Loading...
HomeMy WebLinkAboutWILLOW STREET RESIDENCES - FDP180027 - DOCUMENT MARKUPS - ROUND 2 - REDLINED PLANS AND REPORTS (13)JEFFERSON ST. WILLOW ST. LINDEN ST. N. COLLEGE AVE. E. LINCOLN AVE. E. VINE DR. OLD TOWN BASIN CACHE LA POUDRE BASIN CONIFER ST. MOUNTAIN AVE. E. MULBERRY ST S. COLLEGE AVE. LAPORTE AVE. MAPLE AVE. S. MASON AVE. S. HOWES AVE. E. MYRTLE ST E. LAUREL ST E. OAK ST S. REMINGTON ST Sheet WILLOW STREET RESIDENCES These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 20 C-000 COVER SHEET 01 OCTOBER 2018 CONTACT INFORMATION PROJECT TEAM: Northern Engineering Services, Inc. Cody Snowdon, PE 301 North Howes Street, Suite 100 Fort Collins, CO 80524 (970) 221-4158 Galloway Alicia Thorpe, PE 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 (970) 800-3300 I hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Fort Collins and State of Sheet WILLOW STREET RESIDENCES These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 20 C-001 GENERAL NOTES 02 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner A. GENERAL NOTES 1. All materials, workmanship, and construction of ppublic improvements shall meet or exceed the standards and specifications set forth in the Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort Collins. 2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise. 3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer. Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of any work shown in these plans. 4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 5. All storm sewer construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and specifications current at the date of approval of the plans by the City of Fort Collins Engineer. 6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The Developer shall be responsible for unknown underground utilities. SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W E E E E E E E E E E E E E E E E E E E CTV CTV FO FO T T E E E E E SS SS SS E E E E E X X X X X ST ST ST ST ST SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS OHU OHU G G G X X X X X X X X X X X X X X X X X X X X X X G G A S E V T N GAS M VAULT ELEC E CONTROL IRR T 26' EMERGENCY ACCESS EASEMENT 26' EMERGENCY ACCESS EASEMENT 39' DRAINAGE & UTILITY EASEMENT 8' (TYP.) 17' (TYP.) 9' (TYP.) 17' (TYP.) 15' (TYP.) 9' (TYP.) 19' 9' (TYP.) PROPERTY CORNER N:132125.16 E:195379.63 ST ST ST ST X X X X X X X X X X X X X X X X X X X X X X G G A S E V T N GAS M VAULT ELEC E CONTROL IRR T 26' EMERGENCY ACCESS EASEMENT 26' EMERGENCY ACCESS EASEMENT 39' DRAINAGE & UTILITY EASEMENT 8' (TYP.) 17' (TYP.) 9' (TYP.) 17' (TYP.) 15' (TYP.) 9' (TYP.) 19' 9' (TYP.) TIE TO EXISTING 30" VERTICAL CURB AND GUTTER T T T T T T T T T T T T T T T T T T T T T T G G G G G G G G G G G G G G G G G G G E E W W W W W W W W W W W W ST ST ST ST G SS SS SS SS SS E E E E E E E E E E E E E E E E E SS SS SS S X X X SS SS SS SS S SS SS SS SS SS SS EX. SAN M13387 STA 13+32.13 N: 132565.98 E: 194857.53 (117.35 LF 12" PVC @ 0.79%) SAN MH A2 STA 12+14.78 N: 132527.84 E: 194968.51 168.74 LF 12" PVC @ 1.00% (BORING REQUIRED FOR INSTALLATION) SAN MH A1 STA 10+46.04 N: 132695.64 E: 194986.22 46.04 LF 12" PVC @ 1.00% EX. SAN M18386 STA 10+00.00 N: 132730.00 E: 195016.87 WILLOW STREET 30' UTILITY EASEMENT (BY SEPARATE DOCUMENT) 4955 4960 4965 4970 4975 4980 4985 4990 4955 4960 4965 4970 4975 4980 4985 4990 13+50 13+00 12+00 11+00 10+00 9+50 EX. SAN M18386 STA 10+00.00 RIM 4974.5± INV. IN 4962.06 (SW) INV. IN 4960.06 (N) INV. OUT 4959.92 (E) 46.04 LF 12" PVC @ 1.00% SAN MH A1 4955 4960 4965 4970 4975 4980 4985 4990 4955 4960 4965 4970 4975 4980 4985 4990 9+75 10+00 11+00 11+25 30'' WQ DRAIN BASIN A4.2 STA 10+00.00 RIM 4971.7± INV. IN 4966.48 (SW) INV. IN 4967.50 (NW) INV. IN 4966.48 (SE) INV. OUT 4966.48 (NE) 29.97 LF 12" HDPE @ 1.50% SAND OIL SEPERATOR A4.2-3 STA 10+72.97 RIM 4972.2± INV. IN 4967.58 (E) INV. OUT 4967.58 (NW) 30.90 LF 12" HDPE @ 1.00% INLET A4.2-3 STA 11+04.08 INV. 4967.88 TEE A4.2-2 STA 10+29.97 INV. 4966.93 42.99 LF 12" HDPE @ 1.50% SUBGRADE OF EAST POND PROPOSED GRADE EXISTING GROUND 100-YR HGL 4955 4960 4965 4970 4975 4980 4985 4990 4955 4960 4965 4970 4975 4980 73.00 73.00 72.98 72.27 72.32 71.60 71.37 72.61 1.7% 2.0% 2.1% 71.32 71.44 71.82 72.82 72.92 71.79 71.79 71.40 71.12 71.60 72.63 72.73 72.62 72.54 72.84 71.17 73.00 71.73 71.73 72.61 72.48 72.41 73.00 72.74 72.38 20' 5.4% 4.3% 72.71 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 4.4% 3.9% 2.0% 2.0% 2.0% 2.0% 4.6% 4.2% 1.7% 1.3% 1.2% 1.2% 5.0% 0.0% 5.0% SS SS SS SS SS X X X X X X X X X X X X X X X X X X X X X X D ST ST D ST ST ST ST CONTROL IRR T ST ST ST S NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON UD UD UD UD UD UD UD UD UD UD UD G SS SS SS SS SS OHU OHU OHU G G G G G G G G G G G G G G G G G G G G G G G X X X X X X X X G G G G X X X X X X X X X X X X X G D G A S E V T N MW GAS ST ST D Sheet WILLOW STREET RESIDENCES These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 20 C-601 UTILITY PLAN 15 City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R Ô Ô Ô Ô Ô 006 DANDYSACK DS 003 CURB INLET PROTECTION 007 WATTLE INSTALLATION FLOW 3'-4' ADJACENT ROLLS SHALL TIGHTLY ABUT W1 NOTES: INSTALLATION: WHEN INSTALLING RUNNING LENGTHS OF WATTLES, BUTT THE SECOND WATTLE TIGHTLY AGAINST THE FIRST, DO NOT OVERLAP THE ENDS. STAKE THE WATTLES AT EACH END AND FOUR FOOT ON CENTER. FOR EXAMPLE: A 25 FOOT WATTLE USES 6 STAKES A 20 FOOT WATTLE USES 5 STAKES A 12 FOOT WATTLE USES 4 STAKES STAKES SHOULD BE DRIVEN THROUGH THE MIDDLE OF THE WATTLE. LEAVING 2 - 3 INCHES OF THE STAKE PROTRUDING ABOVE THE WATTLE. A HEAVY SEDIMENT LOAD WILL TEND TO PICK THE WATTLE UP AND COULD PULL IT OFF THE STAKES IF THEY ARE DRIVEN DOWN TOO LOW. IT MAY BE NECESSARY TO MAKE A HOLE IN THE WATTLE WITH A PICK END OF YOUR MADDOX IN ORDER TO GET THE STAKE THROUGH THE STRAW. WHEN STRAW WATTLES ARE USED FOR FLAT GROUND APPLICATIONS, DRIVE THE STAKES STRAIGHT DOWN; WHEN INSTALLING WATTLES ON SLOPES, DRIVE THE STAKES PERPENDICULAR TO THE SLOPE. DRIVE THE FIRST END STAKE OF THE SECOND WATTLE AT AN ANGLE TOWARD THE FIRST WATTLE IN ORDER TO HELP ABUT THEM TIGHTLY TOGETHER. IF YOU HAVE DIFFICULTY DRIVING THE STAKE INTO EXTREMELY HARD OR ROCKY SLOPES, A PILOT BAR MAY BE NEEDED TO BEGIN THE STAKE HOLE. 1"x 1" WOOD STAKES 18"-24" BAILING WIRE OR NYLON ROPE WATTLE "A" WATTLE "B" 1' 2' TYP. 1' 1' W2 NOTES: INSTALLATION: STAKES SHOULD BE DRIVEN ACROSS FROM EACH OTHER AND ON EACH SIDE OF THE WATTLE. LEAVING 4"-6" OF STAKE PROTRUDING ABOVE THE WATTLE. BAILING WIRE OR NYLON ROPE SHOULD BE TIED TO THE STAKES ACROSS THE WATTLE. STAKES SHOULD THEN BE DRIVEN UNTIL THE BAILING WIRE OR NYLON ROPE IS SUFFICIENTLY SNUG TO THE WATTLE. WHEN INSTALLING RUNNING LENGTHS OF WATTLES, TO PREVENT SHIFTING, BUTT THE SECOND WATTLE TIGHTLY AGAINST THE FIRST. DO NOT OVERLAP THE ENDS. STAKES SHOULD BE DRIVEN 1 FT. FROM END, ACROSS FROM AND ON EACH SIDE OF WATTLE LEAVING 4"-6" OF STAKE PROTRUDING ABOVE THE WATTLE. BAILING WIRE OR NYLON ROPE SHOULD BE TIED TO STAKES IN AN HOUR GLASS FORMATION (FRONT TO BACK OF WATTLE "A", ACROSS TO FRONT OF WATTLE "B", ACROSS TO BACK AND BACK TO FRONT OF WATTLE "A"). STAKES SHOULD THEN BE DRIVEN IN UNTIL BAILING WIRE OR NYLON ROPE IS SUFFICIENTLY SNUG TO THE WATTLE. W1 & W2 INSTALLATION NOTES: 1. THE LOCATION AND LENGTH OF WATTLE IS DEPENDENT ON THE CONDITIONS OF EACH SITE. 2. WATTLES SHALL BE INSTALLED PRIOR TO ANY LAND-DISTURBING ACTIVITIES. 3. WATTLES SHALL CONSIST OF STRAW, COMPOST, EXCELSIOR, OR COCONUT FIBER. 4. NOT FOR USE IN CONCENTRATED FLOW AREAS. 5. THE WATTLES SHALL BE TRENCHED INTO THE GROUND A MINIMUM OF TWO (2) INCHES. 6. WATTLES SHALL BE INSTALLED PER MANUFACTURERS SPECIFICATIONS. 7. ON SLOPES, WATTLES SHOULD BE INSTALLED ON CONTOUR WITH A SLIGHT DOWNWARD ANGLE AT THE END OF THE ROW IN ORDER TO PREVENT PONDING AT THE MID SECTION. 8. RUNNING LENGTHS OF WATTLES SHOULD BE ABUTTED FIRMLY TO ENSURE NO LEAKAGE AT THE ABUTMENTS. 9. SPACING - DOWNSLOPE: VERTICAL SPACING FOR SLOPE INSTALLATIONS SHOULD BE DETERMINED BY SITE CONDITIONS. SLOPE GRADIENT AND SOIL TYPE ARE THE MAIN FACTORS. A GOOD RULE OF THUMB IS: 1:1 SLOPES = 10 FEET APART 2:1 SLOPES = 20 FEET APART 3:1 SLOPES = 30 FEET APART 4:1 SLOPES = 40 FEET APART, ETC. HOWEVER, ADJUSTMENTS MAY HAVE TO BE MADE FOR THE SOIL TYPE: FOR SOFT, LOAMY SOILS - ADJUST THE ROWS CLOSER TOGETHER; FOR HARD, ROCKY SOILS - ADJUST THE ROWS FURTHER APART. A SECONDARY WATTLE PLACED BEHIND THE ABUTMENT OF TWO WATTLES IS ENCOURAGED ON STEEP SLOPES OR WHERE JOINTS HAVE FAILED IN THE PAST. 10. STAKING: THE CITY RECOMMENDS USING WOOD STAKES TO SECURE THE WATTLES. 1/2" TO 5/8" REBAR IS ALSO ACCEPTABLE. BE SURE TO USE A STAKE THAT IS LONG ENOUGH TO PROTRUDE SEVERAL INCHES ABOVE THE WATTLE: 18" IS A GOOD LENGTH FOR HARD, ROCKY SOIL. FOR SOFT LOAMY SOIL USE A 24" STAKE. 4"-6" ABOVE WATTLE AFTER BAILING WIRE OR NYLON ROPE IS ATTACHED. STAKES NEED TO BE TAMPED UNTIL WIRE/ROPE IS SNUG WITH WATTLE. 1"x 1" WOOD STAKES 18"-24" ENDS OF ADJACENT WATTLES SHALL BE TIGHTLY ABUTTED TO PREVENT SEDIMENT BYPASS W2 NOTE: ONLY WATTLES MADE WITH COCONUT FIBERS SHALL BE USED WHEN INSTALLATION COMES IN CONTACT WITH A WATER BODY. SF SF ROCK SOCK SECTION ROCK SOCK PLAN ROCK SOCK JOINTING GRADATION TABLE SIEVE SIZE MASS PERCENT PASSING SQUARE MESH SIEVES NO. 4 2" 100 1-1/2" 90-100 1" 20-55 3/4" 0-15 3/8" 0-5 MATCHES SPECIFICATIONS FOR NO. 4 COARSE AGGREGATE FOR CONCRETE PER AASHTO M43. ALL ROCK SHALL BE FRACTURED FACE, ALL SIDES RS VTC 004 VEHICLE CONTROL TRACKING PAD 001 CONCRETE WASHOUT AREA 005 ROCK SOCK DETAIL CW IP Does not match the index on sheet C-000. 11/20/18 MW ST ST CONTROL IRR ST ST ST NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON UD UD UD UD UD UD UD UD UD UD UD M ONITORING WELL TRAFFIC RATED MONITORING WELL TRAFFIC RATED DS DS DS DS SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF CW SF SF VTC VTC SF SF SF SF SF SF RS RS RS RS RS IP IP W2 W2 DECORATIVE PAVERS Sheet WILLOW STREET RESIDENCES These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 20 NORTH C-600 EROSION CONTROL PLAN 14 ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 GRAPHIC SCALE: City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R SF IP W2 DS VTC INLET PROTECTION W1 WATTLE CONSTRUCTION FENCE DANDYSACK WATTLE VEHICLE TRACKING PAD SF CW CONCRETE WASHOUT AREA RS ROCK SOCK EXISTING STORM SEWER ST PROJECT BOUNDARY PROPOSED CURB & GUTTER PROPOSED PERFORATED STROM UD PROPOSED STORM SEWER D NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS PROPOSED INLET BENCHMARK/BASIS OF BEARING: NOTES: LEGEND: 1. CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR SIMILAR METHODS (AS APPLICABLE). 2. TOTAL DISTURBED AREA = 2.04 ACRES 3. SWMP ADMINISTRATOR: Contact ________________________________ Company ________________________________ Address ________________________________ Phone ________________________________ 4. REMOVE SEDIMENT THAT IS TRACKED ONTO THE PUBLIC RIGHT OF WAY DAILY OR MORE FREQUENTLY ASS NEEDED. EXCESS SEDIMENT IN THE ROADWAY INDICATES THAT THE STABILIZED CONSTRUCTION ENTRANCE NEEDS MAINTENANCE. 5. CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF ACCESS IS OFF PAVEMENT. 6. REMOVE ALL ACCUMULATED SEDIMENT AND DEBRIS FROM THE DANDY SACK, SURFACE AND VICINITY OF THE UNIT AFTER EACH STORM EVENT. IF USING OPTIONAL OIL ABSORBENTS, REMOVE AND REPLACE ABSORBENTS WHEN THEY NEAR SATURATION. 7. REFER TO THE "STORM WATER MANAGEMENT PLAN & EROSION CONTROL REPORT FOR WILLOW STREET RESIDENCES BY NORTHERN ENGINEERING, DATED 10/31/2018 FOR ADDITIONAL INFORMATION. TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION Project: STANDARD AT FORT COLLINS CONSTRUCTION PHASE MOBILIZATION DEMOLITION GRADING BEST MANAGEMENT PRACTICES (BMPS) STRUCTURAL "INSTALLATION" Silt Fence Barriers * Flow Barriers (Wattles) * Inlet Filter Bags * Vegetative Temporary Seeding Planting Mulching / Sealant Permanent Seeding Planting Sod Installation Rolled Products : Netting / Blankets / Mats Contour Furrows (Ripping / Disking) Rock Bags * UTILITIES INSTALLATION FLAT WORK INSTALLATION VERTICAL INSTALLATION LANDSCAPE DEMOBILIZATION Vehicle Tracking Pad * * All Temporary BMPs to be Removed once Construction is Complete Any prior inlets that could use protecting Any prior inlets that could use protecting Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Riprap 1. IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES. 2. THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED. 4. CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION. 5. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, PONDS AND RAIN GARDENS UNTIL SITE IS FULLY STABILIZED. 6. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT. 7. INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR PAVEMENT, ETC.) 8. CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE. 9. ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO INSURE THAT EACH BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS. 10. CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR PAVEMENT, ETC.) 11. FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. 12. CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN. 13. THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE. 14. WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION. 15. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE STABILIZATION METHODS. 16. ALL ROOF DRAIN SYSTEM INLETS SHAL BE PLUGGED UNTIL CONNECTED TO BUILDINGS. 17. ALL PARTIES DISTURBING EXISTING SITE SOILS SHALL ADHERE TO THE SOILS MANAGEMENT PLAN (SMP) FOR SCHRADER SHOP PROPERTY PREPARED BY NATIONAL INSPECTION SERVICES, DATED MARCH 27, 2018. SUBSURFACE DISTURBANCE INCLUDES EXCAVATION, UTILITY TRENCHING, CAISSON DRILLING, DEWATERING, AND OTHER SUCH INTRUSIVE ACTIVITIES, AS DESCRIBED IN THE SMP. THE SMP DESCRIBES THE NECESSARY PROCEDURES FOR THE HANDLING, RE-USE, TRANSPORT, AND DISPOSAL OF SOILS EXCAVATED DURING CONSTRUCTION ACTIVITIES, INCLUDING DEWATERING ACTIVITIES. EROSION CONTROL NOTES: PROJECT DATUM: NAVD 88 BENCHMARK #1: CITY OF FORT COLLINS BENCHMARK 1-13 SOUTHWEST CORNER OF COLLEGE AVE. AND MAPLE ST. ON A CONCRETE TRAFFIC SIGNAL BASE. ELEVATION = 4979.75 BENCHMARK #2: CITY OF FORT COLLINS BENCHMARK 3-13 APPROX. 40 FT SOUTH OF THE LINDEN STREET BRIDGE OVER THE POUDRE RIVER ON THE WEST OF OF LINDEN ST., ON A STORM INLET. ELEVATION = 4962.27 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRE FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.17 BASIS OF BEARING: THE BASIS OF BEARINGS IS THE WEST LINE OF THE NORTHWEST QUARTER OF SECTION 12 AS BEARING SOUTH 00°24'12" WEST. 11/20/18 The City's Benchmark Statement format has been revised. See written comments. Line Over Text M ONITORING WELL TRAFFIC RATED MONITORING WELL TRAFFIC RATED S w1 w2 e1 e2 WILLOW STREET w3 e3 W3 OS1 E3 E1 W2 E2 W1 OS2 "WEST POND" 34 SC-740 STORMTECH CHAMBERS 23 SC-740 ISOLATOR CHAMBERS "EAST POND" 21 SC-740 STORMTECH CHAMBERS 21 SC-740 ISOLATOR CHAMBERS SEE SHEET C-300 FOR STORM SEWER INFORMATION ± 732 SQ. FT. OF RUNOFF FLOWING OVER THE PUBLIC SIDEWALK INLET INLET INLET INLET INLET INLET 2' CONCRETE PAN 2' CONCRETE PAN os2 os1 ± 597 SQ. FT. OF RUNOFF FLOWING OVER THE PUBLIC SIDEWALK Sheet WILLOW STREET RESIDENCES These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 20 NORTH C-500 DRAINAGE EXHIBIT 13 ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 GRAPHIC SCALE: LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED STORM INLET EXISTING CURB & GUTTER PROPOSED OVERLAND FLOW EXISTING MAJOR CONTOUR PROPOSED MAJOR CONTOUR RUNOFF SUMMARY: A2 a3 DRAINAGE BASIN AREA DRAINAGE BASIN ID DRAINAGE BASIN MINOR/MAJOR COEFF. EXISTING STORM SEWER ST PROPOSED DIRECT FLOW BASIN DELINEATION 1. REFER TO "FINAL DRAINAGE REPORT FOR WILLOW STREET RESIDENCES" PREPARED BY NORTHERN ENGINEERING ON 10/31/2018 FOR ADDITIONAL INFORMATION. NOTES: BASIN ID TOTAL AREA (acres) C2 C100 Q2 (cfs) Q100 (cfs) W1 0.332 0.73 0.91 0.69 3.00 W2 0.203 0.77 0.97 0.45 1.95 W3 0.677 0.95 1.00 1.83 6.73 E1 0.239 0.83 1.00 0.57 2.38 E2 0.110 0.45 0.57 0.12 0.56 E3 0.383 0.95 1.00 1.04 3.81 OS1 0.070 0.79 0.98 0.16 0.68 OS2 0.026 0.65 0.81 0.05 0.21 City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R Line Over Text 11/20/18 2.0% 0.0% 5.0% 5.0% 0.1% 2.0% 0.1% 1.5% 0.7% 2.0% 2.1% CONCRETE PAVERS 2' CONCRETE PAN STAIRS (2) FURNITURE (SEE LANDSCAPE PLANS) FURNITURE (SEE LANDSCAPE PLANS) STAIRS (2) SEE LANDSCAPE PLANS FOR PAVEMENT TYPE LANDSCAPING WALLS (SEE LANDSCAPE PLANS (TYP.)) 5.0% 73.00 72.99 72.58 72.44 72.33 72.56 70.81 71.59 71.53 70.70 71.59 71.62 71.82 71.79 71.79 71.32 71.60 71.60 71.73 71.40 71.40 71.12 SS SS SS SS SS SS SS X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X C ONTROL IRR NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON BURY FOUNDATION BURY FOUNDATION WILLOW STREET PINE STREET 1.6% 3.6% 2.3% 2.3% 3.8% 3.5% 2.0% 3.7% 3.0% 0.5% 2.6% 2.1% 2.8% 2.8% 2.3% 2.6% 2.1% 1.2% 2.5% 2.2% 3.1% 3.0% 2.8% 2.6% 2.3% 3.1% 2.4% 2.5% 2.7% 1.7% 2.3% 2.0% 2.1% 2.6% 2.4% 2.2% 2.7% 2.1% 2.2% SAWCUT INLET INLET INLET INLET INLET 0.5% 1.5% 0.5% 1.0% 2.0% 2.0% 2.0% 5.4% 4.3% 2.8% 2.4% 5.2% 4.4% 30" OUTFALL CURB AND GUTTER 30" INFLOW CURB AND GUTTER 4.4% 2' CONCRETE PAN 2' CONCRETE PAN LOW VOLUME DRIVEWAY 2.2% 2.8% 2.0% 1.9% 2.0% 2.7% INLET 2.3% 2.8% 2.8% 2.1% 2.8% 2.2% 2.8% 1.5% 2' CONCRETE PAN 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.1% 2.0% CROSSWALK FUTURE CURB AND GUTTER 4.4% 2.2% 4.4% 4.4% 5.0% 5.5% 5.0% 4.9% 3.1% 71.56 73.00 71.36 72.02 71.24 72.08 72.56 72.49 72.83 73.02 73.82 73.60 73.65 73.85 74.23 73.91 75.41 75.11 75.18 75.55 75.49 75.50 71.46 73.00 72.20 71.79 73.00 72.45 75.34 75.10 75.06 75.55 75.70 76.07 75.51 74.80 75.71 75.55 75.50 75.44 75.58 75.82 75.28 75.08 74.86 74.69 75.08 74.84 73.67 73.43 73.25 73.26 73.22 73.32 72.06 73.00 73.00 70.18 71.78 71.53 (69.62) 69.48 70.15 (69.82) 72.99 72.58 72.44 72.58 72.33 72.56 73.81 73.32 73.46 73.28 73.60 73.92 74.93 75.00 75.16 75.16 74.71 74.79 74.67 73.72 72.84 71.98 74.30 73.98 74.03 74.28 74.11 74.00 71.81 73.41 73.01 72.17 72.59 72.22 72.51 72.09 72.64 73.00 72.77 72.93 72.99 72.90 71.26 71.46 71.80 71.54 71.61 HP 72.07 HP 71.10 70.16 70.87 70.84 70.81 68.99 FFE=73.00 FFE=75.16 FFE=73.00 70.56 70.56 70.15 70.27 75.70 75.70 76.00 72.39 (69.76) (70.80) 72.50 72.77 72.91 75.79 72.50 72.86 71.56 72.18 (70.47) (69.91) (68.59) 71.59 71.53 70.70 71.73 74.04 73.49 FFE=75.55 74.09 74.23 72.03 73.21 71.31 73.23 74.93 74.69 74.57 73.45 73.56 73.43 72.98 73.21 72.92 72.89 71.52 71.86 71.66 71.58 71.78 71.59 71.62 71.80 71.80 71.80 71.80 71.80 72.00 72.00 72.00 72.00 72.00 71.82 71.79 71.79 71.32 71.60 71.60 71.73 71.23 70.38 71.40 71.40 71.12 71.03 70.18 70.13 70.97 73.45 72.02 71.90 73.33 74.13 74.33 74.48 (70.49) 70.84 71.23 71.37 (69.14) (69.21) 74.62 74.55 74.44 72.16 70.16 72.92 72.92 72.92 71.90 72.80 70.43 Sheet WILLOW STREET RESIDENCES These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 20 NORTH C-400 GRADING PLAN 11 ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 GRAPHIC SCALE: LEGEND: EXISTING DECID. TREE EXISTING CONIF. TREE EXISTING LIGHT POLE PROJECT BOUNDARY EXISTING CURB/GUTTER FLOWLINE EXISTING EDGE OF ASPHALT 4950 4:1 BANK SLOPE PROPOSED ASPHALT CROSS SLOPE CONCENTRATED FLOW DIRECTION PROPOSED SWALE FLOWLINE FUTURE CURB/GUTTER FLOWLINE PROPOSED STORM DRAIN WITH INLET PROPOSED CONTOUR EXISTING CONTOUR PROPOSED FINISH GROUND ELEVATION 79.45 (79.45) EXISTING GROUND ELEVATION PROPOSED INFLOW CURB/GUTTER FLOWLINE 2.0% BENCHMARK/BASIS OF BEARING NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. 3. EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 4. REFER TO SITE PLAN, LANDSCAPE PLAN, AND PLAT FOR ADDITIONAL INFORMATION. 5. THE CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATING AND VERIFYING ELEVATIONS OF ALL EXISTING SEWER MAINS, WATER MAINS, CURBS, GUTTERS AND OTHER UTILITIES AT THE POINTS OF CONNECTION SHOWN ON THE PLANS, AND AT ANY UTILITY CROSSINGS PRIOR TO INSTALLING ANY OF THE NEW IMPROVEMENTS. IF A CONFLICT EXISTS AND/OR A DESIGN MODIFICATION IS REQUIRED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN. 6. SEE SHEET C-200 FOR HORIZONTAL INFORMATION INCLUDING CURB AND GUTTER TYPES, PAN WIDTHS, DRIVE AISLE DIMENSIONS, EASEMENTS, ETC. 7. ALL PARTIES DISTURBING EXISTING SITE SOILS SHALL ADHERE TO THE SOILS MANAGEMENT PLAN (SMP) FOR SCHRADER SHOP PROPERTY PREPARED BY NATIONAL INSPECTION SERVICES, DATED MARCH 27, 2018. SUBSURFACE DISTURBANCE INCLUDES EXCAVATION, UTILITY TRENCHING, CAISSON DRILLING, DEWATERING, AND OTHER SUCH INTRUSIVE ACTIVITIES, AS DESCRIBED IN THE SMP. THE SMP DESCRIBES THE NECESSARY PROCEDURES FOR THE HANDLING, RE-USE, TRANSPORT, AND DISPOSAL OF SOILS EXCAVATED DURING CONSTRUCTION ACTIVITIES, INCLUDING DEWATERING ACTIVITIES. PROJECT DATUM: NAVD 88 BENCHMARK #1: CITY OF FORT COLLINS BENCHMARK 1-13 SOUTHWEST CORNER OF COLLEGE AVE. AND MAPLE ST. ON A CONCRETE TRAFFIC SIGNAL BASE. ELEVATION = 4929.75 BENCHMARK #2: CITY OF FORT COLLINS BENCHMARK 3-13 APPROXIMATELY 40 FT SOUTH OF THE LINDEN STREET BRIDGE OVER THE POUDRE RIVER ON TEH WEST OF OF LINDEN ST., ON A STORM INLET. ELEVATION = 4962.27 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRE FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.17 BASIS OF BEARING: THE BASIS OF BEARINGS IS THE WEST LINE OF THE NORTHWEST QUARTER OF SECTION 12 AS BEARING SOUTH 00°24'12" WEST. EXISTING STORM SEWER LINE ST PROPOSED OUTFALL CURB/GUTTER FLOWLINE City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ( IN FEET ) 1 inch = ft. 10 0 10 Feet 10 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R Incorrect Elevation The City's Benchmark Statement format has been revised. See written comments. 11/20/18 Text Over Text Text Over Text Line Over Text Text Over Text 4985 4990 9+75 10+00 11+00 11+50 30'' BASIN A5.3-1 STA 10+00.00 RIM 4973.7± INV. IN 4968.04 (N) INV. IN 4968.04 (NE) INV. OUT 4968.04 (SE) 33.03 LF 12" HDPE @ 0.50% TEE A5.3-1.1 STA 10+33.03 INV. 4968.21 56.10 LF 12" HDPE @ 0.50% SAND OIL SEPARATOR A5.3-1.2 STA 10+89.13 RIM 4972.6± INV. IN 4968.49 (NE) INV. OUT 4968.49 (SW) 11.39 LF 12" HDPE @ 0.50% INLET A5.3-1.4 STA 11+30.24 FL. EL 4972.0± INV. OUT 4968.69 (SW) PROPOSED GRADE EXISTING GROUND 29.72 LF 12" HDPE @ 0.50% TEE A5.3-1.3 STA 11+00.52 INV. 4968.54 100-YR HGL 4955 4960 4965 4970 4975 4980 4985 4990 4955 4960 4965 4970 4975 4980 4985 4990 12+00 11+00 10+00 9+75 30'' BASIN A5.3-1 STA 10+00.00 FL. EL 4973.7± INV. IN 4968.04 (N) INV. IN 4968.04 (NE) INV. OUT 4968.04 (SE) 123.64 LF 15" HDPE @ 0.50% TEE A5.3-2 STA 11+23.64 INV. 4968.66 53.53 LF 15" HDPE @ 0.50% INLET A5.3-2 STA 11+77.17 FL. EL 4971.4± INV. OUT 4968.93 (S) PROPOSED GRADE EXISTING GROUND 100-YR HGL ST SS SS SS SS SS S N YLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON TF UD UD UD W E E E E E E EV F E E E E SS SS SS SS SS SS G G G D S S D S CONTROL IRR ST ST SS SS SS SS SS 30'' WQ DRAIN BASIN A4.2 STA 10+00.00 N: 132359.49 E: 195441.18 29.97 LF 12" HDPE @ 1.50% TEE A4.2-2 STA 10+29.97 N: 132339.60 E: 195463.61 42.99 LF 12" HDPE @ 1.50% SAND OIL SEPERATOR A4.2-3 STA 10+72.97 N: 132311.08 E: 195495.78 30.90 LF 12" HDPE @ 1.00% INLET A4.2-3 STA 11+04.08 N: 132299.51 E: 195524.43 EAST POND (SEE SHEET C-401) STORM LINE A (SEE SHEET C-303) STORM LINE A4.2-1 (SEE SHEETS C-300 AND C-401 FOR ADDITIONAL INFORMATION) SANITARY LINE C (SEE SHEET C-302) ROOF DRAIN CONNECTION (SEE SHEET C-300) TF NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS UD UD MONITORING WELL TRAFFIC RATED E E E E G G G G G G X X X X ST INLET A5.3-1.4 STA 11+30.24 N: 132439.55 E: 195348.65 11.39 LF 12" HDPE @ 0.50% SAND OIL SEPARATOR A5.3-1.2 STA 10+89.13 N: 132409.66 E: 195320.43 56.10 LF 12" HDPE @ 0.50% TEE A5.3-1.1 STA 10+33.03 N: 132368.87 E: 195281.91 33.03 LF 12" HDPE @ 0.50% 30'' BASIN A5.3-1 STA 10+00.00 N: 132344.86 E: 195259.24 ROOF DRAIN CONNECTION (SEE SHEET C-300) STORM LINE A5.3-2 (SEE THIS SHEET) WEST POND (SEE SHEET C-401) STORM LINE A (SEE SHEET C-303) 29.72 LF 12" HDPE @ 0.50% TEE A5.3-1.3 STA 11+00.52 N: 132417.94 E: 195328.25 STORM LINE A5.3-1.3 (SEE SHEET C-300) TF NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON UD MONITORING WELL TRAFFIC RATED E E W E E E E E E OHU G G G G G G G G X X X X G A S E V T N 30'' BASIN A5.3-1 STA 10+00.00 N: 132344.86 E: 195259.24 123.64 LF 15" HDPE @ 0.50% 53.53 LF 15" HDPE @ 0.50% INLET A5.3-2 STA 11+77.17 N: 132518.52 E: 195224.17 TEE A5.3-2 STA 11+23.64 N: 132466.05 E: 195234.77 STORM LINE A5.3-1.1 (SEE THIS SHEET) ROOF DRAIN CONNECTION (SEE SHEET C-300) ROOF DRAIN CONNECTION (SEE SHEET C-300) WEST POND (SEE SHEET C-401) Sheet WILLOW STREET RESIDENCES These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 20 C-304 PLAN AND PROFILE STORM LINE A 10 ( IN FEET ) 0 1 INCH = 30 FEET 30 30 60 90 GRAPHIC SCALE: City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner STORM LINE A4.2-2 STORM LINE A5.3-1.1 LEGEND: GENERAL NOTES: EXISTING SANITARY MH S EXISTING GAS METER G EXISTING ELECTRIC METER E VAULT EXISTING ELECTRIC VAULT ELEC EXISTING TELEPHONE PEDESTAL T H Y D EXISTING FIRE HYDRANT TRAFFIC EXISTING TRAFFIC VAULT VAULT EXISTING BURIED ELECTRIC E EXISTING BURIED GAS G EXISTING WATER LINE W EXISTING SANITARY SEWER LINE SS PROPOSED GAS LINE G PROPOSED WATER SERVICE LINE PROPOSED SANITARY SERVICE LINE EXISTING STORM SEWER ST PROJECT BOUNDARY FDC EXISTING EXISTING R.O.W PROPOSED EASEMENT LINE PROPOSED CURB & GUTTER PROPOSED FIRE DEPARTMENT CONNECTION PROPOSED FIRE SERVICE LINE ELECTRIC TRANSFORMER PROPOSED ELECTRIC LINE E PROPOSED PERFORATED STROM UD PROPOSED GAS METER PROPOSED STORM SEWER D S NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS PROPOSED ELECTRIC METER PROPOSED INLET TF WATER METER 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF PLACED END SECTIONS. 3. CONTRACTOR SHALL CONFIRM AND COORDINATE WITH STAMPED PLUMBING DRAWINGS FOR ALL ROOF DRAINS AND COURTYARD DRAIN SIZES AND LOCATIONS. NOTIFY OWNER, ARCHITECT, AND ENGINEER(S) OF ANY DISCREPANCIES PRIOR TO MOBILIZATION. 4. ALL STORM SEWER TO BE INSTALLED WITH WATER TIGHT JOINTS AT EACH CONNECTION. 5. STORMTECH SYSTEMS ARE TO BE MAINTAINED AND OWNED BY THE PROPERTY OWNER. 6. CONTRACTOR SHALL PROVIDE MINIMUM COVER OVER STORM SEWER PIPE DURING CONSTRUCTION IN ACCORDANCE WITH MANUFACTURES RECOMMENDATIONS. 7. ALL ROOF DRAIN CONNECTION SHALL BE PER DETAIL 701 ON SHEET C-701. THE CONTRACTOR SHALL TERMINATE THE ROOF DRAIN LATERALS 5 FEET OUTSIDE OF BUILDINGS. EXACT LOCATIONS OF THE ROOF DRAIN CONNECTION AT THE PROPOSED BUILDING SHALL BE COORDINATED WITH THE ARCHITECTURAL DRAWINGS. INLET SCHEDULE ID BASIN SIZE GRATE INLET A4.2-1 30" 2' x 2' ROAD AND HIGHWAY INLET A4.2-4 30" 2' x 2' CURB INLET DIAGONAL INLET A5.3-1.3 30" 2' x 2' ROAD AND HIGHWAY INLET A5.3-1.4 30" 2' x 2' ROAD AND HIGHWAY INLET A5.3-2 30" 2' x 2' CURB INLET DIAGONAL INLET A5.4 30" 2' x 2' ROAD AND HIGHWAY PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=30' PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=30' PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=30' STORM LINE A5.3-2 11/20/18 Does not match the index on sheet C-000. STA 10+46.04 RIM 4975.6± INV. IN 4962.70 (S) INV. OUT 4962.52 (NE) 168.74 LF 12" PVC @ 1.00% (BORING REQUIRED FOR INSTALLATION) SAN MH A2 STA 12+14.78 RIM 4976.2± INV. IN 4964.89 (W) INV. OUT 4964.39 (N) (117.35 LF 12" PVC @ 0.79%) EX. SAN M13387 STA 13+32.13 RIM 4977.0± INV. OUT 4965.82 (E) EXISTING GROUND 4955 4960 4965 4970 4975 4980 4985 4990 4955 4960 4965 4970 4975 4980 4985 4990 12+50 12+00 11+00 10+00 9+50 SAN MH C1 STA 10+00.00 RIM 4969.5± INV. IN 4958.64 (NW) INV. IN 4958.64 (SW) INV. OUT 4958.64 (SE) 223.29 LF 6" PVC @ 0.50% SAN MH C2 STA 12+23.29 RIM 4974.7± INV. OUT 4959.75 (NE) PROPOSED GRADE EXISTING GROUND T T T T T G G W W W W W ST ST ST E E E E E E E E G G G G D D CONTROL IRR ST ST SS SS SS SS SS SS SS SS SS SS SS SS SS SS S N YLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON TF F W E E SAN MH C1 STA 10+00.00 N: 132364.76 E: 195589.40 223.29 LF 6" PVC @ 0.50% SAN MH C2 STA 12+23.29 N: 132198.01 E: 195440.90 SANITARY SERVICE FOR BUILDING B (SEE SHEET C-300 ) STORM LINE A (SEE SHEET C-303 ) WILLOW STREET STORM LINE A4.2-2 (SEE SHEET C-304 ) Sheet WILLOW STREET RESIDENCES These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 20 C-302 UTILITY PLAN 08 ( IN FEET ) 0 1 INCH = 30 FEET 30 30 60 90 GRAPHIC SCALE: City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R LEGEND: GENERAL NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. ALL WATER AND SANITARY SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS CONSTRUCTION STANDARDS, LATEST EDITION. 3. UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 4. ALL WATER FITTINGS, VALVES, AND OTHER UTILITY APPURTENANCES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5. ALL EXISTING SANITARY SEWER SERVICES ARE APPROXIMATE AND SHALL BE FIELD VERIFIED PRIOR TO CONSTRUCTION. ALL SEWER SERVICES TO BE UNUSED SHALL BE ABANDONED AT THE MAIN AND COORDINATED WITH FORT COLLINS UTILITIES (970-221-6700). 6. ALL EXISTING WATER SERVICES ARE APPROXIMATE AND SHALL BE FIELD VERIFIED PRIOR TO CONSTRUCTION. ALL SEWER SERVICES TO THE UNUSED SHALL BE ABANDONED AT THE MAIN AND COORDINATED WITH FORT COLLINS UTILITIES (970-221-6700) 7. PRIOR TO ORDERING MATERIAL AND MOBILIZING, CONTRACTOR SHALL FIELD LOCATE AND VERIFY ELEVATIONS OF ALL CONCRETE AND ASPHALT TIE-INS, EXISTING SEWER MAINS, WATER MAINS, AND ALL OTHER UTILITIES AT THE POINTS OF CONNECTION SHOWN ON THE PLANS. SPECIAL ATTENTION SHALL BE PAID TO ALL PROPOSED UTILITY CROSSINGS. IT IS RECOMMENDED THAT THE CONTRACTOR POTHOLE SAID CROSSINGS PRIOR TO ORDERING MATERIAL. REFER TO GENERAL NOTE #9 ON SHEET C-001 IF A CONFLICT ARISES AND/OR A DESIGN MODIFICATION IS DESIRED. 8. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 9. CONTRACTOR IS RESPONSIBLE FOR ALL THE REPAIRS AND REPLACEMENTS OF ANY DAMAGED CURB AND GUTTER. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 10. SANITARY SEWER B IS AN EXISTING LINE AND ALL INFORMATION CAN BE FOUND ON SHEET C-300 EXISTING SANITARY MH S EXISTING GAS METER G EXISTING ELECTRIC METER E VAULT EXISTING ELECTRIC VAULT ELEC EXISTING TELEPHONE PEDESTAL T H Y D EXISTING FIRE HYDRANT TRAFFIC EXISTING TRAFFIC VAULT VAULT EXISTING BURIED ELECTRIC E EXISTING BURIED GAS G EXISTING WATER LINE W PROPOSED SANITARY SEWER LINE SS PROPOSED GAS LINE G PROPOSED WATER SERVICE LINE PROPOSED SANITARY SERVICE LINE SS EXISTING STORM SEWER ST PROJECT BOUNDARY FDC EXISTING EXISTING R.O.W PROPOSED EASEMENT LINE PROPOSED CURB & GUTTER PROPOSED FIRE DEPARTMENT CONNECTION PROPOSED FIRE SERVICE LINE ELECTRIC TRANSFORMER PROPOSED ELECTRIC LINE E PROPOSED PERFORATED STROM UD PROPOSED GAS METER PROPOSED STORM SEWER D S NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS PROPOSED ELECTRIC METER PROPOSED INLET TF WATER METER EXISTING SANITARY SEWER LINE SS PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=30' PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=30' SANITARY SEWER A SANITARY SEWER C "PRIVATE SANITARY LINE" 11/20/18 Does not match the index on sheet C-000. E E E E E E E E E E E E E SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS OHU OHU OHU G G G G G G G G G G G G G G G G G G G G G G G X X X X X X X X G G G G G X X X X X X X X X X X X X X G D G A S E V T N MW S GAS ST ST W C S W H2O S D H Y D M VAULT ELEC MW C S MW S S ST ST ST ST E CONTROL IRR T ST ST ST W W W W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS TF SS SS SS SS SS SS SS SS SS SS SS S N YLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS F NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON TF UD UD UD UD UD UD UD UD UD UD UD M ONITORING WELL TRAFFIC RATED MONITORING WELL TRAFFIC RATED FDC W E E E W E E E E E E E E E EV E E E E E E E E E E EV F S E E E EX. SAN M16207 INV. IN=4961.53 (SW) INV. OUT=4961.48 (NE) FG=4974.68 EX. SAN M16208 INV. IN=4960.50 (SW) INV. OUT=4960.65 (NE) FG=4971.83 EX. SAN M16211 INV. IN=4958.80 (NW) INV. OUT=4958.79 (SE) INV. OUT=4958.79 (NE) FG=4971.10 EX. SAN M16213 INV. IN=4959.29 (SW) INV. IN=4958.98 (NW) INV. OUT=4958.98 (SE) FG=4970.72 SAN. SERVICE A1 INV. IN=4960.26 (SW) INV. IN=4960.56 (NW) INV. OUT=4960.26 (NE) FG=4972.08 SAN. SERVICE A1 CONNECTION INV. OUT=4961.38 (SE) FG=4972.99 SAN. SERVICE B1 INV. IN=4958.75 (NW) INV. IN=4958.75 (SW) INV. OUT=4958.75 (SE) FG=4970.43 SAN. SERVICE B1 CONNECTION INV. OUT=4959.38 (NE) FG=4973.00 (131.56 LF 15" PVC @ 0.74%) (232.51 LF 15" PVC @ 0.75%) (399.70 LF 36" PVC @ 0.20%) (230.79 LF 24" PVC @ 0.15%) (23.06 LF 24" PVC @ 0.78%) (76.96 LF 24" PVC @ 0.15%) (25.31 LF 15" PVC @ 1.52%) (63.86 LF 15" PVC @ 1.53%) 41.02 LF 8" PVC @ 2.00% (25.04 LF 24" PVC @ 0.15%) 31.41 LF 8" PVC @ 2.00% 82.32 LF 30" RCP @ 0.50% 188.45 LF 30" RCP @ 1.00% STM MH A6 INV. IN=4967.53 (NW) INV. OUT=4967.53 (E) FG=4974.09 STM MH A7 (INV. IN=4971.41 (SW)) INV. OUT=4969.19 (SE) FG=4974.19 (CONNECT TO THE EXISTING STORM SEWER) INLET A4.2-1 INV. OUT=4967.56 (SE) FG=4971.52 6.20 LF 10" HDPE @ 1.00% 9.73 LF 12" HDPE @ 0.50% INLET A5.4 INV. OUT=4967.87 (NE) FG=4973.91 4" WET TAP 4" - G.V. 4"x3" REDUCER & T.B. N:132634.07 E:195346.70 8"x6" TEE w/ 6" - G.V. (S) & T.B. N:132523.63 E:195493.66 4" WET TAP 4" - G.V. 4"x3" REDUCER & T.B. N:132447.94 E:195556.04 98.38 LF 6" PVC FIRE SERVICE S36°55'34"W EXISTING 8" WATER MAIN EXISTING FIRE HYDRANT 3" METER PIT N:132561.45 E:195303.52 3" METER PIT N:132373.68 E:195475.31 WILLOW STREET "WEST POND" (SEE SHEET C-401) "EAST POND" (SEE SHEET C-401) SAW CUT ELECTRIC TRANSFORMER N:132302.46 E:195413.68 TRANSFORMER N:132431.24 E:195281.06 ELECTRIC METER ELECTRIC METER TIE TO EXISTING ELECTRIC LINE N:132460.10 E:195477.99 17.75' DRAINAGE EASEMENT (186.52 LF 24" RCP @ 1.30% ) 5' EXISTING GAS LINE EASEMENT (REC No. 20000322993) 39' UTILITY EASEMENT 3" WATER SERVICE 6" FIRE SERVICE ELECTRIC SERVICE ELECTRIC SERVICE 26' EMERG. ACCESS 26' EMERG. EASEMENT ACCESS EASEMENT 24' EMERG. ACCESS EASEMENT 10.96' 10' 10.71' 12.51' PRIVATE SANITARY SEWER SERVICE (TO BE PRIVATELY OWNED AND MAINTAINED) TIE TO EXISTING ELECTRIC LINE N:132580.58 E:195317.03 105.25 LF 3" RESIDENTIAL WATER SERVICE N44°34'30"E 101.69 LF 3" RESIDENTIAL WATER SERVICE S36°55'34"W APPROXIMATE ELECTRIC VAULT LOCATE (TO BE DETERMINED BY CITY OF FORT COLLINS) APPROXIMATE ELECTRIC VAULT LOCATE (TO BE DETERMINED BY CITY OF FORT COLLINS) ELECTRIC SERVICE ELECTRIC SERVICE INLET A5.3-1.3 INV. OUT=4969.22 (NW) FG=4972.09 33.96 LF 12" HDPE @ 2.00% 48.69 LF 8" HDPE @ 0.98% RD A5.3-1.1 INV. OUT=4968.83 (NW) FG=4975.16 13.66 LF 8" HDPE @ 1.00% RD A4.2-2 INV. OUT=4967.07 (SW) FG=4973.00 21.23 LF 8" HDPE @ 1.40% RD A5.3-2 INV. OUT=4968.90 (W) FG=4973.13 36.61 LF 8" HDPE @ 2.00% RD A4.3 INV. OUT=4967.37 (NW) FG=4974.73 22.5° BEND N:132444.78 E:195548.58 5.81 LF 8" HDPE @ 0.20% SERVICE LOWERING N:132432.18 E:195536.16 (280.16 LF 24" PVC @ 0.92%) SANITARY LINE C (SEE SHEET C-302 ) STORM LINE A (SEE SHEET C-303 ) STORM LINE A4.2-2 (SEE SHEET C-304 ) STORM LINE A5.3-1.1 (SEE SHEET C-304 ) SANITARY LINE A5.3-2 (SEE SHEET C-302 ) Sheet WILLOW STREET RESIDENCES These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 20 NORTH C-300 UTILITY PLAN 06 ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 GRAPHIC SCALE: MATCHLINE SEE SHEET C-301 LEGEND: GENERAL NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. ALL WATER AND SANITARY SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS CONSTRUCTION STANDARDS, LATEST EDITION. 3. UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 4. ALL WATER FITTINGS, VALVES, AND OTHER UTILITY APPURTENANCES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5. ALL EXISTING SANITARY SEWER SERVICES ARE APPROXIMATE AND SHALL BE FIELD VERIFIED PRIOR TO CONSTRUCTION. ALL SEWER SERVICES TO BE UNUSED SHALL BE ABANDONED AT THE MAIN AND COORDINATED WITH FORT COLLINS UTILITIES (970-221-6700). 6. ALL EXISTING WATER SERVICES ARE APPROXIMATE AND SHALL BE FIELD VERIFIED PRIOR TO CONSTRUCTION. ALL SEWER SERVICES TO THE UNUSED SHALL BE ABANDONED AT THE MAIN AND COORDINATED WITH FORT COLLINS UTILITIES (970-221-6700) 7. PRIOR TO ORDERING MATERIAL AND MOBILIZING, CONTRACTOR SHALL FIELD LOCATE AND VERIFY ELEVATIONS OF ALL CONCRETE AND ASPHALT TIE-INS, EXISTING SEWER MAINS, WATER MAINS, AND ALL OTHER UTILITIES AT THE POINTS OF CONNECTION SHOWN ON THE PLANS. SPECIAL ATTENTION SHALL BE PAID TO ALL PROPOSED UTILITY CROSSINGS. IT IS RECOMMENDED THAT THE CONTRACTOR POTHOLE SAID CROSSINGS PRIOR TO ORDERING MATERIAL. REFER TO GENERAL NOTE #9 ON SHEET C-001 IF A CONFLICT ARISES AND/OR A DESIGN MODIFICATION IS DESIRED. 8. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 9. CONTRACTOR IS RESPONSIBLE FOR ALL THE REPAIRS AND REPLACEMENTS OF ANY DAMAGED CURB AND GUTTER. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 10. ALL STORM SEWER CONVEYING STORMWATER TO MANHOLES A4 AND A5, AS WELL AS AS ALL STORMTECH CHAMBERS SHALL BE PRIVATELY OWNED AND MAINTAINED. 11. MAINTAIN 10 FEET HORIZONTAL AND 18 INCHES VERTICAL SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS AND SERVICES. 12. ALL PARTIES DISTURBING EXISTING SITE SOILS SHALL ADHERE TO THE SOILS MANAGEMENT PLAN (SMP) FOR SCHRADER SHOP PROPERTY PREPARED BY NATIONAL INSPECTION SERVICES, DATED MARCH 27, 2018. SUBSURFACE DISTURBANCE INCLUDES EXCAVATION, UTILITY TRENCHING, CAISSON DRILLING, DEWATERING, AND OTHER SUCH INTRUSIVE ACTIVITIES, AS DESCRIBED IN THE SMP. THE SMP DESCRIBES THE NECESSARY PROCEDURES FOR THE HANDLING, RE-USE, TRANSPORT, AND DISPOSAL OF SOILS EXCAVATED DURING CONSTRUCTION ACTIVITIES, INCLUDING DEWATERING ACTIVITIES. EXISTING SANITARY MH S EXISTING GAS METER G EXISTING ELECTRIC METER E VAULT EXISTING ELECTRIC VAULT ELEC EXISTING TELEPHONE PEDESTAL T H Y D EXISTING FIRE HYDRANT TRAFFIC EXISTING TRAFFIC VAULT VAULT EXISTING BURIED ELECTRIC EXISTING BURIED GAS EXISTING WATER LINE W PROPOSED SANITARY SEWER LINE PROPOSED GAS LINE G PROPOSED WATER SERVICE LINE PROPOSED SANITARY SERVICE LINE EXISTING STORM SEWER ST PROJECT BOUNDARY FDC EXISTING EXISTING R.O.W PROPOSED EASEMENT LINE PROPOSED CURB & GUTTER PROPOSED FIRE DEPARTMENT CONNECTION PROPOSED FIRE SERVICE LINE ELECTRIC TRANSFORMER PROPOSED ELECTRIC LINE E PROPOSED PERFORATED STROM UD PROPOSED GAS METER PROPOSED STORM SEWER D S NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS PROPOSED ELECTRIC METER PROPOSED INLET TF WATER METER EXISTING SANITARY SEWER LINE SS City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R Does not match the Subdivision Plat. Does not match the Subdivision Plat. 11/20/18 N:132349.29 E:195577.77 10' SIDEWALK 10' SIDEWALK 41' 58' WILLOW STREET 50' BNRR EASEMENT 5' EXISTING GAS LINE EASEMENT (REC No. 20000322993) PINE STREET 8' (TYP.) TYPE III BARRICADE RAILROAD BUILDING A BUILDING B 24' 26.05' 58' - 24' EMERGENCY ACCESS EASEMENT 9' (TYP.) 24' 9' (TYP.) 19' 20' 9' (TYP.) 22' 22' 8' 8' PROPOSED STRIPING STRIPING (PER WILLOW STREET IMPROVEMENTS) STRIPING (PER WILLOW STREET IMPROVEMENTS) FUTURE IMPROVEMENTS (PER WILLOW STREET IMPROVEMENTS) 15' 12' 12' 20.28' COMPACT CAR PARKING ONLY S T 0 P FIRE LANE FIRE LANE RESERVED PARKING RESERVED PARKING VAN- ACCESSIBLE RESERVED PARKING COMPACT CAR PARKING ONLY COMPACT CAR PARKING ONLY RESERVED PARKING FIRE LANE COMPACT CAR PARKING ONLY COMPACT CAR PARKING ONLY COMPACT CAR PARKING ONLY COMPACT CAR PARKING ONLY COMPACT CAR PARKING ONLY COMPACT CAR PARKING ONLY COMPACT CAR PARKING ONLY FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE LANE S T 0 P 8' (TYP.) COMPACT CAR PARKING ONLY COMPACT CAR PARKING ONLY Sheet WILLOW STREET RESIDENCES These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 20 NORTH C-201 SIGNAGE & STRIPING PLAN 05 ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 GRAPHIC SCALE: LEGEND: STANDARD ACCESS RAMP CORNER LOCATION ACCESS RAMP C A EXISTING CURB AND GUTTER DIRECTIONAL ACCESS RAMP (FLARE OPTION) B CURB AND GUTTER NOTES: City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R 1. PAVEMENT MARKINGS SHALL BE PER CITY STANDARDS AND PROJECT SPECIFICATIONS MANUAL. 2. SEE DETAIL SHEETS FOR ADDITIONAL INFORMATION REGARDING CURBS AND PAVEMENT SECTIONS. 3. SEE GEOTECHNICAL REPORT BY EARTH ENGINEERING CONSULTANTS, DATED FEBRUARY 23, 2018 FOR ALL SUBGRADE PREPARATION AND PAVEMENT RECOMMENDATIONS. 4. REFER TO SITE AND LANDSCAPE PLANS BY RUSSELL + MILLS FOR DECORATIVE PAVING, SCORING, LANDSCAPE FURNITURE, PLANTINGS, RAILINGS AND WALLS. 5. PRIVATE CONCRETE DRIVE AISLES/PARKING STALLS SHALL BE CONSTRUCTED IN ACCORDANCE WITH ACI 330R-08. 6. SEE CDOT STANDARD M-412-1 FOR ALL CONCRETE PAVING JOINT INFORMATION. 7. BUILDING POINTS ARE AT CORNERS OF NOMINAL BUILDING FOOTPRINT. CONTRACTOR SHALL CONFIRM ALL BUILDING CORNERS AND STRUCTURAL DIMENSIONS WITH ARCHITECTURAL DRAWINGS PRIOR TO STAKING. 8. REFER TO THE SUBDIVISION PLAT BY NORTHERN ENGINEERING SERVICES FOR ALL LOT SIZES AND AND EASEMENT INFORMATION. 9. THE ENCROACHMENTS SHOWN WITHIN THE RIGHTS-OF-WAY ARE SUBJECT TO A MAJOR ENCROACHMENT PERMIT APPROVAL. Does not match the Subdivision Plat. 11/20/18 PROPERTY CORNER N:132543.59 E:195190.61 PROPERTY CORNER N:132523.85 E:195245.88 PROPERTY CORNER N:132591.65 E:195281.94 PROPERTY CORNER N:132337.85 E:195568.19 N:132442.16 E:195440.77 N:132406.17 E:195408.86 N:132556.21 E:195312.11 N:132527.50 E:195281.31 N:132428.13 E:195384.09 N:132441.40 E:195395.85 N:132498.38 E:195331.58 N:132487.70 E:195308.83 N:132543.72 E:195295.68 N:132325.22 E:195492.81 N:132342.50 E:195473.33 N:132355.01 E:195467.13 N:132390.72 E:195498.79 N:132338.82 E:195554.29 N:132308.62 E:195527.52 N:132222.17 E:195401.12 N:132246.29 E:195382.31 N:132229.85 E:195400.85 N:132203.83 E:195384.85 N:132219.75 E:195366.89 N:132358.13 E:195337.43 N:132333.85 E:195365.24 N:132312.50 E:195331.62 N:132329.69 E:195312.22 TIE TO EXISTING EOA N:132632.39 E:195279.47 TIE TO EXISTING 30" VERTICAL CURB AND GUTTER N:132349.29 E:195577.77 10' SIDEWALK 10' SIDEWALK 41' 58' WILLOW STREET CONTROL POINT N:132368.32 E:195179.19 CONTROL POINT N:132413.39 E:195617.08 2 3 3 3 T 2 T 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 2 2 3 3 T B B B C N:132325.01 E:195357.41 N:132332.30 E:195349.18 50' BNRR EASEMENT 5' EXISTING GAS LINE EASEMENT (REC No. 20000322993) PINE STREET 8' (TYP.) TIE TO EXISTING SIDEWALK N:132330.75 E:195576.21 2' PAN UPPER PARKING SUPPORT COLUMN (TYP.) TYPE III BARRICADE 30" VERTICAL OUTFALL CURB AND GUTTER 30" VERTICAL INFLOW CURB AND GUTTER DRAINAGE & UTILITY EASEMENT RAILROAD UPPER PARKING DECK LIMITS 2' PAN 2' PAN BUILDING A BUILDING B SEE LANDSCAPING PLANS FOR ADDITIONAL CLARIFICATION ON AMENITY SPACE 24' 26' R15' 58' - 24' EMERGENCY ACCESS EASEMENT SIGHT LINES SIGHT LINES 9' (TYP.) 24' 9' (TYP.) 19' 20' FUTURE CURB & GUTTER WILLOW STREET (PER WILLOW STREET IMPROVEMENTS) 9' (TYP.) B 22' 22' FUTURE CURB AND GUTTER (PER WILLOW STREET IMPROVEMENTS) 8' 8' R3' R15' R5' R5' R4.5' R5' R5' R15' R2' PROPOSED EDGE OF ASPHALT PROPOSED STRIPING 2 2 2 RAISED CROSSWALK (PER WILLOW STREET IMPROVEMENTS) STRIPING (PER WILLOW STREET IMPROVEMENTS) STRIPING (PER WILLOW STREET IMPROVEMENTS) FUTURE IMPROVEMENTS (PER WILLOW STREET IMPROVEMENTS) FUTURE IMPROVEMENTS (PER WILLOW STREET IMPROVEMENTS) HANDICAP ROLL-OVER RAMP CURB & GUTTER 15' 12' 12' 20.28' B B N:132455.94 E:195434.25 2-RISERS 2-RISERS N:132237.43 E:195374.45 N:132382.69 E:195516.87 R15' R5' LIMITS OF BUILDING ABOVE GROUND LEVEL LIMITS OF BUILDING ABOVE GROUND LEVEL LIMITS OF BUILDING ABOVE GROUND LEVEL Sheet WILLOW STREET RESIDENCES These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of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ity Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ASPHALT PAVING - HEAVY DUTY CONCRETE PAVING CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R Does not match the Subdivision Plat. Does not match the Subdivision Plat. 11/20/18 G G G G G G G G G G G G X X X X G G G X X X X X X X X X X X X X X X X X X X X X X X X X X X X X G G D G A S E V T N MW S MW GAS ELEC BRKR W C S CONTROL IRR W H2O MW GAS MW MW MW S D H Y D ELEC MW C.O. C.O. CONTROL IRR M VAULT ELEC MW C S MW C S E G CONTROL IRR CONTROL IRR ELEC BRKR S S D ST ST ST ST ST ST E LEC VAULT ELEC E CONTROL IRR T C.O. ST ST W W W W W W W W W W W X SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS M W MW SS SS SS SS SS SS SS SS SS ELEC D ST ST ST ST ST D D S S SS SS SS SS SS SS SS SS SS S / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / WILLOW STREET PINE STREET 100' RIGHT OF WAY 20' SEWER AND STORM DRAINAGE EASEMENT REC. NO 20040017224 (TO BE VACATED BY SEPARATE DOCUMENT UPON ACT OF RELOCATION) 30' SEWER AND STORM DRAINAGE EASEMENT REC. NO. 20040017224 50' RAILROAD RIGHT OF WAY 10' RIGHT OF WAY EASEMENT 30' SEWER AND STORM DRAINAGE EASEMENT REC. NO. 20040017224 COVENANT TO RESTRICT USE OF PROPERTY REC. NO. 20040118593 ± 180 L.F. CONCRETE PAN (TO BE REMOVED) ONE STORY TIN-SIDED CONCRETE FOUNDATION WAREHOUSE (TO BE REMOVED) ± 680 L.F. FENCE (TO BE REMOVED) EXISTING STORM MH RIM: 4972.28 INV IN: 4967.07 (SW) INV IN: 4968.68 (W) (OPENING TO BE PLUGGED & GROUTED) INV OUT: 4965.13 (NE) (TO REMAIN) EXISTING STORM MH RIM: 4969.34 INV IN: 4964.19 (SW) INV OUT: 4964.13 (SE) (TO REMAIN) EXISTING INLET FL ELEV: 4971.45 INV IN: 4969.49 (SW) INV OUT: 4969.45 (SE) (TO BE REMOVED) ± 200 L.F. 18" RCP (TO BE REMOVED) EXISTING SANITARY MH RIM: 4972.57 INV IN: 4960.50 (SW) INV IN: 4961.03 (NW) INV IN: 4963.99 (NW) INV OUT: 4960.65 (NE) (TO REMAIN) ± 240 L.F. 15" VCP (TO BE REMOVED) EXISTING SANITARY MH RIM: 4971.95 INV: 4957.94 (NE) UNABLE TO OBTAIN OTHER TWO INVERTS (TO REMAIN) GATE MOTOR BOX (TO BE REMOVED) GATE KEYPAD (TO BE REMOVED) SANITARY VALVES (3) EXISTING SANITARY MH RIM: 4972.01 INV: 4958.79 (SE) INV: 4958.80 (SW) UNABLE TO OBTAIN OTHER INVERT (TO REMAIN) 24" PVC "INTERSTATE BATTERIES" OUTFALL FOR PERMEABLE PAVERS "NO PARKING/FIRE LANE" 18" VCP EXISTING SANITARY MH RIM: 4974.43 INV IN: 4961.93 (SE) INV IN: 4962.00 (SE) INV IN: 4961.53 (SW) INV IN: 4961.92 (NW) INV OUT: 4961.48 (NE) (TO REMAIN) SANITARY VAULT WITH HEADGATE STRUCTURES CP - AZTLAN N:132706.27 E:195257.51 CP - TIRE PILE N:132368.31 E:195179.16 CP - IB N:132413.39 E:195617.08 ± 165 L.F. ELECTRIC LINE (TO BE REMOVED) GAS TANK (TO BE REMOVED) WOOD SHED (TO BE REMOVED) ± 97 L.F. OF SANITARY SEWER (TO BE REMOVED) GRAVEL PATCH (TO BE REMOVED) IRRIGATION VALVE BOXES (2) (TO BE REMOVED) ELECTRIC METER (TO BE REMOVED) GAS METER (TO BE REMOVED) GRAVEL/DETERIORATED ASPHALT (TO BE REMOVED) EXISTING STORM MH RIM: 4978.03 INV IN: 4974.26 (SW) INV IN: 4974.00 (W) INV OUT: 4973.83 (NE) 24" RCP ONE STORY BRICK BUILDING INLET SEE LANDSCAPE PLANS FOR TREE MITIGATION 21" RCP 36" PVC 36" RCP EXISTING SANITARY MH RIM: 4973.01 INV IN: 4959.61 (W) INV OUT: 4959.61 (SE) EXISTING SANITARY MH RIM: 4974.51 INV OUT: 4959.86 (E) ± 2250 SQ. FT. OF ASPHALT TO BE REMOVED AND REPLACED 30' SEWER AND STORM DRAINAGE EASEMENT REC. NO. 20040017224 (TO BE VACATED BY SEPARATE DOCUMENT UPON ACT OF RELOCATION) 8" WATER MAIN SIGN (TO BE RELOCATED) ± 1400 SQ. FT. ASPHALT TO BE REMOVED AND REPLACED SAWCUT SIGN (TO BE RELOCATED) ELECTRIC VAULTS (2) (TO BE RELOCATED) / / / / / / / / / / / / / / / / / / / ± 64 L.F. OF ELECTRIC CONDUIT TO BE REMOVED 3.46' OF WALL (TO BE REMOVED) EXISTING STORM SEWER (PER MILL HOUSE DESIGN) EXISTING W.Q. POND (PER MILL HOUSE DESIGN) TRANSFORMERS (2) (TO BE REMOVED) SANITARY SERVICE CLEANOUTS (2) (TO BE REMOVED) ± 64 L.F. OF WATER SERVICE (TO BE ABANDONED AT THE MAIN)) MONITORING WELL (TO BE REMOVED) 208' 15" VCP (TO BE ABANDONED) EXISTING GAS (TO REMAIN) EXISTING MANHOLES (2) (TO BE REMOVED) / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / ± 205 L.F. 24" RCP (TO BE REMOVED) EXISTING ELECTRIC OUTLETS (TO BE REMOVED TYP.) EXISTING WALL (TO REMAIN) 10' Sheet WILLOW STREET RESIDENCES These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 20 NORTH C-100 AND DEMOLTION PLAN EXISTING CONDITIONS 03 ( IN FEET ) 0 1 INCH = 30 FEET 30 30 60 90 City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner H Y D TRAFFIC VAULT G W / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / S G VAULT ELEC T W SS ST E PROJECT DATUM: NAVD 88 BENCHMARK #1: CITY OF FORT COLLINS BENCHMARK 1-13 SOUTHWEST CORNER OF COLLEGE AVE. AND MAPLE ST. ON A CONCRETE TRAFFIC SIGNAL BASE. ELEVATION = 4929.75 BENCHMARK #2: CITY OF FORT COLLINS BENCHMARK 3-13 APPROX. 40 FT SOUTH OF THE LINDEN STREET BRIDGE OVER THE POUDRE RIVER ON TEH WEST OF OF LINDEN ST., ON A STORM INLET. ELEVATION = 4962.27 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRE FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.17 BASIS OF BEARING: THE BASIS OF BEARINGS IS THE WEST LINE OF THE NORTHWEST QUARTER OF SECTION 12 AS BEARING SOUTH 00°24'12" WEST. 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3. ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 4. CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. 5. CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. THE CITY OF FORT COLLINS STREET DEPARTMENT OPERATES A CRUSHING OPERATION THAT WILL ACCEPT CONCRETE MATERIAL AT NO COST FOR CRUSHING AND RE-USE AS RECYCLED AGGREGATE. THIS OPERATION IS LOCATED AT 1380 HOFFMAN MILL ROAD AND CAN BE REACHED AT (970) 482-1249. 6. SEE LANDSCAPE PLANS FOR TREE MITIGATION MEASURES. 7. ALL EXISTING SANITARY SEWER SERVICES ARE APPROXIMATE AND SHALL BE FIELD VERIFIED PRIOR TO CONSTRUCTION. ALL SEWER SERVICES TO BE UNUSED SHALL BE ABANDONED AT THE MAIN AND COORDINATED WITH FORT COLLINS UTILITIES (970-221-6700). 8. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 9. DEMOLITION OF THE EXISTING BUILDING, PAVEMENTS, AND OTHER SITE FEATURES SHOULD INCLUDE COMPLETE REMOVAL OF ALL FOUNDATION SYSTEMS, BELOW-GRADE STRUCTURAL ELEMENTS, PAVEMENTS, AND EXTERIOR FLAT WORK WITHIN THE PROPOSED CONSTRUCTION AREA. THIS SHOULD INCLUDE REMOVAL OF ANY UTILITIES TO BE ABANDONED ALONG WITH ANY LOOSE UTILITY TRENCH BACKFILL OR LOOSE BACKFILL FOUND ADJACENT TO EXISTING FOUNDATIONS. 10. LIMITS OF CONCRETE CURB REMOVAL SHALL BE TO THE NEAREST JOINT. SECTIONS LESS THAN 5' SHALL BE COMPLETELY REPLACED. 11. CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, SIDEWALKS, FENCES, AND UTILITIES. 12. CONTRACTOR TO COORDINATE REMOVAL AT EXISTING WATER SERVICES WITH CITY OF FORT COLLINS UTILITIES FIELD OPERATIONS AT (970)416.2165. OVERHEAD UTILITY OHU BURIED ELECTRIC STORM LINE SANITARY SEWER LINE CONIF. TREE DECID. TREE TO BE REMOVED H2O METER TELEPHONE PEDESTAL ELECTRIC VAULT POWER POLE CONIF. TREE TO BE REMOVED DECID. TREE GAS METER FOUND CORNER SANITARY MH DEMO LINE RAILROAD MINOR CONTOUR MAJOR CONTOUR EXISTING CURB/GUTTER WATER LINE BURIED GAS PROPERTY BOUNDARY TRAFFIC VAULT FIRE HYDRANT LIGHT POLE LEGEND: GRAPHIC SCALE: BENCHMARK AND BASIS OF BEARING NOTES: CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R Incorrect Elevation The City's Benchmark Statement format has been revised. See written comments. 11/20/18 7. The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans. 8. The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings required. 9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction. 10. The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility service as well as the utility companies. 11. No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to commencement of any work. 12. The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary sewer should be constructed prior to installation of the water lines and dry utilities. 13. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water Utility. 14. A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is discharged into a storm sewer, channel, irrigation ditch or any waters of the United States. 15. The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan. 16. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 17. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. 18. The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development. 19. All recommendations of the Final Drainage Report for Willow Street Residences dated 10/31/2018 by Northern Engineering Services, Inc., shall be followed and implemented. 20. Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping. 21. The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the the City of Fort Collins street inspector. 22. No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit is obtained, if applicable. 23. The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work in the Engineer's absence. However, the City of Fort Collins reserves the right not to accept the improvement if subsequent testing reveals an improper installation. 24. The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final report. 25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets. 26. All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce the excavation necessary for building connections. 27. Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for roads within these districts. 28. All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval. 29. Prior to the commencement of any construction, the contractor shall contact the City of Fort Collins Forester to schedule a site inspection for any tree removal requiring a permit. 30. The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA Publication 2226, Excavating and Trenching. 31. The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The the City of Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall be responsible for providing any and all traffic control devices as may be required by the construction activities. 32. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed. 33. The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the Development. 34. There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site construction activities on Sundays or holidays, unless there is prior written approval by Larimer County. 35. The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise. 36. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for clarification, and annotate the dimension on the as-built record drawings. 37. The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of any permits and extension agreements needed for the job. 38. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the Developer shall contact the Designer and the City of Fort Collins Engineer immediately. 39. The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the Larimer County's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins Engineer. 40. The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the basis of bearings. The information shall be as follows: PROJECT DATUM: NAVD 88 BENCHMARK #1: CITY OF FORT COLLINS BENCHMARK 1-13 SOUTHWEST CORNER OF COLLEGE AVE. AND MAPLE ST. ON A CONCRETE TRAFFIC SIGNAL BASE. ELEVATION = 4979.75 BENCHMARK #2: CITY OF FORT COLLINS BENCHMARK 3-13 APPROX. 40 FT SOUTH OF THE LINDEN STREET BRIDGE OVER THE POUDRE RIVER ON THE WEST OF OF LINDEN ST., ON A STORM INLET. ELEVATION = 4962.27 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRE FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.17 BASIS OF BEARING: THE BASIS OF BEARINGS IS THE WEST LINE OF THE NORTHWEST QUARTER OF SECTION 12 AS BEARING SOUTH 00°24'12" WEST. 41. All stationing is based on centerline of roadways unless otherwise noted. 42. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 43. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the Larimer County Engineer and/or the City of Fort Collins Inspector at the time the cuts are made. 44. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades and condition as required by these plans. 45. Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections. 46. After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a minimum period of two years from the date of acceptance. 47. The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures and pipes, for the following private streets: N.A. 48. Approved Variances are listed as follows: N.A. CONSTRUCTION NOTES A. Grading and Erosion Control Notes 1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site. 2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans. 3. All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion control facilities shown herein. 5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area(s) required for immediate construction operations, and for the shortest practical period of time. 6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County. 7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall: a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in order to ensure the continued performance of their intended function. b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector. c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector. 8. When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and debris from all drainage infrastructure and other public facilities. 9. The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of way, and make sure streets and walkways are cleaned at the end of each working day. 10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any waters of the United States. 11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched. 12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the City/County or Homeowners Association (HOA). 13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations. 14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout material will be removed and properly disposed of prior to the area being restored. 15. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever measures are determined necessary, as directed by the City. 16. See separate Stormwater Management Plan / Erosion Control Report for WILLOW STREET RESIDENCES dated 10/31/2018 by Northern Engineering Services, Inc., shall be followed and implemented for additional information. 17. All parties disturbing existing site soils shall adhere to the Soils Management Plan (SMP) for schrader shop property prepared by National Inspection Services, dated March 27, 2018. Subsurface disturbance includes excavation, utility trenching, caisson drilling, dewatering, and other such intrusive activities, as described in the SMP. The SMP describes the necessary procedures for the handling, re-use, transport, and disposal of soils excavated during construction activities, including dewatering activities. B. Street Improvement Notes 1. All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here. 2. A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to placement of any asphalt. 3. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins. 4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been inspected and approved by the City of Fort Collins Engineer. 5. Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed. 6. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work. 7. All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as per the Right-of-Way Work Permit traffic control plan. 8. The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt. Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly. 9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the City of Fort Collins Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The City of Fort Collins Engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of an Inspector. C. Traffic Signing and Pavement Marking Construction Notes 1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes listed here. 2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic. 3. All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD. 4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads. 5. All lane lines for concrete pavement should be epoxy paint. 6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols. 7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards. 8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction. 9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings. 10. All sign posts shall utilize break-away assemblies and fasteners per the Standards. 11. A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer. All discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin. 12. The Developer installing signs shall be responsible for locating and protecting all underground utilities. 13. Special care shall be taken in sign location to ensure an unobstructed view of each sign. 14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings). 15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail. D. Storm Drainage Notes 1. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 2. All recommendations of the Final Drainage Report for Willow Street Residences dated 10/31/2018 by Northern Engineering Services, Inc., shall be followed and implemented. 3. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. E. Utility Notes 1. All waterline and sanitary sewer construction shall conform to the Fort Collins Utility standards and specifications current to date of construction. 2. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the water utility. 3. Water mains shall be poly-wrapped D.I.P, or PVC with tracer wire. 4. HDPE pipe may be used for 1-1/2 and 2 inch water services. The pipe shall meet the standards of AWWA 901, NSF Standard 61 and ASTM. The HDPE pipe shall be SDR 9 having a pressure rating of 200 psi. Stiffeners shall be used at all fittings and connections. Tracer wire shall be installed with the HDPE service, and shall extend up the curb stop. The curb stop shall be covered with a metal box and tracer wire test lid per City Water Detail 25. The City's Benchmark Statement format has been revised. See written comments. 11/20/18 Colorado standards and statutes, respectively; and that I am fully responsible for the accuracy of all design. revisions, and record conditions that I have noted on these plans. These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. DISCLAIMER STATEMENT: CERTIFICATION STATEMENT: PROJECT LOCATION VICINITY MAP BUILDING ARCHITECT CIVIL ENGINEER MECHANICAL ENGINEER PROJECT DATUM: NAVD 88 BENCHMARK #1: CITY OF FORT COLLINS BENCHMARK 1-13 SOUTHWEST CORNER OF COLLEGE AVE. AND MAPLE ST. ON A CONCRETE TRAFFIC SIGNAL BASE. ELEVATION = 4979.75 BENCHMARK #2: CITY OF FORT COLLINS BENCHMARK 3-13 APPROX. 40 FT SOUTH OF THE LINDEN STREET BRIDGE OVER THE POUDRE RIVER ON THE WEST OF OF LINDEN ST., ON A STORM INLET. ELEVATION = 4962.27 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRE FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.17 BASIS OF BEARING: THE BASIS OF BEARINGS IS THE WEST LINE OF THE NORTHWEST QUARTER OF SECTION 12 AS BEARING SOUTH 00°24'12" WEST. ORIGINAL FIELD SURVEY BY: PROJECT BENCHMARKS: SHEET INDEX OWNER/APPLICANT C-000 COVER SHEET C-001 GENERAL NOTES C-100 EXISTING CONDITIONS AND DEMOLITION PLAN C-200 HORIZONTAL CONTROL PLAN C-201 SIGNAGE & STRIPING PLAN C-300 - C-301 UTILITY PLAN C-302 SANITARY LINES A AND C PLAN AND PROFILE C-303 STORM LINE A PLAN AND PROFILE C-304 STORM LINES A4.2-2, A5.3-2, AND A5.3-1.1 PLAN AND PROFILE C-400 GRADING PLAN C-401 SUBGRADE PLAN C-500 DRAINAGE EXHIBIT C-600 EROSION CONTROL PLAN C-601 EROSION CONTROL DETAILS C-700 - C-704 DETAILS GAS----------------- Xcel Energy----------------------------- Stephanie Rich (970) 225-7828 ELECTRIC-------- City of Fort Collins Light & Power-- Rob Irish (970) 224-6167 CABLE------------- Xfinity-------------------------------------- Don Kapperman (970) 567-0245 TELECOM.--------Centurylink------------------------------- Bill Johnson (970) 490-7501 WATER------------ City of Fort Collins Utilities----------- Shane Boyle (970) 221-6339 WASTEWATER- City of Fort Collins Utilities----------- Shane Boyle (970) 221-6339 STORMWATER- City of Fort Collins Utilities----------- Shane Boyle (970) 221-6339 UTILITY CONTACT LIST: * UTILITY COMPANY * This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of Colorado (UNCC) at 811 for additional information. PHONE NUMBER ** The underground utility locates are based upon the best available information at the time of locating. Contractor acknowledges that it is common for underground facility owner maps to have errors and omissions of data shown. Consequently, it is the Contractor's sole responsibility to field verify the location of all utilities prior to construction, and notify the Engineer of any discrepancies found. OZ Architecture 3003 Larimer Street Denver, CO 80205 Katy Candau (303) 861-5704 ENGINEER ING N O R T H E RN ENGINEER ING N O R T H E RN CA Ventures Ryan Sadowy 130 East Randolph St., Suite 2100 Chicago, IL 60601 (312) 800-5368 ORIGINAL FIELD SURVEY NORTHERN ENGINEERING SERVICES, INC. PROJECT NUMBER: 1287-005 DATE: MARCH 2017 FINAL UTILITY PLANS FOR WILLOW STREET RESIDENCES A TRACT OF LAND LOCATED IN THE NORTHWEST QUARTER OF SECTION 12, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY LARIMER, STATE OF COLORADO CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner Northern Engineering Services, Inc. Steve Lund, PLS 301 North Howes Street, Suite 100 Fort Collins, CO 80524 (970) 221-4158 SURVEYOR Russell + Mills Studios Paul Mills, RLA, ASLA 506 S. College Ave., Unit A Fort Collins, CO 80524 (970) 484-8855 LANDSCAPE ARCHITECT KL&A, Inc. Evan Forbes 421 East Fourth St Loveland, CO 80537 (970) 667-2426 STRUCTURAL ENGINEER Bret's Electric, LLC Justin Martin 8312 Raspberry Way, Suite A Frederick, CO 80530 (720) 378-6497 ELECTRICAL ENGINEER Earth Engineering Company, Inc. David Richer, PE 4396 Greenfield Drive Windsor, Colorado 80550 (970) 545-3908 Matt Delich, PE Delich Associates 2272 Glen Haven Drive Loveland, Colorado 80538 (970) 669-2061 GEOTECHNICAL ENGINEER TRAFFIC ENGINEER National Inspection Services William J. Warren 1136 E. Stuart Street, Suite 4204 Fort Collins, Colorado 80525 (970) 482-1976 ENVIRONMENTAL CONSULTANT OCTOBER 2018 The City's Benchmark Statement format has been revised. See written comments. These do not match the titles on these sheets. 11/20/18