Loading...
HomeMy WebLinkAboutPOUDRE GARAGE - BDR160007 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTMarch 2, 2016 PRELIMINARY DRAINAGE REPORT FOR POUDRE GARAGE Fort Collins, Colorado Prepared for: Poudre Garage, LLC 148 Remington Street Fort Collins, Colorado 80524 Prepared by: 200 South College Avenue, Suite 10 Fort Collins, Colorado 80524 Phone: 970.221.4158 Fax: 970.221.4159 www.northernengineering.com Project Number: 998-002  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. March 2, 2016 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Preliminary Drainage Report for POUDRE GARAGE Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage Report for your review. This report accompanies the Project Development Plan submittal for the proposed Poudre Garage. This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Frederick S. Wegert, PE Project Engineer Downtown Fort Collins Hotel Parking Garage Alternative Preliminary Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ................................................................... 1 A. Location ............................................................................................................................................. 1 B. Description of Property ..................................................................................................................... 2 C. Floodplain.......................................................................................................................................... 3 II. DRAINAGE BASINS AND SUB-BASINS ....................................................................... 4 A. Major Basin Description .................................................................................................................... 4 B. Sub-Basin Description ....................................................................................................................... 4 III. DRAINAGE DESIGN CRITERIA ................................................................................... 4 A. Regulations........................................................................................................................................ 4 B. Four Step Process .............................................................................................................................. 5 C. Development Criteria Reference and Constraints ............................................................................ 5 D. Hydrological Criteria ......................................................................................................................... 6 E. Hydraulic Criteria .............................................................................................................................. 6 F. Modifications of Criteria ................................................................................................................... 6 IV. DRAINAGE FACILITY DESIGN .................................................................................... 6 A. General Concept ............................................................................................................................... 6 B. Specific Details .................................................................................................................................. 7 V. CONCLUSIONS ........................................................................................................ 8 A. Compliance with Standards .............................................................................................................. 8 B. Drainage Concept .............................................................................................................................. 8 APPENDICES: APPENDIX A -- Developed Conditions Hydrologic Computations APPENDIX B – LID Design Computations LIST OF FIGURES: Downtown Fort Collins Hotel Parking Garage Alternative Preliminary Drainage Report Figure 1 - Vicinity Map ........................................................................................................ 1 Figure 2 – Aerial Photograph ................................................................................................ 2 Figure 3 – Proposed Site Plan ............................................................................................... 3 Figure 4 – Area Floodplain Mapping ...................................................................................... 4 MAP POCKET: Proposed Drainage Exhibit Downtown Fort Collins Hotel Parking Garage Alternative Preliminary Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location Figure 1 - Vicinity Map 1. The project site is located in the southwest quarter of Section 12, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. 2. The project site is located at 148 Remington Street at northwest corner of the intersection of Remington Street and Oak Street. 3. The project site lies within the Old Town Basin. The site drains to the storm sewer system in Oak Street, which is conveyed east to the Udall Water Quality Treatment Area, and ultimately discharging into the Cache La Poudre River. The proposed impervious area for the site is 3,328 square feet, and detention is not required since the proposed impervious area is less than the required 5,000 square feet. However, the site still must provide current City Low Impact Design (LID) requirements. Water quality treatment methods are described in further detail below. 4. As this is an infill site, the area surrounding the site is fully developed. 5. No offsite flows enter the site from the north, south, east or west. Downtown Fort Collins Hotel Parking Garage Alternative Preliminary Drainage Report 2 B. Description of Property 1. The development area is roughly 0.16 net acres (6,995 square feet). Figure 2 – Aerial Photograph 2. The subject property is currently composed of existing buildings and a hard-packed dirt parking lot. Existing ground slopes are mild (i.e., 1 - 4±%) through the interior of the property. General topography slopes from north to south. 3. According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey website: http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx, the site consists of Satanta loam (Hydrologic Soil Group B). 4. The proposed project site plan is composed of expanding the existing building to include a mixed use of commercial, residential, and covered parking for the residential units. Associated site work, water, and sewer lines will be constructed with the development. Current City Low Impact Design (LID) requirements will be implemented with the project, and will consist of several LID features which are discussed in Section IV, below. Downtown Fort Collins Hotel Parking Garage Alternative Preliminary Drainage Report 3 Figure 3 – Proposed Site Plan 5. There are no known irrigation laterals crossing the site. 6. The proposed land use is mixed use. C. Floodplain 1. The project site is not encroached by any City or FEMA designated 100-year floodplain. Downtown Fort Collins Hotel Parking Garage Alternative Preliminary Drainage Report 4 Figure 4 – Area Floodplain Mapping II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. The project site lies within the Old Town Basin. Generally, detention requirements for this basin are to detain the difference between the 100-year developed inflow rate and the historic 2-year release rate. However, the site drains to the storm sewer system in Oak Street and conveyed to the Udall Water Quality Treatment Area. As long as existing site runoff rates are not increased, detention is not required for the site. However, the site must comply with current City Low Impact Design (LID) requirements. Water quality treatment methods are described in further detail below. B. Sub-Basin Description 1. The subject property historically drains overland from north to south. Runoff from the majority of the site has historically been collected in existing inlets located within Remington Street and Oak Street. 2. A more detailed description of the project drainage patterns is provided below. III. DRAINAGE DESIGN CRITERIA A. Regulations There are no optional provisions outside of the FCSCM proposed with the proposed project. Downtown Fort Collins Hotel Parking Garage Alternative Preliminary Drainage Report 5 B. Four Step Process The overall stormwater management strategy employed with the proposed project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low Impact Development (LID) strategies including: Conserving existing amenities in the site including the existing vegetated areas. Providing vegetated open areas throughout the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Routing flows, to the extent feasible, through vegetated areas to increase time of concentration, promote infiltration and provide initial water quality. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff; however, urban development of this intensity will still generate stormwater runoff that will require additional BMPs and water quality. The stormwater runoff from the site will be intercepted and treated using rain gardens. Step 3 – Stabilize Drainageways There are no major drainageways within the subject property. While this step may not seem applicable to proposed development, the project indirectly helps achieve stabilized drainageways nonetheless. By providing water quality treatment, where none previously existed, sediment with erosion potential is removed from downstream drainageway systems. Furthermore, this project will pay one-time stormwater development fees, as well as ongoing monthly stormwater utility fees, both of which help achieve City-wide drainageway stability. Step 4 – Implement Site Specific and Other Source Control BMPs. The proposed project will improve upon site specific source controls compared to historic conditions: The proposed development will provide LID features which enhance water quality; thus, eliminating sources of potential pollution previously left exposed to weathering and runoff processes. C. Development Criteria Reference and Constraints The subject property is surrounded by currently developed properties. Thus, several constraints have been identified during the course of this analysis that will impact the proposed drainage system including: Existing elevations along the property lines will generally be maintained. Downtown Fort Collins Hotel Parking Garage Alternative Preliminary Drainage Report 6 As previously mentioned, overall drainage patterns of the existing site will be maintained. Elevations of existing downstream facilities that the subject property will release to will be maintained. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the proposed development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. Two separate design storms have been utilized to address distinct drainage scenarios. A third design storm has also been computed for comparison purposes. The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2-year recurrence interval. The second event considered is the “Major Storm,” which has a 100-year recurrence interval. The third storm computed, for comparison purposes only, is the 10-year event. 4. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. As previously noted, the subject property maintains historic drainage patterns. 2. All drainage facilities proposed with the project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual. 3. As stated above, the subject property is not located in a City or FEMA designated floodplain. The proposed project does not propose to modify any natural drainageways. F. Modifications of Criteria 1. The proposed development is not requesting any modifications to criteria at this time. IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of the project drainage design are to maintain existing drainage patterns, and to ensure no adverse impacts to any adjacent properties. 2. Drainage patterns anticipated for drainage basins shown in the Drainage Exhibit are described below. Drainage basins have been defined for preliminary design purposes and are subject to change at Final design; however, general drainage patterns and concepts are not expected to be significantly altered. Basin A Basin A will generally follow historic drainage patterns. Basin A will drain via overland flow, roof drains, and proposed storm sewer into the existing storm drain system Downtown Fort Collins Hotel Parking Garage Alternative Preliminary Drainage Report 7 within Oak Street. A proposed rain garden located within Basin A will discharge into the proposed building’s storm drain system. Basin OSA Basin OSA will follow historic drainage patterns via overland flow into the existing storm drain system within Oak Street. Basins B & OSB Minimal development will occur with Basins B and OSB. Basins B and OSB will generally drain via overland flow into the existing storm drain system within Remington Street. The emergency overflow for the rain garden will occur through Basins B & OSB. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. Runoff computations for these basins based on the Rational Method is provided in Appendix A. B. Specific Details 1. Low Impact Development (LID) measures will be incorporated into the site design which will consist of a rain garden in the northeast corner of the site. Rain gardens will be designed with drain systems that will outfall to the Oak Street storm drain. The rain garden will be designed to treat 75% of the new impervious area for the site. Details of this design will be provided at Final design. 2. The following table summarizes proposed LID features and overall percentage of the basin being treated by the proposed LID features 75% On-Site Treatment by LID Requirements New Impervious Area 3,328 ft2 0.076 Ac. Traditional Pavement Area 59 ft2 0.001 Ac. Other Impervious Surfaces (Roofs, Concrete Walks, etc.) 3,269 ft2 0.075 Ac. Required Minimum Impervious Area to be Treated 2,496 ft2 0.057 Ac. Required Minimum Volume to be Treated 101 ft3 3.74 yd3 Design Volume of Rain Garden 101 ft3 3.74 yd3 Percent of Treatment of New Impervious Area 75% 3. Final design details, construction documentation, and Standard Operating Procedures (SOP) Manual shall be provided to the City of Fort Collins for review prior to Final Development Plan approval. A final copy of the approved SOP manual shall be provided to City and must be maintained on-site by the entity responsible for the facility maintenance. Annual reports must also be prepared and submitted to the City discussing the results of the maintenance program (i.e. inspection dates, inspection frequency, volume loss due to sedimentation, corrective actions taken, etc.). 4. Proper maintenance of the drainage facilities designed with the proposed development is a critical component of their ongoing performance and effectiveness. Downtown Fort Collins Hotel Parking Garage Alternative Preliminary Drainage Report 8 V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with the proposed project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with this project complies with requirements for the Old Town Basin. 3. The drainage plan and stormwater management measures proposed with the proposed development are compliant with all applicable State and Federal regulations governing stormwater discharge. B. Drainage Concept 1. The drainage design proposed with this project will effectively limit any potential damage associated with its stormwater runoff by compliance with requirements set forth in current City master plans. 2. The drainage concept for the proposed development is consistent with requirements for the Old Town Basin and the Downtown River District Final Design Report. References 1. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 2. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 3. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 4. Old Town Master Drainage Plan, Baseline Hydraulics, Volume II, Anderson Consulting, July 15, 2003. 5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised August 2013. Downtown Fort Collins Hotel Parking Garage Alternative Preliminary Erosion Control Report APPENDIX A HYDROLOGIC COMPUTATIONS Percent Impervious Developed 40% 0% Date: 2% 100% Basin ID Basin Area (sq. ft.) Basin Area (ac) Gravel Area (ac.) Area of Lawns (ac.) Pervious Area (ac.) Area of Impervious (ac.) Composite Percent Impervious 2-year Runoff Coefficient 2 5-year Runoff Coefficient 2 10-year Runoff Coefficient 2 100-year Runoff Coefficient 2 A 6,995 0.16 0.09 0.00 0.00 0.07 67.94% 0.43 0.47 0.51 0.60 OS-A 5,491 0.13 0.00 0.00 0.00 0.12 99.07% 0.87 0.88 0.90 0.94 OS-B 8,929 0.20 0.00 0.00 0.00 0.20 98.54% 0.85 0.86 0.88 0.93 Notes: 2) Runoff Coefficients are taken from the Urban Drainage and Flood Control District, Chapter 5, Table RO-5. Calculations By: F. Wegert EXISTING % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Project: Poudre Garage Gravel Lawns Pervious Area (Historical) Impervious Area 1) Percent impervious are taken from the Urban Drainage and Flood Control District, Chapter 5, Table RO-3. CHARACTER OF SURFACE 1 : March 2, 2016 3/1/2016 8:56 AM D:\Projects\998-002\Drainage\Hydrology\998-002_Pre-Developed_UDFCD_RM.xlsx\Basin Runoff Coefficient Overland Flow, Time of Concentration: Project: Calculations By: Date: Gutter/Swale Flow, Time of Concentration: T t = L / 60V T c = T i + T t (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ Is Length >500' ? C 5 Length, L (ft) Slope, S (%) T i Length, L (ft) Slope, S (%) Velocity, V (ft/s) T t (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) T t (min) Urban Tc Check T c (min) Rational Method Equation: Project: Poudre Garage Calculations By: F. Wegert Date: March 2, 2016 Rainfall Intensity: A A 0.16 10.9 0.43 0.51 0.60 2.17 3.71 7.57 0.15 0.30 0.73 OS-A OS-A 0.13 5.0 0.87 0.90 0.94 2.85 4.87 9.95 0.31 0.55 1.18 OS-B OS-B 0.20 5.0 0.85 0.88 0.93 2.85 4.87 9.95 0.50 0.88 1.89 Notes EXISTING RUNOFF COMPUTATIONS FOR INDIVIDUAL BASINS Rainfall Intensity taken from the Larimer County Stormwater Design Standards, Adopted June 20, 2005, Figure RA-3. Design Point Basin(s) Area, A (acres) T c (min) C 2 C 10 C 100 Intensity, i 2 (in/hr) Intensity, i 10 (in/hr) Intensity, i 100 (in/hr) Flow, Q 2 (cfs) Flow, Q 10 (cfs) Flow, Q 100 (cfs) Q  C f  C  i  A  3/1/2016 8:57 AM D:\Projects\998-002\Drainage\Hydrology\998-002_Pre-Developed_UDFCD_RM.xlsx\Runoff Percent Impervious Developed 40% 0% Date: 2% 100% Basin ID Basin Area (sq. ft.) Basin Area (ac) Gravel Area (ac.) Area of Lawns (ac.) Pervious Area (ac.) Area of Impervious (ac.) Composite Percent Impervious 2-year Runoff Coefficient 2 5-year Runoff Coefficient 2 10-year Runoff Coefficient 2 100-year Runoff Coefficient 2 A 6,618 0.15 0.00 0.01 0.00 0.14 95.42% 0.79 0.81 0.83 0.88 B 377 0.01 0.00 0.00 0.00 0.01 100.00% 0.89 0.90 0.92 0.96 OS-A 5,491 0.13 0.00 0.01 0.00 0.12 92.13% 0.74 0.76 0.78 0.84 OS-B 8,929 0.20 0.00 0.00 0.00 0.20 98.54% 0.85 0.86 0.88 0.93 Notes: 2) Runoff Coefficients are taken from the Urban Drainage and Flood Control District, Chapter 5, Table RO-5. Calculations By: F. Wegert DEVELOPED BASIN % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Project: Poudre Garage Gravel Lawns Pervious Area (Historical) Impervious Area 1) Percent impervious are taken from the Urban Drainage and Flood Control District, Chapter 5, Table RO-3. CHARACTER OF SURFACE 1 : March 2, 2016 3/1/2016 8:58 AM D:\Projects\998-002\Drainage\Hydrology\998-002_Post-Developed_UDFCD_RM.xlsx\Basin Runoff Coefficient Overland Flow, Time of Concentration: Project: Calculations By: Date: Gutter/Swale Flow, Time of Concentration: T t = L / 60V T c = T i + T t (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ Is Length >500' ? C 5 Length, L (ft) Slope, S (%) T i Length, L (ft) Slope, S (%) Velocity, V (ft/s) T t (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) T t (min) Urban Tc Check T c (min) Rational Method Equation: Project: Poudre Garage Calculations By: F. Wegert Date: March 2, 2016 Rainfall Intensity: A A 0.15 10.8 0.79 0.83 0.88 2.17 3.71 7.57 0.26 0.47 1.01 B B 0.01 5.0 0.89 0.92 0.96 2.85 4.87 9.95 0.02 0.04 0.08 OS-A OS-A 0.13 5.0 0.74 0.78 0.84 2.85 4.87 9.95 0.27 0.48 1.05 OS-B OS-B 0.20 5.0 0.85 0.88 0.93 2.85 4.87 9.95 0.50 0.88 1.89 Notes DEVELOPED RUNOFF COMPUTATIONS FOR INDIVIDUAL BASINS Rainfall Intensity taken from the Larimer County Stormwater Design Standards, Adopted June 20, 2005, Figure RA-3. Design Point Basin(s) Area, A (acres) T c (min) C 2 C 10 C 100 Intensity, i 2 (in/hr) Intensity, i 10 (in/hr) Intensity, i 100 (in/hr) Flow, Q 2 (cfs) Flow, Q 10 (cfs) Flow, Q 100 (cfs) Q  C f  C  i  A  3/1/2016 8:59 AM D:\Projects\998-002\Drainage\Hydrology\998-002_Post-Developed_UDFCD_RM.xlsx\Runoff Project Number: Project: Project Location: Calculations By: Date: Percent Impervious ● roof & concrete 3,257 ft 2 100% 3,257 ft 2 ● gravel 1 3,738 ft 2 40% 1,495 ft 2 4,752 ft 2 ● new roof & concrete 1 3,328 ft 2 100% 3,328 ft 2 3,328 ft 2 Note: 1) Gravel parking lot to be replaced with proposed building, concrete, and rain garden. Total New Impervious Area Existing Proposed Impervious Area for the Site 998-002 Poudre Garage Fort Collins, Colorado F. Wegert 3/2/2016 Area Weighted Area Total Existing Impervious Area 3/1/2016 8:57 AM D:\Projects\998-002\Drainage\Hydrology\998-002_Pre-Developed_UDFCD_RM.xlsx\New Impv Area Downtown Fort Collins Hotel Parking Garage Alternative Preliminary Erosion Control Report APPENDIX B WATER WAWALID DESIGN COMPUTATIONS Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 100.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 1.000 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.40 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 2,496 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 83 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 0.0 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 4.0 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 0.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 55 sq ft D) Actual Flat Surface Area AActual = 303 sq ft E) Area at Design Depth (Top Surface Area) ATop = 303 sq ft F) Rain Garden Total Volume VT= 101 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = 1.7 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = 83 cu ft iii) Orifice Diameter, 3/8" Minimum DO = 0.22 in MINIMUM DIAMETER = 3/8" Design Procedure Form: Rain Garden (RG) Frederick Wegert Northern Engineering March 2, 2016 998-002 Rain Garden Onsite Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_v3.02_Rngdn 75% Treatment.xls, RG 3/1/2016, 9:00 AM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) Frederick Wegert Northern Engineering March 2, 2016 998-002 Rain Garden Onsite Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO UD-BMP_v3.02_Rngdn 75% Treatment.xls, RG 3/1/2016, 9:00 AM Downtown Fort Collins Hotel Parking Garage Alternative Preliminary Erosion Control Report MAP POCKET DRAINAGE EXHIBITS S C S H Y D D D W D C S G ELEC VAULT RD RD UD UD UD UD UD EXISTING DOOR THRESHOLD ELEV. = 4982.52 EXISTING DOOR THRESHOLD ELEV. = 4982.44 EXISTING DOOR THRESHOLD ELEV. = 4983.99 EXISTING DOOR THRESHOLD ELEV. = 4984.04 EXISTING DOOR THRESHOLD ELEV. = 4982.56 EXISTING DOOR THRESHOLD ELEV. = 4982.46 EXISTING DOOR THRESHOLD ELEV. = 4982.42 EXISTING TREE WELL (TYP.) PRESERVE & PROTECT EXISTING TREE PRESERVE & PROTECT EX. RAMP WITH HANDRAIL REMMINGTON STREET (100' ROW) 20' WIDE ALLEY PRESERVE & PROTECT EXISTING TREE PRESERVE & PROTECT EXISTING TREE EXISTING 1-STORY BRICK BUILDING EXISTING 1-STORY BRICK BUILDING EXISTING 2-STORY BRICK BUILDING PRESERVE & PROTECT EXISTING UNDERGROUND ELECTRIC VAULT PRESERVE & PROTECT EXISTING TREE OS-A 0.13 AC. A 0.15 AC. OS-B 0.20 AC. PRESERVE & PROTECT EXISTING TREES OAK STREET (100' ROW) B 0.01 AC. PROPOSED BUILDING FF = 4982.50 OSA OSB A (M) N00°18'49"E 99.99' (R) NORTH 100' (M) S00°20'34"W 99.97' (R) SOUTH 100' (M) N89°42'10"W 69.94' (R) WEST 70' (M) S89°41'11"E 69.99' (R) EAST 70' No. Revisions: By: Date: REVIEWED BY: R. Provencio DESIGNED BY: DRAWN BY: SCALE: DATE: 3/2/16 PROJECT: 998-002 Sheet Of 9 Sheets POUDRE GARAGE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 3/2/16 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 E N G I N E E R I N G N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com C500 DRAINAGE PLAN F. Wegert F. Wegert 1" = 10' City UTILITY of Fort PLAN Collins, APPROVAL Colorado Date Date Date Date Date Date APPROVED: City Engineer Traffic Engineer Parks & Recreation Stormwater Utility Water & Wastewater Utility CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R ( IN FEET ) 10 0 10 20 30 1 INCH = 10 FEET A DRAINAGE BASIN LABEL BASIN DESIGNATION BASIN AREA (AC) DRAINAGE BASIN BOUNDARY B2 1.45 ac 80 79 5015 5013 EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED CONTOURS DESIGN POINT FLOW ARROWS 1.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2.REFER TO THE "PRELIMINARY DRAINAGE REPORT FOR POUDRE GARAGE" BY NORTHERN ENGINEERING, DATED MARCH 2, 2016 FOR ADDITIONAL INFORMATION. NOTES: LEGEND: EXISTING RIGHT-OF-WAY/PROPERTY LINE VAULT ELEC EXISTING CONCRETE EXISTING CURB & GUTTER PROPOSED CONCRETE PAVEMENT PROPOSED ASPHALT PAVEMENT PROPOSED VERTICAL CURB & GUTTER RD PROPOSED RAIN GARDEN/LID TREATMENT EXISTING BUILDING SAWCUT LINE EXISTING ELECTRIC VAULT EXISTING FIRE HYDRANT EXISTING TREES PROPOSED ROOF DRAIN PROPOSED BUILDING EXPANSION CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R FIELD SURVEY BY: ORIGINAL FIELD SURVEY NORTHERN ENGINEERING SERVICES, INC. PROJECT NUMBER: 998-002 DATE: DECEMBER 2015 PROPOSED STORM SEWER PROPOSED UNDERDRAIN UD A A No 0.81 137 0.18% 11.0 0 0.00% N/A N/A 0 0.00% N/A N/A 10.8 10.8 B B No 0.90 8 6.25% 0.6 60 0.83% 1.82 0.5 0 0.00% N/A N/A 10.4 5.0 OS-A OS-A No 0.76 23 1.65% 2.5 93 0.87% 1.87 0.8 0 0.00% N/A N/A 10.6 5.0 OS-B OS-B No 0.86 23 1.65% 1.8 159 0.78% 1.77 1.5 0 0.00% N/A N/A 11.0 5.0 DEVELOPED DIRECT TIME OF CONCENTRATION FOR INDIVIDUAL BASINS Gutter Flow 1 Swale Flow Design Point Basin Overland Flow Time of Concentration Poudre Garage F. Wegert March 2, 2016 (Equation RO-4)   3 1 0 . 395 1 . 1 5 S C L Ti   3/1/2016 8:58 AM D:\Projects\998-002\Drainage\Hydrology\998-002_Post-Developed_UDFCD_RM.xlsx\Tc A A No 0.47 170 0.32% 22.2 0 0.00% N/A N/A 0 0.00% N/A N/A 10.9 10.9 OS-A OS-A No 0.88 23 1.65% 1.6 93 0.87% 1.87 0.8 0 0.00% N/A N/A 10.6 5.0 OS-B OS-B No 0.86 23 1.65% 1.8 159 0.78% 1.77 1.5 0 0.00% N/A N/A 11.0 5.0 EXISTING DIRECT TIME OF CONCENTRATION FOR INDIVIDUAL BASINS Gutter Flow 1 Swale Flow Design Point Basin Overland Flow Time of Concentration Poudre Garage F. Wegert March 2, 2016 (Equation RO-4)   3 1 0 . 395 1 . 1 5 S C L Ti   3/1/2016 8:57 AM D:\Projects\998-002\Drainage\Hydrology\998-002_Pre-Developed_UDFCD_RM.xlsx\Tc