HomeMy WebLinkAboutFTC CSU SOUTH VERIZON WTE - PDP170030 - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSCommunity Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com/developmentreview
September 08, 2017
Ryan Sagar
LRK Consulting, LLC
1196 Grant Street, Unit 313
Denver, CO 80203
RE: FTC CSU South, PDP170030, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies
for your submittal of the above referenced project. If you have questions about any comments,
you may contact the individual commenter or direct your questions through the Project Planner,
Kai Kleer, at 970-416-4284 or kkleer@fcgov.com.
Comment Summary:
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com
Topic: General
Comment Number: 1 Comment Originated:
08/17/2017
08/17/2017: If lighting updates will be incorporated into this project: note that
especially for LED light fixtures, cooler color temperatures are harsher at night
and cause more disruption to circadian (biological) rhythms for both humans
and wildlife. Warmer color temperature (warm white, 3000K or less) for any
LED light fixtures is preferred. Please also consider fixtures with dimming
capabilities so that light levels can be adjusted as needed. Site light sources
shall be fully shielded and
down-directional to minimize up-light, light spillage and glare [see LUC
3.2.4(D)(3)]. For further information regarding health effects please see:
http://darksky.org/ama-report-affirms-human-health-impacts-from-leds/
Comment Number: 2 Comment Originated:
08/17/2017
08/17/2017: If any landscaping will be impacted or removed, it should be
replaced with an equivalent amount of landscaping elsewhere on the site.
The proposed underground fiber optic cable vault is proposed within a rock
landscape bed. Any impacted landscaping including the rocks will be replaced
or relocated accordingly. A special side note to this degree has been added on
the bottom of page A1.0.
Department: Light And Power
Contact: Clint Reetz, 970-221-6326, creetz@fcgov.com
Topic: General
Comment Number: 1 Comment Originated:
08/25/2017
08/25/2017: Light and Power can serve the proposed site. The existing 3 phase
300kva transformer on-site has an available connection tap. Commercial services
such as these require that an Electrical contractor install the customers
secondary cable to the City's transformer. Light and Power will perform the
connection at the transformer.
Comment Number: 2 Comment Originated:
08/25/2017: Any changes to the existing electric capacity and or location will initiate electric
development and system modification charges. Please coordinate power requirements with
Light and Power Engineering at 221-6700.
Comment Number: 3 Comment Originated: 08/25/2017
08/25/2017: Please provide a one line diagram and a C-1 form to Light and Power
Engineering. The C-1 form can be found at:
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1Form.pdf
Comment Number: 4 Comment Originated: 08/25/2017
08/25/2017: As your project begins to move forward please contact Light and Power
Engineering to coordinate the route to the transformer location. Also contact Light and
Power if there is an electric meter location, please show the locations on the utility
plans.
Comment Number: 5 Comment Originated: 08/25/2017
08/25/2017: You may contact FCU Light & Power, project engineering if you have
questions. (970) 221-6700. You may reference Light & Power’s Electric Service Standards
at http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandards_F
INAL_18November2016_Amendment.pdf
You may reference our policies, development charge processes, and use our fee
estimator at http://www.fcgov.com/utilities/business/builders-and-developers.
Department: PFA
Contact: Cal Sheesley, 970-416-2599, csheesley@poudre-fire.org
Topic: General
09/05/2017: NO COMMENT Comment Originated: 09/05/2017
PFA has no comment regarding PDP170031. Water supply requirements are met
with the hydrants located at the northwest and northeast corners of the property.
While perimeter and aerial apparatus access requirements are not fully met when
measured from Tamasag, due to the size and scope of the project, these
requirements will not be enforced for this development. The antenna shall be
addressed using the same address (221 West Prospect) and appears to meet
address posting requirements per Google Earth.
Department: Planning Services
Contact: Kai Kleer, 970-416-4284, kkleer@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/01/2017
09/01/2017:
Please provide a photo simulations looking west on W Prospect Rd and looking east
on W Prospect Road. Please provide simulations in architectural plans immediately
after the title sheet.
Photo simulations have been completed and inserted on page PS-1.
Comment Number: 2 Comment Originated: 09/01/2017
09/01/2017:
Title sheet indicates zoning as "Employment". This project is located in the
Community Commercial (CC), zone district.
Title sheet has been updated accordingly.
Comment Number:3 Comment Originated: 09/01/2017
09/01/2017:
The wall mounted equipment on the north side of the building must be painted to
match. Please provide notation on site plan.
The wall mounted fiber enclosure will be painted to match the building color. This has been
added to the callouts of the fiber enclosure on pages A1.0 and A1.1.
Comment Number: 4 Comment Originated:09/01/2017
09/01/2017:
After a site visit, it has been determined that the relocation of bike racks are in an
appropriate location.
Comment Number: 5 Comment Originated: 09/05/2017
09/05/2017:
Can a material sample of the screening be provided to planning staff?
Obtaining material samples are extremely difficult since screening is custom designed and
ordered. Due to the inherent financial risk associated with custom orders, the screening isn’t
ordered until all permits have been approved. However, Verizon is currently in the process of
trying to obtain a specification sheet and a material sample. In order to assist with this
request, the material sample may end up not being an exact replica of the color, texture, or
pattern of the design that is to be installed. Rather, the sample would be intended to help
demonstrate the material consistency and thickness.
Comment Number: 6 Comment Originated: 09/05/2017
09/05/2017:
Please indicate on the site plan how co-location can be achieved. This can be done by
indicating an outline of available space within the proposed structure where other
providers can locate.
Verizon would prefer to leave up any future co-location details up to the prospective
carrier and the property owner due to the varying needs for lease area, line of sight
requirements, and overall equipment needed by each carrier. With that said, Verizon
will not exclude co-location from taking place. As such, a special comment has been
added to page A1.0 declaring that there shall be no act to exclude or attempt to exclude
any other provider from using the building, structure, or location.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 08/21/2017
08/21/2017: No Comment from Erosion Control. Based upon the submitted Erosion
Control Materials it has been determined that this site; disturbs less than 10,000 sq.
ft., is not in a sensitive area, has no steep slopes (greater than 3H:1V), and is not in
a larger development under construction. Therefore, no submittal of Erosion Control
Materials are needed at this time. The site however, still must be swept and
maintained to prevent dirt, saw cuttings, concrete wash, trash & debris, landscape
materials and other pollutants from entering the storm sewer at all times in
accordance with City Code 26-498 or erosion and sediment control measures will
be required of the site. Near by area inlets should be protected as a good
preventative practice. If issues arrise when pulling applicable building permits please
email erosion@fcgov.com to ease getting these signed off. Current Erosion
Control Materials Submitted do not meet requirements. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. a copy of the erosion control requirements can
be found at www.fcgov.com/eroison. If you need clarification concerning the
Erosion Control Material Requirements or Comments presented above please
contact myself. Jesse Schlam (970) 224-6015 jschlam@fcgov.com
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/01/2017
09/01/2017: All plan sheets must be 24"x36".
Verizon will continue to submit at least (1) 24’ X 36’ set of drawings.
Comment Number: 2 Comment Originated: 09/01/2017
09/01/2017: A legal description of the property where this equipment is located will
need to be added to sheet T1.
The legal description of the property has been added to page T-1.0.
Department: Water-Wastewater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
Comment Number: 1 Comment Originated:08/23/2017
08/23/2017: It is assumed that no water or sewer service is needed for the
proposed improvements and existing services will remain unaltered. Please contact
Dan Mogen should these assumptions be incorrect.
Department: Zoning
Contact: Ryan Boehle, 970-416-2401, rboehle@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/05/2017
09/05/2017: Please provide an example of how the screening material will match
the building's design, color and material.
Verizon has included photo simulations to provide clarification on the materials
that will be used for the new screening on page PS-1. These details and their
reference materials from the existing building have been called out on page A3.1.