HomeMy WebLinkAboutTAFT PLACE - FDP180028 - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTGEOTECHNICAL SUBSURFACE EXPLORATION REPORT
PROPOSED MIXED-USE BUILDING
4101 SOUTH TAFT HILL ROAD, FORT COLLINS, COLORADO
SOILOGIC # 18-1038
February 26, 2018
Soilogic, Inc.
3522 Draft Horse Court Loveland, CO 80538 (970) 535-6144
P.O. Box 1121 Hayden, CO 81639 (970) 276-2087
February 26, 2018
Aweida Properties, Inc.
500 Discovery Parkway, Suite 300
Superior, Colorado 80027
Attn: Mr. Neil Aweida
Re: Geotechnical Subsurface Exploration Report
Proposed Mixed-Use Building
4101 South Taft Hill Road
Fort Collins, Colorado
Soilogic Project # 18-1038
Dear Mr. Aweida:
Soilogic, Inc. (Soilogic) personnel have completed the geotechnical subsurface exploration
you requested for the proposed mixed-use building to be constructed at 4101 South Taft
Hill Road in Fort Collins, Colorado. The results of our subsurface exploration and
pertinent geotechnical engineering recommendations are included with this report.
The subsurface materials encountered in the completed site borings can be summarized as
follows. Brown/beige sandy lean clay with gravel which was identified as possible existing
fill material was encountered at the surface at the locations of borings B-1 and B-3. The
lean clay apparent fill varied from medium stiff to very stiff in terms of consistency,
exhibited low to borderline low/moderate swell potential at current moisture and density
conditions and extended to a depth of about 3 feet below ground surface, where it was
underlain by reddish-brown/beige/rust clayey sand with varying amounts of gravel.
Apparently natural reddish-brown/beige/rust clayey sand with varying amounts of gravel
was also encountered at the surface at the locations of borings B-2 and B-4. The clayey
sand varied from loose to medium dense in terms of relative density, exhibited no to low
swell potential at in-situ moisture and density conditions and extended to the maximum
depths explored in each of the borings at depths between 10 and 15 feet below present site
grades. Groundwater was not encountered in the completed site borings to the depths
explored (approximately 10 to 15 feet below ground surface) when checked immediately
after drilling.
Geotechnical Subsurface Exploration Report
Proposed Mixed-Use Building
4101 South Taft Hill Road, Fort Collins, Colorado
Soilogic Project # 18-1038
2
Based on the subsurface conditions encountered, results of laboratory testing and type of
construction proposed, it is our opinion the proposed mixed-use building could be designed
and constructed using conventional spread footing foundations bearing on natural,
undisturbed clayey sand and/or properly placed and compacted overexcavation/backfill
(where required). Care will be needed at the time of construction to ensure all footing
foundations bear on like materials with suitable strength and low volume change potential.
Possible existing undocumented fill soils were identified in borings B-1 and B-3. If/where
undocumented fill is identified underlying footing foundations at the time of excavation,
extending footing foundations to bear on natural, undisturbed clayey sand with no to low
swell potential at slightly greater depth, or extending overexcavation/backfill procedures
to low swelling clayey sand to redevelop foundation bearing would be required.
Overexcavation/backfill procedures extended to natural, undisturbed clayey sand with no
to low swell potential should also be completed below the building floor slab if/where
undocumented fill is identified. Similar methods should be used in order to develop LVC-
potential pavement and exterior flatwork subgrades if/where undocumented fill soils are
identified underlying these improvements. The overexcavation/backfill procedures would
help develop LVC-potential foundation, floor slab/flatwork and pavement support across
the building footprint and pavement areas and reduce the potential for total and differential
movement of those supported elements subsequent to construction.
Based on the results of completed laboratory testing, the existing fill and natural site clayey
sand soils appear suitable for use as low volume change (LVC) fill and overexcavation/
backfill (if/where required) to develop the site. Other opinions and recommendations
concerning design criteria and construction details for the proposed site improvements are
included with this report. Pavement section design options are also included.
Geotechnical Subsurface Exploration Report
Proposed Mixed-Use Building
4101 South Taft Hill Road, Fort Collins, Colorado
Soilogic Project # 18-1038
3
We appreciate the opportunity to be of service to you on this project. If you have any
questions concerning the enclosed information or if we can be of further service to you in
any way, please do not hesitate to contact us.
Very Truly Yours,
Soilogic, Inc. Reviewed by:
Alec Kaljian, E.I. Wolf von Carlowitz, P.E.
Project Engineer Principal Engineer
GEOTECHNICAL SUBSURFACE EXPLORATION REPORT
PROPOSED MIXED-USE BUILDING
4101 SOUTH TAFT HILL ROAD, FORT COLLINS, COLORADO
SOILOGIC # 18-1038
February 26, 2018
INTRODUCTION
This report contains the results of the completed geotechnical subsurface exploration for
the proposed mixed-use building to be constructed at 4101 South Taft Hill Road in Fort
Collins, Colorado. The purpose of our exploration was to describe the subsurface
conditions encountered in the completed site borings and develop the test data necessary
to provide recommendations concerning design and construction of the proposed building
foundations and support of floor slabs, exterior flatwork and site pavements. The
conclusions and recommendations outlined in this report are based on the results of the
completed field and laboratory testing and our experience with subsurface conditions in
this area.
PROPOSED CONSTRUCTION
We understand the proposed mixed-use (commercial/residential) building will be a two-
story, steel frame structure constructed as slab-on-grade, encompassing a plan area of
approximately 2,667 square feet. Foundations loads for the building are anticipated to be
relatively light, with maximum continuous wall loads on the order of 3 to 4 kips per lineal
foot and individual column loads less than 150 kips. Paved drive and parking areas are
also anticipated as part of the proposed site improvements. Small grade changes are
anticipated to develop finish site grades in building and pavement areas. If proposed
construction or assumed loadings differ significantly from those assumed, Soilogic should
be notified to reevaluate the recommendations in this report.
SITE DESCRIPTION
The development parcel includes an approximate 0.46-acre parcel of land located at 4101
South Taft Hill Road in Fort Collins, Colorado. At the time of our exploration, the site was
sparsely vegetated with grasses and weeds and was relatively level, with the maximum
difference in ground surface elevation across the site estimated to be on the order of two to
Geotechnical Subsurface Exploration Report
Proposed Mixed-Use Building
4101 South Taft Hill Road, Fort Collins, Colorado
Soilogic Project # 18-1038
2
three (2-3) feet. We understand a previously existing residence and associated outbuildings
were razed and removed from this property prior to our site exploration.
SITE EXPLORATION
Field Exploration
To develop subsurface information for the proposed site improvements, a total of four (4)
soil borings were completed. Two (2) borings were advanced in the areas of the proposed
mixed-use building to a depth of approximately 15 feet below present site grade. Two (2)
additional borings were completed in the site pavement areas to a depth of approximately
10 feet below ground surface. The boring locations were established in the field by
Soilogic personnel based on a provided site plan, using a mechanical surveyor's wheel and
estimating angles from identifiable site references. The boring locations should be
considered accurate only to the degree implied by the methods used to make the field
measurements. A diagram indicating the approximate boring locations is included with
this report. Graphic logs of each of the auger borings are also included.
The test holes were advanced using 4-inch diameter continuous flight auger powered by a
truck-mounted CME-45 drill rig. Samples of the subsurface materials were obtained at
regular intervals using California barrel sampling procedures in general accordance with
ASTM specification D-1586. As part of the D-1586 sampling procedure, the standard
sampling barrel is driven into the substrata using a 140-pound hammer falling a distance
of 30 inches. The number of blows required to advance the sampler a distance of 12 inches
is recorded and helpful in estimating the consistency, relative density or hardness of the
soils/bedrock encountered. In the California barrel sampling procedure, lesser disturbed
samples are obtained in removable brass liners. Samples of the subsurface materials
obtained in the field were sealed and returned to the laboratory for further evaluation,
classification and testing.
Laboratory Testing
The samples collected were tested in the laboratory to measure natural moisture content
and were visually and/or manually classified in accordance with the Unified Soil
Geotechnical Subsurface Exploration Report
Proposed Mixed-Use Building
4101 South Taft Hill Road, Fort Collins, Colorado
Soilogic Project # 18-1038
3
Classification System (USCS). The USCS group symbols are indicated on the attached
boring logs. An outline of the USCS classification system is included with this report.
Classification of bedrock was completed through visual and tactual observation of
disturbed samples. Other bedrock types could be revealed through petrographic analysis.
As part of the laboratory testing, a calibrated hand penetrometer (CHP) was used to
estimate the unconfined compressive strength of essentially-cohesive specimens. The CHP
also provides a more reliable estimate of soil/bedrock consistency than tactual observation
alone. Dry density, Atterberg limits, -200 wash and swell/consolidation tests were
completed on selected samples to help establish specific soil/bedrock characteristics.
Atterberg limits tests are used to determine soil/bedrock plasticity. The percent passing
the #200 size sieve (-200 wash) test is used to determine the percentage of fine-grained
materials (clay and silt) in a sample. Swell/consolidation tests are performed to evaluate
soil/bedrock volume change potential with variation in moisture content. As part of the
completed laboratory testing water soluble sulfate (WSS) tests were completed on two (2)
selected soil samples to evaluate corrosive soil characteristics with respect to buried
concrete. The results of the completed laboratory tests are outlined on the attached boring
logs and swell/ consolidation test summaries and/or discussed subsequently in this report.
SUBSURFACE CONDITIONS
The subsurface materials encountered in the completed site borings can be summarized as
follows. Brown/beige sandy lean clay with gravel which was identified as possible existing
fill material was encountered at the surface at the locations of borings B-1 and B-3. The
lean clay apparent fill varied from medium stiff to very stiff in terms of consistency,
exhibited low to borderline low/moderate swell potential at current moisture and density
conditions and extended to a depth of about 3 feet below ground surface, where it was
underlain by reddish-brown/beige/rust clayey sand with varying amounts of gravel.
Apparently natural reddish-brown/beige/rust clayey sand with varying amounts of gravel
was also encountered at the surface at the locations of borings B-2 and B-4. The clayey
sand varied from loose to medium dense in terms of relative density, exhibited no to low
swell potential at in-situ moisture and density conditions and extended to the maximum
depths explored in each of the borings at depths between 10 and 15 feet below present site
grades.
Geotechnical Subsurface Exploration Report
Proposed Mixed-Use Building
4101 South Taft Hill Road, Fort Collins, Colorado
Soilogic Project # 18-1038
4
The stratigraphy indicated on the included boring logs represents the approximate location
of changes in soil types. Actual changes may be more gradual than those indicated.
Groundwater was not encountered in the completed site borings to the depths explored
(approximately 10 to 15 feet below ground surface) when checked immediately after
drilling. Groundwater levels will vary due to seasonal variations in precipitation, site
development, irrigation practices and other hydrologic conditions. Perched and/or trapped
groundwater conditions may also be encountered at times throughout the year. Perched
water is commonly encountered in soils overlying less permeable soil layers and/or
bedrock. Trapped water is typically encountered within more permeable zones of layered
soil and bedrock systems. The location and amount of perched and/or trapped water can
also vary over time.
ANALYSIS AND RECOMMENDATIONS
General
Possible existing undocumented fill was encountered at the locations of borings B-1 and
B-3 extending to a depth approaching 3 feet below present site grade. As a precaution, and
in order to develop consistent foundation bearing, we recommend all shallow stemwall
footing foundations be extended through any existing fill (if/where present) to bear on
natural, undisturbed moist clayey sand with no to low swell potential. Overexcavation/
backfill procedures extended to natural, undisturbed clayey sand with no to low swell
potential could also be considered to redevelop foundation bearing in these areas. Careful
observation of the exposed foundation bearing materials should be completed at the time
of construction to ensure all footing foundations will be supported on like materials with
suitable strength and low volume change potential. If/where existing fill soils are identified
underlying the building floor slab at the time of excavation, overexcavation/backfill
procedures extended to low swelling clayey sand in these areas are recommended to
redevelop low volume-change (LVC) floor slab support for this improvement. Similar
overexcavation/backfill procedures below exterior flatwork and site pavements are also
recommended prior to concrete/asphalt placement/surfacing if/where undocumented fill is
identified in these areas.
Geotechnical Subsurface Exploration Report
Proposed Mixed-Use Building
4101 South Taft Hill Road, Fort Collins, Colorado
Soilogic Project # 18-1038
5
Demolition and Site Development
Any remaining foundations, flatwork/landscaping features, underground utilities and other
site improvements should be completely removed from within the building, exterior
flatwork and pavement areas. In addition, we recommend all existing vegetation and
topsoil, including all tree root systems (if any) and dry and desiccated soils associated with
the tree root systems be completely removed. Undocumented fill soils identified within
the proposed building, site pavement and exterior flatwork areas should also be completely
removed to natural, undisturbed clayey sand with no to low swell potential at this time.
After stripping and completing all cuts and removal procedures and prior to placement of
any new fill, removal area backfill, exterior flatwork or site pavements, we recommend the
exposed subgrades be scarified to a depth of 9 inches, adjusted to within ±2% of optimum
moisture content and uniformly re-compacted to at least 95% of the maximum standard
Proctor density (ASTM D698).
Fill and overexcavation/backfill soils required to develop the site should consist of
approved low volume change (LVC) soils free from organic matter, debris and other
objectionable materials. Based on results of the completed laboratory testing, it is our
opinion the existing fill (if any) and site clayey sand could be used as fill and/or
overexcavation/backfill to develop the site provided the proper moisture content is
developed in the materials at the time of placement and compaction. If it is necessary to
import additional material to the site for use as fill, those materials should consist of
approved relatively impervious LVC materials. We recommend suitable fill materials be
uniformly placed and compacted in loose lifts not to exceed 9 inches thick, moisture
conditioned and compacted as recommended for the scarified subgrade soils above.
Care should be taken to avoid disturbing the reconditioned subgrade soils and placed fill
materials prior to placement of any overlying improvements. Soils which are allowed to
dry or out or become wet and softened or disturbed by the construction activities should be
removed and replaced or reworked in place prior to concrete placement and/or paving.
Geotechnical Subsurface Exploration Report
Proposed Mixed-Use Building
4101 South Taft Hill Road, Fort Collins, Colorado
Soilogic Project # 18-1038
6
Foundations
Based on the materials encountered in the completed site borings and results of field and
laboratory testing, it is our opinion the proposed mixed-use building could be supported by
continuous spread footing and isolated pad foundations bearing on natural, undisturbed,
clayey sand with no to low swell potential and/or properly placed and compacted
overexcavation/backfill (if/where required) developed as outlined above.
For design of foundations bearing on natural, undisturbed, loose to medium dense clayey
sand and/or properly placed and compacted overexcavation/backfill (if completed), we
recommend using a maximum net allowable soil bearing pressure of 1,500 psf. As a
precaution, we recommend the footing foundations be sized to maintain a minimum dead-
load pressure of 500 psf (or as high as practical) on the bearing soils.
Exterior footings shall bear a minimum of 30 inches below finished adjacent exterior grade
to provide frost protection. We recommend formed strip footings have a minimum width
of 12 inches and isolated pad foundations have a minimum width of 24 inches in order to
facilitate construction and reduce the potential for development of eccentrically loaded
footings. Actual footing widths should be designed by a structural engineer.
Backfill placed adjacent to foundation walls should consist of LVC potential and relatively
impervious soils free from organic matter, debris and other objectionable materials. The
existing fill and site clayey sand could be used as backfill in this area provided the proper
moisture content is developed in those materials at the time of placement and compaction.
We recommend the existing fill and site clayey sand or similar backfill soils be placed in
loose lifts not to exceed 9 inches thick, adjusted in moisture and compacted as previously
outlined in the “Demolition and Site Development” section of this report.
For design of footing foundations and foundation walls to resist lateral movement, a
passive equivalent fluid pressure value of 275 pcf could be used. The top 30 inches of
subgrade could be considered a surcharge load but should not be used in the passive
resistance calculations. A coefficient of friction of 0.45 could be used between foundation
and floor slab concrete and the bearing soils to resist sliding. The recommended passive
equivalent fluid pressure value and coefficient of friction do not include a factor of safety.
Geotechnical Subsurface Exploration Report
Proposed Mixed-Use Building
4101 South Taft Hill Road, Fort Collins, Colorado
Soilogic Project # 18-1038
7
We estimate settlement of footing foundations designed and constructed as outlined above
and resulting from the assumed structural loads would be less than 1 inch. Differential
settlement could approach the amount of total movement estimated above. If water from
any source is allowed to infiltrate the foundation bearing soils, additional movement of the
foundations could occur.
Seismic Design
Based on the results of this investigation and Soilogic review of the International Building
Code (IBC - 2003), a soil profile type D could be used for the site strata. Based on our
review of United States Geologic Survey (USGS) mapped information, design spectral
response acceleration values of SDS = .231 (23.1%) and SD1 = .094 (9.4%) could be used.
Floor Slab, Exterior Flatwork and Pavement Subgrade
In slab-on-grade, exterior flatwork and pavement areas, those slabs/pavements could be
supported directly on reconditioned natural site soils and/or properly placed and compacted
fill or overexcavation/backfill (if/where required) developed as outlined in the “Demolition
and Site Development” section of this report. A modulus of subgrade reaction (k) value of
150 pci could be used for design of at-grade floor slabs supported on reconditioned natural
site clayey sand and/or properly placed and compacted fill. Disturbed subgrades or
subgrade soils that have been allowed to dry out or become wet and softened should be
removed and replaced or reconditioned in place prior to floor slab construction.
Floor slabs should be designed and constructed as floating slabs, separated from foundation
walls, columns and plumbing and mechanical penetrations by the use of block outs or
appropriate isolation material. Additionally, we recommend all partition walls supported
above slabs-on-grade be constructed as floating walls to help reduce the potential for
differential slab-to-foundation movement causing distress in upper sections of the
structure. A minimum one and one-half (1½) inch void space is recommended beneath all
floating walls. Special attention to door and stair framing, drywall installation and trim
carpentry should be taken to isolate those elements from the floor slab, allowing for some
differential floor slab-to-foundation movement to occur without transmitting stresses to the
overlying structure.
Geotechnical Subsurface Exploration Report
Proposed Mixed-Use Building
4101 South Taft Hill Road, Fort Collins, Colorado
Soilogic Project # 18-1038
8
Depending on the type of floor covering and floor covering adhesive used in finished slab-
on-ground areas, a vapor barrier may be required immediately beneath the floor slab to
maintain flooring product manufacturer warranties. A vapor barrier would help reduce the
transmission of moisture through the floor slabs. However, the unilateral moisture release
caused by placing concrete on an impermeable surface can increase slab curl. The amount
of slab curl can be reduced by careful selection of an appropriate concrete mix. Slab curl
cannot be eliminated. We recommend the owner, architect and flooring contractor consider
the performance of the slab in conjunction with the proposed flooring products to help
determine if a vapor barrier will be required and where best to position the vapor barrier in
relation to the floor slab. Additional guidance and recommendations concerning slab-on-
grade design can be found in American Concrete Institute (ACI) section 302.
Subgrade soils expected to receive floor slabs, exterior flatwork and pavements should be
evaluated closely immediately prior to concrete placement. If areas of disturbed, wet and
softened, or dry subgrade soils are encountered at that time, reworking of those materials
or removal/replacement procedures may be required.
Some movement of site pavements and exterior flatwork should be expected as the
moisture content of the subgrade soils increases subsequent to construction. Based on
results of the completed field and laboratory testing, we expect the amount of movement
of pavements and exterior flatwork supported on reconditioned natural site soils and/or
properly placed and compacted fill and/or overexcavation/backfill would be limited. Care
should be taken to ensure that when site pavements and exterior flatwork move, positive
drainage will be maintained away from the structure.
Pavements
The site clayey sand would be subject to low remolded shear strength. A resistance value
(R-value) of 7 was estimated for the site clayey sand and used in the pavement section
design. Traffic loading on site pavements is expected to consist of low volumes
automobiles and light trucks as well as areas of higher light-vehicle traffic volumes and
heavier trash, delivery and emergency vehicle traffic. Equivalent 18-kip single axle loads
(ESAL’s) were estimated for the quantity of site traffic anticipated. Two (2) general design
classifications are outlined below in Table I. Standard duty pavements could be considered
Geotechnical Subsurface Exploration Report
Proposed Mixed-Use Building
4101 South Taft Hill Road, Fort Collins, Colorado
Soilogic Project # 18-1038
9
in automobile drive and parking areas. Heavy duty pavements should be considered for
access drives and other areas of the site expected to receive higher traffic volumes or
heavier trash, delivery and emergency truck traffic.
Proofrolling of the pavement subgrades should be completed to help identify unstable
areas. Areas which pump or deform excessively should be mended prior to asphalt, PCC
or aggregate base course placement. Isolated areas of subgrade instability can be mended
on a case-by-case basis. If more extensive areas of subgrade instability are observed and
depending on the in-place moisture content of the subgrade soils immediately prior to
paving, the time of year when construction occurs and other hydrologic conditions, overall
stabilization of the subgrade soils may become necessary to develop a suitable paving
platform. If required, we recommend consideration be given to stabilization of the
pavement subgrades with Class C fly ash. With the increase in support strength developed
by the fly ash stabilization procedures, it is our opinion some credit for the stabilized zone
could be included in the pavement section design, reducing the required thickness of
overlying asphaltic concrete and aggregate base course. Fly ash stabilization can also
eliminate some of the uncertainty associated with attempting to pave during periods of
inclement weather. Pavement section design options incorporating some structural credit
for the fly ash-stabilized subgrade soils are outlined below in Table I.
TABLE I – PAVEMENT SECTION DESIGN
Standard Duty Heavy Duty
Option A – Composite
Asphaltic Concrete (Grading S or SX)
Aggregate Base (Class 5 or 6)
4”
6”
5”
8”
Option B – Composite on Stabilized Subgrade
Asphaltic Concrete (Grading S or SX)
Aggregate Base (Class 5 or 6)
Fly Ash Stabilized Subgrade
3”
4”
12”
4”
6”
12”
Option C - Portland Cement Concrete Pavement
PCCP
5”
6”
Asphaltic concrete should consist of a bituminous plant mix composed of a mixture of
aggregate, filler, binders and additives (if required) meeting the design requirements of the
City of Fort Collins. Aggregate used in the asphaltic concrete should meet specific
gradation requirements such as Colorado Department of Transportation (CDOT) grading
Geotechnical Subsurface Exploration Report
Proposed Mixed-Use Building
4101 South Taft Hill Road, Fort Collins, Colorado
Soilogic Project # 18-1038
10
S (¾-inch minus) or SX (½-inch minus) specifications. Hot mix asphalt designed using
“Superpave” criteria should be compacted to within 92 to 96% of the materials Maximum
Theoretical Density. Aggregate base should be consistent with CDOT requirements for
Class 5 or Class 6 aggregate base, placed in loose lifts not to exceed 9 inches thick, adjusted
to within ±2% of standard Proctor optimum moisture content and compacted to at least
95% of the materials standard Proctor maximum dry density.
If fly ash stabilization procedures will be completed, we recommend the addition of 12%
Class ‘C’ fly ash based on component dry unit weights. A 12-inch thick stabilized zone
should be constructed by thoroughly blending the fly ash with the in-place subgrade soils.
Some “fluffing” of the finish subgrade level should be expected with the stabilization
procedures. The blended materials should be adjusted in moisture content to within the
range of ±2% of standard Proctor optimum moisture content and compacted to at least 95%
of the material’s standard Proctor maximum dry density within two (2) hours of fly ash
addition.
For areas subjected to truck turning movements and/or concentrated and repetitive loading
such as dumpster or truck parking and loading areas, we recommend consideration be given
to the use of Portland cement concrete pavement with a minimum thickness of 6 inches.
The concrete used for site pavements should be entrained with 4% to 8% air and have a
minimum 28-day compressive strength of 4,000 psi. Woven wire mesh or fiber entrained
concrete should be considered to help in the control of shrinkage cracking.
The proposed pavement section designs do not include an allowance for excessive loading
conditions imposed by heavy construction vehicles or equipment. Heavily loaded concrete
or other building material trucks and construction equipment can cause some localized
distress to site pavements. The recommended pavement sections are minimums and
periodic maintenance efforts should be expected. A preventative maintenance program
can help increase the service life of site pavements.
Corrosive Soil Characteristics
We measured the soluble sulfate concentration for two (2) representative samples of the
subsoils which will likely be in contact with structural concrete. The sulfate concentrations
Geotechnical Subsurface Exploration Report
Proposed Mixed-Use Building
4101 South Taft Hill Road, Fort Collins, Colorado
Soilogic Project # 18-1038
11
measured in the samples varied from 0 to 0.015 percent by weight. ACI rates the measured
concentrations as being defined as a “negligible risk” category for concrete sulfate attack;
therefore Type I cement should be suitable for concrete members on and below grade. As
an added precaution, Type I/II Portland cement could be considered for additional sulfate
resistance of construction concrete. Foundation concrete should be designed in accordance
with the provisions of the ACI Design Manual, Section 318, Chapter 4.
Drainage
Positive drainage is imperative for satisfactory long-term performance of the proposed
building and associated site improvements. We recommend positive drainage be
developed away from the structure during construction and maintained throughout the life
of the site improvements, with twelve (12) inches of fall in the first 10 feet away from the
building. Shallower slopes could be considered in hardscape areas. In the event that poor
or negative drainage develops adjacent to the building over time, the original grade and
associated positive drainage outlined above should be immediately restored.
Care should be taken in the planning of landscaping to avoid features which could result in
the fluctuation of the moisture content of the foundation bearing and flatwork and
pavement subgrade soils. We recommend watering systems be placed a minimum of 5 feet
away from the perimeters of the site structures and be designed to discharge away from all
site improvements. Gutter systems should be considered to help reduce the potential for
water ponding adjacent to the structure, with the gutter downspouts, roof drains or scuppers
extended to discharge a minimum of 5 feet away from structural, flatwork and pavement
elements. Water which is allowed to pond adjacent to site improvements can result in
unsatisfactory performance of those improvements over time.
LIMITATIONS
This report was prepared based upon the data obtained from the completed site exploration,
laboratory testing, engineering analysis and any other information discussed. The
completed borings provide an indication of subsurface conditions at the boring locations
only. Variations in subsurface conditions can occur in relatively short distances away from
the borings. This report does not reflect any variations which may occur across the site or
Geotechnical Subsurface Exploration Report
Proposed Mixed-Use Building
4101 South Taft Hill Road, Fort Collins, Colorado
Soilogic Project # 18-1038
12
away from the borings. If variations in the subsurface conditions anticipated become
evident, the geotechnical engineer should be notified immediately so that further evaluation
and supplemental recommendations can be provided.
The scope of services for this project does not include either specifically or by implication
any biological or environmental assessment of the site or identification or prevention of
pollutants or hazardous materials or conditions. Other studies should be completed if
concerns over the potential of such contamination or pollution exist.
The geotechnical engineer should be retained to review the plans and specifications so that
comments can be made regarding the interpretation and implementation of our
geotechnical recommendations in the design and specifications. The geotechnical engineer
should also be retained to provide testing and observation services during construction to
help determine that the design requirements are fulfilled.
This report has been prepared for the exclusive use of our client for specific application to
the project discussed and has been prepared in accordance with the generally accepted
standard of care for the profession. No warranties express or implied, are made. The
conclusions and recommendations contained in this report should not be considered valid
in the event that any changes in the nature, design or location of the project as outlined in
this report are planned, unless those changes are reviewed and the conclusions of this report
modified and verified in writing by the geotechnical engineer.
PROPOSED MIXED-USE BUILDING
BORING LOCATION DIAGRAM
4101 SOUTH TAFT HILL ROAD, FORT COLLINS, COLORADO
FEBRUARY 2018
PROJECT # 18-1038
B-1
B-2
B-4
B-3
LOG OF BORING B-1
1/1 CME 45
4" CFA
Automatic
ZG & ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
POSSIBLE EXISTING FILL MATERIAL; 1
CL SANDY LEAN CLAY with GRAVEL -
brown, beige 2
very stiff -
3 CS 34 7.1 116.6 9000+ 2.9% 2400 - - -
-
4
-
5 CS 16 11.1 100.4 9000+ None <500 - - -
-
6
-
7
-
8
SC CLAYEY SAND with varying -
amounts of GRAVEL 9
reddish-brown, beige, rust -
loose to medium dense 10 CS 10 8.8 120.9 9000+ - - - - -
-
11
-
12
-
13
-
14
-
15 CS 42 3.5 - 9000+ - - - - -
BOTTOM OF BORING @ 15.0' -
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
USCS
Sampler
LOG OF BORING B-2
1/1 CME 45
4" CFA
Automatic
ZG & ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
± 1-2' POSSIBLE EXISTING 1
FILL MATERIAL -
2
-
3
-
4
-
5 CS 11 9.4 109.4 9000+ 1.3% - - - -
-
6
-
7
SC CLAYEY SAND with varying -
amounts of GRAVEL 8
reddish-brown, beige, rust -
loose to medium dense 9
-
10 CS 19 2.8 114.4 9000+ None <500 - - -
-
11
-
12
-
13
-
14
-
15 CS 24 2.7 124.0 9000+ - - - - -
BOTTOM OF BORING @ 15.0' -
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
Sheet Drilling Rig: Water Depth Information
PROPOSED MIXED-USE BUILDING
LOG OF BORING B-3
1/1 CME 45
4" CFA
Automatic
ZG & ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
POSSIBLE EXISTING FILL MATERIAL; 1
CL SANDY LEAN CLAY with GRAVEL -
brown, beige 2
medium stiff -
3 CS 8 13.3 116.0 9000+ 0.4% 2000 - - -
-
4
-
5 CS 11 8.8 122.9 9000+ None <500 - - -
SC CLAYEY SAND with varying -
amounts of GRAVEL 6
reddish-brown, beige, rust -
loose 7
-
8
-
9
-
10 CS 11 16.9 111.4 9000+ - - - - -
BOTTOM OF BORING 15.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
Sheet Drilling Rig: Water Depth Information
PROPOSED MIXED-USE BUILDING
LOG OF BORING B-4
1/1 CME 45
4" CFA
Automatic
ZG & ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
± 1-2' POSSIBLE EXISTING 1
FILL MATERIAL -
2
-
3 CS 23 9.8 99.9 9000+ 0.1% 600 - - -
-
4
-
SC CLAYEY SAND with varying 5 CS 6 6.2 105.9 9000+ - - 23 11 32.1%
amounts of GRAVEL -
reddish-brown, beige, rust 6
loose to medium dense -
7
-
8
-
9
-
10 CS 16 1.6 - 9000+ - - - - -
BOTTOM OF BORING 15.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
Sheet Drilling Rig: Water Depth Information
PROPOSED MIXED-USE BUILDING
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 116.6
500
Final Moisture 18.7%
% Swell @ 500 psf 2.9%
Swell Pressure (psf) 2,400
Sample ID: B-1 @ 2
Sample Description: Possible Existing Fill Material; Sandy Lean Clay with Gravel (CL)
Initial Moisture 7.1%
SWELL/CONSOLIDATION TEST SUMMARY
PROPOSED MIXED-USE BUILDING
4101 SOUTH TAFT HILL ROAD, FORT COLLINS, COLORADO
Project # 18-1038
February 2018
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 100.4
SWELL/CONSOLIDATION TEST SUMMARY
PROPOSED MIXED-USE BUILDING
4101 SOUTH TAFT HILL ROAD, FORT COLLINS, COLORADO
Project # 18-1038
February 2018
Initial Moisture 11.1%
Sample ID: B-1 @ 4
Sample Description: Reddish-Brown/Rust Clayey Sand (SC)
(Swell Only)
500
Final Moisture 23.0%
% Swell @ 500 psf None
Swell Pressure (psf) <500
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 109.4
SWELL/CONSOLIDATION TEST SUMMARY
PROPOSED MIXED-USE BUILDING
4101 SOUTH TAFT HILL ROAD, FORT COLLINS, COLORADO
Project # 18-1038
February 2018
Initial Moisture 9.4%
Sample ID: B-2 @ 4
Sample Description: Reddish-Brown/Rust Clayey Sand (SC)
500
Final Moisture 21.7%
% Swell @ 500 psf 1.3%
Swell Pressure (psf) -
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 114.4
SWELL/CONSOLIDATION TEST SUMMARY
PROPOSED MIXED-USE BUILDING
4101 SOUTH TAFT HILL ROAD, FORT COLLINS, COLORADO
Project # 18-1038
February 2018
Initial Moisture 2.8%
Sample ID: B-2 @ 9
Sample Description: Reddish-Brown/Rust Clayey Sand (SC)
(Swell Only)
500
Final Moisture 14.3%
% Swell @ 500 psf None
Swell Pressure (psf) <500
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 116.0
SWELL/CONSOLIDATION TEST SUMMARY
PROPOSED MIXED-USE BUILDING
4101 SOUTH TAFT HILL ROAD, FORT COLLINS, COLORADO
Project # 18-1038
February 2018
Initial Moisture 13.3%
Sample ID: B-3 @ 2
Sample Description: Possible Existing Fill Material; Sandy Lean Clay with Gravel (CL)
500
Final Moisture 17.4%
% Swell @ 500 psf 0.4%
Swell Pressure (psf) 2,000
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 122.9
SWELL/CONSOLIDATION TEST SUMMARY
PROPOSED MIXED-USE BUILDING
4101 SOUTH TAFT HILL ROAD, FORT COLLINS, COLORADO
Project # 18-1038
February 2018
Initial Moisture 8.8%
Sample ID: B-3 @ 4
Sample Description: Reddish-Brown/Rust Clayey Sand (SC)
(Swell Only)
500
Final Moisture 13.4%
% Swell @ 500 psf None
Swell Pressure (psf) <500
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 99.9
SWELL/CONSOLIDATION TEST SUMMARY
PROPOSED MIXED-USE BUILDING
4101 SOUTH TAFT HILL ROAD, FORT COLLINS, COLORADO
Project # 18-1038
February 2018
Initial Moisture 9.8%
Sample ID: B-4 @ 2
Sample Description: Reddish-Brown/Beige Clayey Sand (SC)
500
Final Moisture 23.1%
% Swell @ 500 psf 0.1%
Swell Pressure (psf) 600
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
UNIFIED SOIL CLASSIFICATION SYSTEM
Criteria for Assigning Group Symbols and Group Names Using Laboratory TestsA Soil Classification
Group
Symbol
Group NameB
Clean Gravels Cu ! 4 and 1 " Cc " 3E GW Well graded gravelF
Less than 5% finesC Cu
< 4 and/or 1 > Cc > 3E GP Poorly graded gravelF
Fines classify as ML or MH GM Silty gravelF,G, H
Coarse Grained Soils
More than 50% retained
on No. 200 sieve
Gravels
More than 50% of coarse
fraction retained on
No. 4 sieve Gravels with Fines More
than 12% finesC Fines classify as CL or CH GC Clayey gravelF,G,H
Clean Sands Cu ! 6 and 1 " Cc " 3E SW Well graded sandI
Less than 5% finesD Cu
< 6 and/or 1 > Cc > 3E SP Poorly graded sandI
Fines classify as ML or MH SM Silty sandG,H,I
Sands
50% or more of coarse
fraction passes
No. 4 sieve Sands with Fines
More than 12% finesD Fines classify as CL or CH SC Clayey sandG,H,I
Silts and Clays PI > 7 and plots on or above “A” lineJ CL Lean clayK,L,M
Liquid limit less than 50
Inorganic
PI < 4 or plots below “A” lineJ ML SiltK,L,M
Liquid limit - oven
dried
Organic clayK,L,M,N
Fine-Grained Soils
50% or more passes the
No. 200 sieve
Organic
Liquid limit - not
dried
< 0.75 OL
Organic siltK,L,M,O
Inorganic PI plots on or above “A” line CH Fat clayK,L,M
Silts and Clays
Liquid limit 50 or more
PI plots below “A” line MH Elastic siltK,L,M
Organic Liquid limit - oven dried Organic clayK,L,M,P
Liquid limit - not dried
< 0.75 OH
Organic siltK,L,M,Q
Highly organic soils Primarily organic matter, dark in color, and organic odor PT Peat
A Based on the material passing the 3-in. (75-mm) sieve
B If field sample contained cobbles or boulders, or both, add “with cobbles
or boulders, or both” to group name.
C Gravels with 5 to 12% fines require dual symbols: GW-GM well graded
gravel with silt, GW-GC well graded gravel with clay, GP-GM poorly
graded gravel with silt, GP-GC poorly graded gravel with clay.
D Sands with 5 to 12% fines require dual symbols: SW-SM well graded
sand with silt, SW-SC well graded sand with clay, SP-SM poorly graded
sand with silt, SP-SC poorly graded sand with clay
E Cu = D60/D10 Cc =
GENERAL NOTES
DRILLING & SAMPLING SYMBOLS:
SS: Split Spoon - 1⅜" I.D., 2" O.D., unless otherwise noted HS: Hollow Stem Auger
ST: Thin-Walled Tube – 2.5" O.D., unless otherwise noted PA: Power Auger
RS: Ring Sampler - 2.42" I.D., 3" O.D., unless otherwise noted HA: Hand Auger
CS: California Barrel - 1.92" I.D., 2.5" O.D., unless otherwise noted RB: Rock Bit
BS: Bulk Sample or Auger Sample WB: Wash Boring or Mud Rotary
The number of blows required to advance a standard 2-inch O.D. split-spoon sampler (SS) the last 12 inches of the total 18-inch
penetration with a 140-pound hammer falling 30 inches is considered the “Standard Penetration” or “N-value”. For 2.5” O.D.
California Barrel samplers (CB) the penetration value is reported as the number of blows required to advance the sampler 12
inches using a 140-pound hammer falling 30 inches, reported as “blows per inch,” and is not considered equivalent to the
“Standard Penetration” or “N-value”.
WATER LEVEL MEASUREMENT SYMBOLS:
WL: Water Level WS: While Sampling
WCI: Wet Cave in WD: While Drilling
DCI: Dry Cave in BCR: Before Casing Removal
AB: After Boring ACR: After Casing Removal
Water levels indicated on the boring logs are the levels measured in the borings at the times indicated. Groundwater levels at other
times and other locations across the site could vary. In pervious soils, the indicated levels may reflect the location of groundwater.
In low permeability soils, the accurate determination of groundwater levels may not be possible with only short-term observations.
DESCRIPTIVE SOIL CLASSIFICATION: Soil classification is based on the Unified Classification System. Coarse Grained Soils
have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand.
Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they
are plastic, and silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents
may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined
on the basis of their in-place relative density and fine-grained soils on the basis of their consistency.
FINE-GRAINED SOILS COARSE-GRAINED SOILS BEDROCK
(CB)
Blows/Ft.
(SS)
Blows/Ft.
Consistency
(CB)
Blows/Ft.
(SS)
Blows/Ft.
Relative
Density
(CB)
Blows/Ft.
(SS)
Blows/Ft.
Consistency
< 3 0-2 Very Soft 0-5 < 3 Very Loose < 24 < 20 Weathered
3-5 3-4 Soft 6-14 4-9 Loose 24-35 20-29 Firm
6-10 5-8 Medium Stiff 15-46 10-29 Medium Dense 36-60 30-49 Medium Hard
11-18 9-15 Stiff 47-79 30-50 Dense 61-96 50-79 Hard
19-36 16-30 Very Stiff > 79 > 50 Very Dense > 96 > 79 Very Hard
> 36 > 30 Hard
RELATIVE PROPORTIONS OF SAND AND
GRAVEL
GRAIN SIZE TERMINOLOGY
Descriptive Terms of
Other Constituents
Percent of
Dry Weight
Major Component
of Sample
Particle Size
Trace < 15 Boulders Over 12 in. (300mm)
With 15 – 29 Cobbles 12 in. to 3 in. (300mm to 75 mm)
Modifier > 30 Gravel 3 in. to #4 sieve (75mm to 4.75 mm)
Sand
Silt or Clay
#4 to #200 sieve (4.75mm to 0.075mm)
Passing #200 Sieve (0.075mm)
RELATIVE PROPORTIONS OF FINES PLASTICITY DESCRIPTION
Descriptive Terms of
Other Constituents
Percent of
Dry Weight
Term Plasticity Index
Trace
With
Modifiers
< 5
5 – 12
> 12
Non-plastic
Low
Medium
High
0
1-10
11-30
30+
F If soil contains ! 15% sand, add “with sand” to group name.
G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM.
HIf fines are organic, add “with organic fines” to group name.
I If soil contains ! 15% gravel, add “with gravel” to group name.
J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay.
K If soil contains 15 to 29% plus No. 200, add “with sand” or “with
gravel,” whichever is predominant.
L If soil contains ! 30% plus No. 200 predominantly sand, add
“sandy” to group name.
M If soil contains ! 30% plus No. 200, predominantly gravel, add
“gravelly” to group name.
N PI ! 4 and plots on or above “A” line.
O PI < 4 or plots below “A” line.
P PI plots on or above “A” line.
Q PI plots below “A” line.
4101 SOUTH TAFT HILL ROAD, FORT COLLINS, COLORADO
Project # 18-1038
February 2018
USCS
Sampler
Atterberg Limits
Start Date 2/8/2018 Auger Type: During Drilling None
Finish Date 2/8/2018 Hammer Type: After Drilling None
Surface Elev. - Field Personnel: 24 Hours After Drilling -
4101 SOUTH TAFT HILL ROAD, FORT COLLINS, COLORADO
Project # 18-1038
February 2018
USCS
Sampler
Atterberg Limits
Start Date 2/8/2018 Auger Type: During Drilling None
Finish Date 2/8/2018 Hammer Type: After Drilling None
Surface Elev. - Field Personnel: 24 Hours After Drilling -
4101 SOUTH TAFT HILL ROAD, FORT COLLINS, COLORADO
Project # 18-1038
February 2018
USCS
Sampler
Atterberg Limits
Start Date 2/8/2018 Auger Type: During Drilling None
Finish Date 2/8/2018 Hammer Type: After Drilling None
Surface Elev. - Field Personnel: 24 Hours After Drilling -
Atterberg Limits
Surface Elev. - Field Personnel: 24 Hours After Drilling -
Finish Date 2/8/2018 Hammer Type: After Drilling None
Sheet Drilling Rig: Water Depth Information
Start Date 2/8/2018 Auger Type: During Drilling None
PROPOSED MIXED-USE BUILDING
4101 SOUTH TAFT HILL ROAD, FORT COLLINS, COLORADO
Project # 18-1038
February 2018