December 07, 2018
Klara Rossouw
Fort Collins, CO
Responses Required:
Owner
Northern Engineering
Environmental
Loveland Homes
Ripley Design Inc.
Traffic
Re: Fox Grove Phase 2
Description of project: This is a request to build 49 single-family detached homes as part of
the second phase of the Fox Grove Subdivision located southeast of E Mulberry St and
Interstate 25 (parcel #871220001). Access is taken from Vixen Drive and Fox Grove Drive
to the east, connecting phase one and phase two. The proposed project is located in the
Low Density Mixed-Use Neighborhood (LMN) zone district and will be subject to
Administrative (Type 1) Review.
Please see the following summary of comments regarding the project request referenced
above. The comments offered informally by staff during the Conceptual Review will assist you
in preparing the detailed components of the project application. Modifications and additions
to these comments may be made at the time of formal review of this project. If you have any
questions regarding these comments or the next steps in the review process, you may contact
the individual commenter or direct your questions through the Development Review Coordinator,
Tenae Beane, at 970-224-6119 or tbeane@fcgov.com.
Comment Summary:
Planning Services
Contact: Jason Holland, 970-224-6126, jholland@fcgov.com
1. A PDP/FDP review process is required. Prior to that submittal we will need to confirm the
details of the west trail. I am checking with parks and county staff on that subject.
Response: No details of the trails has been determined at the time of submittal.
2. The proposed development project is subject to a Type 1 review and public hearing, the
decision maker for Type 1 hearings is an Administrative Hearing Officer. The applicant
2
for this development request is not required to hold a neighborhood meeting for a Type 1
hearing, but if you would like to have one to notify your neighbors of the proposal, please
let me know and I can help you in setting a date, time and location for a meeting.
Neighborhood Meetings are a great way to get public feedback and avoid potential
hiccups that may occur later in the review process.
Response: The applicant will not be requesting a neighborhood meeting for the second phase. A neighborhood meeting was held
for the OPD and Phase one portion of the project and comments received were incorporated into the ODP.
3. Please see the Development Review Guide at www.fcgov.com/drg. This online guide
features a color coded flowchart with comprehensive, easy to read information on each
step in the process. This guide includes links to just about every resource you need
during development review.
Response: Thank you for the information.
4. This development proposal will be subject to all applicable standards of the Fort Collins
Land Use Code (LUC), including Article 3 General Development Standards. The entire
LUC is available for your review on the web at
http://www.colocode.com/ftcollins/landuse/begin.htm.
Response: Thank you for the information.
5. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a
Modification of Standard Request will need to be submitted with your formal development
proposal. Please see Section 2.8.2 of the LUC for more information on criteria to apply
for a Modification of Standard.
Response: We will be meeting all standards as set forth in the LUC and approved by the Fox Grove OPD.
6. Please see the Submittal Requirements and Checklist at:
http://www.fcgov.com/developmentreview/applications.php.
Response: Checklists and requirements reviewed.
7. The request will be subject to the Development Review Fee Schedule that is available in
the Community Development and Neighborhood Services office. The fees are due at the
time of submittal of the required documents for the appropriate development review
process by City staff and affected outside reviewing agencies. Also, the required
Transportation Development Review Fee must be paid at time of submittal.
Response: Fees have been reviewed and provided with this submittal.
8. When you are ready to submit your formal plans, please make an appointment with
Community Development and Neighborhood Services at (970)221-6750.
Response: Thank you for the information.
Department: Engineering Development Review
Contact: Morgan Uhlman, 970-416-4344, muhlman@fcgov.com
1. Site Specific: The original plat shows an access easement that was dedicated for a trail
along the western property line near Boxelder Creek. The site plan that was submitted
does not show that easement along the backs of the lots on the cul-de-sac, the lot lines
go all the way to the property line between Fox Grove and Boxelder.
Response: The trail weaves behind the lots. An access easement is provided on the adjacent property in this location. Due to
the topo drop off, we are keeping the trail as close to the lots as possible for this short section.
2. Larimer County Road Impact Fees and Transportation Expansion Fees are due at the
time of building permit. Please contact Kyle Lambrecht at 221-6566 if you have any
3
questions.
Response: Acknowledged
3. The City's Transportation Development Review Fee (TDRF) is due at the time of
submittal. For additional information on these fees, please see:
http://www.fcgov.com/engineering/dev-review.php
Response: TDRF is provided with this submittal.
Response: Acknowledged
4. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets,
sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of
this project, shall be replaced or restored to City of Fort Collins standards at the
Developer's expense prior to the acceptance of completed improvements and/or prior
to the issuance of the first Certificate of Occupancy.
Response: Acknowledged
5. All public sidewalk, driveways and ramps existing or proposed adjacent or within the
site need to meet ADA standards, if they currently do not, they will need to be
reconstructed so that they do meet current ADA standards as a part of this project.
Response: Acknowledged. No ramps are located adjacent to the site that need to be replaced.
6. Any public improvements must be designed and built in accordance with the Larimer
County Urban Area Street Standards (LCUASS). They are available online at:
https://www.larimer.org/engineering/standards-and-guides/urban-area-street-standards
Response: Acknowledged.
7. This project is responsible for dedicating any right-of-way and easements that are
necessary or required by the City for this project. This shall including the standard utility
easements that are to be provided behind the right-of-way (15 foot along an arterial, 8
foot along an alley, and 9 foot along all other street classifications). No easements could
be found on this property in the country recorders files. The following easements will
need to be dedicated on the plat or separate document. Information on the dedication
process can be found at: http://www.fcgov.com/engineering/devrev.php
Response: These easements are shown on the submitted plat.
8. Utility plans will be required and if needed a Development Agreement will be recorded
once the project is finalized
Response: Acknowledged. Utility Plans have been submitted.
9. For final plat submittal requirements, please follow this link:
https://www.fcgov.com/developmentreview/pdf/electronic_final_plat_submittal_req.pdf?
1526073805
Response: Acknowledged.
10. A Development Construction Permit (DCP) will need to be obtained prior to starting any
work on the site.
Response: Acknowledged.
11. LCUASS parking setbacks (Figure 19-6) apply and will need to be followed depending
on parking design. Here is a link to that figure:
https://www.larimer.org/sites/default/files/ch19_2007.pdf
Response: No parking lots are proposed on this site.
12. All fences, barriers, posts or other encroachments within the public right-of-way are only
permitted upon approval of an encroachment permit. Applications for encroachment
permits shall be made to Engineering Department for review and approval prior to
installation. Encroachment items shall not be shown on the site plan as they may not be
4
approved, need to be modified or moved, or if the permit is revoked then the site/
landscape plan is in non-compliance.
Response: No encroachments are planned
13. The development/ site cannot use the right-of-way for any rain gardens to treat the storm
runoff. We can look at the use of rain gardens to treat street flows – the design
standards for these are still in development.
Response: No rain gardens are proposed in the Right of Way.
14. Doors are not allowed to open out into the right-of-way.
Response: Acknowledged.
15. Bike parking required for the project cannot be placed within the right-of-way and if
placed just behind the right-of-way need to be placed so that when bikes are parked
they do not extend into the right-of-way.
Response: There are no bike parking requirements for single-family lots.
16. In regards to construction of this site, the public right-of-way shall not be used for staging
or storage of materials or equipment associated with the Development, nor shall it be
used for parking by any contractors, subcontractors, or other personnel working for or
hired by the Developer to construct the Development. The Developer will need to find a
location(s) on private property to accommodate any necessary staging and/or parking
needs associated with the completion of the Development. Information on the
location(s) of these areas will be required to be provided to the City as a part of the
Development Construction Permit application.
Response: Acknowledged.
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
1. Current site plan does not comply with stream corridor requirements or requirements
related to wetlands greater than one-third acre in size; this will affect concept site plan
as currently proposed. Minimum buffer standards can be viewed online in the LUC 3.4.1
buffer table; for Boxelder Creek and wetlands larger than one-third acre (w/o significant
use by waterfowl) the minimum buffer is 100ft. Note that Boxelder Creek is a major
stream corridor valued by Fort Collins on the same level as Poudre River and Spring
Creek major stream corridors.
Response: The ECS determined that the “wetlands are not as extensive as what NWI maps”. Using the information provide in the
ECS we applied the 100’ buffer requirement from the top of bank to determine the required amount of buffer area within our
project boundary. Using easily delineable feature of the site we an area of buffer zone that exceeds the amount of area required.
In addition to the area provided, the proposed buffer area will be seeded with an approved native seed mix, and additional
plantings are proposed along the boundary to enhance and improve the existing conditions.
2. Remove all lots from within 100ft of Boxelder Creek top of bank and edge of wetlands.
Please refer back to City Environmental Planner comment from Lindsay Ex, delivered to
Ripley Design and dated 3/18/2014, for Fox Grove: "On the modification regarding
allowing single family detached within Phase 2 of the project, it appears that some of the
lots within the conceptual drawing are within the 100' buffer. Please be aware that this
lotting plan will not be approved with the modification, and that only after an ECS has
been received and evaluated with a future PDP can the buffer zone be established."
Response: We have included an updated ECS with this submittal. The ECS determined that the “wetlands are not as extensive as
what the NWI maps”. The designed layout of the proposed habitat buffer zone was thoroughly considered to establish a zone that
5
will successfully establish.
3. An Ecological Characterization Study (ECS) is required by City of Fort Collins Land Use
Code (LUC) Section 3.4.1 as the site is within 500 feet of multiple LUC defined natural
habitats and features (Boxelder Creek, wetlands, riparian forest). Please note the
project will need to be designed in a way that is sensitive to these natural features, and
that buffer standards range from 50ft for riparian forest to 100ft for Boxelder Creek and
100ft for wetlands. Refer to Section 3.4.1(E) of the Land Use Code. This affects the site
layout that is currently proposed.
Response: A 100’ Buffer is applied to Boxelder Creek from top of bank, and a 50’ buffer is applied to the riparian forest edge to the
north of the site.
The ECS should address all items (a)-(l) of LUC 3.4.1(D)(1) available for view online.
The report should also address: survey of use by birds March-June, sensitive species
such as Preble's Meadow jumping mouse, and observance of ways the project could
meet LUC 3.4.1(I) Design and Aesthetics. Ensure the City Environmental Planner joins
the consultant on-site to determine how the ECS appropriately identifies feature(s) size,
the "top of bank" of any stream or ditch, the edge(s) of wetlands, and whether
jurisdictional wetlands may be impacted by the proposed project. Please contact me to
discuss the scope and requirements of the ECS further and/or to schedule an onsite
meeting. Online LUC link: https://library.municode.com/co/fort_collins/codes/land_use
The ECS is due a minimum of 10 days prior to PDP submittal.
Response: An ECS was submitted on January 9th, 2019
4. The project narrative mentions the recent remapping of Boxelder Creek floodplain. Note
FEMA remapping is not related to Fort Collins natural habitat and features protection
standards. Please contact the City Environmental Planner to scope the ECS prior to
completing that work. Information from the ECS informs design of a "natural habitat
buffer zone" or "NHBZ". The ECS is due a minimum of 10 days prior to PDP submittal.
Response: An ECS was submitted on January 9th, 2019
5. Within any Natural Habitat Buffer Zone(s) that may be designated on this site, the City
has the ability to determine if existing landscaping within the zone is incompatible with
the purposes and intent of the buffer zone [LUC 3.4.1(E)(1)(g)]. Please ensure the ECS
discusses existing vegetation on-site and identifies potential restoration options. If
existing vegetation is determined to be insufficient, then restoration and mitigation
measures may be required.
Response: A native palette is proposed within the Buffer Zone. The ECS provides the information as required.
6. With respect to lighting, the City of Fort Collins Land Use Code, Section 3.2.4(D)(6),
requires that "natural areas and natural features shall be protected from light spillage
from off-site sources." Thus, lighting from parking areas or other site amenities shall not
spill over into any natural features or natural habitat buffer areas.
Response: There are no proposed lighting design elements that’s will spill into the proposed Natural Habitat Buffer Zones.
7. Projects in the vicinity of major stream corridors including Boxelder Creek must also
comply with Section 3.4.1(I)(1) of the Land Use Code, which states the following:
"Projects in the vicinity of large natural habitats and/or natural habitat corridors,
including, but not limited to, the Poudre River Corridor and the Spring Creek Corridor,
shall be designed to complement the visual context of the natural habitat. Techniques
such as architectural design, site design, the use of native landscaping and choice of
colors and building materials shall be utilized in such manner that scenic views across or
6
through the site are protected, and manmade facilities are screened from off-site
observers and blend with the natural visual character of the area. These requirements
shall apply to all elements of a project, including any aboveground utility installations."
Response: Comment acknowledged. The landscape plan and proposed buffer zone is designed in a was that compliments the
adjacent landscape.
8. It appears there are not plans to pipe drainage ways and this aligns with Fort Collins
Nature in the City Strategic Plan Policy LU6 specifying multiple values of the City’s ditch
system, including wildlife habitat and ecological functions, and that these should be
supported and protected. This includes keeping ditches daylighted, removing barriers to
wildlife movement along conveyance channels, enhancing habitat, and improving
connectivity for people and wildlife where appropriate. The City highly recommends
leaving ditches open and incorporating conveyance channels into the site design as an
amenity, and enhancing it as part of a connected corridor for people and wildlife.
Response: Comment Acknowledged. As we move through the design process, we will keep this in mind when decisions are
made.
9. A review of trees shall be conducted with Ralph Zentz, Senior Urban Forester
(970-221-6302 or rzentz@fcgov.com) to determine the status of existing trees and any
mitigation requirements that could result from the proposed development. LUC Section
3.2.1(C) requires developments to submit a landscape and tree protection plan, and if
receiving water service from the City, an irrigation plan, that: "...(4) protects significant
trees, natural systems, and habitat, and (5) enhances the pedestrian environment. " Note
that a significant tree is defined as one having DBH (Diameter at Breast Height) of six
inches or more.
Response: No trees were surveyed within the project boundary. Vegetation associated with the Box Elder creek is included in the
ECS.
10. City of Fort Collins Land Use Code [Section 3.2.1 (E)(3)], requires that to the extent
reasonably feasible, all plans be designed to incorporate water conservation materials
and techniques. This includes use of low-water-use plants and grasses in landscaping
or re-landscaping and reducing bluegrass lawns as much as possible. Native plants and
wildlife-friendly (ex: pollinators, butterflies, songbirds) landscaping and maintenance are
also encouraged. Please refer to the Fort Collins Native Plants document available
online and published by the City of Fort Collins Natural Areas Department for guidance
on native plants is: http://www.fcgov.com/naturalareas/pdf/nativeplants2013.pdf. Also
see the City of Fort Collins Plant List : https://www.fcgov.com/forestry/plant_list.pdf.
11. If tree removal is necessary, please include the following note on the tree mitigation plan
and landscape plan, as appropriate:
Response: No tree removal is proposed with this plan.
"NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING SEASON
(FEBRUARY 1 TO JULY 31) WITHOUT FIRST HAVING A PROFESSIONAL
ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A NESTING SURVEY TO
IDENTIFY ANY ACTIVE NESTS EXISTING ON THE PROJECT SITE. THE SURVEY
SHALL BE SENT TO THE CITY ENVIRONMENTAL PLANNER. IF ACTIVE NESTS
ARE FOUND, THE CITY WILL COORDINATE WITH RELEVANT STATE AND
FEDERAL REPRESENTATIVES TO DETERMINE WHETHER ADDITIONAL
RESTRICTIONS ON TREE REMOVAL AND CONSTRUCTION APPLY."
Response: No trees are proposed to be removed with this plan.
12. If any raptor nests are present on the site, consultation with Colorado Parks & Wildlife
7
and additional protection standards may be necessary.
Response: no raptor nests were observed on the project site.
13. Please submit a site photometric plan and luminaire schedule. In regard to outdoor
lighting, especially LED light fixtures, cooler color temperatures are harsher at night and
cause more disruption to circadian (biological) rhythms for both humans and wildlife.
Warmer color temperature (warm white, 3000K or less) for any LED light fixtures is
preferred. Please also consider fixtures with motion-sensing or dimming capabilities so
that light levels can be adjusted as needed. Site light sources shall be fully shielded and
down-directional to minimize up-light, light spillage and glare [see LUC 3.2.4(D)(3)].
Thank you in advance for supporting City of Fort Collins Night Sky Objectives. For further
information regarding health effects please see:
http://darksky.org/ama-report-affirms-human-health-impacts-from-leds/
Response: This proposal consists of only single-family homes. No multi-family is being proposed that would trigger he need for a
photometric plan.
14. Our city has an established identity as a forward-thinking community that cares about the
quality of life it offers its residents now and generations from now. Thus, the City of Fort
Collins has many sustainability programs and goals that may benefit this project. Of
particular interest may be:
1) ClimateWise Program: http://fcgov.com/climatewise, contact
climatewise@fcgov.com
2) Zero Waste Plan and the Waste Reduction and Recycling Assistance Program
(WRAP): http://fcgov.com/recycling/wrap.php, contact Jonathon Nagel at 970-416-2701
or jnagel@fcgov.com
3) Utilities Building Energy Scoring:
https://www.fcgov.com/utilities/business/building-energy-scoring , contact Kirk Longstein
at 970-416-4325 or klongstein@fcgov.com
4) Solar Rebate Program: www.fcgov.com/solar, contact Rhonda Gatzke at
970-416-2312 or rgatzke@fcgov.com
5) Integrated Design Assistance Program: http://fcgov.com/idap, contact Gary
Schroeder at 970-224-6003 or gschroeder@fcgov.com
6) Nature in the City Program: http://fcgov.com/natureinthecity, contact Justin Scharton at
970-221-6213 or jscharton@fcgov.com
7) Bike Share Program: http://fcgov.com/bikeshare, contact Stacy Sebeczek at Bike
Fort Collins at stacy@bikefortcollins.org or 970-481-5577
Response: Thank you for providing these resources.
Department: Forestry
Contact: Molly Roche, 224-616-1992, mroche@fcgov.com
1. 1 11/29/18:
If there are existing trees on-site, please schedule an on-site meeting with City Forestry
to obtain tree inventory and mitigation information. Existing significant trees should be
retained to the extent reasonably feasible. This meeting should occur prior to first round
PDP.
Response: No tree inventory analysis is needed for this site as there are no existing trees within the project boundary. Relevant
8
vegetation along the boxelder creek is documented in the ECS.
2. 2 11/29/18:
Please provide a landscape plan that meets the Land Use Code and 3.2.1
requirements. This should include, but is not limited to, including the City of Fort Collins
General Landscape Notes, Tree Protection Notes, and Street Tree Permit Note,
providing a detailed Plant List – species, quantity, size, method of transplant, and
species percentage, and including current and proposed utility lines as well as proper
tree separation requirements. Please contact Molly Roche (mroche@fcgov.com) if you
have any questions.
Required tree sizes and method of transplant:
Canopy Shade Tree: 2.0” caliper balled and burlapped
Evergreen tree: 6.0’ height balled and burlapped
Ornamental tree: 1.5” caliper balled and burlapped
If any mitigation is required, trees must be upsized to the following dimensions:
Canopy Shade Trees: 3.0" caliper balled and burlap or equivalent.
Evergreen Trees: 8' height balled and burlap or equivalent.
Ornamental Trees: 2.5" caliper balled and burlap or equivalent.
Response: A landscape plan is provided with this submittal.
3. 3 11/29/18:
Include locations of any water or sewer lines on the landscape plan. Please adjust street
tree locations to provide for proper tree/utility separation.
10’ between trees and public water, sanitary, and storm sewer main lines
6’ between trees and public water, sanitary, and storm sewer service lines
4’ between trees and gas lines
Response: A landscape plan is provided with this submittal.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
1. Information Only:
The site disturbs more than 10,000 sq. ft. and therefore Erosion and
Sediment Control Materials need to be submitted. The erosion control
requirements can be located in the Stormwater Design Criteria under the
Amendments of Volume 3 Chapter 7 Section 1.3.3. a copy of the erosion
control requirements can be found at www.fcgov.com/eroison
Response: Acknowledged. A SWMP and Erosion Control Plan will be provided with Final.
2. For Final:
Please submit an Erosion Control Plans to meet City Criteria.
Response: Acknowledged. A SWMP and Erosion Control Plan will be provided with Final.
3. For Final:
Please submit an Erosion Control Report to meet City Criteria.
Response: Acknowledged. A SWMP and Erosion Control Plan will be provided with Final.
9
4. Development Agreement:
Please submit an Erosion Control Escrow / Security Calculation based upon
the accepted Erosion Control Plans to meet City Criteria.
Response: Acknowledged. This will be provided at Final.
5. Information only:
Based upon the area of disturbance, State permits for stormwater will be
required since the site is over an acre and should be pulled before
Construction Activities begin.
Response: Acknowledged.
6. Information only:
Based upon distance to the Boxelder additional attention will need to be planned for to
prevent construction pollution from being introduced into those drainage courses.
Response: Acknowledged.
7. Master plan and criteria compliance (site specific comment):
The design of this site must conform to the drainage basin design of the Boxelder
Master Drainage Plan as well the Fort Collins Stormwater Criteria Manual. In addition,
this site is part of the Fox Grove development and must conform to the drainage design
of the approved development plans.
Response: The drainage design complies with the previously approved development plan, Fort Collins Stormwater Criteria and
the Boxelder Master Drainage Plan.
8. Documentation requirements (site specific comment):
A drainage report and construction plans are required and they must be prepared by a
Professional Engineer registered in the State of Colorado. The drainage report must
address the four-step process for selecting structural BMPs.
Response: Acknowledged.
9. Detention requirements (site specific comment):
Onsite detention is required for the runoff volume difference between the 100-year
developed inflow rate and the 2-year historic release rate.
Response: The proposed drainage plan complies with this requirement.
10. Detention drain times (standard comment):
Per Colorado Revised Statute §37-92-602 (8) that became effective August 5, 2015,
criteria regarding detention drain time will apply to this project. As part of the drainage
design, the engineer will be required to show compliance with this statute using a
standard spreadsheet (available on request) that will need to be included in the
drainage report. Upon completion of the project, the engineer will also be required to
upload the approved spreadsheet onto the Statewide Compliance Portal. This will
apply to any volume based stormwater storage, including extended detention basins.
Response: Acknowledged.
11. Standard water quality requirements (standard comment):
Fifty percent of the site runoff is required to be treated using the standard water quality
treatment as described in the Fort Collins Stormwater Manual, Volume 3-Best
Management Practices (BMPs).
10
(http://www.fcgov.com/utilities/business/builders-and-developers/development-forms-gui
delines-regulations/stormwater-criteria) Extended detention is the usual method
selected for water quality treatment; however the use of any of the BMPs is encouraged.
Response: The proposed drainage plan complies with this requirement.
12. LID requirements (standard comment):
Low Impact Development (LID) requirements are required on all new or redeveloping
property which includes sites required to be brought into compliance with the Land Use
Code. These require a higher degree of water quality treatment with one of the two
following options:
1. 50% of the newly added or modified impervious area must be treated by LID
techniques and 25% of new paved areas must be pervious.
2. 75% of all newly added or modified impervious area must be treated by LID
techniques.
Response: 50% of newly added impervious area is treated by an LID treatment. No private roadways or pavement are planned
for this project.
13. Inspection and maintenance (standard comment):
There will be a final site inspection of the stormwater facilities when the project is
complete and the maintenance is handed over to an HOA or another maintenance
organization. Standard operating procedures (SOPs) for on-going maintenance of all
onsite drainage facilities will be included as part of the Development Agreement. More
information and links can be found at:
http://www.fcgov.com/utilities/what-we-do/stormwater/stormwater-quality/low-impact-dev
elopment
Response: Acknowledged.
14. Fees (standard comment):
The 2017 city wide Stormwater development fee (PIF) is $8,217/acre for new
impervious area over 350 square feet and there is a $1,045/acre of site review fee. No
fee is charged for existing impervious area. These fees are to be paid at the time each
building permit is issued. Information on fees can be found at:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-develo
pment-fees or contact our Utility Fee and Rate Specialists at (970) 416-4252 for
questions on fees. There is also an erosion control escrow required before the
Development Construction permit is issued. The amount of the escrow is determined by
the design engineer, and is based on the site disturbance area, cost of the measures, or
a minimum amount in accordance with the Fort Collins Stormwater Manual.
Response: Acknowledged.
15. 1. INFORMATION ONLY: On February 21, 2019, the proposed FEMA regulatory,
100-year Boxelder Creek Floodplain---associated with a recently completed Letter of
Map Revision (LOMR)---will take effect. A small portion of this property along the north
edge, and the south edge, of the development will be located within the new floodplain.
That portion of this development must comply with the safety regulations of Chapter 10
of City Municipal Code. A FEMA Flood Risk Map is attached.
Response: Acknowledged.
11
16. 2. INFORMATION ONLY: From the submittal materials provided, it appears that the
development is laid out so that the floodplain will be located within an open area on the
north and along the other open area on the south. If any portion of a structure is located
in the floodplain, the structure must meet the elevation requirements of Chapter 10 of
City Municipal Code.
Response: Acknowledged.
17. 3. INFORMATION ONLY: Nonstructural development (fill, utilities, driveways, sidewalks,
vegetation, etc.) is allowed in the floodplain with an approved Floodplain Use Permit.
Response: Acknowledged. A floodplain use permit will be pursued at the time of construction.
18. 4. FOR FINAL: The boundaries of the floodplain and floodway should be included on the
plat and any plans. Contact Beck Anderson of Stormwater Master Planning at
banderson@fcgov.com for floodplain CAD line work.
Response: The linework for the revised floodplain is shown in the plat and plans.
19. 5. INFORMATION ONLY: Please contact Heidi Hansen, hhansen@fcgov.com
970-221-6854, with any questions about these comments or to schedule a meeting to
discuss any requirements for development in the floodplain.
Department: Water-Wastewater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com
1. Other service district (site specific comment):
This project site is located within the East Larimer County (ELCO) Water District and
the Boxelder Sanitation District for water and sewer service. Please contact them for
development requirements.
Response: Acknowledged.
Department: Fire Authority
Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.org
1. 2018 IFC CODE ADOPTION
Poudre Fire Authority and the City of Fort Collins (Town of Timnath, Larimer County) are
in the process of adopting the 2018 International Fire Code. Code adoption is
anticipated in early 2019. Building plan reviews shall be subject to the adopted version
of the fire code in place at the time of plan review submittal and permit application.
ACCESS
Access is required to within 150ft of all portions of the exterior perimeter of each of
these proposed dwellings. This can be achieved by measuring from the street front
therefore no further action required for this.
Response: All perimeter fire access requirements are met with this proposal.
2. HYDRANTS
A hydrant that produces 1000gpm at 20psi residual pressure is required within 400ft of
each residence and 800ft on center thereafter. The hydrants in the existing
neighborhood can also be utilized for this measurement. Code language follows:
> IFC 507.5 and PFA Policy: Within the Urban Growth Area, hydrants to provide 1,000
gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on
12
800-foot centers thereafter.
Response: Acknowledged.
3. ADDRESSING/WAYFINDING
>The address on each residence shall be clearly visible from the street
Response: Comment Acknowledged.
4. PHASING
PFA shall be included in any project phasing plan to ensure that appropriate access is
maintained.
Response: No phasing is proposed with this project proposal. Note, Fox Grove Subdivision Filing 2 is the second and final phase
of the Fox Grove ODP.
Department: Electric Engineering
Contact: Austin Kreager, 970-224-6152, akreager@fcgov.com
1. Light and Power took steps in the first phase to prepare for the installation of round 2.
We have spare conduit stubbed in the direction of phase 2 of building.
Response: Acknowledged. The utility easements provided with the first subdivision are not proposed to be altered substantially.
Fill is proposed in the area where the existing utility easement abuts Fox Grove Drive. As indicated by L&P in the concept review
meeting, no utility structures were built in this location.
2. Light and Power would like to remind you that all of our facilities must have a ten foot
clearance away from all water, wastewater, and storm sewer facilities. We also require
a five foot clearance away from all other utilities with the exception of communication
lines.
Response: Acknowledged.
3. Please contact Light & Power Engineering if you have any questions at 221-6700.
Please reference our policies, development charge processes, and use our fee
estimator at http://www.fcgov.com/utilities/business/builders-and-developers
Response: Acknowledged.
4. As your project begins to move forward please contact Light and Power Engineering to
coordinate the streetlight, transformer and electric meter locations, please show the
locations on the utility plans
Response: Acknowledged. We will be in touch with L&P to determine best locations for transformers and streetlights.
Department: Traffic Operations
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
1. The anticipated change in traffic volume is expected to meet the threshold of requiring
some level of review. Given the previously approved ODP and the relatively limited
number of trips (less under 500 daily) this can be limited to a traffic memo. Please have
your traffic engineer contact me to scope the study.
Response: Traffic was scoped, and Tis is submitted with this proposal.
2. Is there a trail connection on the west side of the proposal?
Response: There is no regional trail connection proposed with this submittal. A neighborhood trail is located along the western
boundary of the project that is located within a public access easement.
13
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
1. As of January 1, 2015 all development plans are required to be on the NAVD88 vertical
datum. Please make your consultants aware of this, prior to any surveying and/or design
work. Please contact our office for up to date Benchmark Statement format and City
Vertical Control Network information.
Response: The submitted plans are on NAVD88 datum.
2. When submitting a replat for this property/project, addresses are not acceptable in the
Subdivision Plat title/name. Numbers in numeral form may not begin the title/name.
Please contact our office with any questions.
Response: Acknowledged.