RE: Verizon FTC Parkwood Telecommunication Facility, FDP180012, Round Number 1 Comment Responses
Please see the following responses to the Comment Summary Dated May 04, 2018. Please contact me with
any questions or comments regarding the following responses. I can be directly contacted via phone at 720.527.9914
or email at sarah.beckham@pinnacleco.net if further information is needed at this time. Thank you for your time and
assistance in reviewing these responses.
COMMENT SUMMARY AND RESPONSES BY SPECIFIC DEPARTMENT
ENGINEERING DEVELOPMENT REVIEW DEPARTMENT
Contact: Marc Virata
Topic: General
Comment Number: 1
Originated: 04/30/2018
The dedication of the right of way may appear to place an existing building with storage units partially in the newly
dedicated right of way (its depiction isn't shown as there doesn't appear to be a site plan that fully shows the southern
boundary beyond the extent of Sheet Z 1. In addition, there would appear to be an existing fence and an existing
trailer in the right of way as well. The parking that is perpendicular to Sharp Point Drive isn't necessarily shown to be
in right of way, however with future sidewalk placed abutting the new right of way, there could be overhanging of
vehicles into the sidewalk and typically Zoning requires a landscape buffer from parking to the right of way. The items
in right of way would need to be relocated out of the right of way dedication, but if ultimately a building would be in
right of way further investigation would be needed and possibly different consideration for the dedication.
Response Number: 1
It has been confirmed that the existing building will not be in the newly dedicated right-of-way. The trailer has been
moved out of the right-of-way. The fence is on the newly dedicated right-of-way line.
Comment Number: 2
Originated: 04/30/2018
The replat should also be dedicating a 9-foot utility easement behind the dedicated right of way. Parking lots may be
within the easement, as well as fences. Buildings and other structural items could not be in an easement.
Page 2 of 8
Response Number: 2
Dedication of additional 9 feet for a utility easement has been included in the replat.
Comment Number: 3
Originated: 04/30/2018
The site plan shows an access and utility easement. As it appears to be needed partially for PFA/emergency access, it
should be dedicated as an emergency access easement instead of an access easement. Note that these are not shown
on the plat, and could be dedicated via plat, otherwise they would need to be dedicated by separate document and
would require additional fees.
Response Number: 3
This has been also addressed in the replat.
Comment Number: 4
Originated: 04/30/2018
It should be noted that the construction of sidewalk improvements was indicated during the conceptual as not being
required with the specific telecommunication development proposal. Further redevelopment of the property would
require reevaluation and the likely requirement of the construction of sidewalk and ADA compliant access
improvements along Sharp Point Drive and Midpoint Drive.
Response Number: 4
Thank you and this has been noted.
Comment Number: 5
Originated: 04/30/2018
The development plan narrative indicate that the property is currently undeveloped, but I'm trying to reconcile how
there can be existing trailers, parking, and a building as well as a parking lot on undeveloped property.
Response Number: 5
The property is still undeveloped as there are no permanent structures. To clarify, the property owner does store
vehicles and trailers temporarily which can be moved to another location on property.
ENVIRONMENTAL PLANNING DEPARTMENT
Contact: Stephanie Blochowiak
Topic: General
Comment Number: 1
Originated: 04/23/2018
It appears there will be no impacts to existing trees along Sharp Point Drive and Midpoint Drive but please confirm.
Response Number: 1
The existing trees along Sharp Point Drive will not be impacted.
Page 3 of 8
Comment Number: 2
Originated: 04/23/2018
Consider planting southwest white pine instead of ponderosa pine as the former seem to do better long term in this
area.
Response Number: 2
We will be proposing Austrian Pines to augment the existing trees on the property.
Comment Number: 3
Originated: 04/23/2018
Consider addition of 2-3 native flowering shrubs for additional screening and enhancements mirroring Prospect
Ponds Natural Area.
Response Number: 3
Currently the property is underdeveloped and the property owner does not have permanent structures. The property
owner stores vehicles and trailers temporarily. At the time that the owner develops the property, additional flowering
shrubs can be added. Current design is for the newly installed trees to be watered by hand until additional
development occurs. Adding in 2-3 flowering shrubs at this time will not be watered adequately to keep them alive
and will instead need to be removed and replaced.
LIGHT AND POWER DEPARTMENT
Contact: Clint Reetz
Topic: General
Comment Number: 1
Originated: 04/16/2018
Electric facility takeoff point noted in the plans are accurate. Transformer location must be placed within 10ft of
drivable surface for installation and maintenance purposes. The transformer must also have a front clearance of 10ft
and side/rear clearance of 3ft minimum.
Response Number: 1
These requirements have been included in the plans.
Comment Number: 2
Originated: 04/16/2018
Please reference our policies, development charge processes, and use our fee estimator at
https://www.fcgov.com/utilities/business/builders and developers/plant investment development fees
Response Number: 2
Noted and thank you.
Comment Number: 3
Originated: 04/16/2018
Please provide a one-line diagram and a C 1 form to Light and Power Engineering. The C1 form can be found at:
http://zeus.fcgov.com/utils procedures/files/EngWiki/WikiPdfs/C/C 1Form.pdf. The C1 form will be used to
calculate capacity fees, the one-line diagram will be used for our electric design and meter shop approval.
Page 4 of 8
Response Number: 3
The C1 form will be sent separately directly to the Light and Power Engineering Department via Clint Reetz.
Comment Number: 4
Originated: 04/16/2018
Please send any questions and requested forms to creetz@fcgov.com
Response Number: 4
Noted and thank you.
PFA DEPARTMENT
Contact: Andrew Rosen
Topic: General
Comment Number: 1
Originated: 05/02/2018
To assist with prompt emergency response, a sign will be required on the street indicating the most appropriate route
to this site on the property.
Response Number: 1
A sign for emergency response outlining the route to the site will be included on the construction drawings.
PLANNING SERVICES DEPARTMENT
Contact: Jason Holland
Topic: General
Comment Number: 1
Originated: 05/02/2018
Sheet GN 1 is not necessary for City entitlement approval document. This would be more appropriate for your
construction set. The sheet can remain as long as it's clarified that the City notes take precedent if there are conflicts.
Response Number: 1
This has been noted on GN-1 at the bottom next to the New Lease and Easement Color Legend.
Comment Number: 2
Originated: 05/02/2018
Add CFC site plan and landscape plan general notes, available in Word on the City submittal documents web page.
https://www.fcgov.com/developmentreview/applications.php Down the page, under “PDP standard notes”. Also
add standard City signature blocks to cover page T 1. See examples.
Response Number: 2
The requested changes have been made.
Page 5 of 8
Comment Number: 3
Originated: 05/02/2018
Sheet L 1 – add landscape specification information for the plantings – see plant table example.
Response Number: 3
The requested changes have been made.
Comment Number: 4
Originated: 05/02/2018
Sheet L 1 – provide an additional note explaining how the new trees will be irrigated. If hand irrigated periodically,
provide details on who will be doing that and that it will be done regularly. I want to ensure that this is coordinated.
Automatic irrigation system would be preferred if possible. If not irrigated regularly the trees will not survive and will
need to be replaced.
Response Number: 4
Please see this same comment as listed above:
Currently the property is underdeveloped, and the property owner does not have permanent structures. The property
owner stores vehicles and trailers temporarily. At the time that the owner develops the property, additional flowering
shrubs can be added. Current design is for the newly installed trees to be watered by hand until additional
development occurs. Adding in 2-3 flowering shrubs at this time will not be watered adequately to keep them alive
and will instead need to be removed and replaced.
Comment Number: 5
Originated: 05/02/2018
Sheet L 1 add standard City Landscape Notes. You can add additional notes as long as they supplement, and don’t
conflict with the City notes. Sheet L 1 – include information on how the utility area surface will be restored or
treated, including areas that are visible from the street. Will this be planted with sod, seed, more rock mulch.
Response Number: 5
The requested changes have been made.
Comment Number: 6
Originated: 05/02/2018
Sheet Z 1 – show and label the linework that represents the existing curb/flowline on Midpoint Drive. There is a line
shown but not labelled. Also note in the bottom left of the page says sall be used, pls. correct to shall.
Response Number: 6
The requested changes have been made.
Comment Number: 7
Originated: 05/02/2018
Sheet Z 4 – Provide more specification information and /or photo specs on the branch and needle density, type,
color, and character. The drawings don’t provide enough information to ensure that the monopine will be realistic and
high quality.
Page 6 of 8
Response Number: 7
This information is included on a separate document from the manufacturer. At this time, it is suggested that the
monopine will be from Larson. Please note that the tree will be made to required specifications with approximately
160 – 210 branches that will be pyramidal in design as requested. Please see separate vendor specifications PDF
included with this narrative.
Comment Number: 8
Originated: 05/02/2018
Sheet Z 4 – The branching does not appear to cover the top tier of antennas. Show the branching be expanded here.
Also, the tree appears top heavy, is it possible to widen the base and make the tree more pyramidal in form similar to
evergreen trees typically seen in Fort Collins such as the Austrian Pines, Spruce and White Pines.
Response Number: 8
Please see Response 7 for comments.
Comment Number: 9
Originated: 05/02/2018
Sheet Z 4 The cabinets proposed, it looks like these will pop up over the wood fence and that they will be visible from
the street. Will these be painted? Would suggest looking at the Van Dyke Brown fence color, and the cabinet colors,
and making them a light matching color in the warm tan range, such as desert tan. This way the cabinets, steel canopy,
transformer and other visible utility appurtenances and the fence will all match and blend. The Van Dyke Brown is
probably too dark. Provide labels clarifying all that will be painted.
Response Number: 9
As requested the fence will be painted using Van Dyke Brown and the equipment, canopy and posts will be painted
Desert Tan as requested. Cabinets must remain manufacturer color as per warranty requirements.
Comment Number: 10
Originated: 05/02/2018
In addressing the comments above, please update the photo simulation to reflect the comments.
Response Number: 10
Photo Simulations have been updated to reflect above changes.
Comment Number: 11
Originated: 05/02/2018
With the photo simulation handout, the top of monopine is obscured in photos. Please adjust the photos so that the
entire monopine is shown.
Response Number: 11
Photo Simulations have been updated to reflect above changes.
STORMWATER ENGINEERING DEPARTMENT
Contact: Dan Mogen
Topic: General
Page 7 of 8
Comment Number: 1
Originated: 04/09/2018
The proposed site changes shown in this submittal are not substantial enough to trigger Stormwater requirements
beyond a grading plan. It appears these improvements can be installed with minimal impact to existing grading and
drainage patterns. Please confirm that existing grading and drainage patterns are being maintained with this
installation, and I will waive the grading plan requirement. If future submittals include site or grading changes that are
not shown on these plans, please contact Dan Mogen at (970)224 6192 or dmogen@fcgov.com to coordinate and
determine what requirements, if any, will apply.
Response Number: 1
The proposed installation will minimally impact the existing grading and drainage patterns and if in the future any
additional improvements are being proposed they will contact Stormwater Engineering.
Comment Number: 2
Originated: 04/09/2018
There is an adjacent development currently under review for 2601 Canton Court that has a proposed detention basin
on this property (2025 Sharp Point). Please show the proposed drainage easement for this detention basin on these
plans and confirm that the proposed basin and associated grading do not impact what is proposed with this wireless
telecommunications facility.
Response Number: 2
The 2601 Canton Court is owned by the same group. I spoke to Dan Bernth, one of the principals and they are not
moving forward with the development of 2601 Canton Court at this time and will not impact the proposed Verizon
site.
TECHNICAL SERVICES DEPARTMENT
Contact: Jeff County
Topic: General
NOTE: Comment Number 1 was not included on original May 04, 2018 document
Comment Number: 2
Originated: 04/27/2018
Please revise the legal description to match the replat submitted with this project.
Response Number: 2
The requested changes have been made.
Comment Number: 3
Originated: 04/27/2018
The Access/Utility Easement shown on the Site Plan (sheet Z 1) is not on the Subdivision Plat.
Response Number: 3
The requested changes have been made.
Page 8 of 8
Comment Number: 4
Originated: 04/27/2018
There are line over text issues. See redlines.
Response Number: 4
The requested changes have been made.
Comment Number: 5
Originated: 04/27/2018
There is text that needs to be masked. Mask all text in hatched areas. See redlines.
Response Number: 5
The requested changes have been made.
Comment Number: 6
Originated: 04/27/2018
Please clean up the fuzziness around the text and/or line work. See redlines.
Response Number: 6
The requested changes have been made.
TECHNICAL SERVICES DEPARTMENT
Contact: Jeff County
Topic: Plat
Comment Number: 1
Originated: 04/27/2018
Please make changes as marked. If changes are not made or you disagree with comments, please provide written
response of why corrections were not made. Please provide any responses on redlined sheets and/or in response
letter.
Response Number: 1
The requested changes have been made.
Thank you for your time and assistance in reviewing these responses. Again, if there are any questions or further
items for clarification, please feel free to contact me directly.
Sincerely,
Sarah Beckham
Site Acquisition Specialist
Pinnacle Consulting, Inc