HomeMy WebLinkAboutSTREETS PARK - BDR180010 - SUBMITTAL DOCUMENTS - ROUND 4 - UTILITY PLANSSITE
1
COVER SHEET
PROJ. NO.
DRAWN:
CHECKED:
DATE:
REVISIONS :
SCALE:
SHEET NUMBER
SHEET TITLE:
ISSUED FOR:
APPROVED:
CITY OF FORT COLLINS
FORT COLLINS, COLORADO
STREETS PARK
100% CONSTRUCTION
BID DOCUMENTS
STREETS PARK
100% CONSTRUCTION BID DOCUMENTS
FOR THE MARKING OF UNDERGROUND
BEFORE YOU DIG, GRADE, OR EXCAVATE
CALL 2 BUSINESS DAYS IN ADVANCE
IN METRO
DENVER
1-800-922-1987
CENTER OF COLORADO
CALL UTILITY NOTIFICATION
MEMBER UTILITIES
OR 534-6700
Park Planning
& Development
City of
215 North Mason Street
Fort Collins, Colorado 80521
tel: 970.221.6360
www.fcgov.com/parkplanning/
Park Planning & Development
PRELIMINARY
NOT FOR CONSTRUCTION
1165-012-92
12/12/2018
UTILITY PLANS FOR:
STREETS PARK
tract a, east vine streets facility p.u.d., lots 1a & 2a, a replat of a portion of lots
1 and 2, east vine streets facility p.u.d., major amended final, phase two final
LOCATED IN THE NORTHEAST QUARTER OF SECTION 12, T-7-N, R-69-W OF THE SIXTH PRINCIPAL MERIDIAN
CITY OF FORT COLLINS, LARIMER COUNTY, COLORADO
DECEMBER 2018
PROJECT DATUM: NAVD88
BENCHMARK #B 402
IN FORT COLLINS, AT THE JUNCTION OF SAN CRISTO STREET AND 9TH STREET, IN THE NORTH EDGE OF
THE CONCRETE FOOTING FOR HIGHLINE TOWER NUMBER 34, 19.1 METERS (62.7 FT) SOUTH OF THE
EXTENDED CENTER OF THE STREET, 16.6 METERS (54.5 FT) WEST OF THE CENTERLINE OF 9TH STREET, 8.8
METERS (28.9 FT) SOUTH OF THE CENTER OF A GRAVELED PRIVATE DRIVE LEADING WEST, 0.5 METER (1.6
FT) SOUTH OF A FENCE, AND 0.3 METER (1.0 FT) SOUTH OF THE NORTH EDGE OF THE FOOTING. NOTE--THE
FOOTING IS 120-INCHES IN DIAMETER, 28-1/2 FEET DEEP AND SET INTO 12 FEET OF BEDROCK. THE MARK
IS ABOVE LEVEL WITH 9TH STREET.
ELEVATION: 4947.37
BENCHMARK #12-07
2
GENERAL NOTES
PROJ. NO.
DRAWN:
CHECKED:
DATE:
REVISIONS :
SCALE:
SHEET NUMBER
SHEET TITLE:
ISSUED FOR:
APPROVED:
CITY OF FORT COLLINS
FORT COLLINS, COLORADO
STREETS PARK
100% CONSTRUCTION
BID DOCUMENTS
STREETS PARK
100% CONSTRUCTION BID DOCUMENTS
FOR THE MARKING OF UNDERGROUND
BEFORE YOU DIG, GRADE, OR EXCAVATE
CALL 2 BUSINESS DAYS IN ADVANCE
IN METRO
DENVER
1-800-922-1987
CENTER OF COLORADO
CALL UTILITY NOTIFICATION
MEMBER UTILITIES
OR 534-6700
Park Planning
& Development
City of
215 North Mason Street
Fort Collins, Colorado 80521
tel: 970.221.6360
www.fcgov.com/parkplanning/
Park Planning & Development
PRELIMINARY
NOT FOR CONSTRUCTION
1165-012-92
12/12/2018
“ ”
“ ”
“ ”
“ ” “ ”
LAJ
MPO
N/A
LOT 1A, A REPLAT OF A
PORTION OF LOTS 1 AND 2,
EAST VINE STREETS FACILITY
P.U.D., MAJOR AMENDED
FINAL, PHASE TWO FINAL
9th STREET
TRACT A EAST , VINE STREETS
FACILITY P.U.D. - DRAINAGE
AND ACCESS EASEMENT
LOT 2A, A REPLAT OF A PORTION OF LOTS 1
AND 2, EAST VINE STREETS FACILITY P.U.D.,
MAJOR AMENDED FINAL, PHASE TWO FINAL
0
40'
40 20 40 80
SCALE: 1" =
NOTES:
1. LIMITS OF STREET CUT SHOWN ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING
INSPECTOR. ALL REPAIRS SHALL BE IN ACCORDANCE WITH THE CITY STREET REPAIR STANDARDS.
2. ALL ITEMS SHOWN FOR REMOVAL ARE NOT SHOWN ON THE SUBSEQUENT PLAN SHEETS.
3. DRY UTILITY LINES (GAS, POWER, CABLE, TELECOM) SHALL BE RELOCATED BY THE UTILITY PROVIDER. CONTRACTOR TO COORDINATE.
4. ALL PAVEMENT REMOVALS SHALL BE SAWCUT TO A CLEAN EDGE OR IF IN CONCRETE TO THE NEAREST JOINT.
5. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES.
6. DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS EXISTING FENCES, TREES, STREETS,
SIDEWALKS, CURBS AND GUTTERS, LANDSCAPING, STRUCTURES, AND IMPROVEMENTS DESTROYED, DAMAGED OR REMOVED DUE TO
CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACE OR RESTORED IN LIKE KIND AT THE CONTRACTOR'S EXPENSE, UNLESS
OTHERWISE INDICATED ON THESE PLANS, PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE
ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY.
7. COORDINATE WITH CITY ON THE RELOCATION OF SPRINKLER CONTROL BOXES.
8. COORDINATE WITH WATER UTILITIES (970.224.6065) FOR WORK AROUND THE WATER MAIN AND SANITARY MAIN.
9. COORDINATE WITH LIGHT & POWER (970.224.6167) ON THE RELOCATION OF THE EXISTING ELECTRIC LINE, VAULTS, AND STREET LIGHTS.
10. ALL EXISTING TREES, NOT MARKED FOR REMOVAL, ARE TO BE PROTECTED IN PLACE.
*11. PREVIOUSLY PLATTED EASEMENTS ARE NOW ALIGNMENTS.
EX TREE TO BE REMOVED
EX TREE TO BE TRANSPLANTED
3
DEMOLITION PLAN
PROJ. NO.
DRAWN:
CHECKED:
DATE:
REVISIONS :
SCALE:
SHEET NUMBER
SHEET TITLE:
ISSUED FOR:
APPROVED:
CITY OF FORT COLLINS
FORT COLLINS, COLORADO
STREETS PARK
100% CONSTRUCTION
BID DOCUMENTS
STREETS PARK
100% CONSTRUCTION BID DOCUMENTS
FOR THE MARKING OF UNDERGROUND
BEFORE YOU DIG, GRADE, OR EXCAVATE
CALL 2 BUSINESS DAYS IN ADVANCE
IN METRO
DENVER
1-800-922-1987
TRACT A EAST , VINE STREETS
FACILITY P.U.D. - DRAINAGE
AND ACCESS EASEMENT
PROPOSED
RESTROOM
FFE=52.3
9th STREET
TRACT A EAST , VINE STREETS
FACILITY P.U.D. - DRAINAGE
AND ACCESS EASEMENT
NOTES:
1. SEE ARCHITECTURAL DRAWINGS FOR WALL LOCATION DETAILS OF GAS METERS, ELECTRIC METERS, AND TELEPHONE
TERMINALS.
2. LIMITS OF STREET CUT SHOWN ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY CITY
ENGINEER INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS.
3. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS,
CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE
REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE
ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF
OCCUPANCY.
4. FLOWLINE RADII ARE 2' UNLESS OTHERWISE NOTED.
5. THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION
3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE.
*6. PREVIOUSLY PLATTED EASEMENTS ARE NOW ALIGNMENTS.
0
40'
40 20 40 80
SCALE: 1" =
0
20'
20 10 20 40
SCALE: 1" =
4
HORIZONTAL CONTROL PLAN
PROJ. NO.
DRAWN:
CHECKED:
DATE:
REVISIONS :
SCALE:
SHEET NUMBER
SHEET TITLE:
ISSUED FOR:
APPROVED:
CITY OF FORT COLLINS
FORT COLLINS, COLORADO
STREETS PARK
100% CONSTRUCTION
BID DOCUMENTS
STREETS PARK
100% CONSTRUCTION BID DOCUMENTS
FOR THE MARKING OF UNDERGROUND
BEFORE YOU DIG, GRADE, OR EXCAVATE
CALL 2 BUSINESS DAYS IN ADVANCE
IN METRO
DENVER
1-800-922-1987
CENTER OF COLORADO
CALL UTILITY NOTIFICATION
MEMBER UTILITIES
TRACT A , EAST VINE STREETS FACILITY
P.U.D. - DRAINAGE
AND ACCESS EASEMENT
9th STREET
PROPOSED
RESTROOM
FFE=52.3
LOT 1A, A REPLAT OF A
PORTION OF LOTS 1 AND 2,
EAST VINE STREETS FACILITY
P.U.D., MAJOR AMENDED
FINAL, PHASE TWO FINAL
LOT 2A, A REPLAT OF A PORTION OF LOTS 1
AND 2, EAST VINE STREETS FACILITY P.U.D.,
MAJOR AMENDED FINAL, PHASE TWO FINAL
0
40'
40 20 40 80
SCALE: 1" =
NOTES:
1. ALL STORM SEWER, SANITARY SEWER, AND WATER CONSTRUCTION, AS WELL AS POWER AND OTHER "DRY"
UTILITY INSTALLATIONS, SHALL CONFORM TO THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS
CURRENT AT THE DATE OF APPROVAL OF THE PLANS BY THE LOCAL ENGINEER.
2. STORM SEWER PIPE SHALL BE RCP OR PVC WITH WATER TIGHT JOINTS. ALL STORM SEWER SHALL BE INSPECTED
BY THE CITY OF FORT COLLINS.
3. LENGTH OF PIPE IS MEASURED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE AND INCLUDES THE
FLARED END SECTION UNLESS OTHERWISE NOTED.
5. ALL STORMWATER FACILITIES WILL BE PRIVATELY MAINTAINED (NOT MAINTAINED BY CITY STORMWATER).
6. ALL WATER SERVICES SHALL BE INSTALLED AT A MINIMUM OF 5-FEET BELOW FINISHED FLOOR ELEVATION AND
SHALL BE TYPE K COPPER OR HDPE WITH TRACER WIRE AS NOTED.
7. ALL SANITARY SEWER PIPE SHALL BE PVC (SDR 35) UNLESS OTHERWISE NOTED ON THE PLAN. SEWER PIPE SHALL
BE AS SPECIFIED BY THE CITY OF FORT COLLINS STANDARD PLANS AND SPECIFICATIONS.
8. SEE ARCHITECTURAL DRAWINGS FOR WALL LOCATION DETAILS OF GAS METERS, ELECTRIC METERS, AND
TELEPHONE TERMINALS.
9. LIMITS OF STREET CUT SHOWN ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY CITY
ENGINEER INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS.
10. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS,
SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS
PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S
EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE
FIRST CERTIFICATE OF OCCUPANCY.
11. COORDINATE WITH LIGHT & POWER (970.224.6167) ON THE RELOCATION OF THE EXISTING ELECTRIC LINE,
VAULTS, AND STREET LIGHTS.
12. THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE
SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE.
*13. PREVIOUSLY PLATTED EASEMENTS ARE NOW ALIGNMENTS.
5
UTILITY PLAN
PROJ. NO.
DRAWN:
CHECKED:
DATE:
REVISIONS :
SCALE:
SHEET NUMBER
SHEET TITLE:
ISSUED FOR:
APPROVED:
CITY OF FORT COLLINS
FORT COLLINS, COLORADO
TRACT A EAST , VINE STREETS
FACILITY P.U.D. - DRAINAGE
AND ACCESS EASEMENT
PROPOSED
RESTROOM
FFE=52.3
100 YR
WSEL=50.2
9th STREET
LOT 1A, A REPLAT OF A
PORTION OF LOTS 1 AND 2,
EAST VINE STREETS FACILITY
P.U.D., MAJOR AMENDED
FINAL, PHASE TWO FINAL
LOT 2A, A REPLAT OF A PORTION OF LOTS 1
AND 2, EAST VINE STREETS FACILITY P.U.D.,
MAJOR AMENDED FINAL, PHASE TWO FINAL
0
40'
40 20 40 80
SCALE: 1" =
NOTES:
1. ELEVATIONS SHOWN ARE 49XX.XX
2. ADA PARKING STALLS SHALL HAVE A MAX 2.0% SLOPE IN ANY DIRECTION.
3. ALL SIDEWALKS SHALL HAVE A MAX 2.0% CROSS SLOPE.
4. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO
CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS,
DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS
PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS
STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF
COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST
CERTIFICATE OF OCCUPANCY.
5. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS.
6. ALL EXISTING TREES, NOT MARKED FOR REMOVAL, ARE TO BE PROTECTED IN
PLACE.
7. THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A
NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR
ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE.
8. ALL STORMWATER FACILITIES WILL BE PRIVATELY MAINTAINED (NOT
MAINTAINED BY CITY STORMWATER).
*6. PREVIOUSLY PLATTED EASEMENTS ARE NOW ALIGNMENTS. 6
OVERALL GRADING PLAN
PROJ. NO.
DRAWN:
CHECKED:
DATE:
REVISIONS :
SCALE:
SHEET NUMBER
SHEET TITLE:
ISSUED FOR:
APPROVED:
CITY OF FORT COLLINS
FORT COLLINS, COLORADO
STREETS PARK
100% CONSTRUCTION
BID DOCUMENTS
STREETS PARK
100% CONSTRUCTION BID DOCUMENTS
FOR THE MARKING OF UNDERGROUND
PROPOSED
RESTROOM
FFE=52.3
100 YR
WSEL
100 YR WSEL
0
20'
20 10 20 40
SCALE: 1" =
7
DETAILED GRADING PLAN
PROJ. NO.
DRAWN:
CHECKED:
DATE:
REVISIONS :
SCALE:
SHEET NUMBER
SHEET TITLE:
ISSUED FOR:
APPROVED:
CITY OF FORT COLLINS
FORT COLLINS, COLORADO
STREETS PARK
100% CONSTRUCTION
BID DOCUMENTS
STREETS PARK
100% CONSTRUCTION BID DOCUMENTS
FOR THE MARKING OF UNDERGROUND
BEFORE YOU DIG, GRADE, OR EXCAVATE
CALL 2 BUSINESS DAYS IN ADVANCE
IN METRO
DENVER
1-800-922-1987
CENTER OF COLORADO
CALL UTILITY NOTIFICATION
MEMBER UTILITIES
OR 534-6700
Park Planning
& Development
City of
215 North Mason Street
Fort Collins, Colorado 80521
tel: 970.221.6360
www.fcgov.com/parkplanning/
Park Planning & Development
PRELIMINARY
NOT FOR CONSTRUCTION
1165-012-92
12/12/2018
NOTES:
1. ELEVATIONS SHOWN ARE 49XX.XX
2. ADA PARKING STALLS SHALL HAVE A MAX 2.0% SLOPE IN ANY DIRECTION.
3. ALL SIDEWALKS SHALL HAVE A MAX 2.0% CROSS SLOPE.
4. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS
STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO
CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS
STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED
IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY.
PROPOSED
RESTROOM
FFE=52.3
detention pond
water quality
pond b
water quality
pond a
9th STREET
TRACT A EAST , VINE STREETS FACILITY
P.U.D. - DRAINAGE
AND ACCESS EASEMENT
100 YR
WSEL=50.2
core area
LOT 1A, A REPLAT OF A
PORTION OF LOTS 1 AND 2,
EAST VINE STREETS FACILITY
P.U.D., MAJOR AMENDED
FINAL, PHASE TWO FINAL
DESIGNATED
WETLAND AREA
LOT 2A, A REPLAT OF A PORTION OF LOTS 1
AND 2, EAST VINE STREETS FACILITY P.U.D.,
MAJOR AMENDED FINAL, PHASE TWO FINAL
DRAINAGE FLOW ARROW
DRAINAGE BASIN
BOUNDARY
LEGEND
EX MAJOR CONTOUR
EX MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
NOTES:
1. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO
CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS,
DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS
PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS
STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF
COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST
CERTIFICATE OF OCCUPANCY.
*2. PREVIOUSLY PLATTED EASEMENTS ARE NOW ALIGNMENTS.
3. ALL STORMWATER FACILITIES WILL BE PRIVATELY MAINTAINED (NOT MAINTAINED
BY CITY STORMWATER).
0
40'
40 20 40 80
SCALE: 1" =
8
DRAINAGE PLAN
PROJ. NO.
DRAWN:
CHECKED:
DATE:
REVISIONS :
SCALE:
SHEET NUMBER
SHEET TITLE:
ISSUED FOR:
APPROVED:
PROPOSED
RESTROOM
FFE=52.3
9th STREET
DESIGNATED
WETLAND AREA
(DO NOT DISTURB)
LOT 1A, A REPLAT OF A
PORTION OF LOTS 1 AND 2,
EAST VINE STREETS FACILITY
P.U.D., MAJOR AMENDED
FINAL, PHASE TWO FINAL
LOT 2A, A REPLAT OF A
PORTION OF LOTS 1 AND 2,
EAST VINE STREETS FACILITY
P.U.D., MAJOR AMENDED
FINAL, PHASE TWO FINAL TRACT A EAST , VINE STREETS
FACILITY P.U.D. - DRAINAGE
AND ACCESS EASEMENT
0
40'
40 20 40 80
SCALE: 1" =
XXXX PROPOSED MINOR CONTOUR
XXXX PROPOSED MAJOR CONTOUR
EXISTING MINOR CONTOUR
XXXX EXISTING MAJOR CONTOUR
LEGEND
XXXX
VEHICLE TRACKING PAD STORM DRAIN INLET PROTECTION - TYPE I
CONCRETE WASHOUT STRUCTURE
EROSION LOG INLET PROTECTION
AT DROP INLET
EROSION LOG WITH
CONSTRUCTION FENCE
EROSION LOG AT FES OUTLET
AGGREGATE BAG
EROSION LOG
NOTES:
1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL
NECESSARY EROSION CONTROL MEASURES PRIOR TO AND
THROUGHOUT CONSTRUCTION. EROSION CONTROL
PROTECTION SHALL REMAIN IN PLACE UNTIL
CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND
IS ADEQUATELY VEGETATED WITH OWNER'S APPROVAL FOR
REMOVAL.
2. THE EXTENT OF EROSION CONTROL PROTECTION
SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING
CONSTRUCTION BASED ON SITE CONDITIONS AND THE
PERFORMANCE OF THE EROSION CONTROL MEASURES
SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND
MINIMIZE DOWNSTREAM WATERWAY POLLUTION.
3. LIMIT DISTURBANCE TO AREAS WITHIN EROSION
CONTROL BOUNDARIES. ADJUST EROSION CONTROL
BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE
PROPOSED WORK. ALL DISTURBED AREAS SHALL BE
PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING,
ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL
MIGRATION.
4. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS
SAN-01 PROFILE
HORIZ. SCALE: 1"=40'
VERT. SCALE: 1"=4'
4945
4950
4955
4960
4965
4945
4950
4955
4960
4965
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50
TRACT A EAST , VINE STREETS
FACILITY P.U.D. - DRAINAGE
AND ACCESS EASEMENT
LOT 1A
PROPOSED
RESTROOM
FFE=52.3
0
40'
40 20 40 80
SCALE: 1" =
HORIZONTAL
VERTICAL
SCALE: 1" = 4
NOTES:
1. SEWER PIPE SHALL BE AS SPECIFIED BY THE CITY OF FORT COLLINS STANDARD PLANS AND
SPECIFICATIONS.
2. SANITARY SEWER PIPE SHALL BE SDR 35 PVC.
3. LENGTH OF PIPE IS MEASURED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE.
4. CONTRACTOR TO VERIFY LOCATION AND ELEVATIONS OF EXISTING UTILITIES.
5. THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE.
PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL
HABITAT BUFFER ZONE.
*6. PREVIOUSLY PLATTED EASEMENTS ARE NOW ALIGNMENTS.
10
SANITARY PLAN & PROFILE
PROJ. NO.
DRAWN:
CHECKED:
DATE:
REVISIONS :
SCALE:
SHEET NUMBER
SHEET TITLE:
ISSUED FOR:
APPROVED:
CITY OF FORT COLLINS
FORT COLLINS, COLORADO
STREETS PARK
100% CONSTRUCTION
BID DOCUMENTS
STREETS PARK
100% CONSTRUCTION BID DOCUMENTS
FOR THE MARKING OF UNDERGROUND
BEFORE YOU DIG, GRADE, OR EXCAVATE
CALL 2 BUSINESS DAYS IN ADVANCE
PARKING STALL DETAIL
NTS
11
CONSTRUCTION DETAILS
PROJ. NO.
DRAWN:
CHECKED:
DATE:
REVISIONS :
SCALE:
SHEET NUMBER
SHEET TITLE:
ISSUED FOR:
APPROVED:
CITY OF FORT COLLINS
FORT COLLINS, COLORADO
STREETS PARK
100% CONSTRUCTION
BID DOCUMENTS
STREETS PARK
100% CONSTRUCTION BID DOCUMENTS
FOR THE MARKING OF UNDERGROUND
BEFORE YOU DIG, GRADE, OR EXCAVATE
CALL 2 BUSINESS DAYS IN ADVANCE
IN METRO
DENVER
1-800-922-1987
CENTER OF COLORADO
CALL UTILITY NOTIFICATION
MEMBER UTILITIES
OR 534-6700
Park Planning
& Development
City of
215 North Mason Street
Fort Collins, Colorado 80521
tel: 970.221.6360
www.fcgov.com/parkplanning/
Park Planning & Development
PRELIMINARY
NOT FOR CONSTRUCTION
1165-012-92
12/12/2018
LAJ
MPO
N/A
12
CONSTRUCTION DETAILS
PROJ. NO.
DRAWN:
CHECKED:
DATE:
REVISIONS :
SCALE:
SHEET NUMBER
SHEET TITLE:
ISSUED FOR:
APPROVED:
CITY OF FORT COLLINS
FORT COLLINS, COLORADO
STREETS PARK
100% CONSTRUCTION
BID DOCUMENTS
STREETS PARK
100% CONSTRUCTION BID DOCUMENTS
FOR THE MARKING OF UNDERGROUND
BEFORE YOU DIG, GRADE, OR EXCAVATE
CALL 2 BUSINESS DAYS IN ADVANCE
IN METRO
DENVER
1-800-922-1987
CENTER OF COLORADO
CALL UTILITY NOTIFICATION
MEMBER UTILITIES
OR 534-6700
Park Planning
& Development
City of
215 North Mason Street
Fort Collins, Colorado 80521
tel: 970.221.6360
www.fcgov.com/parkplanning/
Park Planning & Development
PRELIMINARY
NOT FOR CONSTRUCTION
1165-012-92
12/12/2018
LAJ
MPO
N/A
13
CONSTRUCTION DETAILS
PROJ. NO.
DRAWN:
CHECKED:
DATE:
REVISIONS :
SCALE:
SHEET NUMBER
SHEET TITLE:
ISSUED FOR:
APPROVED:
CITY OF FORT COLLINS
FORT COLLINS, COLORADO
STREETS PARK
100% CONSTRUCTION
BID DOCUMENTS
STREETS PARK
100% CONSTRUCTION BID DOCUMENTS
FOR THE MARKING OF UNDERGROUND
BEFORE YOU DIG, GRADE, OR EXCAVATE
CALL 2 BUSINESS DAYS IN ADVANCE
IN METRO
DENVER
1-800-922-1987
CENTER OF COLORADO
CALL UTILITY NOTIFICATION
MEMBER UTILITIES
OR 534-6700
Park Planning
& Development
City of
215 North Mason Street
Fort Collins, Colorado 80521
tel: 970.221.6360
www.fcgov.com/parkplanning/
Park Planning & Development
PRELIMINARY
NOT FOR CONSTRUCTION
1165-012-92
12/12/2018
SMALL PIPE HEADWALL
NOTES:
ORIFICE PLATE DETAIL
LAJ
MPO
N/A
14
CONSTRUCTION DETAILS
PROJ. NO.
DRAWN:
CHECKED:
DATE:
REVISIONS :
SCALE:
SHEET NUMBER
SHEET TITLE:
ISSUED FOR:
APPROVED:
CITY OF FORT COLLINS
FORT COLLINS, COLORADO
STREETS PARK
100% CONSTRUCTION
BID DOCUMENTS
STREETS PARK
100% CONSTRUCTION BID DOCUMENTS
FOR THE MARKING OF UNDERGROUND
BEFORE YOU DIG, GRADE, OR EXCAVATE
CALL 2 BUSINESS DAYS IN ADVANCE
IN METRO
DENVER
1-800-922-1987
CENTER OF COLORADO
CALL UTILITY NOTIFICATION
MEMBER UTILITIES
OR 534-6700
Park Planning
& Development
City of
215 North Mason Street
Fort Collins, Colorado 80521
tel: 970.221.6360
www.fcgov.com/parkplanning/
Park Planning & Development
PRELIMINARY
NOT FOR CONSTRUCTION
1165-012-92
12/12/2018
LAJ
MPO
N/A
IN METRO
DENVER
1-800-922-1987
CENTER OF COLORADO
CALL UTILITY NOTIFICATION
MEMBER UTILITIES
OR 534-6700
Park Planning
& Development
City of
215 North Mason Street
Fort Collins, Colorado 80521
tel: 970.221.6360
www.fcgov.com/parkplanning/
Park Planning & Development
PRELIMINARY
NOT FOR CONSTRUCTION
1165-012-92
12/12/2018
LAJ
MPO
(AS NOTED)
AND DETAILS. DURING CONSTRUCTION, ANY SOIL
DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL
BE SEEDED AND MULCHED PER LCUASS STANDARDS.
5. THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO
BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE
SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE
USES WITHIN THE NATURAL HABITAT BUFFER ZONE.
*6. PREVIOUSLY PLATTED EASEMENTS ARE NOW
ALIGNMENTS.
NOTE:
REFER TO CONSTRUCTION DETAILS SHEETS 13 & 14
FOR EROSION CONTROL METHOD SPECIFICATIONS.
CITY OF FORT COLLINS STANDARD EROSION AND SEDIMENT CONTROL NOTES:
1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY
CONSTRUCTION ON THIS SITE.
2. ALL REQUIRED BMPS SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC.).
ALL OF THEIR REQUIRED EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION
SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT.
3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF
EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE
SHORTEST PRACTICAL PERIOD OF TIME.
4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A
ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT
EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND
DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G.
SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT.
5. THE PROJECT MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT
WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS
ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT.
6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS
NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED
FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED
OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGE WAY.
7. NO STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT
TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS
SHALL BE SEEDED AND MULCHED.
8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS
BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR.
GRAVEL FILTER
9
EROSION CONTROL PLAN
PROJ. NO.
DRAWN:
CHECKED:
DATE:
REVISIONS :
SCALE:
SHEET NUMBER
SHEET TITLE:
ISSUED FOR:
APPROVED:
CITY OF FORT COLLINS
FORT COLLINS, COLORADO
STREETS PARK
100% CONSTRUCTION
BID DOCUMENTS
STREETS PARK
100% CONSTRUCTION BID DOCUMENTS
FOR THE MARKING OF UNDERGROUND
BEFORE YOU DIG, GRADE, OR EXCAVATE
CALL 2 BUSINESS DAYS IN ADVANCE
IN METRO
DENVER
1-800-922-1987
CENTER OF COLORADO
CALL UTILITY NOTIFICATION
MEMBER UTILITIES
OR 534-6700
Park Planning
& Development
City of
215 North Mason Street
Fort Collins, Colorado 80521
tel: 970.221.6360
www.fcgov.com/parkplanning/
Park Planning & Development
PRELIMINARY
NOT FOR CONSTRUCTION
1165-012-92
12/12/2018
LAJ
MPO
1"=40'
BIODEGRADABLE EROSION
CONTROL BLANKET
OR HYDROMULCH
CITY OF FORT COLLINS
FORT COLLINS, COLORADO
STREETS PARK
100% CONSTRUCTION
BID DOCUMENTS
STREETS PARK
100% CONSTRUCTION BID DOCUMENTS
FOR THE MARKING OF UNDERGROUND
BEFORE YOU DIG, GRADE, OR EXCAVATE
CALL 2 BUSINESS DAYS IN ADVANCE
IN METRO
DENVER
1-800-922-1987
CENTER OF COLORADO
CALL UTILITY NOTIFICATION
MEMBER UTILITIES
OR 534-6700
Park Planning
& Development
City of
215 North Mason Street
Fort Collins, Colorado 80521
tel: 970.221.6360
www.fcgov.com/parkplanning/
Park Planning & Development
PRELIMINARY
NOT FOR CONSTRUCTION
1165-012-92
12/12/2018
LAJ
MPO
1"=40'
5. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS.
6. ALL EXISTING TREES, NOT MARKED FOR REMOVAL, ARE TO BE PROTECTED IN PLACE.
7. THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE.
PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL
HABITAT BUFFER ZONE.
8. ALL STORMWATER FACILITIES WILL BE PRIVATELY MAINTAINED (NOT MAINTAINED BY CITY
STORMWATER).
*9. PREVIOUSLY PLATTED EASEMENTS ARE NOW ALIGNMENTS.
CITY OF FORT COLLINS BIORETENTION SAND MEDIA SPECIFICATION
RAIN GARDEN
NTS
PLAYGROUND DRAIN DETAIL
NTS
LAJ
MPO
1"=20'
RAIN GARDEN NOTES:
1. PLEASE REFER TO THE EROSION
CONTROL PLAN SHEETS AND REPORT FOR
TEMPORARY CONTROL MEASURES AND
CONSTRUCTION SEQUENCING THAT SHALL
BE USED TO PREVENT LOADING OF THIS
DRAINAGE FACILITY WITH SEDIMENT DURING
CONSTRUCTION.
BEFORE YOU DIG, GRADE, OR EXCAVATE
CALL 2 BUSINESS DAYS IN ADVANCE
IN METRO
DENVER
1-800-922-1987
CENTER OF COLORADO
CALL UTILITY NOTIFICATION
MEMBER UTILITIES
OR 534-6700
Park Planning
& Development
City of
215 North Mason Street
Fort Collins, Colorado 80521
tel: 970.221.6360
www.fcgov.com/parkplanning/
Park Planning & Development
PRELIMINARY
NOT FOR CONSTRUCTION
1165-012-92
12/12/2018
LAJ
MPO
1"=40'
0
20'
20 10 20 40
SCALE: 1" =
SIDEWALK GRADING DETAIL
STREETS PARK
100% CONSTRUCTION
BID DOCUMENTS
STREETS PARK
100% CONSTRUCTION BID DOCUMENTS
FOR THE MARKING OF UNDERGROUND
BEFORE YOU DIG, GRADE, OR EXCAVATE
CALL 2 BUSINESS DAYS IN ADVANCE
IN METRO
DENVER
1-800-922-1987
CENTER OF COLORADO
CALL UTILITY NOTIFICATION
MEMBER UTILITIES
OR 534-6700
Park Planning
& Development
City of
215 North Mason Street
Fort Collins, Colorado 80521
tel: 970.221.6360
www.fcgov.com/parkplanning/
Park Planning & Development
PRELIMINARY
NOT FOR CONSTRUCTION
1165-012-92
12/12/2018
LAJ
1"=40'
OR 534-6700
Park Planning
& Development
City of
215 North Mason Street
Fort Collins, Colorado 80521
tel: 970.221.6360
www.fcgov.com/parkplanning/
Park Planning & Development
PRELIMINARY
NOT FOR CONSTRUCTION
1165-012-92
12/12/2018
LAJ
MPO
(AS NOTED)
CENTER OF COLORADO
CALL UTILITY NOTIFICATION
MEMBER UTILITIES
OR 534-6700
Park Planning
& Development
City of
215 North Mason Street
Fort Collins, Colorado 80521
tel: 970.221.6360
www.fcgov.com/parkplanning/
Park Planning & Development
PRELIMINARY
NOT FOR CONSTRUCTION
1165-012-92
12/12/2018
LAJ
MPO
1"=40'
SOUTH SIDE OF VINE DR. ON THE SOUTH HEADWALL OF THE BRIDGE OVER DRY CREEK BASIN 0.4 MILES
EAST OF NORTH LEMAY AVE.
ELEVATION: 4947.86
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS
HAVE USED NGVD29 UNADJUSTED (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED (PRIOR CITY OF FORT COLLINS
DATUM) = NAVD88 - 3.18'
PROPOSED STREET LIGHT
PROPOSED STORM SEWER MANHOLE
EXISTING SANITARY SEWER MAIN
PROPOSED TELEPHONE LINE
EXISTING GAS
EXISTING STORM SEWER
EXISTING WATER MAIN
EXISTING MANHOLE
PROPOSED STORM INLET
LEGEND
PROPOSED CONCRETE
PROPOSED MINOR CONTOUR
PROPOSED SPOT ELEVATION
XXXX
EXISTING SPOT ELEVATION
XXXX PROPOSED MAJOR CONTOUR
XXXX EXISTING MINOR CONTOUR
XXXX EXISTING MAJOR CONTOUR
EXISTING UTILITY POLE
EXISTING GUY WIRE
PROPOSED GAS
EXISTING ELECTRIC LINE PROPOSED ELECTRIC LINE
EXISTING TELEPHONE LINE
PROPOSED FIRE HYDRANT
EXISTING FIRE HYDRANT
EXISTING WATER VALVE
PROPOSED SANITARY SEWER MANHOLE
PROPOSED WATER VALVE
EXISTING CONCRETE
EXISTING FLOWLINE, CURB & GUTTER
PROPOSED FLOWLINE, CURB & GUTTER
PROPOSED FENCE
LIMITS OF 100-YR FLOODPLAIN/FLOODWAY
EXISTING OVERHEAD UTILITY
EXISTING STORM SEWER INLET
PROPOSED UTILITY POLE
EXISTING STREET LIGHT
PROPOSED SWALE
PROPOSED DIRECTION OF OVERLAND FLOW
EXISTING FIBER OPTIC LINE
LIMITS OF EROSION BUFFER
EXISTING OVERHEAD ELECTRIC LINE
EXISTING OVERHEAD TELEPHONE LINE
PROPOSED OVERHEAD ELECTRIC LINE
PROPOSED FIBER OPTIC LINE
PROPOSED OVERHEAD TELEPHONE LINE
EXISTING FENCE
PROPOSED WATER SERVICE W/
PROPOSED SANITARY SEWER SERVICE
CURB STOP AND METER PIT
W/ CLEANOUT
AD ALGEBRAIC DIFFERENCE
AE ACCESS EASEMENT
ARV AIR RELEASE VALVE
BOV BLOW OFF VALVE
BW BOTTOM OF WALL
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CO CLEAN OUT
DE DRAINAGE EASEMENT
E ELECTRIC
EAE EMERGENCY ACCESS EASEMENT
EG EXISTING GROUND
EL ELEVATION
EOA EDGE OF ASPHALT
EX EXISTING
ESMT EASEMENT
F FIRE LINE
FES FLARED END SECTION
FF FINISHED FLOOR
FG FINISHED GRADE
FH FIRE HYDRANT
FL FLOWLINE
FO FIBER OPTIC
G GAS
GB GRADE BREAK
GD GROUND
GV GATE VALVE
HDPE HIGH DENSITY POLYETHYLENE
HP HIGH POINT
IE IRRIGATION EASEMENT
INV INVERT
IRR IRRIGATION
LF LINEAR FEET
LP LOW POINT
LT LEFT
MH MANHOLE
OHE OVERHEAD ELECTRIC
OHT OVERHEAD TELEPHONE
OHU OVERHEAD UTILITY
PE PEDESTRIAN EASEMENT
PC POINT OF CURVATURE
PCC POINT OF COMPOUND CURVATURE
PCR POINT OF CURB RETURN
PI POINT OF INTERSECTION
PT POINT OF TANGENCY
PVC POLYVINYL CHLORIDE
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN
ROW RIGHT-OF-WAY
RT RIGHT
S SANITARY SEWER
STA STATION
SD STORM DRAIN PIPE
SDMH STORM DRAIN MANHOLE
SMH SANITARY SEWER MANHOLE
T TELEPHONE
TB THRUST BLOCK
TBC TOP BACK OF CURB
TCE TEMPORARY CONSTRUCTION EASEMENT
TOC TOP OF CONCRETE
TF TOP OF FOUNDATION
TW TOP OF WALL
TYP TYPICAL
UE UTILITY EASEMENT
VB VALVE BOX
VCP VITRIFIED CLAY PIPE
VPC VERTICAL POINT OF CURVATURE
VPI VERTICAL POINT OF INTERSECTION
VPT VERTICAL POINT OF TANGENCY
W WATERLINE
ABBREVIATION LIST
PROPOSED OVERHEAD UTILITY
PROPOSED LIGHT POLES
EXISTING CABLE TV PROPOSED CABLE TV
EXISTING WOOD POST
EXISTING METAL POST
Architect
Architecture West, LLC
160 Palmer Drive
Fort Collins, CO 80525
Ph. 970.207.0424
Contact: Stephen Steinbicker
Planner/Landscape Architect
City of Fort Collins
Park Planning & Development
215 N Mason Street
Fort Collins, CO 80524
Ph. 970.416.2815
Contact: Craig Kisling
City of Fort Collins
700 Wood Street
Fort Collins, Colorado 80522
Water Utilities Engineering
Heather McDowell
Ph. 970.224.6065
Light & Power
Tyler Siegmund
Ph. 970.416.2772
UTILITY CONTACTS
EXISTING TELEPHONE PEDESTAL
EXISTING TRANSFORMER
INDEX OF SHEETS
Sheet No. Description of Sheets
1 COVER SHEET
2 GENERAL NOTES
3 DEMOLITION PLAN
4 HORIZONTAL CONTROL PLAN
5 UTILITY PLAN
6 OVERALL GRADING PLAN
7 DETAILED GRADING PLAN
8 DRAINAGE PLAN
9 EROSION CONTROL PLAN
10 SANITARY PLAN & PROFILE
11 - 14 CONSTRUCTION DETAILS
INDEMNIFICATION STATEMENT:
THESE PLANS HAVE BEEN REVIEWED BY THE LOCAL ENTITY FOR
CONCEPT ONLY. THE REVIEW DOES NOT IMPLY RESPONSIBILITY BY
THE REVIEWING DEPARTMENT, THE LOCAL ENTITY ENGINEER, OR THE
LOCAL ENTITY FOR ACCURACY AND CORRECTNESS OF THE
CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT
QUANTITIES OF ITEMS ON THE PLANS ARE THE FINAL QUANTITIES
REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON
AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE LOCAL
ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE
REQUIRED DURING THE CONSTRUCTION PHASE.
Vicinity Map
Scale: 1" = 1000'
Engineer
Interwest Consulting Group
1218 W. Ash, Suite C
Windsor, Colorado 80550
PH. 970.460.1091
Contact: Skylar Brower
Surveyor
City of Fort Collins
Surveying Department
281 N. College Avenue
Fort Collins, Colorado 80524
PH. 970.221.6565
Contact: John Von Nieda
Natural Gas
Xcel Energy
1901 E. Horsetooth Road
Fort Collins, Colorado 80525
Contact: Stephanie Rich
Ph. 970.225.7828
Telephone Service
Century Link
3702 Automation Dr, Suite 106
Contact: Engineering Office
Ph. 970.490.7508
LAJ
MPO
N/A