Loading...
HomeMy WebLinkAboutSTREETS PARK - BDR180010 - SUBMITTAL DOCUMENTS - ROUND 4 - UTILITY PLANSSITE 1 COVER SHEET PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: CITY OF FORT COLLINS FORT COLLINS, COLORADO STREETS PARK 100% CONSTRUCTION BID DOCUMENTS STREETS PARK 100% CONSTRUCTION BID DOCUMENTS FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES OR 534-6700 Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development PRELIMINARY NOT FOR CONSTRUCTION 1165-012-92 12/12/2018 UTILITY PLANS FOR: STREETS PARK tract a, east vine streets facility p.u.d., lots 1a & 2a, a replat of a portion of lots 1 and 2, east vine streets facility p.u.d., major amended final, phase two final LOCATED IN THE NORTHEAST QUARTER OF SECTION 12, T-7-N, R-69-W OF THE SIXTH PRINCIPAL MERIDIAN CITY OF FORT COLLINS, LARIMER COUNTY, COLORADO DECEMBER 2018 PROJECT DATUM: NAVD88 BENCHMARK #B 402 IN FORT COLLINS, AT THE JUNCTION OF SAN CRISTO STREET AND 9TH STREET, IN THE NORTH EDGE OF THE CONCRETE FOOTING FOR HIGHLINE TOWER NUMBER 34, 19.1 METERS (62.7 FT) SOUTH OF THE EXTENDED CENTER OF THE STREET, 16.6 METERS (54.5 FT) WEST OF THE CENTERLINE OF 9TH STREET, 8.8 METERS (28.9 FT) SOUTH OF THE CENTER OF A GRAVELED PRIVATE DRIVE LEADING WEST, 0.5 METER (1.6 FT) SOUTH OF A FENCE, AND 0.3 METER (1.0 FT) SOUTH OF THE NORTH EDGE OF THE FOOTING. NOTE--THE FOOTING IS 120-INCHES IN DIAMETER, 28-1/2 FEET DEEP AND SET INTO 12 FEET OF BEDROCK. THE MARK IS ABOVE LEVEL WITH 9TH STREET. ELEVATION: 4947.37 BENCHMARK #12-07 2 GENERAL NOTES PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: CITY OF FORT COLLINS FORT COLLINS, COLORADO STREETS PARK 100% CONSTRUCTION BID DOCUMENTS STREETS PARK 100% CONSTRUCTION BID DOCUMENTS FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES OR 534-6700 Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development PRELIMINARY NOT FOR CONSTRUCTION 1165-012-92 12/12/2018 “ ” “ ” “ ” “ ” “ ” LAJ MPO N/A LOT 1A, A REPLAT OF A PORTION OF LOTS 1 AND 2, EAST VINE STREETS FACILITY P.U.D., MAJOR AMENDED FINAL, PHASE TWO FINAL 9th STREET TRACT A EAST , VINE STREETS FACILITY P.U.D. - DRAINAGE AND ACCESS EASEMENT LOT 2A, A REPLAT OF A PORTION OF LOTS 1 AND 2, EAST VINE STREETS FACILITY P.U.D., MAJOR AMENDED FINAL, PHASE TWO FINAL 0 40' 40 20 40 80 SCALE: 1" = NOTES: 1. LIMITS OF STREET CUT SHOWN ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS SHALL BE IN ACCORDANCE WITH THE CITY STREET REPAIR STANDARDS. 2. ALL ITEMS SHOWN FOR REMOVAL ARE NOT SHOWN ON THE SUBSEQUENT PLAN SHEETS. 3. DRY UTILITY LINES (GAS, POWER, CABLE, TELECOM) SHALL BE RELOCATED BY THE UTILITY PROVIDER. CONTRACTOR TO COORDINATE. 4. ALL PAVEMENT REMOVALS SHALL BE SAWCUT TO A CLEAN EDGE OR IF IN CONCRETE TO THE NEAREST JOINT. 5. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES. 6. DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS EXISTING FENCES, TREES, STREETS, SIDEWALKS, CURBS AND GUTTERS, LANDSCAPING, STRUCTURES, AND IMPROVEMENTS DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACE OR RESTORED IN LIKE KIND AT THE CONTRACTOR'S EXPENSE, UNLESS OTHERWISE INDICATED ON THESE PLANS, PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 7. COORDINATE WITH CITY ON THE RELOCATION OF SPRINKLER CONTROL BOXES. 8. COORDINATE WITH WATER UTILITIES (970.224.6065) FOR WORK AROUND THE WATER MAIN AND SANITARY MAIN. 9. COORDINATE WITH LIGHT & POWER (970.224.6167) ON THE RELOCATION OF THE EXISTING ELECTRIC LINE, VAULTS, AND STREET LIGHTS. 10. ALL EXISTING TREES, NOT MARKED FOR REMOVAL, ARE TO BE PROTECTED IN PLACE. *11. PREVIOUSLY PLATTED EASEMENTS ARE NOW ALIGNMENTS. EX TREE TO BE REMOVED EX TREE TO BE TRANSPLANTED 3 DEMOLITION PLAN PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: CITY OF FORT COLLINS FORT COLLINS, COLORADO STREETS PARK 100% CONSTRUCTION BID DOCUMENTS STREETS PARK 100% CONSTRUCTION BID DOCUMENTS FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 TRACT A EAST , VINE STREETS FACILITY P.U.D. - DRAINAGE AND ACCESS EASEMENT PROPOSED RESTROOM FFE=52.3 9th STREET TRACT A EAST , VINE STREETS FACILITY P.U.D. - DRAINAGE AND ACCESS EASEMENT NOTES: 1. SEE ARCHITECTURAL DRAWINGS FOR WALL LOCATION DETAILS OF GAS METERS, ELECTRIC METERS, AND TELEPHONE TERMINALS. 2. LIMITS OF STREET CUT SHOWN ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 3. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 4. FLOWLINE RADII ARE 2' UNLESS OTHERWISE NOTED. 5. THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. *6. PREVIOUSLY PLATTED EASEMENTS ARE NOW ALIGNMENTS. 0 40' 40 20 40 80 SCALE: 1" = 0 20' 20 10 20 40 SCALE: 1" = 4 HORIZONTAL CONTROL PLAN PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: CITY OF FORT COLLINS FORT COLLINS, COLORADO STREETS PARK 100% CONSTRUCTION BID DOCUMENTS STREETS PARK 100% CONSTRUCTION BID DOCUMENTS FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES TRACT A , EAST VINE STREETS FACILITY P.U.D. - DRAINAGE AND ACCESS EASEMENT 9th STREET PROPOSED RESTROOM FFE=52.3 LOT 1A, A REPLAT OF A PORTION OF LOTS 1 AND 2, EAST VINE STREETS FACILITY P.U.D., MAJOR AMENDED FINAL, PHASE TWO FINAL LOT 2A, A REPLAT OF A PORTION OF LOTS 1 AND 2, EAST VINE STREETS FACILITY P.U.D., MAJOR AMENDED FINAL, PHASE TWO FINAL 0 40' 40 20 40 80 SCALE: 1" = NOTES: 1. ALL STORM SEWER, SANITARY SEWER, AND WATER CONSTRUCTION, AS WELL AS POWER AND OTHER "DRY" UTILITY INSTALLATIONS, SHALL CONFORM TO THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS CURRENT AT THE DATE OF APPROVAL OF THE PLANS BY THE LOCAL ENGINEER. 2. STORM SEWER PIPE SHALL BE RCP OR PVC WITH WATER TIGHT JOINTS. ALL STORM SEWER SHALL BE INSPECTED BY THE CITY OF FORT COLLINS. 3. LENGTH OF PIPE IS MEASURED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE AND INCLUDES THE FLARED END SECTION UNLESS OTHERWISE NOTED. 5. ALL STORMWATER FACILITIES WILL BE PRIVATELY MAINTAINED (NOT MAINTAINED BY CITY STORMWATER). 6. ALL WATER SERVICES SHALL BE INSTALLED AT A MINIMUM OF 5-FEET BELOW FINISHED FLOOR ELEVATION AND SHALL BE TYPE K COPPER OR HDPE WITH TRACER WIRE AS NOTED. 7. ALL SANITARY SEWER PIPE SHALL BE PVC (SDR 35) UNLESS OTHERWISE NOTED ON THE PLAN. SEWER PIPE SHALL BE AS SPECIFIED BY THE CITY OF FORT COLLINS STANDARD PLANS AND SPECIFICATIONS. 8. SEE ARCHITECTURAL DRAWINGS FOR WALL LOCATION DETAILS OF GAS METERS, ELECTRIC METERS, AND TELEPHONE TERMINALS. 9. LIMITS OF STREET CUT SHOWN ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 10. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 11. COORDINATE WITH LIGHT & POWER (970.224.6167) ON THE RELOCATION OF THE EXISTING ELECTRIC LINE, VAULTS, AND STREET LIGHTS. 12. THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. *13. PREVIOUSLY PLATTED EASEMENTS ARE NOW ALIGNMENTS. 5 UTILITY PLAN PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: CITY OF FORT COLLINS FORT COLLINS, COLORADO TRACT A EAST , VINE STREETS FACILITY P.U.D. - DRAINAGE AND ACCESS EASEMENT PROPOSED RESTROOM FFE=52.3 100 YR WSEL=50.2 9th STREET LOT 1A, A REPLAT OF A PORTION OF LOTS 1 AND 2, EAST VINE STREETS FACILITY P.U.D., MAJOR AMENDED FINAL, PHASE TWO FINAL LOT 2A, A REPLAT OF A PORTION OF LOTS 1 AND 2, EAST VINE STREETS FACILITY P.U.D., MAJOR AMENDED FINAL, PHASE TWO FINAL 0 40' 40 20 40 80 SCALE: 1" = NOTES: 1. ELEVATIONS SHOWN ARE 49XX.XX 2. ADA PARKING STALLS SHALL HAVE A MAX 2.0% SLOPE IN ANY DIRECTION. 3. ALL SIDEWALKS SHALL HAVE A MAX 2.0% CROSS SLOPE. 4. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 5. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. 6. ALL EXISTING TREES, NOT MARKED FOR REMOVAL, ARE TO BE PROTECTED IN PLACE. 7. THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 8. ALL STORMWATER FACILITIES WILL BE PRIVATELY MAINTAINED (NOT MAINTAINED BY CITY STORMWATER). *6. PREVIOUSLY PLATTED EASEMENTS ARE NOW ALIGNMENTS. 6 OVERALL GRADING PLAN PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: CITY OF FORT COLLINS FORT COLLINS, COLORADO STREETS PARK 100% CONSTRUCTION BID DOCUMENTS STREETS PARK 100% CONSTRUCTION BID DOCUMENTS FOR THE MARKING OF UNDERGROUND PROPOSED RESTROOM FFE=52.3 100 YR WSEL 100 YR WSEL 0 20' 20 10 20 40 SCALE: 1" = 7 DETAILED GRADING PLAN PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: CITY OF FORT COLLINS FORT COLLINS, COLORADO STREETS PARK 100% CONSTRUCTION BID DOCUMENTS STREETS PARK 100% CONSTRUCTION BID DOCUMENTS FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES OR 534-6700 Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development PRELIMINARY NOT FOR CONSTRUCTION 1165-012-92 12/12/2018 NOTES: 1. ELEVATIONS SHOWN ARE 49XX.XX 2. ADA PARKING STALLS SHALL HAVE A MAX 2.0% SLOPE IN ANY DIRECTION. 3. ALL SIDEWALKS SHALL HAVE A MAX 2.0% CROSS SLOPE. 4. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. PROPOSED RESTROOM FFE=52.3 detention pond water quality pond b water quality pond a 9th STREET TRACT A EAST , VINE STREETS FACILITY P.U.D. - DRAINAGE AND ACCESS EASEMENT 100 YR WSEL=50.2 core area LOT 1A, A REPLAT OF A PORTION OF LOTS 1 AND 2, EAST VINE STREETS FACILITY P.U.D., MAJOR AMENDED FINAL, PHASE TWO FINAL DESIGNATED WETLAND AREA LOT 2A, A REPLAT OF A PORTION OF LOTS 1 AND 2, EAST VINE STREETS FACILITY P.U.D., MAJOR AMENDED FINAL, PHASE TWO FINAL DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY LEGEND EX MAJOR CONTOUR EX MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR NOTES: 1. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. *2. PREVIOUSLY PLATTED EASEMENTS ARE NOW ALIGNMENTS. 3. ALL STORMWATER FACILITIES WILL BE PRIVATELY MAINTAINED (NOT MAINTAINED BY CITY STORMWATER). 0 40' 40 20 40 80 SCALE: 1" = 8 DRAINAGE PLAN PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: PROPOSED RESTROOM FFE=52.3 9th STREET DESIGNATED WETLAND AREA (DO NOT DISTURB) LOT 1A, A REPLAT OF A PORTION OF LOTS 1 AND 2, EAST VINE STREETS FACILITY P.U.D., MAJOR AMENDED FINAL, PHASE TWO FINAL LOT 2A, A REPLAT OF A PORTION OF LOTS 1 AND 2, EAST VINE STREETS FACILITY P.U.D., MAJOR AMENDED FINAL, PHASE TWO FINAL TRACT A EAST , VINE STREETS FACILITY P.U.D. - DRAINAGE AND ACCESS EASEMENT 0 40' 40 20 40 80 SCALE: 1" = XXXX PROPOSED MINOR CONTOUR XXXX PROPOSED MAJOR CONTOUR EXISTING MINOR CONTOUR XXXX EXISTING MAJOR CONTOUR LEGEND XXXX VEHICLE TRACKING PAD STORM DRAIN INLET PROTECTION - TYPE I CONCRETE WASHOUT STRUCTURE EROSION LOG INLET PROTECTION AT DROP INLET EROSION LOG WITH CONSTRUCTION FENCE EROSION LOG AT FES OUTLET AGGREGATE BAG EROSION LOG NOTES: 1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH OWNER'S APPROVAL FOR REMOVAL. 2. THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND MINIMIZE DOWNSTREAM WATERWAY POLLUTION. 3. LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. 4. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS SAN-01 PROFILE HORIZ. SCALE: 1"=40' VERT. SCALE: 1"=4' 4945 4950 4955 4960 4965 4945 4950 4955 4960 4965 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 TRACT A EAST , VINE STREETS FACILITY P.U.D. - DRAINAGE AND ACCESS EASEMENT LOT 1A PROPOSED RESTROOM FFE=52.3 0 40' 40 20 40 80 SCALE: 1" = HORIZONTAL VERTICAL SCALE: 1" = 4 NOTES: 1. SEWER PIPE SHALL BE AS SPECIFIED BY THE CITY OF FORT COLLINS STANDARD PLANS AND SPECIFICATIONS. 2. SANITARY SEWER PIPE SHALL BE SDR 35 PVC. 3. LENGTH OF PIPE IS MEASURED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. 4. CONTRACTOR TO VERIFY LOCATION AND ELEVATIONS OF EXISTING UTILITIES. 5. THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. *6. PREVIOUSLY PLATTED EASEMENTS ARE NOW ALIGNMENTS. 10 SANITARY PLAN & PROFILE PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: CITY OF FORT COLLINS FORT COLLINS, COLORADO STREETS PARK 100% CONSTRUCTION BID DOCUMENTS STREETS PARK 100% CONSTRUCTION BID DOCUMENTS FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE PARKING STALL DETAIL NTS 11 CONSTRUCTION DETAILS PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: CITY OF FORT COLLINS FORT COLLINS, COLORADO STREETS PARK 100% CONSTRUCTION BID DOCUMENTS STREETS PARK 100% CONSTRUCTION BID DOCUMENTS FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES OR 534-6700 Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development PRELIMINARY NOT FOR CONSTRUCTION 1165-012-92 12/12/2018 LAJ MPO N/A 12 CONSTRUCTION DETAILS PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: CITY OF FORT COLLINS FORT COLLINS, COLORADO STREETS PARK 100% CONSTRUCTION BID DOCUMENTS STREETS PARK 100% CONSTRUCTION BID DOCUMENTS FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES OR 534-6700 Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development PRELIMINARY NOT FOR CONSTRUCTION 1165-012-92 12/12/2018 LAJ MPO N/A 13 CONSTRUCTION DETAILS PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: CITY OF FORT COLLINS FORT COLLINS, COLORADO STREETS PARK 100% CONSTRUCTION BID DOCUMENTS STREETS PARK 100% CONSTRUCTION BID DOCUMENTS FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES OR 534-6700 Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development PRELIMINARY NOT FOR CONSTRUCTION 1165-012-92 12/12/2018 SMALL PIPE HEADWALL NOTES: ORIFICE PLATE DETAIL LAJ MPO N/A 14 CONSTRUCTION DETAILS PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: CITY OF FORT COLLINS FORT COLLINS, COLORADO STREETS PARK 100% CONSTRUCTION BID DOCUMENTS STREETS PARK 100% CONSTRUCTION BID DOCUMENTS FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES OR 534-6700 Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development PRELIMINARY NOT FOR CONSTRUCTION 1165-012-92 12/12/2018 LAJ MPO N/A IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES OR 534-6700 Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development PRELIMINARY NOT FOR CONSTRUCTION 1165-012-92 12/12/2018 LAJ MPO (AS NOTED) AND DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS. 5. THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. *6. PREVIOUSLY PLATTED EASEMENTS ARE NOW ALIGNMENTS. NOTE: REFER TO CONSTRUCTION DETAILS SHEETS 13 & 14 FOR EROSION CONTROL METHOD SPECIFICATIONS. CITY OF FORT COLLINS STANDARD EROSION AND SEDIMENT CONTROL NOTES: 1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2. ALL REQUIRED BMPS SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC.). ALL OF THEIR REQUIRED EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5. THE PROJECT MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGE WAY. 7. NO STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. GRAVEL FILTER 9 EROSION CONTROL PLAN PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: CITY OF FORT COLLINS FORT COLLINS, COLORADO STREETS PARK 100% CONSTRUCTION BID DOCUMENTS STREETS PARK 100% CONSTRUCTION BID DOCUMENTS FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES OR 534-6700 Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development PRELIMINARY NOT FOR CONSTRUCTION 1165-012-92 12/12/2018 LAJ MPO 1"=40' BIODEGRADABLE EROSION CONTROL BLANKET OR HYDROMULCH CITY OF FORT COLLINS FORT COLLINS, COLORADO STREETS PARK 100% CONSTRUCTION BID DOCUMENTS STREETS PARK 100% CONSTRUCTION BID DOCUMENTS FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES OR 534-6700 Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development PRELIMINARY NOT FOR CONSTRUCTION 1165-012-92 12/12/2018 LAJ MPO 1"=40' 5. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. 6. ALL EXISTING TREES, NOT MARKED FOR REMOVAL, ARE TO BE PROTECTED IN PLACE. 7. THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 8. ALL STORMWATER FACILITIES WILL BE PRIVATELY MAINTAINED (NOT MAINTAINED BY CITY STORMWATER). *9. PREVIOUSLY PLATTED EASEMENTS ARE NOW ALIGNMENTS. CITY OF FORT COLLINS BIORETENTION SAND MEDIA SPECIFICATION RAIN GARDEN NTS PLAYGROUND DRAIN DETAIL NTS LAJ MPO 1"=20' RAIN GARDEN NOTES: 1. PLEASE REFER TO THE EROSION CONTROL PLAN SHEETS AND REPORT FOR TEMPORARY CONTROL MEASURES AND CONSTRUCTION SEQUENCING THAT SHALL BE USED TO PREVENT LOADING OF THIS DRAINAGE FACILITY WITH SEDIMENT DURING CONSTRUCTION. BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES OR 534-6700 Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development PRELIMINARY NOT FOR CONSTRUCTION 1165-012-92 12/12/2018 LAJ MPO 1"=40' 0 20' 20 10 20 40 SCALE: 1" = SIDEWALK GRADING DETAIL STREETS PARK 100% CONSTRUCTION BID DOCUMENTS STREETS PARK 100% CONSTRUCTION BID DOCUMENTS FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES OR 534-6700 Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development PRELIMINARY NOT FOR CONSTRUCTION 1165-012-92 12/12/2018 LAJ 1"=40' OR 534-6700 Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development PRELIMINARY NOT FOR CONSTRUCTION 1165-012-92 12/12/2018 LAJ MPO (AS NOTED) CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES OR 534-6700 Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development PRELIMINARY NOT FOR CONSTRUCTION 1165-012-92 12/12/2018 LAJ MPO 1"=40' SOUTH SIDE OF VINE DR. ON THE SOUTH HEADWALL OF THE BRIDGE OVER DRY CREEK BASIN 0.4 MILES EAST OF NORTH LEMAY AVE. ELEVATION: 4947.86 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 - 3.18' PROPOSED STREET LIGHT PROPOSED STORM SEWER MANHOLE EXISTING SANITARY SEWER MAIN PROPOSED TELEPHONE LINE EXISTING GAS EXISTING STORM SEWER EXISTING WATER MAIN EXISTING MANHOLE PROPOSED STORM INLET LEGEND PROPOSED CONCRETE PROPOSED MINOR CONTOUR PROPOSED SPOT ELEVATION XXXX EXISTING SPOT ELEVATION XXXX PROPOSED MAJOR CONTOUR XXXX EXISTING MINOR CONTOUR XXXX EXISTING MAJOR CONTOUR EXISTING UTILITY POLE EXISTING GUY WIRE PROPOSED GAS EXISTING ELECTRIC LINE PROPOSED ELECTRIC LINE EXISTING TELEPHONE LINE PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT EXISTING WATER VALVE PROPOSED SANITARY SEWER MANHOLE PROPOSED WATER VALVE EXISTING CONCRETE EXISTING FLOWLINE, CURB & GUTTER PROPOSED FLOWLINE, CURB & GUTTER PROPOSED FENCE LIMITS OF 100-YR FLOODPLAIN/FLOODWAY EXISTING OVERHEAD UTILITY EXISTING STORM SEWER INLET PROPOSED UTILITY POLE EXISTING STREET LIGHT PROPOSED SWALE PROPOSED DIRECTION OF OVERLAND FLOW EXISTING FIBER OPTIC LINE LIMITS OF EROSION BUFFER EXISTING OVERHEAD ELECTRIC LINE EXISTING OVERHEAD TELEPHONE LINE PROPOSED OVERHEAD ELECTRIC LINE PROPOSED FIBER OPTIC LINE PROPOSED OVERHEAD TELEPHONE LINE EXISTING FENCE PROPOSED WATER SERVICE W/ PROPOSED SANITARY SEWER SERVICE CURB STOP AND METER PIT W/ CLEANOUT AD ALGEBRAIC DIFFERENCE AE ACCESS EASEMENT ARV AIR RELEASE VALVE BOV BLOW OFF VALVE BW BOTTOM OF WALL CL CENTERLINE CMP CORRUGATED METAL PIPE CO CLEAN OUT DE DRAINAGE EASEMENT E ELECTRIC EAE EMERGENCY ACCESS EASEMENT EG EXISTING GROUND EL ELEVATION EOA EDGE OF ASPHALT EX EXISTING ESMT EASEMENT F FIRE LINE FES FLARED END SECTION FF FINISHED FLOOR FG FINISHED GRADE FH FIRE HYDRANT FL FLOWLINE FO FIBER OPTIC G GAS GB GRADE BREAK GD GROUND GV GATE VALVE HDPE HIGH DENSITY POLYETHYLENE HP HIGH POINT IE IRRIGATION EASEMENT INV INVERT IRR IRRIGATION LF LINEAR FEET LP LOW POINT LT LEFT MH MANHOLE OHE OVERHEAD ELECTRIC OHT OVERHEAD TELEPHONE OHU OVERHEAD UTILITY PE PEDESTRIAN EASEMENT PC POINT OF CURVATURE PCC POINT OF COMPOUND CURVATURE PCR POINT OF CURB RETURN PI POINT OF INTERSECTION PT POINT OF TANGENCY PVC POLYVINYL CHLORIDE RCP REINFORCED CONCRETE PIPE RD ROOF DRAIN ROW RIGHT-OF-WAY RT RIGHT S SANITARY SEWER STA STATION SD STORM DRAIN PIPE SDMH STORM DRAIN MANHOLE SMH SANITARY SEWER MANHOLE T TELEPHONE TB THRUST BLOCK TBC TOP BACK OF CURB TCE TEMPORARY CONSTRUCTION EASEMENT TOC TOP OF CONCRETE TF TOP OF FOUNDATION TW TOP OF WALL TYP TYPICAL UE UTILITY EASEMENT VB VALVE BOX VCP VITRIFIED CLAY PIPE VPC VERTICAL POINT OF CURVATURE VPI VERTICAL POINT OF INTERSECTION VPT VERTICAL POINT OF TANGENCY W WATERLINE ABBREVIATION LIST PROPOSED OVERHEAD UTILITY PROPOSED LIGHT POLES EXISTING CABLE TV PROPOSED CABLE TV EXISTING WOOD POST EXISTING METAL POST Architect Architecture West, LLC 160 Palmer Drive Fort Collins, CO 80525 Ph. 970.207.0424 Contact: Stephen Steinbicker Planner/Landscape Architect City of Fort Collins Park Planning & Development 215 N Mason Street Fort Collins, CO 80524 Ph. 970.416.2815 Contact: Craig Kisling City of Fort Collins 700 Wood Street Fort Collins, Colorado 80522 Water Utilities Engineering Heather McDowell Ph. 970.224.6065 Light & Power Tyler Siegmund Ph. 970.416.2772 UTILITY CONTACTS EXISTING TELEPHONE PEDESTAL EXISTING TRANSFORMER INDEX OF SHEETS Sheet No. Description of Sheets 1 COVER SHEET 2 GENERAL NOTES 3 DEMOLITION PLAN 4 HORIZONTAL CONTROL PLAN 5 UTILITY PLAN 6 OVERALL GRADING PLAN 7 DETAILED GRADING PLAN 8 DRAINAGE PLAN 9 EROSION CONTROL PLAN 10 SANITARY PLAN & PROFILE 11 - 14 CONSTRUCTION DETAILS INDEMNIFICATION STATEMENT: THESE PLANS HAVE BEEN REVIEWED BY THE LOCAL ENTITY FOR CONCEPT ONLY. THE REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE LOCAL ENTITY ENGINEER, OR THE LOCAL ENTITY FOR ACCURACY AND CORRECTNESS OF THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT QUANTITIES OF ITEMS ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE LOCAL ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING THE CONSTRUCTION PHASE. Vicinity Map Scale: 1" = 1000' Engineer Interwest Consulting Group 1218 W. Ash, Suite C Windsor, Colorado 80550 PH. 970.460.1091 Contact: Skylar Brower Surveyor City of Fort Collins Surveying Department 281 N. College Avenue Fort Collins, Colorado 80524 PH. 970.221.6565 Contact: John Von Nieda Natural Gas Xcel Energy 1901 E. Horsetooth Road Fort Collins, Colorado 80525 Contact: Stephanie Rich Ph. 970.225.7828 Telephone Service Century Link 3702 Automation Dr, Suite 106 Contact: Engineering Office Ph. 970.490.7508 LAJ MPO N/A