Loading...
HomeMy WebLinkAboutFORTY THREE PRIME - PDP - PDP180014 - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE REPORTNovember 14, 2018 DRAINAGE LETTER AND LID REPORT FORTY-THREE PRIME Fort Collins, Colorado Prepared for: Red Raven LLC 201 Commerce Drive Unit 2 Fort Collins, Colorado 80524 Prepared by: 301 North Mason Street, Suite 100 Fort Collins, Colorado 80524 Phone: 970.221.4158 www.northernengineering.com Project Number: 1328-010 Drainage Letter and LID Report – Forty-Three Prime Date: November 14, 2018 Project: Forty-Three Prime Project No. 1328-010 Preliminary Development Plan (PDP) Fort Collins, Colorado Attn: City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 To whom it may concern: This letter serves to address the stormwater impacts of the proposed project known as “Forty-Three Prime”. The site is located in southeast Fort Collins and is bounded to the north by East Trilby Road, to the east by Brittany Drive, to the south by Candlewood Drive and to the west by Autumn Ridge Drive. The project site is Tract A of the Provincetowne P.U.D. Filing 2, which was approved in 2001, and was included in the drainage study by Manhard Consulting for that project. The proposed development consists of six (6) multifamily buildings, a parking area, two carports and amenity areas for residents. The project site also contains a detention area and drainage facilities that were designed and constructed as a part of the Provincetowne development. Since the project was included in the Provincetowne development, this letter is intended to show conformance with the approved drainage design, including general drainage patterns and imperviousness. This letter also documents how the project meets new Low Impact Development requirements that the City of Fort Collins has implemented since the original project was approved. Original Drainage Patterns The original Provincetowne drainage design divided Tract A into 5 basins – Basins 212, 220, 221, 225 and 406. In general, all of the basins drained from south to north, where they were intercepted by a swale along the north boundary. The exception was Basin 212, which drained west to Autumn Ridge Drive and then collected by an inlet located on Trilby. Once captured, the flows from all of the basins were conveyed to the northeast corner of Tract A and detained in Detention Pond 306. An Existing Drainage Exhibit has been provided has been provided at the back of this report for reference, along with excerpts from the original report in the appendix. Proposed Drainage Patterns The Forty-Three Prime project has divided the site into seven drainage basins that follow essentially the same drainage patterns that were originally approved with the Provincetowne project. The proposed site is comprised of Basin A, which encompasses the parking area, and Basins B1-B3, which define building and landscape areas. Basin C encompasses areas outside of the main development, including the existing detention pond and the swale along the north property line. All of the aforementioned basins drain to the existing detention pond via swales and surface conveyance. Additionally, Basin OS1 has been defined on the west side of the project to quantify flows to Autumn Ridge Drive that will be captured by the existing inlet located on Trilby and conveyed to the existing detention pond via existing storm drains. Please see the Drainage Exhibit for more information. Page | 3 Site Imperviousness While the drainage patterns of the proposed project generally conform with the previously approved drainage design, the drainage basins themselves do not have the same extents or areas. Since a direct comparison cannot be made between the original and proposed basins, a weighted percent imperviousness has been developed. Using this approach, we find that the original drainage plan had a Composite Percent Imperviousness of 42.6% (C100=0.56) while the proposed project will have a Composite Percent Imperviousness of 39.5% (C100=0.44). This is an overall imperviousness decrease of 3.1%, which will result in decreased runoff from the project than the original report anticipated. Detention As shown in the analysis of overall Site Imperviousness, the proposed project will decrease the imperviousness of the project site when compared to the originally approved project, thereby decreasing the runoff from the project site. This decrease in imperviousness and runoff also results in a decrease in the required detention volume identified in the original Provincetowne report. Since detention was accounted for in the original drainage report and the detention required by this project is less than originally assumed, no additional detention is required as a part of this project, and no changes to the existing facilities are proposed. Inlets Similar to the analysis performed for detention, all areas draining to existing inlets have a decrease in imperviousness and area from what was projected in the original Provincetowne report. This results in decreased runoff to the existing inlets that were designed and approved with the earlier project, so no additional inlet calculations have been provided as a part of this report. Water Quality/LID Conformance Although stormwater quantity detention is not required, stormwater quality will be addressed by permanent Best Management Practices (BMPs) and Low Impact Development (LID) requirements. City LID requirements specify that either 75% of all newly added impermeable areas are provided LID treatment OR 50% LID treatment by which 25% of drivable surfaces are treated by permeable pavers. This project proposes to treat at least 75% of the new impervious though a combination of a large rain garden on the east side of the project site and a grass swale on the north side of the site. Both treatment methods are recognized as LID treatment methods by Urban Drainage. The rain garden will treat 77,772 square-feet of impervious area on the site. This is 80.2% of the total impervious area within the project area, which exceeds the amount of LID treatment required by City Code without further treatment. The rain garden will be designed as a single feature that will treat the majority of the parking lot, concrete flatwork and rooftops by conveying flows from the parking area into the rain garden. The facility will allow 12” of ponding as allowed by Urban Drainage, at which point stormwater will flow out the east side of the facility, down a reinforced rundown and into the existing detention pond. The grass swale will treat an additional 14,940 square-feet of impervious area on the site, which constitutes 15.4% of the impervious areas on the site. The grass lined swale is being provided along the north side of the project to collect and treat runoff from the north sides of Buildings A thru D as well as the associated concrete flatwork in those areas. The swale will be vegetated with blue grass to the west of the proposed sidewalk and native grasses to the east. The swale bottom will be sloped at 2%, which conforms with Urban Drainage requirements for vegetation and slope. These areas should see relatively low pollutant loads since they are non- vehicular areas, making the grass swale an excellent treatment option. When combined, 92,712 square-feet of total impervious area will be treated by these two methods, which equates to 95.6% of the project areas. A LID Treatment Exhibit is provided with this report detailing the treatment areas and methods. Page | 4 Erosion and Sediment Control During construction, the Contractor will follow the appropriate and applicable City of Fort Collins standards for erosion and sediment control. Since more than 10,000 sf will be disturbed as a part of this project, a comprehensive Stormwater Management Plan will be prepared for this project at final design. Post construction water quality and erosion control will be achieved by a fully established and stabilized site. All areas disturbed during construction will receive permanent hardscape, landscape, or building structure. Floodplains There are no regulatory floodplains associated with the project. Conclusions The proposed grading concept closely matches the original drainage patterns and decreases overall site imperviousness and additional detention is proven to be unnecessary. Stormwater quality has been provided and meets the city requirements for Low Impact Development treatment. Therefore, it is my professional opinion that Forty-Three Prime satisfies all applicable stormwater criteria and will effectively limit potential damage associated with its stormwater runoff. Please do not hesitate to contact me if you have questions or require additional information. Sincerely, Andy Reese Project Manager ATTACHMENT 1 HYDROLOGIC CALCULATIONS SITE IMPERVIOUSNESS COMPARISON Basin ID Basin Area (ac) Composite % Imperv. 100-year Composite Runoff Coefficient 212 0.68 33% 0.71 220 0.52 45% 0.74 221 2.18 45% 0.74 224 0.08 96% 1.00 225 1.30 39% 0.73 406 0.11 45% 0.74 Total Site 4.87 42.6% 0.56 Basin ID Basin Area (ac) Composite % Imperv. 100-year Composite Runoff Coefficient OS1 0.23 40% 0.69 A 1.62 80% 1.00 B1 0.15 68% 0.97 B2 0.03 59% 0.89 B3 0.15 39% 0.69 B4 0.45 39% 0.69 C 2.23 8% 0.39 Total Site 4.87 39.5% 0.44 EXISTING MASTER PLANNED COMPOSITE % IMPERVIOUSNESS PROPOSED COMPOSITE % IMPERVIOUSNESS CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Forty-Three Prime Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: B. Ruch Asphalt ……....……………...……….....…...……………….………………………………….0.95 . 100% Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90% Gravel ……….…………………….….…………………………..……………………………….0.50 . 40% Roofs …….…….………………..……………….…………………………………………….0.95 . 90% Pavers…………………………...………………..…………………………………………….0.40 . 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….0.15 . 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. OS1 0.23 0.04 0.03 0.03 0.00 0.00 0.13 0.55 0.55 0.69 40% A 1.62 0.75 0.38 0.23 0.00 0.00 0.27 0.83 0.83 1.00 80% B1 0.15 0.00 0.01 0.11 0.00 0.00 0.04 0.78 0.78 0.97 68% B2 0.03 0.00 0.00 0.02 0.00 0.00 0.01 0.71 0.71 0.89 59% B3 0.15 0.00 0.01 0.05 0.00 0.00 0.09 0.55 0.55 0.69 39% B4 0.45 0.00 0.03 0.17 0.00 0.00 0.25 0.56 0.56 0.69 39% C 2.23 0.00 0.07 0.12 0.02 0.00 2.02 0.31 0.31 0.39 8% Total Onsite 4.64 0.75 0.49 0.70 0.02 0.00 2.68 0.54 0.54 0.68 40% DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 Overland Flow, Time of Concentration: Project: Forty-Three Prime Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, Rational Method Equation: Project: Forty-Three Prime Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: Design Point Basin(s) Area, A (acres) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) C2 C10 C100 Intensity, i2 (in/hr) Intensity, i10 (in/hr) Intensity, i100 (in/hr) Flow, Q2 (cfs) Flow, Q10 (cfs) Flow, Q100 (cfs) Flow, WQ (cfs) OS1 OS1 0.23 5 5 5 0.55 0.55 0.69 2.85 4.87 9.95 0.4 0.6 1.6 0.18 A A 1.62 10 10 10 0.83 0.83 1.00 2.21 3.78 7.88 3.0 5.1 12.8 1.50 B1 B1 0.15 5 5 5 0.78 0.78 0.97 2.85 4.87 9.95 0.3 0.6 1.5 0.17 B2 B2 0.03 5 5 5 0.71 0.71 0.89 2.85 4.87 9.95 0.1 0.1 0.2 0.03 B3 B3 0.15 8 8 8 0.55 0.55 0.69 2.40 4.10 8.59 0.2 0.4 0.9 0.10 B4 B4 0.45 10 10 10 0.56 0.56 0.69 2.21 3.78 7.88 0.6 0.9 2.5 0.28 C C 2.23 26 26 25 0.31 0.31 0.39 1.40 2.39 5.04 1.0 1.7 4.4 0.49 DEVELOPED RUNOFF COMPUTATIONS B. Ruch September 26, 2018 Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 Q = C f ( C )( i )( A ) Basin ID Basin Area (s.f.) Basin Area (ac) Composite % Imperv. Flow, WQ (cfs) Flow, Q2 (cfs) Flow, Q100 (cfs) OS1 10136 0.23 40% 0.18 0.36 1.59 A 70765 1.62 80% 1.50 3.00 12.79 B1 6750 0.15 68% 0.17 0.34 1.50 B2 1190 0.03 59% 0.03 0.06 0.24 B3 6718 0.15 39% 0.10 0.21 0.92 B4 19613 0.45 39% 0.28 0.55 2.46 C 97043 2.23 8% 0.49 0.97 4.38 Rational Summary (Proposed) ATTACHMENT 2 LID/WATER QUALITY CALCULATIONS MAIL 6YD 6YD 6YD 6YD C C T F E S F E S F E S F E S LID LID LID / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / D D D D D D D D RAINGARDEN REQUIRED VOLUME: 1,333 CU. FT. PROVIDED VOLUME: 1,496 CU. FT. TREATMENT AREA: 76,464 SF GRASS SWALE TREATMENT AREA: 14,940SF FORTY-THREE PRIME SHEET NO: D:\PROJECTS\1328-010\DWG\DRNG\1328-010_LID.DWG 301 N. Howes Street, Suite 100 Fort Collins, Colorado 80521 ENGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com DRAWING REFERENCE: LID TREATMENT EXHIBIT B. Ruch 1 in = 60 ft November 14, 2018 LID-1 DRAWN BY: SCALE: ISSUED: Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 68.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.680 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.21 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 75,091 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 1,333 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 0.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 1021 sq ft D) Actual Flat Surface Area AActual = 1496 sq ft E) Area at Design Depth (Top Surface Area) ATop = 1496 sq ft F) Rain Garden Total Volume VT= 1,496 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = N/A cu ft iii) Orifice Diameter, 3/8" Minimum DO = N/A in Design Procedure Form: Rain Garden (RG) B. Ruch Northern Engineering November 13, 2018 Forty-Three Prime Fort Collins, CO UD-BMP (Version 3.06, November 2016) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_v3.06_Rain Garden WQVol.xlsm, RG 11/13/2018, 3:49 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? PROVIDE A 30 MIL (MIN) PVC LINER WITH CDOT CLASS B GEOTEXTILE ABOVE IT. USE THE SAME GEOTEXTILE BELOW THE LINER IF THE SUBGRADE IS ANGULAR 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) B. Ruch Northern Engineering November 13, 2018 Forty-Three Prime Fort Collins, CO Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO UD-BMP_v3.06_Rain Garden WQVol.xlsm, RG 11/13/2018, 3:49 PM ATTACHMENT 3 PREVIOUS REPORT EXCERPTS This unofficial copy was downloaded on Aug-14-2018 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact Engineering Office 281 North College Fort Collins, CO 80521 USA                                                 ATTACHMENT 4 DRAINAGE EXHIBITS ST ST ST ST C C T F E S F E S CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR F E S F E S LID LID LID / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / D D D D D D D D MAIL 6YD ST ST ST ST C C T V.P. F E S F E S F E S V.P. V.P. F E S LID LID LID / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / D D D D D D D D 221 220 406 224 221 225 224 0.08 AC 221 2.18 AC 225 1.30 AC 212 0.68 AC 220 0.52 AC 406 0.11 AC EAST TRILBY ROAD CANDLEWOOD DRIVE BRITTANY DRIVE AUTUMN RIDGE DRIVE EXISTING EXISTING STORM DRAIN STORM DRAIN EXISTING STORM DRAIN EXISTING STORM DRAIN EXISTING INLET EXISTING INLET EXISTING INLET EXISTING INLET EXISTING INLET FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R NORTH DR2 EXISTING DRAINAGE EXHIBIT 18 A 1.62 AC LEGEND: EXISTING STORM SEWER EXISTING CONTOUR EXISTING CURB & GUTTER PROPERTY BOUNDARY EXISTING INLET DESIGN POINT A FLOW ARROW DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION 1 1 NOTES: 1. REFER TO THE PRELIMINARY DRAINAGE LETTER AND LID REPORTFOR FORTY-THREE PRIME, DATED NOVEMBER 14, 2018 BY NORTHERN ENGINEERING SERVICES, INC AND THE FINAL DRAINAGE AND EROSION CONTROL REPORT FOR PROVINCETOWNE PUD FILING TWO, DATED MARCH 22, 2001 BY MANHARD CONSULTING, LTD., FOR ADDITIONAL 2. THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. BENCHMARK PROJECT DATUM: NAVD88 CITY OF FORT COLLINS BENCHMARK 24-94 NORTHEAST CORNER OF EAST TRILBY RD AND PORTNER DR., ON TOP OF THE WEST END OF A CONCRETE HEADWALL. ELEV. = 4960.69 CITY OF FORT COLLINS BENCHMARK 25-94 NORTHWEST CORNER OF EAST TRILBY RD. AND SOUTH LEMAY AVE, ON TOP OF THE SOUTHEAST EDGE OF THE CONCRETE RING TO AN ELECTRIC MANHOLE. ELEV. = 4913.16 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.19' BASIS OF BEARINGS THE BASIS OF BEARINGS IS THE NORTH LINE OF THE NORTHEAST QUARTER OF SECTION 13-6-69 AS BEARING NORTH 88° 11' 32" WEST (ASSUMED BEARING). EXISTING PLANNEDCOMPOSITE % IMPERVIOUSNESS Basin ID Basin Area (ac) Composite % Imperv. 100-year Composite Runoff Coefficient 212 0.68 33% 0.71 220 0.52 45% 0.74 221 2.18 45% 0.74 224 0.08 96% 1.00 225 1.30 39% 0.73 406 0.11 45% 0.74 Total Site 4.87 42.6% 0.56 Sheet FORTY-THREE PRIME These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 18 6YD 6YD 6YD UD UD UD C OS1 B1 B2 B3 B4 C A OS1 B1 B2 B3 B4 OS1 0.23 AC A 1.62 AC B1 0.15 AC B2 0.03 AC B3 0.15 AC B4 0.45 AC C 2.23 AC EXISTING EXISTING STORM DRAIN STORM DRAIN EXISTING STORM DRAIN EXISTING STORM DRAIN PROPOSED AREA DRAIN PROPOSED AREA DRAIN PROPOSED AREA DRAIN EXISTING INLET EXISTING INLET EXISTING INLET EXISTING INLET EXISTING INLET PROPOSED PROPOSED 2' RAIN GARDEN CONCRETE CHASE PROPOSED RAIN GARDEN PROPOSED UNDERDRAIN PROPOSED 1'SIDEWALK CHASE PROPOSED 1' SIDEWALK CHASE PROPOSED 1' SIDEWALK CHASE PROPOSED 7.5' SIDEWALK CULVERT PROPOSED CULVERTS EAST TRILBY ROAD CANDLEWOOD DRIVE BRITTANY DRIVE AUTUMN RIDGE DRIVE LOT 2 TRACT A LOT 1 BLDG A BLDG B BLDG C BLDG D BLDG E BLDG F PROPOSED CULVERT FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION HYDROLOGY SUMMARY CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R NORTH LID SUMMARY Sheet FORTY-THREE PRIME These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 18 DR1 DRAINAGE EXHIBIT 17 Basin ID Basin Area (s.f.) Basin Area (ac) Composite % Imperv. Flow, WQ (cfs) Flow, Q2 (cfs) Flow, Q100 (cfs) Treatment Area (sf) OS1 10136 0.23 40% 0.18 0.36 1.59 4315.00 A 70765 1.62 80% 1.50 3.00 12.79 59061.24 B1 6750 0.15 68% 0.17 0.34 1.50 5103.00 B2 1190 0.03 59% 0.03 0.06 0.24 784.00 B3 6718 0.15 39% 0.10 0.21 0.92 2921.16 B4 19613 0.45 39% 0.28 0.55 2.46 8565.00 C 97043 2.23 8% 0.49 0.97 4.38 9091.00 PROPOSED COMPOSITE % IMPERVIOUSNESS FORTY-THREE PRIME ON-SITE LID TREATMENT Project Summary Total Impervious Area 96,936 sf Target Treatment Percentage 75% Minimum Area to be Treated by LID measures 72,702.00 sf Rain Garden Total Rain Garden Treatment Area 77,772 sf Grass Swale Total Rain Garden Treatment Area 14,940 sf Total Treatment Area 92,712 sf Percent Total Project Area Treated 95.6% Basin ID Basin Area (ac) Composite % Imperv. 100-year Composite Runoff Coefficient OS1 0.23 40% 0.69 A 1.62 80% 1.00 B1 0.15 68% 0.97 B2 0.03 59% 0.89 B3 0.15 39% 0.69 B4 0.45 39% 0.69 C 2.23 8% 0.39 Total Site 4.87 39.5% 0.44 A 1.62 AC LEGEND: PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET DESIGN POINT A FLOW ARROW DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION 1 1 NOTES: 1. REFER TO THE PRELIMINARY DRAINAGE LETTER AND LID REPORTFOR FORTY-THREE PRIME, DATED NOVEMBER 14, 2018 BY NORTHERN ENGINEERING SERVICES, INC AND THE FINAL DRAINAGE AND EROSION CONTROL REPORT FOR PROVINCETOWNE PUD FILING TWO, DATED MARCH 22, 2001 BY MANHARD CONSULTING, LTD., FOR ADDITIONAL INFORMATION. 2. THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. PROPOSED UNDERDRAIN UD BENCHMARK PROJECT DATUM: NAVD88 CITY OF FORT COLLINS BENCHMARK 24-94 NORTHEAST CORNER OF EAST TRILBY RD AND PORTNER DR., ON TOP OF THE WEST END OF A CONCRETE HEADWALL. ELEV. = 4960.69 CITY OF FORT COLLINS BENCHMARK 25-94 NORTHWEST CORNER OF EAST TRILBY RD. AND SOUTH LEMAY AVE, ON TOP OF THE SOUTHEAST EDGE OF THE CONCRETE RING TO AN ELECTRIC MANHOLE. ELEV. = 4913.16 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.19' BASIS OF BEARINGS THE BASIS OF BEARINGS IS THE NORTH LINE OF THE NORTHEAST QUARTER OF SECTION 13-6-69 AS BEARING NORTH 88° 11' 32" WEST (ASSUMED BEARING). EXISTING NATURAL HABITAT BUFFER ZONE PROPOSED NATURAL HABITAT BUFFER ZONE EXISTING WETLAND  %       &   '     !! %  (") #$*" & +  %       &   '     !! %  (") #$*" & +  %       &   '     !! %  (") #$*" & + ( IN FEET ) 0 1 INCH = 60 FEET 60 60 LEGEND UNTREATED AREA RAIN GARDEN AREA RAIN GARDEN TREATMENT AREA FORTY-THREE PRIME ON-SITE LID TREATMENT Project Summary Total Impervious Area 96,936 sf Target Treatment Percentage 75% Minimum Area to be Treated by LID measures 72,702.00 sf Rain Garden Total Rain Garden Treatment Area 77,772 sf Grass Swale Total Rain Garden Treatment Area 14,940 sf Total Treatment Area 92,712 sf Percent Total Project Area Treated 95.6% GRASS SWALE TREATMENT AREA V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) OS1 OS1 No 0.25 0.25 0.31 0 N/A N/A N/A N/A 99 4.88% 4.42 0.4 0 NA N/A N/A 5 5 5 A A No 0.25 0.25 0.31 23 22.78% 2.7 2.7 2.5 563 0.50% 1.41 6.6 91 1.79% 2.01 0.8 10 10 10 B1 B1 No 0.25 0.25 0.31 0 N/A N/A N/A N/A 143 0.50% 1.41 1.7 21 2.00% 2.12 0.2 5 5 5 B2 B2 No 0.25 0.25 0.31 0 N/A N/A N/A N/A 61 0.50% 1.41 0.7 20 4.85% 3.30 0.1 5 5 5 B3 B3 No 0.25 0.25 0.31 53 6.64% 6.2 6.2 5.7 138 0.50% 1.41 1.6 76 1.96% 2.10 0.6 8 8 8 B4 B4 No 0.25 0.25 0.31 23 22.78% 2.7 2.7 2.5 563 0.50% 1.41 6.6 91 1.79% 2.01 0.8 10 10 10 C C No 0.25 0.25 0.31 140 0.91% 19.4 19.4 17.9 513 0.40% 1.26 6.8 0 NA N/A N/A 26 26 25 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Gutter Flow Swale Flow Design Point Basin Overland Flow B. Ruch September 26, 2018 Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S C Cf L Ti = − September 26, 2018