HomeMy WebLinkAboutReports - Transportation Impact Study - 02/01/2019DELICH Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
ASSOCIATES
TABLE OF CONTENTS
I. INTRODUCTION ........................................................................................................ 1
II. EXISTING CONDITIONS .......................................................................................... 2
Land Use ......................................................................................................................... 2
Roads .............................................................................................................................. 2
Existing Traffic ................................................................................................................. 5
Existing Operation ........................................................................................................... 5
Pedestrians Facilities ...................................................................................................... 8
Bicycle Facilities .............................................................................................................. 8
Transit Facilities .............................................................................................................. 8
III. PROPOSED DEVELOPMENT ................................................................................. 9
Trip Generation ............................................................................................................... 9
Trip Distribution ............................................................................................................. 11
Background Traffic Projections ..................................................................................... 11
Trip Assignment ............................................................................................................ 11
Signal Warrants ............................................................................................................. 11
Operation Analysis ........................................................................................................ 18
Geometry ...................................................................................................................... 25
Weekend Services ........................................................................................................ 25
Pedestrian Level of Service ........................................................................................... 25
Bicycle Level of Service ................................................................................................ 27
Transit Level of Service ................................................................................................. 27
Mitigation ....................................................................................................................... 28
IV. CONCLUSIONS/RECOMMENDATIONS .............................................................. 29
LIST OF TABLES
1. Current Peak Hour Operation .................................................................................... 7
2. Trip Generation ......................................................................................................... 9
3. Short Range (2023) Background Peak Hour Operation .......................................... 19
4. Long Range (2040) Background Peak Hour Operation ........................................... 20
5. Short Range (2023) Total Peak Hour Operation ..................................................... 21
6. Long Range (2040) Total Peak Hour Operation ...................................................... 23
DELICH Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
ASSOCIATES
LIST OF FIGURES
1. Site Location ............................................................................................................. 3
2. Existing Intersection Geometry ................................................................................. 4
3. Recent Peak Hour Traffic .......................................................................................... 6
4. Site Plan .................................................................................................................. 10
5. Trip Distribution ....................................................................................................... 12
6. Short Range (2023) Background Peak Hour Traffic ................................................ 13
7. Long Range (2040) Background Peak Hour Traffic ................................................. 14
8. Site Generated Peak Hour Traffic ........................................................................... 15
9. Short Range (2023) Total Peak Hour Traffic ........................................................... 16
10. Long Range (2040) Total Peak Hour Traffic ............................................................ 17
11. Short Range (2023) and Long Range (2040) Geometry ......................................... 26
APPENDICES
A. Base Assumptions form and related information
B. Recent Peak Hour Traffic
C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins LOS
Standards
D. Short Range (2023) Background Peak Hour Operation
E. Long Range (2040) Background Peak Hour Operation
F. Short Range (2023) Total Peak Hour Operation
G. Long Range (2040) Total Peak Hour Operation
H. Pedestrian/Bicycle Level of Service
DELICH Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
ASSOCIATES Page 1
I. INTRODUCTION
This transportation impact study (TIS) addresses the capacity, geometric, and
control requirements at and near the proposed Saint John XXIII Church and Lombardy
Student Housing. The proposed Saint John XXIII Church and Lombardy Student Housing
site is located north of (adjacent to) University Avenue, between Shields Street and City
Park Avenue in Fort Collins, Colorado.
During the course of the analysis, numerous contacts were made with the project
developer (Blackbird Investments), the project engineer (Northern Engineering), the
project planning consultant (BHA Design), and the Fort Collins Traffic Engineering staff.
This study generally conforms to the format set forth in the Fort Collins transportation
impact study guidelines contained in the “Larimer County Urban Area Street Standards”
(LCUASS). The base assumptions packet is provided in Appendix A. The study involved
the following steps:
Collect physical, traffic, and development data;
Perform trip generation, trip distribution, and trip assignment;
Determine peak hour traffic volumes;
Conduct capacity and operational level of service analyses on key intersections;
Analyze signal warrants;
Conduct level of service evaluation of pedestrian, bicycle, and transit modes of
transportation.
DELICH Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
ASSOCIATES Page 2
II. EXISTING CONDITIONS
The location of the Saint John XXIII Church and Lombardy Student Housing site is
shown in Figure 1. It is important that a thorough understanding of the existing conditions
be presented.
Land Use
Land uses in the area are primarily institutional (CSU), commercial, or residential.
Land adjacent to the site is flat (<2% grade) from a traffic operations perspective. This site
is west of the center of Fort Collins. Colorado State University is east of the proposed
Saint John XXIII Church and Lombardy Student Housing site.
Roads
The primary streets near the Saint John XXIII Church and Lombardy Student
Housing site are University Avenue, West Elizabeth Street, Shields Street, and City
Park Avenue. Figure 2 shows a schematic of the existing geometry at the West
Elizabeth/Shields, West Elizabeth/City Park, Shields/University, and University/City Park
intersections.
West Elizabeth Street is to the north of the Saint John XXIII Church and
Lombardy Student Housing site. It is classified as a four-lane arterial street on the Fort
Collins Master Street Plan. Currently, West Elizabeth Street has a four-lane cross
section in this area. At the West Elizabeth/Shields intersection, West Elizabeth Street
has dual eastbound left-turn lanes, a westbound left-turn lane, a through lane in each
direction, and eastbound and westbound right-turn lanes. At the West Elizabeth/City
Park intersection, West Elizabeth Street has eastbound and westbound left-turn lanes
and two through lanes in each direction. Eastbound and westbound right-turn lanes are
required with the existing traffic volumes at the West Elizabeth/City Park intersection.
Typically with constrained conditions, when turn lanes are shown to be required based
on volumes, they are not built unless the operation at the subject intersection is
determined to be unacceptable. The West Elizabeth/Shields and West Elizabeth/City
Park intersections have signal control. The posted speed limit in this area of West
Elizabeth Street is 30 mph.
Shields Street is to the east of the Saint John XXIII Church and Lombardy
Student Housing site. It is a north-south street designated as a four-lane arterial street
on the Fort Collins Master Street Plan. Currently, it has a four-lane cross section in this
area. At the West Elizabeth/Shields intersection, Shields Street has northbound and
southbound left-turn lanes, two through lanes in each direction, and a southbound right-
turn lane. According to LCUASS, a northbound right-turn lane is required with the
existing traffic volumes at the West Elizabeth/Shields intersection. With regard to this
right-turn lane, Shields Street is considered to be in a constrained condition. At the
SCALE: 1"=500'
SITE LOCATION Figure 1
DELICH
ASSOCIATES
City Park Avenue
Shields Street
University Avenue
Plum Street
Elizabeth Street
Laurel Street
Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
Page 3
EXISTING GEOMETRY Figure 2
DELICH
ASSOCIATES
Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
Page 4
West Elizabeth Street
Shields Street
City Park Avenue
- Denotes Lane
University Avenue
STOP
STOP
DELICH Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
ASSOCIATES Page 5
Shields/University intersection, Shields Street has northbound left-turn lane, two through
lanes in each direction. The Shields/University intersection has stop sign control on
University Avenue. The posted speed limit in this area of Shields Street is 30 mph.
City Park Avenue is a north-south street designated as a local street on the Fort
Collins Master Street Plan. Currently, City Park Avenue has a two-lane cross section
with parking on both sides of the street. At the West Elizabeth/City Park intersection,
City Park Avenue has northbound and southbound left-turn lanes and a through/right-
turn lane in each direction. According to LCUASS, a northbound right-turn lane is
required with the existing traffic volumes at the West Elizabeth/City Park intersection.
With regard to this right-turn lane, City Park Avenue is considered to be in a constrained
condition. At the City Park/University intersection, City Park Avenue has northbound
and southbound movements combined into single lanes. The posted speed limit in this
area of City Park Avenue is 25 mph.
University Avenue is to the south (adjacent to) of the Saint John XXIII Church
and Lombardy Student Housing site. It is classified as a local street on the Fort Collins
Master Street Plan. Currently, University Avenue has a two-lane cross section in this
area. University Avenue only has a west leg at the Shields/University intersection. At
the Shields/University intersection, University Avenue has eastbound movements
combined into a single lane. University Avenue only has an east leg at the City
Park/University intersection. At the City Park/University intersection, University Avenue
has westbound movements combined into a single lane. The West Elizabeth/Shields
and West Elizabeth/City Park intersections have signal control. The posted speed limit
in this area of West Elizabeth Street is 30 mph.
Existing Traffic
Figure 3 shows the recent morning and afternoon peak hour traffic counts at the
West Elizabeth/Shields, West Elizabeth/City Park, Shields/University, and City Park/
University intersections. Recent count data at the West Elizabeth/Shields and West
Elizabeth/City Park intersections was obtained in October 2016. Raw count data is
provided in Appendix B. Recent count data at the Shields/University, City Park/
University, and the University/access intersections was obtained in September 2018.
Existing Operation
The West Elizabeth/Shields, West Elizabeth/City Park, Shields/University, City
Park/University intersections were evaluated using techniques provided in the 2016
Highway Capacity Manual (2016HCM). Using the peak hour traffic shown in Figure 3,
the peak hour operation is shown in Table 1. The West Elizabeth/Shields, West
Elizabeth/City Park, Shields/University, and City Park/University intersections meet the
meet the City of Fort Collins Motor Vehicle LOS Standard during the morning and
afternoon peak hours with existing signal control, geometry, and signal timing. At the
RECENT PEAK HOUR TRAFFIC Figure 3
DELICH
ASSOCIATES
Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
Page 6
2/1
0/0
7/8
0/1
0/0
0/7
0/1
44/64
1/1
16/20
40/120
3/2
West Elizabeth Street
AM/PM
Shields Street
106/301
860/1175
113/65
119/362
732/1075
5/6
298/298
51/30
258/326
7/10
5/45
22/84
28/113
44/112
61/85
22/67
10/106
47/74
47/77
478/459
90/85
48/89
175/491
25/86
City Park Avenue
45/123
891/1402
14/19
890/1495
5/4
54/75
28/110
2/10
34/44
2/4
1/6
18/14
2/3
7/10
10/1
DELICH Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
ASSOCIATES Page 7
TABLE 1
Current Peak Hour Operation
Intersection Movement Level of Service
AM PM
West Elizabeth/Shields
(signal)
EB LT E E
EB T C C
EB RT C D
EB APPROACH D E
WB LT D E
WB T D D
WB RT A A
WB APPROACH D E
NB LT B E
NB T D C
NB T/RT D C
NB APPROACH D D
SB LT C C
SB T A C
SB RT A A
SB APPROACH A C
OVERALL C D
West Elizabeth/City Park
(signal)
EB LT A A
EB T A A
EB T/RT A A
EB APPROACH A A
WB LT A A
WB T A B
WB T/RT A B
WB APPROACH A B
NB LT B C
NB T/RT B B
NB APPROACH B B
SB LT C B
SB T/RT B B
SB APPROACH C B
OVERALL A A
Shields/University
(stop sign)
EB LT/RT C F (76.9 secs)
NB LT B C
OVERALL A A
City Park/University
(stop sign)
WB LT/RT A B
SB LT/T A A
OVERALL A A
DELICH Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
ASSOCIATES Page 8
Shields/University intersection, the calculated delay for the eastbound approach was
commensurate with level of service F. The calculated delay associated with level of
service F operation is provided in Table 1. Calculation forms are provided in Appendix
C. The University/access intersections were not rigorously analyzed, since based on
the volumes the intersections will operate a level of service A. A description of level of
service for signalized and unsignalized intersections from the 2016 Highway Capacity
Manual and a table showing the Fort Collins Motor Vehicle LOS Standards
(Intersections) are also provided in Appendix C. The Saint John XXIII Church and
Lombardy Student Housing is in an area termed “mixed-use district.” In areas termed
“mixed-use districts,” acceptable operation at signalized intersections during the peak
hours is defined as level of service E or better for the overall intersection, and level of
service E or better for any leg or movement. At arterial/arterial and collector/collector
stop sign controlled intersections, acceptable operation is considered to be at level of
service E, overall and level of service F, for any approach leg. At arterial/collector,
arterial/local, collector/local, and local/local stop sign controlled intersections,
acceptable operation is considered to be at level of service D, overall and level of
service F, for any approach leg.
Pedestrian Facilities
There are sidewalks along West Elizabeth Street, Shields Street, City Park
Avenue, and University Avenue. There is a pedestrian/bicycle underpass under Shields
Street
Bicycle Facilities
Bicycle lanes exist on West Elizabeth Street and Shields Street. City Park
Avenue and University Avenue have no bicycle lanes. Bike lanes are not required on
local streets. There is a pedestrian/bicycle underpass under Shields Street.
Transit Facilities
This area of Fort Collins is served by Transfort Route 2 on West Elizabeth Street
and Routes 7 and 19 on Shields Street.
DELICH Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
ASSOCIATES Page 9
III. PROPOSED DEVELOPMENT
The Saint John XXIII Church and Lombardy Student Housing development is a
student residential development with 630 beds, a 2,000 square foot coffee shop, and
2,000 square feet of retail. The existing St. John XXIII Church will be relocated to the
northwest quadrant of the Shields/University intersection. Figure 4 shows a site plan of
the Saint John XXIII Church and Lombardy Student Housing development. The site
plan shows access to/from University Avenue. There will be no motor vehicle access to
West Elizabeth Street. There will be pedestrian and bicycle access to West Elizabeth
Street. The Saint John XXIII Church will be relocated to the northwest quadrant of the
Shields/University intersection. The short range analysis (Year 2023) includes
development of the Saint John XXIII Church and Lombardy Student Housing site and an
appropriate increase in background traffic, due to normal growth, and other approved
developments in the area. The long range analysis (Year 2040) includes background
traffic due to normal growth and in general accordance with the Fort Collins Structure
Plan.
Trip Generation
Trip generation is important in considering the impact of a development such as this
upon the existing and proposed street system. A compilation of trip generation information
contained in Trip Generation, 10th Edition, ITE is customarily used to estimate trips that
would be generated by the proposed/expected use at a site. However, the City of Fort
Collins has developed trip generation rates for apartment projects similar to Saint John
XXIII Church and Lombardy Student Housing. The Fort Collins trip generation rates are
specifically applied to student housing projects. While the number of beds is expected to
be less, 630 beds was conservatively used in this analysis. Table 2 shows the daily and
peak hour trip generation for the Saint John XXIII Church and Lombardy Student Housing
site. It is assumed that alternative modes (pedestrian, bicycle, and transit) have been
considered in the City of Fort Collins rates for apartments. The additional trip
generation of the Saint John XXIII Church and Lombardy Student Housing development
resulted in 2616 daily trip ends, 224 morning peak hour trip ends, and 310 afternoon
peak hour trip ends.
TABLE 2
Trip Generation
Code Use Size
AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
Student Housing 630 Beds 2.65 1670 0.07 44 0.12 76 0.21 132 0.21 132
936 Coffee w/No Drive-Thru 2.0 KSF 852(1) 51.6 51(1) 49.6 50(1) 18.2 18(1) 18.2 18(1)
820 Shopping Center 2.0 KSF 37.75 94(1) 0.58 2(1) 0.36 1(1) 1.83 5(1) 1.98 5(1)
Total 2616 97 127 155 155
(1) 50 percent via motor vehicle
SITE PLAN Figure 4
DELICH
ASSOCIATES
Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
Page 10
DELICH Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
ASSOCIATES Page 11
Trip Distribution
Directional distribution of the generated trips was determined for the Saint John
XXIII Church and Lombardy Student Housing site. Figure 5 shows the vehicle trip
distribution used for the Saint John XXIII Church and Lombardy Student Housing site. The
trip distribution was agreed to by City of Fort Collins staff in the scoping discussions.
Background Traffic Projections
Figures 6 and 7 show the short range (2023) and long range (2040) background
peak hour traffic projections at the key intersections. Traffic at the key intersections was
increased at a rate of approximately one percent per year for the short range (2023) and
long range (2040) background traffic forecasts. In addition to this, site generated traffic
from the Hub, West Plum Street Apartment, and Union on Elizabeth developments were
included in the traffic forecasts. Site generated traffic from St. John XXIII Church was
excluded from the traffic forecasts, since it will be razed and relocated for the Saint
John XXIII Church and Lombardy Student Housing development.
Trip Assignment
Trip assignment is how the generated and distributed trips are expected to be
loaded on the street system. The assigned trips are the resultant of the trip distribution
process. Using the trip distribution shown in Figure 5, Figure 8 shows the assignment
of the site generated peak hour vehicle traffic. The site generated vehicle traffic was
combined with the background traffic to determine the total forecasted vehicle traffic at
the key intersections. Figures 9 and 10 shows the short range (2023) and long range
(2040) total peak hour vehicle traffic at the key intersections. The long range
background and total hour traffic forecasts (Figures 7 and 10) are generally higher than
those reflected in the “West Elizabeth Corridor Plan” at the West Elizabeth/Shields and
West Elizabeth/City Park intersections. The forecasts in this TIS consider known/
approved development projects.
Signal Warrants
As a matter of policy, traffic signals are not installed at any location unless warrants
are met according to the Manual on Uniform Traffic Control Devices (MUTCD). The West
Elizabeth/Shields and West Elizabeth/City Park intersections are currently signalized.
The stop sign controlled intersections at the Shields/University, City Park/University, and
University/Site Access intersections are not expected to meet peak hour signal warrants
and do not meet signal spacing requirements.
TRIP DISTRIBUTION Figure 5
DELICH
ASSOCIATES
Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
Page 12
West Elizabeth Street
Shields Street
City Park Avenue
University Avenue
35%
10% 20%
35%
Nominal
Nominal
SHORT RANGE (2023)
BACKGROUND PEAK HOUR TRAFFIC Figure 6
DELICH
ASSOCIATES
Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
Page 13
West Elizabeth Street
AM/PM
Shields Street
150/401
920/1273
120/70
149/431
791/1157
5/6
355/348
63/43
341/405
7/11
11/64
23/90
30/120
46/119
64/86
26/78
42/113
51/79
55/87
591/607
96/90
54/94
268/636
25/87
City Park Avenue
47/129
1185/1740
15/20
1145/1601
5/4
57/79
48/128
34/45
57/104
25/5
29/96
9/27
University Avenue
2/7
12/11
33/36
3/8
27/97
2/8
26/109
2/10
32/41
2/4
1/6
18/14
33/121
LONG RANGE (2040)
BACKGROUND PEAK HOUR TRAFFIC Figure 7
DELICH
ASSOCIATES
Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
Page 14
West Elizabeth Street
Shields Street
175/485
1100/1520
145/85
175/525
945/1385
10/10
425/430
75/55
400/500
10/15
10/75
25/105
35/145
60/140
80/110
30/95
55/135
60/100
65/105
690/725
115/110
70/120
310/760
30/110
City Park Avenue
55/150
1415/2085
20/25
1350/1965
5/5
65/90
55/150
40/50
65/120
30/5
35/110
10/30
University Avenue
AM/PM
Rounded to Nearest
5 Vehicles
5/5
10/10
30/50
5/10
50/130
5/10
50/135
2/10
40/55
5/5
5/5
SITE GENERATED
PEAK HOUR TRAFFIC Figure 8
DELICH
ASSOCIATES
Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
Page 15
West Elizabeth Street
AM/PM
Shields Street
1/2
NOM
19/31
25/30
NOM
44/55
12/14
22/29
11/14
34/55
City Park Avenue
34/55
19/31
1/2
46/55
45/69
NOM
78/98
NOM
University Avenue
59/77
11/13
0/0
8/10
11/7
59/66
13/15
80/99
80/99
51/67
71/98
13/15
59/66
8/10
SJXXIII/Lombardy
West Access
Big Horn
Village
Access
Comcast
Access
Big Horn
Village
Access
SJXXIII/Lombardy
East Access
84/113
67/76
93/114
SHORT RANGE (2023)
TOTAL PEAK HOUR TRAFFIC Figure 9
DELICH
ASSOCIATES
Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
Page 16
West Elizabeth Street
AM/PM
Shields Street
150/401
922/1275
120/70
149/431
812/1189
5/6
380/378
63/43
341/405
7/11
11/64
23/90
74/175
58/133
87/115
26/78
52/127
51/79
55/87
591/607
130/145
54/94
268/636
25/87
City Park Avenue
81/184
1185/1740
34/51
1145/1601
6/6
103/134
48/128
79/114
57/104
25/5
107/194
9/27
University Avenue
2/7
0/0
12/11
11/13
0/0
8/10
11/7
92/102
3/8
13/15
107/196
2/8
119/223
LONG RANGE (2040)
TOTAL PEAK HOUR TRAFFIC Figure 10
DELICH
ASSOCIATES
West Elizabeth Street
Shields Street
City Park Avenue
University Avenue
5/5
0/0
10/10
10/15
0/0
10/10
10/10
90/115
5/10
15/15
130/230
5/10
145/250
5/10
105/130
5/5
5/5
20/15
80/100
50/70
70/100
70/160
60/65
65/80
135/255
5/5
110/145
5/5
5/5
5/10
AM/PM
Rounded to Nearest
5 Vehicles
175/485
1100/1525
145/85
175/525
965/1415
10/10
450/460
75/55
400/500
10/15
10/75
25/105
80/200
70/155
100/140
30/95
65/150
60/100
65/105
DELICH Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
ASSOCIATES Page 18
Operation Analysis
Operation analyses were performed at the West Elizabeth/Shields, West
Elizabeth/City Park, Shields/University, City Park/University, and University/Site Access
intersections. The operation analyses were conducted for the short range future,
reflecting a year 2023 condition and for the long range future, reflecting a year 2040
condition. The long range (2040) operational analyses are used for planning and
informational purposes only.
Using the short range (2023) background peak hour traffic volumes, the West
Elizabeth/Shields, West Elizabeth/City Park, Shields/University, and City Park/University
intersections operate as indicated in Table 3. Calculation forms for these analyses are
provided in Appendix D. The key intersections will meet the City of Fort Collins Motor
Vehicle LOS Standard in the morning and afternoon peak hours, except the northbound
left-turn movement at the West Elizabeth/Shields intersection in the afternoon peak
hour. The northbound left-turn volume in the afternoon peak hour indicates the need for
dual left-turn lanes. However, this is not possible at this intersection.
Using the long range (2040) background peak hour traffic volumes, the West
Elizabeth/Shields, West Elizabeth/City Park, Shields/University, and City Park/University
intersections operate as indicated in Table 4. Calculation forms for these analyses are
provided in Appendix E. In the long range (2040) future, the West Elizabeth/Shields
intersection does not meet the City of Fort Collins Motor Vehicle LOS standard in the
afternoon peak hour. It is important for the City of Fort Collins to continue monitoring
traffic conditions at this intersection in the future to determine if and when any additional
improvements are needed.
Using the short range (2023) total peak hour traffic volumes, the West
Elizabeth/Shields, West Elizabeth/City Park, Shields/University, City Park/University,
and University/Site Access intersections operate as indicated in Table 5. Calculation
forms for these analyses are provided in Appendix F. The key intersections will meet
the City of Fort Collins Motor Vehicle LOS Standard in the morning and afternoon peak
hours, except the eastbound and northbound left-turn movements and the eastbound
and northbound approaches at the West Elizabeth/Shields intersection in the afternoon
peak hour. The northbound left-turn volume in the afternoon peak hour indicates the
need for dual left-turn lanes. However, this is not possible at this intersection. This lack
of dual northbound left-turn lanes affects the signal timing and impacts other
movements.
Using the long range (2040) total peak hour traffic volumes, the West
Elizabeth/Shields, West Elizabeth/City Park, Shields/University, City Park/University,
and University/Site Access intersections operate as indicated in Table 6. Calculation
forms for these analyses are provided in Appendix G. In the long range (2040) future,
the West Elizabeth/Shields intersection does not meet the City of Fort Collins Motor
Vehicle LOS standard in the afternoon peak hour. It is important for the City of Fort
Collins to continue monitoring traffic conditions at this intersection in the future to
determine if and when any additional improvements are needed.
DELICH Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
ASSOCIATES Page 19
TABLE 3
Short Range (2023) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
West Elizabeth/Shields
(signal)
EB LT E E
EB T C C
EB RT C D
EB APPROACH D E
WB LT D E
WB T D D
WB RT C A
WB APPROACH D E
NB LT C F (200.7 secs)
NB T D D
NB T/RT D D
NB APPROACH D E
SB LT C C
SB T B E
SB RT A B
SB APPROACH B E
OVERALL C E
West Elizabeth/City Park
(signal)
EB LT A A
EB T A A
EB T/RT A A
EB APPROACH A A
WB LT A B
WB T A B
WB T/RT A B
WB APPROACH A B
NB LT B C
NB T/RT B B
NB APPROACH B B
SB LT C B
SB T/RT B B
SB APPROACH B B
OVERALL A B
Shields/University
(stop sign)
EB LT/RT D F (196.0 secs)
NB LT B C
OVERALL A A
City Park/University
(stop sign)
WB LT/RT A B
SB LT/T A A
OVERALL A A
DELICH Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
ASSOCIATES Page 20
TABLE 4
Long Range (2040) Background Peak Hour Operation
(For Information Only)
Intersection Movement Level of Service
AM PM
West Elizabeth/Shields
(signal)
EB LT D F
EB T D D
EB RT D D
EB APPROACH D F
WB LT D D
WB T D D
WB RT D D
WB APPROACH D D
NB LT B F
NB T/RT C D
NB APPROACH C F
SB LT B C
SB T C F
SB RT B C
SB APPROACH C F
OVERALL C F
West Elizabeth/City Park
(signal)
EB LT B B
EB T/RT B B
EB APPROACH B B
WB LT B B
WB T/RT B A
WB APPROACH B A
NB LT A B
NB T/RT A B
NB APPROACH A B
SB LT A B
SB T/RT A B
SB APPROACH A B
OVERALL B B
DELICH Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
ASSOCIATES Page 21
TABLE 5
Short Range (2023) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
West Elizabeth/Shields
(signal)
EB LT E F (102.1 secs)
EB T C D
EB RT C D
EB APPROACH D F (80.1 secs)
WB LT D E
WB T D D
WB RT A A
WB APPROACH D E
NB LT C F (251.9 secs)
NB T E D
NB T/RT E D
NB APPROACH D F (86.8 secs)
SB LT C C
SB T B D
SB RT A B
SB APPROACH B D
OVERALL D E
West Elizabeth/City Park
(signal)
EB LT A A
EB T A A
EB T/RT A A
EB APPROACH A A
WB LT A B
WB T A B
WB T/RT A B
WB APPROACH A B
NB LT C C
NB T/RT B B
NB APPROACH C B
SB LT C B
SB T/RT B B
SB APPROACH B B
OVERALL A B
Continued on next page
DELICH Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
ASSOCIATES Page 22
Continued from previous page
TABLE 5
Short Range (2023) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Shields/University
(stop sign)
EB LT/RT E F (959.5 secs)
NB LT B D
OVERALL A E
University/Comcast Access
(stop sign)
WB LT/T A A
NB LT/RT A A
OVERALL A A
University/SJXXIII-Lombardy East
Access
(stop sign)
EB LT/T A A
SB LT/RT A A
OVERALL A A
University/Big Horn Village Access
(stop sign)
WB LT/T A A
NB LT/RT A A
OVERALL A A
University/SJXXIII-Lombardy West
Access-Big Horn Village Access
(stop sign)
EB LT/T/RT A A
WB LT/T/RT A A
NB LT/T/RT A A
SB LT/T/RT A A
OVERALL A A
City Park/University
(stop sign)
WB LT/RT A B
SB LT/T A A
OVERALL A A
DELICH Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
ASSOCIATES Page 23
TABLE 6
Long Range (2040) Total Peak Hour Operation
(For Information Only)
Intersection Movement Level of Service
AM PM
West Elizabeth/Shields
(signal)
EB LT F D
EB T C D
EB RT C F
EB APPROACH E E
WB LT D D
WB T D D
WB RT C D
WB APPROACH D D
NB LT E F
NB T C D
NB T/RT C D
NB APPROACH C F
SB LT B C
SB T C F
SB RT B C
SB APPROACH C F
OVERALL C F
West Elizabeth/City Park
(signal)
EB LT B B
EB T B B
EB T/RT B B
EB APPROACH B B
WB LT B B
WB T B B
WB T/RT B A
WB APPROACH B A
NB LT A B
NB T/RT A B
NB APPROACH A B
SB LT A B
SB T/RT A B
SB APPROACH A B
OVERALL B B
Continued from previous page
DELICH Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
ASSOCIATES Page 24
Continued from previous page
TABLE 6
Long Range (2040) Total Peak Hour Operation
(For Information Only)
Intersection Movement Level of Service
AM PM
Shields/University
(stop sign)
EB LT/RT E F
NB LT B F
OVERALL A F
University/Comcast Access
(stop sign)
WB LT/T A A
NB LT/RT A A
OVERALL A A
University/SJXXIII-Lombardy East
Access
(stop sign)
EB LT/T A A
SB LT/RT A A
OVERALL A A
University/Big Horn Village Access
(stop sign)
WB LT/T A A
NB LT/RT A A
OVERALL A A
University/SJXXIII-Lombardy West
Access-Big Horn Village Access
(stop sign)
EB LT/T/RT A A
WB LT/T/RT A A
NB LT/T/RT A A
SB LT/T/RT A A
OVERALL A A
City Park/University
(stop sign)
WB LT/RT A B
SB LT/T A A
OVERALL A A
DELICH Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
ASSOCIATES Page 25
The eastbound movement at the Shields/University intersection will continue to
experience delays. This is due to the delay experienced by the left-turns entering Shields
Street. The number of left turns is/will low because of the difficulty making this movement.
The analyses depict a peak hour condition. It is likely that these delays exist when the
volumes on Shields Street are high. Motorists avoid making the left-turn at high traffic
times. However, at other times (probably 15 hours on a given weekday and on
weekends), this left turn can be executed with much shorter delay. Therefore, it is
recommended that this intersection continue to allow full-movements. If safety issues
occur, that are related to this specific movement, the City should consider taking action to
address this.
Geometry
The short range (2023) and long range (2040) geometry is shown in Figure 11. As
mentioned earlier, according to LCUASS, a northbound right-turn lane at the West
Elizabeth/Shields intersection and eastbound and westbound right-turn lanes at the
West Elizabeth/City Park intersection are required with the existing traffic volumes.
Typically at constrained locations, when turn lanes are shown to be required based on
volumes, they are not built unless the operation at the subject intersection is determined
to be unacceptable.
Weekend Service
Weekend Church services occur on Saturday and Sunday. The anticipatory
service is at 5:30 pm on Saturday. There are conventional services on Sunday at: 8:00
am, 10:00 am, 5:30 pm, and 8:00 pm. There are special services on Sunday at: 12:00
pm (Latin) and 3:00 pm (Byzantine). It is assumed that these weekend church services
would continue. The City of Fort Collins requested a discussion of traffic and parking
related to weekend church services.
There are 174 parking spaces in the church parking lot. Observations during
conventional church service times indicated there was an average parking lot
occupancy of 134 parked vehicles. The church service parking lot occupancy is 77
percent. It was also observed that a number of service attendees were pedestrians and
bicyclists from other locations.
It is expected weekend church service attendance will continue as it does today.
Weekend motor vehicle traffic would be similar, except for the additional traffic that
would occur related to the student housing component. Research indicates no
data/information with regard to weekend travel for student housing. However, it is
expected that it would be much lower than the peak hour travel on a weekday. This,
along with lower weekend travel on the area streets, will result in traffic operations that
are similar to that which currently exist.
SHORT RANGE (2023) AND
LONG RANGE (2040) GEOMETRY Figure 11
DELICH
ASSOCIATES
Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
Page 26
West Elizabeth Street
Shields Street
City Park Avenue
- Denotes Lane
University Avenue
Required Based
on Existing Traffic
Required Based
on Existing Traffic
Required Based
on Existing Traffic
STOP
STOP
DELICH Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
ASSOCIATES Page 27
A portion of the parking garage is devoted to church related traffic (40 parking
spaces). There are 9 parking spaces north of the Piazza. On weekends, it is typical
that some residents of the student housing component will not be at the site. Therefore,
some garage parking spaces (371 spaces in Building C and 49 spaces in Building A)
may be available for weekend church service parking.
Pedestrian Level of Service
Appendix H shows a map of the area that is within 1320 feet of the Saint John
XXIII Church and Lombardy Student Housing site. The Saint John XXIII Church and
Lombardy Student Housing site is located within an area termed as a “pedestrian
district,” which sets the level of service threshold at LOS A for all measured categories,
except for street crossing at LOS B. There are four destination areas within 1320 feet of
the proposed Saint John XXIII Church and Lombardy Student Housing: 1) the Colorado
State University Campus; 2) the commercial/residential to the north of the site; 3) the
commercial/residential to the west of the site; and 4) the residential uses to the south
the site. The Pedestrian LOS Worksheet is provided in Appendix H. The pedestrian
destination areas meet the LOS requirements for all categories.
Bicycle Level of Service
Appendix H shows a map of the area that is within 1320 feet of the Saint John
XXIII Church and Lombardy Student Housing site. This area is considered to be a
community/neighborhood commercial center. Based upon Fort Collins bicycle LOS
criteria, the level of service threshold for bicycles is LOS B. There are two bicycle
destinations within 1320 feet of the Saint John XXIII Church and Lombardy Student
Housing. These are: 1) Colorado State University to the east of the site; and 2) the
commercial center to the north of the site. There are bicycle facilities along West Elizabeth
Street and Shields Street. The Saint John XXIII Church and Lombardy Student Housing is
directly connected to the bike lanes on Shields Street, which satisfies the LOS B criteria.
The bicycle LOS Worksheet is provided in Appendix H.
Transit Level of Service
This area of Fort Collins will be served by Transfort Routes 7 and 19 on Shields
Street, and Route 2 on West Elizabeth Street. According to Transfort, the West
Elizabeth Street route has very high ridership. Route 2 has headways every 30
minutes.
DELICH Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
ASSOCIATES Page 28
Mitigation
A northbound right-turn lane is required at the West Elizabeth/Shields
intersection into CSU. The Saint John XXIII Church and Lombardy Student Housing
adds no traffic to the northbound right-turn movement. Eastbound and westbound right-
turn lanes are required at the West Elizabeth/City Park intersection with existing traffic.
The West Elizabeth/Shields intersection is in a constrained location. The Saint John
XXIII Church and Lombardy Student Housing adds no traffic to the westbound right-turn
movement. In the short range (2023) future, the Saint John XXIII Church and Lombardy
Student Housing adds 26 percent to the morning peak hour and 38 percent to the
afternoon peak hour eastbound right-turn movement. Since the project adds traffic to
the eastbound right-turn movement, the following mitigation factors will be implemented:
Residents (students) have Transfort passes that provide access to all Transfort
fixed-routes including MAX and FLEX. The Saint John XXIII Church and
Lombardy Student Housing will inform students regarding this benefit and
promote it by making transit maps readily available in the leasing office and
hosting educational programs.
Three hundred and eighty-five (385) bicycle spaces will be provide within the
development. Twenty-eight bicycles are not covered, 14spaces at the church
and 14 spaces at the Newman Center. Three hundred and fifty-seven (357)
bicycle spaces are covered and located outside or in the parking garage. Secure
bicycle parking will encourage residents to utilize bicycles as a mode of travel.
DELICH Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
ASSOCIATES Page 29
IV. CONCLUSIONS/RECOMMENDATIONS
This study assessed the impacts of the Saint John XXIII Church and Lombardy
Student Housing development on the short range (2023) and long range (2040) street
system in the vicinity of the proposed development. As a result of this analysis, the
following is concluded:
The development of the Saint John XXIII Church and Lombardy Student Housing
site is feasible from a traffic engineering standpoint. At full development, the
Saint John XXIII Church and Lombardy Student Housing site will generate
approximately 2616 daily trip ends, 224 morning peak hour trip ends, and 310
afternoon peak hour trip ends.
Current operation at the West Elizabeth/Shields, West Elizabeth/City Park,
Shields/University, and City Park/University intersections is acceptable. At the
Shields/University intersection, the calculated delay for the eastbound approach
was commensurate with level of service F.
In the short range (2023) future, given development of the Saint John XXIII
Church and Lombardy Student Housing site and an increase in background
traffic, the West Elizabeth/Shields, West Elizabeth/City Park, Shields/University,
and City Park/University intersections will meet the City of Fort Collins Motor
Vehicle LOS Standard in the morning and afternoon peak hours, except the
eastbound and northbound left-turn movements and eastbound and northbound
approaches at the West Elizabeth/Shields intersection in the afternoon peak
hour. The northbound left-turn volume in the afternoon peak hour indicates the
need for dual left-turn lanes. However, this is not possible at this intersection.
This lack of dual northbound left-turn lanes affects the signal timing and impacts
other movements.
In the long range (2040) future, given development of the Saint John XXIII
Church and Lombardy Student Housing site and an increase in background
traffic, the key intersections will meet the City of Fort Collins Motor Vehicle LOS
Standard in the morning and afternoon peak hours, except at the West
Elizabeth/Shields and Shields/University intersections in the afternoon peak hour.
The long range (2040) operational analyses are used for planning and
informational purposes only.
The eastbound movement at the Shields/University intersection will continue to
experience delays. This is due to the delay experienced by the left-turns entering
Shields Street. The number of left turns is/will be low because of the difficulty
making this movement. The analyses depict a peak hour condition. It is likely that
these delays exist when the volumes on Shields Street are high. Motorists avoid
making the left-turn at high traffic times. However, at other times (probably 15
hours on a given weekday and on weekends), this left turn can be executed with
much shorter delay. Therefore, it is recommended that this intersection continue to
allow full-movements. If safety issues occur, that are related to this specific
movement, the City should consider taking action to address this.
DELICH Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
ASSOCIATES Page 30
The short range (2023) and long range (2040) geometry is shown in Figure 11. A
northbound right-turn lane at the West Elizabeth/Shields intersection and
eastbound and westbound right-turn lanes at the West Elizabeth/City Park
intersection are required with the existing traffic volumes. West Elizabeth/City
Park intersections meet the City of Fort Collins Motor Vehicle LOS Standard without
the required right-turn lanes. Saint John XXIII Church and Lombardy Student
Housing added no traffic to the northbound right-turn lane at the West
Elizabeth/Shields intersection. A southbound right-turn lane at the
Shields/University intersection is required with this development.
It is expected that traffic operations related to weekend church services will meet
the Fort Collins criteria.
Acceptable level of service is achieved for pedestrian, bicycles, and transit based
upon the measures in the multi-modal transportation guidelines.
690/725
150/165
70/120
310/760
30/110
90/205
1415/2085
40/55
1350/1965
5/10
110/145
55/150
100/120
65/120
30/5
115/210
10/30
SJXXIII/Lombardy
West Access
Big Horn
Village
Access
Comcast
Access
Big Horn
Village
Access
SJXXIII/Lombardy
East Access
Saint John XXIII Church and Lombardy Student Housing TIS, February 2019
Page 17
2/10
99/117
2/4
1/6
18/14
80/99
51/67
71/98
39/138
59/66
55/65
117/234
3/2
106/131
1/1
2/1
7/8
SJXXIII/Lombardy
West Access
Big Horn
Village
Access
Comcast
Access
Big Horn
Village
Access
SJXXIII/Lombardy
East Access
20/15
50/140
5/5
50/70
5/5
5/5
5/10
Big Horn
Village
Access
Comcast
Access
Big Horn
Village
Access
3/2
47/54
1/1
2/1
7/8
Big Horn
Village
Access
Comcast
Access
Big Horn
Village
Access
28/121
2/0
42/58
46/122
32/43
54/99
24/5
21/94
7/26
9/10
5/3
5/5
22/111
24/4
32/43
30/114
2/8
47/38
3/8
2/7
12/11
University Avenue
SJXXIII
Access
SJXXIII
Access
SJXXIII
Access
Comcast
Access
Big Horn
Village
Access
Big Horn
Village
Access
APPENDIX A
1
2
3
4
5
APPENDIX B
6
7
8
9
10
11
12
13
14
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 9/20/2018 Observer: Vickie
Day: Thursday Jurisdiction: Fort Collins
R = right turn Intersection: Shields/University
S = straight
L = left turn
Time Northbound: Shields Southbound: Shields Total Eastbound: University Westbound: Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 8 265 273 236 3 239 512 217 19 0 19 531
7:45 21 254 275 235 7 242 517 211 13 0 13 530
8:00 6 204 210 217 2 219 429 015 15 0 15 444
8:15 10 168 178 202 2 204 382 111 12 0 12 394
7:30-8:30 45 891 0 936 0 890 14 904 1840 5054 59 000 0 59 1899
PHF 0.54 0.84 n/a 0.85 n/a 0.94 0.5 0.93 0.89 0.63 n/a 0.79 0.78 n/a n/a n/a n/a 0.78 0.89
4:30 24 349 373 360 2 362 735 218 20 0 20 755
4:45 39 364 403 379 6 385 788 018 18 0 18 806
5:00 30 340 370 400 5 405 775 221 23 0 23 798
5:15 30 349 379 356 6 362 741 018 18 0 18 759
4:30-5:30 123 1402 0 1525 0 1495 19 1514 3039 4075 79 000 0 79 3118
PHF 0.79 0.96 n/a 0.95 n/a 0.93 0.79 0.93 0.96 0.5 n/a 0.89 0.86 n/a n/a n/a n/a 0.86 0.97
15
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 9/26/2018 Observer: Vickie
Day: Wednesday Jurisdiction: Fort Collins
R = right turn Intersection: City Park/University
S = straight
L = left turn
Time Northbound: City Park Southbound: City Park Total Eastbound: Westbound: University Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 16 7 23 10 8 18 41 0 22 4 445
7:45 22 11 33 98 17 50 0 312 15 15 65
8:00 12 4 16 510 15 31 0 04 4 435
8:15 42 6 820 28 34 0 23 5 539
7:30-8:30 0 54 24 78 32 46 0 78 156 0 0 007 0 212828 184
PHF n/a 0.61 0.55 0.59 0.8 0.58 n/a 0.7 0.78 n/a n/a n/a n/a 0.58 n/a 0.44 0.47 0.47 0.71
4:30 19 0 19 421 25 44 0 812 20 20 64
4:45 26 1 27 11 31 42 69 0 821 29 29 98
5:00 26 2 28 14 35 49 77 0 439 43 43 120
5:15 28 2 30 14 35 49 79 0 622 28 28 107
4:30-5:30 0 99 5 104 43 122 0 165 269 0 0 0 0 26 0 94 120 120 389
PHF n/a 0.88 0.63 0.87 0.77 0.87 n/a 0.84 0.85 n/a n/a n/a n/a 0.81 n/a 0.6 0.7 0.7 0.81
16
APPENDIX C
17
HCM 6th Signalized Intersection Summary 1: Shields & Elizabeth/Moby Lot (Eliz)
Recent AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 298 51 258 22 5 7 106 860 113 5 732 119
Future Volume (veh/h) 298 51 258 22 5 7 106 860 113 5 732 119
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.91 1.00 1.00 1.00 0.95 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1683 1683 1683 1683 1683 1683 1683 1683 1616 1683 1683 1683
Adj Flow Rate, veh/h 351 60 37 26 6 0 125 1012 126 6 861 34
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 222222222222
Cap, veh/h 417 509 393 87 327 277 358 1347 168 149 1347 598
Arrive On Green 0.16 0.30 0.30 0.05 0.19 0.00 0.02 0.16 0.16 0.03 0.84 0.84
Sat Flow, veh/h 2565 1683 1299 1603 1683 1427 1603 2845 354 1603 3198 1420
Grp Volume(v), veh/h 351 60 37 26 6 0 125 568 570 6 861 34
Grp Sat Flow(s),veh/h/ln 1283 1683 1299 1603 1683 1427 1603 1599 1600 1603 1599 1420
Q Serve(g_s), s 14.6 2.8 2.3 1.7 0.3 0.0 4.6 37.4 37.4 0.2 10.1 0.4
Cycle Q Clear(g_c), s 14.6 2.8 2.3 1.7 0.3 0.0 4.6 37.4 37.4 0.2 10.1 0.4
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.22 1.00 1.00
Lane Grp Cap(c), veh/h 417 509 393 87 327 277 358 757 758 149 1347 598
V/C Ratio(X) 0.84 0.12 0.09 0.30 0.02 0.00 0.35 0.75 0.75 0.04 0.64 0.06
Avail Cap(c_a), veh/h 455 543 419 146 398 337 366 757 758 241 1347 598
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 0.33 0.33 0.33 2.00 2.00 2.00
Upstream Filter(I) 0.93 0.93 0.93 1.00 1.00 0.00 1.00 1.00 1.00 0.91 0.91 0.91
Uniform Delay (d), s/veh 44.7 27.8 27.6 50.0 35.8 0.0 16.1 40.2 40.2 21.8 5.8 5.0
Incr Delay (d2), s/veh 11.8 0.1 0.1 1.9 0.0 0.0 0.6 6.7 6.8 0.1 2.1 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 5.3 1.2 0.7 0.7 0.1 0.0 1.8 17.4 17.5 0.1 2.3 0.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 56.4 27.9 27.7 51.8 35.9 0.0 16.7 46.9 47.0 21.9 7.9 5.2
LnGrp LOS E CCDDABDDCAA
Approach Vol, veh/h 448 32 1263 901
Approach Delay, s/veh 50.2 48.8 44.0 7.9
Approach LOS D D D A
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 10.4 50.8 11.0 37.7 4.7 56.6 22.4 26.4
Change Period (Y+Rc), s 4.0 5.5 6.0 5.5 4.0 * 5.5 5.5 6.0
Max Green Setting (Gmax), s 7.0 38.5 9.0 34.5 7.0 * 39 18.5 25.0
Max Q Clear Time (g_c+I1), s 6.6 12.1 3.7 4.8 2.2 39.4 16.6 2.3
Green Ext Time (p_c), s 0.0 3.9 0.0 0.3 0.0 0.0 0.3 0.0
Intersection Summary
HCM 6th Ctrl Delay 32.8
HCM 6th LOS C
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
18
Timing Report, Sorted By Phase 1: Shields & Elizabeth/Moby Lot (Eliz)
Recent AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 1
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 11 44 15 40 11 44 24 31
Maximum Split (%) 10.0% 40.0% 13.6% 36.4% 10.0% 40.0% 21.8% 28.2%
Minimum Split (s) 11 24.5 11 25.5 11 23.5 11 29
Yellow Time (s) 3 3.5 3 3.5 3 3.5 3.5 3
All-Red Time (s) 12321 1.523
Minimum Initial (s) 4 10 5 7 4 10 5.5 7
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 12 13 10 16
Dual Entry No Yes Yes Yes No Yes Yes Yes
Inhibit Max No No No No No No No No
Start Time (s) 43.5 54.5 98.5 3.5 43.5 54.5 19.5 98.5
End Time (s) 54.5 98.5 3.5 43.5 54.5 98.5 43.5 19.5
Yield/Force Off (s) 50.5 93 107.5 38 50.5 93.5 38 13.5
Yield/Force Off 170(s) 50.5 81 107.5 25 50.5 83.5 38 107.5
Local Start Time (s) 60.5 71.5 5.5 20.5 60.5 71.5 36.5 5.5
Local Yield (s) 67.5 0 14.5 55 67.5 0.5 55 30.5
Local Yield 170(s) 67.5 98 14.5 42 67.5 100.5 55 14.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 100
Offset: 93 (85%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 1: Shields & Elizabeth/Moby Lot (Eliz)
19
HCM 6th Signalized Intersection Summary 1: Shields & Elizabeth/Moby Lot (Eliz)
recent pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 10 Light Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 298 30 326 84 45 10 301 1175 65 6 1075 362
Future Volume (veh/h) 298 30 326 84 45 10 301 1175 65 6 1075 362
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.86 1.00 1.00 1.00 0.96 1.00 0.98
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1683 1683 1683 1683 1683 1683 1683 1683 1616 1683 1683 1683
Adj Flow Rate, veh/h 320 32 122 90 48 0 324 1263 68 6 1156 150
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 222222222222
Cap, veh/h 379 412 300 128 298 252 331 1599 86 151 1228 534
Arrive On Green 0.15 0.24 0.24 0.08 0.18 0.00 0.15 0.52 0.52 0.03 0.77 0.77
Sat Flow, veh/h 2565 1683 1227 1603 1683 1427 1603 3078 165 1603 3198 1391
Grp Volume(v), veh/h 320 32 122 90 48 0 324 655 676 6 1156 150
Grp Sat Flow(s),veh/h/ln 1283 1683 1227 1603 1683 1427 1603 1599 1645 1603 1599 1391
Q Serve(g_s), s 14.6 1.8 10.0 6.6 2.9 0.0 17.3 40.0 40.2 0.3 36.4 3.8
Cycle Q Clear(g_c), s 14.6 1.8 10.0 6.6 2.9 0.0 17.3 40.0 40.2 0.3 36.4 3.8
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.10 1.00 1.00
Lane Grp Cap(c), veh/h 379 412 300 128 298 252 331 831 854 151 1228 534
V/C Ratio(X) 0.85 0.08 0.41 0.70 0.16 0.00 0.98 0.79 0.79 0.04 0.94 0.28
Avail Cap(c_a), veh/h 395 442 322 134 323 273 331 831 854 235 1228 534
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
Upstream Filter(I) 0.96 0.96 0.96 1.00 1.00 0.00 1.00 1.00 1.00 0.68 0.68 0.68
Uniform Delay (d), s/veh 49.8 34.9 38.0 53.8 41.8 0.0 32.7 23.5 23.5 23.9 12.8 9.0
Incr Delay (d2), s/veh 14.5 0.1 0.8 14.7 0.3 0.0 43.5 7.5 7.4 0.1 11.3 0.9
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 5.4 0.7 3.1 3.2 1.2 0.0 13.6 16.3 16.8 0.1 6.4 1.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 64.3 35.0 38.9 68.5 42.1 0.0 76.3 31.0 30.9 24.0 24.1 9.9
LnGrp LOS E C D E D A E CCCCA
Approach Vol, veh/h 474 138 1655 1312
Approach Delay, s/veh 55.8 59.3 39.8 22.5
Approach LOS E E D C
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 21.0 50.6 14.6 33.9 4.7 66.8 22.2 26.2
Change Period (Y+Rc), s 4.0 5.5 6.0 5.5 4.0 * 5.5 5.5 6.0
Max Green Setting (Gmax), s 17.0 42.5 9.0 30.5 7.0 * 53 17.5 22.0
Max Q Clear Time (g_c+I1), s 19.3 38.4 8.6 12.0 2.3 42.2 16.6 4.9
Green Ext Time (p_c), s 0.0 2.3 0.0 0.5 0.0 4.1 0.1 0.1
Intersection Summary
HCM 6th Ctrl Delay 36.3
HCM 6th LOS D
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
20
Timing Report, Sorted By Phase 1: Shields & Elizabeth/Moby Lot (Eliz)
recent pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 10 Light Report
Page 1
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 21 48 15 36 11 58 23 28
Maximum Split (%) 17.5% 40.0% 12.5% 30.0% 9.2% 48.3% 19.2% 23.3%
Minimum Split (s) 11 24.5 11 23.5 11 23.5 11 27
Yellow Time (s) 3 3.5 3 3.5 3 3.5 3.5 3
All-Red Time (s) 12321 1.523
Minimum Initial (s) 4 10 5 7 4 10 5.5 7
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7575
Flash Dont Walk (s) 12 13 10 16
Dual Entry No Yes Yes Yes No Yes Yes Yes
Inhibit Max No No No No No No No No
Start Time (s) 92.5 113.5 41.5 56.5 92.5 103.5 69.5 41.5
End Time (s) 113.5 41.5 56.5 92.5 103.5 41.5 92.5 69.5
Yield/Force Off (s) 109.5 36 50.5 87 99.5 36.5 87 63.5
Yield/Force Off 170(s) 109.5 24 50.5 74 99.5 26.5 87 47.5
Local Start Time (s) 56.5 77.5 5.5 20.5 56.5 67.5 33.5 5.5
Local Yield (s) 73.5 0 14.5 51 63.5 0.5 51 27.5
Local Yield 170(s) 73.5 108 14.5 38 63.5 110.5 51 11.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 120
Offset: 36 (30%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 1: Shields & Elizabeth/Moby Lot (Eliz)
21
HCM 6th Signalized Intersection Summary 2: City Park & Elizabeth
Recent AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 47 478 90 25 175 48 28 44 61 47 10 22
Future Volume (veh/h) 47 478 90 25 175 48 28 44 61 47 10 22
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.97 0.84 0.98 0.93 0.98 0.92 0.98 0.95
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1796 1870 1870 1796 1870 1945 1796 1870 1945 1796
Adj Flow Rate, veh/h 53 537 84 28 197 36 31 49 7 53 11 3
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89
Percent Heavy Veh, % 222222222222
Cap, veh/h 848 1998 310 657 1986 354 367 293 42 333 259 71
Arrive On Green 1.00 1.00 1.00 0.67 0.67 0.67 0.18 0.18 0.18 0.18 0.18 0.18
Sat Flow, veh/h 1116 2996 465 789 2977 530 1368 1643 235 1320 1453 396
Grp Volume(v), veh/h 53 317 304 28 115 118 31 0 56 53 0 14
Grp Sat Flow(s),veh/h/ln 1116 1777 1685 789 1777 1731 1368 0 1878 1320 0 1850
Q Serve(g_s), s 0.1 0.0 0.0 0.7 1.3 1.3 1.1 0.0 1.4 1.9 0.0 0.3
Cycle Q Clear(g_c), s 1.4 0.0 0.0 0.7 1.3 1.3 1.4 0.0 1.4 3.3 0.0 0.3
Prop In Lane 1.00 0.28 1.00 0.31 1.00 0.13 1.00 0.21
Lane Grp Cap(c), veh/h 848 1185 1124 657 1185 1154 367 0 335 333 0 330
V/C Ratio(X) 0.06 0.27 0.27 0.04 0.10 0.10 0.08 0.00 0.17 0.16 0.00 0.04
Avail Cap(c_a), veh/h 848 1185 1124 657 1185 1154 632 0 700 590 0 689
HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.99 0.99 0.99 0.99 0.99 0.99 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 0.0 0.0 0.0 3.2 3.3 3.3 19.3 0.0 19.1 20.5 0.0 18.7
Incr Delay (d2), s/veh 0.1 0.5 0.6 0.1 0.2 0.2 0.1 0.0 0.2 0.2 0.0 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.0 0.2 0.2 0.1 0.3 0.3 0.3 0.0 0.6 0.6 0.0 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.2 0.5 0.6 3.3 3.4 3.4 19.4 0.0 19.4 20.8 0.0 18.8
LnGrp LOS AAAAAABABCAB
Approach Vol, veh/h 674 261 87 67
Approach Delay, s/veh 0.5 3.4 19.4 20.3
Approach LOS A A B C
Timer - Assigned Phs 2468
Phs Duration (G+Y+Rc), s 14.3 40.7 14.3 40.7
Change Period (Y+Rc), s 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s 19.5 25.0 19.5 25.0
Max Q Clear Time (g_c+I1), s 5.3 3.4 3.4 3.3
Green Ext Time (p_c), s 0.1 2.4 0.2 0.9
Intersection Summary
HCM 6th Ctrl Delay 4.0
HCM 6th LOS A
22
Timing Report, Sorted By Phase 2: City Park & Elizabeth
Recent AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 3
Phase Number 2468
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode None C-Max None C-Max
Maximum Split (s) 25 30 25 30
Maximum Split (%) 45.5% 54.5% 45.5% 54.5%
Minimum Split (s) 22.5 22 24.5 22
Yellow Time (s) 3 3.5 3 3.5
All-Red Time (s) 2.5 1.5 2.5 1.5
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 10 12 10
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 18 43 18 43
End Time (s) 43 18 43 18
Yield/Force Off (s) 37.5 13 37.5 13
Yield/Force Off 170(s) 27.5 3 25.5 3
Local Start Time (s) 0 25 0 25
Local Yield (s) 19.5 50 19.5 50
Local Yield 170(s) 9.5 40 7.5 40
Intersection Summary
Cycle Length 55
Control Type Actuated-Coordinated
Natural Cycle 50
Offset: 18 (33%), Referenced to phase 4:EBTL and 8:WBTL, Start of Red
Splits and Phases: 2: City Park & Elizabeth
23
HCM 6th Signalized Intersection Summary 2: City Park & Elizabeth
recent pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 10 Light Report
Page 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 77 459 85 86 491 89 113 112 85 74 106 67
Future Volume (veh/h) 77 459 85 86 491 89 113 112 85 74 106 67
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.99 0.90 0.97 0.83 0.95 0.92 0.96 0.92
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1796 1870 1870 1796 1870 1945 1796 1870 1945 1796
Adj Flow Rate, veh/h 80 478 70 90 511 74 118 117 31 77 110 21
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 222222222222
Cap, veh/h 494 1764 256 601 1742 250 395 411 109 381 442 84
Arrive On Green 1.00 1.00 1.00 0.39 0.39 0.39 0.28 0.28 0.28 0.28 0.28 0.28
Sat Flow, veh/h 818 3066 445 836 3027 434 1202 1453 385 1185 1563 298
Grp Volume(v), veh/h 80 275 273 90 298 287 118 0 148 77 0 131
Grp Sat Flow(s),veh/h/ln 818 1777 1734 836 1777 1685 1202 0 1838 1185 0 1861
Q Serve(g_s), s 1.5 0.0 0.0 4.3 7.0 7.1 5.0 0.0 3.8 3.3 0.0 3.3
Cycle Q Clear(g_c), s 8.5 0.0 0.0 4.3 7.0 7.1 8.3 0.0 3.8 7.0 0.0 3.3
Prop In Lane 1.00 0.26 1.00 0.26 1.00 0.21 1.00 0.16
Lane Grp Cap(c), veh/h 494 1023 998 601 1023 970 395 0 520 381 0 526
V/C Ratio(X) 0.16 0.27 0.27 0.15 0.29 0.30 0.30 0.00 0.28 0.20 0.00 0.25
Avail Cap(c_a), veh/h 494 1023 998 601 1023 970 505 0 689 490 0 698
HCM Platoon Ratio 2.00 2.00 2.00 0.67 0.67 0.67 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.98 0.98 0.98 0.96 0.96 0.96 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 0.9 0.0 0.0 9.1 10.0 10.0 19.8 0.0 16.8 19.5 0.0 16.6
Incr Delay (d2), s/veh 0.7 0.6 0.7 0.5 0.7 0.7 0.4 0.0 0.3 0.3 0.0 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.1 0.2 0.2 0.7 2.6 2.5 1.4 0.0 1.5 0.9 0.0 1.3
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 1.6 0.6 0.7 9.6 10.7 10.7 20.2 0.0 17.1 19.8 0.0 16.8
LnGrp LOS AAAABBCABBAB
Approach Vol, veh/h 628 675 266 208
Approach Delay, s/veh 0.8 10.6 18.5 17.9
Approach LOS ABBB
Timer - Assigned Phs 2468
Phs Duration (G+Y+Rc), s 21.5 38.5 21.5 38.5
Change Period (Y+Rc), s 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s 21.5 28.0 21.5 28.0
Max Q Clear Time (g_c+I1), s 9.0 10.5 10.3 9.1
Green Ext Time (p_c), s 0.5 2.3 0.7 2.5
Intersection Summary
HCM 6th Ctrl Delay 9.1
HCM 6th LOS A
24
Timing Report, Sorted By Phase 2: City Park & Elizabeth
recent pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 10 Light Report
Page 3
Phase Number 2468
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode None C-Max None C-Max
Maximum Split (s) 27 33 27 33
Maximum Split (%) 45.0% 55.0% 45.0% 55.0%
Minimum Split (s) 22.5 22 24.5 22
Yellow Time (s) 3 3.5 3 3.5
All-Red Time (s) 2.5 1.5 2.5 1.5
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 10 12 10
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 44 11 44 11
End Time (s) 11 44 11 44
Yield/Force Off (s) 5.5 39 5.5 39
Yield/Force Off 170(s) 55.5 29 53.5 29
Local Start Time (s) 5 32 5 32
Local Yield (s) 26.5 0 26.5 0
Local Yield 170(s) 16.5 50 14.5 50
Intersection Summary
Cycle Length 60
Control Type Actuated-Coordinated
Natural Cycle 50
Offset: 39 (65%), Referenced to phase 4:EBTL and 8:WBTL, Start of Yellow
Splits and Phases: 2: City Park & Elizabeth
25
HCM 6th TWSC 3: Shields & University
Recent AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 5
Intersection
Int Delay, s/veh 0.8
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 54 45 891 890 14
Future Vol, veh/h 5 54 45 891 890 14
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 120 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 6 64 53 1048 1047 16
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1685 532 1063 0 - 0
Stage 1 1055 -----
Stage 2 630 -----
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 85 492 651 - - -
Stage 1 296 -----
Stage 2 493 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 78 492 651 - - -
Mov Cap-2 Maneuver 78 -----
Stage 1 272 -----
Stage 2 493 -----
Approach EB NB SB
HCM Control Delay, s 18.3 0.5 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 651 - 339 - -
HCM Lane V/C Ratio 0.081 - 0.205 - -
HCM Control Delay (s) 11 - 18.3 - -
HCM Lane LOS B - C - -
HCM 95th %tile Q(veh) 0.3 - 0.8 - -
26
HCM 6th TWSC 3: Shields & University
recent pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 10 Light Report
Page 5
Intersection
Int Delay, s/veh 2.7
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 4 75 123 1402 1495 19
Future Vol, veh/h 4 75 123 1402 1495 19
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 120 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 22222
Mvmt Flow 4 83 137 1558 1661 21
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 2725 841 1682 0 - 0
Stage 1 1672 -----
Stage 2 1053 -----
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 17 308 377 - - -
Stage 1 138 -----
Stage 2 297 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 11 308 377 - - -
Mov Cap-2 Maneuver 11 -----
Stage 1 88 -----
Stage 2 297 -----
Approach EB NB SB
HCM Control Delay, s 76.9 1.6 0
HCM LOS F
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 377 - 130 - -
HCM Lane V/C Ratio 0.363 - 0.675 - -
HCM Control Delay (s) 19.9 - 76.9 - -
HCM Lane LOS C - F - -
HCM 95th %tile Q(veh) 1.6 - 3.7 - -
27
HCM 6th TWSC 4: City Park & University
Recent AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 6
Intersection
Int Delay, s/veh 2.7
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 7 21 54 24 32 46
Future Vol, veh/h 7 21 54 24 32 46
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 8 25 64 28 38 54
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 208 78 0 0 92 0
Stage 1 78 -----
Stage 2 130 -----
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 780 983 - - 1503 -
Stage 1 945 -----
Stage 2 896 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 760 983 - - 1503 -
Mov Cap-2 Maneuver 760 -----
Stage 1 945 -----
Stage 2 873 -----
Approach WB NB SB
HCM Control Delay, s 9.1 0 3.1
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 916 1503 -
HCM Lane V/C Ratio - - 0.036 0.025 -
HCM Control Delay (s) - - 9.1 7.5 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0.1 0.1 -
28
HCM 6th TWSC 4: City Park & University
recent pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 10 Light Report
Page 6
Intersection
Int Delay, s/veh 3.9
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 26 94 99 5 43 122
Future Vol, veh/h 26 94 99 5 43 122
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 22222
Mvmt Flow 29 104 110 6 48 136
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 345 113 0 0 116 0
Stage 1 113 -----
Stage 2 232 -----
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 652 940 - - 1473 -
Stage 1 912 -----
Stage 2 807 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 629 940 - - 1473 -
Mov Cap-2 Maneuver 629 -----
Stage 1 912 -----
Stage 2 779 -----
Approach WB NB SB
HCM Control Delay, s 10 0 2
HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 849 1473 -
HCM Lane V/C Ratio - - 0.157 0.032 -
HCM Control Delay (s) - - 10 7.5 0
HCM Lane LOS - - B A A
HCM 95th %tile Q(veh) - - 0.6 0.1 -
29
Table 4-3
Fort Collins (GMA and City Limits)
Motor Vehicle LOS Standards (Intersections)
Overall
Any
Approach Leg
Any
Movement
Signalized D1
E E2
Unsignalized E3 F4
Arterial/Arterial
Collector/Collector
Unsignalized D3 F4
Arterial/Collector
Arterial/Local
Collector/Local
Local/Local
Roundabout E3,5 E5,4 E5
1 In mixed use district including downtown as defined by structure plan, overall LOS E is acceptable
2 Applicable with at least 5% of total entering volume
3 Use weighed average to identify overall delay
4 Mitigation may be required
5 Apply unsignalized delay value thresholds to determine LOS
30
UNSIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 15
C > 15 and < 25
D > 25 and < 35
E > 35 and < 50
F > 50
SIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 20
C > 20 and < 35
D > 35 and < 55
E > 55 and < 80
F > 80
31
APPENDIX D
32
HCM 6th Signalized Intersection Summary 1: Shields & Elizabeth/Moby Lot (Eliz)
Short Background AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 355 63 341 23 11 7 150 920 120 5 791 149
Future Volume (veh/h) 355 63 341 23 11 7 150 920 120 5 791 149
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.92 1.00 0.96 1.00 0.95 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1683 1683 1683 1683 1683 1683 1683 1683 1616 1683 1683 1683
Adj Flow Rate, veh/h 418 74 150 27 13 1 176 1082 30 6 931 53
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 222222222222
Cap, veh/h 481 551 428 87 327 266 305 1423 39 145 1251 555
Arrive On Green 0.19 0.33 0.33 0.05 0.19 0.19 0.02 0.15 0.15 0.03 0.78 0.78
Sat Flow, veh/h 2565 1683 1309 1603 1683 1369 1603 3174 88 1603 3198 1419
Grp Volume(v), veh/h 418 74 150 27 13 1 176 545 567 6 931 53
Grp Sat Flow(s),veh/h/ln 1283 1683 1309 1603 1683 1369 1603 1599 1662 1603 1599 1419
Q Serve(g_s), s 17.4 3.4 9.6 1.8 0.7 0.1 6.8 36.0 36.0 0.2 16.7 1.0
Cycle Q Clear(g_c), s 17.4 3.4 9.6 1.8 0.7 0.1 6.8 36.0 36.0 0.2 16.7 1.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.05 1.00 1.00
Lane Grp Cap(c), veh/h 481 551 428 87 327 266 305 717 746 145 1251 555
V/C Ratio(X) 0.87 0.13 0.35 0.31 0.04 0.00 0.58 0.76 0.76 0.04 0.74 0.10
Avail Cap(c_a), veh/h 501 551 428 146 367 299 305 717 746 237 1251 555
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 0.33 0.33 0.33 2.00 2.00 2.00
Upstream Filter(I) 0.93 0.93 0.93 1.00 1.00 1.00 1.00 1.00 1.00 0.91 0.91 0.91
Uniform Delay (d), s/veh 43.4 26.0 28.1 50.0 36.0 22.7 20.0 41.2 41.2 23.2 9.1 7.4
Incr Delay (d2), s/veh 13.9 0.1 0.5 2.0 0.0 0.0 2.7 7.4 7.2 0.1 3.7 0.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 6.4 1.4 3.1 0.8 0.3 0.0 2.9 16.9 17.5 0.1 3.6 0.4
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 57.3 26.1 28.6 52.0 36.0 22.7 22.7 48.6 48.4 23.3 12.8 7.7
LnGrp LOS E CCDDCCDDCBA
Approach Vol, veh/h 642 41 1288 990
Approach Delay, s/veh 47.0 46.2 45.0 12.6
Approach LOS D D D B
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 11.0 47.5 11.0 40.5 4.7 53.8 25.1 26.4
Change Period (Y+Rc), s 4.0 5.5 6.0 5.5 4.0 * 5.5 5.5 6.0
Max Green Setting (Gmax), s 7.0 38.5 9.0 34.5 7.0 * 39 20.5 23.0
Max Q Clear Time (g_c+I1), s 8.8 18.7 3.8 11.6 2.2 38.0 19.4 2.7
Green Ext Time (p_c), s 0.0 4.1 0.0 0.8 0.0 0.5 0.2 0.0
Intersection Summary
HCM 6th Ctrl Delay 34.6
HCM 6th LOS C
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
33
Timing Report, Sorted By Phase 1: Shields & Elizabeth/Moby Lot (Eliz)
Short Background AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 1
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 11 44 15 40 11 44 26 29
Maximum Split (%) 10.0% 40.0% 13.6% 36.4% 10.0% 40.0% 23.6% 26.4%
Minimum Split (s) 11 24.5 11 25.5 11 23.5 11 29
Yellow Time (s) 3 3.5 3 3.5 3 3.5 3.5 3
All-Red Time (s) 12321 1.523
Minimum Initial (s) 4 10 5 7 4 10 5.5 7
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 12 13 10 16
Dual Entry No Yes Yes Yes No Yes Yes Yes
Inhibit Max No No No No No No No No
Start Time (s) 43.5 54.5 98.5 3.5 43.5 54.5 17.5 98.5
End Time (s) 54.5 98.5 3.5 43.5 54.5 98.5 43.5 17.5
Yield/Force Off (s) 50.5 93 107.5 38 50.5 93.5 38 11.5
Yield/Force Off 170(s) 50.5 81 107.5 25 50.5 83.5 38 105.5
Local Start Time (s) 60.5 71.5 5.5 20.5 60.5 71.5 34.5 5.5
Local Yield (s) 67.5 0 14.5 55 67.5 0.5 55 28.5
Local Yield 170(s) 67.5 98 14.5 42 67.5 100.5 55 12.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 110
Offset: 93 (85%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 1: Shields & Elizabeth/Moby Lot (Eliz)
34
HCM 6th Signalized Intersection Summary 1: Shields & Elizabeth/Moby Lot (Eliz)
short background pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 10 Light Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 348 43 405 90 64 11 401 1273 70 6 1157 431
Future Volume (veh/h) 348 43 405 90 64 11 401 1273 70 6 1157 431
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.86 1.00 1.00 1.00 0.96 1.00 0.97
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1683 1683 1683 1683 1683 1683 1683 1683 1616 1683 1683 1683
Adj Flow Rate, veh/h 374 46 226 97 69 0 431 1369 72 6 1244 154
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 222222222222
Cap, veh/h 395 417 305 134 298 252 300 1581 83 124 1206 525
Arrive On Green 0.15 0.25 0.25 0.08 0.18 0.00 0.15 0.51 0.51 0.03 0.75 0.75
Sat Flow, veh/h 2565 1683 1230 1603 1683 1427 1603 3083 162 1603 3198 1391
Grp Volume(v), veh/h 374 46 226 97 69 0 431 708 733 6 1244 154
Grp Sat Flow(s),veh/h/ln 1283 1683 1230 1603 1683 1427 1603 1599 1645 1603 1599 1391
Q Serve(g_s), s 17.3 2.5 20.3 7.1 4.2 0.0 18.0 46.5 46.9 0.3 45.3 4.2
Cycle Q Clear(g_c), s 17.3 2.5 20.3 7.1 4.2 0.0 18.0 46.5 46.9 0.3 45.3 4.2
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.10 1.00 1.00
Lane Grp Cap(c), veh/h 395 417 305 134 298 252 300 820 844 124 1206 525
V/C Ratio(X) 0.95 0.11 0.74 0.73 0.23 0.00 1.43 0.86 0.87 0.05 1.03 0.29
Avail Cap(c_a), veh/h 395 442 323 134 323 273 300 820 844 207 1206 525
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
Upstream Filter(I) 0.96 0.96 0.96 1.00 1.00 0.00 1.00 1.00 1.00 0.68 0.68 0.68
Uniform Delay (d), s/veh 50.3 34.9 41.6 53.7 42.4 0.0 38.3 25.6 25.7 25.9 14.7 9.7
Incr Delay (d2), s/veh 30.8 0.1 8.1 17.8 0.4 0.0 213.6 11.7 11.7 0.1 29.8 1.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 7.2 1.1 6.9 3.5 1.8 0.0 26.8 19.6 20.4 0.1 10.9 1.3
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 81.1 35.0 49.7 71.5 42.8 0.0 251.9 37.3 37.4 26.0 44.5 10.7
LnGrp LOS F D D E D A F D D C F B
Approach Vol, veh/h 646 166 1872 1404
Approach Delay, s/veh 66.8 59.5 86.7 40.7
Approach LOS E E F D
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 21.0 49.8 15.0 34.2 4.7 66.0 23.0 26.2
Change Period (Y+Rc), s 4.0 5.5 6.0 5.5 4.0 * 5.5 5.5 6.0
Max Green Setting (Gmax), s 17.0 42.5 9.0 30.5 7.0 * 53 17.5 22.0
Max Q Clear Time (g_c+I1), s 20.0 47.3 9.1 22.3 2.3 48.9 19.3 6.2
Green Ext Time (p_c), s 0.0 0.0 0.0 0.7 0.0 2.3 0.0 0.1
Intersection Summary
HCM 6th Ctrl Delay 66.7
HCM 6th LOS E
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
35
Timing Report, Sorted By Phase 1: Shields & Elizabeth/Moby Lot (Eliz)
short background pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 10 Light Report
Page 1
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 21 48 15 36 11 58 23 28
Maximum Split (%) 17.5% 40.0% 12.5% 30.0% 9.2% 48.3% 19.2% 23.3%
Minimum Split (s) 11 24.5 11 23.5 11 23.5 11 27
Yellow Time (s) 3 3.5 3 3.5 3 3.5 3.5 3
All-Red Time (s) 12321 1.523
Minimum Initial (s) 4 10 5 7 4 10 5.5 7
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7575
Flash Dont Walk (s) 12 13 10 16
Dual Entry No Yes Yes Yes No Yes Yes Yes
Inhibit Max No No No No No No No No
Start Time (s) 92.5 113.5 41.5 56.5 92.5 103.5 69.5 41.5
End Time (s) 113.5 41.5 56.5 92.5 103.5 41.5 92.5 69.5
Yield/Force Off (s) 109.5 36 50.5 87 99.5 36.5 87 63.5
Yield/Force Off 170(s) 109.5 24 50.5 74 99.5 26.5 87 47.5
Local Start Time (s) 56.5 77.5 5.5 20.5 56.5 67.5 33.5 5.5
Local Yield (s) 73.5 0 14.5 51 63.5 0.5 51 27.5
Local Yield 170(s) 73.5 108 14.5 38 63.5 110.5 51 11.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 150
Offset: 36 (30%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 1: Shields & Elizabeth/Moby Lot (Eliz)
36
HCM 6th Signalized Intersection Summary 2: City Park & Elizabeth
Short Background AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 55 591 96 25 268 54 30 46 64 51 42 26
Future Volume (veh/h) 55 591 96 25 268 54 30 46 64 51 42 26
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.97 0.84 0.99 0.93 0.98 0.92 0.98 0.95
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1796 1870 1870 1796 1870 1945 1796 1870 1945 1796
Adj Flow Rate, veh/h 62 664 93 28 301 42 34 52 7 57 47 3
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89
Percent Heavy Veh, % 222222222222
Cap, veh/h 800 2019 282 593 2057 283 345 304 41 338 331 21
Arrive On Green 1.00 1.00 1.00 1.00 1.00 1.00 0.18 0.18 0.18 0.18 0.18 0.18
Sat Flow, veh/h 1011 3050 426 697 3107 427 1328 1659 223 1318 1802 115
Grp Volume(v), veh/h 62 386 371 28 170 173 34 0 59 57 0 50
Grp Sat Flow(s),veh/h/ln 1011 1777 1699 697 1777 1757 1328 0 1882 1318 0 1918
Q Serve(g_s), s 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 1.5 2.1 0.0 1.2
Cycle Q Clear(g_c), s 0.0 0.0 0.0 0.0 0.0 0.0 2.4 0.0 1.5 3.6 0.0 1.2
Prop In Lane 1.00 0.25 1.00 0.24 1.00 0.12 1.00 0.06
Lane Grp Cap(c), veh/h 800 1176 1125 593 1176 1164 345 0 345 338 0 352
V/C Ratio(X) 0.08 0.33 0.33 0.05 0.14 0.15 0.10 0.00 0.17 0.17 0.00 0.14
Avail Cap(c_a), veh/h 800 1176 1125 593 1176 1164 597 0 702 587 0 715
HCM Platoon Ratio 2.00 2.00 2.00 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.99 0.99 0.99 0.99 0.99 0.99 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 19.8 0.0 18.9 20.4 0.0 18.8
Incr Delay (d2), s/veh 0.2 0.7 0.8 0.1 0.3 0.3 0.1 0.0 0.2 0.2 0.0 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.0 0.2 0.2 0.0 0.1 0.1 0.4 0.0 0.6 0.6 0.0 0.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.2 0.7 0.8 0.1 0.3 0.3 20.0 0.0 19.2 20.7 0.0 19.0
LnGrp LOS AAAAAABABCAB
Approach Vol, veh/h 819 371 93 107
Approach Delay, s/veh 0.7 0.3 19.5 19.9
Approach LOS AABB
Timer - Assigned Phs 2468
Phs Duration (G+Y+Rc), s 14.6 40.4 14.6 40.4
Change Period (Y+Rc), s 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s 19.5 25.0 19.5 25.0
Max Q Clear Time (g_c+I1), s 5.6 2.0 4.4 2.0
Green Ext Time (p_c), s 0.2 3.1 0.2 1.3
Intersection Summary
HCM 6th Ctrl Delay 3.3
HCM 6th LOS A
37
Timing Report, Sorted By Phase 2: City Park & Elizabeth
Short Background AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 3
Phase Number 2468
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode None C-Max None C-Max
Maximum Split (s) 25 30 25 30
Maximum Split (%) 45.5% 54.5% 45.5% 54.5%
Minimum Split (s) 22.5 22 24.5 22
Yellow Time (s) 3 3.5 3 3.5
All-Red Time (s) 2.5 1.5 2.5 1.5
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 10 12 10
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 18 43 18 43
End Time (s) 43 18 43 18
Yield/Force Off (s) 37.5 13 37.5 13
Yield/Force Off 170(s) 27.5 3 25.5 3
Local Start Time (s) 0 25 0 25
Local Yield (s) 19.5 50 19.5 50
Local Yield 170(s) 9.5 40 7.5 40
Intersection Summary
Cycle Length 55
Control Type Actuated-Coordinated
Natural Cycle 50
Offset: 18 (33%), Referenced to phase 4:EBTL and 8:WBTL, Start of Red
Splits and Phases: 2: City Park & Elizabeth
38
HCM 6th Signalized Intersection Summary 2: City Park & Elizabeth
short background pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 10 Light Report
Page 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 87 607 90 87 636 94 120 119 86 79 113 78
Future Volume (veh/h) 87 607 90 87 636 94 120 119 86 79 113 78
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.99 0.90 0.98 0.82 0.96 0.92 0.96 0.92
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1796 1870 1870 1796 1870 1945 1796 1870 1945 1796
Adj Flow Rate, veh/h 91 632 65 91 662 81 125 124 28 82 118 37
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 222222222222
Cap, veh/h 391 1827 187 536 1764 215 385 438 99 388 403 126
Arrive On Green 1.00 1.00 1.00 0.19 0.19 0.19 0.29 0.29 0.29 0.29 0.29 0.29
Sat Flow, veh/h 712 3216 330 731 3105 379 1180 1510 341 1183 1388 435
Grp Volume(v), veh/h 91 349 348 91 378 365 125 0 152 82 0 155
Grp Sat Flow(s),veh/h/ln 712 1777 1769 731 1777 1707 1180 0 1851 1183 0 1823
Q Serve(g_s), s 3.3 0.0 0.0 6.3 11.2 11.2 5.5 0.0 3.8 3.5 0.0 4.0
Cycle Q Clear(g_c), s 14.5 0.0 0.0 6.3 11.2 11.2 9.5 0.0 3.8 7.3 0.0 4.0
Prop In Lane 1.00 0.19 1.00 0.22 1.00 0.18 1.00 0.24
Lane Grp Cap(c), veh/h 391 1010 1005 536 1010 970 385 0 537 388 0 529
V/C Ratio(X) 0.23 0.35 0.35 0.17 0.37 0.38 0.32 0.00 0.28 0.21 0.00 0.29
Avail Cap(c_a), veh/h 391 1010 1005 536 1010 970 485 0 694 488 0 684
HCM Platoon Ratio 2.00 2.00 2.00 0.33 0.33 0.33 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.98 0.98 0.98 0.96 0.96 0.96 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 2.4 0.0 0.0 13.1 15.1 15.1 20.2 0.0 16.5 19.3 0.0 16.5
Incr Delay (d2), s/veh 1.4 0.9 0.9 0.7 1.0 1.1 0.5 0.0 0.3 0.3 0.0 0.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.3 0.3 1.1 5.4 5.2 1.5 0.0 1.6 0.9 0.0 1.6
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 3.7 0.9 0.9 13.8 16.1 16.2 20.7 0.0 16.8 19.5 0.0 16.8
LnGrp LOS AAABBBCABBAB
Approach Vol, veh/h 788 834 277 237
Approach Delay, s/veh 1.2 15.9 18.5 17.8
Approach LOS ABBB
Timer - Assigned Phs 2468
Phs Duration (G+Y+Rc), s 21.9 38.1 21.9 38.1
Change Period (Y+Rc), s 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s 21.5 28.0 21.5 28.0
Max Q Clear Time (g_c+I1), s 9.3 16.5 11.5 13.2
Green Ext Time (p_c), s 0.6 2.6 0.7 3.0
Intersection Summary
HCM 6th Ctrl Delay 11.0
HCM 6th LOS B
39
Timing Report, Sorted By Phase 2: City Park & Elizabeth
short background pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 10 Light Report
Page 3
Phase Number 2468
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode None C-Max None C-Max
Maximum Split (s) 27 33 27 33
Maximum Split (%) 45.0% 55.0% 45.0% 55.0%
Minimum Split (s) 22.5 22 24.5 22
Yellow Time (s) 3 3.5 3 3.5
All-Red Time (s) 2.5 1.5 2.5 1.5
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 10 12 10
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 44 11 44 11
End Time (s) 11 44 11 44
Yield/Force Off (s) 5.5 39 5.5 39
Yield/Force Off 170(s) 55.5 29 53.5 29
Local Start Time (s) 5 32 5 32
Local Yield (s) 26.5 0 26.5 0
Local Yield 170(s) 16.5 50 14.5 50
Intersection Summary
Cycle Length 60
Control Type Actuated-Coordinated
Natural Cycle 50
Offset: 39 (65%), Referenced to phase 4:EBTL and 8:WBTL, Start of Yellow
Splits and Phases: 2: City Park & Elizabeth
40
HCM 6th TWSC 3: Shields & University
Short Background AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 5
Intersection
Int Delay, s/veh 1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 57 47 1185 1145 15
Future Vol, veh/h 5 57 47 1185 1145 15
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 120 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 6 67 55 1394 1347 18
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 2163 683 1365 0 - 0
Stage 1 1356 -----
Stage 2 807 -----
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 40 392 499 - - -
Stage 1 205 -----
Stage 2 399 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 36 392 499 - - -
Mov Cap-2 Maneuver 36 -----
Stage 1 182 -----
Stage 2 399 -----
Approach EB NB SB
HCM Control Delay, s 29.6 0.5 0
HCM LOS D
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 499 - 218 - -
HCM Lane V/C Ratio 0.111 - 0.335 - -
HCM Control Delay (s) 13.1 - 29.6 - -
HCM Lane LOS B - D - -
HCM 95th %tile Q(veh) 0.4 - 1.4 - -
41
HCM 6th TWSC 3: Shields & University
short background pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 10 Light Report
Page 5
Intersection
Int Delay, s/veh 5.4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 4 79 129 1740 1601 20
Future Vol, veh/h 4 79 129 1740 1601 20
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 120 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 22222
Mvmt Flow 4 88 143 1933 1779 22
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 3043 901 1801 0 - 0
Stage 1 1790 -----
Stage 2 1253 -----
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 10 281 338 - - -
Stage 1 119 -----
Stage 2 232 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 6 281 338 - - -
Mov Cap-2 Maneuver 6 -----
Stage 1 69 -----
Stage 2 232 -----
Approach EB NB SB
HCM Control Delay, s 196 1.6 0
HCM LOS F
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 338 - 88 - -
HCM Lane V/C Ratio 0.424 - 1.048 - -
HCM Control Delay (s) 23.3 - 196 - -
HCM Lane LOS C - F - -
HCM 95th %tile Q(veh) 2 - 6.2 - -
42
HCM 6th TWSC 4: City Park & University
Short Background AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 6
Intersection
Int Delay, s/veh 3
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 9 29 57 25 34 48
Future Vol, veh/h 9 29 57 25 34 48
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 11 34 67 29 40 56
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 218 82 0 0 96 0
Stage 1 82 -----
Stage 2 136 -----
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 770 978 - - 1498 -
Stage 1 941 -----
Stage 2 890 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 748 978 - - 1498 -
Mov Cap-2 Maneuver 748 -----
Stage 1 941 -----
Stage 2 865 -----
Approach WB NB SB
HCM Control Delay, s 9.2 0 3.1
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 912 1498 -
HCM Lane V/C Ratio - - 0.049 0.027 -
HCM Control Delay (s) - - 9.2 7.5 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0.2 0.1 -
43
HCM 6th TWSC 4: City Park & University
short background pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 10 Light Report
Page 6
Intersection
Int Delay, s/veh 3.9
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 27 96 104 5 45 128
Future Vol, veh/h 27 96 104 5 45 128
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 22222
Mvmt Flow 30 107 116 6 50 142
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 361 119 0 0 122 0
Stage 1 119 -----
Stage 2 242 -----
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 638 933 - - 1465 -
Stage 1 906 -----
Stage 2 798 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 614 933 - - 1465 -
Mov Cap-2 Maneuver 614 -----
Stage 1 906 -----
Stage 2 768 -----
Approach WB NB SB
HCM Control Delay, s 10.1 0 2
HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 837 1465 -
HCM Lane V/C Ratio - - 0.163 0.034 -
HCM Control Delay (s) - - 10.1 7.5 0
HCM Lane LOS - - B A A
HCM 95th %tile Q(veh) - - 0.6 0.1 -
44
APPENDIX E
45
Timing Report, Sorted By Phase 1: Shields & Elizabeth/Moby Lot (Eliz)
Short Background AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 1
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 11 44 15 40 11 44 26 29
Maximum Split (%) 10.0% 40.0% 13.6% 36.4% 10.0% 40.0% 23.6% 26.4%
Minimum Split (s) 11 24.5 11 25.5 11 23.5 11 29
Yellow Time (s) 3 3.5 3 3.5 3 3.5 3.5 3
All-Red Time (s) 12321 1.523
Minimum Initial (s) 4 10 5 7 4 10 5.5 7
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 12 13 10 16
Dual Entry No Yes Yes Yes No Yes Yes Yes
Inhibit Max No No No No No No No No
Start Time (s) 43.5 54.5 98.5 3.5 43.5 54.5 17.5 98.5
End Time (s) 54.5 98.5 3.5 43.5 54.5 98.5 43.5 17.5
Yield/Force Off (s) 50.5 93 107.5 38 50.5 93.5 38 11.5
Yield/Force Off 170(s) 50.5 81 107.5 25 50.5 83.5 38 105.5
Local Start Time (s) 60.5 71.5 5.5 20.5 60.5 71.5 34.5 5.5
Local Yield (s) 67.5 0 14.5 55 67.5 0.5 55 28.5
Local Yield 170(s) 67.5 98 14.5 42 67.5 100.5 55 12.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 110
Offset: 93 (85%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 1: Shields & Elizabeth/Moby Lot (Eliz)
46
HCM 6th Signalized Intersection Summary 1: Shields & Elizabeth/Moby Lot (Eliz)
Short Background AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 355 63 341 23 11 7 150 920 120 5 791 149
Future Volume (veh/h) 355 63 341 23 11 7 150 920 120 5 791 149
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.92 1.00 0.96 1.00 0.95 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1683 1683 1683 1683 1683 1683 1683 1683 1616 1683 1683 1683
Adj Flow Rate, veh/h 418 74 150 27 13 1 176 1082 30 6 931 53
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 222222222222
Cap, veh/h 481 551 428 87 327 266 305 1423 39 145 1251 555
Arrive On Green 0.19 0.33 0.33 0.05 0.19 0.19 0.02 0.15 0.15 0.03 0.78 0.78
Sat Flow, veh/h 2565 1683 1309 1603 1683 1369 1603 3174 88 1603 3198 1419
Grp Volume(v), veh/h 418 74 150 27 13 1 176 545 567 6 931 53
Grp Sat Flow(s),veh/h/ln 1283 1683 1309 1603 1683 1369 1603 1599 1662 1603 1599 1419
Q Serve(g_s), s 17.4 3.4 9.6 1.8 0.7 0.1 6.8 36.0 36.0 0.2 16.7 1.0
Cycle Q Clear(g_c), s 17.4 3.4 9.6 1.8 0.7 0.1 6.8 36.0 36.0 0.2 16.7 1.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.05 1.00 1.00
Lane Grp Cap(c), veh/h 481 551 428 87 327 266 305 717 746 145 1251 555
V/C Ratio(X) 0.87 0.13 0.35 0.31 0.04 0.00 0.58 0.76 0.76 0.04 0.74 0.10
Avail Cap(c_a), veh/h 501 551 428 146 367 299 305 717 746 237 1251 555
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 0.33 0.33 0.33 2.00 2.00 2.00
Upstream Filter(I) 0.93 0.93 0.93 1.00 1.00 1.00 1.00 1.00 1.00 0.91 0.91 0.91
Uniform Delay (d), s/veh 43.4 26.0 28.1 50.0 36.0 22.7 20.0 41.2 41.2 23.2 9.1 7.4
Incr Delay (d2), s/veh 13.9 0.1 0.5 2.0 0.0 0.0 2.7 7.4 7.2 0.1 3.7 0.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 6.4 1.4 3.1 0.8 0.3 0.0 2.9 16.9 17.5 0.1 3.6 0.4
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 57.3 26.1 28.6 52.0 36.0 22.7 22.7 48.6 48.4 23.3 12.8 7.7
LnGrp LOS E CCDDCCDDCBA
Approach Vol, veh/h 642 41 1288 990
Approach Delay, s/veh 47.0 46.2 45.0 12.6
Approach LOS D D D B
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 11.0 47.5 11.0 40.5 4.7 53.8 25.1 26.4
Change Period (Y+Rc), s 4.0 5.5 6.0 5.5 4.0 * 5.5 5.5 6.0
Max Green Setting (Gmax), s 7.0 38.5 9.0 34.5 7.0 * 39 20.5 23.0
Max Q Clear Time (g_c+I1), s 8.8 18.7 3.8 11.6 2.2 38.0 19.4 2.7
Green Ext Time (p_c), s 0.0 4.1 0.0 0.8 0.0 0.5 0.2 0.0
Intersection Summary
HCM 6th Ctrl Delay 34.6
HCM 6th LOS C
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
47
Timing Report, Sorted By Phase 2: City Park & Elizabeth
Short Background AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 3
Phase Number 2468
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode None C-Max None C-Max
Maximum Split (s) 25 30 25 30
Maximum Split (%) 45.5% 54.5% 45.5% 54.5%
Minimum Split (s) 22.5 22 24.5 22
Yellow Time (s) 3 3.5 3 3.5
All-Red Time (s) 2.5 1.5 2.5 1.5
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 10 12 10
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 18 43 18 43
End Time (s) 43 18 43 18
Yield/Force Off (s) 37.5 13 37.5 13
Yield/Force Off 170(s) 27.5 3 25.5 3
Local Start Time (s) 0 25 0 25
Local Yield (s) 19.5 50 19.5 50
Local Yield 170(s) 9.5 40 7.5 40
Intersection Summary
Cycle Length 55
Control Type Actuated-Coordinated
Natural Cycle 50
Offset: 18 (33%), Referenced to phase 4:EBTL and 8:WBTL, Start of Red
Splits and Phases: 2: City Park & Elizabeth
48
HCM 6th Signalized Intersection Summary 2: City Park & Elizabeth
Short Background AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 55 591 96 25 268 54 30 46 64 51 42 26
Future Volume (veh/h) 55 591 96 25 268 54 30 46 64 51 42 26
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.97 0.84 0.99 0.93 0.98 0.92 0.98 0.95
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1796 1870 1870 1796 1870 1945 1796 1870 1945 1796
Adj Flow Rate, veh/h 62 664 93 28 301 42 34 52 7 57 47 3
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89
Percent Heavy Veh, % 222222222222
Cap, veh/h 800 2019 282 593 2057 283 345 304 41 338 331 21
Arrive On Green 1.00 1.00 1.00 1.00 1.00 1.00 0.18 0.18 0.18 0.18 0.18 0.18
Sat Flow, veh/h 1011 3050 426 697 3107 427 1328 1659 223 1318 1802 115
Grp Volume(v), veh/h 62 386 371 28 170 173 34 0 59 57 0 50
Grp Sat Flow(s),veh/h/ln 1011 1777 1699 697 1777 1757 1328 0 1882 1318 0 1918
Q Serve(g_s), s 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 1.5 2.1 0.0 1.2
Cycle Q Clear(g_c), s 0.0 0.0 0.0 0.0 0.0 0.0 2.4 0.0 1.5 3.6 0.0 1.2
Prop In Lane 1.00 0.25 1.00 0.24 1.00 0.12 1.00 0.06
Lane Grp Cap(c), veh/h 800 1176 1125 593 1176 1164 345 0 345 338 0 352
V/C Ratio(X) 0.08 0.33 0.33 0.05 0.14 0.15 0.10 0.00 0.17 0.17 0.00 0.14
Avail Cap(c_a), veh/h 800 1176 1125 593 1176 1164 597 0 702 587 0 715
HCM Platoon Ratio 2.00 2.00 2.00 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.99 0.99 0.99 0.99 0.99 0.99 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 19.8 0.0 18.9 20.4 0.0 18.8
Incr Delay (d2), s/veh 0.2 0.7 0.8 0.1 0.3 0.3 0.1 0.0 0.2 0.2 0.0 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.0 0.2 0.2 0.0 0.1 0.1 0.4 0.0 0.6 0.6 0.0 0.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.2 0.7 0.8 0.1 0.3 0.3 20.0 0.0 19.2 20.7 0.0 19.0
LnGrp LOS AAAAAABABCAB
Approach Vol, veh/h 819 371 93 107
Approach Delay, s/veh 0.7 0.3 19.5 19.9
Approach LOS AABB
Timer - Assigned Phs 2468
Phs Duration (G+Y+Rc), s 14.6 40.4 14.6 40.4
Change Period (Y+Rc), s 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s 19.5 25.0 19.5 25.0
Max Q Clear Time (g_c+I1), s 5.6 2.0 4.4 2.0
Green Ext Time (p_c), s 0.2 3.1 0.2 1.3
Intersection Summary
HCM 6th Ctrl Delay 3.3
HCM 6th LOS A
49
HCM 6th TWSC 3: Shields & University
Short Background AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 5
Intersection
Int Delay, s/veh 1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 57 47 1185 1145 15
Future Vol, veh/h 5 57 47 1185 1145 15
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 120 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 6 67 55 1394 1347 18
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 2163 683 1365 0 - 0
Stage 1 1356 -----
Stage 2 807 -----
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 40 392 499 - - -
Stage 1 205 -----
Stage 2 399 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 36 392 499 - - -
Mov Cap-2 Maneuver 36 -----
Stage 1 182 -----
Stage 2 399 -----
Approach EB NB SB
HCM Control Delay, s 29.6 0.5 0
HCM LOS D
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 499 - 218 - -
HCM Lane V/C Ratio 0.111 - 0.335 - -
HCM Control Delay (s) 13.1 - 29.6 - -
HCM Lane LOS B - D - -
HCM 95th %tile Q(veh) 0.4 - 1.4 - -
50
HCM 6th TWSC 4: City Park & University
Short Background AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 6
Intersection
Int Delay, s/veh 3
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 9 29 57 25 34 48
Future Vol, veh/h 9 29 57 25 34 48
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 11 34 67 29 40 56
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 218 82 0 0 96 0
Stage 1 82 -----
Stage 2 136 -----
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 770 978 - - 1498 -
Stage 1 941 -----
Stage 2 890 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 748 978 - - 1498 -
Mov Cap-2 Maneuver 748 -----
Stage 1 941 -----
Stage 2 865 -----
Approach WB NB SB
HCM Control Delay, s 9.2 0 3.1
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 912 1498 -
HCM Lane V/C Ratio - - 0.049 0.027 -
HCM Control Delay (s) - - 9.2 7.5 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0.2 0.1 -
51
Timing Report, Sorted By Phase 1: Shields & Elizabeth/Moby Lot (Eliz)
Short Background AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 1
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 11 44 15 40 11 44 26 29
Maximum Split (%) 10.0% 40.0% 13.6% 36.4% 10.0% 40.0% 23.6% 26.4%
Minimum Split (s) 11 24.5 11 25.5 11 23.5 11 29
Yellow Time (s) 3 3.5 3 3.5 3 3.5 3.5 3
All-Red Time (s) 12321 1.523
Minimum Initial (s) 4 10 5 7 4 10 5.5 7
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 12 13 10 16
Dual Entry No Yes Yes Yes No Yes Yes Yes
Inhibit Max No No No No No No No No
Start Time (s) 43.5 54.5 98.5 3.5 43.5 54.5 17.5 98.5
End Time (s) 54.5 98.5 3.5 43.5 54.5 98.5 43.5 17.5
Yield/Force Off (s) 50.5 93 107.5 38 50.5 93.5 38 11.5
Yield/Force Off 170(s) 50.5 81 107.5 25 50.5 83.5 38 105.5
Local Start Time (s) 60.5 71.5 5.5 20.5 60.5 71.5 34.5 5.5
Local Yield (s) 67.5 0 14.5 55 67.5 0.5 55 28.5
Local Yield 170(s) 67.5 98 14.5 42 67.5 100.5 55 12.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 110
Offset: 93 (85%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 1: Shields & Elizabeth/Moby Lot (Eliz)
52
HCM 6th Signalized Intersection Summary 1: Shields & Elizabeth/Moby Lot (Eliz)
Short Background AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 355 63 341 23 11 7 150 920 120 5 791 149
Future Volume (veh/h) 355 63 341 23 11 7 150 920 120 5 791 149
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.92 1.00 0.96 1.00 0.95 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1683 1683 1683 1683 1683 1683 1683 1683 1616 1683 1683 1683
Adj Flow Rate, veh/h 418 74 150 27 13 1 176 1082 30 6 931 53
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 222222222222
Cap, veh/h 481 551 428 87 327 266 305 1423 39 145 1251 555
Arrive On Green 0.19 0.33 0.33 0.05 0.19 0.19 0.02 0.15 0.15 0.03 0.78 0.78
Sat Flow, veh/h 2565 1683 1309 1603 1683 1369 1603 3174 88 1603 3198 1419
Grp Volume(v), veh/h 418 74 150 27 13 1 176 545 567 6 931 53
Grp Sat Flow(s),veh/h/ln 1283 1683 1309 1603 1683 1369 1603 1599 1662 1603 1599 1419
Q Serve(g_s), s 17.4 3.4 9.6 1.8 0.7 0.1 6.8 36.0 36.0 0.2 16.7 1.0
Cycle Q Clear(g_c), s 17.4 3.4 9.6 1.8 0.7 0.1 6.8 36.0 36.0 0.2 16.7 1.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.05 1.00 1.00
Lane Grp Cap(c), veh/h 481 551 428 87 327 266 305 717 746 145 1251 555
V/C Ratio(X) 0.87 0.13 0.35 0.31 0.04 0.00 0.58 0.76 0.76 0.04 0.74 0.10
Avail Cap(c_a), veh/h 501 551 428 146 367 299 305 717 746 237 1251 555
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 0.33 0.33 0.33 2.00 2.00 2.00
Upstream Filter(I) 0.93 0.93 0.93 1.00 1.00 1.00 1.00 1.00 1.00 0.91 0.91 0.91
Uniform Delay (d), s/veh 43.4 26.0 28.1 50.0 36.0 22.7 20.0 41.2 41.2 23.2 9.1 7.4
Incr Delay (d2), s/veh 13.9 0.1 0.5 2.0 0.0 0.0 2.7 7.4 7.2 0.1 3.7 0.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 6.4 1.4 3.1 0.8 0.3 0.0 2.9 16.9 17.5 0.1 3.6 0.4
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 57.3 26.1 28.6 52.0 36.0 22.7 22.7 48.6 48.4 23.3 12.8 7.7
LnGrp LOS E CCDDCCDDCBA
Approach Vol, veh/h 642 41 1288 990
Approach Delay, s/veh 47.0 46.2 45.0 12.6
Approach LOS D D D B
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 11.0 47.5 11.0 40.5 4.7 53.8 25.1 26.4
Change Period (Y+Rc), s 4.0 5.5 6.0 5.5 4.0 * 5.5 5.5 6.0
Max Green Setting (Gmax), s 7.0 38.5 9.0 34.5 7.0 * 39 20.5 23.0
Max Q Clear Time (g_c+I1), s 8.8 18.7 3.8 11.6 2.2 38.0 19.4 2.7
Green Ext Time (p_c), s 0.0 4.1 0.0 0.8 0.0 0.5 0.2 0.0
Intersection Summary
HCM 6th Ctrl Delay 34.6
HCM 6th LOS C
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
53
Timing Report, Sorted By Phase 2: City Park & Elizabeth
Short Background AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 3
Phase Number 2468
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode None C-Max None C-Max
Maximum Split (s) 25 30 25 30
Maximum Split (%) 45.5% 54.5% 45.5% 54.5%
Minimum Split (s) 22.5 22 24.5 22
Yellow Time (s) 3 3.5 3 3.5
All-Red Time (s) 2.5 1.5 2.5 1.5
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 10 12 10
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 18 43 18 43
End Time (s) 43 18 43 18
Yield/Force Off (s) 37.5 13 37.5 13
Yield/Force Off 170(s) 27.5 3 25.5 3
Local Start Time (s) 0 25 0 25
Local Yield (s) 19.5 50 19.5 50
Local Yield 170(s) 9.5 40 7.5 40
Intersection Summary
Cycle Length 55
Control Type Actuated-Coordinated
Natural Cycle 50
Offset: 18 (33%), Referenced to phase 4:EBTL and 8:WBTL, Start of Red
Splits and Phases: 2: City Park & Elizabeth
54
HCM 6th Signalized Intersection Summary 2: City Park & Elizabeth
Short Background AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 55 591 96 25 268 54 30 46 64 51 42 26
Future Volume (veh/h) 55 591 96 25 268 54 30 46 64 51 42 26
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.97 0.84 0.99 0.93 0.98 0.92 0.98 0.95
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1796 1870 1870 1796 1870 1945 1796 1870 1945 1796
Adj Flow Rate, veh/h 62 664 93 28 301 42 34 52 7 57 47 3
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89
Percent Heavy Veh, % 222222222222
Cap, veh/h 800 2019 282 593 2057 283 345 304 41 338 331 21
Arrive On Green 1.00 1.00 1.00 1.00 1.00 1.00 0.18 0.18 0.18 0.18 0.18 0.18
Sat Flow, veh/h 1011 3050 426 697 3107 427 1328 1659 223 1318 1802 115
Grp Volume(v), veh/h 62 386 371 28 170 173 34 0 59 57 0 50
Grp Sat Flow(s),veh/h/ln 1011 1777 1699 697 1777 1757 1328 0 1882 1318 0 1918
Q Serve(g_s), s 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 1.5 2.1 0.0 1.2
Cycle Q Clear(g_c), s 0.0 0.0 0.0 0.0 0.0 0.0 2.4 0.0 1.5 3.6 0.0 1.2
Prop In Lane 1.00 0.25 1.00 0.24 1.00 0.12 1.00 0.06
Lane Grp Cap(c), veh/h 800 1176 1125 593 1176 1164 345 0 345 338 0 352
V/C Ratio(X) 0.08 0.33 0.33 0.05 0.14 0.15 0.10 0.00 0.17 0.17 0.00 0.14
Avail Cap(c_a), veh/h 800 1176 1125 593 1176 1164 597 0 702 587 0 715
HCM Platoon Ratio 2.00 2.00 2.00 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.99 0.99 0.99 0.99 0.99 0.99 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 19.8 0.0 18.9 20.4 0.0 18.8
Incr Delay (d2), s/veh 0.2 0.7 0.8 0.1 0.3 0.3 0.1 0.0 0.2 0.2 0.0 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.0 0.2 0.2 0.0 0.1 0.1 0.4 0.0 0.6 0.6 0.0 0.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.2 0.7 0.8 0.1 0.3 0.3 20.0 0.0 19.2 20.7 0.0 19.0
LnGrp LOS AAAAAABABCAB
Approach Vol, veh/h 819 371 93 107
Approach Delay, s/veh 0.7 0.3 19.5 19.9
Approach LOS AABB
Timer - Assigned Phs 2468
Phs Duration (G+Y+Rc), s 14.6 40.4 14.6 40.4
Change Period (Y+Rc), s 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s 19.5 25.0 19.5 25.0
Max Q Clear Time (g_c+I1), s 5.6 2.0 4.4 2.0
Green Ext Time (p_c), s 0.2 3.1 0.2 1.3
Intersection Summary
HCM 6th Ctrl Delay 3.3
HCM 6th LOS A
55
HCM 6th TWSC 3: Shields & University
Short Background AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 5
Intersection
Int Delay, s/veh 1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 57 47 1185 1145 15
Future Vol, veh/h 5 57 47 1185 1145 15
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 120 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 6 67 55 1394 1347 18
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 2163 683 1365 0 - 0
Stage 1 1356 -----
Stage 2 807 -----
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 40 392 499 - - -
Stage 1 205 -----
Stage 2 399 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 36 392 499 - - -
Mov Cap-2 Maneuver 36 -----
Stage 1 182 -----
Stage 2 399 -----
Approach EB NB SB
HCM Control Delay, s 29.6 0.5 0
HCM LOS D
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 499 - 218 - -
HCM Lane V/C Ratio 0.111 - 0.335 - -
HCM Control Delay (s) 13.1 - 29.6 - -
HCM Lane LOS B - D - -
HCM 95th %tile Q(veh) 0.4 - 1.4 - -
56
HCM 6th TWSC 4: City Park & University
Short Background AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 6
Intersection
Int Delay, s/veh 3
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 9 29 57 25 34 48
Future Vol, veh/h 9 29 57 25 34 48
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 11 34 67 29 40 56
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 218 82 0 0 96 0
Stage 1 82 -----
Stage 2 136 -----
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 770 978 - - 1498 -
Stage 1 941 -----
Stage 2 890 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 748 978 - - 1498 -
Mov Cap-2 Maneuver 748 -----
Stage 1 941 -----
Stage 2 865 -----
Approach WB NB SB
HCM Control Delay, s 9.2 0 3.1
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 912 1498 -
HCM Lane V/C Ratio - - 0.049 0.027 -
HCM Control Delay (s) - - 9.2 7.5 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0.2 0.1 -
57
APPENDIX F
58
HCM 6th Signalized Intersection Summary 1: Shields & Elizabeth/Moby Lot (Eliz)
Short Total AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 380 63 341 23 11 7 150 922 120 5 812 149
Future Volume (veh/h) 380 63 341 23 11 7 150 922 120 5 812 149
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.92 1.00 1.00 1.00 0.95 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1683 1683 1683 1683 1683 1683 1683 1683 1616 1683 1683 1683
Adj Flow Rate, veh/h 447 74 150 27 13 0 176 1085 134 6 955 66
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 222222222222
Cap, veh/h 501 564 440 87 327 277 286 1254 155 118 1225 543
Arrive On Green 0.20 0.34 0.34 0.05 0.19 0.00 0.02 0.15 0.15 0.03 0.77 0.77
Sat Flow, veh/h 2565 1683 1312 1603 1683 1427 1603 2848 351 1603 3198 1419
Grp Volume(v), veh/h 447 74 150 27 13 0 176 608 611 6 955 66
Grp Sat Flow(s),veh/h/ln 1283 1683 1312 1603 1683 1427 1603 1599 1600 1603 1599 1419
Q Serve(g_s), s 18.7 3.4 9.4 1.8 0.7 0.0 6.9 40.9 41.1 0.2 19.1 1.3
Cycle Q Clear(g_c), s 18.7 3.4 9.4 1.8 0.7 0.0 6.9 40.9 41.1 0.2 19.1 1.3
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.22 1.00 1.00
Lane Grp Cap(c), veh/h 501 564 440 87 327 277 286 704 705 118 1225 543
V/C Ratio(X) 0.89 0.13 0.34 0.31 0.04 0.00 0.62 0.86 0.87 0.05 0.78 0.12
Avail Cap(c_a), veh/h 501 564 440 146 367 311 286 704 705 210 1225 543
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 0.33 0.33 0.33 2.00 2.00 2.00
Upstream Filter(I) 0.93 0.93 0.93 1.00 1.00 0.00 1.00 1.00 1.00 0.91 0.91 0.91
Uniform Delay (d), s/veh 43.1 25.4 27.4 50.0 36.0 0.0 21.3 43.8 43.8 25.2 10.2 8.1
Incr Delay (d2), s/veh 16.9 0.1 0.4 2.0 0.0 0.0 3.9 13.3 13.5 0.2 4.5 0.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 7.0 1.4 3.0 0.8 0.3 0.0 3.1 20.1 20.2 0.1 4.0 0.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 60.0 25.5 27.9 52.0 36.0 0.0 25.2 57.1 57.4 25.3 14.7 8.5
LnGrp LOS E CCDDACEECBA
Approach Vol, veh/h 671 40 1395 1027
Approach Delay, s/veh 49.0 46.8 53.2 14.4
Approach LOS D D D B
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 11.0 46.6 11.0 41.4 4.7 53.0 26.0 26.4
Change Period (Y+Rc), s 4.0 5.5 6.0 5.5 4.0 * 5.5 5.5 6.0
Max Green Setting (Gmax), s 7.0 38.5 9.0 34.5 7.0 * 39 20.5 23.0
Max Q Clear Time (g_c+I1), s 8.9 21.1 3.8 11.4 2.2 43.1 20.7 2.7
Green Ext Time (p_c), s 0.0 4.1 0.0 0.8 0.0 0.0 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 39.5
HCM 6th LOS D
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
59
Timing Report, Sorted By Phase 1: Shields & Elizabeth/Moby Lot (Eliz)
Short Total AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 1
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 11 44 15 40 11 44 26 29
Maximum Split (%) 10.0% 40.0% 13.6% 36.4% 10.0% 40.0% 23.6% 26.4%
Minimum Split (s) 11 24.5 11 25.5 11 23.5 11 29
Yellow Time (s) 3 3.5 3 3.5 3 3.5 3.5 3
All-Red Time (s) 12321 1.523
Minimum Initial (s) 4 10 5 7 4 10 5.5 7
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 12 13 10 16
Dual Entry No Yes Yes Yes No Yes Yes Yes
Inhibit Max No No No No No No No No
Start Time (s) 43.5 54.5 98.5 3.5 43.5 54.5 17.5 98.5
End Time (s) 54.5 98.5 3.5 43.5 54.5 98.5 43.5 17.5
Yield/Force Off (s) 50.5 93 107.5 38 50.5 93.5 38 11.5
Yield/Force Off 170(s) 50.5 81 107.5 25 50.5 83.5 38 105.5
Local Start Time (s) 60.5 71.5 5.5 20.5 60.5 71.5 34.5 5.5
Local Yield (s) 67.5 0 14.5 55 67.5 0.5 55 28.5
Local Yield 170(s) 67.5 98 14.5 42 67.5 100.5 55 12.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 120
Offset: 93 (85%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 1: Shields & Elizabeth/Moby Lot (Eliz)
60
HCM 6th Signalized Intersection Summary 1: Shields & Elizabeth/Moby Lot (Eliz)
short total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 10 Light Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 378 43 405 90 64 11 401 1275 70 6 1189 431
Future Volume (veh/h) 378 43 405 90 64 11 401 1275 70 6 1189 431
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.86 1.00 1.00 1.00 0.96 1.00 0.97
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1683 1683 1683 1683 1683 1683 1683 1683 1616 1683 1683 1683
Adj Flow Rate, veh/h 406 46 226 97 69 0 431 1371 72 6 1278 154
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 222222222222
Cap, veh/h 395 417 305 134 298 252 300 1581 83 123 1206 525
Arrive On Green 0.15 0.25 0.25 0.08 0.18 0.00 0.15 0.51 0.51 0.03 0.75 0.75
Sat Flow, veh/h 2565 1683 1230 1603 1683 1427 1603 3083 161 1603 3198 1391
Grp Volume(v), veh/h 406 46 226 97 69 0 431 709 734 6 1278 154
Grp Sat Flow(s),veh/h/ln 1283 1683 1230 1603 1683 1427 1603 1599 1645 1603 1599 1391
Q Serve(g_s), s 18.5 2.5 20.3 7.1 4.2 0.0 18.0 46.6 47.0 0.3 45.3 4.2
Cycle Q Clear(g_c), s 18.5 2.5 20.3 7.1 4.2 0.0 18.0 46.6 47.0 0.3 45.3 4.2
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.10 1.00 1.00
Lane Grp Cap(c), veh/h 395 417 305 134 298 252 300 820 844 123 1206 525
V/C Ratio(X) 1.03 0.11 0.74 0.73 0.23 0.00 1.43 0.86 0.87 0.05 1.06 0.29
Avail Cap(c_a), veh/h 395 442 323 134 323 273 300 820 844 207 1206 525
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
Upstream Filter(I) 0.96 0.96 0.96 1.00 1.00 0.00 1.00 1.00 1.00 0.68 0.68 0.68
Uniform Delay (d), s/veh 50.8 34.9 41.6 53.7 42.4 0.0 38.3 25.6 25.7 25.9 14.7 9.7
Incr Delay (d2), s/veh 51.3 0.1 8.1 17.8 0.4 0.0 213.6 11.8 11.8 0.1 39.1 1.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 8.7 1.1 6.9 3.5 1.8 0.0 26.8 19.7 20.5 0.1 12.5 1.3
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 102.1 35.0 49.7 71.5 42.8 0.0 251.9 37.4 37.5 26.0 53.8 10.7
LnGrp LOS F D D E D A F D D C F B
Approach Vol, veh/h 678 166 1874 1438
Approach Delay, s/veh 80.1 59.5 86.8 49.1
Approach LOS F E F D
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 21.0 49.8 15.0 34.2 4.7 66.0 23.0 26.2
Change Period (Y+Rc), s 4.0 5.5 6.0 5.5 4.0 * 5.5 5.5 6.0
Max Green Setting (Gmax), s 17.0 42.5 9.0 30.5 7.0 * 53 17.5 22.0
Max Q Clear Time (g_c+I1), s 20.0 47.3 9.1 22.3 2.3 49.0 20.5 6.2
Green Ext Time (p_c), s 0.0 0.0 0.0 0.7 0.0 2.3 0.0 0.1
Intersection Summary
HCM 6th Ctrl Delay 71.5
HCM 6th LOS E
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
61
Timing Report, Sorted By Phase 1: Shields & Elizabeth/Moby Lot (Eliz)
short total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 10 Light Report
Page 1
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 21 48 15 36 11 58 23 28
Maximum Split (%) 17.5% 40.0% 12.5% 30.0% 9.2% 48.3% 19.2% 23.3%
Minimum Split (s) 11 24.5 11 23.5 11 23.5 11 27
Yellow Time (s) 3 3.5 3 3.5 3 3.5 3.5 3
All-Red Time (s) 12321 1.523
Minimum Initial (s) 4 10 5 7 4 10 5.5 7
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7575
Flash Dont Walk (s) 12 13 10 16
Dual Entry No Yes Yes Yes No Yes Yes Yes
Inhibit Max No No No No No No No No
Start Time (s) 92.5 113.5 41.5 56.5 92.5 103.5 69.5 41.5
End Time (s) 113.5 41.5 56.5 92.5 103.5 41.5 92.5 69.5
Yield/Force Off (s) 109.5 36 50.5 87 99.5 36.5 87 63.5
Yield/Force Off 170(s) 109.5 24 50.5 74 99.5 26.5 87 47.5
Local Start Time (s) 56.5 77.5 5.5 20.5 56.5 67.5 33.5 5.5
Local Yield (s) 73.5 0 14.5 51 63.5 0.5 51 27.5
Local Yield 170(s) 73.5 108 14.5 38 63.5 110.5 51 11.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 150
Offset: 36 (30%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 1: Shields & Elizabeth/Moby Lot (Eliz)
62
HCM 6th Signalized Intersection Summary 2: City Park & Elizabeth
Short Total AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 55 591 130 25 268 54 74 58 87 51 52 26
Future Volume (veh/h) 55 591 130 25 268 54 74 58 87 51 52 26
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.97 0.84 0.99 0.93 0.98 0.92 0.98 0.95
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1796 1870 1870 1796 1870 1945 1796 1870 1945 1796
Adj Flow Rate, veh/h 62 664 124 28 301 41 83 65 11 57 58 3
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89
Percent Heavy Veh, % 222222222222
Cap, veh/h 797 1905 355 577 2054 276 342 299 51 329 341 18
Arrive On Green 1.00 1.00 1.00 1.00 1.00 1.00 0.19 0.19 0.19 0.19 0.19 0.19
Sat Flow, veh/h 1012 2892 539 678 3118 419 1316 1599 271 1299 1828 95
Grp Volume(v), veh/h 62 407 381 28 170 172 83 0 76 57 0 61
Grp Sat Flow(s),veh/h/ln 1012 1777 1654 678 1777 1760 1316 0 1869 1299 0 1923
Q Serve(g_s), s 0.0 0.0 0.0 0.0 0.0 0.0 3.1 0.0 1.9 2.1 0.0 1.5
Cycle Q Clear(g_c), s 0.0 0.0 0.0 0.0 0.0 0.0 4.6 0.0 1.9 4.0 0.0 1.5
Prop In Lane 1.00 0.33 1.00 0.24 1.00 0.14 1.00 0.05
Lane Grp Cap(c), veh/h 797 1170 1089 577 1170 1159 342 0 349 329 0 359
V/C Ratio(X) 0.08 0.35 0.35 0.05 0.14 0.15 0.24 0.00 0.22 0.17 0.00 0.17
Avail Cap(c_a), veh/h 797 1170 1089 577 1170 1159 586 0 697 570 0 717
HCM Platoon Ratio 2.00 2.00 2.00 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.99 0.99 0.99 0.99 0.99 0.99 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 20.7 0.0 19.0 20.7 0.0 18.8
Incr Delay (d2), s/veh 0.2 0.8 0.9 0.2 0.3 0.3 0.4 0.0 0.3 0.2 0.0 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.0 0.3 0.3 0.0 0.1 0.1 0.9 0.0 0.8 0.6 0.0 0.6
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.2 0.8 0.9 0.2 0.3 0.3 21.1 0.0 19.3 20.9 0.0 19.0
LnGrp LOS AAAAAACABCAB
Approach Vol, veh/h 850 370 159 118
Approach Delay, s/veh 0.8 0.3 20.2 19.9
Approach LOS A A C B
Timer - Assigned Phs 2468
Phs Duration (G+Y+Rc), s 14.8 40.2 14.8 40.2
Change Period (Y+Rc), s 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s 19.5 25.0 19.5 25.0
Max Q Clear Time (g_c+I1), s 6.0 2.0 6.6 2.0
Green Ext Time (p_c), s 0.3 3.2 0.4 1.3
Intersection Summary
HCM 6th Ctrl Delay 4.2
HCM 6th LOS A
63
Timing Report, Sorted By Phase 2: City Park & Elizabeth
Short Total AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 3
Phase Number 2468
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode None C-Max None C-Max
Maximum Split (s) 25 30 25 30
Maximum Split (%) 45.5% 54.5% 45.5% 54.5%
Minimum Split (s) 22.5 22 24.5 22
Yellow Time (s) 3 3.5 3 3.5
All-Red Time (s) 2.5 1.5 2.5 1.5
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 10 12 10
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 18 43 18 43
End Time (s) 43 18 43 18
Yield/Force Off (s) 37.5 13 37.5 13
Yield/Force Off 170(s) 27.5 3 25.5 3
Local Start Time (s) 0 25 0 25
Local Yield (s) 19.5 50 19.5 50
Local Yield 170(s) 9.5 40 7.5 40
Intersection Summary
Cycle Length 55
Control Type Actuated-Coordinated
Natural Cycle 50
Offset: 18 (33%), Referenced to phase 4:EBTL and 8:WBTL, Start of Red
Splits and Phases: 2: City Park & Elizabeth
64
HCM 6th Signalized Intersection Summary 2: City Park & Elizabeth
short total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 10 Light Report
Page 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 87 607 145 87 636 94 175 133 115 79 127 78
Future Volume (veh/h) 87 607 145 87 636 94 175 133 115 79 127 78
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.99 0.90 0.98 0.82 0.96 0.93 0.96 0.93
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1796 1870 1870 1796 1870 1945 1796 1870 1945 1796
Adj Flow Rate, veh/h 91 632 122 91 662 81 182 139 58 82 132 37
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 222222222222
Cap, veh/h 375 1595 307 500 1698 207 402 395 165 378 445 125
Arrive On Green 1.00 1.00 1.00 0.18 0.18 0.18 0.31 0.31 0.31 0.31 0.31 0.31
Sat Flow, veh/h 712 2912 561 694 3102 378 1171 1271 530 1143 1433 402
Grp Volume(v), veh/h 91 385 369 91 378 365 182 0 197 82 0 169
Grp Sat Flow(s),veh/h/ln 712 1777 1696 694 1777 1704 1171 0 1801 1143 0 1835
Q Serve(g_s), s 3.5 0.0 0.0 6.7 11.3 11.3 8.4 0.0 5.1 3.6 0.0 4.2
Cycle Q Clear(g_c), s 14.8 0.0 0.0 6.7 11.3 11.3 12.6 0.0 5.1 8.7 0.0 4.2
Prop In Lane 1.00 0.33 1.00 0.22 1.00 0.29 1.00 0.22
Lane Grp Cap(c), veh/h 375 973 929 500 973 933 402 0 560 378 0 570
V/C Ratio(X) 0.24 0.40 0.40 0.18 0.39 0.39 0.45 0.00 0.35 0.22 0.00 0.30
Avail Cap(c_a), veh/h 375 973 929 500 973 933 477 0 675 452 0 688
HCM Platoon Ratio 2.00 2.00 2.00 0.33 0.33 0.33 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.98 0.98 0.98 0.96 0.96 0.96 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 2.5 0.0 0.0 13.9 15.7 15.8 20.5 0.0 16.0 19.4 0.0 15.7
Incr Delay (d2), s/veh 1.5 1.2 1.2 0.8 1.1 1.2 0.8 0.0 0.4 0.3 0.0 0.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.3 0.3 1.1 5.5 5.3 2.2 0.0 2.0 0.9 0.0 1.7
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 4.0 1.2 1.2 14.6 16.9 16.9 21.3 0.0 16.4 19.6 0.0 16.0
LnGrp LOS AAABBBCABBAB
Approach Vol, veh/h 845 834 379 251
Approach Delay, s/veh 1.5 16.7 18.7 17.2
Approach LOS ABBB
Timer - Assigned Phs 2468
Phs Duration (G+Y+Rc), s 23.1 36.9 23.1 36.9
Change Period (Y+Rc), s 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s 21.5 28.0 21.5 28.0
Max Q Clear Time (g_c+I1), s 10.7 16.8 14.6 13.3
Green Ext Time (p_c), s 0.7 2.8 0.9 3.1
Intersection Summary
HCM 6th Ctrl Delay 11.5
HCM 6th LOS B
65
Timing Report, Sorted By Phase 2: City Park & Elizabeth
short total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 10 Light Report
Page 3
Phase Number 2468
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode None C-Max None C-Max
Maximum Split (s) 27 33 27 33
Maximum Split (%) 45.0% 55.0% 45.0% 55.0%
Minimum Split (s) 22.5 22 24.5 22
Yellow Time (s) 3 3.5 3 3.5
All-Red Time (s) 2.5 1.5 2.5 1.5
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 10 12 10
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 44 11 44 11
End Time (s) 11 44 11 44
Yield/Force Off (s) 5.5 39 5.5 39
Yield/Force Off 170(s) 55.5 29 53.5 29
Local Start Time (s) 5 32 5 32
Local Yield (s) 26.5 0 26.5 0
Local Yield 170(s) 16.5 50 14.5 50
Intersection Summary
Cycle Length 60
Control Type Actuated-Coordinated
Natural Cycle 50
Offset: 39 (65%), Referenced to phase 4:EBTL and 8:WBTL, Start of Yellow
Splits and Phases: 2: City Park & Elizabeth
66
HCM 6th TWSC 3: Shields & University
Short Total AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 5
Intersection
Int Delay, s/veh 2.2
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 6 103 81 1185 1145 34
Future Vol, veh/h 6 103 81 1185 1145 34
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 120 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 7 121 95 1394 1347 40
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 2254 694 1387 0 - 0
Stage 1 1367 -----
Stage 2 887 -----
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 35 385 490 - - -
Stage 1 202 -----
Stage 2 363 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 28 385 490 - - -
Mov Cap-2 Maneuver 28 -----
Stage 1 163 -----
Stage 2 363 -----
Approach EB NB SB
HCM Control Delay, s 40 0.9 0
HCM LOS E
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 490 - 226 - -
HCM Lane V/C Ratio 0.194 - 0.567 - -
HCM Control Delay (s) 14.1 - 40 - -
HCM Lane LOS B - E - -
HCM 95th %tile Q(veh) 0.7 - 3.1 - -
67
HCM 6th TWSC 3: Shields & University
short total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 10 Light Report
Page 5
Intersection
Int Delay, s/veh 37.8
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 6 134 184 1740 1601 51
Future Vol, veh/h 6 134 184 1740 1601 51
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 120 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 22222
Mvmt Flow 7 149 204 1933 1779 57
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 3183 918 1836 0 - 0
Stage 1 1808 -----
Stage 2 1375 -----
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 8 274 328 - - -
Stage 1 116 -----
Stage 2 200 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver ~ 3 274 328 - - -
Mov Cap-2 Maneuver ~ 3 -----
Stage 1 44 -----
Stage 2 200 -----
Approach EB NB SB
HCM Control Delay, s$ 959.5 3.1 0
HCM LOS F
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 328 - 56 - -
HCM Lane V/C Ratio 0.623 - 2.778 - -
HCM Control Delay (s) 32.5 -$ 959.5 - -
HCM Lane LOS D - F - -
HCM 95th %tile Q(veh) 4 - 16.1 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
68
HCM 6th TWSC 4: City Park & University
Short Total AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 6
Intersection
Int Delay, s/veh 5.2
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 9 107 57 25 79 48
Future Vol, veh/h 9 107 57 25 79 48
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 11 126 67 29 93 56
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 324 82 0 0 96 0
Stage 1 82 -----
Stage 2 242 -----
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 670 978 - - 1498 -
Stage 1 941 -----
Stage 2 798 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 627 978 - - 1498 -
Mov Cap-2 Maneuver 627 -----
Stage 1 941 -----
Stage 2 747 -----
Approach WB NB SB
HCM Control Delay, s 9.5 0 4.7
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 937 1498 -
HCM Lane V/C Ratio - - 0.146 0.062 -
HCM Control Delay (s) - - 9.5 7.6 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0.5 0.2 -
69
HCM 6th TWSC 4: City Park & University
short total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 10 Light Report
Page 6
Intersection
Int Delay, s/veh 5.8
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 27 194 104 5 114 128
Future Vol, veh/h 27 194 104 5 114 128
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 22222
Mvmt Flow 30 216 116 6 127 142
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 515 119 0 0 122 0
Stage 1 119 -----
Stage 2 396 -----
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 520 933 - - 1465 -
Stage 1 906 -----
Stage 2 680 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 471 933 - - 1465 -
Mov Cap-2 Maneuver 471 -----
Stage 1 906 -----
Stage 2 616 -----
Approach WB NB SB
HCM Control Delay, s 11.1 0 3.6
HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 833 1465 -
HCM Lane V/C Ratio - - 0.295 0.086 -
HCM Control Delay (s) - - 11.1 7.7 0
HCM Lane LOS - - B A A
HCM 95th %tile Q(veh) - - 1.2 0.3 -
70
APPENDIX G
71
HCM 6th Signalized Intersection Summary 1: Shields & Elizabeth/Moby Lot (Eliz)
Long Total AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 450 75 400 25 10 10 175 1100 145 10 965 175
Future Volume (veh/h) 450 75 400 25 10 10 175 1100 145 10 965 175
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.92 1.00 0.96 1.00 0.95 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1683 1683 1683 1683 1683 1683 1683 1683 1616 1683 1683 1683
Adj Flow Rate, veh/h 529 88 220 29 12 4 206 1294 164 12 1135 97
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 222222222222
Cap, veh/h 501 564 440 87 327 266 221 1237 156 98 1225 543
Arrive On Green 0.20 0.34 0.34 0.05 0.19 0.19 0.02 0.14 0.14 0.04 0.77 0.77
Sat Flow, veh/h 2565 1683 1312 1603 1683 1369 1603 2840 357 1603 3198 1419
Grp Volume(v), veh/h 529 88 220 29 12 4 206 725 733 12 1135 97
Grp Sat Flow(s),veh/h/ln 1283 1683 1312 1603 1683 1369 1603 1599 1598 1603 1599 1419
Q Serve(g_s), s 21.5 4.0 14.7 1.9 0.6 0.2 8.0 47.9 47.9 0.5 31.5 2.0
Cycle Q Clear(g_c), s 21.5 4.0 14.7 1.9 0.6 0.2 8.0 47.9 47.9 0.5 31.5 2.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.22 1.00 1.00
Lane Grp Cap(c), veh/h 501 564 440 87 327 266 221 696 696 98 1225 543
V/C Ratio(X) 1.06 0.16 0.50 0.33 0.04 0.02 0.93 1.04 1.05 0.12 0.93 0.18
Avail Cap(c_a), veh/h 501 564 440 146 367 299 221 696 696 182 1225 543
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 0.33 0.33 0.33 2.00 2.00 2.00
Upstream Filter(I) 0.93 0.93 0.93 1.00 1.00 1.00 1.00 1.00 1.00 0.91 0.91 0.91
Uniform Delay (d), s/veh 44.2 25.6 29.2 50.1 36.0 22.7 27.1 47.1 47.1 27.2 11.6 8.2
Incr Delay (d2), s/veh 54.1 0.1 0.8 2.2 0.0 0.0 41.6 45.1 49.2 0.5 12.3 0.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 10.5 1.6 4.8 0.8 0.3 0.1 5.8 29.3 30.0 0.2 6.1 0.7
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 98.4 25.8 30.0 52.3 36.0 22.8 68.7 92.2 96.3 27.7 23.9 8.8
LnGrp LOS F CCDDCEFFCCA
Approach Vol, veh/h 837 45 1664 1244
Approach Delay, s/veh 72.8 45.3 91.1 22.8
Approach LOS E D F C
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 11.0 46.6 11.0 41.4 5.2 52.4 26.0 26.4
Change Period (Y+Rc), s 4.0 5.5 6.0 5.5 4.0 * 5.5 5.5 6.0
Max Green Setting (Gmax), s 7.0 38.5 9.0 34.5 7.0 * 39 20.5 23.0
Max Q Clear Time (g_c+I1), s 10.0 33.5 3.9 16.7 2.5 49.9 23.5 2.6
Green Ext Time (p_c), s 0.0 2.5 0.0 1.1 0.0 0.0 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 64.1
HCM 6th LOS E
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
72
Timing Report, Sorted By Phase 1: Shields & Elizabeth/Moby Lot (Eliz)
Long Total AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 1
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 11 44 15 40 11 44 26 29
Maximum Split (%) 10.0% 40.0% 13.6% 36.4% 10.0% 40.0% 23.6% 26.4%
Minimum Split (s) 11 24.5 11 25.5 11 23.5 11 29
Yellow Time (s) 3 3.5 3 3.5 3 3.5 3.5 3
All-Red Time (s) 12321 1.523
Minimum Initial (s) 4 10 5 7 4 10 5.5 7
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 12 13 10 16
Dual Entry No Yes Yes Yes No Yes Yes Yes
Inhibit Max No No No No No No No No
Start Time (s) 43.5 54.5 98.5 3.5 43.5 54.5 17.5 98.5
End Time (s) 54.5 98.5 3.5 43.5 54.5 98.5 43.5 17.5
Yield/Force Off (s) 50.5 93 107.5 38 50.5 93.5 38 11.5
Yield/Force Off 170(s) 50.5 81 107.5 25 50.5 83.5 38 105.5
Local Start Time (s) 60.5 71.5 5.5 20.5 60.5 71.5 34.5 5.5
Local Yield (s) 67.5 0 14.5 55 67.5 0.5 55 28.5
Local Yield 170(s) 67.5 98 14.5 42 67.5 100.5 55 12.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 150
Offset: 93 (85%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 1: Shields & Elizabeth/Moby Lot (Eliz)
73
HCM 6th Signalized Intersection Summary 2: City Park & Elizabeth
Long Total AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 65 690 150 30 310 70 80 70 100 60 65 30
Future Volume (veh/h) 65 690 150 30 310 70 80 70 100 60 65 30
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.98 0.84 0.99 0.93 0.98 0.93 0.98 0.95
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1796 1870 1870 1796 1870 1945 1796 1870 1945 1796
Adj Flow Rate, veh/h 73 775 147 34 348 59 90 79 25 67 73 8
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89
Percent Heavy Veh, % 222222222222
Cap, veh/h 747 1858 352 517 1942 325 344 278 88 324 343 38
Arrive On Green 1.00 1.00 1.00 1.00 1.00 1.00 0.20 0.20 0.20 0.20 0.20 0.20
Sat Flow, veh/h 955 2879 546 599 3010 503 1295 1386 439 1270 1713 188
Grp Volume(v), veh/h 73 478 444 34 203 204 90 0 104 67 0 81
Grp Sat Flow(s),veh/h/ln 955 1777 1648 599 1777 1737 1295 0 1825 1270 0 1901
Q Serve(g_s), s 0.0 0.0 0.0 0.0 0.0 0.0 3.4 0.0 2.7 2.6 0.0 2.0
Cycle Q Clear(g_c), s 0.0 0.0 0.0 0.0 0.0 0.0 5.4 0.0 2.7 5.3 0.0 2.0
Prop In Lane 1.00 0.33 1.00 0.29 1.00 0.24 1.00 0.10
Lane Grp Cap(c), veh/h 747 1146 1063 517 1146 1120 344 0 365 324 0 381
V/C Ratio(X) 0.10 0.42 0.42 0.07 0.18 0.18 0.26 0.00 0.28 0.21 0.00 0.21
Avail Cap(c_a), veh/h 747 1146 1063 517 1146 1120 567 0 680 543 0 708
HCM Platoon Ratio 2.00 2.00 2.00 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.99 0.99 0.99 0.99 0.99 0.99 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 20.6 0.0 18.7 20.9 0.0 18.4
Incr Delay (d2), s/veh 0.3 1.1 1.2 0.2 0.3 0.4 0.4 0.0 0.4 0.3 0.0 0.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.1 0.4 0.4 0.0 0.1 0.1 1.0 0.0 1.1 0.8 0.0 0.8
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.3 1.1 1.2 0.2 0.3 0.4 21.0 0.0 19.1 21.2 0.0 18.6
LnGrp LOS AAAAAACABCAB
Approach Vol, veh/h 995 441 194 148
Approach Delay, s/veh 1.1 0.3 20.0 19.8
Approach LOS AABB
Timer - Assigned Phs 2468
Phs Duration (G+Y+Rc), s 15.5 39.5 15.5 39.5
Change Period (Y+Rc), s 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s 19.5 25.0 19.5 25.0
Max Q Clear Time (g_c+I1), s 7.3 2.0 7.4 2.0
Green Ext Time (p_c), s 0.3 4.0 0.5 1.6
Intersection Summary
HCM 6th Ctrl Delay 4.5
HCM 6th LOS A
74
Timing Report, Sorted By Phase 2: City Park & Elizabeth
Long Total AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 3
Phase Number 2468
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode None C-Max None C-Max
Maximum Split (s) 25 30 25 30
Maximum Split (%) 45.5% 54.5% 45.5% 54.5%
Minimum Split (s) 22.5 22 24.5 22
Yellow Time (s) 3 3.5 3 3.5
All-Red Time (s) 2.5 1.5 2.5 1.5
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 10 12 10
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 18 43 18 43
End Time (s) 43 18 43 18
Yield/Force Off (s) 37.5 13 37.5 13
Yield/Force Off 170(s) 27.5 3 25.5 3
Local Start Time (s) 0 25 0 25
Local Yield (s) 19.5 50 19.5 50
Local Yield 170(s) 9.5 40 7.5 40
Intersection Summary
Cycle Length 55
Control Type Actuated-Coordinated
Natural Cycle 50
Offset: 18 (33%), Referenced to phase 4:EBTL and 8:WBTL, Start of Red
Splits and Phases: 2: City Park & Elizabeth
75
HCM 6th TWSC 3: Shields & University
Long Total AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 5
Intersection
Int Delay, s/veh 4.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 110 90 1415 1350 40
Future Vol, veh/h 5 110 90 1415 1350 40
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 120 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 6 129 106 1665 1588 47
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 2657 818 1635 0 - 0
Stage 1 1612 -----
Stage 2 1045 -----
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 18 319 393 - - -
Stage 1 149 -----
Stage 2 300 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 13 319 393 - - -
Mov Cap-2 Maneuver 13 -----
Stage 1 109 -----
Stage 2 300 -----
Approach EB NB SB
HCM Control Delay, s 94.6 1 0
HCM LOS F
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 393 - 158 - -
HCM Lane V/C Ratio 0.269 - 0.856 - -
HCM Control Delay (s) 17.5 - 94.6 - -
HCM Lane LOS C - F - -
HCM 95th %tile Q(veh) 1.1 - 5.8 - -
76
HCM 6th TWSC 4: City Park & University
Long Total AM
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 10 Light Report
Page 6
Intersection
Int Delay, s/veh 5.3
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 10 115 65 30 100 55
Future Vol, veh/h 10 115 65 30 100 55
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 12 135 76 35 118 65
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 395 94 0 0 111 0
Stage 1 94 -----
Stage 2 301 -----
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 610 963 - - 1479 -
Stage 1 930 -----
Stage 2 751 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 559 963 - - 1479 -
Mov Cap-2 Maneuver 559 -----
Stage 1 930 -----
Stage 2 689 -----
Approach WB NB SB
HCM Control Delay, s 9.7 0 4.9
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 910 1479 -
HCM Lane V/C Ratio - - 0.162 0.08 -
HCM Control Delay (s) - - 9.7 7.6 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0.6 0.3 -
77
APPENDIX H
78
SCALE: 1"=500'
PEDESTRIAN INFLUENCE AREA
DELICH
ASSOCIATES
City Park Avenue
Shields Street
University Avenue
Plum Street
Elizabeth Street
Laurel Street
79
Pedestrian LOS Worksheet
Project Location Classification: Pedestrian Corridor
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Level of Service (minimum based on project location classification)
Directness Continuity Street
Crossings
Visual
Interest &
Amenities
Security
Colorado State
University to the east Institutional
Minimum A A B A A
1 Actual A A A A A
Proposed A A A A A
Residential/Commercial
to the north
Residential/
Commercial
Minimum A A B A A
2 Actual A A B A A
Proposed A A B A A
Residential/Commercial
to the west
Residential/
Commercial
Minimum A A B A A
3 Actual A A A A A
Proposed A A A A A
Residential to the south Residentail
Minimum A A B A A
4 Actual A A A A A
Proposed A A A A A
Minimum
5 Actual
Proposed
Minimum
6 Actual
Proposed
Minimum
7 Actual
Proposed
Minimum
8 Actual
Proposed
Minimum
9 Actual
Proposed
Minimum
10 Actual
Proposed
80
SCALE: 1"=500'
BICYCLE INFLUENCE AREA
DELICH
ASSOCIATES
City Park Avenue
Shields Street
University Avenue
Plum Street
Elizabeth Street
Laurel Street
81
Bicycle LOS Worksheet
Level of Service – Connectivity
Minimum Actual Proposed
Base Connectivity: C A A
Specific connections to priority sites:
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Colorado State
1 University to the east Institutional B B B
Campus West to the
2 north Commercial B B B
3
4
82