September 26, 2018
Courtney Lockwood
4045 STONEY CREEK DR
Fort Collins, CO 805255651
RE: Vintage Marketplace, MA180059 / BDR180024, Round Number 2
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of Vintage Marketplace. If you have questions about any comments, you may contact the individual
commenter or direct your questions through your Development Review Coordinator, Brandy Bethurem Harras, at
970-416-6689 or bbethuremharras@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Morgan Uhlman, 970-416-4344, muhlman@fcgov.com
Topic: General
Comment Number: 1 MA
09/04/2018: From the letter that was sent to Kimberly Mary on March 6, 2018, the payment in lieu and
construction of Aran street will be deferred. This will require the owner/developer to enter into a development
agreement with the City.
This process is underway.
Comment Number: 2 MA
09/04/2018: There is a payment in lieu required before first building permit for the College frontage which an
estimate was provided to Kimberly Mary dated 3/20/2018. This will be addressed in the development agreement
with the owner/developer as well.
This process is underway.
Comment Number: 3 MA/1 BDR
09/25/2018: The right-of-way shown to be dedicated for Aran St is still 33' on the subdivision plat submittal.
Please increase this to 36'.
This has been corrected on the Plat to match the site plan.
09/04/2018: There is an accepted cross section for Aran St that is not in the Larimer County Urban Area Street
Standards currently and would require an additional 3' of right-of-way to be dedicated on this property for Aran St
to bring the total right-of-way dedication to 36'.
2
Comment Number: 3 BDR
09/06/2018: For final plat submission please use the following links, the first is a check list of what needs to be
submitted with the plat, and the second are the AutoCad drawing requirements
: https://www.fcgov.com/developmentreview/pdf/electronic_final_plat_submittal_req.pdf
https://www.fcgov.com/developmentreview/files/digitalsubmittalstandards.pdf
Thank you for the information.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Plat
Comment Number: 1 BDR
09/25/2018: Please make changes as marked. If changes are not made or you disagree with comments, please
provide written response of why corrections were not made. Please provide any responses on redlined sheets
and/or in response letter.
09/03/2018: Please make changes as marked. If changes are not made or you disagree with comments, please
provide written response of why corrections were not made. Please provide any responses on redlined sheets
and/or in response letter.
To the best of my knowledge, and after reviewing the drawing, these changes have been corrected on the Plat.
Department: Internal Services
Contact: Jonathon Nagel, jnagel@fcgov.com
Topic: General
Comment Number: 2 MA
09/17/2018: Please provide a detail or narrative on the site plan describing the construction of the
gate/hinges/latch as agreed upon per our conversation.
The details for the trash enclosure are shown on Sheet 2of2 Detail 3. The detail plan and elevations on this sheet
describe the construction of the gate/hinges/latch as agreed upon per our conversation.
Department: Forestry
Contact: Molly Roche, 224-616-1992, mroche@fcgov.com
Topic: Landscape Plans
Comment Number: 2 MA / BDR
9/18/2018: An email was sent to Courtney Lockwood to clarify if there is a tree proposed on the west side of the
building. There is a symbol shown that typically dictates a tree, but no species abbreviation was called out.
Please clarify.
The detail plan for this is on Sheet 2of2 Detail 2.
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
Topic: General
Comment Number: 1 MA / BDR
09/03/2018: No comments.
Thank you
3
Department: PFA
Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.org
Topic: General
Comment Number: 1 BDR
08/31/2018: PFA has no comments on the Plat of this parcel. PFA has comments on this site MA180059 (all
Minor Amendment comments have been resolved)
Thank you
Department: Light And Power
Contact: Austin Kreager, 970-224-6152, akreager@fcgov.com
Topic: General
Comment Number: 1 MA
08/08/2018: It is the understanding of Light and Power that this minor amendment will not cause a change to the
electric capacity needs or the location of our facilities. If this an incorrect understanding or if plans change, please
contact me directly at akreager@fcgov.com or (970)224-6152. Thank you.
Comment Number: 1 BDR
09/04/2018: It is the current understanding of Light and Power that there are no electrical changes or upgrades
anticipated for the proposed BDR. If this changes, please contact us as soon as possible so that we can work
with you to find solutions and calculate fees.
Comment Number: 2 BDR
09/04/2018: Please contact Light & Power Engineering if you have any questions at 221-6700. Please reference
our policies, development charge processes, and use our fee estimator
at http://www.fcgov.com/utilities/business/builders-and-developers.
Thank you for this information.