Loading...
HomeMy WebLinkAboutFRCC HEALTH CARE CAREERS CENTER - SPA180002 - SUBMITTAL DOCUMENTS - ROUND 1 - SITE, LANDSCAPE & ELEVATIONS PLANSLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD MATCH EXISTING BRICK & BANDING MATCH EXISTING METAL PANEL MATCH EXISTING ROOF FASCIA/SOFFIT MATERIAL & COLOR MATCH EXISTING METAL PANEL, WINDOW FRAME COLOR & GLAZING TYPES MATCH EXISTING METAL PANEL, WINDOW FRAME COLOR & GLAZING TYPES MATCH EXISTING METAL PANEL, WINDOW FRAME COLOR & GLAZING TYPES BRICK WALL ASSEMBLY - MATCH EXISTING LIGHT COLOR BRICK STOREFRONT WINDOW ASSEMBLY - MATCH EXISTING WINDOW FRAME AND GLASS METAL PANEL BANDING ABOVE BRICK - MATCH EXISTING METAL PANEL COLOR METAL PANEL ROOF FASCIA - MATCH EXISTING METAL PANEL COLOR BRICK WALL ASSEMBLY - MATCH EXISTING DARK COLOR BRICK CURTAINWALL WINDOW ASSEMBLY - MATCH EXISTING WINDOW FRAME AND GLASS TYPE * GENERAL NOTES: BRICK, STOREFRONT FRAMES, CURTAINWALL FRAMES AND METAL PANELS TO MATCH THE EXISTING CAMPUS LANGUAGE COLORS AND TYPES BRICK WALL ASSEMBLY - MATCH EXISTING LIGHT COLOR BRICK STOREFRONT WINDOW ASSEMBLY - MATCH EXISTING WINDOW FRAME AND GLASS METAL PANEL BANDING ABOVE BRICK - MATCH EXISTING METAL PANEL COLOR METAL PANEL ROOF FASCIA - MATCH EXISTING METAL PANEL COLOR BRICK WALL ASSEMBLY - MATCH EXISTING DARK COLOR BRICK CURTAINWALL WINDOW ASSEMBLY - MATCH EXISTING WINDOW FRAME AND GLASS TYPE EXISTING CAMPUS LANGUAGE & MATERIALS BUILDING SIGNAGE BUILDING SIGNAGE WEST ELEVATION 1" = 10'-0" WEST ELEVATION 1" = 10'-0" MATCH EXISTING BRICK & BANDING MATCH EXISTING METAL PANEL MATCH EXISTING ROOF FASCIA/SOFFIT MATERIAL & COLOR MATCH EXISTING METAL PANEL, WINDOW FRAME COLOR & GLAZING TYPES MATCH EXISTING METAL PANEL, WINDOW FRAME COLOR & GLAZING TYPES MATCH EXISTING METAL PANEL, WINDOW FRAME COLOR & GLAZING TYPES BRICK WALL ASSEMBLY - MATCH EXISTING LIGHT COLOR BRICK STOREFRONT WINDOW ASSEMBLY - MATCH EXISTING WINDOW FRAME AND GLASS METAL PANEL BANDING ABOVE BRICK - MATCH EXISTING METAL PANEL COLOR METAL PANEL ROOF FASCIA - MATCH EXISTING METAL PANEL COLOR BRICK WALL ASSEMBLY - MATCH EXISTING DARK COLOR BRICK CURTAINWALL WINDOW ASSEMBLY - MATCH EXISTING WINDOW FRAME AND GLASS TYPE * GENERAL NOTES: BRICK, STOREFRONT FRAMES, CURTAINWALL FRAMES AND METAL PANELS TO MATCH THE EXISTING CAMPUS LANGUAGE COLORS AND TYPES BRICK WALL ASSEMBLY - MATCH EXISTING LIGHT COLOR BRICK STOREFRONT WINDOW ASSEMBLY - MATCH EXISTING WINDOW FRAME AND GLASS METAL PANEL BANDING ABOVE BRICK - MATCH EXISTING METAL PANEL COLOR METAL PANEL ROOF FASCIA - MATCH EXISTING METAL PANEL COLOR BRICK WALL ASSEMBLY - MATCH EXISTING DARK COLOR BRICK CURTAINWALL WINDOW ASSEMBLY - MATCH EXISTING CONSULTANT: ISSUE: OWNER: PROJECT: DRAWING INFORMATION: DRAWN BY: PROJECT NO: SHEET TITLE: APPROVED BY: CHECKED BY: SHEET OF 1 2 3 4 5 A B C D 1 2 3 4 5 P 303.607.0977 www.hcm2.com 1331 Nineteenth Street Denver, CO. 80202 hord|coplan|macht 11/27/2018 10:16:23 AM J:\2018\218214.00 FRCC HCCC\04 Programming\OPTION 02\Option 02_Floor Plan.rvt SPAR - BUILDING ELEVATIONS FRONT RANGE COMMUNITY COLLEGE FRCC Health Care Careers Center Checker Author 218214.00 Approver 4616 S. Shields St. Fort Collins, CO 80526 A105 11/28/18 Schematic Design Package PR-01 SPAR - BUILDING PERSPECTIVES VIEW FROM SOUTHEAST VIEW FROM NORTHWEST WINDOW FRAME AND GLASS TYPE EXISTING CAMPUS LANGUAGE & MATERIALS BUILDING SIGNAGE METAL PANEL BUILDING SIGNAGE CONSULTANT: ISSUE: OWNER: PROJECT: DRAWING INFORMATION: DRAWN BY: PROJECT NO: SHEET TITLE: APPROVED BY: CHECKED BY: SHEET OF 1 2 3 4 5 A B C D 1 2 3 4 5 P 303.607.0977 www.hcm2.com 1331 Nineteenth Street Denver, CO. 80202 hord|coplan|macht 11/26/2018 5:57:13 PM C:\Users\hmorehead\Documents\Option 02_Floor Plan_hmorehead.rvt SPAR - BUILDING ELEVATIONS FRONT RANGE COMMUNITY COLLEGE FRCC Health Care Careers Center Checker Author 218214.00 Approver 4616 S. Shields St. Fort Collins, CO 80526 A106 11/28/18 Schematic Design Package BUILDING ADDRESS - 10" LETTERS MIN CONSULTANT: ISSUE: OWNER: PROJECT: DRAWING INFORMATION: DRAWN BY: PROJECT NO: SHEET TITLE: APPROVED BY: CHECKED BY: SHEET OF 1 2 3 4 5 A B C D 1 2 3 4 5 P 303.607.0977 www.hcm2.com 1331 Nineteenth Street Denver, CO. 80202 hord|coplan|macht 11/26/2018 5:57:12 PM C:\Users\hmorehead\Documents\Option 02_Floor Plan_hmorehead.rvt SPAR - BUILDING ELEVATIONS FRONT RANGE COMMUNITY COLLEGE FRCC Health Care Careers Center Checker Author 218214.00 Approver 4616 S. Shields St. Fort Collins, CO 80526 A105 11/28/18 Schematic Design Package LOD LOD LOD LOD CONSULTANT: ISSUE: OWNER: PROJECT: DRAWING INFORMATION: DRAWN BY: PROJECT NO: SHEET TITLE: APPROVED BY: CHECKED BY: SHEET OF 1 2 3 4 5 A B C D 1 2 3 4 5 P 303.607.0977 www.hcm2.com 1331 Nineteenth Street Denver, CO. 80202 hord|coplan|macht 11/8/2018 4:37:55 PM 2018 DEN Project Template_detached.rvt BJC KRB KAT 213 Linden Street, Suite 200 Fort Collins, CO 80524 970.225.9099 www.jvajva.com JVA, Inc. Boulder ● Fort Collins ● Winter Park Glenwood Springs ● Denver FRONT RANGE COMMUNITY COLLEGE FRCC HEALTHCARE CAREER CENTER 218214.00 S.SHIELDS STREET AND W. COUNTY RD.38 FORT COLLINS, CO 80526 11.14.2018 SPAR SUBMITTAL S.SHIELDS STREET AND W. COUNTY RD.38 FORT COLLINS, CO 80526 SITE PLAN SP1