Loading...
HomeMy WebLinkAboutFTC COLLINDALE, WTE (VERIZON) - BASIC DEVELOPMENT REVIEW - BDR180021 - SUBMITTAL DOCUMENTS - ROUND 3 - RESPONSE TO STAFF REVIEW COMMENTS16035 Table Mountain Pkwy Golden, CO 80403 P: 303-993-3293 / F: 303-993-3019 Re: FTC COLLINDALE Dated: 11/07/2018 Project: Cell site Rooftop Job Address: 4824 S. Lemay Ave., Ft. Collins, CO. 80525 To: Brandy Bethurem Harras Development Review Coordinator City of Fort Collins Community Development & Neighborhood Services 281 N. College Ave. Fort Collins, CO 80524 Hello Brandy, We are sending you this narrative pertaining to the Drawing Revisions you requested below: As Noted: RE: FTC Collindale, BDR180021, Round Number 1 Department: Stormwater Engineering Contact: Dan Mogen, 970-305-5989, dmogen@fcgov.com Topic: General Comment Number: 1 10/18/2018: FOR APPROVAL: Thank you for updating plans to show these existing utilities and adding notes requiring these to be located prior to construction. It appears the only conflicts will be with the existing stormwater. Please clarify these locations where proposed fiber is to cross existing storm pipes - currently these locations call out "new stormwater pipe." I don't believe new stormwater pipe is proposed. [RESPONSE] - NOTES CLARIFIED TO IDENTIFY THAT THE CROSSING IS A NEW FIBER RUN OVER AN EXISTING STORMWATER PIPE. Please also clarify how any conflicts will be addressed. I see the note stating, "new fiber will apparently need to run below the existing stormwater lines at (2) crossing points" - also note the typical minimum separation at such a crossing is 18". It is expected that this separation be provided. [RESPONSE] - ADDED SPECIFICATION THAT THE MINIMUM SEPARATION BETWEEN THE EX. STORMWATER PIPE AND NEW FIBER CROSSING IS 18” Lastly, my phone number has changed. Please update to 970-305-5989 in the plans. [RESPONSE] - UPDATED CONTACT PHONE NUMBER. 07/09/2018: The submitted plans do not depict existing utilities including water, wastewater, and stormwater. It appears the proposed bores are in the vicinity of existing water and will cross existing stormwater pipes in multiple locations; please review "Columbine East Long Term Care" plans that show utilities for this property. Please locate and show these existing utilities on the plans, provide adequate separation, and show crossing conflicts and how they will be addressed. 16035 Table Mountain Pkwy Golden, CO 80403 P: 303-993-3293 / F: 303-993-3019 Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: General Comment Number: 4 10/29/2018: FOR APPROVAL: Some of the sheet titles & numbers in the sheet index do not match the noted sheets. See redlines. [RESPONSE] – REDLINES ADDRESSED AS SPECIFIED Comment Number: 5 10/29/2018: FOR APPROVAL: There are line over text issues. See redlines. [RESPONSE] – REDLINES ADDRESSED AS SPECIFIED Department: Light and Power Contact: Austin Kreager, 970-224-6152, akreager@fcgov.com Topic: General Comment Number: 1 10/29/2018: INFORMATION ONLY: It is my clear understanding from your submitted plans that your plan is to bring power from the existing panel of the building. This will result in Verizon not having a City of Fort Collins Light and Power meter. If this plan changes, please contact us to work out fees and plans to connect to our system. Thank you. Comment Number: 2 10/29/2018: INFORMATION ONLY: You may contact FCU Light & Power, project engineering if you have questions. (970) 221-6700. You may reference Light & Power’s Electric Service Standards at http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandards_FINAL_18November2016_A mendment.pdf You may reference our policies, development charge processes, and use our fee estimator at http://www.fcgov.com/utilities/business/builders-and-developers. Brad Bryant A & E PROJECT MANAGER CENTERLINE SOLUTIONS 16035 Table Mountain Parkway Golden, CO 80403 Phone: 303.993.3293 x1383 Mobile: 720.284.8628