HomeMy WebLinkAboutKYLE AVENUE SOLAR ARRAY - PDP / FDP - FDP180026 - SUBMITTAL DOCUMENTS - ROUND 2 - SUBMITTAL CHECKLISTSubmittal Instructions
• Appointments are required for all submittals or resubmittals – A paper copy of this checklist, all submittal
materials and fee payments are due at the time of project submittal. Please contact a Development
Review Coordinator at 970-221-6689 to schedule a submittal appointment and for assistance with this
checklist.
• Only complete submittals are accepted. The submittal may be returned to the applicant if any required
materials or application fees are missing or insufficient. Submittals received Monday morning through
Wednesday noon will be routed for review the same week and submittals received after Wednesday
noon will be held and routed the following week.
• This checklist shall be used in tandem with the Submittal Requirements Document. The applicant must
complete this checklist and acknowledgement of the Submittal Requirements Document.
• The applicant shall be the designated contact person who will receive correspondence from city staff
and referral agencies.
Additional Resources
• Development Review Guide and Flowchart:
https://www.fcgov.com/drg/
• Development Review Applications and Submittal Requirements Main Page:
https://www.fcgov.com/developmentreview/applications.php
• City Land Use Code:
https://library.municode.com/co/fort_collins/codes/land_use
• City Utilities:
Development Forms, Guidelines & Regulations
• City Engineering main page:
https://www.fcgov.com/engineering/
• The City’s Comprehensive Plans:
City Plan and Transportation Master Plan
• Online City Map Resources:
https://www.fcgov.com/gis/maps.php
Development Application
Complete Submittal Checklist
Development Review Center – 281 N College Ave – Fort Collins, CO 80522-0580 – 970.221.6689
DRCoord@fcgov.com
Page 1 September 4, 2018
Page 2 Development Application Submittal Checklist September 4, 2018
Complete Submittal Checklist:
Final Development Plan (FDP) · Basic Development Review (BDR)
FDP Major Amendments (MJA) · Minor Amendments (MA)
Project Name:
Applicant Name:
Office Use Only:
Project Type: Project Number (if assigned):
New Submittal Revision -- Review Round Submittal Date:
Staff Review Meeting Date: Staff Coordinator:
This checklist is intended to be used for the final review phase for all development projects (see Step 7 of the process
flowchart). This includes final detail required for Project Development Plans (PDP). The checklist shall also be used for
Basic Development Reviews (BDR). The checklist can also be used for plan amendments including Major Amendments
(MJA) and Minor Amendments (MA). Refer to the Submittal Requirements Document for a description of these review
types. All checklist items are required unless city staff indicates an item is (W)aived, (D)eferred, (NA)Not
Applicable or already (R)eceived. If the staff code is blank (grey or blue), then the item is required. This
checklist must be reviewed, completed and accepted by staff prior to project routing. Additional information may be
requested from the applicant during the review process if necessary to address specific issues that arise. Please note
that all application materials, once submitted, become a matter of public record.
Paper Copies:
Staff
Code
Applicant
Validation Item Description
Submittal Requirement
Resources
One paper copy is required (with the initial submittal only) for
the following: Planning Submittal Package, PUD subdivision
plat, Civil Construction Plans. Plan sets shall be provided at full
scale (24” x 36”); staple together each plan set; do not fold sets
Development Review
Coordination staff
970-221-6689
One paper copy of this checklist, completed and signed by
applicant
Development Review
Coordination staff 970-221-
6689– DRCoord@fcgov.com
One signed paper copy of Development Application Form Application Form.pdf
One signed paper copy of Transportation Development
Review (TDR) Application and Fee
TDR Fees and Application.pdf
Contact Engineering at 221-
6605 for TDR fee information
Check for the above application forms payable to the “City of
Fort Collins” (fees may be consolidated into one check)
Development Review
Coordination staff
970-221-6689
Page 3 Development Application Submittal Checklist September 4, 2018
Electronic Copies:
All copies must be provided per City file naming standards and submitted on a flash drive or CD
See: Submittal Requirements Section M – File Naming Standards
1) General Information:
Staff
Code
Applicant
Validation Item Description
Submittal Requirement
Resources
Conceptual Review (CR) or Preliminary Development
Review (PDR) comment response letter; or for resubmittals
include a comment response letter from the prior round of
review
Submittal Requirements
Section C
Development Review
Coordination staff
970-221-6689
DRCoord@fcgov.com
Project Information and Design Narrative (see Submittal
Requirements, Section C)
2) Planning Submittal Package:
Staff
Code
Applicant
Validation Item Description
Submittal Requirement
Resources
Title Block information on all plan sheets Section D
Cover Page, including: Section D
a) Title Block Section D
b) Land Use Table Section E
c) Sheet Index Section D
d) Signature Blocks Section D
e) Site Plan Notes
Standard Notes
(also available in Word
format at the Submittal
Requirements web page)
Site Location Map Section D
Legal Description Section D
Final Site Plan Sheet(s) (and related hardscape design detail
sheets, See Section I for Requirements) Section F
Final Architectural Elevation Sheet(s), Materials and other
Detail Sheets (color elevations recommended) Section G
Page 4 Development Application Submittal Checklist September 4, 2018
Final Landscape Plan Sheet(s), standard city landscape
notes, and related planting detail sheets (See Section I for
planting detail requirements)
Section H and I;
Standard Notes
(also available in Word
format at the Submittal
Requirements web page)
Final Lighting Plan, Photometric Plan and Lighting Detail
Sheets Section L
Final Trash and Recycling Enclosure Details (include these
details with the site plan sheets or elevation sheets) Section I
Confirmation that all Sheets provided incorporate City drafting
standards Section D
3) Final Subdivision Plat:
Staff
Code
Applicant
Validation Item Description
Submittal Requirement
Resources
A final subdivision plat of the site. This plat must conform to
the subdivision requirements of the City. The subdivision
plat shall contain proper designations for public streets,
easements, flood plains, floodways with base flood
elevations if applicable and all other public rights-of-way.
Approval by the Director for Type I Administrative Review,
and approval by the Planning and Zoning Board for Type II
Review by the Planning and Zoning Board, of the final plan
and subdivision plat, and complete execution, together with
all necessary certifications, shall be required before filing of
the subdivision plat or issuance of building permits.
Each residential lot on the subdivision plat shall identify if
the garage door(s) is recessed behind the front face of the
building, located on one of the other sides of the building,
detached from the building or located to the front of the front
face of the building.
Please note that, with the mylar submittal, the subdivision
plat is required to be provided in CAD format at time of
recordation. The CAD file for plat must be set up to be in
conformance with GIS's Subdivision Plat Digital Submittal
Standards. Refer to the Mylar Submittal Checklist.
Submittal Requirements
Section J
LUC Division 3.3 –
Engineering Standards
Subdivision Plat Digital
Submittal Standards
Mylar Submittal Checklist
Page 5 Development Application Submittal Checklist September 4, 2018
4) Final Civil Construction Plans:
Staff
Code
Applicant
Validation Item Description
Submittal Requirement
Resources
Cover Sheet Utility Plans Checklist.pdf
City Contact: Development
Review Coordination staff
970-221-6689
Standard Notes Sheet
Existing Conditions and/or Demolition Plan (if applicable)
Overall Grading Plan (if applicable)
Detailed Grading Plan Sheets
Overall Utility Plan Sheet (if applicable)
Detailed Utility Plan Sheets
Sanitary Sewer Plan and Profile Sheets
Storm Sewer Plan and Profile Sheets
Water Plan and Profile Sheets (if applicable)
Street Plan and Profile Sheets (if applicable)
Street Cross-sections (if applicable)
City of Fort Collins Standard Construction Details
Page 6 Development Application Submittal Checklist September 4, 2018
5) Final Drainage and Erosion Control Report:
Staff
Code
Applicant
Validation Item Description
Submittal Requirement
Resources
Items a-g from the PDP Checklist:
a. Detention Requirements and Calculations
Stormwater Criteria Manual
Resource Page
Stormwater Criteria Manual
Appendices:
A. Required Submittal
Content
B. Stormwater Facilities
Landscape Standards
C. LID Implementation
D. Erosion Control
Guidance
E. Erosion Control
Construction Measures
Fact Sheets
F. Erosion Control
Construction Measures
Standard Notes
City Utilities:
Development Forms,
Guidelines & Regulations
City Contact: Development
Review Coordination staff
970-221-6689
b. Offsite Flows (if applicable)
c. Floodplain Zone (if applicable)
d. Hydraulic Calculations
e. Detention Basin Calculations
f. Standard Water Quality and LID Calculations
g. Include Drainage Plan or Exhibit in the report
Additional Final Checklist Items:
h. Hydraulic Calculations
i. Four Step Process
j. SDI Data Spreadsheet (if applicable)
k. Erosion Control Materials
Page 7 Development Application Submittal Checklist September 4, 2018
6) Final Reports and Supporting Documents:
Staff
Code
Applicant
Validation Item Description
Submittal Requirement
Resources
Meeting
Date:
(mm/dd/yy)
(ITEM REQUIRED WITH INITIAL SUBMITTAL ONLY)
Building Services:
Confirmation of completed Pre-Submittal Code Review
Meeting with Building Services, required for all new
construction projects (except individual single family
detached residences and tenant finishes). For questions,
or to schedule this meeting call 970-416-2748.
Please Note: Building
Permits will not be reviewed
until Development Plan
review process is completed
Building Codes and
Standards
Building Permit Fees
Traffic Operations:
Transportation Impact Study (TIS) or waiver indicated from
Traffic Operations staff (waiver indication to be provided with
initial submittal)
Traffic Operations
Resource Page
City Contact: Traffic
Operations 970-221-6630
Planning Services:
a) Perspective views of the Building Exterior
(incorporated into the building elevation sheets)
Submittal Requirements
Section G
b) Building Material Sample Board Submittal Requirements
Section G
c) Neighborhood Context Plan (Overall site plan
diagram indicating surrounding neighborhood
features, to be incorporated into Site Plan sheets
or cover page)
Submittal Requirements
Section C
d) Land Use Code Modification and Alternative
Compliance Requests (if required); staff review and
approval required prior to Development Review
Completion
LUC Division 2.8
City Contact: Planning
Services 970-416-4311
e) Parking Alternative Compliance Studies – Guidelines
for these studies are held by the Director (if required)
Parking Impact Study Guidelines
LUC Section 3.2.2(K)
City Contact: Planning
Services 970-416-4311
f) Certification of Notice to Mineral Owner(s)
Page 8 Development Application Submittal Checklist September 4, 2018
b) Subsurface Hydrologic Study Stormwater Criteria Manual
Resource Page
c) Development Agreement application form
Engineering Main Page
City Contact: Engineering
Development Review 970-
221-6605
d) Final legal descriptions for accompanying deeds of
dedication by separate document
Easement and Right-of-Way
Dedication Process
e) Final legal descriptions for accompanying easement
vacation request by separate document
Vacation of Easements
Process
f) Approved and Signed Engineering or Utility Variance
Requests
Larimer County Urban Area
Street Standards
Utilities – Environmental Engineering:
Erosion Control Cost Estimate
City Utilities: Development
Forms, Guidelines &
Regulations
Utilities – Electric Systems Engineering:
Electric Utility Service C-1 Form
City Utilities: Development
Forms, Guidelines &
Regulations
Environmental Planning:
a) Ecological Characterization Study (ECS). If an ECS
is required, this must be submitted at least ten days
prior to the development review application. A copy
shall also be submitted at the time of the application
with this checklist.
Submittal Requirements:
Section J, Section H
LUC Section 3.4.1
City Contact:
Environmental Planning
Staff at 970-416-4311
b) Phase 1 Environmental Site Assessment To be provided by qualified
third-party consultant
City Forestry:
Existing Tree Removal Feasibility Letter; Existing Tree
Inventory Plan; Existing Tree Mitigation Plan (if applicable).
The applicant must schedule an on-site meeting with City
Forestry to obtain tree inventory and mitigation information
for all existing trees on-site prior to review submittal.
EXISTING TREES REMOVED PRIOR TO DEVELOPMENT
APPLICATION MAY BE IN VIOLATION OF CITY CODE.
Sections H and L;
City Forestry:
forestry@fcgov.com
970-221-6660
Page 9 Development Application Submittal Checklist September 4, 2018
Other Information and Data as the Director may require for
the full and complete consideration of the development: (to
be completed by staff):
Hazardous Materials Impact Analysis (if required).
Any special wildlife, wetland, natural habitats and
features, ecological or environmental study or mapping
pursuant to Section 3.3 and 3.4 of the Land Use Code
as requested by the Director.
Other items required by the Director:
City Contact: Development
Review Coordination
970-221-6689
DRCoord@fcgov.com
Applicant Acknowledgement:
I have reviewed the Development Application Submittal Requirements, Sections A – M. All documents submitted
are complete and the Development Application Submittal Requirements have been incorporated into the plans
(See Development Application Submittal Requirements for detailed description of requirements). All documents
submitted have been compared and consistent design information is shown on all plan sheets and reports. I
understand that submittal requirements not sufficiently addressed or deferred may result in added review time.
Applicant Name Check box to confirm acknowledgement
(See Development Application Submittal Requirements for detailed description of requirements)
(if required)
Mineral Rights
Certificate.pdf
Development Review Engineering:
a) Soils Report – in conformance with the Larimer
County Urban Area Street Standards
Larimer County Urban Area
Street Standards