HomeMy WebLinkAboutSW PROSPECT AND I 25 ROADWAY PROJECT - RP180001 - SUBMITTAL DOCUMENTS - ROUND 2 - EROSION CONTROL LETTER/REPORTProject Number: 232-043 Location: Fort Collins, CO
Date: December 17, 2018 Total Acres: 7.20
EROSION CONTROL MEASURE Units
Estimated
Quantity
Unit
Price
Total
Price
each 0 $100.00 $0.00
L.F. 1895 $1.10 $2,084.50
each 0 $125.00 $0.00
each 1 $300.00 $300.00
each 1 $200.00 $200.00
Straw Wattle each 29 $75.00 $2,175.00
acre 2.79 $1,000.00 $2,790.00
TOTAL = $7,549.50
TOTAL = $11,324.25
TOTAL = $10,800.00
REQUIRED AMOUNT OF SECURITY = $11,324.25
NOTE: 'Total Acres' represents total disturbed area.
COST TO VEGETATE: TOTAL ACRES x ($1000/acre) x 1.5
(WHICHEVER IS GREATER)
SW Prospect & I-25
Erosion Control Cost Estimate
Vehicle Tracking Control Pads
AMOUNT OF SECURITY = 1.5 x $7,549.50
Vegetate Landscaped Areas
Inlet Protection
Rock Socks
Concrete Washout Area
Silt Fence
- OR -
=
=
D:\Projects\232-043\Drainage\Reports\SWMP Report\232-043_Erosion-Escrow-Estimate.xls