HomeMy WebLinkAboutFORTY THREE PRIME - PDP - PDP180014 - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE RELATED DOCUMENTAUTUMN RIDGE DR
64.33
64.71
66.01
65.73
64.85
66.01
FFE=67.18
BLDG F
66.01
65.67
64.51
PROPOSED
INLET
PROPOSED
INLET
PROPOSED
INLET
PROPOSED
INLET
66.17
UD
UD
UD
MAIL
FFE=64.06
BLDG E
62.48
62.43
62.48
62.91
63.16
63.77
62.78
64.87
PROPOSED
INLET
PROPOSED
INLET
D
UD UD
UD
T
FFE=63.15
BLDG D
61.66
61.55
61.99
61.54
63.26
61.99
61.54
62.33
62.75
64.13
PROPOSED
INLET
PROPOSED
INLET
PROPOSED
INLET
61.57
DRAINAGE OVERFLOW PATHS
FORT COLLINS, CO
FORTY-THREE PRIME
ENGINEER ING
N O R T H E RN
NOVEMBER 14, 2018
D:\PROJECTS\1328-010\DWG\EXHIBITS\FORTY THREE PRIME-OVERFLOW PATH.DWG
BUILDING F BUILDING E BUILDING D
( IN FEET )
0
1 INCH = 30 FEET
30 30