Loading...
HomeMy WebLinkAboutSW PROSPECT AND I 25 ROADWAY PROJECT - RP180001 - SUBMITTAL DOCUMENTS - ROUND 3 - EROSION CONTROL LETTER/REPORTProject Number: 232-043 Location: Fort Collins, CO Date: January 30, 2019 Total Acres: 7.27 EROSION CONTROL MEASURE Units Estimated Quantity Unit Price Total Price L.F. 1890 $1.50 $2,835.00 Construction Fence w/Rock Sock L.F. 0 $4.50 $0.00 each 0 $200.00 $0.00 each 1 $2,500.00 $2,500.00 each 1 $1,850.00 $1,850.00 each 28 $150.00 $4,200.00 L.F. 70 $3.50 $245.00 per hour 24 $60.00 $1,440.00 Sub-Total: $13,070.00 1.5 x Sub-Total: $19,605.00 Amount of security: $19,605.00 Total Acres x $1325/acre: $9,632.75 Sub-Total: $9,632.75 1.5 x Sub-Total: $14,449.13 Cost to Re-seed: $14,449.13 Minimum escrow amount: $3,000.00 Erosion Control Escrow: $19,605.00 NOTE: 'Total Acres' represents total disturbed area. Prospect Road / I-25 Erosion Control Cost Estimate Silt Fencing Inlet Protection Vehicle Tracking Control Pads Option 2 | Cost to Re-seed Disturbed acreage Option 3 | Miniumum Escrow Amount Final Escrow Amount Concrete Washout Area Rock Sock Sawcutting Pollution Prevention Street Sweeping and Cleaning Option 1 | BMP Costs