Loading...
HomeMy WebLinkAboutVERIZON FTC PARKWOOD TELECOMMUNICATIONS FACILITY (WTF) - PDP/FDP - FDP180012 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject Routing Sheet New: Revision: X Project Name: Project Type: Project Number: Items for New Projects & Resubmittals Final Redlines Date Received: Review Round: Planner: Engineer: # Label Sets Needed (1,2,3….): N/A Labels Received Y/N: Y //////// RETURN ALL REDLINES 11 11 1 11 1 11 1 11 1 11 1 11 1 11 1 07707100000000100000Revised: 1-29-2016 PPPPPPPPPPPPPP PPPPP Traffic Study / Parking Study Utility Plans Planning Objectives Comment Response Letter Plan Set sheets T1-Z4 Landscape Plan New projects: APO labels & list: Holland Virata Wetland Delineation (plans) Ecological Study (ECS) Hazmat Review Soils Study- New/Update Digital copy of all materials L.U.C. Mod. Requests Drainage Report Variance Requests Easements (As Needed) SWMP (Erosion Report) Utility Plan Site Plan Landscape Plan Plat Building Elevations Item Waived(W); Deferred (D); or n/a File: Project Planner Building Inspection Century Link Comcast Development Review Engineering Economic Development Environmental Planner Forestry GIS Historic Preservation CFC Light & Power Neighborhood Services Park Planning Pavement Management Post Office Poudre Fire Authority Real Estate Planning Outside Agency Sanitation Dist: N/A Outside Agency Water District: N/A Street Oversizing Technical Services Traffic Operations Transfort Transportation Planning Water Conservation Received: County Assessor CDOT Ditch Co: N/A Railroad: ___________________ School District Other: 2 Total: Format Required: (P)aper, Digital (CD) Xcel Energy Zoning City Water Utilities Eng. (Stormwater) City Erosion Control (SWMP Review) Lighting Plan Plat Photo Simulations Lighting Plan Drainage Report Turnaround Time: 3 weeks Comments Due: Verizon Parkwood WTF Final Development Plan FDP180012