Loading...
HomeMy WebLinkAboutNORTHFIELD FILING 1 EXPANDED - PDP180011 - SUBMITTAL DOCUMENTS - ROUND 3 - DRAINAGE REPORTPRELIMINARY DRAINAGE REPORT FOR Northfield Prepared by: Highland Development Services 6355 Fairgrounds Ave, Suite 100 Windsor, Colorado 80550 Phone: 970.674.7550 Prepared for: Landmark Real Estate Holdings, LLC 6341 Fairgrounds Ave, Suite 100 Windsor, Colorado 80550 Office: 970.460.0567 January 23, 2019 Job Number 18-1000-00 6355 FAIRGROUNDS AVE, SUITE 100, WINDSOR, COLORADO 80550 | PHONE 970.674.7550 January 23, 2019 Mr. Shane Boyle Fort Collins Utilities 700 Wood Street Fort Collins, CO 80522 RE: Preliminary Drainage Report for Northfield Dear Shane, We are pleased to submit for your review, the Preliminary Drainage Report for the Northfield subdivision. This report describes the drainage design intent to be in accordance with the criteria in the City of Fort Collins Storm Drainage Manual. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, Jason T. Claeys, P.E., LEED AP Interwest Consulting Group Page i TABLE OF CONTENTS Table of Contents .............................................................................................................................. i Engineer’s Certification Block ..........................................................................................................ii General Description and Location .................................................................................................. 1 Site Description and Location ...................................................................................................... 1 Site Soils ....................................................................................................................................... 2 Storm Drainage Criteria .................................................................................................................. 3 Hydrologic Criteria ....................................................................................................................... 3 Hydraulic Criteria ......................................................................................................................... 3 Drainage Basins ............................................................................................................................... 5 Drainage Facility Design .................................................................................................................. 7 Drainage Conveyance Design ...................................................................................................... 7 Detention/Water Quality Pond Design ....................................................................................... 7 Low Impact Development ............................................................................................................... 9 Stormwater Pollution Prevention ................................................................................................. 11 Conclusions ................................................................................................................................... 12 References .................................................................................................................................... 13 Appendix ....................................................................................................................................... 14 Appendix A – Site Descriptions, Characteristics, & References .................................................. A Appendix B – Rational Calculations ............................................................................................. B Appendix C – Detention Pond Calculations ................................................................................ C Appendix D – Street Capacities ................................................................................................... D Appendix E – Low Impact Development Calculations ................................................................. E Page ii ENGINEER’S CERTIFICATION BLOCK I hereby certify that this Preliminary Drainage Report for Northfield was prepared by me (or under my direct supervision) for the owners thereof and meets or exceeds the criteria of the City of Fort Collins Stormwater Design Standards. ________________________________________ Jason T. Claeys, PE Registered Professional Engineer State of Colorado No. 42122 Page 1 GENERAL DESCRIPTION AND LOCATION SITE DESCRIPTION AND LOCATION Northfield is located in the Southeast Quarter of Section 1, Township 7 North, Range 67 West of the Sixth Principal Meridian, City of Fort Collins, County of Larimer, within the State of Colorado. More specifically, Northfield is located north of the ALTA Vista Subdivision, west of N. Lemay Avenue, and southeast of the Lake Canal irrigation ditch. The project site is approximately 55.26 acres currently and is undeveloped agricultural land. The site appears to be vegetated with grasses harvested for livestock feed. The site generally slopes from the northwest to the southeast at about 0.5% slope. There are no existing surface improvements currently on the property. The property is proposed to be subdivided into multiple single-family lots and condominium tracts. Northfield will consist of 139 single family attached (fee simple) units and 301 condominium units, a mixed-use building with a combination of retail and apartments, and a community clubhouse. Northfield is located within the City’s Dry Creek Drainage Basin. In addition to the City of Fort Collins Stormwater Design Standards, drainage requirements are also described in the “North East College Corridor Outfall (NECCO) Design Report”, prepared by Ayres Associates, dated August 2009. The improvements associated with Northfield are located within basins 115, 116, 117, 414, 950, 951, 960, 961, 970, 971, 980, and 981 as delineated in the above report. A portion of the Northfield improvements are located within the FEMA regulatory, Dry Creek 100-year Floodplain as shown on FEMA FIRM map numbers 08069C0977G (revised June 17, 2008), and 08069C0981G (revised June 17, 2008). All improvements are outside of the 100-yr floodway, and a portion of the improvements are within the 100-yr floodplain. The first phase of the NECCO improvements were completed early in 2017 with the remaining improvements completed in the spring of 2018. It is anticipated that the LOMR associated with these improvements will be completed by the end of year in 2019. Once the LOMR is complete, the 100-yr floodplain is anticipated to be removed from the site. If circumstances occur that the LOMR is not complete at the time of construction for the Northfield improvements, a Floodplain Use Permit will be required. It is anticipated that the floodplain limits will be adjusted prior to the construction of the residential units. If buildings are constructed prior to the map revision, the buildings will be elevated above the Regulatory Base Floodplain Elevation and adhering to Fort Collins Municipal Code Chapter 10 requirements. A portion of the site is located within the Cache la Poudre River 500-yr floodplain. Critical facilities are prohibited Page 2 within the 100-yr and/or 500-yr floodplains. Critical facilities include facilities for at-risk populations (daycares, schools, nursing homes, etc) and emergency service facilities (urgent care, hospitals, fire stations, police stations, etc). SITE SOILS The Northfield site consists of Loveland clay loam and Nunn clay loam and are classified as Type C hydrologic group. According to USDA/Natural Resource Conservation Group, this soil has a slow infiltration rate when thoroughly wet. These soils consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Per the “Preliminary Subsurface Exploration and Groundwater Report – Schlagel Property”, prepared be Earth Engineering Consultants (EEC), dated August 16, 2017: Vegetation growth and topsoil was encountered at the surface of each boring. Underlying the topsoil/vegetation layer was a zone of cohesive subsoils classified lean to fat clay with varying amounts of sand and clayey sand to approximate depths of 2 to 5-1/2 feet. Underlying the cohesive subsoils was a granular layer of poorly to well graded sand with silt and gravel extending to the depths explored at approximately 14 to 21-1/2 feet or to underlying bedrock. It appears that below the lean to fat clay, there is a granular materials that would inhibit more moderate infiltration rates then the surface materials. Groundwater was also observed during the subsurface soil exploration: Groundwater and/or the presence of a piezometric water surface, was generally observed at depths ranging from approximately 3 to 7 feet below ground surface as indicated on the enclosed boring logs. EEC has continued to monitor the groundwater level depths over the last 12 month period after the original borings. Due to the groundwater elevations and in consideration of the infiltration galleries, pond bottoms, and building foundations, the site is anticipated to be dewatered, utilizing the NECCO pipe as the dewatering outfall. A groundwater study is currently in process and will be reviewed with staff when complete. Supporting figures can be found in the Appendix A. Page 3 STORM DRAINAGE CRITERIA This preliminary report was prepared to meet or exceed the City of Fort Collins storm water criteria. The City of Fort Collin’s Storm Drainage Design Criteria and amendments to the Urban Drainage Flood Control District’s (UDFCD) Drainage Criteria Manual (USDCM) Volumes 1, 2 and 3 were referenced as guidelines for this design. HYDROLOGIC CRITERIA The rational method was performed to calculate the peak runoff rates for each basin. Percent impervious were estimated based on land use and the associated runoff coefficients were calculated. The time of concentration was calculated using City of Fort Collins initial time of concentration and the intensity was calculated using the corresponding storm rainfall depth and USDCM Equation 4-3. To account for the City of Fort Collins’ IDF Curve, Coefficient 3 of the UDFCD’s intensity formula was adjusted to 0.7867. The City of Fort Collins area has 2-yr 1-hr rainfall depth of 0.82 inches and a 100-yr 1 hr rainfall depth of 2.86 inches. These depths do account for the 1999 adjusted rainfall depths. HYDRAULIC CRITERIA The hydraulic calculations provided for in this report are limited to maximum street capacities based on the minimum street slopes. The Street Sections and Allowable Half-Street spreadsheets for 0.5% longitudinal slope are provided in the Appendix. The final Northfield storm drainage system will be designed to convey the minor and major storm events through the combination of streets, inlets, storm sewer pipes, and swales. Per the requirements provided by the City of Fort Collins Storm Drainage Design Criteria, all inlets and storm pipes will be designed such that, during the minor initial storm event, the 2-yr storm, the flows for the Local Street will not top the curb and may only rise to the street crown elevation, and for an Arterial (with Median) will not top the curb and the flow spread will leave at least one 12 ft lane width free of water in each direction. During the major storm event, the 100-yr storm, the water depth for the Local Street will be held to a maximum depth of 6” at the street crown, 12” at the gutter flow line, and/or flow must be contained within right-of- way or easements paralleling the right-of-way. The Arterial (with Median) will be held to a maximum depth that will not exceed the median gutter elevation, 12” at the gutter flowline, and/or flow must be contained within right-of-way or easements paralleling the right-of-way. Within the Final Drainage Report, peak basin runoff flows from the rational calculations will then be used to determine the street capacities, and on-grade inlet locations. The on-grade Page 4 and sump inlet capacities will be calculated using UDFCD’s spreadsheet UD-Inlet_v4.05.xlsm. The inlet capacities will be analyzed and the necessary adjustments will be applied to the street runoff flows based on the amount of runoff collected by on-grade inlets. The sump inlets will be sized using the previous mentioned street capacity allowances with overtopping if needed. The captured flows will then be analyzed using EPA’s SWMM program to design pipe size and slopes. UD-Inlet applies a clogging factor while sizing the inlets, but while sizing the storm pipes, it is assumed that the inlets are free of clogging debris and capturing the maximum amount of street runoff. Orifice rating curves will be utilized for the inlet capture capacities and route the captured runoff through the storm drain system. The program accounts for head losses within manholes and bends and head losses associated with pipe friction. Hydraflow will be used to compute the open channel hydraulics and check the capacities of the drainage swales throughout the site. Flow velocities within these swales will be reviewed and where flows are found to be supercritical, the swales will be protected with turf reinforcement mat. All swale and pipe outlets will be protected with riprap or suitable erosion protection methods. Storm sewer pipe outlets will be protected using the requirements set by the USDCM for the protection downstream of culverts. All supporting calculations for street sections are located in the Appendix. Page 5 DRAINAGE BASINS The Northfield developed drainage basins are delineated by areas draining to major drainage elements (such as ponds and roadway sumps). The final drainage report will further detail the drainage basins. For the purposes of this preliminary drainage study, it is assumed that the project is 60% impervious for medium density residential sites, slightly higher than the 50% listed for LMN land use zone. Detailed percent imperviousness will be determined with the final drainage study. Historical drainage analysis was completed for the areas of Northfield located within the NECCO basin map that allows the runoff to be released at historic rates. The remaining areas of Northfield did not calculate the historic runoff rates since the developed runoff is restricted to 0.2 cfs/acre release rate. The basins are broken into 5 main drainage systems: Drainage System A: Drainage System A pertains to the improvements along the east side of the project site. Majority of this basin’s improvements are proposed for future phases. Sub-basin A1 consists of 8.12 acres of single-family attached and condominium residential lots, public roadways and private drives. The basin includes a portion of Schlagel Street and N. Lemay Avenue. Flows from this basin is mainly conveyed along roadways and will be collected by a Type R inlets and conveyed to detention Pond A1. Sub-basin A2 consists of 9.45 acres of single-family attached and condominium residential lots, public roadways and private drives. The basin includes a portion of Schlagel Street, Harvest Sun Street, and Pioneer Road. Runoff from this basin will be conveyed along roadways and directed to detention Pond A2 and ultimately to detention Pond A1. All of basin A2 will be treated by a LID infiltration gallery. Drainage System B: Sub-basin B1 consists of 7.71 acres of single-family attached and condominium residential lots, public roadways and private drives. This basin includes portions of Landmark Way Road, Steeley Drive, and Schlagel Street. Runoff is mainly conveyed along roadways and directed to detention Pond B1. Sub-basin B2 consists of 3.10 acres of single-family attached and condominium residential lots, public roadways and private drives. Runoff is conveyed along Schlagel St, Toomey Drive, and the private drives, is captured by Type R inlets and area inlets. Runoff is then conveyed to detention Pond B1 via storm drain pipes. All of basin B2 will be treated by a LID infiltration gallery. Page 6 Sub-basin B3 consists of 9.95 acres of single-family attached lots, multifamily residential buildings and private drives. Runoff is conveyed along streets and private drives and captured by area inlets. Runoff is then conveyed to detention Pond B2 via storm drain pipes and ultimately conveyed to detention Pond B1. All of basin B3 will be treated by a LID infiltration gallery. Drainage System C: Sub-basin C1 consists of 1.07 acres of multifamily residential buildings and open space. Runoff is conveyed along an open channel swale to culverts crossing Steeley Drive to detention Pond C. Sub-basin C2 consists of 1.39 acres of commercial lots and detention Pond C. Flows drain to the swale, running southwesterly along the northwest property line of the site, then into Pond C. A concrete pan conveys all of the collected flow to the outlet structure, restricting flows to the allowed release rate. Drainage System D: Drainage System D consists of the area south of Suniga Rd. Sub-basin D1 consists of 6.47 acres of future multifamily residential buildings, a commercial lot, public roadway, and private drives. Runoff is conveyed to detention Pond D via open channel swales and storm drains. Approximately 60% of basin D1 will be treated by a LID bioretention/rain garden. Sub-basin D2 consists of 3.69 acres of commercial property, detention Pond D, and portions of N. Lemay Ave and Suniga Rd. Runoff from the roadways is conveyed along Suniga Rd and N. Lemay Ave to two Type R sump inlets. Runoff outside of the roadways is conveyed to detention Pond D. This basin’s detention requirements allows a release rate equal to the current/historic runoff rates and is accounted for in the Pond D detention volume calculations. Drainage System E: Sub-basins E1 & E2 consist of two basins, combining for a total of 7.12 acres of public roadways along Suniga Rd. Runoff is conveyed along Suniga Rd and collected by Type R sump inlets. The locations of these inlets were depicted in the conceptual design of the “East Vine Drive Relocation” utility plans. Runoff captured by these inlets is conveyed to the existing NECCO reinforced concrete box culvert storm drain, undetained. Page 7 DRAINAGE FACILITY DESIGN DRAINAGE CONVEYANCE DESIGN Storm infrastructure to convey runoff will include overland grass-lined swales, concrete trickle pans, inlets, storm sewer and culverts. Stormwater detention and water quality enhancement will be achieved through the use of an extended detention basin. Storm inlets, storm sewers and the roadway culverts will be appropriately sized with the final drainage design DETENTION/WATER QUALITY POND DESIGN Multiple extended detention basins (EDB) with a dry bottom will be utilized as the detention and water quality facility for Northfield. The EDBs along the north side of Suniga Road are designed to reduce the 100-yr developed runoff to the allow 0.2 cfs/acre. A portion of the area south of Suniga Road is allowed release rates equal to current/historic rates with the remaining restricted to the 0.2 cfs/acre. For the preliminary drainage study, the FAA method was used to determine the detention volume needed. EPA SWWM will be utilized for the final drainage design. UDFCD is referenced for the water quality capture volume (WQCV) with a 40-yr drain time. Due to the limited grades on the site, multiple ponds are proposed throughout the site with the main detention ponds being located along Suniga Rd. The pond bottoms have been graded to be 2 ft above the established groundwater levels. The ultimate outfall will be the existing NECCO storm drain system. Below is a description of the pond networks: Drainage System A: This basin is 17.57 acres draining to the detention Pond A1 and Pond A2, which allows a release rate of 3.51 cfs. 3.89 acre-ft of detention storage is required with 0.42 acre-ft WQCV. To achieve the total detention volume, a network of two detention ponds, Pond A1 and Pond A2, will provide the total volume. At final design, SWMM will be utilized to maximize the detention volume in Pond A2 by determining the appropriate release rate, while only allowing the 0.2 cfs/acre from Pond A1. Drainage System B: Drainage System B’s basin is 20.76 acres which allows a release rate of 4.15 cfs. This requires 4.60 acre-ft of detention storage volume with 0.42 acre-ft WQCV. To achieve the total detention volume, a network of two detention ponds, Pond B1, and Pond B2, along with Pond A1 will provide the volume. At final design, SWMM will be utilized to maximize the detention volume in upstream ponds by determining the appropriate release rate, while only allowing the 0.2 cfs/acre from Pond A1. Page 8 Drainage System C: Drainage System C’s basin is 2.46 acres which allows a release rate of 0.49 cfs. This requires 0.54 acre-ft of detention storage volume with 0.06 acre-ft WQCV. During final design the release rate from Pond C may need to be reduced to ultimately only allow 0.2 cfs/acre release rate from Pond A1. Drainage System D: This basin is 10.16 acres which allows a release rate of 9.15 cfs, requiring 1.24 acre-ft of detention storage 0.23 acre-ft WQCV. 6.47 acres are required to detain to 0.2 cfs/acre while the remaining will be detained to historic rates. The release rate from Pond D will account for the portions of Lemay that are not able to be conveyed to the detention pond. Page 9 LOW IMPACT DEVELOPMENT The City of Fort Collins updated the Low Impact Development ordinance in 2016 (Ordinance No. 007, 2016) to require: • Treat at least 75% of any newly developed or redeveloped impervious area using one or a combination of LID techniques, or • Treat at least 50% of any newly developed or redeveloped impervious area using one or a combination of LID techniques when 25% of private driveable surfaces are permeable. To satisfy the required implementation of Low Impact Development (LID) techniques, Northfield will utilize below grade infiltration galleries (such as ADS StormTech chamber system) and bioretention ponds/rain gardens. Other LID techniques were explored, but due to the limited grade available and the amount of detention volume required, shallow infiltration galleries assisted in maintaining storm drain grades and detention volumes. Pavers within the private drives did not treat enough contributing area to justify their use. Infiltration galleries will promote infiltration while capturing fine sediment that drains off the impervious areas. Further soil investigation will occur to confirm the infiltration capacities within the sandy/gravel soil layers approximately 2’ to 5 ½’ below existing grades. It is anticipated that the infiltration gallery aggregates will extend to this sandy/gravel layer. Isolator rows will be implemented at the headworks to the infiltration galleries to allow larger sediment particles to settle prior to entering the infiltration gallery. The isolator rows will be accessible to remove sediments. Standard water quality is also provided within the detention ponds in addition to these LID infiltration galleries. A Standard Operations Procedure will be provided at final design to assist in ensuring that these BMPs will adequately perform over time. It was discussed with staff that there may be consideration on lowering the percent of area treated for single-family areas to 50%. Though the current design exceeds the 50% treatment, it is slightly under 75% treatment. For the purposes of the preliminary design, the area of treatment was calculated, rather than the area of impervious area. This approach assumes that the area of treatment has similar correlation to the impervious area treated. The preliminary area of treatment calculations will be further detailed and coordinated with staff during the final drainage design. Below is a description of the 4-step process for selecting structural BMPs: Urban Drainage and Flood Control District (UDFCD) recommends a Four Step Process for receiving water protection that focuses on reducing runoff volumes, treating the water quality capture volume (WQCV), stabilizing drainageways and implementing long-term source Page 10 controls. The Four Step Process applies to the management of smaller, frequently occurring events. Step 1: Employ Runoff Reduction Practices To reduce runoff peaks, volumes, and pollutant loads from urbanizing areas, implement Low Impact Development (LID) strategies, including Minimizing Directly Connected Impervious Areas (MDCIA). Captured runoff from strategic areas are routed through below grade infiltration galleries and bioretention pond/rain gardens. Infiltration galleries and rain gradens will slow runoff, promote infiltration, and filter runoff prior to being released into the adjacent storm drain system. Step 2: Implement BMPs that Provide a Water Quality Capture Volume with Slow Release The infiltration galleries and rain gardens are designed to provide water quality capture volume per Urban Drainage’s recommendations and calculations. The captured runoff is design for a 12-hr drain time. Step 3: Stabilize Drainageways Natural Drainageways are subject to bed and bank erosion due to increases in frequency, duration, rate and volume of runoff during and following development. Because the site will drain to an existing storm system, bank stabilization is unnecessary with this project. Step 4: Implement Site Specific and Other Source Control BMPs Proactively controlling pollutants at their source by preventing pollution rather than removing contaminants once they have entered the stormwater system or receiving waters is important when protecting storm systems and receiving waters. This can be accomplished through site specific needs such as construction site runoff control, post-construction runoff control and pollution prevention / good housekeeping. It will be the responsibility of the contractor to develop a procedural best management practice for the site. All calculations are attached for reference. Page 11 STORMWATER POLLUTION PREVENTION Erosion and sedimentation will be controlled on-site by use of sediment control logs, inlet protection, a gravel construction entrance, seeding, mulch, and turf. The measures are designed to limit the overall sediment yield increase due to construction as required by the City of Fort Collins. During overlot and final grading the soil will be roughened and furrowed perpendicular to the prevailing winds. During the performance of the work required by these specifications or any operations appurtenant thereto, whether on right-of-way provided by the City or elsewhere, the contractor shall furnish all labor, equipment, materials, and means required. The Contractor shall carry out proper efficient measures wherever and as necessary to reduce dust nuisance, and to prevent dust nuisance that has originated from his operations from damaging crops, orchards, cultivated fields, and dwellings, or causing naissance to persons. The Contractor will be held liable for any damage resulting from dust originating from his operations under these specifications on right-of-way or elsewhere. It is unlawful to track or cause to be tracked mud or other debris onto city streets or rights-of- way. Wherever construction vehicles access routes or intersect paved public roads, previsions must be made to minimize the transport of sediment by runoff or vehicles tracking onto the paved surface. Stabilized construction entrances are required with base material consisting of 6” coarse aggregate. The contractor will be responsible for clearing mud tracked onto city streets on a daily basis. All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to assure continued performance of their intended function. Silt fence and sediment control logs will require periodic replacement. Maintenance is the responsibility of the contractor. All disturbed areas must be seeded and mulched within 30 days of project start. Vegetation shall not be considered established until a ground cover is achieved which is demonstrated to be mature enough to control soil erosion to the satisfaction of the City Inspector and to survive severe weather condition. Page 12 CONCLUSIONS This Preliminary Drainage Report for Northfield has been prepared to comply with the stormwater criteria set by the City of Fort Collins. The proposed preliminary drainage system presented in this report is designed to convey the developed peak storm water runoff through the site to the existing storm drain system and to the development’s LID features, detention and water quality facilities. Storm drains will be sized to provide the required roadway relief in both the 2-yr and 100-yr storm events, and to adequately convey the released runoff from the detention ponds disbursed throughout the site. Overland relief will be provided at all sump locations. The calculated 100-yr peak flows released from Northfield will adhere to the allowed rates as established in the NECCO drainage studies. This preliminary drainage report anticipates the implementation of best management practices for erosion control, temporary and permanent, and on-site construction facilities that will be further designed and details in the Final Drainage Report. It can therefore be concluded that development of Northfield will comply with the storm water jurisdictional criteria and will not adversely affect the adjacent properties, streets, storm drain system and/or detention/water quality facilities. Controlling the developed runoff from these improvements will improve the current situations currently existing on the site. Therefore, this preliminary report satisfies the burden of proof needed to proceed to a Final Drainage Report. Page 13 REFERENCES 1. Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3), Urban Drainage and Flood Control District, June 2001, Revised November 2010. 2. Storm Drainage Criteria Manual and Construction Standards, City of Fort Collins Storm Water Utility, City of Fort Collins, Colorado, Updated January, 1997 with 2012 amendments. 3. Fort Collins Stormwater Criterial Manual (Draft for Council), Fort Collins Utilities, City of Fort Collins, Colorado, Dated November 2017 [Anticipated to be adopted by City Council in 2018] 4. “Hydrologic Group Rating for Larimer County Area, Colorado”, USDA-Natural Resources Conservation Service, National Cooperative Soil Survey. Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov. [12/06/2017] 5. “Preliminary Subsurface Exploration and Groundwater Report – Schlagel Property”, prepared by Earth Engineering Consultants, LLC, Dated August 16, 2017 6. “Public Improvement Plans, East Vine Drive Relocation”, prepared by Ayres Associates, Dated February 2009, obtained from City of Fort Collins. 7. “Utility Plans for NECCO Ponds and Backbone” – Record Drawings, prepared by Ayres Associates, Dated June 2017, obtained from the City of Fort Collins. 8. “Flood Insurance Rate Map, Larimer County, Colorado – Map Number 08069C0977G”, Federal Emergency Management Agency, Map Revised June 17, 2008. 9. “Flood Insurance Rate Map, Larimer County, Colorado – Map Number 08069C0981G”, Federal Emergency Management Agency, Map Revised June 17, 2008. Page 14 APPENDIX Appendix A – Site Descriptions, Characteristics, & References Appendix B – Rational Calculations Appendix C – Detention Pond Calculations Appendix D – Street Capacities Appendix E – Low Impact Development Calculations Appendix A APPENDIX A – SITE DESCRIPTIONS, CHARACTERISTICS, & REFERENCES SITE Vicinity Map PROJECT DATUM: NAVD88 CITY OF FORT COLLINS BENCHMARK #43-97 ON THE SOUTH END OF THE WEST HEADWALL OF THE LAKE CANAL BRIDGE AT NORTH LEMAY AVENUE, 200 FEET SOUTH OF THE INTERSECTION OF LEMAY AVENUE. AND CONIFER STREET ELEV= 4960.11 CITY OF FORT COLLINS BENCHMARK #12-07 SOUTH SIDE OF VINE DRIVE ON THE SOUTH HEADWALL OF THE BRIDGE OVER DRY CREEK BASIN 0.4 MILES EAST OF NORTH LEMAY AVENUE ELEV= 4947.86 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. IF NGVD29 UNADJUSTED IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATIONS SHOULD BE USED: NGVD UNADJUSTED = 4960.11 (NAVD88) - 3.17 NGVD UNADJUSTED = 4947.81 (NAVD88) - 3.18 NTS Hydrologic Soil Group—Larimer County Area, Colorado (NorthField) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/6/2017 Page 1 of 4 4494130 4494220 4494310 4494400 4494490 4494580 4494670 4494130 4494220 4494310 4494400 4494490 4494580 4494670 494350 494440 494530 494620 494710 494800 494890 494980 495070 495160 494350 494440 494530 494620 494710 494800 494890 494980 495070 495160 40° 36' 11'' N 105° 4' 2'' W 40° 36' 11'' N 105° 3' 23'' W 40° 35' 52'' N 105° 4' 2'' W 40° 35' 52'' N 105° 3' 23'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 200 400 800 1200 Feet 0 50 100 200 300 Meters Map Scale: 1:4,140 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 64 Loveland clay loam, 0 to 1 percent slopes C 11.9 20.9% 73 Nunn clay loam, 0 to 1 percent slopes C 16.6 29.2% 76 Nunn clay loam, wet, 1 to 3 percent slopes C 28.3 49.9% Totals for Area of Interest 56.7 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Hydrologic Soil Group—Larimer County Area, Colorado NorthField Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/6/2017 Page 3 of 4 Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado NorthField Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/6/2017 Page 4 of 4 SUBJECT PROPERTY (APPROX.) SUBJECT PROPERTY (APPROX.) 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 Intensity (in/hr) City of Fort Collins Rainfall Intensity-Duration-Frequency Curve 2-yr (FTC) 10-yr (FTC) 100-yr (FTC) 2-yr (UD) 10-yr (UD) 100-yr (UD) 100-yr 10-yr 0.0 1.0 2.0 3.0 4.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 60.0 65.0 Duration (min) 2-yr 10-yr Duration (minutes) 2-yr Intensity (in/hr) 10-yr Intensity (in/hr) 100-yr Intensity (in/hr) Duration (minutes) 2-yr Intensity (in/hr) 10-yr Intensity (in/hr) 100-yr Intensity (in/hr) 5 2.85 4.87 9.95 33 1.22 2.08 4.24 6 2.67 4.56 9.31 34 1.19 2.04 4.16 7 2.52 4.31 8.80 35 1.17 2.00 4.08 8 2.40 4.10 8.38 36 1.15 1.96 4.01 9 2.30 3.93 8.03 37 1.13 1.93 3.93 10 2.21 3.78 7.72 38 1.11 1.89 3.87 11 2.13 3.63 7.42 39 1.09 1.86 3.80 12 2.05 3.50 7.16 40 1.07 1.83 3.74 13 1.98 3.39 6.92 41 1.05 1.80 3.68 14 1.92 3.29 6.71 42 1.04 1.77 3.62 15 1.87 3.19 6.52 43 1.02 1.74 3.56 16 1.81 3.08 6.30 44 1.01 1.72 3.51 17 1.75 2.99 6.10 45 0.99 1.69 3.46 18 1.70 2.90 5.92 46 0.98 1.67 3.41 19 1.65 2.82 5.75 47 0.96 1.64 3.36 20 1.61 2.74 5.60 48 0.95 1.62 3.31 21 1.56 2.67 5.46 49 0.94 1.60 3.27 22 1.53 2.61 5.32 50 0.92 1.58 3.23 23 1.49 2.55 5.20 51 0.91 1.56 3.18 24 1.46 2.49 5.09 52 0.90 1.54 3.14 25 1.43 2.44 4.98 53 0.89 1.52 3.10 26 1.40 2.39 4.87 54 0.88 1.50 3.07 27 1.37 2.34 4.78 55 0.87 1.48 3.03 28 1.34 2.29 4.69 56 0.86 1.47 2.99 29 1.32 2.25 4.60 57 0.85 1.45 2.96 30 1.30 2.21 4.52 58 0.84 1.43 2.92 31 1.27 2.16 4.42 59 0.83 1.42 2.89 32 1.24 2.12 4.33 60 0.82 1.40 2.86 Figure 3-1a City of Fort Collins Rainfall Intensity-Duration-Frequency Table for using the Rational Method Duration 2-yr 10-yr 100-yr 2-yr ∆∆∆∆ 10-yr ∆∆∆∆ 100-yr ∆∆∆∆ 5 2.85 4.87 9.95 2.78 -0.07 4.74 -0.13 9.68 -0.27 6 2.67 4.56 9.31 2.64 -0.03 4.51 -0.05 9.20 -0.11 7 2.52 4.31 8.80 2.52 0.00 4.30 -0.01 8.78 -0.02 8 2.40 4.10 8.38 2.41 0.01 4.11 0.01 8.39 0.01 9 2.30 3.93 8.03 2.31 0.01 3.94 0.01 8.04 0.01 10 2.21 3.78 7.72 2.21 0.00 3.78 0.00 7.72 0.00 11 2.13 3.63 7.42 2.13 0.00 3.64 0.01 7.43 0.01 2-yr 0.82 12 2.05 3.50 7.16 2.05 0.00 3.51 0.01 7.16 0.00 10-yr 1.40 13 1.98 3.39 6.92 1.98 0.00 3.39 0.00 6.92 0.00 100-yr 2.86 14 1.92 3.29 6.71 1.92 0.00 3.28 -0.01 6.69 -0.02 15 1.87 3.19 6.52 1.86 -0.01 3.17 -0.02 6.48 -0.04 16 1.81 3.08 6.30 1.80 -0.01 3.08 0.00 6.28 -0.02 C 1 28.5 17 1.75 2.99 6.10 1.75 0.00 2.99 0.00 6.10 0.00 C 2 10 18 1.70 2.90 5.92 1.70 0.00 2.90 0.00 5.93 0.01 C 3 0.786651 19 1.65 2.82 5.75 1.65 0.00 2.82 0.00 5.77 0.02 20 1.61 2.74 5.60 1.61 0.00 2.75 0.01 5.61 0.01 21 1.56 2.67 5.46 1.57 0.01 2.68 0.01 5.47 0.01 22 1.53 2.61 5.32 1.53 0.00 2.61 0.00 5.34 0.02 23 1.49 2.55 5.20 1.49 0.00 2.55 0.00 5.21 0.01 24 1.46 2.49 5.09 1.46 0.00 2.49 0.00 5.09 0.00 25 1.43 2.44 4.98 1.43 0.00 2.43 -0.01 4.97 -0.01 26 1.40 2.39 4.87 1.39 -0.01 2.38 -0.01 4.86 -0.01 27 1.37 2.34 4.78 1.36 -0.01 2.33 -0.01 4.76 -0.02 28 1.34 2.29 4.69 1.34 0.00 2.28 -0.01 4.66 -0.03 29 1.32 2.25 4.60 1.31 -0.01 2.24 -0.01 4.57 -0.03 30 1.30 2.21 4.52 1.28 -0.02 2.19 -0.02 4.48 -0.04 31 1.27 2.16 4.42 1.26 -0.01 2.15 -0.01 4.39 -0.03 32 1.24 2.12 4.33 1.24 0.00 2.11 -0.01 4.31 -0.02 33 1.22 2.08 4.24 1.21 -0.01 2.07 -0.01 4.23 -0.01 34 1.19 2.04 4.16 1.19 0.00 2.03 -0.01 4.15 -0.01 Coefficients Intensity (in/hr) Urban Drainage Intensity (in/hr) City of Fort Collins Urban Drainage Inputs Urban Drainage Intensity Equation 1-hr Rainfall Depths (P 1 ) City of Fort Collins Rainfall Intensity-Duration-Frequency Table Use of Urban Drainage Intensity Equation for CoFC IDF Values This cell was determined using Solver to best match intensities given from the Fort Collins IDF values. C 3 2 1 1 ( c ) C t C P I + = 34 1.19 2.04 4.16 1.19 0.00 2.03 -0.01 4.15 -0.01 35 1.17 2.00 4.08 1.17 0.00 2.00 0.00 4.08 0.00 36 1.15 1.96 4.01 1.15 0.00 1.96 0.00 4.01 0.00 37 1.13 1.93 3.93 1.13 0.00 1.93 0.00 3.94 0.01 2-year 5-yr 10-yr 25-yr 50-yr 100-yr 5 0.29 0.40 0.49 0.63 0.79 1.00 10 0.33 0.45 0.56 0.72 0.90 1.14 15 0.38 0.53 0.65 0.84 1.05 1.33 20 0.64 0.89 1.09 1.41 1.77 2.23 25 0.81 1.13 1.39 1.80 2.25 2.84 30 1.57 2.19 2.69 3.48 4.36 5.49 35 2.85 3.97 4.87 6.30 7.90 9.95 40 1.18 1.64 2.02 2.61 3.27 4.12 45 0.71 0.99 1.21 1.57 1.97 2.48 50 0.42 0.58 0.71 0.92 1.16 1.46 55 0.35 0.49 0.60 0.77 0.97 1.22 60 0.30 0.42 0.52 0.67 0.84 1.06 65 0.20 0.28 0.39 0.62 0.79 1.00 70 0.19 0.27 0.37 0.59 0.75 0.95 75 0.18 0.25 0.35 0.56 0.72 0.91 80 0.17 0.24 0.34 0.54 0.69 0.87 85 0.17 0.23 0.32 0.52 0.66 0.84 90 0.16 0.22 0.31 0.50 0.64 0.81 95 0.15 0.21 0.30 0.48 0.62 0.78 100 0.15 0.20 0.29 0.47 0.60 0.75 105 0.14 0.19 0.28 0.45 0.58 0.73 110 0.14 0.19 0.27 0.44 0.56 0.71 115 0.13 0.18 0.26 0.42 0.54 0.69 120 0.13 0.18 0.25 0.41 0.53 0.67 City of Fort Collins Design Storms for using SWMM Figure 3-1c Time (min) Intensity (in/hr) These are the 1-hour storm 2-year 5-yr 10-yr 25-yr 50-yr 100-yr 1-hr 0.82 1.14 1.40 1.81 2.27 2.86 2-hr 0.98 1.36 1.71 2.31 2.91 3.67 Storm Duration Rainfall Depth (in) Note: The City of Fort Collins SWWM input hyetopgrah is used to calculate the 1-hr and 2-hr storm rainfall depths for the different storm events. These are the 1-hour storm depths that are used in the Urban Drainage intensity equation, derived from the CoFC Hyetograph. Table RO-13 SWMM Input Parameters Depth of Storage on Impervious Areas 0.1 inches Depth of Storage on Pervious Areas 0.3 inches Maximum Infiltration Rate 0.51 inches/hour Minimum Infiltration Rate 0.50 inches/hour Decay Rate 0.0018 inches/sec Zero Detention Depth 1% Manning’s n Value for Pervious Surfaces 0.025 Manning’s n Value for Impervious Surfaces 0.016 4.3.2 Pervious-Impervious Area Table RO-14 should be used to determine preliminary percentages of impervious land cover for a given land-use or zoning. The final design must be based on the actual physical design conditions of the site. Table RO-14 Percent Imperviousness Relationship to Land Use* LAND USE OR ZONING PERCENT IMPERVIOUS (%) Business: T CCN, CCR, CN E, RDR, CC, LC C, NC, I, D, HC, CS 20 70 80 90 Residential: RF,UE RL, NCL LMN,NCM MMN, NCB 30 45 50 70 Open Space: Open Space and Parks (POL) Open Space along foothills ridge (POL,RF) RC 10 20 20 *For updated zoning designations and definitions, please refer to Article Four of the City Land Use Code, as amended LEGEND DRAINAGE BASIN BASIN NUMBER BASIN AREA (ACRES) EXHIBIT 4.2 FUTURE DETENTION AND WATER QUALITY REQUIREMENTS RESTRICT AMOUNT OF RUNOFF TO EXISTING CONDITIONS IF RE-DEVELOPED. WATER QUALITY PROVIDED IN REDWOOD POND REQUIRE FUTURE ON-SITE DETENTION & WATER QUALITY. RELEASE RATE @ 0.20 cfs/acre REQUIRE FUTURE ON-SITE DETENTION. WATER QUALITY PROVIDED IN REGIONAL POND. FUTURE RE-ALIGNED VINE DRIVE. WATER QUALITY PROVIDED WITH SNOUTS. DISCHARGE INTO REGIONAL POND WITHOUT FUTURE DETENTION OR WATER QUALITY. RESTRICT AMOUNT OF RUNOFF TO EXISTING CONDITIONS IF RE-DEVELOPED. FUTURE WATER QUALITY REQUIRED. RESTRICT AMOUNT OF RUNOFF TO EXISTING CONDITIONS IF RE-DEVELOPED. WATER QUALITY PROVIDED IN REGINAL POND. BASIN 103: NO DETENTION OR WATER QUALITY REQURED IF DISCHARGING INTO EVERGREEN WEST POND COLLEGE AVENUE RED CEDAR CIRCLE LEMAY AVENUE DRY CREEK BRISTLECONE DRIVE CONIFER STREET NOKOMIS COURT BLUE SPRUCE DRIVE CONIFER STREET LUPINE DRIVE REDWOOD POND REGIONAL POND REDWOOD STREET COLLEGE AVENUE JEROME STREET BONDELL STREET OSIANDER STREET EAST VINE DRIVE 70.0 ac 68.2 ac 13.2 ac 1 Jason Claeys From: Jaclyn Michaelsen <jmichaelsen@iconeng.com> Sent: Thursday, October 12, 2017 11:50 AM To: Jason Claeys Cc: Linsey Chalfant Subject: RE: Necco-Construction Plans The manhole on the northwest corner of Suniga and Lemay is MH Riser A-7. It is approximately 500-ft to the west of Lemay. The invert of the riser is at a 4943.68. The HGL is at a 4947.68 in the Master Plan condition. The Master Plan had the Schlagel property connecting into the system at this junction. I would check with the City, but I would assume tat you could connect into the storm sewer anywhere downstream of this location. Let me know if you need another elevation. Thanks Jaclyn Michaelsen 970.310.1547 From: Jason Claeys [mailto:jclaeys@interwestgrp.com] Sent: Wednesday, October 11, 2017 10:54 AM To: Jaclyn Michaelsen <jmichaelsen@iconeng.com> Cc: Linsey Chalfant <lchalfant@fcgov.com> Subject: RE: Necco-Construction Plans Hi Jackie, I hope that all is well. I am digging deeper into our stormwater design for the Schlagel property. I am anticipating tying to the NECCO line near the northwest corner of (Old) Lemay and Suniga. There were a few HGL’s in the report Lindsey sent but not near this intersection. Would you be able to send me appendixes to the report for reference and possibly the SWMM model? I want to review how the HGL’s in the NECCO pipe will affect our detention. Thanks! Jason T. Claeys, P.E., LEED AP Interwest Consulting Group | jclaeys@interwestgrp.com 1218 W Ash St, Suite A | Windsor, CO 80550 D 970.347.8917 | M 970.817.1712 | www.interwestgrp.com PZ-2 MW-1 PZ-1 PZ-5 PZ-6 MW-2 PZ-3 PZ-4 PZ-7 (4956.1) [4948.9] (4957.3) [4951.3] (4956.1) [4951.0] (4953.5) [4948.5] (4954.2) [4947.4] (4951.8) [4946.5] (4953.2) [4948.6] (4954.6) [4958.5] (4956.5) [4950.8] 4951 4950 4949 4948 4947 Figure 2: Groundwater Contour Map Schlagel Property Fort Collins, Colorado EEC Project #: 1172056 Date: August 2017 EARTH ENGINEERING CONSULTANTS, LLC MW-1 & MW-2: Approximate Monitor Well Locations Legend PZ-1 thru PZ-7: Approximate Piezometer Locations Approximate Ground Surface Elevation Approximate Groundwater Elevation (4950.8) [4950.8] Approximate Groundwater Contours Approximate Groundwater Directional Flow 4950.8 4951.8 Boring/Piezometer No. (PZ) Approx Surface Elev (ft) Date Measured Approx Depth to GW Approx GW Elev Min Bldg FG Approx Depth to GW Approx GW Elev Min Bldg FG Approx Depth to GW Approx GW Elev Min Bldg FG 7/26/2017 3.0 4951.6 4957.6 5.0 4946.8 4952.8 5.0 4951.5 4957.5 7/27/2017 3.8 4950.8 4956.8 5.3 4946.5 4952.5 4.7 4951.8 4957.8 9/19/2017 4.0 4950.6 4956.6 5.7 4946.1 4952.1 5.2 4951.3 4957.3 10/19/2017 4.0 4950.6 4956.6 5.6 4946.2 4952.2 5.0 4951.5 4957.5 2/12/2017 5.7 4948.9 4954.9 7.0 4944.8 4950.8 6.8 4949.7 4955.7 6/7/2018 3.7 4950.9 4956.9 5.2 4946.6 4952.6 4.4 4952.1 4958.1 Boring/Piezometer No. (PZ) Approx Surface Elev (ft) Date Measured Approx Depth to GW Approx GW Elev Min Bldg FG Approx Depth to GW Approx GW Elev Min Bldg FG Approx Depth to GW Approx GW Elev Min Bldg FG 7/26/2017 5.5 4947.7 4953.7 5.0 4951.1 4957.1 5.0 4948.5 4954.5 7/27/2017 4.6 4948.6 4954.6 5.1 4951.0 4957.0 5.0 4948.5 4954.5 9/19/2017 4.7 4948.5 4954.5 5.8 4950.3 4956.3 5.3 4948.2 4954.2 10/19/2017 4.6 4948.6 4954.6 5.9 4950.2 4956.2 5.1 4948.4 4954.4 2/12/2017 6.2 4947.0 4953.0 7.5 4948.6 4954.6 6.5 4947.0 4953.0 6/7/2018 4.6 4948.6 4954.6 4.4 4951.7 4957.7 5.3 4948.2 4954.2 Boring/Piezometer No. (PZ) Approx Surface Elev (ft) Date Measured Approx Depth to GW Approx GW Elev Min Bldg FG Approx Depth to GW Approx GW Elev Appendix B APPENDIX B – RATIONAL CALCULATIONS ONLY ONLY ONLY ONLY ONLY ONLY LAKE CANAL DITCH DRY CREEK LAKE CANAL DITCH N. LEMAY AVENUE TOOMEY DRIVE PIONEER TRAIL ROAD STEELEY DRIVE LANDMARK WAY N. LEMAY AVENUE POND D POND C POND B1 POND B2 POND A2 POND A1 SCHLAGEL STREET BASIN COEFFICIENT (100-YR) BASIN DESIGNATION BASIN AREA DESIGN POINT DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY DRAINAGE BASIN FLOW PATH LEGEND EX MAJOR CONTOUR EX MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR 0 100' 100 50 100 200 SCALE: 1" = NO. REVISION BY DATE HIGHLAND DEVELOPMENT SERVCIES 6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550 PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION SHEET OF DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) NORTHFIELD OVERALL DRAINAGE EXHIBIT Design Engineer: Design Firm: Project Number: Date: % Impervious Runoff Coefficient C Return Period Frequency Adjustment Factor (Cf ) 100% 0.95 2-year to 10-year 1.00 90% 0.95 100-year 1.25 90% 0.95 40% 0.50 0% 0.25 C2 to C10 C100 A1 353,688 8.120 212,213 0 0 0 141,475 60.0% 0.67 0.84 A2 411,678 9.451 247,007 0 0 0 164,671 60.0% 0.67 0.84 B1 335,799 7.709 201,479 0 0 0 134,319 60.0% 0.67 0.84 B2 135,085 3.101 81,051 0 0 0 54,034 60.0% 0.67 0.84 B3 433,610 9.954 260,166 0 0 0 173,444 60.0% 0.67 0.84 C1 46,517 1.068 27,910 0 0 0 18,607 60.0% 0.67 0.84 C2 60,493 1.389 36,296 0 0 0 24,197 60.0% 0.67 0.84 D1 281,776 6.469 169,065 0 0 0 112,710 60.0% 0.67 0.84 D2 160,920 3.694 37,716 0 0 0 123,205 23.4% 0.41 0.52 E1 49,837 1.144 29,902 0 0 0 19,935 60.0% 0.67 0.84 E2 260,459 5.979 156,276 0 0 0 104,184 60.0% 0.67 0.84 Overall 2,529,863 58.078 1,459,081 0 0 0 1,070,782 57.7% 0.65 0.82 Historic D2 160,920 3.694 21,754 0 0 0 139,166 13.5% 0.34 0.43 Northfield DEVELOPED IMPERVIOUS AREA CALCULATION DESIGN CRITERIA: Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual BASINS: Highland Development Services % Impervious values from Table RO-11 in the Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual J.Claeys 18-1000-00 January 23, 2019 Land Use Paved Roof Walks Runoff Coefficients and Frequency Adjustment Factors for City of Fort Collins - Storm Water Criteria Manual Gravel/Pavers Lawns (Heavy, 2-7% Slope) Sub-basin Designation Atotal (sq feet) Design Engineer: Design Firm: Project Number: Date: EQUATIONS: -Equation 6-2 -Equation 6-4 -Urbanized Check Equation 6-5 - CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition 500 ft - Overland flow shall not exceed for undeveloped condition Final t c = minimum of t i + t t and urbanized basin check recommended minimum t c = 5 min for urbanized basins Time of Concentration (2-yr to 10-yr) Type of Travel Surface Cv A1 A1 60.0% 0.67 8.120 52 0.0050 7.31 1074 0.0050 Paved Areas 20 1.41 12.66 19.96 0.0050 19.05 19.05 A2 A2 60.0% 0.67 9.451 55 0.0050 7.51 1036 0.0050 Paved Areas 20 1.41 12.21 19.72 0.0050 18.74 18.74 B1 B1 60.0% 0.67 7.709 24 0.0050 4.96 1048 0.0050 Paved Areas 20 1.41 12.35 17.31 0.0050 18.57 17.31 B2 B2 60.0% 0.67 3.101 24 0.0050 4.96 404 0.0050 Paved Areas 20 1.41 4.76 9.72 0.0050 12.82 9.72 B3 B3 60.0% 0.67 9.954 300 0.0050 17.55 491 0.0050 Paved Areas 20 1.41 5.79 23.33 0.0050 16.06 16.06 C1 C1 60.0% 0.67 1.068 200 0.0050 14.33 366 0.0050 Paved Areas 20 1.41 4.31 18.64 0.0050 14.05 14.05 C2 C2 60.0% 0.67 1.389 200 0.0050 14.33 387 0.0050 Paved Areas 20 1.41 4.56 18.89 0.0050 14.24 14.24 D1 D1 60.0% 0.67 6.469 42 0.0050 6.57 776 0.0050 Paved Areas 20 1.41 9.15 15.71 0.0050 16.30 15.71 D2 D2 23.4% 0.41 3.694 115 0.0050 17.33 285 0.0050 Paved Areas 20 1.41 3.36 20.69 0.0050 19.83 19.83 E1 E1 60.0% 0.67 1.144 42 0.0050 6.57 348 0.0050 Paved Areas 20 1.41 4.10 10.67 0.0050 12.48 10.67 E2 E2 60.0% 0.67 5.979 42 0.0050 6.57 1132 0.0050 Paved Areas 20 1.41 13.34 19.91 0.0050 19.48 19.48 HD2 Historic D2 13.5% 0.34 3.694 300 0.0048 31.32 478 0.0029 Tilage/Field 5 0.27 29.44 60.76 0.0036 30.08 30.08 January 23, 2019 Northfield DEVELOPED TIME OF CONCENTRATION J.Claeys 18-1000-00 Highland Development Services LENGTH (ft) DESIGN CRITERIA: Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual Overland Flow Equations for City of Fort Collins - Storm Water Criteria Manual SUB-BASIN DATA INITIAL/OVERLAND TIME (ti) TRAVEL TIME (tt) tc =ti +tt (min) Urban Check Final tc (min) DESIGN POINT Sub-basin % Impervious C2-10 AREA (acres) tt (min) Design Engineer: Design Firm: Project Number: Date: EQUATIONS: -Equation 6-2 -Equation 6-4 -Urbanized Check Equation 6-5 - CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition 500 ft - Overland flow shall not exceed for undeveloped condition Final t c = minimum of t i + t t and urbanized basin check recommended minimum t c = 5 min for urbanized basins Time of Concentration (100-yr) Type of Travel Surface Cv A1 A1 60.0% 0.84 8.120 52 0.0050 4.46 1074 0.0050 Paved Areas 20 1.41 12.66 17.12 0.0050 19.05 17.12 A2 A2 60.0% 0.84 9.451 55 0.0050 4.59 1036 0.0050 Paved Areas 20 1.41 12.21 16.80 0.0050 18.74 16.80 B1 B1 60.0% 0.84 7.709 24 0.0050 3.03 1048 0.0050 Paved Areas 20 1.41 12.35 15.38 0.0050 18.57 15.38 B2 B2 60.0% 0.84 3.101 24 0.0050 3.03 404 0.0050 Paved Areas 20 1.41 4.76 7.79 0.0050 12.82 7.79 B3 B3 60.0% 0.84 9.954 300 0.0050 10.71 491 0.0050 Paved Areas 20 1.41 5.79 16.50 0.0050 16.06 16.06 C1 C1 60.0% 0.84 1.068 200 0.0050 8.75 366 0.0050 Paved Areas 20 1.41 4.31 13.06 0.0050 14.05 13.06 C2 C2 60.0% 0.84 1.389 200 0.0050 8.75 387 0.0050 Paved Areas 20 1.41 4.56 13.31 0.0050 14.24 13.31 D1 D1 60.0% 0.84 6.469 42 0.0050 4.01 776 0.0050 Paved Areas 20 1.41 9.15 13.15 0.0050 16.30 13.15 D2 D2 23.4% 0.52 3.694 115 0.0050 14.72 285 0.0050 Paved Areas 20 1.41 3.36 18.07 0.0050 19.83 18.07 E1 E1 60.0% 0.84 1.144 42 0.0050 4.01 348 0.0050 Paved Areas 20 1.41 4.10 8.11 0.0050 12.48 8.11 E2 E2 60.0% 0.84 5.979 42 0.0050 4.01 1132 0.0050 Paved Areas 20 1.41 13.34 17.35 0.0050 19.48 17.35 HD2 Historic D2 13.5% 0.43 3.694 300 0.0048 27.75 478 0.0029 Tilage/Field 5 0.27 29.44 57.19 0.0036 30.08 30.08 January 23, 2019 Northfield DEVELOPED TIME OF CONCENTRATION J.Claeys 18-1000-00 Highland Development Services LENGTH (ft) DESIGN CRITERIA: Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual Overland Flow Equations for City of Fort Collins - Storm Water Criteria Manual SUB-BASIN DATA INITIAL/OVERLAND TIME (ti) TRAVEL TIME (tt) tc =ti +tt (min) Urban Check Final tc (min) DESIGN POINT Sub-basin % Impervious C100 AREA (acres) tt (min) Design Engineer: Design Firm: Project Number: Date: EQUATIONS: I = rainfall intensity (in/hr) Q n = n -yr peak discharge (cfs) P 1 = one-hour point rainfall depth (in) C n = n -yr runoff coefficient t c = time of concentration (min) I n = n -yr rainfall intensity (in/hr) P 1-2yr = 0.82 in A n = Basin drainage area (ac) P 1-10yr = 1.40 in P 1-100yr = 2.86 in BASIN SUMMARY: tc (min) Runoff Coeff (C2-10) C(A) (acres) Intensity (in/hr) Q (ft3/s) tc (min) Runoff Coeff (C2-10) C(A) (acres) Intensity (in/hr) Q (ft3/s) tc (min) Runoff Coeff. (C100) C(A) (acres) Intensity (in/hr) Q (ft3/s) A1 A1 8.120 19.05 0.67 5.44 1.65 8.98 19.05 0.67 5.44 2.82 15.33 17.12 0.84 6.80 6.08 41.33 A2 A2 9.451 18.74 0.67 6.33 1.66 10.54 18.74 0.67 6.33 2.84 18.00 16.80 0.84 7.92 6.14 48.56 B1 B1 7.709 17.31 0.67 5.16 1.73 8.95 17.31 0.67 5.16 2.96 15.28 15.38 0.84 6.46 6.40 41.34 B2 B2 3.101 9.72 0.67 2.08 2.24 4.65 9.72 0.67 2.08 3.82 7.94 7.79 0.84 2.60 8.47 21.99 B3 B3 9.954 16.06 0.67 6.67 1.80 11.99 16.06 0.67 6.67 3.07 20.47 16.06 0.84 8.34 6.27 52.28 C1 C1 1.068 14.05 0.67 0.72 1.91 1.37 14.05 0.67 0.72 3.27 2.34 13.06 0.84 0.89 6.90 6.17 C2 C2 1.389 14.24 0.67 0.93 1.90 1.77 14.24 0.67 0.93 3.25 3.02 13.31 0.84 1.16 6.85 7.96 D1 D1 6.469 15.71 0.67 4.33 1.82 7.88 15.71 0.67 4.33 3.10 13.45 13.15 0.84 5.42 6.88 37.29 D2 D2 3.694 19.83 0.41 1.53 1.62 2.47 19.83 0.41 1.53 2.76 4.22 18.07 0.52 1.91 5.91 11.31 E1 E1 1.144 10.67 0.67 0.77 2.16 1.65 10.67 0.67 0.77 3.68 2.82 8.11 0.84 0.96 8.35 8.00 E2 E2 5.979 19.48 0.67 4.01 1.63 6.54 19.48 0.67 4.01 2.79 11.16 17.35 0.84 5.01 6.04 30.23 HD2 Historic D2 3.694 30.08 0.34 1.27 1.28 1.63 30.08 0.34 1.27 2.19 2.79 30.08 0.43 1.59 4.47 7.11 10-yr Peak Runoff 100-yr Peak Runoff Northfield DEVELOPED PEAK RUNOFF Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual DESIGN CRITERIA: Design Point Sub-basin Area (acres) J.Claeys Highland Development Services 18-1000-00 January 23, 2019 2-yr Peak Runoff Q n = C n I n A n (0.786651) 1 ( 10 ) 28 . 5 Appendix C APPENDIX C – DETENTION POND CALCULATIONS Basin Req'd WQCV (ac-ft) Req'd Detention Volume (ac-ft) Total Volume Req'd (ac-ft) Total Volume Provided (ac-ft) A Basins 0.41 3.89 4.31 4.69 B Basins 0.49 4.60 5.09 3.42 C Basins 0.06 0.54 0.60 1.30 D Basins 0.23 1.24 1.47 3.55 11.47 12.96 North of Suniga Total Pond Summary Northfield Design Engineer: Design Firm: Project Number: Date: Pond Summary Table J.Claeys Highland Development Services 18-1000-00 January 23, 2019 18-1000-00 PondCalcs.xls Page 1 of 5 Highland Development Services Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA 0.67 1.25 0.84 ft3 acre-ft 17.570 acres 169,646 3.89 3.51 cfs Time (min) 100-yr Intensity (I , in/hr) Q100 (cfs) Accumulative Runoff Volume (ft3) Accumulative Release Volume (ft3) Detained Volume (ft3) Detained Volume (acre-ft) 0 0.00 0.00 0 0 0 0.00 5 9.95 146.42 43,925 1,054 42,871 0.98 10 7.72 113.60 68,161 2,108 66,052 1.52 15 6.52 95.94 86,349 3,163 83,186 1.91 20 5.60 82.41 98,886 4,217 94,669 2.17 25 4.98 73.28 109,923 5,271 104,652 2.40 30 4.52 66.51 119,723 6,325 113,398 2.60 35 4.08 60.04 126,080 7,380 118,700 2.72 40 3.74 55.03 132,084 8,434 123,650 2.84 45 3.46 50.91 137,470 9,488 127,981 2.94 50 3.23 47.53 142,590 10,542 132,048 3.03 55 3.03 44.59 147,137 11,596 135,541 3.11 60 2.86 42.09 151,508 12,651 138,857 3.19 65 2.72 40.03 156,099 13,705 142,394 3.27 70 2.59 38.11 160,072 14,759 145,313 3.34 75 2.48 36.49 164,222 15,813 148,408 3.41 80 2.38 35.02 168,107 16,868 151,239 3.47 85 2.29 33.70 171,859 17,922 153,937 3.53 90 2.21 32.52 175,611 18,976 156,635 3.60 95 2.13 31.34 178,657 20,030 158,627 3.64 100 2.06 30.31 181,880 21,084 160,796 3.69 105 2.00 29.43 185,412 22,139 163,273 3.75 110 1.94 28.55 188,414 23,193 165,221 3.79 115 1.89 27.81 191,901 24,247 167,654 3.85 120 1.84 27.08 194,947 25,301 169,646 3.89 Northfield 100-yr Detention Volume - FAA Method Highland Development Services January 23, 2019 18-1000-00 Northfield Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA REQUIRED WATER QUALITY CAPTURE VOLUME (WQCV): Tributary Area, A 17.570 acres Imperviousness, I 60.0% WQCV (watershed inches) 0.236 inches 40-Hour Drain Time (Fig SQ-2) Required WQCV 0.415 acre-feet Including 20% for Sedimentation Stage Storage Volume (pond volume calculated using the prismoidal formula): Pond A1 CONTOUR (FT) AREA (FT 2 ) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4948.00 0 0.00 0.00 0.00 0.00 4949.0 23600 0.54 0.18 1.00 0.18 4950.0 67420 1.55 1.00 2.00 1.18 4951.0 80448 1.85 1.70 3.00 2.88 4951.6 86080 1.98 1.15 3.60 4.02 Pond A2 CONTOUR (FT) AREA (FT 2 ) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4950.21 0 0.00 0.00 0.00 0.00 4951.0 6116 0.14 0.04 0.79 0.04 4952.0 15342 0.35 0.24 1.79 0.28 4953.0 18370 0.42 0.39 2.79 0.66 Critical Pond Elevations - A Basins J.Claeys Highland Development 18-1000-00 January 23, 2019 Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual ( ) 3 AAAADepth 1 2 1 2 V + + = * * 1 . 2 12 Area WQCV Volume     Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA 0.67 1.25 0.84 ft3 acre-ft 20.764 acres 200,484 4.60 4.15 cfs Time (min) 100-yr Intensity (I , in/hr) Q100 (cfs) Accumulative Runoff Volume (ft3) Accumulative Release Volume (ft3) Detained Volume (ft3) Detained Volume (acre-ft) 0 0.00 0.00 0 0 0 0.00 5 9.95 173.03 51,909 1,246 50,664 1.16 10 7.72 134.25 80,551 2,492 78,059 1.79 15 6.52 113.38 102,045 3,738 98,308 2.26 20 5.60 97.38 116,862 4,983 111,878 2.57 25 4.98 86.60 129,904 6,229 123,675 2.84 30 4.52 78.60 141,486 7,475 134,011 3.08 35 4.08 70.95 148,998 8,721 140,277 3.22 40 3.74 65.04 156,094 9,967 146,127 3.35 45 3.46 60.17 162,458 11,213 151,246 3.47 50 3.23 56.17 168,510 12,459 156,052 3.58 55 3.03 52.69 173,884 13,704 160,179 3.68 60 2.86 49.74 179,049 14,950 164,098 3.77 65 2.72 47.30 184,474 16,196 168,278 3.86 70 2.59 45.04 189,170 17,442 171,728 3.94 75 2.48 43.13 194,074 18,688 175,386 4.03 80 2.38 41.39 198,665 19,934 178,731 4.10 85 2.29 39.82 203,099 21,180 181,920 4.18 90 2.21 38.43 207,534 22,425 185,108 4.25 95 2.13 37.04 211,133 23,671 187,462 4.30 100 2.06 35.82 214,942 24,917 190,025 4.36 105 2.00 34.78 219,115 26,163 192,952 4.43 110 1.94 33.74 222,663 27,409 195,254 4.48 115 1.89 32.87 226,784 28,655 198,130 4.55 120 1.84 32.00 230,384 29,901 200,484 4.60 Northfield 100-yr Detention Volume - FAA Method January 23, 2019 Highland Development Services 18-1000-00 Northfield Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA REQUIRED WATER QUALITY CAPTURE VOLUME (WQCV): Tributary Area, A 20.764 acres Imperviousness, I 60.0% WQCV (watershed inches) 0.236 inches 40-Hour Drain Time (Fig SQ-2) Required WQCV 0.490 acre-feet Including 20% for Sedimentation Stage Storage Volume (pond volume calculated using the prismoidal formula): Pond B1 CONTOUR (FT) AREA (FT 2 ) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4949.0 0 0.00 0.00 0.00 0.00 4950.0 9,741 0.22 0.07 1.00 0.07 4951.0 28,648 0.66 0.42 2.00 0.50 4952.0 48,037 1.10 0.87 3.00 1.37 4953.0 67,627 1.55 1.32 4.00 2.69 Pond B2 CONTOUR (FT) AREA (FT 2 ) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4952.04 0 0.00 0.00 0.00 0.00 4953.0 8,592 0.20 0.06 0.96 0.06 4954.0 23,159 0.53 0.35 1.96 0.41 4954.5 32,929 0.76 0.32 2.46 0.73 Critical Pond Elevations - B Basins J.Claeys Highland Development 18-1000-00 January 23, 2019 Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual ( ) 3 AAAADepth 1 2 1 2 V + + = * * 1 . 2 12 Area WQCV Volume     Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA Detention Volume Calculation - C Basins 0.67 1.25 0.84 ft3 acre-ft 2.457 acres 23,719 0.54 0.49 cfs Time (min) 100-yr Intensity (I , in/hr) Q100 (cfs) Accumulative Runoff Volume (ft3) Accumulative Release Volume (ft3) Detained Volume (ft3) Detained Volume (acre-ft) 0 0.00 0.00 0 0 0 0.00 5 9.95 20.47 6,141 147 5,994 0.14 10 7.72 15.88 9,530 295 9,235 0.21 15 6.52 13.41 12,073 442 11,631 0.27 20 5.60 11.52 13,826 590 13,236 0.30 25 4.98 10.25 15,369 737 14,632 0.34 30 4.52 9.30 16,739 884 15,855 0.36 35 4.08 8.39 17,628 1,032 16,596 0.38 40 3.74 7.69 18,467 1,179 17,288 0.40 45 3.46 7.12 19,220 1,327 17,894 0.41 50 3.23 6.65 19,936 1,474 18,462 0.42 55 3.03 6.23 20,572 1,621 18,951 0.44 60 2.86 5.88 21,183 1,769 19,414 0.45 65 2.72 5.60 21,825 1,916 19,909 0.46 70 2.59 5.33 22,381 2,064 20,317 0.47 75 2.48 5.10 22,961 2,211 20,750 0.48 80 2.38 4.90 23,504 2,358 21,146 0.49 85 2.29 4.71 24,028 2,506 21,523 0.49 90 2.21 4.55 24,553 2,653 21,900 0.50 95 2.13 4.38 24,979 2,801 22,178 0.51 100 2.06 4.24 25,430 2,948 22,482 0.52 105 2.00 4.11 25,923 3,095 22,828 0.52 110 1.94 3.99 26,343 3,243 23,100 0.53 115 1.89 3.89 26,831 3,390 23,441 0.54 120 1.84 3.79 27,257 3,538 23,719 0.54 Northfield 100-yr Detention Volume - FAA Method January 23, 2019 Highland Development Services Northfield Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA REQUIRED WATER QUALITY CAPTURE VOLUME (WQCV): Tributary Area, A 2.457 acres Imperviousness, I 60.0% WQCV (watershed inches) 0.236 inches 40-Hour Drain Time (Fig SQ-2) Required WQCV 0.058 acre-feet Including 20% for Sedimentation Stage Storage Volume (pond volume calculated using the prismoidal formula): Pond C1 CONTOUR (FT) AREA (FT 2 ) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4953.20 0 0.00 0.00 0.00 0.00 4954.0 2550 0.06 0.02 0.80 0.02 4955.0 12625 0.29 0.16 1.80 0.18 4956.0 15228 0.35 0.32 2.80 0.49 4957.0 17591 0.40 0.38 3.80 0.87 4958.0 20183 0.46 0.43 4.80 1.30 Critical Pond Elevations - C Basins J.Claeys Highland Development 18-1000-00 January 23, 2019 Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual ( ) 3 AAAADepth 1 2 1 2 V + + = * * 1 . 2 12 Area WQCV Volume       = 18-1000-00 PondCalcs.xls Page 4 of 5 Highland Development Services Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA 0.66 1.25 0.83 ft3 acre-ft 10.163 acres 53,806 1.24 9.15 cfs Time (min) 100-yr Intensity (I , in/hr) Q100 (cfs) Accumulative Runoff Volume (ft3) Accumulative Release Volume (ft3) Detained Volume (ft3) Detained Volume (acre-ft) 0 0.00 0.00 0 0 0 0.00 5 9.95 83.42 25,027 2,744 22,284 0.51 10 7.72 64.73 38,837 5,488 33,349 0.77 15 6.52 54.67 49,200 8,232 40,968 0.94 20 5.60 46.95 56,343 10,976 45,368 1.04 25 4.98 41.75 62,631 13,719 48,912 1.12 30 4.52 37.90 68,215 16,463 51,752 1.19 35 4.08 34.21 71,838 19,207 52,630 1.21 40 3.74 31.36 75,258 21,951 53,307 1.22 45 3.46 29.01 78,327 24,695 53,632 1.23 50 3.23 27.08 81,245 27,439 53,806 1.24 55 3.03 25.40 83,836 30,183 53,653 1.23 60 2.86 23.98 86,326 32,927 53,399 1.23 65 2.72 22.81 88,942 35,670 53,271 1.22 70 2.59 21.72 91,205 38,414 52,791 1.21 75 2.48 20.79 93,570 41,158 52,412 1.20 80 2.38 19.95 95,783 43,902 51,881 1.19 85 2.29 19.20 97,921 46,646 51,275 1.18 90 2.21 18.53 100,059 49,390 50,670 1.16 95 2.13 17.86 101,795 52,134 49,661 1.14 100 2.06 17.27 103,631 54,878 48,754 1.12 105 2.00 16.77 105,643 57,622 48,022 1.10 110 1.94 16.27 107,354 60,365 46,988 1.08 115 1.89 15.85 109,341 63,109 46,232 1.06 120 1.84 15.43 111,076 65,853 45,223 1.04 Runoff Coefficient (C ) Frequency Factor (C f ) 100-yr Detention Volume - FAA Method Northfield January 23, 2019 Northfield Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA REQUIRED WATER QUALITY CAPTURE VOLUME (WQCV): Tributary Area, A 10.163 acres Imperviousness, I 58.1% WQCV (watershed inches) 0.230 inches 40-Hour Drain Time (Fig SQ-2) Required WQCV 0.234 acre-feet Including 20% for Sedimentation Stage Storage Volume (pond volume calculated using the prismoidal formula): Pond D CONTOUR (FT) AREA (FT 2 ) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4945.62 0 0.00 0.00 0.00 0.00 4946.00 272 0.01 0.00 0.38 0.00 4947.00 3426 0.08 0.04 1.38 0.04 4948.00 16131 0.37 0.21 2.38 0.24 4949.0 41269 0.95 0.64 3.38 0.88 4950.0 60269 1.38 1.16 4.38 2.04 4951.0 71520 1.64 1.51 5.38 3.55 Critical Pond Elevations - D Basins J.Claeys Highland Development 18-1000-00 January 23, 2019 Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual ( ) 3 AAAADepth 1 2 1 2 V + + = * * 1 . 2 12 Area WQCV Volume       = 18-1000-00 PondCalcs.xls Page 5 of 5 Highland Development Services Appendix D APPENDIX D – STREET CAPACITIES CONNECTOR LOCAL NTS MAJOR ARTERIAL NTS NOTES: 1. MINOR STORM - NO CURB-TOPPING. MAXIMUM SIX (6) INCH FLOW DEPTH AT GUTTER. FLOW SPREAD MUST LEAVE AT LEAST A TWELVE (12) FEET WIDE CLEAR TRAVEL LANE IN EACH DIRECTION. 2. MAJOR STORM - THE DEPTH OF WATER MUST NOT EXCEED THE BOTTOM OF THE GUTTER AT THE MEDIAN TO ALLOW OPERATION OF EMERGENCY VEHICLES, THE DEPTH OF WATER OVER THE GUTTER FLOW LINE SHALL NOT EXCEED TWELVE (12) INCHES, AND THE FLOW MUST BE CONTAINED WITHIN THE RIGHT-OF-WAY OR EASEMENTS PARALLELING THE RIGHT-OF-WAY. THE MOST RESTRICTIVE OF THE THREE CRITERIA SHALL GOVERN. NOTES: 1. MINOR STORM - NO CURB-TOPPING. FLOW MAY SPREAD TO CROWN OF STREET. 2. MAJOR STORM - THE DEPTH OF WATER AT THE STREET CROWN SHALL NOT EXCEED SIX (6) INCHES TO ALLOW OPERATION OF EMERGENCY VEHICLES, THE DEPTH OF WATER OVER THE GUTTER FLOW LINE SHALL NOT EXCEED TWELVE (12) INCHES, AND THE FLOW MUST BE CONTAINED WITHIN THE RIGHT-OF-WAY OR EASEMENTS PARALLELING THE RIGHT-OF-WAY. THE MOST RESTRICTIVE OF THE THREE CRITERIA SHALL GOVERN. DEVELOPMENT HIGHLAND SERVCIES 6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550 PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com SHEET OF DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJ # SCALE (V) NORTHFIELD STREET CAPACITY EXHIBIT 1/23/19 N/A N/A JTC JTC 18-1000-00 1 1 Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 19.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.015 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 18.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.005 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 5.8 10.5 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = 9.5 61.8 cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Northfield Connector Local Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' 1282-168-03 Inlet Calcs_Connector Local.xlsm, Inlet 1 8/21/2018, 5:11 PM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 13.8 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.015 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 32.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.005 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 18.67 32.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 9.2 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = 10.3 45.4 cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Northfield Major Arterial Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' 1282-168-03 Inlet Calcs_Major Arterial.xlsm, Inlet 1 8/21/2018, 5:13 PM Appendix E APPENDIX E – LOW IMPACT DEVELOPMENT CALCULATIONS Northfield Low Impact Development Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA Low Impact Development Summary Sq-Ft Acres % Impervious Impervious Area (ft 2 ) % of Impervious Area Requiring Treatment Impervious Area Requiring Treatment 512,841 11.77 60% 307,704 50% 153,852 1,227,884 28.19 60% 736,731 75% 552,548 107,764 2.47 90% N/A 75% (future treatment) N/A 304,152 6.98 60% 182,491 0% N/A 360,777 8.28 0% 0 0% N/A 2,513,418 57.70 1,226,927 - 706,400 A2 418,325 60% 250,995 Infiltration Gallery 0.19 6,586 SC-310 5,207 B2 159,134 60% 95,480 Infiltration Gallery 0.19 2,505 SC-740 1,264 B3 433,610 60% 260,166 Infiltration Gallery 0.19 6,827 SC-310 5,405 D1 172,132 60% 103,279 Rain Garden 0.19 2,710 706,400 709,920 City of Fort Collins - Ordinance No. 007, 2016 - Treat at least 75% of any newly developed or redeveloped impervious area using one or a combination of LID techniques, or - Treat at least 50% of any newly developed or redeveloped impervious area using one or a combination of LID techniques when 25% of private driveable surfaces are permeable. J.Claeys Highland Development Services 18-1000-00 January 23, 2019 Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised January 2016) Development Area Breakdown Area Drainage to LID (ft 2 ) % Impervious Totals Description Single Family Area Multifamily Area Commercial Area (future treatment) Suniga (no treatment) Detention / Landscape Areas (no treatment) Total Impervious Area Treated (ft2) Total Impervious Area Required for Treatment (ft2) Basin(s) Treatment Areas Summary WQCV12-hr (ft 3 ) WQCV12-hr (watershed inches) Impervious Area Treated (ft 2 ) Treatment Method StormTech Chamber Model Infiltration Gallery Footprint (ft 2 ) (from StormTech) N/A (See UD BMP) Highland Development Services 18-1000-00 J.Claeys Adjusted Runoff Coefficient (CC f ) Area (A ) Allowed Release Rate Required Detention Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual City of Fort Collins - Storm Water Criteria Manual Detention Volume Calculation - D1 Basin 18-1000-00 J.Claeys Area (A ) Allowed Release Rate Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual City of Fort Collins - Storm Water Criteria Manual Runoff Coefficient (C ) Frequency Factor (C f ) Required Detention Adjusted Runoff Coefficient (CC f )   = 18-1000-00 PondCalcs.xls Page 3 of 5 Highland Development Services J.Claeys Area (A ) Allowed Release Rate Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual City of Fort Collins - Storm Water Criteria Manual Runoff Coefficient (C ) Frequency Factor (C f ) Required Detention Adjusted Runoff Coefficient (CC f ) Detention Volume Calculation - B Basins   = 18-1000-00 PondCalcs.xls Page 2 of 5 Highland Development Services J.Claeys Area (A ) Allowed Release Rate Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual City of Fort Collins - Storm Water Criteria Manual Runoff Coefficient (C ) Frequency Factor (C f ) Required Detention Adjusted Runoff Coefficient (CC f ) Detention Volume Calculation - A Basins t c P I + = 18-1000-00 Rational Calcs (FC).xlsx Page 4 of 4 Highland Development Services OVERALL SLOPE (ft/ft) tc (min) SLOPE (ft/ft) ti (min) LENGTH (ft) SLOPE (ft/ft) Table RO-2 VELOCITY (ft/s) t c = t i + t t 0 . 5 V = C v S w V L tt 60 = �� = 18 − 15� + � 60 24� + 12 � �� = 1.87(1.1 − �� �� ) � � � 18-1000-00 Rational Calcs (FC).xlsx Page 3 of 4 Highland Development Services OVERALL SLOPE (ft/ft) tc (min) SLOPE (ft/ft) ti (min) LENGTH (ft) SLOPE (ft/ft) Table RO-2 VELOCITY (ft/s) t c = t i + t t 0 . 5 V = C v S w V L tt 60 = �� = 18 − 15� + � 60 24� + 12 � �� = 1.87(1.1 − �� �� ) � � � 18-1000-00 Rational Calcs (FC).xlsx Page 2 of 4 Highland Development Services Atotal (acres) Weighted % Impervious A COMPOSITE paved (sq feet) Aroof (sq feet) Awalk (sq feet) Agravel/pavers (sq feet) Alawn (sq feet) 18-1000-00 Rational Calcs (FC).xlsx Page 1 of 4 Highland Development Services 1/23/19 1" = 100' N/A JTC JTC 18-1000-00 ---- 1 1 N W E S Min Bldg FG Approx Depth to GW Approx GW Elev Min Bldg FG 7/26/2017 5.0 4952.3 4958.3 6.5 4947.7 4953.7 7.0 4949.1 4955.1 7/27/2017 6.0 4951.3 4957.3 6.8 4947.4 4953.4 7.2 4948.9 4954.9 9/19/2017 7.0 4950.3 4956.3 6.7 4947.5 4953.5 7.3 4948.8 4954.8 10/19/2017 7.1 4950.2 4956.2 6.6 4947.6 4953.6 7.3 4948.8 4954.8 2/12/2017 8.8 4948.5 4954.5 8.0 4946.2 4952.2 8.9 4947.2 4953.2 6/7/2018 5.1 4952.2 4958.2 7.2 4947.0 4953.0 7.0 4949.1 4955.1 4957.3 4954.2 4956.1 4953.5 PZ-7 PZ-4 4953.2 4954.6 4951.8 4956.5 4956.1 MW-1 MW-2 PZ-1 PZ-2 PZ-3 PZ-5 PZ-6 Northfield - (AKA Schalagel Property) Earth Engineering Consultants, LLC (EEC) - Project No. 1172056 Groundwater Monitoring - Summary Table 18.5 ac 8.7 ac 29.3 ac 11.4 ac 9.8 ac 11.4 ac 4.8 ac 16.4 ac 3.3 ac 1.3 ac 31.6 ac 52.7 ac 21.3 ac 7.4 ac 18.1 ac 17.0 ac 2.5 ac 2.7 ac 2.0 ac 4.6 ac 2.5 ac 13.1 ac 3.9 ac 13.7 ac 1.8 ac 0.2 ac 7.2 ac 6.0 ac 3.8 ac 0.6 ac 2.4 ac 5.2 ac 1.6 ac 2.6 ac 35.7 ac 2.6 ac 1.8 ac 1.8 ac 1.6 ac 1.2 ac 0.7 ac 4.2 ac 2.6 ac 13.6 ac 13.0 ac 8.6 ac 7.1 ac 5.1 ac 4.5 ac 4.2 ac 10.9 ac 8.2 ac 19.2 ac 16.0 ac 32.4 ac 17.5 ac 9.8 ac 16.6 ac 29.3 ac 6.0 ac 10.3 ac 5.9 ac 1.5 ac 1.3 ac 21.2 ac 1.ac5 ac 1.2 1.1 ac 1.1 ac 8.2 ac 1.0 ac 8.6 ac 5.2 ac 14.8 ac 2.0 ac 1.6 ac 3.3 ac 1.4 ac 5.3 ac 1.2 ac 1.0 ac 2.7 ac 2.2 ac 3.9 ac 3.3 ac 3.4 ac 4.4 ac 7.9 ac 0.2 ac 4.2 ac 1.1 ac 1.7 ac 2.4 ac 2.0 ac 1.0 ac 36.2 ac 5.5 ac 49.1 ac APPROX NORTHFIELD PROPRETY LINE 38 1.11 1.89 3.87 1.11 0.00 1.90 0.01 3.88 0.01 39 1.09 1.86 3.80 1.09 0.00 1.87 0.01 3.82 0.02 40 1.07 1.83 3.74 1.08 0.01 1.84 0.01 3.76 0.02 41 1.05 1.80 3.68 1.06 0.01 1.81 0.01 3.70 0.02 42 1.04 1.77 3.62 1.04 0.00 1.78 0.01 3.64 0.02 43 1.02 1.74 3.56 1.03 0.01 1.76 0.02 3.59 0.03 44 1.01 1.72 3.51 1.01 0.00 1.73 0.01 3.54 0.03 45 0.99 1.69 3.46 1.00 0.01 1.71 0.02 3.48 0.02 46 0.98 1.67 3.41 0.99 0.01 1.68 0.01 3.44 0.03 47 0.96 1.64 3.36 0.97 0.01 1.66 0.02 3.39 0.03 48 0.95 1.62 3.31 0.96 0.01 1.64 0.02 3.34 0.03 49 0.94 1.60 3.27 0.95 0.01 1.61 0.01 3.30 0.03 50 0.92 1.58 3.23 0.93 0.01 1.59 0.01 3.25 0.02 51 0.91 1.56 3.18 0.92 0.01 1.57 0.01 3.21 0.03 52 0.90 1.54 3.14 0.91 0.01 1.55 0.01 3.17 0.03 53 0.89 1.52 3.10 0.90 0.01 1.53 0.01 3.13 0.03 54 0.88 1.50 3.07 0.89 0.01 1.51 0.01 3.09 0.02 55 0.87 1.48 3.03 0.88 0.01 1.50 0.02 3.06 0.03 56 0.86 1.47 2.99 0.87 0.01 1.48 0.01 3.02 0.03 57 0.85 1.45 2.96 0.86 0.01 1.46 0.01 2.98 0.02 58 0.84 1.43 2.92 0.85 0.01 1.44 0.01 2.95 0.03 59 0.83 1.42 2.89 0.84 0.01 1.43 0.01 2.92 0.03 60 0.82 1.40 2.86 0.83 0.01 1.41 0.01 2.88 0.02 0.00 -0.02 0.00 C 3 2 1 1 ( c ) C t C P I + = of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 12, Oct 10, 2017 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Mar 20, 2015—Oct 15, 2016 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado (NorthField) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/6/2017 Page 2 of 4