Loading...
HomeMy WebLinkAboutFORTY THREE PRIME - PDP - PDP180014 - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE RELATED DOCUMENTAUTUMN RIDGE DR 64.33 64.71 66.01 65.73 64.85 66.01 FFE=67.18 BLDG F 66.01 65.67 64.51 PROPOSED INLET PROPOSED INLET PROPOSED INLET PROPOSED INLET 66.17 UD UD UD MAIL FFE=64.06 BLDG E 62.48 62.43 62.48 62.91 63.16 63.77 62.78 64.87 PROPOSED INLET PROPOSED INLET D UD UD UD T FFE=63.15 BLDG D 61.66 61.55 61.99 61.54 63.26 61.99 61.54 62.33 62.75 64.13 PROPOSED INLET PROPOSED INLET PROPOSED INLET 61.57 DRAINAGE OVERFLOW PATHS FORT COLLINS, CO FORTY-THREE PRIME ENGINEER ING N O R T H E RN NOVEMBER 14, 2018 D:\PROJECTS\1328-010\DWG\EXHIBITS\FORTY THREE PRIME-OVERFLOW PATH.DWG BUILDING F BUILDING E BUILDING D ( IN FEET ) 0 1 INCH = 30 FEET 30 30