
14
14
14
14
14
16 16 16 16
18
19
19
19
19
INTERSTATE 25
4
EXISTING OIL WELL -
CAPPED AND ABANDONED
150' ALTERNATIVE COMPLIANCE
REDUCED BUFFER
500' BUFFER
EXISTING OIL WELL - DRILLED
AND ABANDONED
150' ALTERNATIVE COMPLIANCE
REDUCED BUFFER
500' BUFFER
EXISTING TREES, TYP.
EXISTING OIL WELL -
CAPPED AND ABANDONED
150' ALTERNATIVE COMPLIANCE
REDUCED BUFFER
500' BUFFER
EXISTING OIL WELL -
CAPPED AND ABANDONED
150' ALTERNATIVE COMPLIANCE
REDUCED BUFFER
500' BUFFER
PUD BOUNDARY /
LIMITS OF DEVELOPMENT
PUD BOUNDARY /
LIMITS OF DEVELOPMENT
TURNBERRY RD (CR 11)
PUD BOUNDARY /
LIMITS OF DEVELOPMENT
NO. 8 DITCH / WETLAND 4
PUD BOUNDARY
PUD BOUNDARY /
LIMITS OF DEVELOPMENT
LIMITS OF DEVELOPMENT
PUD BOUNDARY / LIMITS OF DEVELOPMENT
BNSF RAILWAY
PUD BOUNDARY / LIMITS OF DEVELOPMENT
CITY OF
FORT
COLLINS
BNSF RAILWAY
PUD BOUNDARY / LIMITS OF DEVELOPMENT
LIMITS OF DEVELOPMENT
LIMITS OF DEVELOPMENT
PUD BOUNDARY
LIMITS OF DEVELOPMENT
NO. 8 DITCH / WETLAND 4
NO. 8 DITCH
NORTH TIMBERLINE ROAD
L&W CANAL
Sheet Number:
Project Number:
Project:
Client:
1603 Oakridge Drive
Fort Collins, CO 80525
p. (970) 223-7577
www.BHADesign.com
Landscape Architecture
Urban Design
Master Planning
L:\PROJECTS\MONTAVA\DWGS\ACAD\PUD\DWG\PUD_EX-COND-PLAN.DWG
Plot Date:1/22/2019 7:57 PM Plotted By: Angie Milewski
Date Created:9/18/2018
Produced by:
Date:
Revision & Date:
AKM
1/23/2019
1734
HF2M
MONTAVA MONTAVA
EX CONDITIONS & NATURAL FEATURES
PUD MASTER PLAN
1. THIS PLANNED UNIT DEVELOPMENT PLAN SHOWS THE GENERAL LOCATION AND APPROXIMATE SIZE OF
ALL NATURAL AREAS, HABITATS, AND FEATURES WITHIN ITS BOUNDARIES AND THE PROPOSED ROUGH
ESTIMATE OF THE NATURAL AREA BUFFER ZONES AS REQUIRED BY LAND USE CODE SECTION 3.4.1(E).
DETAILED MAPPING OF THE SITE'S NATURAL AREAS, HABITATS, AND FEATURES WILL BE PROVIDED AT
THE TIME OF INDIVIDUAL PDP SUBMITTALS. GENERAL BUFFER ZONES SHOWN ON THIS PUD MAY BE
REDUCED OR ENLARGED BY THE DECISION MAKER DURING THE PUD PROCESS."
2. A SITE VISIT MAY BE NECESSARY TO DETERMINE WHICH FEATURES REQUIRE DOCUMENTATION AND
BUFFERING ON THE PUD.
3. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL
HABITAT BUFFER ZONES.
4. STANDARDS FOR PROTECTION DURING CONSTRUCTION - THE DIRECTOR SHALL ESTABLISH A "LIMITS
OF DEVELOPMENT" ("LOD") LINE(S) TO ESTABLISH THE BOUNDARY OF THE PROJECT OUTSIDE OF
WHICH NO LAND DISTURBANCE ACTIVITIES WILL OCCUR DURING THE CONSTRUCTION OF THE
PROJECT.
5. SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE BUFFER ZONE.
6. CONSTRUCTION SHALL BE ORGANIZED AND TIMED TO MINIMIZE THE DISTURBANCE OF SENSITIVE
SPECIES OCCUPYING OR USING ON-SITE AND ADJACENT NATURAL HABITATS OR FEATURES.
7. CONSTRUCTION OF BARRIER FENCING SHALL BE PROVIDED AT THE LIMITS OF THE DEVELOPMENT
DURING CONSTRUCTION.
8. BY PDP PROJECT HEARING: CONFIRMATION UNITED STATES ARMY CORPS OF ENGINEERS (USACE)
JURISDICTIONAL DETERMINATION PROCESS HAS BEGUN; ESSENTIALLY THAT USACE HAS BEEN
CONTACTED AND DATA SUBMITTED.
9. BY PDP FINAL PLAN AND NO LATER THAN DEVELOPMENT CONSTRUCTION PERMIT (DCP):
DOCUMENTATION OF JURISDICTIONAL DETERMINATION LETTER FROM USACE AND SIGN_OFF THAT
PROJECT MEETS CLEAN WATER ACT REQUIREMENTS.
10. BY DEVELOPMENT AGREEMENT (DA): WEED MANAGEMENT AND NHBZ ANNUAL MONITORING PLANS
11. PRIOR TO ISSUANCE OF DCP: COPY OF NATIONWIDE 404 PERMIT DOCUMENTATION.
12. PRIOR TO ISSUANCE OF DCP: 1) ENVIRONMENTAL PLANNING APPROVED SECURITY BASED ON 125%
COST OF ITEMIZED LIST OF NHBZ INSTALLATION COSTS (MATERIAL AND LABOR); 2) SECURITY BASED
ON 125% COST OF WEED MANAGEMENT AND ANNUAL MONITORING REPORT.
13. A FULL TREE INVENTORY FOR MITIGATION REQUIREMENTS WILL BE CONDUCTED AT THE TIME OF PDP
FOR EACH PHASE
NATURAL HABITATS AND FEATURES NOTES NATURAL FEATURES SQ. FT. TABLE
APPROX. SQUARE FOOTAGES OF NATURAL FEATURES WITHIN PUD
AREA (AS DETERMINED BY ERO: ECOLOGICAL CHARACTERIZATION
SURVEY, JUNE 27, 2018)
NON-JURISDICTIONAL FEATURES
NAME SIZE: AC (SF)
1 IRRIGATION DITCH 1 0.011 AC (479.16 SF)
2 IRRIGATION DITCH 2 0.031 AC (1,350.36 SF)
3 IRRIGATION DITCH 3 0.042 AC (1,829.52 SF)
4 IRRIGATION DITCH 4 0.038 AC (1,655.28 SF)
5 IRRIGATION DITCH 5 0.047 AC (2,047.32 SF)
6 WETLAND 1 0.42 AC (18,295.2 SF)
7 WETLAND 2 0.72 AC (31,363.2 SF)
TOTAL 1.309 AC (57,020.04 SF)
JURISDICTIONAL FEATURES
8 WETLAND 3 0.30 AC (13,068.0 SF)
9 WETLAND 4/NO 8 DITCH 0.813 AC (35,414.28 SF)
TOTAL 1.113 AC (48,482.28 SF)
2
0 225' 450' 675' 900' 1800'
FEATURES WILL BE PROVIDED AT THE TIME OF INDIVIDUAL PROJECT DEVELOPMENT PLAN SUP BMITTALS. GENERAL BUFFER
ZONES SHOWN ON THIS MONTAVA - PUD MASTER PLAN MAY BE REDUCED OR ENLARGED BY THE DECISION MAKER FOR
INDIVIDUAL PROJECT DEVELOPMENT PLANS IN ACCORDANCE WITH LAND USE CODE SECTION (E)(1).
7. AT THE TIME OF EACH PROJECT DEVELOPMENT PLAN, AN ECOLOGICAL CHARACTERIZATION STUDY (ECS) WILL BE PERFORMED
TO MATCH THE SCOPE OF THE PROJECT DEVELOPMENT PLAN. EACH SUCH ECS WILL DOCUMENT EXISTING SIGNIFICANT
ECOLOGICAL VALUE OF THE SITE, AND PROPOSE MITIGATION FOR THE IMPACTS THE DEVELOPMENT WILL HAVE TO THE
ECOLOGICAL VALUE OF THE SITE AS REQUIRED BY LAND USE CODE SECTION 3.4.1.
NOTES
OWNER'S CERTIFICATION
KNOW ALL MEN BY THESE PRESENTS THAT the Poudre R-1 School District, a political subdivision of the State of Colorado, certifies that it is a lawful
owner of property within the Montava - PUD Master Plan and consents to the inclusion of its property therein, but acknowledges that development of its
property is not subject to the jurisdiction of the City of Fort Collins or the requirements of the Montava – PUD Master Plan. [Note: This certification is under
discussion with the City Attorney.]
POUDRE R-1 SCHOOL DISTRICT
By: ____________________________
Printed Name: ___________________
Title: __________________________
APPROVED:
This Planned Unit Development to be known as the Montava - PUD Master Plan is approved by Ordinance No. _______, 2019, passed and
adopted on final reading at a regular meeting of the City Council of Fort Collins, Colorado, held on April 16, 2019.
______________________
City Clerk
SHEET INDEX
SHEET 1 COVER SHEET
SHEET 2 EXISTING CONDITIONS AND NATURAL FEATURES
SHEET 3 OVERALL MASTER PLAN
SHEET 4 ANNOTATED MASTER PLAN
SHEET 5 EXISTING ZONING
SHEET 6 PUD TRANSECT DISTRICTS AND SPECIAL DISTRICTS
SHEET 7 CONCEPTUAL DEVELOPMENT PHASING PLAN
VICINITY MAP
NTS
LANDSCAPE ARCHITECT:
BHA DESIGN, INC.
1603 OAKRIDGE DRIVE, SUITE 100
FORT COLLINS, CO 80525
PHONE: 970.223.7577
CONTACT: ANGELA MILEWSKI
EMAIL: AMILEWSKI@BHADESIGN.COM
CIVIL ENGINEER:
MARTIN/MARTIN, INC.
12499 W COLFAX AVE
LAKEWOOD, CO 80215
PHONE: 303.431.6100
CONTACT: PETER BUCKLEY
EMAIL: PBUCKLEY@MARTINMARTIN.COM
TEAM DIRECTORY
SITE
N O R T H
OWNER/DEVELOPER:
HF2M
430 N COLLEGE AVE. SUITE 410
FORT COLLINS, COLORADO 80521
PHONE: 512.507.5570
CONTACT: MAX MOSS
EMAIL: MAX@HF2M.COM
1
PLANNER:
DPZ
7435 NE HALSEY ST
PORTLAND, OR 97213
PHONE: 305.799.3892
CONTACT: MATT LAMBERT
EMAIL: MATT@DPZ.COM
TRAFFIC CONSULTANT:
RUTH ROLLINS CONSULT, INC.
PHONE: 970.213.2393
CONTACT: RUTH ROLLINS
EMAIL: RUTHIE.ROLLINS@GMAIL.COM
TRAFFIC ENGINEER:
NELSON\NYGAARD
77 FRANKLIN STREET, 10TH FLOOR
BOSTON, MA 02110
PHONE: 857.305.8005
CONTACT: MICHAEL RIEBE
EMAIL: MRIEBE@NELSONNYGAARD.COM
MONTAVA - PUD MASTER PLAN
A PARCEL OF LAND SITUATE IN THE EAST HALF OF SECTION 32, AND THE WEST HALF OF SECTION
33, TOWNSHIP 8 NORTH, RANGE 68 WEST OF THE SIXTH PRINCIPAL MERIDIAN, AND THE NORTH
HALF OF SECTION 4, TOWNSHIP 7 NORTH, RANGE 68 WEST OF THE SIXTH PRINCIPAL MERIDIAN,
CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO; AND BEING MORE
PARTICULARLY DESCRIBED AS FOLLOWS:
BEGINNING AT THE NORTH QUARTER CORNER OF SECTION 32 WHENCE THE SOUTH QUARTER
CORNER BEARS S00°29'18"E A DISTANCE OF 5289.91 FEET AND CONSIDERING ALL BEARINGS
HEREIN RELATIVE THERETO;
THENCE S89°35'02"E A DISTANCE OF 2638.10 FEET;
THENCE S89°53'24"E A DISTANCE OF 1773.90 FEET;
THENCE S00°00'00"E A DISTANCE OF 472.51 FEET;
THENCE S89°53'24"E A DISTANCE OF 864.73 FEET;
THENCE S00°16'21"E A DISTANCE OF 1513.06 FEET;
THENCE S89°59'54"E A DISTANCE OF 397.54 FEET;
THENCE S00°20'11"E A DISTANCE OF 380.10 FEET;
THENCE S89°59'31"E A DISTANCE OF 397.12 FEET;
THENCE S00°16'21"E A DISTANCE OF 2906.93 FEET;
THENCE S00°06'47"E A DISTANCE OF 50.00 FEET;
THENCE S89°47'00"E A DISTANCE OF 945.36 FEET;
THENCE S00°00'50"E A DISTANCE OF 15.00 FEET;
THENCE N89°59'10"E A DISTANCE OF 1022.26 FEET;
THENCE S84°33'41"E A DISTANCE OF 150.45 FEET;
THENCE S00°31'28"E A DISTANCE OF 220.49 FEET;
THENCE S19°10'52"E A DISTANCE OF 716.33 FEET;
THENCE S06°01'40"E A DISTANCE OF 296.08 FEET;
THENCE S00°30'00"W A DISTANCE OF 783.98 FEET;
THENCE N88°21'45"W A DISTANCE OF 92.96 FEET;
THENCE S86°38'10"W A DISTANCE OF 1900.01 FEET;
THENCE S68°38'10"W A DISTANCE OF 99.99 FEET;
THENCE S55°58'15" W A DISTANCE OF 200.00 FEET;
THENCE S36°58'15"W A DISTANCE OF 199.96 FEET;
THENCE S89°38'15"W A DISTANCE OF 15.00 FEET;
THENCE S00°06'47"W A DISTANCE OF 139.93 FEET;
THENCE N89°11'06"W A DISTANCE OF 2627.63 FEET;
THENCE N00°23'56"E A DISTANCE OF 2580.05 FEET;
THENCE N89°53'45W A DISTANCE OF 2639.82 FEET;
THENCE S89°44'44"W A DISTANCE OF 1339.28 FEET;
THENCE N01°15'55"W A DISTANCE OF 1062.88 FEET;
THENCE S89°50'10"W A DISTANCE OF 721.52 FEET;
THENCE N01°15'28"W A DISTANCE OF 1589.29 FEET;
THENCE N89°50'10"E A DISTANCE OF 2060.57 FEET;
THENCE N00°29'18"W A DISTANCE OF 2644.95 FEET TO THE POINT OF BEGINNING;
SAID PARCEL CONTAINS 999.25 ACRES (43,527,318.65 SQUARE FEET) MORE OR LESS AND IS
SUBJECT TO ALL RIGHTS-OF-WAY, EASEMENTS AND RESTRICTIONS NOW IN USE OR OF RECORD.
LEGAL DESCRIPTION
APPROVAL OF THIS MONTAVA
PLANNED UNIT DEVELOPMENT - MASTER PLAN
CREATES A VESTED PROPERTY RIGHT
PURSUANT TO SECTION 24-68-103
COLORADO REVISED STATUTES, AS AMENDED,
ANDFORT COLLINS LAND USE CODE SECTION 2.2.11(C)
STATE OF COLORADO)
)SS
COUNTY OF LARIMER)
The foregoing instrument was acknowledged before me this day of , 20 , by
My commission expires: ____________________________
__________________________
Notary Public
KNOW ALL MEN BY THESE PRESENTS THAT the Anheuser-Busch Foundation, being an owner of property within the Montava - PUD Master Plan, does
certify that it accepts the conditions and restrictions set forth on said plan and in the conditions of approval by the City of Fort Collins, dated
_______________, 2019 and consents to the recordation of any information pertaining thereto.
ANHEUSER-BUSCH FOUNDATION,
a Missouri charitable trust
By: ____________________________
Printed Name: ___________________
Title: __________________________
STATE OF COLORADO)
)SS
COUNTY OF LARIMER)
The foregoing instrument was acknowledged before me this day of , 20 , by
My commission expires: ____________________________
__________________________
Notary Public