HomeMy WebLinkAboutFTC FOXSTONE, WTE (VERIZON) - PDP - PDP180007 - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTS16035 Table Mountain Pkwy
Golden, CO 80403
P: 303-993-3293 / F: 303-993-3019
Re:
FTC FOXSTONE
Dated: 10/05/2018
Project: 3 Leg Tower Cell Site
Job Address: 1961 Caribou Dr., Ft. Collins, CO. 80525
To: Brandy Bethurem Harras
Development Review Coordinator
City of Fort Collins Community Development & Neighborhood Services
281 N. College Ave. Fort Collins, CO 80524
Hello Brandy,
We are sending you this narrative pertaining to the Drawing Revisions you requested below:
As Noted:
RE: FTC FOXSTONE, PDP180007, Round Number 1
Comment Summary:
Department: Engineering Development Review
Contact: Morgan Uhlman, 970-416-4344, muhlman@fcgov.com
Topic: General
Comment Number: 1
07/10/2018: Please add construction notes (Appendix E-1 and E-2) from the Larimer County
Urban Area Street Standards. This link will take you to them.
https://www.larimer.org/sites/default/files/apdxe.pdf
Comment Number: 2
07/10/2018: A few questions/comments regarding the easements shown on sheet 4:
1. Are these public easements?
[RESPONSE] No Easements are required in the Right-of-Way as part of this submittal. All
Easements shown are on the subject property and private between the Property owner and
Verizon only.
2. These can't be dedicated through a utility plan set, they need to be dedicated by separate
document or by platting. If these are private easements, Engineering would like to see the
recording number that the easement was agreed too before the project is approved. If these are
public easements, then they need to follow the City's procedure for dedication by separate
document located at this link:
https://www.fcgov.com/engineering/devrev.php
[RESPONSE] Not Needed
Comment Number: 3
07/10/2018: Please add the following note to Sheet 6 of your utility plan set: "Any damaged curb,
gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters,
destroyed, damaged or removed due to construction of this project, shall be replaced or restored
to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed
improvements and/or prior to the issuance of the first Certificate of Occupancy."
[RESPONSE] Note Added to Site Plan
16035 Table Mountain Pkwy
Golden, CO 80403
P: 303-993-3293 / F: 303-993-3019
Comment Number: 4
07/10/2018: Please see redlines for additional comments.
[RESPONSE] Revised as requested
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
Topic: General
Comment Number: 1
07/17/2018: Generally, an Ecological Characterization Study (ECS) is required by City of Fort
Collins Land Use Code (LUC) Section 3.4.1 as the site is within 500 feet of LUC defined natural
habitats and features (wetlands). However, as the proposal for a cell tower is on northeast corner
of parcel and the minimum and the minimum buffer setback is being maintained, the ECS is
waived for this site. However, if landscape updates are required, please consider the use of native
plants to complement the natural feature.
[RESPONSE] No action required
Comment Number: 2
07/17/2018: It appears trees may be impacted. LUC Section 3.2.1(C) requires developments to
submit a landscape and tree protection plan, and if receiving water service from the City, an
irrigation plan, that: "... (4) protects significant trees, natural systems, and habitat, and (5)
enhances the pedestrian environment. " Note that a significant tree is defined as one having DBH
(Diameter at Breast Height) of six inches or more. If trees may be impacted then a review of trees
shall be conducted with Ralph Zentz, Senior Urban Forester (970-221-6302 or
rzentz@fcgov.com) to determine the status of existing trees and any mitigation requirements that
could result from the proposed development.
[RESPONSE] No action required
Department: Forestry
Contact: Molly Roche, mroche@fcgov.com
Topic: Landscape Plans
Comment Number: 1
7/9/2018: There appears to be existing trees on-site, and a few that are in close proximity to the
proposed wireless communications device. Please include the City of Fort Collins tree protection
notes to the site plan, which are available from City Forestry or the project planner. In addition,
please schedule an on-site meeting to obtain tree inventory and mitigation information if there are
any proposed or expected impacts to existing trees.
[RESPONSE] Verizon will pay the fee to offset the removal of the tree on site.
Department: Light and Power
Contact: Austin Kreager, akreager@fcgov.com
Topic: General
Comment Number: 1
07/17/2018: The property is being fed by a single phase, 25kVA transformer. If this cell site
requires any change to this configuration, the applicant will be responsible for all costs associated
with that modification.
[RESPONSE] Understood. We have contacted Austin and at this point he believes we are ok
Comment Number: 2
07/17/2018: Please ensure that the utility easement covers the entire run from our transformer to
the new cell location.
[RESPONSE] Easement extended to edge of Transformer
Comment Number: 3
07/17/2018: Your plans show that Xcel Energy is the power company that you will be working
with. That is incorrect. This is an area served by Fort Collins Light and Power.
[RESPONSE] Reference Corrected and Austin’s Contact Info added to Utility Coordination Plan
16035 Table Mountain Pkwy
Golden, CO 80403
P: 303-993-3293 / F: 303-993-3019
Comment Number: 4
07/17/2018: This is a commercial electric service. Therefore, we will not be running the service
from the transformer to the cell site. Your plans note that it will be run (by others). We will not be
those "others".
[RESPONSE] Verizon will extend the conduits and conductors from the Transformer to the
Service Panels
Comment Number: 5
07/17/2018: Please provide a one line diagram and a C-1 form to Light and Power Engineering.
The C-1 form can be found at: http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-
1Form.pdf
[RESPONSE] Drawing and C-1 form Provided to Austin
Comment Number: 6
07/17/2018: Any changes to the existing electric capacity and or location will initiate electric
development and system modification charges. Please coordinate power requirements with Light
and Power Engineering at 221-6700.
[RESPONSE] Understood. We have contacted Austin and at this point he believes we are ok
Comment Number: 7
07/17/2018: You may contact FCU Light & Power, project engineering if you have questions.
(970) 221-6700. You may reference Light & Power’s Electric Service Standards at
http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandards_FINAL_18Nove
mber2016_Amendment.pdf. You may reference our policies, development charge processes,
and use our fee estimator at: http://www.fcgov.com/utilities/business/builders-and-developers.
[RESPONSE] Understood
Department: PFA
Contact: Andrew Rosen, arosen@fcgov.com
Topic: General
Comment Number: 3
7-18-18 UPDATE BATTERY STORAGE SYSTEMS
Stationary storage battery systems used for standby power and having an electrolyte capacity in
excess of 50 gallons of stationary lead acid or 1,000 lbs. lithium ion shall comply with Section 608
and Table 608.1 of the International Fire Code. Battery storage systems triggering fire code
compliance shall be reviewed and approved by PFA prior to install.
[RESPONSE] Total Electrolyte Capacity of Backup Batteries = 21.10 gal.
Department: Planning Services
Contact: Clay Frickey, 970-224-6045, cfrickey@fcgov.com
Topic: General
Comment Number: 1
07/16/2018: The proposal as shown with the antennas exposed does not meet Land Use Code
section 3.8.13(C) (15), which requires the facility to employ stealth technology to blend into the
neighborhood. We had discussed using a slimline tower design but with the antennas still being
screened and housed within the tower. Is this still an option? If not, please explore some other
tower design that fully encloses the antennas and screens them from view.
[RESPONSE] We have returned to the original 3-Leg Tower with Concealment Panels to screen
the antennas and related equipment
07/16/2018: Is this facility colocatable? Land Use Code section 3.8.13(B) requires facilities to
allow multiple carriers. Would this site accommodate another carrier? You will need to provide
some documentation about the possibilities of colocating another carrier on this site and also
include a note on the site plan indicating another carrier may be able to locate on this facility.
[RESPONSE] There is space in the Tower for Future Carriers antennas, but equipment space
would need to be between that carrier and the Landlord.
16035 Table Mountain Pkwy
Golden, CO 80403
P: 303-993-3293 / F: 303-993-3019
Comment Number: 3
07/16/2018: Section 3.8.13(C)(5) requires the fencing for ground equipment to be opaque. It
appears the fencing proposed would match the existing fencing of the site, which is not opaque.
You will need to explore either adding landscaping and submitting a landscape plan to screen the
ground equipment or a fence style that is more opaque and fully screens the ground equipment.
[RESPONSE] Fencing has been changed to Dog Eared Cedar
Department: Stormwater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
Comment Number: 1
07/09/2018: There is an existing storm pipe/system at the north end of the proposed trench.
Please show this storm system on the plans and confirm this trench will be hand-dug (or other
considerations made) so the existing pipe is not disturbed or damaged.
[RESPONSE] 8” PVC Pipe located on plans, as well as areas that need to be hand dug
Comment Number: 2
07/09/2018: The proposed site changes shown in this submittal are not substantial enough to
trigger Stormwater requirements; therefore, no requirements apply at this time. If future submittals
include site or grading changes that are not shown on these plans, please contact Dan Mogen at
(970)224-6192 or dmogen@fcgov.com to coordinate and determine what requirements, if any, will
apply.
[RESPONSE] No Action Needed
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: General
Comment Number: 1
07/10/2018: Please revise the legal description as marked. See redlines.
[RESPONSE] Revised as requested
Comment Number: 2
07/10/2018: There is a sheet missing from the sheet index.
[RESPONSE] Revised as requested
Comment Number: 3
07/10/2018: All plan sheets must be 24"x36".
[RESPONSE] Revised as requested
Brad Bryant
A & E PROJECT MANAGER
CENTERLINE SOLUTIONS
16035 Table Mountain Parkway
Golden, CO 80403
Phone: 303.993.3293 x1383
Mobile: 720.284.8628