Loading...
HomeMy WebLinkAboutFTC OLD TOWN WTE (VERIZON) - BDR180018 - SUBMITTAL DOCUMENTS - ROUND 4 - RESPONSE TO STAFF REVIEW COMMENTS1 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6689 970.224.6134 - fax fcgov.com/developmentreview December 06, 2018 Jennifer Daniels Verizon Wireless / Centerline Solutions 16035 Table Mountain Pkwy Golden, CO 80403 RE: FTC OLD TOWN, BDR180018, Round Number 3 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through your Development Review Coordinator, Brandy Bethurem Harras, at bbethuremharras@fcgov.com or 970.416.2744. Comment Summary: Department: Planning Services Contact: Pete Wray, 970-221-6754, pwray@fcgov.com Topic: General Comment Number: FOR APPROVAL: Add to FC Notes on Page GN-1. REPLACEMENT: ANY LANDSCAPE ELEMENT THAT DIES, OR IS OTHERWISE REMOVED, SHALL BE PROMPTLY REPLACED IN ACCORDANCE WITH THE REQUIREMENTS OF THESE PLANS. Note Added to GN-1 Department: Forestry Contact: Molly Roche, 224-616-1992, mroche@fcgov.com Topic: Landscape Plans Comment Number: 1 FOR APPROVAL: Continued: An on-site meeting to receive tree inventory and mitigation information has not been scheduled with City Forestry. City Forestry will not resolve BDR comments related to existing trees until this information is received and included on the site plans. Please contact Forestry Specialist, 2 Molly Roche, to schedule this meeting – mroche@fcgov.com. 9/17/2018: Continued: Thank you for including the City of Fort Collins Tree Protection Notes. According to the site plan, it appears that the proposed fiber line will be installed between several existing trees on-site. Although no impacts are expected, please schedule a meeting with City Forestry to obtain tree inventory and mitigation information, which is to be included on the site plan. In the instance where the fiber line trenches through and cuts existing tree roots, certain trees might not be able to withstand the impacts of root loss or damage. Any questions, please contact Molly Roche (mroche@fcgov.com). 7/9/2018: There appears to be existing trees on-site, and a few that are in close proximity to the proposed wireless communications device. Please include the City of Fort Collins tree protection notes to the site plan, which are available from City Forestry or the project planner. In addition, please schedule an on-site meeting to obtain tree inventory and mitigation information if there are any proposed or expected impacts to existing trees. TM-1 sheet added to include tree inventory Department: Parks Contact: Jill Wuertz, 970-416-2062, jwuertz@fcgov.com Topic: Landscape Plans Comment Number: 2 11/30/2018: FOR DCP/BUILDING PERMIT: Please coordinate with the Parks Department regarding impacts to Library Park, including existing irrigation, turf, shrubs/trees and sidewalk. Work will need to be inspected by Parks. Please contact Jill with any further questions - JWUERTZ@FCGOV.COM. Comment Number: 3 11/30/2018: FOR DCP/BUILDING PERMIT: Please coordinate with the Parks Department with regards to large events potentially coinciding with the time of construction. Please contact Jill with any further questions - JWUERTZ@FCGOV.COM. Department: Light And Power Contact: Austin Kreager, 970-224-6152, akreager@fcgov.com Topic: General Comment Number: 1 12/04/2018: INFORMATION ONLY: Light and Power acknowledges that this will require a new service. 09/18/2018: Light and Power has an existing 300kVA 277/480v transformer on the property. Is the plan to add an additional meter for the proposed cell site? If not, you can disregard the following: Site will require new service with new meter, reference sheet U1 Comment Number: 2 12/04/2018: FOR BUILDING PERMIT: 3 Light and Power has a copy of a C-1 form. The C-1 form does not currently reflect a 277/480 service that would need to be installed. Before construction, we will need a complete C-1. 09/18/2018: Please provide a one line diagram and a C-1 form to Light and Power Engineering. The C-1 form can be found at: http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1Form.pdf Comment Number: 4 09/18/2018: INFORMATION ONLY: This would be a commercial service, therefor, the applicant would be responsible for running the secondary service to our power source. Comment Number: 5 09/18/2018: INFORMATION ONLY: You may contact FCU Light & Power, project engineering if you have questions. (970) 221-6700. You may reference Light & Power’s Electric Service Standards at http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandar ds_FINAL_18November2016_Amendment.pdf You may reference our policies, development charge processes, and use our fee estimator at http://www.fcgov.com/utilities/business/builders-and-developers. Comment Number: 6 12/04/2018: PRIOR TO MYLARS: Due to Verizon running their own service to the transformer, we will need the totality of our primary line as well as our transformer placed in a utility easement. Utility easement updated to encompass transformer as well Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: General Comment Number: 5 12/03/2018: FOR APPROVAL: Please revise the legal description as marked. See redlines. Corrected on T1 Department: PFA Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.org Topic: General Comment Number: 1 9-17-2018: INFORMATION ONLY: PFA has no further comments at this time 07/05/2018: SIGNAGE To assist with emergency response, signage should be clearly visible at ground level and at the access ladder to indicate the most appropriate access to the Verizon equipment. CONTINUED – FORRESTRY COMMENTS (ADDED HERE BY AEROSOLUTIONS) 4 2 12/6/18: City Forestry will provide the Development Review Coordinator with the updated tree inventory information. This table will include species, diameter, condition, and appraised value for each tree. Please include this information on the site plan. Redlines provided to show matching tree #s. Reference TM-1 3 12/6/18: City Forestry has reviewed the layout of the new fiber line and would like to request that this line be installed through boring techniques. Forestry requests that the boring start near the right-of-way along Olive and then work toward the building. Working in this direction will limit the impact of boring equipment and drilling near the tree closest to the building. In addition, the boring should be done at a minimum of 48” or deeper to avoid all tree roots. Tree protection in the form of concrete blankets around tree trunks should be installed prior to on-site construction. Note added to TM-1 4 12/6/18: The appraised values of each tree within proximity to the project is shown in the tree inventory table. Please add the following note to the site plan, preferably below the tree inventory table: “Any damage to a tree as a direct result of this activity will result in fines equal to $1,000 per inch of damaged area up to the total appraised value of each tree. If a tree is girdled 40% or higher, then the full appraised value of the tree will be collected by City Forestry.” Reference TM-1