FTC EAST DALE
Dated: 01/17/2019
Project: Cell site Rooftop Cupola
Job Address: 901 Riverside Ave., Ft. Collins, CO. 80524
To: Brandy Bethurem Harras
Development Review Coordinator
City of Fort Collins Community Development & Neighborhood Services
281 N. College Ave. Fort Collins, CO 80524
Hello Brandy,
We are sending you this narrative pertaining to the Drawing Revisions you requested below:
As Noted:
RE: FTC EAST DALE, BDR180016, Round Number 2
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through your Development Review Coordinator, Brandy
Bethurem Harras at 970.416.2744 or bbethuremharras@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Kai Kleer, 970-416-4284, kkleer@fcgov.com
Topic: Building Elevations
Comment Number: 6
10/30/2018 FOR APPROVAL:
RF screen does not represent the design of the existing building's block work. More discussion is needed
around this and will require a follow up comment after there is a clear understanding of what is needed.
[RESPONSE] The concealment screen has been designed to match the existing banding
courses and painted Tan to match. Stucco Texture will be added to the Flat Faces 8x8 to
simulate the Concrete Finish, joints between the Faces will be white painted to match the
existing mortar joints.
06/26/2018 FOR APPROVAL:
Greater design detail of the RF screen is required. How will the structure be textured to match the buildings
CMU? The facility will need to incorporate a design that imitates the existing CMU banding. The design
detail should show how screen wall texturing will create depth. Please also include flashing that is
consistent with what exists on the site.
Topic: Landscape Plans
Comment Number: 2
10/30/2018 FOR APPROVAL:
A landscape plan was not provided during 2nd round. Project will need another round of review before
proceeding.
[RESPONSE] The site has been completely redesigned and all previous Ground Based
equipment has been moved to the roof. No ground-based improvements are included with this
design.
16035 Table Mountain Pkwy
Golden, CO 80403
P: 303-993-3293 / F: 303-993-3019
06/26/2018:
A Landscape Plan is required and will need to show the following:
What species and how many shrubs will be impacted by the proposed equipment enclosure.
How the equipment enclosure will be screened by additional landscape. Keep in mind that a total screening
affect at the base of the enclosure is required. Heavy emphasis should be placed on the use of coniferous
plants. General landscape plan notes are required. Please visit our website at
fcgov.com/developmentreview/applications and find 'PDP Standard Notes' for more information.
This project will bring the existing landscape peninsula out of compliance with 3.2.1(E)(5). Please think
about how the impacted shrubs can be mitigated. Alternative compliance for this standard should
demonstrate innovative design and use of plant materials and other landscape elements where the shrubs
are proposed to be removed.
Topic: Site Plan
Comment Number: 3
10/30/2018 FOR APPROVAL:
Please add note to plan stating, "No wireless telecommunication facility or equipment owner or lessee or
employee thereof shall act to exclude or attempt to exclude any other wireless telecommunication provider
from using the same building, structure or location. Wireless telecommunication facility or equipment
owners or lessees or employees thereof, and applicants for the approval of plans for the installation of such
facilities or equipment, shall cooperate in good faith to achieve co-location of wireless telecommunication
facilities and equipment. Any application for the approval of a plan for the installation of wireless
telecommunication facilities or equipment shall include documentation of the applicant's good faith efforts
toward such cooperation."
[RESPONSE] The Site Plan sheet has been updated to include this note
06/26/2018:
To comply with 3.8.13(B), this project will need to demonstrate how future providers can co-locate on the
proposed antenna array. This can be achieved by showing outlines of where antenna locations for future
co-location can fit and where an additional equipment cabinet can be located within the enclosure.
Department: Stormwater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com
Topic: General
Comment Number: 1
10/29/2018: FOR APPROVAL:
The plans now show the proposed equipment sitting directly on top of an existing storm pipe. This isn’t
allowed. The proposed equipment and conduits must be placed a minimum of 6’ away from the existing
storm pipe or the storm pipe must be moved to a location that shows the separation requirements are met.
[RESPONSE] The site has been completely redesigned and all previous Ground Based
equipment has been moved to the roof.
07/09/2018: There is an existing 6-inch PVC drain line located through the proposed lease area that
needs to be located and shown on the plans. The depth will also need to be verified and shown on
the plans to ensure that any surface or subsurface improvements (i.e. conduit runs) don't impact or
damage the existing drain line.
16035 Table Mountain Pkwy
Golden, CO 80403
P: 303-993-3293 / F: 303-993-3019
Comment Number: 3
10/29/2018: FOR APPROVAL:
Please add a note to the plans that indicates to the contractor that they are to stay out of the drainage area,
meaning no driving across or compacting the drainage/water quality swale area.
[RESPONSE] The site has been completely redesigned and all previous Ground Based
equipment has been moved to the roof. No ground-based improvements are included with
this design, and construction activities will not be necessary in the drainage/water quality
swale area.
07/09/2018: There is a stormwater quality swale located along the property frontage along Riverside
(where your plans show riprap). This area needs to be protected from construction activities and in specific,
not driven on. Construction fencing or some sort of barrier needs to be shown on the plans to keep
contractors out of the drainage area. In addition, some form of erosion control should be placed along the
top of bank between the drainage area and the construction area to protect the swale from sediment and
runoff during construction activities.
Contact: Mark Taylor, 970-416-2494, mtaylor@fcgov.com
Topic: Floodplain
Comment Number: 4
07/09/2018: This property is in the Old Town 100-year Flood Fringe. A Floodplain Use Permit must be
submitted and approved before any construction can begin on the ground level equipment and the
enclosure associated with it. Please add notes indicating this to the FTC East Dale plan set.
Department: Water-Wastewater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com
Topic: General
Comment Number: 1
10/29/2018: FOR APPROVAL:
The Houska Tire and Lube plans show the water service to the building going through this area
somewhere. Per the previous comment, this water meter and service needs to be located and the proposed
design needs to show that the equipment and conduits are a minimum of 6’ away from the existing water
service and if crossing the existing water service perpendicularly, then the conduits must be shown to cross
over or above the water service with a minimum of 18” clearance. 07/09/2018: There is an existing water
service with a curb stop and meter located in the vicinity of the proposed lease area. The service needs to
be located and shown on the plans. The lease area cannot overlap the service line.
[RESPONSE] The site has been completely redesigned and all previous Ground Based
equipment has been moved to the roof. The Water Service line is depicted on the Survey
sheets and Site Plans. Proposed Fiber Entrance is shown separated by 13+ ft.
16035 Table Mountain Pkwy
Golden, CO 80403
P: 303-993-3293 / F: 303-993-3019
Department: Light and Power
Contact: Luke Unruh, 9704162724, lunruh@fcgov.com
Topic: General
Comment Number: 1
10/29/2018: INFORMATION ONLY:
The transformer that feeds 901 Riverside sits on the neighboring property. The new service from the
existing transformer will be the owner’s responsibility. I recommend that the new electric service be placed
in an easement.
[RESPONSE] The site has been completely redesigned and all previous Ground Based
equipment has been moved to the roof, and as such the site will be powered off the
Existing Buildings power thru a sub-meter.
Comment Number: 2
10/29/2018:
Electric capacity fees, development fees, building site charges and any system modification charges
necessary to feed the site will apply to this development. Please contact me or visit the following website
for an estimate of development charges and fees:
https://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-
development-fees
Comment Number: 3
10/29/2018 FOR APPROVAL:
The existing transformer may need to be upgraded depending on power requirements. Please provide a
commercial service information form (C-1 form) and a one-line diagram will need to be completed and
submitted to Light & Power Engineering for review. A link to the C-1 form is below:
www.fcgov.com/utilities/business/builders-and-developers/development- forms-guidelines-regulations
Comment Number: 4
10/30/2018: Please contact me to further discuss this project at 970-416-2724
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: General
Comment Number: 2
10/29/2018: FOR APPROVAL:
Some of the sheet titles in the sheet index do not match the sheet titles on the noted sheets. See redlines.
[RESPONSE] Updated Titles
07/10/2018: Some of the sheet titles in the sheet index do not match the sheet titles on the noted sheets.
See redlines.
Comment Number: 4
10/29/2018: FOR APPROVAL:
There is text that needs to be masked. Mask all text in hatched areas. See redlines.
16035 Table Mountain Pkwy
Golden, CO 80403
P: 303-993-3293 / F: 303-993-3019
Department: Forestry
Contact: Molly Roche, 224-616-1992, mroche@fcgov.com
Topic: Landscape Plans
Comment Number: 1
10/29/2018: FOR APPROVAL
Continued: PRIOR TO NEXT SUBMITTAL
On the site plan, please call out existing trees to remain. In addition, please add the City of Fort Collins
Tree Protection notes to the plans. These notes are available form the project planner or Molly Roche,
Forestry Specialist (mroche@fcgov.com).
[RESPONSE] The site has been completely redesigned and all previous Ground Based
equipment has been moved to the roof. No ground-based improvements are included with
this design, and construction activities will not be necessary in the areas where Trees
Exist.
7/9/2018:
There appears to be existing trees on-site, and a few that are in close proximity to the proposed wireless
communications device. Please include the City of Fort Collins tree protection notes to the site plan, which
are available from City Forestry or the project planner. In addition, please schedule an on-site meeting to
obtain tree inventory and mitigation information if there are any proposed or expected impacts to existing
trees.
Department: Engineering Development Review
Contact: Spencer Smith, 970-221-6603, smsmith@fcgov.com
Topic: General
Comment Number: 1
10/30/2018: INFORMATION ONLY:
07/09/2018: Please contact Spencer Smith (smsmith@fcgov.com or (970)-221-6603) if you have further
questions regarding these conceptual engineering comments or requirements.
Comment Number: 3
10/30/2018: INFORMATION ONLY:
07/09/2018: All necessary permitting will be required of any proposed work/improvements within the public
right-of-way, prior to construction. From the site plan, it appears that a portion of the proposed utilities are
being installed within existing road ROW. Please provide more detail to clarify extend of utility work
proposed. Utility plans may be required for the project if any public improvements are proposed (to be
determined by City staff).
Comment Number: 4
10/30/2018: FOR BUILDING PERMIT:
07/09/2018: Larimer County Road Impact Fees and Transportation Expansion Fees are due at the time of
building permit. Please contact Kyle Lambrecht at (970)-221-6566 if you have any questions.
Comment Number: 6
10/30/2018: INFORMATION ONLY:
07/09/2018: Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets,
sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be
replaced or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of
completed improvements and/or prior to the issuance of the first Certificate of Occupancy.
16035 Table Mountain Pkwy
Golden, CO 80403
P: 303-993-3293 / F: 303-993-3019
Comment Number: 7
10/30/2018: INFORMATION ONLY:
07/09/2018: All public sidewalk, driveways and ramps, existing or proposed, adjacent or within the site,
need to meet ADA standards.
Comment Number: 9
10/30/2018: INFORMATION ONLY:
07/09/2018: A utility coordination meeting on this site is suggested. Utility coordination meetings, if
requested, are typically scheduled after the preliminary submittal of the project, but can be scheduled prior
to submittal upon request. Please provide a site plan with a preliminary utility layout for routing with the
meeting notice. If you are interested in having a utility coordination meeting, please contact the
development review engineer for scheduling.
Comment Number: 10
10/30/2018: INFORMATION ONLY:
07/09/2018: All fences, barriers, posts or other encroachments within the public right-of-way are only
permitted upon approval of an encroachment permit. Applications for encroachment permits shall be made
to the Engineering Department for review and approval prior to installation. Encroachment items shall not
be shown on the site plan as they may not be approved, need to be modified or moved, or if the permit is
revoked then the site/ landscape plan is in non-compliance.
Comment Number: 11
10/30/2018: INFORMATION ONLY:
07/09/2018: With regards to construction of this site, the public right-of-way shall not be used for staging or
storage of materials or equipment associated with the Development, nor shall it be used for parking by any
contractors, subcontractors, or other personnel working for or hired by the Developer to construct the
Development. The Developer will need to find a location(s) on private property to accommodate any
necessary staging and/or parking needs associated with the completion of the Development. Information
on the location(s) of these areas will be required to be provided to the City as a part of the Development
Construction Permit application.
Brad Bryant
A & E PROJECT MANAGER