HomeMy WebLinkAboutVERIZON FTC PARKWOOD TELECOMMUNICATIONS FACILITY (WTF) - PDP/FDP - FDP180012 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject Routing Sheet New: Revision: X
Project Name:
Project Type:
Project Number: Items for New Projects & Resubmittals Final Redlines
Date Received:
Review Round:
Planner:
Engineer:
# Label Sets Needed (1,2,3….): N/A
Labels Received Y/N: Y
//////// RETURN ALL REDLINES
11 11 1
11 1
11 1
11 1
11 1
11 1
11 1
07707100000000100000Revised: 1-29-2016
PPPPPPPPPPPPPP PPPPP
Traffic Study / Parking Study
Utility Plans
Planning Objectives
Comment Response Letter
Plan Set sheets T1-Z4
Landscape Plan
New projects: APO labels & list:
Holland
Virata
Wetland Delineation (plans)
Ecological Study (ECS)
Hazmat Review
Soils Study- New/Update
Digital copy of all materials
L.U.C. Mod. Requests
Drainage Report
Variance Requests
Easements (As Needed)
SWMP (Erosion Report)
Utility Plan
Site Plan
Landscape Plan
Plat
Building Elevations
Item Waived(W); Deferred (D); or n/a
File: Project Planner
Building Inspection
Century Link
Comcast
Development Review Engineering
Economic Development
Environmental Planner
Forestry
GIS
Historic Preservation
CFC Light & Power
Neighborhood Services
Park Planning
Pavement Management
Post Office
Poudre Fire Authority
Real Estate Planning
Outside Agency Sanitation Dist: N/A
Outside Agency Water District: N/A
Street Oversizing
Technical Services
Traffic Operations
Transfort
Transportation Planning
Water Conservation
Received:
County Assessor
CDOT
Ditch Co: N/A
Railroad: ___________________
School District
Other:
2
Total:
Format Required: (P)aper, Digital (CD)
Xcel Energy
Zoning
City Water Utilities Eng. (Stormwater)
City Erosion Control (SWMP Review)
Lighting Plan
Plat
Photo Simulations
Lighting Plan
Drainage Report
Turnaround Time: 3 weeks Comments Due:
Verizon Parkwood WTF
Final Development Plan
FDP180012