Loading...
HomeMy WebLinkAboutMONTAVA PUD - ODP - ODP180002 - MONTAVA SUBMITTAL DOCUMENTS - ROUND 1 - VARIANCE REQUESTOctober 22, 2018 Chad Crager Engineering Department Manager City of Fort Collins 281 North College Avenue Fort Collins, Colorado 80524 RE: Montava PUD – Larimer County Urban Area Street Standards (LCUASS) Variance Requests Dear Mr. Crager, Variance Request No.1: The Montava PUD Master Plan includes deviations from the standard street cross-sections as outlined in Chapter 7 Street Design and Technical Criteria, Figures 7-1F through 7-13F, Street Cross-sections. The requested deviations to the street cross-sections are to accommodate specific site conditions and the block patterns envisioned for the Montava project. Exhibits of the proposed street cross-sections are attached to this letter in support of this variance request. Variance Request No.2: The modified street grid within the Montava PUD Master Plan includes some streets that intersect at greater than 100 degrees. With deliberate access control and design control within sight distance triangles, these intersections can enhance visibility and intersection safety. The Montava PUD Master Plan requests a variance to the standards outlined Chapter 8 – 8.2.3 - Angle of Intersection which requires that crossing roadways should intersect at 90 degrees whenever possible. In no case shall they intersect at less than 80 degrees or more than 100 degrees. Exhibits of the proposed non-standard Intersections are attached to this letter in support of this variance request. Sincerely, Peter Buckley, PE Attachments: Montava PUD Street Cross-Sections Montava PUD Non-standard Street Intersections Sheet Number: Project Number: Project: Client: /USERS/MATT/ELC/SHARED/PROJECTS-2015_2019/1725-MONTAVA/1725-02-FILES/1725-MASTERPLAN/01-RESOURCE/TITLE_BLOCK/PUD_SUBMITTAL/24X36_TITLE_BLOCK_PUD_CONSULTANT.DWG Plot Date:9/13/2018 10:34 AM Plotted By: Matthew Lambert Date Created:9/13/2018 Produced by: Date: Revision & Date: X.X. X.X.XXX 1734 HF2M MONTAVA MONTAVA OVERALL UTILITY PLAN PUD MASTER PLAN 10/23/18 DPZ CODESIGN STREET TYPES AND LOCATIONS COLLECTOR ROADWAYS 4 T5 and T4 land use context <- | -> T3 and T2 land use context ARTERIAL ROADWAYS 2a 2b Minor Collector Right-of-way: 80’ Roadway: 54’ Mountain Vista from Timberline to Giddings (optional median) Right-of-way: 115’ Roadway: 84’ Mountain Vista from Giddings eastward (optional median) Right-of-way: 115’ Roadway: 84’ 3b Giddings from Mountain Vista north (optional median) Right-of-way: 93’ Roadway: 61’ 3a Giddings from Mountain Vista north; Mountain Vista from Timberline westward; Timberline from Mountain Vista to Country Club Rd Right-of-way: 84’ Roadway: 52’ Mountain Vista from Timberline to Giddings Right-of-way: 102’ Roadway: 74’ 1a Mountain Vista from Giddings eastward Right-of-way: 102’ Roadway: 74’ 1a # ROW ROADWAY TYPE 1 [102] [74] 4-lane Arterial 2 [115] [84] 4-lane Arterial (optional median) 3a [84] [52] 2-lane Arterial 3b [93] [61] 2-lane Arterial (optional median) 4 [80] [54] Minor Collector 5a [82] [52] Commercial Local 5b [66] [36] Commercial Local 6 [50-60] [27-30] Residential Local 7a [60] [36] Connector Local 7b [66 exl. Green] [48] Connector Local w/ Green 8 [68 + Green] [40 exl. Green] Local Paired w/ Green 9 [66] [44] Industrial Local 10 [51] [Varies] Home Zone 0’ 200’ 400’ 600’ 800’ 1,600’ 4 7a Sheet Number: Project Number: Project: Client: /USERS/MATT/ELC/SHARED/PROJECTS-2015_2019/1725-MONTAVA/1725-02-FILES/1725-MASTERPLAN/01-RESOURCE/TITLE_BLOCK/PUD_SUBMITTAL/24X36_TITLE_BLOCK_PUD_CONSULTANT.DWG Plot Date:9/13/2018 10:34 AM Plotted By: Matthew Lambert Date Created:9/13/2018 Produced by: Date: Revision & Date: X.X. X.X.XXX 1734 HF2M MONTAVA MONTAVA OVERALL UTILITY PLAN PUD MASTER PLAN 10/23/18 DPZ CODESIGN 7a T5 and T4 land use context <- | -> T3 and T2 land use context 6 8 LOCAL ROADWAYS 5a 6 T4 and T3 land use context <- | -> T2 land use context 5b 8 T5 land use context <- | -> T4 and T3 land use context 7b T5 land use context <- | -> T4 and T3 land use context SPECIAL LOCAL ROADWAY CONDITIONS 10 STREET TYPES AND LOCATIONS Connector Local Right-of-way: 60’ Roadway: 36’ Residential Local (without alley) Right-of-way: 53’ Roadway: 30’ Industrial Local Right-of-way: 66’ Roadway: 44’ Residential Local (with alley) Right-of-way: 50’ Roadway: 27’ Commercial Local (with bike lanes) Right-of-way: 82’ Roadway: 52’ Commercial Local (without bike lanes) Right-of-way: 66’ Roadway: 36’ Local Paired around a Green Right-of-way: Varies Roadway: 40’ Connector Local with an Attached Green Right-of-way: 66’ Roadway: 48’ Home Zone Right-of-way: 51’ Roadway: Varies 12b EXHIBIT - VARIANCE REQUEST NO. 2 6 7a 5b 5b 7a 7a 6 6 6 7a 7a 6 8 8 8 8 6 8 10 10 10 7a 10 5b 5b 10 10 10 10 10 10 8 8 8 6 6 9 5b 4 5a 4 4 5b 5b 4 1b 6 7a 6 7b 6 6 6 7b 8 7a 6 1a/2a 10 10 10 6 8 4 7a 7a 4 10 6 6 3a 4 3a 7b 7b 7a 7a 7a 6 7a 10 10 8 6 7a 7a 5b 7a 6 7a 1b/2b 3a / 3b 3a 12a