September 14, 2018
Dana W Lockwood
Lockwood Architects, Inc
415 E Pitkin St
Fort Collins, CO 80524
RE:Taft Place (Formerly Aweida), PDP180008, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Development Review Coordinator, Tenae Beane, at 970-224-6119 or tbeane@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Pete Wray, 970-221-6754, pwray@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/11/2018
09/11/2018: Show darker curb line on plan typ. for FDP review.
The face of curb line has been changed to a solid line.
Comment Number: 2 Comment Originated: 09/11/2018
At staff Review meeting if determined project is ready for hearing, please
provide revised PDF plans for hearing set. I will coordinate with you to schedule
Type II Hearing with the Planning and Zoning Board for October. The Board
meets on Thursday 10/18 with work session on 10/12. Packet material is due,
including revised plans on 9/28 to staff with packet forwarded to Board on 10/4.
Thank you.
Comment Number: 3 Comment Originated: 09/12/2018
This project is subject to a Type II review with the Planning and Zoning Board
since the commercial component of the mixed-use building is not part of a
neighborhood center.
A neighborhood meeting was held on March 22, 2018 for both the initial
2
annexation and proposed project for a mixed-use building, zoned LMN.
Thank you.
Comment Number: 4 Comment Originated: 09/12/2018
Staff has determined this PDP is ready for hearing. No additional PDP rounds
of review are needed. Please provide a revised PDF plan set for hearing
packet.
Thank you.
Topic: Landscape Plans
Comment Number: 5 Comment Originated: 09/11/2018
09/11/2018:
Distinguish better mulch symbols in legend and on plans, maybe darker screen
symbol - for FDP review.
Mulch symbols have been changed.
Topic: Site Plan
Comment Number: 6 Comment Originated: 09/11/2018
09/11/2018:
Show Building wall separation lines between units.
Wall separation lines have been added to the units on the plans.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 07/30/2018
09/10/2018: A complete review of all other plans will be done at FDP.
07/30/2018: A complete review of all other plans will be done at FDP.
These changes have been made to the best of my knowledge.
Topic: Plat
Comment Number: 1 Comment Originated: 07/30/2018
09/10/2018: Please make changes as marked. If changes are not made or you
disagree with comments, please provide written response of why corrections
were not made. Please provide any responses on redlined sheets and/or in
response letter.
07/30/2018: Please make changes as marked. If changes are not made or you
disagree with comments, please provide written response of why corrections
were not made. Please provide any responses on redlined sheets and/or in
response letter.
These changes have been made to the best of my knowledge.
Department: Engineering Development Review
Contact: Katie Andrews, 970-221-6501, kandrews@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 07/30/2018
09/10/2018: Along CR38: the utility plans show a 9 foot utility easement and a
6.5 drainage easement, which I believe is correct. The plat has these 2
3
easements flipped and shows the easement adjacent to Taft as a drainage
easement when it should also be a utility easement. Please ensure that the
utility plan, site plan, and plat easements all match prior to hearing. 07/30/2018:
Prior to hearing: Plat: The 9-foot easement adjacent to the ROW should be a
UE not DE per plans and standards.
The easements have been coordinated between consultants and have been corrected on all plans.
Comment Number: 6 Comment Originated: 08/01/2018
09/10/2018: Thank you for showing these easements on the site plan, please
add these easements to the plat and utility plans prior to hearing. 08/01/2018:
Prior to hearing: the portions of the pedestrian ramps that are not within ROW
should lie within public access easements - please add easements to these
areas.
The easements have been coordinated between consultants and have been corrected on all plans.
Comment Number: 9 Comment Originated: 09/10/2018
09/10/2018: Thank you for submitting the variance request, please list it as an
approved variance under general note 48 on the utility plan set.
Noted
Comment Number: 10 Comment Originated: 09/10/2018
09/10/2018: Please note that Engineering will likely have FDP-level comments
at time of final plan (FDP) submittal.
Noted
Department: Forestry
Contact: Molly Roche, mroche@fcgov.com
Topic: General
Comment Number: 6 Comment Originated: 09/10/2018
9/10/2018:
The ABSB tree is located less than 10 feet from the SS utility line. Please
confirm with Stormwater and Water Utilities if the 7 ft distance from the tree is
adequate, or if the tree should be shifted to obtain the 10 ft separation.
The 7’ separation was approved in the meeting on 09/12/2018. This is a service line not a main line.
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 07/30/2018
9/10/2018:
Continued:
Please update the plant list to show mitigation calipers. For example, two
Kentucky Coffeetrees should be specified at 3” caliper, two Jack Pear should
be specified at 2.5” caliper, and one Shumard Oak should be specified at 3”
caliper.
These have been updated in the plant list.
7/30/2018:
Thank you for including the tree inventory and mitigation information to the
landscape plans. Since trees will be removed, the total number of mitigation
trees required is 4 (3.5 rounded up). Please provide 4 upsized trees on-site.
4
Mitigation trees can be any combination of the following tree sizes:
Canopy Shade Trees: 3” caliper B&B
Ornamental Trees: 2.5” caliper B&B
Evergreen Trees: 8” height B&B
4 upsized trees have been added per mitigation requirements.
Comment Number: 2 Comment Originated: 07/30/2018
07/30/2018:
Please include locations of street lights and stop signs to the landscape plans,
especially if they appear within the city right of way.
Stop Signs: 20 feet from sign
Street Light: 40 feet for canopy shade trees and 15 feet for ornamental trees
There are no stop signs proposed on site. The street light is on the landscape plan at the corner of Harmony
and Taft Hill – There is a 40’-42’ separation for canopy trees and 15-17’ separation for the ornamental trees
from the street light and signal.
Comment Number: 3 Comment Originated: 07/30/2018
9/10/2018:
Continued:
This has not been done. Please include the street tree permit note in the bolded
box. This should be included in the set of notes provided in previous rounds.
This note has been updated and added to all landscape plans.
07/30/2018:
Please include the City of Fort Collins Street Tree Permit Note. This should be
displayed on all landscape sheets.
This note has been updated and added to all landscape plans.
Comment Number: 4 Comment Originated: 09/10/2018
9/10/2018:
Please include the maximum species diversity percentages in the plant list.
Since there are 35 trees proposed on-site, the maximum percentage of any one
species cannot exceed 33%. A reference table can be found in LUC 3.2.1 (D)
(3).
A note has been added to the plant list “% species diversity”. There are 25 trees proposed on site.
Comment Number: 5 Comment Originated: 09/10/2018
9/10/2018:
It appears that trees #2 and 3 were already removed from the site. Please note
that although these trees were planned to be removed as a part of this plan, no
tree removal should occur prior to DCP (Development Construction Permit)
issuance. Prior to hearing, please provide a narrative to City Forestry explaining
the reason for removal ahead of time.
There have not been any trees removed from the site during this process. There are a couple existing
stumps that may have been the source of confusion.
Department: Light And Power
Contact: Luke Unruh, 9704162724, lunruh@fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 07/25/2018
07/25/2018: Streetlights will be placed along public streets. A 40 feet
5
separation on both sides of the light is required between canopy trees and
streetlights. A 15 feet separation on both sides of the light is required between
ornamental trees and streetlights.
The plans comply with the above separations.
Comment Number: 4 Comment Originated: 07/25/2018
07/25/2018: Modifications to our existing electrical infastructure will be needed
to feed power to the site. Electric Capacity Fee, Building Site charges, and any
necessary system modification charges will apply at owner’s expense. Please
see the Electric Estimating Calculator and Electric Construction Policies,
Practices & Procedures at the following link:
http://www.fcgov.com/utilities/business/builders-and-developers
Thank you for this information.
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
Topic: General
Comment Number: 5 Comment Originated: 09/11/2018
09/11/2018: Environmental Planning is ready for Hearing. Thank you.
Thank you.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 07/31/2018
08/30/2018: Repeat will review materials at FDP
7/18/2018: Submitted materials are acceptable for PDP. At FDP please
provide protection measures around rain garden and underground detention
pipe array in order to prevent these from clogging or accumulating sediment
during construction activities on the site.
Noted. Thank you.
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 7 Comment Originated: 09/10/2018
09/10/2018: At Final Compliance Review, some revisions to the StormTech
calculations need to be made. It looks like there is plenty of volume and
chambers, but need just correct documentation.
Comment Number: 8 Comment Originated: 09/10/2018
09/10/2018: Stormwater is ready for a hearing.
Thank you.
Department: Water-Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 07/31/2018
6
07/31/2018: No comments.
Thank you.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 07/30/2018
07/30/2018: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Noted. Thank you.
Department: Traffic Operation
Contact: Tim Tuttle, 970-221-6820, TTUTTLE@fcgov.com
Topic: General
Comment Number: 6 Comment Originated: 09/10/2018
09/10/2018: After hearing additional signing and striping comments will need
to be addressed including showing crosswalks that align with the new ramps.
Comment Number: 7 Comment Originated: 09/10/2018
09/10/2018: Coordination will be needed for the timing of the relocated signal
pole. Please note that it may take 5 months to receive a new signal pole and
mast arm.
Noted. Thank you.
Department: PFA
Contact: Andrew Rosen, 970-416-2599, arosen@fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 09/07/2018
09/07/2018:
FIRE DEPARTMENT TRAINING OPPORTUNITY
Poudre Fire Authority is currently looking to acquire a residential or commercial
property to use for training our firefighters. The training is intended to be
non-destructive in nature: no walls or ceilings breeched, no water flow, etc.
Please contact me (970-416-2599) if your site may be willing to pursue a
discussion along this line and I will put you in touch with our training division
chief. Thank you.
The existing building has already been removed from the site, but thank you for this information we
will keep this in mind for any future developments.
Department: Outside Agencies
Contact: Terry Farrill,
Topic: General
Comment Number: 1 Comment Originated: 07/26/2018
08/02/2018:
7
RE: Aweida PDP180008 (Type 1)
l1 1 Submittal
Dear Mr. Wray,
The Fort Collins - Loveland Water District and the South Fort Collins Sanitation
District have reviewed the above mentioned project and submit the following
comments.
The District requires the signature block on the face page only.
There needs to be at least 5 feet of horizontal separation between the fire line
and the fire hydrant line.
The water line notes need to be correct to District Standards. The curb stop in
front of the meter pit is to be deleted.
The existing meter pit assembly cannot be re-used.
Separate water taps are required for the residential and commercial
development. A separate irrigation tap is required to satisfy the multi-family fee
reduction.
A reduced pressure principle Back-Flow-Prevention-Device is required on the
fire line.
Please do not hesitate to contact me at 226-3104, ext. 104, if you have any