HomeMy WebLinkAboutNORTHFIELD FILING 1 EXPANDED - PDP180011 - SUBMITTAL DOCUMENTS - ROUND 3 - UTILITY PLANSSITE
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
PROPOSED STREET LIGHT
PROPOSED STORM SEWER
EXISTING SANITARY SEWER MAIN
PROPOSED TELEPHONE LINE
EXISTING GAS
EXISTING STORM SEWER
EXISTING WATER MAIN
EXISTING MANHOLE
PROPOSED STORM INLET
LEGEND
PROPOSED CONCRETE
PROPOSED MINOR CONTOUR
EXISTING SPOT ELEVATION PROPOSED SPOT ELEVATION
PROPOSED MAJOR CONTOUR
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
EXISTING UTILITY POLE
EXISTING GUY WIRE
PROPOSED GAS
EXISTING ELECTRIC LINE PROPOSED ELECTRIC LINE
EXISTING TELEPHONE LINE
EXISTING FIRE HYDRANT PROPOSED FIRE HYDRANT
EXISTING WATER VALVE
PROPOSED SANITARY SEWER MAIN
PROPOSED WATER MAIN
EXISTING CONCRETE
EXISTING FLOWLINE, CURB & GUTTER PROPOSED FLOWLINE, CURB & GUTTER
PROPOSED FENCE
LIMITS OF CONSTRUCTION
EXISTING OVERHEAD UTILITY
EXISTING STORM SEWER INLET
PROPOSED WATER VALVE
PROPOSED MANHOLE
PROPOSED UTILITY POLE
EXISTING STREET LIGHT
PROPOSED SWALE
PROPOSED DIRECTION OF OVERLAND FLOW
N. LEMAY AVENUE
MATCHLINE
SEE SHEET 4
MATCHLINE
SEE SHEET 3
LAKE CANAL
SNYDER, RICHARD F
SCHLAGEL, DONALD E
/CHERYL D
SCHLAGEL, LEONARD L
/JUNE S
UNTERBERGER,
LORIN
Graham, John
C/Ginger L
KEY MAP
NTS
N
W E
S
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
NOTES:
1. ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN DETERMINED FROM A COMBINATION OF RECORD DRAWINGS,
SURVEYED FIELD MARK-OUTS AND PHYSICAL OBSERVATIONS. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THE
DRAWINGS WHICH PRESENTLY EXIST IN THE AREA OF CONSTRUCTION. THEREFORE, THE CONTRACTOR SHALL VERIFY
LOCATION AND DEPTH OF ALL EXISTING UTILITIES IN THE PROJECT VICINITY PRIOR TO BEGINNING WORK. THE
CONTRACTOR SHALL COORDINATE AND PROVIDE PROTECTION OF CONFLICTING UTILITIES. NOTIFY
OWNER/ENGINEER IF ANY CONFLICTS ARE ENCOUNTERED. THE OWNER AND/OR ENGINEER ASSUMES NO
RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS SHOWN.
2. COORDINATE DEMOLITION REQUIREMENTS, LIMITS OF DEMOLITION, SALVAGE ITEMS, PROTECTION OF ITEMS TO
REMAIN, TREES, FENCING, ETC. WITH OWNER, ARCHITECT, AND RELEVANT CONSTRUCTION AND/OR PHASING
PLANS. ADDITIONAL DEMOTION OF PAVING, TREES, UTILITIES, STRUCTURES, ETC. TO BE PERFORMED AS REQUIRED.
3. ALL EXISTING UTILITIES TO REMAIN SHALL BE ADJUSTED TO FINAL GRADE.
4. CONTRACTOR RESPONSIBLE FOR ALL SURFACE REPAIR/REPLACEMENT TO RESTORE SIDEWALKS, PAVEMENT,
CURB/GUTTER AND SOD AREAS DISTURBED BY NEW WORK. REPAIR/REPLACEMENTS SHALL BE COMPLETED PER CITY
REDWOOD STREET
LAKE CANAL
DRY CREEK
MATCHLINE
SEE SHEET 2
MATCHLINE
SEE SHEET 4
SNYDER, RICHARD F
TRACT A, REDWOOD
VILLAGE PUD PHASE II
ROCKY MOUNTAIN
RAPTOR PROGRAM
SNYDER, RICHARD F
KEY MAP
NTS
N
W E
S
0
50'
50 25 50 100
SCALE: 1" =
CALL BEFORE YOU DIG
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
1-800-922-1987
or 8-1-1
CALL 2-BUSINESS DAYS IN ADVANCE
BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE
MARKING OF UNDERGROUND MEMBER UTILITIES.
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
NOTES:
1. ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN DETERMINED FROM A COMBINATION OF RECORD
DRAWINGS, SURVEYED FIELD MARK-OUTS AND PHYSICAL OBSERVATIONS. THERE MAY BE OTHER UTILITIES NOT
SHOWN ON THE DRAWINGS WHICH PRESENTLY EXIST IN THE AREA OF CONSTRUCTION. THEREFORE, THE
CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES IN THE PROJECT VICINITY PRIOR
TO BEGINNING WORK. THE CONTRACTOR SHALL COORDINATE AND PROVIDE PROTECTION OF CONFLICTING
UTILITIES. NOTIFY OWNER/ENGINEER IF ANY CONFLICTS ARE ENCOUNTERED. THE OWNER AND/OR ENGINEER
ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS SHOWN.
N. LEMAY AVENUE
MATCHLINE
SEE SHEET 2
MATCHLINE
SEE SHEET 3
SWARTZ, DAVID A,
MILCAN, SUSAN MARIE
LOT 29
ARREOLA, MANUEL L
LOT 30
CUSACK, JOAN E
LOT 37
EMMERICH, KARLA J
LOT 41
Tallent, Charles G / Tami A
BAZOIN-LAPPARTIENT,
ANDREA MARIE, GREGORY C
LOT 40
MONDRAGON, LUCY
V / CHRISTINA M,
LOT 28
ALTA VISTA SUBDIVISION
Graham, John
C/Ginger L
Kederike Lemay, LLC
ROCKY MOUNTAIN
RAPTOR PROGRAM
MAIN
STREET
KEY MAP
NTS
N
W E
S
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
ONLY
ONLY
ONLY
ONLY
ONLY
ONLY
N. LEMAY AVENUE
E. SUNIGA ROAD
TOOMEY DRIVE
PIONEER TRAIL ROAD
SCHLAGEL STREET
LANDMARK WAY
REDWOOD STREET
STEELEY DRIVE
A
A
B
B
C
C
DRY CREEK
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
100'
100 50 100 200
SCALE: 1" =
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
SECTION A-A
SECTION B-B
SECTION C-C
LAKE CANAL DITCH
MATCHLINE
SEE SHEET 7
N. LEMAY AVENUE
TOOMEY DRIVE
PIONEER TRAIL ROAD
SCHLAGEL STREET
LANDMARK WAY
Block 2 Block 1
Block 3
Block 7 Block 6
Block 5
Block 8
Block 14
Block 9
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
ONLY
ONLY
ONLY
LAKE CANAL DITCH
MATCHLINE
SEE SHEET 6
SCHLAGEL STREET
E. SUNIGA ROAD
REDWOOD STREET
MATCHLINE
SEE SHEET 8
Block 11
Lot 1
Tract D
(Drainage, Utility, &
Access Easement)
Tract B
(Drainage, Utility, &
Access Easement)
Tract G
(Drainage, Utility, &
Access Easement)
Tract E
(Drainage, Utility, &
Access Easement)
Tract H
(Drainage,
Utility, &
Access
Easement)
STEELEY DRIVE
Lot 1
Lot 2
Lot 3
Lot 4
Block 20
Drive 'J'
Drive 'J'
Bldg 2b
Bldg 1b
Bldg 14a
Bldg 2a Bldg 4a
Bldg 3a Bldg 5a
Bldg 1a
Bldg 6a
Bldg 7a
Bldg 8a
Bldg 9a
Bldg 1d
KEY MAP
NTS
N
W E
S
0
50'
50 25 50 100
SCALE: 1" =
CHECKED BY:
Date
ONLY
ONLY
ONLY
MATCHLINE
SEE SHEET 6
N. LEMAY AVENUE
E. SUNIGA ROAD
LANDMARK WAY
MATCHLINE
SEE SHEET 7
RAIN
GARDEN
Tract I
(Drainage, Utility, &
Access Easement)
Tract E
(Drainage, Utility, &
Access Easement)
Tract F
(Drainage, Utility, &
Access Easement)
Tract H
(Drainage, Utility, &
Access Easement)
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 20
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Block 16
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 17
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 15
Lot 1
Lot 2
Lot 3
AE
AG
AH
AG
AE
AH
AF
LAKE CANAL DITCH
FUTURE LEMAY AVENUE
MATCHLINE
SEE SHEET 11
MATCHLINE
SEE SHEET 10
N. LEMAY AVENUE
TOOMEY DRIVE
PIONEER TRAIL ROAD
LANDMARK
WAY
Tract C
(Drainage, Utility, &
Access Easement)
Tract B
(Drainage, Utility, &
Access Easement)
Tract A
(Drainage, Utility, &
Access Easement)
Tract F
(Drainage, Utility, &
Access Easement)
Tract E
(Drainage, Utility, &
Access Easement)
Tract B
(Drainage, Utility, &
Access Easement)
Tract F
(Drainage,
Utility, &
Access
Easement)
POND B2
POND A2
SCHLAGEL STREET
4956.38 FEET
4956.38 FEET STA: 139+11
STA: 139+11
4954.08 FEET
STA:
127+80
4954.08 FEET
STA:
127+80
4952.98 FEET
STA:
122+37
4951.84 FEET
STA: 118+01
4951.84 FEET
STA:
ONLY
ONLY
ONLY
AH
AI
AI
AJ
AJ
AK
AI
AH
LAKE CANAL DITCH
DRY CREEK
E. SUNIGA ROAD
MATCHLINE
SEE SHEET 9
MATCHLINE
SEE SHEET 11
STEELEY DRIVE
POND B1
REDWOOD STREET
Tract D
(Drainage, Utility, &
Access Easement)
Tract B
(Drainage, Utility, &
Access Easement)
Tract G
(Drainage, Utility, &
Access Easement)
(Drainage, Utility, &
Access Easement)
Tract E
(Drainage, Utility, &
Access Easement)
Tract H
(Drainage,
Utility, &
Access
Easement)
POND C
4956.38 FEET
STA: 139+11
4960.48 FEET
STA: 144+91
4960.48 FEET
STA: 144+91
4960.77 FEET
STA: 147+32
4961.25 FEET
STA: 149+48
4956.38 FEET
STA: 139+11
A
A
B
B
Block 11
Lot 1
Lot 1
ONLY
ONLY
ONLY
AE
AF
AG
E. SUNIGA ROAD
MATCHLINE
SEE SHEET 9
MATCHLINE
SEE SHEET 10
LANDMARK WAY
N. LEMAY AVENUE
RAIN
GARDEN
POND D
Tract I
(Drainage, Utility, &
Access Easement)
Tract E
(Drainage, Utility, &
Access Easement)
Tract F
(Drainage, Utility, &
Access Easement)
Tract H
(Drainage, Utility, &
Access Easement)
POND B1
POND A2
POND A1
4954.08 FEET
STA: 127+80
4952.98 FEET
STA:
122+37
4951.84 FEET
STA:
118+01
FUTURE
SUNIGA
ROAD
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 20
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Block 16
Lot 1
Lot 2
Lot 3
E. SUNIGA ROAD CL PROFILE
4955
4960
4965
4970
4975
4980
4955
4960
4965
4970
4975
4980
37+50 38+00 38+50 39+00 39+50 40+00 40+50 41+00 41+50 42+00 42+50 43+00 43+50 44+00 44+50 45+00 45+50 46+00 46+50 47+00
ONLY
ONLY
LAKE CANAL DITCH
MATCHLINE STA 47+00
SEE SHEET 13
LAKE CANAL DITCH
E. SUNIGA ROAD
REDWOOD STREET
Tract D
(Drainage, Utility &
Access Easement)
Tract G
(Drainage,
Utility &
Access
Easement)
KEY MAP
NTS
N
W E
S
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
E. SUNIGA ROAD CL PROFILE
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
47+00 47+50 48+00 48+50 49+00 49+50 50+00 50+50 51+00 51+50 52+00 52+50 53+00 53+50 54+00 54+50 55+00 55+50 56+00 56+50
ONLY
ONLY
E. SUNIGA ROAD
E. SUNIGA ROAD
MATCHLINE STA 47+00
SEE SHEET 12
Tract E
(Drainage, Utility &
Access Easement)
Tract H
(Drainage,
Utility &
Access
Easement)
MATCHLINE STA 56+50
SEE SHEET 14
Tract I
(Drainage, Utility, &
Access Easement)
KEY MAP
NTS
N
W E
S
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
E. SUNIGA ROAD CL PROFILE
4945
4950
4955
4960
4965
4970
4945
4950
4955
4960
4965
4970
56+50 57+00 57+50 58+00 58+50 59+00 59+50 60+00 60+50 61+00 61+50 62+00 62+50 63+00 63+50 64+00 64+50
ONLY
MATCHLINE STA 56+50
SEE SHEET 13
E. SUNIGA ROAD
N. LEMAY AVENUE
Tract F
(Drainage, Utility &
Access Easement)
Tract I
(Drainage, Utility, &
Access Easement)
KEY MAP
NTS
N
W E
S
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
E. SUNIGA ROAD
STEELEY DRIVE CL PROFILE
4950
4955
4960
4965
4970
4950
4955
4960
4965
4970
7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50
LAKE CANAL
DITCH
Tract E
(Drainage, Utility, &
Access Easement)
Tract D
(Drainage,
Utility, &
Access
Easement)
Tract G
(Drainage, Utility, &
Access Easement)
Tract H
(Drainage, Utility, &
Access Easement)
Block 11
Lot 1
Tract B
(Drainage, Utility, &
Access Easement)
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
STEELEY DRIVE
LEGEND
PROPOSED STORM SEWER
PROPOSED STORM INLET
SIDEWALK
SCHLAGEL STREET CL PROFILE
4955
4960
4965
4970
4975
4955
4960
4965
4970
4975
9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00
SCHLAGEL STREET
MATCHLINE STA 13+00
see sheet
17
Tract B
(Drainage, Utility &
Access Easement)
Tract E
(Drainage, Utility &
Access Easement)
Block 11
Lot 1
KEY MAP
NTS
N
W E
S
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
SCHLAGEL STREET
LEGEND
PROPOSED STORM SEWER
PROPOSED STORM INLET
SIDEWALK
PROPOSED FLOWLINE, CURB & GUTTER
PROPOSED MANHOLE
STREET CENTERLINE
EASEMENT
SCHLAGEL STREET CL PROFILE
4955
4960
4965
4970
4975
4955
4960
4965
4970
4975
13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00
MATCHLINE STA 22+00
SEE SHEET
18
MATCHLINE STA 13+00
SEE SHEET 16
SCHLAGEL STREET
TRACT B
(DRAINAGE, UTILITY, &
ACCESS EASEMENT)
TRACT A
(DRAINAGE, UTILITY, &
ACCESS EASEMENT)
SCHLAGEL STREET
TRACT E
(DRAINAGE, UTILITY, &
ACCESS EASEMENT)
TRACT C
(DRAINAGE, UTILITY, &
ACCESS EASEMENT) Block 7 Block 6
Block 8
Lot 4
Lot 5
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
KEY MAP
NTS
N
W E
S
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
SCHLAGEL STREET CL PROFILE
4955
4960
4965
4970
4975
4955
4960
4965
4970
4975
22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50
SCHLAGEL STREET
TRACT A
(DRAINAGE, UTILITY, &
ACCESS EASEMENT)
TRACT C
(DRAINAGE, UTILITY, &
ACCESS EASEMENT)
TRACT F
(DRAINAGE, UTILITY, &
ACCESS EASEMENT)
Block 2 Block 1
Block 3
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Block 4 KEY MAP
NTS
N
N. LEMAY AVENUE CL PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 35+50 36+00 36+50 37+00 37+50 38+00 38+50 39+00 39+50
MATCHLINE STA 39+50
SEE SHEET
20
SCHLAGEL STREET
N. LEMAY AVENUE
Tract F
(Drainage, Utility, &
Access Easement)
Tract F
(Drainage, Utility, &
Access Easement)
Tract A
(Drainage, Utility, &
Access Easement)
Block 1
Block 3
Lot 5
Lot 6
Lot 7
Lot 8
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8 KEY MAP
NTS
N
W E
S
MATCHLINE STA 39+50
SEE SHEET
20
SCHLAGEL STREET
(SEE SHEET 18)
N. LEMAY AVENUE
Tract F
(Drainage, Utility, &
Access Easement)
Tract F
(Drainage, Utility, &
Access Easement)
Tract A
(Drainage, Utility, &
Access Easement)
Block 1
Block 3
Lot 4
Lot 5
Lot 6
Lot 7
N. LEMAY AVENUE CL PROFILE
4945
4950
4955
4960
4965
4945
4950
4955
4960
4965
39+50 40+00 40+50 41+00 41+50 42+00 42+50 43+00 43+50 44+00 44+50 45+00 45+50 46+00 46+50 47+00 47+50
ONLY
MATCHLINE STA 39+50
SEE SHEET 19
E. SUNIGA ROAD
(SEE SHEET 14)
N. LEMAY AVENUE
Tract F
(Drainage, Utility, &
Access Easement)
Tract I
(Drainage, Utility, &
Access Easement)
KEY MAP
NTS
N
W E
S
ONLY
MATCHLINE STA 39+50
SEE SHEET 19
E. SUNIGA ROAD
(SEE SHEET 14)
N. LEMAY AVENUE
Tract F
(Drainage, Utility, &
Access Easement)
Tract I
(Drainage, Utility, &
Access Easement)
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
HARVEST SUN STREET CL PROFILE
4955
4960
4965
4970
4955
4960
4965
4970
7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50
TOOMEY DRIVE
Block 7
Block 8
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
LAKE CANAL DITCH
KEY MAP
NTS
N
W E
S
LANDMARK WAY
(SEE SHEET 24)
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
LEGEND
PROPOSED STORM SEWER
PROPOSED STORM INLET
SIDEWALK
PROPOSED FLOWLINE, CURB & GUTTER
PROPOSED MANHOLE
STREET CENTERLINE
EASEMENT
RIGHT-OF-WAY LINE
LOT LINE
HARVEST SUN STREET CL PROFILE
4950
4955
4960
4965
4970
4950
4955
4960
4965
4970
13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50
TOOMEY DRIVE
Block 14
Block 9
Lot 1
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
KEY MAP
NTS
N
W E
S
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
TOOMEY DRIVE
LEGEND
PROPOSED STORM SEWER
PROPOSED STORM INLET
SIDEWALK
PROPOSED FLOWLINE, CURB & GUTTER
PROPOSED MANHOLE
STREET CENTERLINE
EASEMENT
MATCHLINE STA 18+90
SEE SHEET
22
PIONEER TRAIL ROAD
Tract A
(Drainage, Utility, &
Access Easement)
Tract C
(Drainage, Utility, &
Access Easement)
Tract F
(Drainage, Utility, &
Access Easement)
Tract F
(Drainage, Utility, &
Access Easement)
Block 2 Block 1
Block 3
Block 14
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Block 4
Lot 7
Lot 8
Block 12
Block 13
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
LANDMARK WAY ROAD CL PROFILE
4950
4955
4960
4965
4970
4950
4955
4960
4965
4970
9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50
LANDMARK WAY
Tract C
(Drainage, Utility, &
Access Easement)
Tract E
(Drainage, Utility, &
Access Easement)
Tract F
(Drainage, Utility, &
Access Easement)
Block 9
Lot 1
Lot 1
Lot 2
Lot 3
Block 17
Lot 5
Lot 6
Lot 7
Lot 8
Block 18
KEY MAP
NTS
N
W E
S
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
ONLY
ONLY
ONLY
ONLY
ONLY
ONLY
N. LEMAY AVENUE
E. SUNIGA ROAD
TOOMEY DRIVE
PIONEER TRAIL ROAD
SCHLAGEL STREET
LANDMARK WAY
REDWOOD STREET
STEELEY DRIVE
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
SIGHT DISTANCE EXHIBIT
1/23/19
1" = 100'
N/A
JTC
JTC
18-1000-00
----
25 25
0
100'
100 50 100 200
SCALE: 1" =
CORNER INTERSECTION SIGHT DISTANCE
LINE-OF-SIGHT
EDGE OF PAVEMENT
PROPERTY LINE
OBSTRUCTION
DESIGN SPEED
(MPH)
55
50
40
45
30
25
20
35
CORNER INTERSECTION
SIGHT DISTANCE (FT.)*
310
260
210
830
660
520
1240
1030
**
**
**
D=13'
Corner sight distance measured from a point on the minor road at 13 feet back from the
edge of the major road pavement (flowline) and measured from a height of eye at 3.50 feet
on the minor road to a height of object at 4.25 feet on the major road.
At Local-Local street intersections only, the "D" distance shall be ten feet (10') and the
sight distance shall be measured to the centerline of the street.
For private driveway access to a public street, use 10 feet back from flowline (or shoulder
for gravel roads).
*
**
***
SIGHT DISTANCE AT INTERSECTIONS
Line Of Sight must be within R.O.W. or sight distance easement.
NOTE:
CURB
CURB
D
(Unsignalized)
(Vehicle Path)
15
MAJOR STREET
MINOR STREET
**** *
210 **
These values apply to passenger cars on 2-lane roads only. Intersections and
access serving trucks or on multi-lane roadways requires separate analysis.
MAJOR STREET
OR ACCESS
Adjustments may be required for a skewed intersection.
1.
2.
CORNER INTERSECTION SIGHT DISTANCE
LINE-OF-SIGHT
EDGE OF PAVEMENT
PROPERTY LINE
OBSTRUCTION
DESIGN SPEED
(MPH)
55
50
40
45
30
25
20
35
CORNER INTERSECTION
SIGHT DISTANCE (FT.)*
310
260
210
830
660
520
1240
1030
**
**
**
D=13'
Corner sight distance measured from a point on the minor road at 13 feet back from the
edge of the major road pavement (flowline) and measured from a height of eye at 3.50 feet
on the minor road to a height of object at 4.25 feet on the major road.
At Local-Local street intersections only, the "D" distance shall be ten feet (10') and the
sight distance shall be measured to the centerline of the street.
For private driveway access to a public street, use 10 feet back from flowline (or shoulder
for gravel roads).
*
**
***
SIGHT DISTANCE AT INTERSECTIONS
Line Of Sight must be within R.O.W. or sight distance easement.
NOTE:
CURB
CURB
D
(Unsignalized)
(Vehicle Path)
15
MAJOR STREET
MINOR STREET
**** *
210 **
These values apply to passenger cars on 2-lane roads only. Intersections and
access serving trucks or on multi-lane roadways requires separate analysis.
MAJOR STREET
OR ACCESS
Adjustments may be required for a skewed intersection.
1.
2.
SIGHT DISTANCE TRIANGLE
LEGEND
NOTES
1. THERE ARE THREE INTERSECTION SIGHT DISTANCE SCENARIOS ON-SITE; PRIVATE DRIVE - LOCAL, LOCAL - LOCAL, AND
LOCAL - ARTERIAL.
2. FOR LOCAL - ARTERIAL INTERSECTIONS, THE LINE OF SIGHT ORIGIN WAS MEASURED FROM 2.5 FEET FROM THE CENTERLINE
OF THE MINOR STREET, 13 FEET FROM THE FLOWLINE OF THE MAJOR STREET.
3. FOR PRIVATE DRIVE - LOCAL AND LOCAL - LOCAL INTERSECTIONS, THE LINE OF SIGHT ORIGIN WAS MEASURED FROM THE
CENTERLINE OF THE MINOR STREET, 10 FEET FROM THE FLOWLINE OF THE STREET TO WHICH THE CONNECTION IS BEING
MADE.
4. WHERE SIGHT DISTANCES EXTEND INTO OR BEYOND T - INTERSECTIONS, THE SIGHT DISTANCE WAS LIMITED TO THE
CENTERLINE OF THE STREET TO WHICH THE CONNECTION IS BEING MADE.
5. WHERE SIGHT DISTANCES EXTEND INTO OR BEYOND A 90° CURVE IN THE STREET, THE SIGHT DISTANCE WAS LIMITED TO THE
POINT OF CURVATURE IN THE CENTERLINE OF THE CURVE.
SIGHT DISTANCE TRIANGLE DETAIL
NTS
N
W E
S
LANDMARK WAY
LEGEND
PROPOSED STORM SEWER
PROPOSED STORM INLET
SIDEWALK
PROPOSED MANHOLE
STREET CENTERLINE
EASEMENT
RIGHT-OF-WAY LINE
LOT LINE
PROPOSED FLOWLINE,
CURB & GUTTER
E. SUNIGA ROAD
(SEE SHEET 13)
TOOMEY DRIVE
(SEE SHEET 22)
E. SUNIGA ROAD
(SEE SHEET 14)
TOOMEY DRIVE
(SEE SHEET 22)
CONNECTOR LOCAL
W/ MEDIAN
STREET DETAIL
TYPICAL TURN LANE MEDIAN DETAIL
NTS
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
LANDMARK WAY ROAD STA 9+50 TO 15+50
1/23/19
1" = 50'
1" = 5'
JTC
JTC
18-1000-00
----
24 25
LEGEND
PROPOSED STORM SEWER
PROPOSED STORM INLET
SIDEWALK
PROPOSED FLOWLINE, CURB & GUTTER
PROPOSED MANHOLE
STREET CENTERLINE
EASEMENT
RIGHT-OF-WAY LINE
LOT LINE
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N
W E
S
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
3. LEFT AND RIGHT FLOWLINE PROFILES, STREET DETAILS, AND INTERSECTION DETAILS ARE TO
BE PROVIDED WITH THE FCP SUBMITTAL.
4. OFFSITE STREET GRADING/DESIGN WILL BE PROVIDED WITH THE FCP SUBMITTAL AS
REQUIRED.
Lot 6
PIONEER TRAIL ROAD CL PROFILE
4950
4955
4960
4965
4970
4950
4955
4960
4965
4970
18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50
KEY MAP
NTS
N
W E
S
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
PIONEER TRAIL ROAD
LEGEND
PROPOSED STORM SEWER
PROPOSED STORM INLET
SIDEWALK
PROPOSED FLOWLINE, CURB & GUTTER
PROPOSED MANHOLE
STREET CENTERLINE
EASEMENT
RIGHT-OF-WAY LINE
LOT LINE
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
SCHLAGEL STREET
(SEE SHEET 18)
SCHLAGEL STREET
(SEE SHEET 18)
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
PIONEER TRAIL ROAD STA 18+90 TO 25+08
1/23/19
1" = 50'
1" = 5'
JTC
JTC
18-1000-00
----
23 25
CONNECTOR LOCAL STREET DETAIL
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
3. LEFT AND RIGHT FLOWLINE PROFILES, STREET DETAILS, AND INTERSECTION DETAILS ARE TO
BE PROVIDED WITH THE FCP SUBMITTAL.
4. OFFSITE STREET GRADING/DESIGN WILL BE PROVIDED WITH THE FCP SUBMITTAL AS
REQUIRED.
RIGHT-OF-WAY LINE
LOT LINE
LANDMARK WAY
(SEE SHEET 24)
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
PIONEER TRAIL ROAD
(SEE SHEET 23)
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
TOOMEY DRIVE STA 9+50 TO 18+90
1/23/19
1" = 50'
1" = 5'
JTC
JTC
18-1000-00
----
22 25
CONNECTOR LOCAL STREET DETAIL
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
3. LEFT AND RIGHT FLOWLINE PROFILES, STREET DETAILS, AND INTERSECTION DETAILS ARE TO
BE PROVIDED WITH THE FCP SUBMITTAL.
4. OFFSITE STREET GRADING/DESIGN WILL BE PROVIDED WITH THE FCP SUBMITTAL AS
REQUIRED.
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
SCHLAGEL STREET
(SEE SHEET 17)
SCHLAGEL STREET
(SEE SHEET 17)
TOOMEY DRIVE
N
W
E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
TOOMEY DRIVE STA 7+71 TO 13+50
1/23/19
1" = 50'
1" = 5'
JTC
JTC
18-1000-00
----
21 25
CONNECTOR LOCAL STREET DETAIL
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
3. LEFT AND RIGHT FLOWLINE PROFILES, STREET DETAILS, AND INTERSECTION DETAILS ARE TO
BE PROVIDED WITH THE FCP SUBMITTAL.
4. OFFSITE STREET GRADING/DESIGN WILL BE PROVIDED WITH THE FCP SUBMITTAL AS
REQUIRED.
Date
Date
Date
N. LEMAY AVENUE
LEGEND
PROPOSED STORM SEWER
PROPOSED STORM INLET
SIDEWALK
PROPOSED FLOWLINE, CURB & GUTTER
PROPOSED MANHOLE
STREET CENTERLINE
EASEMENT
RIGHT-OF-WAY LINE
LOT LINE
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
INTERIM
CONDITION
ULTIMATE
CONDITION
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
N. LEMAY AVE STA 39+50 TO 47+00
1/23/19
1" = 50'
1" = 5'
JTC
JTC
18-1000-00
----
20 25
CONNECTOR LOCAL STREET DETAIL
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
3. LEFT AND RIGHT FLOWLINE PROFILES, STREET DETAILS, AND INTERSECTION DETAILS ARE TO
BE PROVIDED WITH THE FCP SUBMITTAL.
4. OFFSITE STREET GRADING/DESIGN WILL BE PROVIDED WITH THE FCP SUBMITTAL AS
REQUIRED.
Lot 8
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
N. LEMAY AVENUE
LEGEND
PROPOSED STORM SEWER
PROPOSED STORM INLET
SIDEWALK
PROPOSED FLOWLINE, CURB & GUTTER
PROPOSED MANHOLE
MATCHLINE STA 30+05
SEE SHEET
18
STREET CENTERLINE
EASEMENT
RIGHT-OF-WAY LINE
LOT LINE
ULTIMATE CONDITION INTERIM CONDITION
MATCHLINE STA 30+05
SEE SHEET
18
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
N. LEMAY AVE STA 30+05 TO 39+50
1/23/19
1" = 50'
1" = 5'
JTC
JTC
18-1000-00
----
19 25
CONNECTOR LOCAL STREET DETAIL
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
3. LEFT AND RIGHT FLOWLINE PROFILES, STREET DETAILS, AND INTERSECTION DETAILS ARE TO
BE PROVIDED WITH THE FCP SUBMITTAL.
4. OFFSITE STREET GRADING/DESIGN WILL BE PROVIDED WITH THE FCP SUBMITTAL AS
REQUIRED.
W E
S
SCHLAGEL STREET
TRACT A
(DRAINAGE, UTILITY, &
ACCESS EASEMENT)
TRACT C
(DRAINAGE, UTILITY, &
ACCESS EASEMENT)
TRACT F
(DRAINAGE, UTILITY, &
ACCESS EASEMENT)
Block 2 Block 1
Block 3
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Block 4
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
LEGEND
PROPOSED STORM SEWER
PROPOSED STORM INLET
SIDEWALK
PROPOSED FLOWLINE, CURB & GUTTER
PROPOSED MANHOLE
STREET CENTERLINE
EASEMENT
RIGHT-OF-WAY LINE
LOT LINE
MATCHLINE STA 30+05
SEE SHEET
19
SCHLAGEL STREET
MATCHLINE STA 22+00
SEE SHEET
17
PIONEER TRAIL ROAD
(SEE SHEET 23)
N. LEMAY AVENUE
(SEE SHEET 19)
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
MATCHLINE STA 22+00
SEE SHEET
17
PIONEER TRAIL ROAD
(SEE SHEET 23)
N. LEMAY AVENUE
(SEE SHEET 19)
INTERIM
CONDITION
ULTIMATE
CONDITION
MATCHLINE STA 30+05
SEE SHEET
19
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
SCHLAGEL STREET STA 22+00 TO 30+05
1/23/19
1" = 50'
1" = 5'
JTC
JTC
18-1000-00
----
18 25
CONNECTOR LOCAL STREET DETAIL
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
3. LEFT AND RIGHT FLOWLINE PROFILES, STREET DETAILS, AND INTERSECTION DETAILS ARE TO
BE PROVIDED WITH THE FCP SUBMITTAL.
4. OFFSITE STREET GRADING/DESIGN WILL BE PROVIDED WITH THE FCP SUBMITTAL AS
REQUIRED.
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
SCHLAGEL STREET
LEGEND
PROPOSED STORM SEWER
PROPOSED STORM INLET
SIDEWALK
PROPOSED FLOWLINE, CURB & GUTTER
PROPOSED MANHOLE
STREET CENTERLINE
EASEMENT
RIGHT-OF-WAY LINE
LOT LINE
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
TOOMEY DRIVE
(SEE SHEET 21)
TOOMEY DRIVE
(SEE SHEET 21)
N
W
E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
SCHLAGEL STREET STA 13+00 TO 22+00
1/23/19
1" = 50'
1" = 5'
JTC
JTC
18-1000-00
----
17 25
CONNECTOR LOCAL STREET DETAIL
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
3. LEFT AND RIGHT FLOWLINE PROFILES, STREET DETAILS, AND INTERSECTION DETAILS ARE TO
BE PROVIDED WITH THE FCP SUBMITTAL.
4. OFFSITE STREET GRADING/DESIGN WILL BE PROVIDED WITH THE FCP SUBMITTAL AS
REQUIRED.
RIGHT-OF-WAY LINE
LOT LINE
STEELEY DRIVE
(SEE SHEET 15)
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
STEELEY DRIVE
(SEE SHEET 15)
N
W
E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
SCHLAGEL STREET STA 10+00 TO 13+00
1/23/19
1" = 50'
1" = 5'
JTC
JTC
18-1000-00
----
16 25
CONNECTOR LOCAL STREET DETAIL
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
3. LEFT AND RIGHT FLOWLINE PROFILES, STREET DETAILS, AND INTERSECTION DETAILS ARE TO
BE PROVIDED WITH THE FCP SUBMITTAL.
4. OFFSITE STREET GRADING/DESIGN WILL BE PROVIDED WITH THE FCP SUBMITTAL AS
REQUIRED.
PROPOSED FLOWLINE, CURB & GUTTER
PROPOSED MANHOLE
STREET CENTERLINE
EASEMENT
RIGHT-OF-WAY LINE
LOT LINE
KEY MAP
NTS
N
W E
S
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
E. SUNIGA ROAD
(SEE SHEET 12)
E. SUNIGA ROAD
(SEE SHEET 14)
SCHLAGEL STREET
(SEE SHEET 16)
STEELEY DRIVE
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
STEELEY DRIVE STA 7+45 TO 14+19
1/23/19
1" = 50'
1" = 5'
JTC
JTC
18-1000-00
----
15 25
CONNECTOR LOCAL STREET DETAIL
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
3. LEFT AND RIGHT FLOWLINE PROFILES, STREET DETAILS, AND INTERSECTION DETAILS ARE TO
BE PROVIDED WITH THE FCP SUBMITTAL.
4. OFFSITE STREET GRADING/DESIGN WILL BE PROVIDED WITH THE FCP SUBMITTAL AS
REQUIRED.
LEGEND
PROPOSED STORM SEWER
PROPOSED STORM INLET
SIDEWALK
PROPOSED FLOWLINE, CURB & GUTTER
PROPOSED MANHOLE
STREET CENTERLINE
EASEMENT
RIGHT-OF-WAY LINE
LOT LINE
N. LEMAY AVENUE
(SEE SHEET
20
)
N. LEMAY AVENUE
(SEE SHEET
20
)
LEFT TURN MEDIAN
STREET DETAIL
TYPICAL 4-LANE ARTERIAL STREET SECTION
NOTE:
THE FINAL SUNIGA ROAD CROSS-SECTION WILL BE PER THE CITY'S RAISED PROTECTED
BIKE LAND SECTION PROVIDED BY THE CITY'S CAPITAL IMPROVEMENT ENGINEER.
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
E. SUNIGA ROAD STA 56+50 TO 64+50
1/23/19
1" = 50'
1" = 5'
JTC
JTC
18-1000-00
----
14 25
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
3. LEFT AND RIGHT FLOWLINE PROFILES, STREET DETAILS, AND INTERSECTION DETAILS ARE TO
BE PROVIDED WITH THE FCP SUBMITTAL.
4. OFFSITE STREET GRADING/DESIGN WILL BE PROVIDED WITH THE FCP SUBMITTAL AS
REQUIRED.
E. SUNIGA ROAD
LEGEND
PROPOSED STORM SEWER
PROPOSED STORM INLET
SIDEWALK
PROPOSED FLOWLINE, CURB & GUTTER
PROPOSED MANHOLE
STREET CENTERLINE
EASEMENT
RIGHT-OF-WAY LINE
LOT LINE
LANDMARK WAY
(SEE SHEET 24)
STEELEY DRIVE
(SEE SHEET 15)
0
50'
50 25 50 100
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
STEELEY DRIVE
(SEE SHEET 15)
LEFT TURN MEDIAN
STREET DETAIL
TYPICAL 4-LANE ARTERIAL STREET SECTION
NOTE:
THE FINAL SUNIGA ROAD CROSS-SECTION WILL BE PER THE CITY'S RAISED PROTECTED
BIKE LAND SECTION PROVIDED BY THE CITY'S CAPITAL IMPROVEMENT ENGINEER.
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
E. SUNIGA ROAD STA 47+00 TO 56+50
1/23/19
1" = 50'
1" = 5'
JTC
JTC
18-1000-00
----
13 25
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
3. LEFT AND RIGHT FLOWLINE PROFILES, STREET DETAILS, AND INTERSECTION DETAILS ARE TO
BE PROVIDED WITH THE FCP SUBMITTAL.
4. OFFSITE STREET GRADING/DESIGN WILL BE PROVIDED WITH THE FCP SUBMITTAL AS
REQUIRED.
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 5'
E. SUNIGA ROAD
LEGEND
NOTES:
1. ALL CURB RETURN FLOW LINE RADII ARE 20' FOR LOCAL STREETS AND 25' FOR ARTERIAL
STREETS.
2. PAVEMENT SECTION TO BE DESIGNED BY GEOTECHNICAL ENGINEER. REFERENCE
"PRELIMINARY SUBSURFACE EXPLORATION AND GROUNDWATER REPORT SCHLAGEL
PROPERTY NORTH OF EAST VINE DRIVE AND WEST OF NORTH LEMAY AVENUE", PREPARED
BY EARTH ENGINEERING CONSULTANTS, DATED 08/16/17, FOR PRELIMINARY
GEOTECHNICAL RECOMMENDATIONS.
3. LEFT AND RIGHT FLOWLINE PROFILES, STREET DETAILS, AND INTERSECTION DETAILS ARE TO
BE PROVIDED WITH THE FCP SUBMITTAL.
4. OFFSITE STREET GRADING/DESIGN WILL BE PROVIDED WITH THE FCP SUBMITTAL AS
REQUIRED.
PROPOSED STORM SEWER
PROPOSED STORM INLET
SIDEWALK
PROPOSED FLOWLINE, CURB & GUTTER
LEFT TURN MEDIAN
STREET DETAIL
TYPICAL 4-LANE ARTERIAL STREET SECTION
NOTE:
THE FINAL SUNIGA ROAD CROSS-SECTION WILL BE PER THE CITY'S RAISED PROTECTED
BIKE LAND SECTION PROVIDED BY THE CITY'S CAPITAL IMPROVEMENT ENGINEER.
PROPOSED MANHOLE
STREET CENTERLINE
EASEMENT
RIGHT-OF-WAY LINE
LOT LINE
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
STREET PLAN & PROFILE
E. SUNIGA ROAD STA 37+50 TO 47+00
1/23/19
1" = 50'
1" = 5'
JTC
JTC
18-1000-00
----
12 25
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 17
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 15
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 18
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Block 19
KEY MAP
NTS
N
W E
S
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
NOTES
1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR
TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING
INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL
REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS
ADEQUATELY VEGETATED WITH OWNER'S APPROVAL FOR REMOVAL.
2. THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED
DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION
CONTROL CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND MINIMIZE
DOWNSTREAM WATERWAY POLLUTION.
3. LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION
CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. ALL
DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO
MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION.
4. STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR
TO CONSTRUCTION COMMENCEMENT.
5. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY
SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER
LCUASS STANDARDS.
6. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO
SLOPED AREAS.
7. AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN
SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE
RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE SOIL.
8. REFERENCE NORTHFIELD PRELIMINARY DRAINAGE REPORT.
FLOODPLAIN NOTES
1. THE CURRENT EFFECTIVE (JUNE 17, 2008) FEMA FLOOD INSURANCE RATE MAP (FIRM, MAP NUMBERS
08096C0977G & 08069C0981G) DEPICTS THE 100-YR FLOODPLAIN IN SOME AREAS OF THE
PROPOSED DEVELOPMENT. HOWEVER, IT IS ANTICIPATED THAT, AT THE TIME OF BUILDING
CONSTRUCTION ON THE AFFECTED LOTS, THE NORTHEAST COLLEGE CORRIDOR OUTFALL PROJECT
(NECCO) WILL HAVE REMAPPED THE FLOODPLAIN SUCH THAT THE 100-YR FLOODPLAIN WILL NO
LONGER BE PRESENT ON THE PROPOSED DEVELOPMENT. IT IS ANTICIPATED THAT THE MAP REVISION
WILL BE COMPLETED BY THE END OF 2019.
2. IF THE DEVELOPER DECIDES TO CONSTRUCT STRUCTURES OR OTHER CONSTRUCTION ELEMENTS IN
THE CURRENT EFFECTIVE 100-YR FLOODPLAIN BEFORE THE REMAPPING EFFORTS ARE COMPLETE
AND DOCUMENTED BY NECCO AND FEMA, IT SHOULD BE NOTED THAT ADDITIONAL ANALYSIS OF
THE BFE IS NECESSARY, AND THE FOLLOWING NOTES WILL ALSO APPLY:
2.1 FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR EACH STRUCTURE AND EACH SITE
CONSTRUCTION ELEMENT (DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITIES, ETC.) IN
THE FLOODPLAIN
2.2.A FEMA ELEVATION OR FLOODPROOFING CERTIFICATE MUST BE COMPLETED AND
APPROVED BEFORE THE CERTIFICATE OF OCCUPANCY (CO) IS ISSUED FOR ANY
STRUCTURES IN THE FLOODPLAIN.
3. THE 500 -YR FLOODPLAIN (SHADED ZONE X - NOT SHOWN HEREON) IS DUE TO THE FLOODING OF
THE POUDRE RIVER, CRITICAL FACILITIES ARE PROHIBITED WITHIN THE 500-YR FLOODPLAIN,
FACILITIES FOR AT-RISK POPULATIONS (DAYCARES, SCHOOLS, NURSING HOMES, ETC.) AND
EMERGENCY SERVICES FACILITIES (E.G. URGENT CARE, HOSPITALS, FIRE, POLICE).
BASIN COEFFICIENT (100-YR)
BASIN DESIGNATION
BASIN AREA
DESIGN POINT
DRAINAGE FLOW ARROW
DRAINAGE BASIN BOUNDARY
DRAINAGE BASIN FLOW PATH
LEGEND
EX MAJOR CONTOUR
SPILL GUTTER
EX MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
CROSS-SECTION (FEMA)
100-YR FLOODPLAIN (FEMA)
AH
100-YR FLOODWAY (FEMA)
500-YR FLOODPLAIN (FEMA)
100-YR FLOODPLAIN (NECCO)
100-YR FLOODWAY (NECCO)
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
GRADING & DRAINAGE PLAN
1/23/19
1" = 50'
N/A
JTC
JTC
18-1000-00
----
11 25
Lot 2
Lot 3
Lot 4
Block 20
KEY MAP
NTS
N
W E
S
REGIONAL TRAIL SECTION A-A
4950
4955
4960
4965
4970
4950
4955
4960
4965
4970
-0+25 0+00 0+50 1+00 1+25
REGIONAL TRAIL SECTION B-B
HORIZ. SCALE: 1"=50'
VERT. SCALE: 1"=10'
4950
4955
4960
4965
4970
4950
4955
4960
4965
4970
-0+25 0+00 0+50 1+00 1+25
0
50'
50 25 50 100
SCALE: 1" =
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
NOTES
1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND
THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM
FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL
CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH OWNER'S
APPROVAL FOR REMOVAL.
2. THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING
CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL CONTROL
MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND MINIMIZE DOWNSTREAM WATERWAY
POLLUTION.
3. LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL
BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. ALL DISTURBED AREAS SHALL BE
PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL
MIGRATION.
4. STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO
CONSTRUCTION COMMENCEMENT.
5. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL
DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS.
6. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS.
7. AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED NOT BEING
ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL
BLANKETS TO STABILIZE THE SOIL.
8. REFERENCE NORTHFIELD PRELIMINARY DRAINAGE REPORT.
FLOODPLAIN NOTES
1. THE CURRENT EFFECTIVE (JUNE 17, 2008) FEMA FLOOD INSURANCE RATE MAP (FIRM, MAP NUMBERS 08096C0977G
& 08069C0981G) DEPICTS THE 100-YR FLOODPLAIN IN SOME AREAS OF THE PROPOSED DEVELOPMENT. HOWEVER,
IT IS ANTICIPATED THAT, AT THE TIME OF BUILDING CONSTRUCTION ON THE AFFECTED LOTS, THE NORTHEAST
COLLEGE CORRIDOR OUTFALL PROJECT (NECCO) WILL HAVE REMAPPED THE FLOODPLAIN SUCH THAT THE 100-YR
FLOODPLAIN WILL NO LONGER BE PRESENT ON THE PROPOSED DEVELOPMENT. IT IS ANTICIPATED THAT THE MAP
REVISION WILL BE COMPLETED BY THE END OF 2019.
2. IF THE DEVELOPER DECIDES TO CONSTRUCT STRUCTURES OR OTHER CONSTRUCTION ELEMENTS IN THE CURRENT
EFFECTIVE 100-YR FLOODPLAIN BEFORE THE REMAPPING EFFORTS ARE COMPLETE AND DOCUMENTED BY NECCO
AND FEMA, IT SHOULD BE NOTED THAT ADDITIONAL ANALYSIS OF THE BFE IS NECESSARY, AND THE FOLLOWING
NOTES WILL ALSO APPLY:
2.1 FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR EACH STRUCTURE AND EACH SITE CONSTRUCTION ELEMENT
(DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITIES, ETC.) IN THE FLOODPLAIN
2.2.A FEMA ELEVATION OR FLOODPROOFING CERTIFICATE MUST BE COMPLETED AND APPROVED BEFORE THE
CERTIFICATE OF OCCUPANCY (CO) IS ISSUED FOR ANY STRUCTURES IN THE FLOODPLAIN.
3. THE 500 -YR FLOODPLAIN (SHADED ZONE X - NOT SHOWN HEREON) IS DUE TO THE FLOODING OF THE POUDRE
RIVER, CRITICAL FACILITIES ARE PROHIBITED WITHIN THE 500-YR FLOODPLAIN, FACILITIES FOR AT-RISK POPULATIONS
(DAYCARES, SCHOOLS, NURSING HOMES, ETC.) AND EMERGENCY SERVICES FACILITIES (E.G. URGENT CARE,
HOSPITALS, FIRE, POLICE).
BASIN COEFFICIENT (100-YR)
BASIN DESIGNATION
BASIN AREA
DESIGN POINT
DRAINAGE FLOW ARROW
DRAINAGE BASIN BOUNDARY
DRAINAGE BASIN FLOW PATH
LEGEND
EX MAJOR CONTOUR
SPILL GUTTER
EX MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
CROSS-SECTION (FEMA)
100-YR FLOODPLAIN (FEMA)
AH
100-YR FLOODWAY (FEMA)
500-YR FLOODPLAIN (FEMA)
100-YR FLOODPLAIN (NECCO)
100-YR FLOODWAY (NECCO)
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
N
W E
S
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
GRADING & DRAINAGE PLAN
1/23/19
1" = 50'
N/A
JTC
JTC
18-1000-00
----
10 25
118+01
Block 2 Block 1
Block 3
Block 7
Block 6
Block 5
Block 8
Block 14
Block 9
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 4
Block 9
Block 10 Block 11
L
ot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 12
Block 13
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
KEY MAP
NTS
N
W E
S
0
50'
50 25 50 100
SCALE: 1" =
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
BASIN COEFFICIENT (100-YR) AH
BASIN DESIGNATION
BASIN AREA
DESIGN POINT
DRAINAGE FLOW ARROW
DRAINAGE BASIN BOUNDARY
DRAINAGE BASIN FLOW PATH
LEGEND
EX MAJOR CONTOUR
SPILL GUTTER
EX MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
CROSS-SECTION (FEMA)
100-YR FLOODPLAIN (FEMA)
100-YR FLOODWAY (FEMA)
500-YR FLOODPLAIN (FEMA)
100-YR FLOODPLAIN (NECCO)
100-YR FLOODWAY (NECCO)
NOTES
1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION
CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE
EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM
THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN
IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS
ADEQUATELY VEGETATED WITH OWNER'S APPROVAL FOR REMOVAL.
2. THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND
ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS
AND THE PERFORMANCE OF THE EROSION CONTROL CONTROL MEASURES
SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND MINIMIZE
DOWNSTREAM WATERWAY POLLUTION.
3. LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES.
ADJUST EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY
COMPLETE PROPOSED WORK. ALL DISTURBED AREAS SHALL BE PREPARED
(SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION
POTENTIAL AND SOIL MIGRATION.
4. STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY
CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT.
5. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING
CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE
CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS.
6. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT
NOT LIMITED TO SLOPED AREAS.
7. AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER
EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST
GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL
BLANKETS TO STABILIZE THE SOIL.
8. REFERENCE NORTHFIELD PRELIMINARY DRAINAGE REPORT.
FLOODPLAIN NOTES
1. THE CURRENT EFFECTIVE (JUNE 17, 2008) FEMA FLOOD INSURANCE RATE MAP
(FIRM, MAP NUMBERS 08096C0977G & 08069C0981G) DEPICTS THE 100-YR
FLOODPLAIN IN SOME AREAS OF THE PROPOSED DEVELOPMENT. HOWEVER, IT
IS ANTICIPATED THAT, AT THE TIME OF BUILDING CONSTRUCTION ON THE
AFFECTED LOTS, THE NORTHEAST COLLEGE CORRIDOR OUTFALL PROJECT
(NECCO) WILL HAVE REMAPPED THE FLOODPLAIN SUCH THAT THE 100-YR
FLOODPLAIN WILL NO LONGER BE PRESENT ON THE PROPOSED
DEVELOPMENT. IT IS ANTICIPATED THAT THE MAP REVISION WILL BE
COMPLETED BY THE END OF 2019.
2. IF THE DEVELOPER DECIDES TO CONSTRUCT STRUCTURES OR OTHER
CONSTRUCTION ELEMENTS IN THE CURRENT EFFECTIVE 100-YR FLOODPLAIN
BEFORE THE REMAPPING EFFORTS ARE COMPLETE AND DOCUMENTED BY
NECCO AND FEMA, IT SHOULD BE NOTED THAT ADDITIONAL ANALYSIS OF THE
BFE IS NECESSARY, AND THE FOLLOWING NOTES WILL ALSO APPLY:
2.1 FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR EACH STRUCTURE AND
EACH SITE CONSTRUCTION ELEMENT (DETENTION PONDS, BIKE PATHS,
PARKING LOTS, UTILITIES, ETC.) IN THE FLOODPLAIN
2.2.A FEMA ELEVATION OR FLOODPROOFING CERTIFICATE MUST BE
COMPLETED AND APPROVED BEFORE THE CERTIFICATE OF
OCCUPANCY (CO) IS ISSUED FOR ANY STRUCTURES IN THE FLOODPLAIN.
3. THE 500 -YR FLOODPLAIN (SHADED ZONE X - NOT SHOWN HEREON) IS DUE TO
THE FLOODING OF THE POUDRE RIVER, CRITICAL FACILITIES ARE PROHIBITED
WITHIN THE 500-YR FLOODPLAIN, FACILITIES FOR AT-RISK POPULATIONS
(DAYCARES, SCHOOLS, NURSING HOMES, ETC.) AND EMERGENCY SERVICES
FACILITIES (E.G. URGENT CARE, HOSPITALS, FIRE, POLICE).
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
GRADING & DRAINAGE PLAN
1/23/19
1" = 50'
N/A
JTC
JTC
18-1000-00
----
9 25
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 18
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Block 19
Drive 'F' Drive 'F'
Drive 'E'
Drive 'I'
Drive 'H'
Drive 'G'
Drive 'J'
Bldg 10a
Bldg 11a
Bldg 12a
Bldg 13a
Bldg 1d Bldg 2d Bldg 3d Bldg 4d
Bldg 5d Bldg 6d
Bldg 2c
Bldg 1c
Bldg 3c Bldg 4c Bldg 5c Bldg 6c Bldg 8c
Bldg 9c
Bldg 7c
KEY MAP
NTS
N
W E
S
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
0
50'
50 25 50 100
SCALE: 1" =
NOTES:
1. ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN PROVIDED BY OTHERS AND DETERMINED FROM A COMBINATION OF RECORD DRAWINGS, SURVEYED FIELD MARK-OUTS AND PHYSICAL OBSERVATIONS.
THERE MAY BE UTILITIES NOT SHOWN ON THE DRAWINGS WHICH PRESENTLY EXIST IN THE AREA OF CONSTRUCTION. THEREFORE, THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING
UTILITIES IN THE PROJECT VICINITY PRIOR TO BEGINNING WORK. THE CONTRACTOR SHALL BE FULLY AND SOLELY RESPONSIBLE FOR ANY AND ALL DAMAGES AND COSTS WHICH MIGHT OCCUR BY THE
CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES. THE CONTRACTOR SHALL NOTIFY ALL PUBLIC AND PRIVATE UTILITY COMPANIES AND DETERMINE THE LOCATION OF ALL
EXISTING UTILITIES PRIOR TO PROCEEDING WITH GRADING AND CONSTRUCTION. ALL WORK PERFORMED IN THE AREA OF UTILITIES SHALL BE PERFORMED AND INSPECTED ACCORDING TO THE
REQUIREMENTS OF THE UTILITY OWNER. LIKEWISE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND MAPPING ANY EXISTING UTILITY (INCLUDING DEPTH) WHICH MAY CONFLICT WITH THE
PROPOSED CONSTRUCTION, AND FOR RELOCATING ENCOUNTERED UTILITIES AS DIRECTED BY THE ENGINEER. CONTRACTOR SHALL CONTACT AND RECEIVE APPROVAL FROM OWNER/UTILITY OWNER
BEFORE RELOCATING ANY ENCOUNTERED UTILITIES. CONTRACTOR RESPONSIBLE FOR SERVICE CONNECTIONS, AND RELOCATING AND RECONNECTING AFFECTED UTILITIES AS COORDINATED WITH UTILITY
OWNER AND/OR ENGINEER, INCLUDING NON-MUNICIPAL UTILITIES (TELEPHONE, GAS, CABLE, ETC., WHICH SHALL BE COORDINATED WITH THE UTILITY OWNER). THE CONTRACTOR SHALL IMMEDIATELY
CONTACT ENGINEER UPON DISCOVERY OF A UTILITY DISCREPANCY OR CONFLICT. AT LEAST 48 HOURS PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE UTILITY NOTIFICATION CENTER OF
COLORADO (1-800-922-1987, WWW.UNCC.ORG).
2. IN ADDITION TO MEETING APPLICABLE LCUASS, STATE OR FEDERAL STANDARDS, ALL MATERIALS, WORKMANSHIP AND CONSTRUCTION OF PUBLIC WATER AND WASTEWATER SYSTEM IMPROVEMENTS SHALL
MEET OR EXCEED THE STANDARDS SET FORTH IN THE CITY OF FORT COLLINS WATER AND WASTEWATER DEVELOPMENT STANDARDS.
3. IN CASES OF CONFLICT BETWEEN THESE SIGNED PLANS AND APPLICABLE STANDARDS, THE MOST RESTRICTIVE STANDARD SHALL APPLY.
4. ALL WATER MAINS AND FIRE LINES SHALL BE AWWA C900 PLASTIC PRESSURE PIPE (DR-18, PRESSURE CLASS 305). ALL PLASTIC PRESSURE PIPE SHALL HAVE TRACER WIRE PER STANDARDS. ALL FITTINGS ON
THE
PROPOSED FIRE LINES AND FIRE HYDRANT LATERALS SHALL BE FULLY RESTRAINED JOINTS PER CITY STANDARDS (MEGA-LUG OR APPROVED EQUAL).
5. ALL WATER SERVICES SHALL BE TYPE K SOFT COPPER.
6. ALL WATER MAINS AND SERVICES SHALL HAVE A MINIMUM COVER OF 4.5' AND A MAXIMUM OF 5.5', UNLESS OTHERWISE NOTED.
7. ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC. VERIFY BUILDING CONNECTION ELEVATION (RE: MEP).
8. ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS.
9. INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO SPRING LINE.
10. SITE CONTRACTOR SHALL COORDINATE UTILITY CONNECTIONS AT THE BUILDING WITH BUILDING CONTRACTOR.
11. ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS.
12. STORM PIPES SHALL BE ADS HP STORM PIPE UNLESS OTHERWISE NOTED.
13. COORDINATE SITE LIGHTING AND ELECTRIC SERVICE ROUTING, DEMOLISHING, RELOCATING, AND MODIFICATIONS WITH THE ELECTRICAL ENGINEER, ARCHITECT, AND OWNER.
14. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
15. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE LENGTHS.
16. A FLOODPLAIN USE PERMIT MUST BE APPROVED PRIOR TO BEGINNING ANY WORK WITHIN THE DRY CREEK 100-YEAR FLOOD FRINGE.
17. SEE SHEET 5 FOR FLOODPLAIN/FLOODWAY LIMITS AND REQUIREMENTS.
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
N
W E
S
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
UTILITY PLAN
1/23/19
1" = 50'
N/A
JTC
JTC
18-1000-00
----
8 25
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
NOTES:
1. ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN PROVIDED BY OTHERS AND DETERMINED FROM A COMBINATION OF RECORD DRAWINGS,
SURVEYED FIELD MARK-OUTS AND PHYSICAL OBSERVATIONS. THERE MAY BE UTILITIES NOT SHOWN ON THE DRAWINGS WHICH PRESENTLY EXIST IN THE
AREA OF CONSTRUCTION. THEREFORE, THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES IN THE PROJECT VICINITY
PRIOR TO BEGINNING WORK. THE CONTRACTOR SHALL BE FULLY AND SOLELY RESPONSIBLE FOR ANY AND ALL DAMAGES AND COSTS WHICH MIGHT
OCCUR BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES. THE CONTRACTOR SHALL NOTIFY ALL PUBLIC AND
PRIVATE UTILITY COMPANIES AND DETERMINE THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO PROCEEDING WITH GRADING AND CONSTRUCTION.
ALL WORK PERFORMED IN THE AREA OF UTILITIES SHALL BE PERFORMED AND INSPECTED ACCORDING TO THE REQUIREMENTS OF THE UTILITY OWNER.
LIKEWISE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND MAPPING ANY EXISTING UTILITY (INCLUDING DEPTH) WHICH MAY CONFLICT
WITH THE PROPOSED CONSTRUCTION, AND FOR RELOCATING ENCOUNTERED UTILITIES AS DIRECTED BY THE ENGINEER. CONTRACTOR SHALL CONTACT
AND RECEIVE APPROVAL FROM OWNER/UTILITY OWNER BEFORE RELOCATING ANY ENCOUNTERED UTILITIES. CONTRACTOR RESPONSIBLE FOR SERVICE
CONNECTIONS, AND RELOCATING AND RECONNECTING AFFECTED UTILITIES AS COORDINATED WITH UTILITY OWNER AND/OR ENGINEER, INCLUDING
NON-MUNICIPAL UTILITIES (TELEPHONE, GAS, CABLE, ETC., WHICH SHALL BE COORDINATED WITH THE UTILITY OWNER). THE CONTRACTOR SHALL
IMMEDIATELY CONTACT ENGINEER UPON DISCOVERY OF A UTILITY DISCREPANCY OR CONFLICT. AT LEAST 48 HOURS PRIOR TO CONSTRUCTION, THE
CONTRACTOR SHALL NOTIFY THE UTILITY NOTIFICATION CENTER OF COLORADO (1-800-922-1987, WWW.UNCC.ORG).
2. IN ADDITION TO MEETING APPLICABLE LCUASS, STATE OR FEDERAL STANDARDS, ALL MATERIALS, WORKMANSHIP AND CONSTRUCTION OF PUBLIC
WATER AND WASTEWATER SYSTEM IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS SET FORTH IN THE CITY OF FORT COLLINS WATER AND
WASTEWATER DEVELOPMENT STANDARDS.
3. IN CASES OF CONFLICT BETWEEN THESE SIGNED PLANS AND APPLICABLE STANDARDS, THE MOST RESTRICTIVE STANDARD SHALL APPLY.
4. ALL WATER MAINS AND FIRE LINES SHALL BE AWWA C900 PLASTIC PRESSURE PIPE (DR-18, PRESSURE CLASS 305). ALL PLASTIC PRESSURE PIPE SHALL
HAVE TRACER WIRE PER STANDARDS. ALL FITTINGS ON THE PROPOSED FIRE LINES AND FIRE HYDRANT LATERALS SHALL BE FULLY RESTRAINED JOINTS PER
CITY STANDARDS (MEGA-LUG OR APPROVED EQUAL).
5. ALL WATER SERVICES SHALL BE TYPE K SOFT COPPER.
6. ALL WATER MAINS AND SERVICES SHALL HAVE A MINIMUM COVER OF 4.5' AND A MAXIMUM OF 5.5', UNLESS OTHERWISE NOTED.
7. ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC. VERIFY BUILDING CONNECTION ELEVATION (RE: MEP).
8. ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS.
9. INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO SPRING LINE.
10. SITE CONTRACTOR SHALL COORDINATE UTILITY CONNECTIONS AT THE BUILDING WITH BUILDING CONTRACTOR.
11. ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS.
12. STORM PIPES SHALL BE ADS HP STORM PIPE UNLESS OTHERWISE NOTED.
13. COORDINATE SITE LIGHTING AND ELECTRIC SERVICE ROUTING, DEMOLISHING, RELOCATING, AND MODIFICATIONS WITH THE ELECTRICAL ENGINEER,
ARCHITECT, AND OWNER.
14. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
15. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE
LENGTHS.
16. A FLOODPLAIN USE PERMIT MUST BE APPROVED PRIOR TO BEGINNING ANY WORK WITHIN THE DRY CREEK 100-YEAR FLOOD FRINGE.
17. SEE SHEET 5 FOR FLOODPLAIN/FLOODWAY LIMITS AND REQUIREMENTS.
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
N
W E
S
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
UTILITY PLAN
1/23/19
1" = 50'
N/A
JTC
JTC
18-1000-00
----
7 25
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Tract C
(Drainage, Utility, &
Access Easement)
Tract A Block 4
(Drainage, Utility, &
Access Easement)
Tract A
(Drainage, Utility, &
Access Easement)
Tract F
(Drainage, Utility, &
Access Easement)
Tract E
(Drainage, Utility, &
Access Easement)
Tract B
(Drainage, Utility, &
Access Easement)
Tract F
(Drainage, Utility, &
Access Easement)
MATCHLINE
SEE SHEET 8
FUTURE LEMAY AVENUE
Block 9
Block 10 Block 11
L
ot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Block 12
Block 13
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Drive 'B'
Drive 'B'
Drive 'A' Drive 'A'
Drive 'B'
Drive D'
Drive 'C'
Drive 'E'
Bldg 5b
Bldg 4b
Bldg 3b
Bldg 2b
Bldg 15a
Bldg 16a
Bldg 17a
Bldg 2c Bldg 3c Bldg 4c Bldg 5c Bldg 6c Bldg 8c
Bldg 9c
Bldg 12c
Bldg 13c
Bldg 14c Bldg 15c
Bldg 10c Bldg 11c
Bldg 7d
Bldg 19d Bldg 20d
Bldg 15d Bldg 18d
Bldg 16d
Bldg 17d
Bldg 8d
Bldg 9d
Bldg 10d Bldg 12d
Bldg 11d
Bldg 13d
Bldg 14d
COMMUNITY
CLUBHOUSE
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
KEY MAP
NTS
N
W E
S
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
NOTES:
1. ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN PROVIDED BY OTHERS AND DETERMINED FROM A COMBINATION OF
RECORD DRAWINGS, SURVEYED FIELD MARK-OUTS AND PHYSICAL OBSERVATIONS. THERE MAY BE UTILITIES NOT SHOWN ON
THE DRAWINGS WHICH PRESENTLY EXIST IN THE AREA OF CONSTRUCTION. THEREFORE, THE CONTRACTOR SHALL VERIFY
LOCATION AND DEPTH OF ALL EXISTING UTILITIES IN THE PROJECT VICINITY PRIOR TO BEGINNING WORK. THE CONTRACTOR
SHALL BE FULLY AND SOLELY RESPONSIBLE FOR ANY AND ALL DAMAGES AND COSTS WHICH MIGHT OCCUR BY THE
CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES. THE CONTRACTOR SHALL NOTIFY ALL
PUBLIC AND PRIVATE UTILITY COMPANIES AND DETERMINE THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO PROCEEDING
WITH GRADING AND CONSTRUCTION. ALL WORK PERFORMED IN THE AREA OF UTILITIES SHALL BE PERFORMED AND
INSPECTED ACCORDING TO THE REQUIREMENTS OF THE UTILITY OWNER. LIKEWISE, THE CONTRACTOR SHALL BE RESPONSIBLE
FOR LOCATING AND MAPPING ANY EXISTING UTILITY (INCLUDING DEPTH) WHICH MAY CONFLICT WITH THE PROPOSED
CONSTRUCTION, AND FOR RELOCATING ENCOUNTERED UTILITIES AS DIRECTED BY THE ENGINEER. CONTRACTOR SHALL
CONTACT AND RECEIVE APPROVAL FROM OWNER/UTILITY OWNER BEFORE RELOCATING ANY ENCOUNTERED UTILITIES.
CONTRACTOR RESPONSIBLE FOR SERVICE CONNECTIONS, AND RELOCATING AND RECONNECTING AFFECTED UTILITIES AS
COORDINATED WITH UTILITY OWNER AND/OR ENGINEER, INCLUDING NON-MUNICIPAL UTILITIES (TELEPHONE, GAS, CABLE,
ETC., WHICH SHALL BE COORDINATED WITH THE UTILITY OWNER). THE CONTRACTOR SHALL IMMEDIATELY CONTACT
ENGINEER UPON DISCOVERY OF A UTILITY DISCREPANCY OR CONFLICT. AT LEAST 48 HOURS PRIOR TO CONSTRUCTION, THE
CONTRACTOR SHALL NOTIFY THE UTILITY NOTIFICATION CENTER OF COLORADO (1-800-922-1987, WWW.UNCC.ORG).
2. IN ADDITION TO MEETING APPLICABLE LCUASS, STATE OR FEDERAL STANDARDS, ALL MATERIALS, WORKMANSHIP AND
CONSTRUCTION OF PUBLIC WATER AND WASTEWATER SYSTEM IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS
SET FORTH IN THE CITY OF FORT COLLINS WATER AND WASTEWATER DEVELOPMENT STANDARDS.
3. IN CASES OF CONFLICT BETWEEN THESE SIGNED PLANS AND APPLICABLE STANDARDS, THE MOST RESTRICTIVE STANDARD
SHALL APPLY.
4. ALL WATER MAINS AND FIRE LINES SHALL BE AWWA C900 PLASTIC PRESSURE PIPE (DR-18, PRESSURE CLASS 305). ALL PLASTIC
PRESSURE PIPE SHALL HAVE TRACER WIRE PER STANDARDS. ALL FITTINGS ON THE PROPOSED FIRE LINES AND FIRE HYDRANT
LATERALS SHALL BE FULLY RESTRAINED JOINTS PER CITY STANDARDS (MEGA-LUG OR APPROVED EQUAL).
5. ALL WATER SERVICES SHALL BE TYPE K SOFT COPPER.
6. ALL WATER MAINS AND SERVICES SHALL HAVE A MINIMUM COVER OF 4.5' AND A MAXIMUM OF 5.5', UNLESS OTHERWISE
NOTED.
7. ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC. VERIFY BUILDING CONNECTION ELEVATION (RE: MEP).
8. ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS.
9. INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO SPRING LINE.
10. SITE CONTRACTOR SHALL COORDINATE UTILITY CONNECTIONS AT THE BUILDING WITH BUILDING CONTRACTOR.
11. ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS
AND SPECIFICATIONS.
12. STORM PIPES SHALL BE ADS HP STORM PIPE UNLESS OTHERWISE NOTED.
13. COORDINATE SITE LIGHTING AND ELECTRIC SERVICE ROUTING, DEMOLISHING, RELOCATING, AND MODIFICATIONS WITH
THE ELECTRICAL ENGINEER, ARCHITECT, AND OWNER.
14. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO
INSTALLATION.
15. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. LENGTH OF FLARED END SECTIONS
ARE INCLUDED IN PIPE LENGTHS.
16. A FLOODPLAIN USE PERMIT MUST BE APPROVED PRIOR TO BEGINNING ANY WORK WITHIN THE DRY CREEK 100-YEAR FLOOD
FRINGE.
17. SEE SHEET 5 FOR FLOODPLAIN/FLOODWAY LIMITS AND REQUIREMENTS.
0
50'
50 25 50 100
SCALE: 1" =
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
UTILITY PLAN
1/23/19
1" = 50'
N/A
JTC
JTC
18-1000-00
----
6 25
PRELIMINARY PRIVATE DRIVE UTILITY LAYOUTS
(SEE PLAN VIEW FOR SECTION LOCATIONS)
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
OVERALL UTILITY PLAN
1/23/19
1" = 100'
N/A
JTC
JTC
18-1000-00
----
5 25
FLOODPLAIN NOTES
1. THE CURRENT EFFECTIVE (JUNE 17, 2008) FEMA FLOOD INSURANCE RATE MAP (FIRM, MAP NUMBERS 08096C0977G & 08069C0981G) DEPICTS
THE 100-YR FLOODPLAIN IN SOME AREAS OF THE PROPOSED DEVELOPMENT. HOWEVER, IT IS ANTICIPATED THAT, AT THE TIME OF BUILDING
CONSTRUCTION ON THE AFFECTED LOTS, THE NORTHEAST COLLEGE CORRIDOR OUTFALL PROJECT (NECCO) WILL HAVE REMAPPED THE
FLOODPLAIN SUCH THAT THE 100-YR FLOODPLAIN WILL NO LONGER BE PRESENT ON THE PROPOSED DEVELOPMENT. IT IS ANTICIPATED THAT THE
MAP REVISION WILL BE COMPLETED BY THE END OF 2019.
2. IF THE DEVELOPER DECIDES TO CONSTRUCT STRUCTURES OR OTHER CONSTRUCTION ELEMENTS IN THE CURRENT EFFECTIVE 100-YR FLOODPLAIN
BEFORE THE REMAPPING EFFORTS ARE COMPLETE AND DOCUMENTED BY NECCO AND FEMA, IT SHOULD BE NOTED THAT ADDITIONAL ANALYSIS
OF THE BFE IS NECESSARY, AND THE FOLLOWING NOTES WILL ALSO APPLY:
2.1. FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR EACH STRUCTURE AND EACH SITE CONSTRUCTION ELEMENT (DETENTION PONDS, BIKE
PATHS, PARKING LOTS, UTILITIES, ETC.) IN THE FLOODPLAIN
2.2. A FEMA ELEVATION OR FLOODPROOFING CERTIFICATE MUST BE COMPLETED AND APPROVED BEFORE THE CERTIFICATE OF
OCCUPANCY (CO) IS ISSUED FOR ANY STRUCTURES IN THE FLOODPLAIN.
3. THE 500 -YR FLOODPLAIN (SHADED ZONE X - NOT SHOWN HEREON) IS DUE TO THE FLOODING OF THE POUDRE RIVER, CRITICAL FACILITIES ARE
PROHIBITED WITHIN THE 500-YR FLOODPLAIN, FACILITIES FOR AT-RISK POPULATIONS (DAYCARES, SCHOOLS, NURSING HOMES, ETC.) AND
EMERGENCY SERVICES FACILITIES (E.G. URGENT CARE, HOSPITALS, FIRE, POLICE).
4. A FLOODPLAIN USE PERMIT MUST BE APPROVED PRIOR TO BEGINNING ANY WORK WITHIN THE DRY CREEK 100-YEAR FLOOD FRINGE.
100-YR FLOODPLAIN (FEMA)
100-YR FLOODWAY (FEMA)
500-YR FLOODPLAIN (FEMA)
100-YR FLOODPLAIN (NECCO)
100-YR FLOODWAY (NECCO)
LEGEND
NOTES:
1. ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN DETERMINED FROM A COMBINATION OF RECORD
DRAWINGS, SURVEYED FIELD MARK-OUTS AND PHYSICAL OBSERVATIONS. THERE MAY BE OTHER UTILITIES NOT
SHOWN ON THE DRAWINGS WHICH PRESENTLY EXIST IN THE AREA OF CONSTRUCTION. THEREFORE, THE
CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES IN THE PROJECT VICINITY PRIOR
TO BEGINNING WORK. THE CONTRACTOR SHALL COORDINATE AND PROVIDE PROTECTION OF CONFLICTING
UTILITIES. NOTIFY OWNER/ENGINEER IF ANY CONFLICTS ARE ENCOUNTERED. THE OWNER AND/OR ENGINEER
ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS SHOWN.
2. COORDINATE DEMOLITION REQUIREMENTS, LIMITS OF DEMOLITION, SALVAGE ITEMS, PROTECTION OF ITEMS TO
REMAIN, TREES, FENCING, ETC. WITH OWNER, ARCHITECT, AND RELEVANT CONSTRUCTION AND/OR PHASING
PLANS. ADDITIONAL DEMOTION OF PAVING, TREES, UTILITIES, STRUCTURES, ETC. TO BE PERFORMED AS
REQUIRED.
3. ALL EXISTING UTILITIES TO REMAIN SHALL BE ADJUSTED TO FINAL GRADE.
4. CONTRACTOR RESPONSIBLE FOR ALL SURFACE REPAIR/REPLACEMENT TO RESTORE SIDEWALKS, PAVEMENT,
CURB/GUTTER AND SOD AREAS DISTURBED BY NEW WORK. REPAIR/REPLACEMENTS SHALL BE COMPLETED PER
CITY OF FORT COLLINS STANDARDS AT CONTRACTOR EXPENSE.
5. EXISTING CONCRETE AND ASPHALT PAVING SHALL BE SAWCUT AND REMOVED PRIOR TO EXCAVATION.
REMOVE CONCRETE TO THE NEAREST JOINT.
6. CONTRACTOR TO PROVIDE ALL NECESSARY EROSION CONTROL MEASURES DURING CONSTRUCTION. PLACE
EROSION CONTROL PROTECTION AT ALL PROPOSED AND EXISTING INLETS DOWNSTREAM FROM
CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS
COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED.
7. LIMITS OF STREET CUTS, ASPHALT, AND CONCRETE REMOVALS ARE APPROXIMATE. LIMITS OF REMOVAL TO BE
DETERMINED IN THE FIELD TO ADEQUATELY COMPLETE THE PROPOSED IMPROVEMENTS, WHILE MAINTAINING,
IF NOT IMPROVING, EXISTING CONDITIONS. ADDITIONAL REMOVAL IDENTIFIED IN THE FIELD SHALL BE
COMPLETED AT CONTRACTOR EXPENSE. ALL REPAIRS TO BE COMPLETED IN ACCORDANCE WITH CITY STREET
REPAIRS STANDARDS.
8. REFER TO LANDSCAPE TREE MITIGATION PLAN (IF APPLICABLE) FOR TREE REMOVAL, RELOCATION AND
PROTECTION. TREE REMOVAL INFORMATION SHOWN FOR COORDINATION PURPOSES ONLY.
9. REFERENCE LANDSCAPE PLANS FOR ADDITIONAL SITE DEMOLITION.
10. ALL UTILITIES TO BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED.
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
N
W E
S
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
EXISTING CONDITIONS & DEMOLITION PLAN
1/23/19
1" = 50'
N/A
JTC
JTC
18-1000-00
----
4 25
2. COORDINATE DEMOLITION REQUIREMENTS, LIMITS OF DEMOLITION, SALVAGE ITEMS, PROTECTION OF ITEMS TO
REMAIN, TREES, FENCING, ETC. WITH OWNER, ARCHITECT, AND RELEVANT CONSTRUCTION AND/OR PHASING
PLANS. ADDITIONAL DEMOTION OF PAVING, TREES, UTILITIES, STRUCTURES, ETC. TO BE PERFORMED AS
REQUIRED.
3. ALL EXISTING UTILITIES TO REMAIN SHALL BE ADJUSTED TO FINAL GRADE.
4. CONTRACTOR RESPONSIBLE FOR ALL SURFACE REPAIR/REPLACEMENT TO RESTORE SIDEWALKS, PAVEMENT,
CURB/GUTTER AND SOD AREAS DISTURBED BY NEW WORK. REPAIR/REPLACEMENTS SHALL BE COMPLETED PER
CITY OF FORT COLLINS STANDARDS AT CONTRACTOR EXPENSE.
5. EXISTING CONCRETE AND ASPHALT PAVING SHALL BE SAWCUT AND REMOVED PRIOR TO EXCAVATION.
REMOVE CONCRETE TO THE NEAREST JOINT.
6. CONTRACTOR TO PROVIDE ALL NECESSARY EROSION CONTROL MEASURES DURING CONSTRUCTION. PLACE
EROSION CONTROL PROTECTION AT ALL PROPOSED AND EXISTING INLETS DOWNSTREAM FROM
CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS
COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED.
7. LIMITS OF STREET CUTS, ASPHALT, AND CONCRETE REMOVALS ARE APPROXIMATE. LIMITS OF REMOVAL TO BE
DETERMINED IN THE FIELD TO ADEQUATELY COMPLETE THE PROPOSED IMPROVEMENTS, WHILE MAINTAINING,
IF NOT IMPROVING, EXISTING CONDITIONS. ADDITIONAL REMOVAL IDENTIFIED IN THE FIELD SHALL BE
COMPLETED AT CONTRACTOR EXPENSE. ALL REPAIRS TO BE COMPLETED IN ACCORDANCE WITH CITY STREET
REPAIRS STANDARDS.
8. REFER TO LANDSCAPE TREE MITIGATION PLAN (IF APPLICABLE) FOR TREE REMOVAL, RELOCATION AND
PROTECTION. TREE REMOVAL INFORMATION SHOWN FOR COORDINATION PURPOSES ONLY.
9. REFERENCE LANDSCAPE PLANS FOR ADDITIONAL SITE DEMOLITION.
10. ALL UTILITIES TO BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED.
N
W E
S
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
EXISTING CONDITIONS & DEMOLITION PLAN
1/23/19
1" = 50'
N/A
JTC
JTC
18-1000-00
----
3 25
OF FORT COLLINS STANDARDS AT CONTRACTOR EXPENSE.
5. EXISTING CONCRETE AND ASPHALT PAVING SHALL BE SAWCUT AND REMOVED PRIOR TO EXCAVATION. REMOVE
CONCRETE TO THE NEAREST JOINT.
6. CONTRACTOR TO PROVIDE ALL NECESSARY EROSION CONTROL MEASURES DURING CONSTRUCTION. PLACE
EROSION CONTROL PROTECTION AT ALL PROPOSED AND EXISTING INLETS DOWNSTREAM FROM CONSTRUCTION
AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL
DISTURBED GROUND IS ADEQUATELY VEGETATED.
7. LIMITS OF STREET CUTS, ASPHALT, AND CONCRETE REMOVALS ARE APPROXIMATE. LIMITS OF REMOVAL TO BE
DETERMINED IN THE FIELD TO ADEQUATELY COMPLETE THE PROPOSED IMPROVEMENTS, WHILE MAINTAINING, IF NOT
IMPROVING, EXISTING CONDITIONS. ADDITIONAL REMOVAL IDENTIFIED IN THE FIELD SHALL BE COMPLETED AT
CONTRACTOR EXPENSE. ALL REPAIRS TO BE COMPLETED IN ACCORDANCE WITH CITY STREET REPAIRS STANDARDS.
8. REFER TO LANDSCAPE TREE MITIGATION PLAN (IF APPLICABLE) FOR TREE REMOVAL, RELOCATION AND
PROTECTION. TREE REMOVAL INFORMATION SHOWN FOR COORDINATION PURPOSES ONLY.
9. REFERENCE LANDSCAPE PLANS FOR ADDITIONAL SITE DEMOLITION.
10. ALL UTILITIES TO BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED.
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
N
W E
S
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
EXISTING CONDITIONS & DEMOLITION PLAN
1/23/19
1" = 50'
N/A
JTC
JTC
18-1000-00
----
2 25
EXISTING FIBER OPTIC LINE
PROPOSED HANDICAP RAMP
EXISTING OVERHEAD ELECTRIC LINE
EXISTING OVERHEAD TELEPHONE LINE
PROPOSED OVERHEAD ELECTRIC LINE
PROPOSED FIBER OPTIC LINE
PROPOSED OVERHEAD TELEPHONE LINE
EXISTING FENCE
PROPOSED OVERHEAD UTILITY
PROPOSED LIGHT POLES
EXISTING CABLE TV LINE PROPOSED CABLE TV
PROPOSED WATER SERVICE W/ CURB
STOP AND METER PIT
PROPOSED SANITARY SEWER SERVICE W/
CLEANOUT
EXISTING ROW
Vicinity Map
Scale: 1" = 1000'
PROJECT DATUM: NAVD88
CITY OF FORT COLLINS BENCHMARK #43-97
ON THE SOUTH END OF THE WEST HEADWALL OF THE LAKE CANAL BRIDGE AT NORTH LEMAY AVENUE, 200 FEET SOUTH OF
THE INTERSECTION OF LEMAY AVENUE. AND CONIFER STREET
ELEV= 4960.11
CITY OF FORT COLLINS BENCHMARK #12-07
SOUTH SIDE OF VINE DRIVE ON THE SOUTH HEADWALL OF THE BRIDGE OVER DRY CREEK BASIN 0.4 MILES EAST OF NORTH
LEMAY AVENUE
ELEV= 4947.86
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED
NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATIONS SHOULD BE USED:
NGVD UNADJUSTED = 4960.11 (NAVD88) - 3.17
NGVD UNADJUSTED = 4947.86 (NAVD88) - 3.18
UTILITY CONTACTS:
LIGHT & POWER
City of Fort Collins Light & Power
Contact: Janet McTague
Ph. 970.224.6154
STORMWATER,WATER & WASTEWATER
City of Fort Collins Utilities
700 Wood Street
Fort Collins, Colorado 80522
Contact: Heather McDowell
Ph. 970.221.6339
NATURAL GAS
Xcel Energy
1901 E. Horsetooth Road
Fort Collins, Colorado 80525
Contact: Stephanie Rich
Ph. 970.225.7828
TELEPHONE SERVICE
Century Link (Qwest)
3351 Eastbrook Drive
Fort Collins, Colorado 80525
Contact: Bill Johnson
Ph. 970.490.7501
CABLE SERVICE
Comcast
1201 University Dr.
Fort Collins, Colorado 80521
Contact: Don Kapperman
Ph. 970.567.0245
DEVELOPER
Landmark Real Estate Holdings
1170 Ash Street, Suite 100
Windsor, CO 80550
Ph. 970.460.0567
ENGINEER
Highland Development Services
6355 Fairgrounds Ave, Suite 100
Windsor, CO 80550
Ph. 970.674.7550
LANDSCAPE ARCHITECT
The Birdsall Group
444 Mountain Ave
Berthoud CO, 80513
Ph. 970.532.5891
SURVEYOR
PLS Group
532 W 66th Street
Loveland, CO 80538
Ph. 970.669.2100
INDEX OF SHEETS
Sheet No. Description of Sheets
1 COVER SHEET
2 - 4 EXISTING CONDITIONS & DEMOLITION PLANS
5 OVERALL UTILITY PLAN
6 - 8 UTILITY PLANS
9 - 11 GRADING & DRAINAGE PLANS
12 - 24 STREET PLAN & PROFILES
25 SIGHT DISTANCE EXHIBIT
UTILITY PLANS FOR
NORTHFIELD
LOCATED IN THE SOUTHEAST 1/4 SECTION 1, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M
CITY OF FORT COLLINS, LARIMER COUNTY, COLORADO
JANUARY 2019
ABBREVIATION LIST
ABC AGGREGATE BASE COURSE
AD ALGEBRAIC DIFFERENCE
AE ACCESS EASEMENT
ARCH ARCHITECT
ARV AIR RELEASE VALVE
ASPH ASPHALT
BLDG BUILDING
BFV BUTTERFLY VALVE
BOV BLOW OFF VALVE
BOS BOTTOM OF STEP
BOW BACK OF WALK
BW BOTTOM OF WALL
C&G CURB & GUTTER
CATV CABLE TELEVISION
CDOT COLORADO DEPARTMENT OF
TRANSPORTATION
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CO CLEAN OUT
CoFC CITY OF FORT COLLINS
COMM COMMUNICATION
CON CONDENSATE
CONC CONCRETE
COORD COORDINATION
CW CHILL WATER
CWR CHILL WATER RETURN
CWS CHILL WATER SUPPLY
DE DRAINAGE EASEMENT
DEMO DEMOLITION
DIA DIAMETER
DIP DUCTILE IRON PIPE
E EAST(ING)
EAE EMERGENCY ACCESS EASEMENT
EG EXISTING GROUND
EL ELEVATION
ELCO EAST LARIMER COUNTY WATER DISTRICT
ELEC ELECTRIC
EOA EDGE OF ASPHALT
EOC EDGE OF CONCRETE
EX EXISTING
ESMT EASEMENT
EST ESTIMATE(D)
F FIRE LINE
FCP FINAL COMPLIANCE PLAN
FDC FIRE DEPARTMENT CONNECTION
FES FLARED END SECTION
FF FINISHED FLOOR
FFE FINISHED FLOOR ELEVATION
FG FINISHED GRADE
FH FIRE HYDRANT
FL FLOWLINE
FO FIBER OPTIC
G GAS
GB GRADE BREAK
GF GARAGE FLOOR
GND GROUND
GV GATE VALVE
HBP HOT BITUMINOUS PAVEMENT
HORZ HORIZONTAL
HDPE HIGH DENSITY POLYETHYLENE
HP HIGH POINT
HW HEADWALL
IE IRRIGATION EASEMENT
INV INVERT
IRR IRRIGATION
LA LANDSCAPE (PLAN/ACRH)
LF LINEAR FEET
LP LOW POINT
LT LEFT
MAX MAXIMUM
ME MATCH EXISTING
MEP MECHANICAL, ELECTRICAL, PLUMBING
ENGINEER
MH MANHOLE
MIN MINIMUM
N NORTH(ING)
NA NOT APPLICABLE
NHBZ NATURAL HABITAT BUFFER ZONE
NTS NOT TO SCALE
NWCWD NORTH WELD COUNTY WATER DISTRICT
OC ON CENTER
OHE OVERHEAD ELECTRIC
OHT OVERHEAD TELEPHONE
OHU OVERHEAD UTILITY
P&UE PEDESTRIAN & UTILITY EASEMENT
PE PEDESTRIAN EASEMENT
PERF PERFORATED
PC POINT OF CURVATURE
PCC PORTLAND CEMENT CONCRETE
PCR POINT OF CURB RETURN
PH POTHOLE
PI POINT OF INTERSECTION
PL PROPERTY LINE
PT POINT OF TANGENCY
PVC POLYVINYL CHLORIDE
R&R REMOVAL & REPLACEMENT
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN
RE REFERENCE
RJ RESTRAINT JOINT
ROW RIGHT-OF-WAY
RT RIGHT
SCH SCHEDULE
S SOUTH
SD STORM DRAIN PIPE
SDMH STORM DRAIN MANHOLE
SRVC SERVICE
SS SANITARY SEWER
SSCO SANITARY SEWER CLEAN-OUT
SSMH SANITARY SEWER MANHOLE
SSWR SANITARY SEWER
STA STATION
STM STEAM
SWMP STORMWATER MANAGEMENT PLAN
T TELEPHONE
TB THRUST BLOCK
TBC TOP BACK OF CURB
TBV TO BE VACATED
TBR TO BE REMOVED
TELE TELEPHONE
TEMP TEMPORARY
TF TOP OF FOUNDATION
TOS TOP OF STEP
TW TOP OF WALL
TYP TYPICAL
XS CROSS SECTION
UD UNDERDRAIN
UE UTILITY EASEMENT
UGE UNDERGROUND ELECTRIC
UTIL UTILITY
VCP VITRIFIED CLAY PIPE
VIF VERIFY IN FIELD
VERT VERTICAL
VPC VERTICAL POINT OF CURVATURE
VPI VERTICAL POINT OF INTERSECTION
VPT VERTICAL POINT OF TANGENCY
W WATERLINE OR WEST
WL WATERLINE
WQCE WATER QUALITY CONTROL ELEVATION
WSE WATER SURFACE ELEVATION
I HEREBY AFFIRM THAT THESE FINAL CONSTRUCTION PLANS WERE PREPARED UNDER MY
DIRECT SUPERVISION, IN ACCORDANCE WITH ALL APPLICABLE CITY OF FORT COLLINS
AND STATE OF COLORADO STANDARDS AND STATUTES, RESPECTIVELY, AND THAT I AM
FULLY RESPONSIBLE FOR THE ACCURACY OF ALL DESIGN, REVISIONS AND RECORD
CONDITIONS THAT I HAVE NOTED ON THESE PLANS.
INDEMNIFICATION STATEMENT:
THESE PLANS HAVE BEEN REVIEWED BY THE LOCAL ENTITY FOR CONCEPT ONLY. THE
REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE LOCAL
ENTITY ENGINEER, OR THE LOCAL ENTITY FOR ACCURACY AND CORRECTNESS OF THE
CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT QUANTITIES OF ITEMS
ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE
CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE
LOCAL ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED
DURING THE CONSTRUCTION PHASE.
JASON T. CLAEYS
P.E. NO. 42122
Lake Canal Reservoir Company
UTILITY PLAN Approval
District Manager
APPROVED:
Date
North Weld County Water District
UTILITY PLAN Approval
District Manager
APPROVED:
Date
East Larimer County Water District
UTILITY PLAN Approval
District Manager
APPROVED:
Date
City of Greeley
UTILITY PLAN Approval
City Official
APPROVED:
Date
TYPICAL CONNECTOR LOCAL W/ MEDIAN STREET SECTION
TURN LANE MEDIAN DETAIL
TYPICAL CONNECTOR LOCAL STREET SECTION
TYPICAL LEFT TURN MEDIAN DETAIL
TYPICAL 4-LANE ARTERIAL STREET SECTION
NOTE:
THE FINAL SUNIGA ROAD CROSS-SECTION WILL BE PER THE CITY'S RAISED PROTECTED
BIKE LAND SECTION PROVIDED BY THE CITY'S CAPITAL IMPROVEMENT ENGINEER.
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
Know Call what'sbelow. before you dig.
R
NO. REVISION BY DATE
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | FAX: 970.674.7568 | www.Highland-DS.com
PREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
SHEET OF
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)
NORTHFIELD
COVER SHEET
1/23/19
N/A
N/A
JTC
JTC
18-1000-00
----
1 25