Loading...
HomeMy WebLinkAboutFTC CSU SOUTH WTE VERIZON - FDP180008 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSCommunity Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview March 27, 2018 Ryan Sagar LRK Consulting, LLC 1196 Grant Street, Unit 313 Denver, CO 80203 RE: FTC CSU South, FDP180008, Round Number 1 Comment Summary: Department: Engineering Development Review Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com Topic: General 03/12/2018: If any changes to plan or alignment of lines are proposed will want to review those. Comment Number: 1 Comment Originated: 03/12/2018 Department: Environmental Planning Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com Topic: General 03/12/2018: SITE PLAN: Please show where and how the landscaping that will be impacted will be transplanted or replaced. Note #1 on sheet A1.0 indicates that all impacted plantings will be replaced, but we need a more specific landscape plan to ensure there are no conflicts with other utilities or infrastructure. Since most of the trees and shrubs on that site are still very young, transplanting will probably be a viable option for all plants that will be affected. Comment Number: 1 Comment Originated: 03/12/2018 Department: PFA Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org Topic: General 03/26/2018: BACK UP POWER Backup power systems shall be designed in compliance with 2018 IFC Section 1206 for battery storage. Comment Number: 1 Comment Originated: 03/26/2018 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Kai Kleer, at 970-416-4284 or kkleer@fcgov.com. Page 1 of 2 03/26/2018: ROOF ACCESS Access to the roof via roof hatch requires appropriate labeling adjacent to the hatch on the top habitable floor so as to identify rooftop utilities as well as any electrical (or other) hazards associated with wireless communications equipment. Comment Number: 2 Comment Originated: 03/26/2018 Department: Planning Services Contact: Kai Kleer, 970-416-4284, kkleer@fcgov.com Topic: General 03/27/2018: Minor text corrections see site plan for redlines. Comment Number: 1 Comment Originated: 03/27/2018 Landscape plan on sheet A1.0 should be on its own page. The landscape plan should also show exactly where the relocation of the affected shrubs will be. Comment Number: 2 Comment Originated: 03/27/2018 A few pages of the plan do not include references to the relocation of the bike rack. Please update. Comment Number: 3 Comment Originated: 03/27/2018 Department: Stormwater Engineering Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com Topic: General 03/02/2018: It appears the site survey did not pick up existing storm sewer on this site. There is existing storm sewer as well as associated rain gardens that are required for water quality on this site in the location for the "NEW U.G. ELECTRIC CONDUIT ROUTED FROM (E) XFMR TO HFRAME @ EQUIPMENT AREA RE: 1/A1.1" Please see plans from Prospect Station showing this storm sewer. It appears the proposed conduit would conflict with the existing system. Please review Prospect Station plans provided and show storm sewer system on your plans. Please show how the conduit can be routed and installed without negatively impacting the storm system. It may be necessary to relocate the proposed conduit if it is conflicting with the storm system. Comment Number: 1 Comment Originated: 03/02/2018 Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: General 03/23/2018: There are line over text issues. See redlines. Comment Number: 1 Comment Originated: 03/23/2018 03/23/2018: There is text that needs to be masked. Mask all text in hatched areas. See redlines. Comment Number: 2 Comment Originated: 03/23/2018 Page 2 of 2