• Appointments are required for all submittals or resubmittals – A paper copy of this checklist, all submittal
materials and fee payments are due at the time of project submittal. Please contact a Development
Review Coordinator at 970-221-6689 to schedule a submittal appointment and for assistance with this
checklist.
• Only complete submittals are accepted. The submittal may be returned to the applicant if any required
materials or application fees are missing or insufficient. Submittals received Monday morning through
Wednesday noon will be routed for review the same week and submittals received after Wednesday
noon will be held and routed the following week.
• This checklist shall be used in tandem with the Submittal Requirements Document. The applicant must
complete this checklist and acknowledgement of the Submittal Requirements Document.
• The applicant shall be the designated contact person who will receive correspondence from city staff
and referral agencies.
Additional Resources
• Development Review Guide and Flowchart:
https://www.fcgov.com/drg/
• Development Review Applications and Submittal Requirements Main Page:
https://www.fcgov.com/developmentreview/applications.php
• City Land Use Code:
https://library.municode.com/co/fort_collins/codes/land_use
• City Utilities:
Development Forms, Guidelines & Regulations
• City Engineering main page:
https://www.fcgov.com/engineering/
• The City’s Comprehensive Plans:
City Plan and Transportation Master Plan
• Online City Map Resources:
https://www.fcgov.com/gis/maps.php
Development Application
Complete Submittal Checklist
Development Review Center – 281 N College Ave – Fort Collins, CO 80522-0580 – 970.221.6689
DRCoord@fcgov.com
Page 1 September 4, 2018
Page 2 Development Application Submittal Checklist September 4, 2018
Complete Submittal Checklist:
Final Development Plan (FDP) · Basic Development Review (BDR)
FDP Major Amendments (MJA) · Minor Amendments (MA)
Project Name:
Applicant Name:
Office Use Only:
Project Type: Project Number (if assigned):
New Submittal Revision -- Review Round Submittal Date:
Staff Review Meeting Date: Staff Coordinator:
This checklist is intended to be used for the final review phase for all development projects (see Step 7 of the process
flowchart). This includes final detail required for Project Development Plans (PDP). The checklist shall also be used for
Basic Development Reviews (BDR). The checklist can also be used for plan amendments including Major Amendments
(MJA) and Minor Amendments (MA). Refer to the Submittal Requirements Document for a description of these review
types. All checklist items are required unless city staff indicates an item is (W)aived, (D)eferred, (NA)Not
Applicable or already (R)eceived. If the staff code is blank (grey or blue), then the item is required. This
checklist must be reviewed, completed and accepted by staff prior to project routing. Additional information may be
requested from the applicant during the review process if necessary to address specific issues that arise. Please note
that all application materials, once submitted, become a matter of public record.
Paper Copies:
Staff
Code
Applicant
Validation Item Description
Submittal Requirement
Resources
One paper copy is required (with the initial submittal only) for
the following: Planning Submittal Package, PUD subdivision
plat, Civil Construction Plans. Plan sets shall be provided at full
scale (24” x 36”); staple together each plan set; do not fold sets
Development Review
Coordination staff
970-221-6689
One paper copy of this checklist, completed and signed by
applicant
Development Review
Coordination staff 970-221-
6689– DRCoord@fcgov.com
One signed paper copy of Development Application Form Application Form.pdf
One signed paper copy of Transportation Development
Review (TDR) Application and Fee
TDR Fees and Application.pdf
Contact Engineering at 221-
6605 for TDR fee information
Check for the above application forms payable to the “City of
Fort Collins” (fees may be consolidated into one check)
Development Review
Coordination staff
970-221-6689
Page 3 Development Application Submittal Checklist September 4, 2018
Electronic Copies:
All copies must be provided per City file naming standards and submitted on a flash drive or CD
See: Submittal Requirements Section M – File Naming Standards
1) General Information:
Staff
Code
Applicant
Validation Item Description
Submittal Requirement
Resources
Conceptual Review (CR) or Preliminary Development
Review (PDR) comment response letter; or for resubmittals
include a comment response letter from the prior round of
review
Submittal Requirements
Section C
Development Review
Coordination staff
970-221-6689
DRCoord@fcgov.com
Project Information and Design Narrative (see Submittal
Requirements, Section C)
2) Planning Submittal Package:
Staff
Code
Applicant
Validation Item Description
Submittal Requirement
Resources
Title Block information on all plan sheets Section D
Cover Page, including: Section D
a) Title Block Section D
b) Land Use Table Section E
c) Sheet Index Section D
d) Signature Blocks Section D
e) Site Plan Notes
Standard Notes
(also available in Word
format at the Submittal
Requirements web page)
Site Location Map Section D
Legal Description Section D
Final Site Plan Sheet(s) (and related hardscape design detail
sheets, See Section I for Requirements) Section F
Final Architectural Elevation Sheet(s), Materials and other
Detail Sheets (color elevations recommended) Section G
Page 4 Development Application Submittal Checklist September 4, 2018
Final Landscape Plan Sheet(s), standard city landscape
notes, and related planting detail sheets (See Section I for
planting detail requirements)
Section H and I;
Standard Notes
(also available in Word
format at the Submittal
Requirements web page)
Final Lighting Plan, Photometric Plan and Lighting Detail
Sheets Section L
Final Trash and Recycling Enclosure Details (include these
details with the site plan sheets or elevation sheets) Section I
Confirmation that all Sheets provided incorporate City drafting
standards Section D
3) Final Subdivision Plat:
Staff
Code
Applicant
Validation Item Description
Submittal Requirement
Resources
A final subdivision plat of the site. This plat must conform to
the subdivision requirements of the City. The subdivision
plat shall contain proper designations for public streets,
easements, flood plains, floodways with base flood
elevations if applicable and all other public rights-of-way.
Approval by the Director for Type I Administrative Review,
and approval by the Planning and Zoning Board for Type II
Review by the Planning and Zoning Board, of the final plan
and subdivision plat, and complete execution, together with
all necessary certifications, shall be required before filing of
the subdivision plat or issuance of building permits.
Each residential lot on the subdivision plat shall identify if
the garage door(s) is recessed behind the front face of the
building, located on one of the other sides of the building,
detached from the building or located to the front of the front
face of the building.
Please note that, with the mylar submittal, the subdivision
plat is required to be provided in CAD format at time of
recordation. The CAD file for plat must be set up to be in
conformance with GIS's Subdivision Plat Digital Submittal
Standards. Refer to the Mylar Submittal Checklist.
Submittal Requirements
Section J
LUC Division 3.3 –
Engineering Standards
Subdivision Plat Digital
Submittal Standards
Mylar Submittal Checklist
Page 9 Development Application Submittal Checklist September 4, 2018
Other Information and Data as the Director may require for
the full and complete consideration of the development: (to
be completed by staff):
Hazardous Materials Impact Analysis (if required).
Any special wildlife, wetland, natural habitats and
features, ecological or environmental study or mapping
pursuant to Section 3.3 and 3.4 of the Land Use Code
as requested by the Director.
Other items required by the Director:
City Contact: Development
Review Coordination
970-221-6689
DRCoord@fcgov.com
Applicant Acknowledgement:
I have reviewed the Development Application Submittal Requirements, Sections A – M. All documents submitted
are complete and the Development Application Submittal Requirements have been incorporated into the plans
(See Development Application Submittal Requirements for detailed description of requirements). All documents
submitted have been compared and consistent design information is shown on all plan sheets and reports. I
understand that submittal requirements not sufficiently addressed or deferred may result in added review time.
Applicant Name Check box to confirm acknowledgement
(See Development Application Submittal Requirements for detailed description of requirements)